Sanyo Electric Co NPM-2000-C310 NPM-2000 Wireless Base Station User Manual NPM2 Installation Procedures 1600 mmds NPM2

Sanyo Electric Co Ltd NPM-2000 Wireless Base Station NPM2 Installation Procedures 1600 mmds NPM2

Contents

Users Manual Part I

Download: Sanyo Electric Co NPM-2000-C310 NPM-2000  Wireless Base Station User Manual NPM2 Installation Procedures 1600 mmds NPM2
Mirror Download [FCC.gov]Sanyo Electric Co NPM-2000-C310 NPM-2000  Wireless Base Station User Manual NPM2 Installation Procedures 1600 mmds NPM2
Document ID707402
Application IDWHT94qg/v1UhoH6lqR7AsQ==
Document DescriptionUsers Manual Part I
Short Term ConfidentialNo
Permanent ConfidentialNo
SupercedeNo
Document TypeUser Manual
Display FormatAdobe Acrobat PDF - pdf
Filesize89.83kB (1122890 bits)
Date Submitted2006-09-21 00:00:00
Date Available2006-09-21 00:00:00
Creation Date2006-08-03 16:13:36
Producing SoftwareAcrobat Distiller 7.0.5 (Windows)
Document Lastmod2006-08-03 16:13:36
Document TitleNPM2 Installation Procedures_1600_mmds NPM2.book
Document CreatorPScript5.dll Version 5.2
Document Author: noria

Macro Base Station Installation
Procedures (NPM-2000)
Release 2.1
Part ####### revision 001-Prelim
August 3, 2006
Copyright 2006 SOMA Networks, Inc.
SOMA Networks, Inc.
185 Berry Street
Suite 4600
San Francisco, CA 94107
U.S.A.
Phone +1.415.882.6500
Fax +1.415.882.6501
SOMA, SOMA Networks, SOMAport, SoftAir, and the star-and-circle design are trademarks or registered trademarks of SOMA
Networks, Inc in the United States and other countries. All SOMA Networks product names are trademarks of SOMA Networks, Inc.
All other company and product names may be trademarks or registered trademarks of their respective owners.
Products and services of SOMA Networks, Inc. may be protected by one or more pending or issued U.S. or foreign patents.
SOMA Networks, Inc. assumes no responsibility for the accuracy or completeness of the information presented or for any use of the
information contained in this document. SOMA Networks, Inc. reserves the right to, without notice, make changes to its products as
progress in engineering or manufacturing methods or circumstances may warrant.
FCC Warning
This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to Part 15 of the FCC Rules.
These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a
commercial environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in
accordance with the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a
residential area is likely to cause harmful interference, in which case the user will be required to correct the interference at his or her
own expense.
Any unauthorized product changes or modifications will invalidate warranty and all applicable regulatory certifiations and approvals.
PREFACE
Chapter 0
This book explains how to install a SOMA NPM-2000 macro base station. Installation includes
installing the rack, connecting the base station to the network core, and powering on the system.
This book is intended for field technicians with experience installing and configuring telecommunications equipment at cellular base stations and network operations centers.
Related Documentation
SOMA Documentation Suite
Table 1 shows the guides in the SOMA service provider documentation suite.
Book
Description
Alarms and Events Reference
Comprehensive list of alarms and events
Core Server Installation Procedures
Procedures for installing and maintaining a core server
Diagnostics Reference
Description of the diagnostics
Macro Base Station Installation Procedures
Procedures for installing a base station
Macro Base Station Maintenance Procedures
Procedures for performing preventive and corrective maintenance on a
base station
Macro Base Station Provisioning Procedures
Procedures for provisioning base station equipment after installation
Network Core Provisioning Procedures
Procedures for provisioning core equipment after installation
SIG Installation and Configuration Procedures
Procedures for installing and configuring SOMA home agent and access
servers
System Administration Reference
Description of utilities and administration activities
System Deployment Planning Guide
Information required when deploying the system
System Overview
Complete solution overview
Table 1
2006/8/3
Customer Documentation Components
Part ####### revision 001
Preface
Third-Party Documentation
Table 2 shows third-party documents that provide additional information which may be useful when
installing the base station.
Document
Description
Central Office Environment Installation/Removal
Generic Requirements (GR-1275-CORE)
Available from Telcordia Technologies, Inc. Provides generic installation requirements for telecommunication suppliers and carriers.
Flex21 System User Manual
Available from Continuous Computing Corporation. Provides installation, configuration, and operational information about the digital shelf.
FlexCompute cPCI-OCM1113 User Manual
Available from Continuous Computing Corporation. The manual
describes the processor cards in detail.
Table 2
Third-Party Documentation
Conventions
This section outlines the conventions used in this guide.
Measurement Conventions
Measurements in this guide are expressed according to the System International d’Unites (SI) standards for metric units and abbreviation. Equivalent Imperial measurement (used in the United States)
are provided in parentheses, except when Imperial is the international standard.
Bits and Bytes
For clarity, bits and bytes are not abbreviated in this document, but their prefixes are. SOMA Networks follows the common practice of using SI prefixes (base 10) with these terms. Thus, 1 kbit/s
(kilobit per second) is equivalent to 1000 bits/s; it should not be confused with 1 Kibit/s (kilobinary
bit per second) or 1 x 210 =1024 bits/s.
