NCR Voyix 7710GA2 Electronic Pricing Transmitter User Manual

NCR Corporation, RSD - Atlanta Electronic Pricing Transmitter Users Manual Cover

a href="https://usermanual.wiki/NCR-Voyix" itemprop="url"> NCR Voyix >

Chapter 2

Pre-Installation ProceduresOverview of the Installation ProcessThis chapter provides an overview of the planning and installationprocesses. The basic steps are:• Survey the site and develop an installation plan based on thecustomer’s needs• Develop SmarTalker overlays• Contract the purchase of SmarTalker mounting rails and clips, andschedule labor for installation, or purchase SmarTalker II mountingclips from NCR and schedule contract labor for clip installation• Install the DecisioNet hardware and DecisioNet software• Install the SmarTalker tags• Validate the quality of installation Note:  This chapter provides an overview and does not contain everydetailed step for every installation. An NCR representative will workwith each customer to address every detail of a particular installation.2
2-2 Pre-Installation Procedures Phase 1: Survey Site and Plan the Installation Once the customer has requested installation services, a number ofactivities are required. These activities consist of gathering, recording,and preparing information for presentation to the customers and theDecisioNet support team. The information gathered is used toformulate a strategy and identify the steps necessary to create a properenvironment for operation of the DecisioNet System. Phase 1 consists of the following tasks:• Meet with the customer to determine requirements• Survey the site• Develop Software Integration plan (pilot only)• Determine overlay design (Refer to the next section, “Phase 2: Scanthe Site and Develop SmarTalker Overlays.”)• Determine a Hardware Installation Plan. (This includes CBSs,cabling, SmarTalkers, rails and clips, and all other relatedhardware components.)• Establish an Installation Schedule• Prepare a site installation plan• Confirm the schedule with Manufacturing• Review the plan with the customerNote:  For more information on Phase 1 tasks, see your NCRrepresentative and reference the DecisioNet System ImplementationGuide (497-0002329). For more information on site certification, seeyour NCR representative and reference the following documents:• B005-0000-1138: DecisioNet Support Tools Reference Guide(document)• G370-1182-0000: EPL Implementation Package for Windows 95/NT(disk media containing the EPL RF Certification Package)
Download:
Mirror Download [FCC.gov]
Document ID47889
Application IDBlybQxAd1JNvB93b2sEg3A==
Document DescriptionChapter 2
Short Term ConfidentialNo
Permanent ConfidentialNo
SupercedeNo
Document TypeUser Manual
Display FormatAdobe Acrobat PDF - pdf
Filesize1.67kB (20897 bits)
Date Submitted1999-07-14 00:00:00
Date Available1999-09-22 00:00:00
Creation Date2001-06-11 10:54:40
Producing SoftwareAcrobat Distiller 4.0 for Windows
Document Lastmod2001-06-11 10:54:41
Document TitleChapter 2
FCC ID Filing: JEH7710GA2

Navigation menu