Itron 100GDLAN AMR transceiver device for utility meters User Manual

Itron Inc AMR transceiver device for utility meters 100G Datalogging Installation Guide Direct Mount

a href="https://usermanual.wiki/Itron" itemprop="url"> Itron >

Users Manual 3

 TDC-0823-005     100G Datalogging Installation Guide - Direct Mount  28   Proprietary and Confidential     This chapter provides the instructions to install the 100G Datalogging gas endpoint on an Itron/Sprague Meter.   Note  Itron/Sprague meters are also known as Actaris and Schlumberger meters. For these instructions, all meters are referred to as Itron/Sprague meters.  To remove the index from the meter 1. Remove the index cover screws and the index cover from the Itron/Sprague meter. Examine the mounting screws. If they are 5/8" long and not corroded, keep them to re-attach the 100G Datalogging gas endpoint assembly. If the screws are not the correct length or if the screws are corroded, discard.    Note Use the removed index cover as a temporary storage container for screws. Properly dispose all unused screws, old index covers, gaskets, tamper seals, and other leftover materials. Do not leave materials on customer premises.  CH A P T E R   4  Itron/Sprague Meter Installation
Itron/Sprague Meter Installation   TDC-0823-005     100G Datalogging Installation Guide - Direct Mount  29   Proprietary and Confidential     2. Loosen the index mounting screws 1/2 to one turn. Slide the index to the left and off the mounting screws and remove from the meter.     Set the index aside where it will not be damaged or fill with dirt, rain or snow. The index is mounted in the endpoint later in this procedure. Verify the index mounting screws are 1/4" long and not corroded. If the screws are the correct length and not corroded, retain for later use. If the original screws are discarded, use the correct replacement screws (see Installation Prerequisites on page 7). 3. Remove the old gasket, gasket residue, and dirt from the meter (if applicable). The meter face must be free of gasket residue or dirt before you install the 100G Datalogging gas endpoint.    To assemble the 100G Datalogging gas endpoint and index 1. Separate the 100G Datalogging gas endpoint housing from the cover by pulling the cover straight out from the housing. Set the endpoint cover aside where it will not be damaged or fill with rain, dirt or snow. You will use the cover later in this installation procedure.
Download:
Mirror Download [FCC.gov]
Document ID1367891
Application ID75C9L9s3mtpSn3UxVraWCA==
Document DescriptionUsers Manual 3
Short Term ConfidentialNo
Permanent ConfidentialNo
SupercedeNo
Document TypeUser Manual
Display FormatAdobe Acrobat PDF - pdf
Filesize236kB (2949956 bits)
Date Submitted2010-10-28 00:00:00
Date Available2010-10-29 00:00:00
Creation Date2010-07-28 11:36:50
Producing SoftwareMicrosoft® Office Word 2007
Document Lastmod2010-09-15 13:45:04
Document Title100G Datalogging Installation Guide - Direct Mount
Document CreatorMicrosoft® Office Word 2007
Document Author: TDC-0823-005
FCC ID Filing: EWQ100GDLAN

Navigation menu