Unless otherwise specified, SI prefixes with bits and bytes in this document refer to a power of 10.
Typographical Conventions
Table 3 shows how different fonts are used throughout this guide.
Font
Usage
Example
Courier
System output and all things involving source code
(commands, samples, methods, functions, objects,
variables, types, constants, fields, properties, and
structures)
echo “NETWORKING=yes
HOSTNAME=soma
GATEWAY=10.110.0.1”
User-keyed commands
eject cdrom
Arial gray
Interface objects: buttons, links, fields, and drop-down
list names
Click OK.
Italics
Anything that appears as part of the file system, such
as files, applications, paths, directories, libraries,
scripts, daemons, devices, and commands with
parameters when used as a noun
Data is in subscribers/billing
Courier bold italic
Placeholders in commands
boot cdrom -install arg
Courier italic
Placeholders in code
n urn:soma:dialplan:domain
Courier bold
Table 3
2006/8/3
All devices use devfs.
Display Font Usage
Part ####### revision 001
Macro Base Station Installation Procedures (NPM2000)
Table 4 shows the meaning of symbols used in procedures throughout this guide.
Symbol
Meaning
Example
↵
Indicates that you should press the Return, or Enter, key
su admin ↵
In a keystroke combination, indicates that you should
press the keys simultaneously
Control+Alt+Delete
In a keystroke combination, indicates that you should
press the keys consecutively
Control, Shift, q
→
Indicates that you should choose a menu option or a submenu
Table 4
Choose File→Import→Formats
Symbols Used in Procedures
Special Information
Information of special importance is highlighted in the text using indentation and icons. The following examples show the special information types used in the document. They are listed in ascending
order of importance.
N O T E : A note contains information of special interest.
C A U T I O N : A general caution is shown when there is a risk of affecting service.
W A R N I N G : A general warning is shown when there is a risk of personal injury
from a nonelectrical hazard or a risk of irreversible damage to data, software, or the
operating system.
W A R N I N G : An electrical warning is shown when there is danger of physical
harm to a person or damage to equipment due to electrical hazard.
Part ####### revision 001
2006/8/3
Preface
Document Change History
Table 5 shows the change history for this document.
Revision
Date
001-Draft
July 14, 2006
Change Summary
R2.1 Initial release. Revision from R2.0
Added 700Mhz configuration and mechanical info.
001-Prelim
Table 5
2006/8/3
August 3, 2006
Added FCC warning
Document Change History
Part ####### revision 001
CONTENTS
Chapter 0
Chapter 1
Installation Overview ............................................................................................................ 13
Installation Process Summary ............................................................................................ 14
Requirements for Installation .............................................................................................. 15
Chapter 2
Site Preparation .................................................................................................................... 17
Physical Requirements ........................................................................................................ 18
Environmental Requirements .............................................................................................. 21
Electrical Requirements ....................................................................................................... 23
Network and Backhaul Requirements ................................................................................ 28
General Site Requirements .................................................................................................... 29
Chapter 3
Pre-Installation Procedures ................................................................................................. 31
Preparing for Installation ..................................................................................................... 32
Antistatic Precautions ............................................................................................................. 33
Equipment, Tools, and Supplies Checklists ............................................................................ 35
Unpack the Equipment ........................................................................................................... 37
Review Site Deliverables List ................................................................................................. 38
Chapter 4
Base Station Installation Procedures ................................................................................. 39
Installing the Rack ................................................................................................................ 40
Removing the Rack’s Rear Panel ........................................................................................... 41
Prepare the Installation Location ............................................................................................ 44
Position the Rack .................................................................................................................... 46
Secure the Rack ..................................................................................................................... 48
Attaching Ground and Power Cables ................................................................................. 51
Ground the Rack ..................................................................................................................... 52
Attach the Main and Return Power Cables............................................................................. 54
Attaching the Shelves and Modules ................................................................................... 58
Rack Layout ............................................................................................................................ 59
Attach the Digital Shelf to the Rack ........................................................................................ 60
Attach the Radio Module to the Rack ..................................................................................... 62
Cover Empty Radio Module Slots ........................................................................................... 63
Populating the Digital Shelf ................................................................................................. 64
Shelf Layout ............................................................................................................................ 65
Insert CompactPCI Power Supplies ....................................................................................... 67
Test CompactPCI Power Supplies ......................................................................................... 68
Insert the Digital Shelf Cards .................................................................................................. 70
Cover Unused Card Slots ....................................................................................................... 72
06/8/3
Part ####### revision 001
Contents
Connecting the Cables ......................................................................................................... 73
Connect the PDP Power Cables ............................................................................................. 74
Connect the MDM Signal Cables............................................................................................ 77
Connect the Ethernet Cables (where applicable) ................................................................... 79
Connect the PDP Monitor Cable ............................................................................................. 80
Connect the LO Crossover Cables ......................................................................................... 81
Chapter 5
Antenna Installation Procedures......................................................................................... 83
Install the Main and Diversity Antennas............................................................................. 84
Before You Begin .................................................................................................................... 84
Measuring VSWR and Return Loss ..................................................................................... 88
Return Loss ............................................................................................................................ 88
Measuring the Distance to a Fault ...................................................................................... 90
Chapter 6
On-Site Configuration Procedures ...................................................................................... 91
Power On the Base Station .................................................................................................... 92
Appendix A
Decommissioning Procedures ............................................................................................ 95
Decommission a Base Station ................................................................................................ 96
Appendix B
Adding Additional Sectors ................................................................................................... 98
Pre-Upgrade Preparation ........................................................................................................ 99
Adding Sectors to a Base Station ......................................................................................... 101
Performing the Cutover and Power-On ................................................................................ 102
Acceptance Test Plan for Base Station Upgrade ................................................................. 103
Glossary
............................................................................................................................................... 104
Abbreviation ............................................................................................................................................... 107
06/8/3
Part ####### revision 001
List of Figures
Chapter1
Chapter 2
Installation Overview ...................................................................................................................................13
Site Preparation ...........................................................................................................................................17
Figure 2.1 Rack Dimensions 18
Figure 2.2 Power and Grounding Cabling .................................................................................. 23
Figure 2.3 Power Consumption 25
Chapter 3
Pre-Installation Procedures 31
Figure 3.1 Wrist-Strap Grounding Point ..................................................................................... 34
Chapter 4
Base Station Installation Procedures 39
Figure 4.1
Figure 4.2
Figure 4.3
Figure 4.4
Figure 4.5
Figure 4.6
Figure 4.7
Figure 4.8
Figure 4.9
Figure 4.10
Figure 4.11
Figure 4.12
Figure 4.13
Figure 4.14
Figure 4.15
Figure 4.16
Figure 4.17
Figure 4.18
Figure 4.19
Figure 4.20
Figure 4.21
Figure 4.22
Figure 4.23
Figure 4.24
Figure 4.25
Figure 4.26
Figure 4.27
Figure 4.28
Figure 4.29
Figure 4.30
Figure 4.31
Chapter 5
NPM2000 Factory default status .............................................................................. 40
Removable Rear Panel of the Rack ......................................................................... 41
Removing the Frame Ground 42
Rack Status with Rear Panel Removed .................................................................... 43
NPM2000 Rack Outline ............................................................................................ 44
Anchor Hole Locations .............................................................................................. 45
Position of the Isolation Pads ................................................................................... 46
The Rack Position ..................................................................................................... 47
Support Bolt Hole Locations ..................................................................................... 48
Anchor Bolts ............................................................................................................. 48
Adjusting Bolts .......................................................................................................... 49
Ground Cables .......................................................................................................... 52
Compression Lug Dimensions .................................................................................. 53
Ground Terminals on the PDP .................................................................................. 53
Main and Return Power Terminals ........................................................................... 55
Power cable connector pinout .................................................................................. 56
Rack Layout .............................................................................................................. 59
Digital Shelf Mounting ............................................................................................... 60
Mount Screws ........................................................................................................... 61
Back of the Radio Module Shelf ............................................................................... 62
Digital Shelf Layout (Front View) .............................................................................. 65
Digital Shelf Layout (Rear View) ............................................................................... 66
3U and 6U Modules .................................................................................................. 67
FlexCool Module ....................................................................................................... 69
Card Insertion ........................................................................................................... 70
Rack Connector Layout ............................................................................................ 74
PDP Power Cable Connection .................................................................................. 76
MDM Signal Cables Connection ............................................................................... 78
Ethernet Cables Connection ..................................................................................... 79
PDP Monitor Cable Connection ................................................................................ 80
LO Cable Connection ............................................................................................... 81
Antenna Installation Procedures .................................................................................................................83
Figure 5.1 Radio Module with TT-LNA Antenna Configuration .................................................. 85
Figure 5.2 Radio Module Antenna Connections ........................................................................ 86
Chapter 6
On-Site Configuration Procedures .............................................................................................................91
Figure 6.1 Circuit Breakers on the Digital Shelf ......................................................................... 92
Figure 6.2 Circuit Breakers on the PDP Front Panel ................................................................. 93
Part ####### revision 001
06/8/3
List of Figures
06/8/3
Part ####### revision 001
10
List of Tables
Chapter 1
Installation Overview ...................................................................................................................................13
Table 1.1
Chapter 2
Site Preparation ...........................................................................................................................................17
Table 2.1
Table 2.2
Table 2.3
Table 2.4
Table 2.5
Table 2.6
Table 2.7
Table 2.8
Table 2.9
Table 2.10
Table 2.11
Table 2.12
Table 2.13
Table 2.14
Chapter 3
Pre-Installation Requirement .................................................................................... 32
Recommended Test Equipment ............................................................................... 36
Recommended Software .......................................................................................... 36
Inventory Checklists .................................................................................................. 38
Base Station Installation Procedures .........................................................................................................39
Table 4.1
Table 4.2
Table 4.3
Table 4.4
Table 4.5
Table 4.6
Table 4.7
Table 4.8
Table 4.9
Table 4.10
Table 4.11
Table 4.12
Table 4.13
Table 4.14
06/8/3
Rack Dimensions ...................................................................................................... 18
Weight of Base Station Components ........................................................................ 19
Base Station Floor Loading ...................................................................................... 19
Torque Values of Threaded Fasteners ..................................................................... 20
Temperature Requirements ...................................................................................... 21
Humidity Requirements ............................................................................................ 21
Altitude Requirements .............................................................................................. 21
Heat Output .............................................................................................................. 22
Power Consumption Values without Routers ........................................................... 24
Power Consumption Values without Routers (700MHz) ........................................... 24
Required Ground and Voltage Levels ....................................................................... 25
Circuit Breaker Current Loads .................................................................................. 26
Grounding Requirements .......................................................................................... 26
Compression Lug Color Codes ................................................................................. 27
Pre-Installation Procedures ........................................................................................................................31
Table 3.1
Table 3.2
Table 3.3
Table 3.4
Chapter 4
Installation Process Summary .................................................................................. 14
Installing the Rack Procedure Summary .................................................................. 40
Attaching Ground and Power Cables Procedure Summary ..................................... 51
Cable Thickness ....................................................................................................... 55
Attaching the Shelves and Modules Procedure Summary ....................................... 58
Populating the Shelves Procedure Summary ........................................................... 64
Digital Shelf Layout (Front-Facing Cards) ................................................................ 65
Digital Shelf Layout (Rear-Facing Cards) ................................................................. 66
Digital Shelf Power Supply Circuit Breaker Summary .............................................. 68
Connecting the Cables Procedure Summary ........................................................... 73
Rack Power Cable Summary .................................................................................... 75
Radio Module - MDM Signal Cable Summary .......................................................... 77
Ethernet Cable Summary Edge Router 1: Redundant Router ............................... 79
PDP Monitor Cable Summary ................................................................................... 80
Lo Cable Summary ................................................................................................... 81
Part ####### revision 001
11
List of Tables
Chapter 5
Antenna Installation Procedures ................................................................................................................83
Table 5.1
Chapter 6
On-Site Configuration Procedures .............................................................................................................91
Table 6.1
Table 6.2
06/8/3
VSWR, Return Loss, and Reflected Power Conversions ......................................... 88
Circuit Breakers ........................................................................................................ 93
Sector Upgrade Documentation Requirements ........................................................ 99
Part ####### revision 001
12
Chapter 1
I NSTALLATION O VERVIEW
Chapter 1
This chapter provides an overview of the installation process. Please familiarize yourself with the installation process in general before proceeding to the next chapter.
Contents
Installation Process Summary ...................................................................................................................... 14
Requirements for Installation ........................................................................................................................ 15
2006/8/3
Part ####### revision 001
13
Installation Overview
INSTALLATION PROCESS SUMMARY
Installation of a NPM2000 base station should take approximately two to three days, assuming the site
already meets the requirements specified in Chapter 2, "Site Preparation".
Three people should be present during the installation, especially when moving the NPM2000 equipment.
lists the procedures to install the base station.
Step
Chapter
Page
Procedures
Installation Overview
13
Ensure that the installation site is equipped to handle the
base station. Collect information and add additional infrastructure if necessary.
Site Preparation
17
Unpack the rack. Review checklists to ensure you have
the required equipment, software, and tools to perform an
installation.
Base Station Installation
Procedures
39
Install the rack. Connect ground and power. Add components to their respective shelves. Attach cables. Install the
main and diversity antennas.
Antenna Installation Pro- 83
cedures
Install and test the required antennas, such as main and
diversity.
Power On the Base Station
92
Apply power to the base station. Perform basic system
verification tests.
On-Site Configuration
Procedures
91
Configure software on the base station.
Table 1.1
2006/8/3
Installation Process Summary
Part ####### revision 001
14
Macro Base Station Installation Procedures (NPM2000)
REQUIREMENTS FOR INSTALLATION
The installation procedures in this manual assume that the following conditions have been met:
„ The core servers located at the network operations center (NOC) are operational and connected to the backhaul.
„ The backhaul has been tested.
„ The management controllers and sector controller are separately configured in their BIOS to
boot from the correct source.
„ At least one of the hard disk drives on the management controllers contains a software image.
„ A power supply that meets the specifications listed in “Electrical Requirements” on Page 23
has been installed.
N O T E : If these conditions are not met, it is still possible to complete the physical
installation of the base station. However, you will not be able to boot the base station
and provide cell coverage until you satisfy these conditions.
15
Part ####### revision 001
2006/8/3
Installation Overview
2006/8/3
Part ####### revision 001
16
Chapter 2
SITE PREPARATION
Chapter 2
This chapter identifies the requirements that your site needs to meet before you proceed with the
installation of the NPM2000 base station. Please review these requirements before proceeding to the
next chapter.
Contents
Physical Requirements .................................................................................................................................
Environmental Requirements ........................................................................................................................
Electrical Requirements ................................................................................................................................
Network and Backhaul Requirements ...........................................................................................................
General Site Requirements ...........................................................................................................................
2006/8/3
Part ####### revision 001
18
21
23
28
29
17
Site Preparation
PHYSICAL REQUIREMENTS
Before you begin installing the base station, read the following physical requirements. Ensure that each
requirement is met before proceeding with the installation.
W A R N I N G : Failure to meet the following requirements may result in personal
injury and cause damage to or destruction of the base station and surrounding equipment.
Space
Three people should be present during the installation, especially when moving the NPM2000 equipment.
Table 2.1 and Figure 2.1 show the physical dimensions of the rack. These dimensions do not include
space for cabling, the insertion and removal of modules, or adequate airflow.
Type-1
2006/8/3
Width
Height
Depth
600 mm (23.6 inches)
1600 mm (63.0 inches)
600 mm (23 6 inches)
Table 2.1
Rack Dimensions
Figure 2.1
Rack Dimensions
Part ####### revision 001
18
Macro Base Station Installation Procedures (NPM2000)
Weight
The total weight of a full-sector base station is approximately 250 kg (560 pounds) (exclusive cables
and antennas). A dolly or crane is required to move the rack.
Table 2.2 shows the weight of the different base station components.
Component
Weight
Empty Rack
86 kg (189.6 pounds)
PDP
12 kg (26.5 pounds)
Digital Shelf (4 sector)
44 kg (97 pounds)
Radio Module Shelf (filled to capacity)
6.8 kg (15 pounds)
9.5 kg (20.9 pounds) … 700MHz only
Radio Module
11 kg (24.3 pounds)
12.4 kg (27.3 pounds) … 700MHz only
Table 2.2
Weight of Base Station Components
Floor Loading
Table 2.3 shows the floor loading for the base station.
Version
Floor Loading
MMDS
317.2 kg/m2 (64.6 pounds/foot2)
700MHz
338.8 kg/m2 (69.0 pounds/foot2)
1098
317.2 kg/m2 (64.6 pounds/foot2)
PCS
TBD
WCS
TBD
3.5GHz
TBD
3.3GHz
TBD
Table 2.3
Base Station Floor Loading
N O T E : Floor-loading values are calculated as per Telcordia Technologies
GR-63-CORE.
19
Part ####### revision 001
2006/8/3
Site Preparation
Torque Values
Table 2.4 shows the recommended torque values for the different sizes of fasteners used in the rack.
Fastener Size
Recommended Torque
5/16 inch compression lug nuts on PDP
6.20 N•m (54.9 inch-pounds)
M5 screw
3.00 N•m (26.6 inch-pounds)
M4 screw
1.50 N•m ( 13.3 inch-pounds)
M3 screw
0.63 N•m (5.6 inch-pounds)
M2.5 screw
0.36 N•m (3.2 inch-pounds)
SMA connector
0.98 N•m (8.67 inch-pounds)
Type-N connector
0.98 N•m (8.67 inch-pounds) (hand-tightening)
2.45 N•m (21.7 inch-pounds) (hex-connector)
7/16 DIN connector
28.0 N•m (247.8 inch-pounds)
Radio Module thumb screws (M4 screw)
1.5 N•m (13.3 inch-pounds)
Power cable screws
TBD N•m ( inch-pounds)
Table 2.4
Torque Values of Threaded Fasteners
N O T E : Unless otherwise specified, torque tolerances are ±0.2 N•m (±1.8 inchpounds).
2006/8/3
Part ####### revision 001
20
Macro Base Station Installation Procedures (NPM2000)
ENVIRONMENTAL REQUIREMENTS
Before you begin installing the base station, read the following environmental requirements. Ensure
that each requirement is met before proceeding with the installation and consult your MOPs
for procedures concerning building requirements, hazardous materials and waste,
and environmental systems.
W A R N I N G : Failure to meet the following requirements may result in personal
injury and cause damage to or destruction of the base station and surrounding equipment.
Temperature
The base station is designed to be installed in a temperature-controlled environment.
Table 2.5 shows the ambient temperature requirements for the base station.
Operational State
Temperature Requirement
Operating
+5°C to + 40°C (+41°F to +104°F)
Short-term operation (less than 96 hours / year)
–5°C to + 50°C (+23°F to +122°F)
Storage
–40°C to + 60°C (–40°F to +140°F)
Table 2.5
Temperature Requirements
Humidity
The base station is designed to be installed in a humidity-controlled environment.
Table 2.6 shows the humidity requirements for the base station.
Operational State
Humidity Requirement
Operating
5% to 85%
Short-term operation (less than 96 hours / year9
5% to 90%
Storage
5% to 95%
Table 2.6
Humidity Requirements
Altitude
Certain components in the base station are sensitive to altitude. Table 2.7 shows the altitude requirements for the base station.
Operational State
Altitude Requirement
Operating
–60 m to +1800 m (–197 feet to +5904 feet)
Table 2.7
21
Altitude Requirements
Part ####### revision 001
2006/8/3
Site Preparation
Airflow
The base station rack requires 600 mm of open space in front of and behind it to allow suitable airflow
for cooling.
Heat Output
Table 2.8 shows the amount of heat produced by the base station.
Configuration
Heat Output (W)
Heat Output (BTU / h)
1 sector
1392
4750
1104 (700MHz)
3767 (700MHz)
2304
7862
1728 (700MHz)
5896 (700MHz)
3216
10973
2352 (700MHz)
8025 (700MHz)
4128
14085
2976 (700MHz)
10155 (700MHz)
2 sector
3 sector
4 sector
Table 2.8
2006/8/3
Heat Output
Part ####### revision 001
22
Macro Base Station Installation Procedures (NPM2000)
ELECTRICAL REQUIREMENTS
Before you begin installing the base station, read the following requirements. Ensure that each requirement is met before proceeding with the installation.
W A R N I N G : Failure to meet the following requirements may result in personal
injury and cause damage to or destruction of the base station and surrounding equipment
Main Power
The base station requires a –48 V DC power supply.
The allowable DC input voltage at the PDP ranges from –46 V to –56 V. The input power noise level
should not exceed a maximum of 100 mV peak-to peak, DC to 20 MHz.
N O T E : The minimum gauge for the wires connecting the base station to the main
power source is #2 AWG. The maximum loop length of #2 AWG wire is 19.8 m. #2
AWG wire that is less than this length will not be damaged or overheat in the event of a
current overload or short-circuit condition.
Figure 2.2 shows the base satation’s power and grounding cabling.
Figure 2.2
23
Power and Grounding Cabling
Part ####### revision 001
2006/8/3
Site Preparation
Table 2.9 and Table 2.10 shows the power consumption for the base station when receiving –48V DC
at the PDP.
Configuration
1 sector
11
18
30
18
30
27
40
27
40
36
50
36
50
Digital Shelf
(A)
Fan Max Spped
(A)
10
11
Radio Module
(A)
FEED-A
FEED-B
4 sector
20
FEED-A
FEED-B
3 sector
10
FEED-A
FEED-B
2 sector
20
Total
(A)
Total
(W)
29
1392
48
2304
67
3216
86
4128
Total
(A)
Total
(W)
23
1104
36
1728
49
2352
62
2976
Power Consumption Values without Routers
Configuration
1 sector
FEED-A
FEED-B
Table 2.9
Each Feed
(A)
FEED-A
FEED-B
4 sector
Radio Module
(A)
FEED-A
FEED-B
3 sector
Fan Max Speed
(A)
FEED-A
FEED-B
2 sector
Digital Shelf
(A)
FEED-A
FEED-B
Each Feed
(A)
17
17
12
24
12
24
18
31
18
31
24
38
24
38
Table 2.10 Power Consumption Values without Routers (700MHz)
N O T E : Each radio module draws 9A at –48V DC
2006/8/3
Part ####### revision 001
24
Macro Base Station Installation Procedures (NPM2000)
FEED-A
FEED-B
11A
29A
Digital Shelf
11A
9A
RM-1M
RM-1D
9A
9A
RM-2M
RM-2D
9A
9A
RM-3M
RM-3D
9A
9A
RM-4M
RM-4D
9A
48A
67A
86A
Figure 2.3
Power Consumption
Main Power Bay Circuit Breaker Size
The base station rack is connected to the main power bay by two power cables. The circuit breaker size
for the power supply should be 60A per feed to protect the power cables in the event of a current overload or short-circuit condition.Power Bay Ground and Voltage Levels
Table 2.11 shows the required electrical levels as measured at the PDP terminals.
Unit
Measurement
Specification
Voltage
–48V DC to return
–48V DC nominal
(–46V DC to –56V DC)
Power
–48V DC to return
Dual Supply 2 kW maximum (each power supply)
Single Supply 5.3 kW maximum
Voltage
Return to ground
0.5V DC maximum
Resistance
Return to ground
0.1Ω maximum
Voltage
–48V DC to ground
–46 DC to –56V DC
Table 2.11 Required Ground and Voltage Levels
25
Part ####### revision 001
2006/8/3
Site Preparation
Base Station Circuit Breaker Current Loads
The rack contains a power distribution panel (PDP). The PDP has up to 18 circuit breakers (CBs).
Each breaker switch controls the power to a specific base station component. Individual base station
component can be powered off by setting the appropriate breaker switch to the OFF (down) position.
Table 2.12 shows the maximum current loading of the circuit breakers in the rack PDP.
Circuit Breaker
Circuit Breaker
CBA1
15A
CBB1
15A
CBA2
15A
CBB2
15A
CBA3
15A
CBB3
15A
CBA4
15A
CBB4
15A
CBA5
15A
CBB5
15A
CBA6
15A
CBB6
15A
CBA7
15A
CBB7
15A
CBA8
15A
CBB8
15A
CBA9
7.5A
CBB9
7.5A
Table 2.12 Circuit Breaker Current Loads
Backup Power
The base station does not contain any internal battery backup systems. Ensure that your main power
source has a backup power system in case of a power failure.
Fuses
Each radio module contains one 30A, 250V, fast-blowing fuse to protect the RF components from
damage in the event of an electrical overload.
Rack Grounds
Table 2.13 shows the grounding requirements for each rack.
Ground Type
Requirement
Frame ground
The rack requires one connection to its frame assembly for use as a frame ground. The
frame ground cable uses #6 AWG wire.
Main ground
The rack requires one connection to the main building ground, such as the master
ground bar (MGB). The ground cable uses #6 AWG wire.
Table 2.13 Grounding Requirements
2006/8/3
Part ####### revision 001
26
Macro Base Station Installation Procedures (NPM2000)
Compression Lug Color Codes
Table 2.14 shows the compression lug color codes for common wire gauges.
Wire Gauge (AWG)
Color Code
#6 (used for NPM2000 ground cables)
Blue
#4
Gray
#2 (used for NPM2000 main and return power cables)
Brown
#1
Green
1/0
Pink
2/0
Black
Table 2.14 Compression Lug Color Codes
27
Part ####### revision 001
2006/8/3
Site Preparation
NETWORK AND BACKHAUL REQUIREMENTS
Before you begin installing the base station, read the following network requirements. See the following documents for detailed information about network and backhaul requirements:
„ Network Deployment Planning Guide–describes site, network, and backhaul requirements.
„ System Overview–describes the role and function of equipment in the network core.
Edge Routers
The base station requires a 100-Mbit/s Ethernet connection to at least one edge router configured to
direct packets between the base station and the network core. Ensure that your base station site can
accommodate the electrical, environmental, and physical requirements of the edge routers.
Backhaul Circuits
Multiple T1, DS3/E3, or other interfaces connect the edge routers at the base station site to the network core. See your field engineering package information about your site’s backhaul circuits and the
configuration of any necessary customer service units (CSUs).
N O T E : Backhaul circuits must be tested by qualified personnel before the base station is placed into operation in order to ensure connectivity with the core servers
PSTN Gateway
The base station does not connect directly to the PSTN. A PSTN gateway located in the network core
connects the IP-based equipment to the circuit-switched PSTN.
N O T E : Ensure that any equipment connecting the base station to the PSTN is ULlisted.
2006/8/3
Part ####### revision 001
28
Macro Base Station Installation Procedures (NPM2000)
General Site Requirements
Each site has unique requirements and characteristics. The field engineering package contains the site’s
floor plan, cabling routing and termination, and other site-specific.
Restricted Access
Access to the site must be controlled by the authority for that location and granted through the use of
special tools, locks and keys, or other means of security. Access should be limited to service personnel
who have been instructed about the reasons for the access restrictions and about any precautions that
must be taken while at the location.
Mounting Surface
The base station is suitable for mounting on concrete or other noncombustible surfaces only.
Equipment Entrance and Unloading Area
A route must be provided between the unloading area and the equipment room where no restrictions
will be encountered with a clearance less than 900 mm wide (side-to-side), and 2000 mm high (floorto-obstruction).
All turns along the route must allow sufficient clearance to turn or tilt an object 600 mm wide, 600
mm deep, and 1600 mm high.
AC Outlets
The site must have at least two duplex AC receptacles located within a convenient distance to facilitate
installation and maintenance of the base station.
Fire Protection System
It is recommended that a fire protection system is provided for the site.
Lighting
The site must have sufficient lighting to conduct work in a safe manner. Emergency lighting is recommended. Lighting must meet local and other applicable regulations.
Tower Lights
Depending on its height and applicable regulations, the tower may require aviation safety lights. Consult the aviation, environmental, and communication regulations applicable to your site for information.
Antenna Mounting Locations
The base station uses two antennas (main and diversity) per sector.
Cabling Requirements
Ensure that your site has the necessary cable racks and ladders to accommodate the base station and
that your site has external cable access ports for the RF antenna cabling.
29
Part ####### revision 001
2006/8/3
Site Preparation
Isolated Ground Plane Environment
Ensure that the base station will be installed in an isolated ground plane environment as defined in
Telcordia Technologies GR-1275-CORE.
Master Ground Bar Requirements
The site’s master ground bar (MGB) must be connected to the building principal ground’s electrode
system. The building principal ground is the point where grounding conductors of the building (such
as air-conditioning, communication systems, and structure) are bonded together.
Ground Riser Cable
The ground riser cable (the cable connecting the MGB to the building principal ground) must have a
minimum conductor sizing of 2/0 AWG. If any equipment cables at the site are larger than 2/0 AWG
(such as to compensate for voltage drop), the size of the ground riser cable must be adjusted.
Ground Resistance
The resistance of the building principal ground shall be as low as possible. AN objective of 5Ω is a telecommunications industry standard. In no case should resistance be allowed to exceed the local electrical utility limits of 25Ω (NEC article 256-56).
2006/8/3
Part ####### revision 001
30
Chapter 3
PRE-I NSTALLATION PROCEDURES
Chapter 3
This chapter lists the tools and equipment required for installing and testing the equipment. It also
provides procedures for unpacking the rack and configuring individual cards and shelves.
Contents
Preparing for Installation ...............................................................................................................................
Antistatic Precautions ............................................................................................................................
Equipment, Tools, and Supplies Checklists ...........................................................................................
Unpack the Equipment ..........................................................................................................................
Review Site Deliverables List ................................................................................................................
2006/8/3
Part ####### revision 001
32
33
35
37
38
31
Pre-Installation Procedures
PREPARING FOR INSTALLATION
This section describes precautions, equipment, and tasks that should be reviewed or performed prior
to beginning the NPM2000 base station installation.
Table 3.1 shows the topics described in this section.
Topics
Page
Antistatic Precautions
33
Equipment, Tools, and Supplies Checklists
35
Unpack the Equipment
37
Review Site Deliverables List
38
Table 3.1
2006/8/3
Pre-Installation Requirement
Part ####### revision 001
32
Macro Base Station Installation Procedures (NPM2000)
Antistatic Precautions
W A R N I N G : Components in the base station are highly sensitive to electrostatic
discharges (ESD). Follow the procedures described below to prevent unseen damage
from occurring.
To prevent damage to the base station components from static electricity:
„ Do not handle circuit boards unless you are using the appropriate antistatic protection, such
as wrist straps, boot straps, boots, or a conductive mat. Wrist straps must have snug but comfortable contact with your skin, and they must be connected to a grounding point on the
rack.
„ Handle circuit boards by the faceplate, handles, or edges. Do not touch any integrated circuits, connections, pins, or soldered surfaces.
33
Part ####### revision 001
2006/8/3
Pre-Installation Procedures
Wrist-Strap Grounding Point
The rack contains a wrist-strap grounding point in the bottom-left corner of the power distribution
panel (PDP). The grounding point is connected to the frame ground and provides antistatic protection when technicians work with circuit cards.
N O T E : The rack must be grounded for the wrist-strap grounding point to be effective.
Figure 3.1 shows the location of the Wrist-Strap grounding point to be connected to the frame
ground.
F1
Figure 3.1
2006/8/3
Wrist-Strap Grounding Point
Part ####### revision 001
34
Macro Base Station Installation Procedures (NPM2000)
Equipment, Tools, and Supplies Checklists
Tools
The following tools are recommended for a typical base station installation:
„
Allen key set
„
Platform stepladder (6-feet)
„
Bolt cutter
„
Plum bob
„
Cable ties
„
Portable band saw kit
„
Chalk line
„
Scissors
„
Drill bits (metal and masonry)
„
Scratch awl
„
Electrical tape
„
Shims (for leveling NPM2000)
„
Extension cord
„
Socket sets (Imperial and metric)
„
Flat file
„
Strap (with buckle)
„
Framing square
„
Tape measures (linen and metal)
„
Hacksaw (with blades)
„
Hammer drill
„
Torpedo level
„
Heat gun (with heat shrink roll)
„
Torque wrenches
„
Label maker
„
Wrench sets (imperial and metric)
„
Marking pencil
„
Utility knife
„
Oxide-inhibiting compound
„
Vacuum Cleaner with high-efficiency particulate air (HEPA) filter.
N O T E : Ensure that your torque wrenches are correctly calibrated according to the
methods and schedule specified by the manufacturer. The calibration date should be
indicated on each wrench.
Safety Equipment
The following safety equipment is recommended for a typical base station installation.
35
„
Ear plugs
„
Flashlight
„
Electrical gloves
„
Portable eye-wash station
„
ESD straps
„
Safety glasses
„
First aid kit
„
Safety shoes
Part ####### revision 001
2006/8/3
Pre-Installation Procedures
Test Equipment
Table 3.2 shows the equipment recommended for testing base station functionality.
Equipment
Digital multimeter
Checking continuity and electrical characteristics.
Sunset OCx
Testing SONET and T-carrier network and services.
Workstation, terminal, or laptop
Installing, configuring, and verifying software.
Cable sweep generator
Testing the electrical integrity of antenna and RF cables.
Spectrum analyzer
Monitoring RF signal output.
Ethernet cable tester
Testing the type and integrity of Ethernet cables
Oscilloscope
Checking input power noise levels
Table 3.2
Recommended Test Equipment
N O T E : Ensure that your test equipment is correctly calibrated according to the methods and schedule specified by the manufacturer. The calibration date should be indicated on each piece of test equipment.
Software
Table 3.3 shows the software recommended to be installed on your laptop or workstation.
Software
Purpose
TCI/IP drivers
Accessing the individual systems over TCP/IP
SSH, SCP
Creating secure shell (SSH) sessions with the cards in the base station. For UNIX-like operating systems, you can type ssh at the command line. For Windows operating systems, use
putty.exe or another SSH client.
Secure copy (SCP) is required for transferring files securely across the network.
Telnet, FTP
Establishing sessions and transferring files with devices in the network.
Serial terminal
Communicating with management controllers, sector controllers.
Text editor
Viewing and editing text and configuration files. Must support UNIX-style text files.
Web browser
Displaying the Configuration Management (CM) tool and other Web-based tools
Table 3.3
2006/8/3
Recommended Software
Part ####### revision 001
36
Macro Base Station Installation Procedures (NPM2000)
Unpack the Equipment
The rack is delivered on shipping pallets. The rack is secured in an upright position and is bolted to
the pallet. Additional equipment is delivered in separate shipping boxes.
 To unpack the base station equipment
Transport the shipping boxes to the installation area using a dolly or pallet jack.
Inspect the exterior packaging for any noticeable damage that may have occurred during shipment.
Verify that the shipment is complete by checking the contents of each box against the bill of materials
(BOM) or shipping invoice that arrives with each box. The BOM for each box may be located on the outside or inside of the box.
Report any missing or damaged components to the field support coordinator as soon as possible.
Cut the packaging tape on each box using scissors or a utility knife.
Remove the cardboard packaging from the rack:
Remove the top of the cardboard packaging.
ii
Remove the cardboard sides. The cardboard sides are bolted to the shipping pallet and pull off with
minimal effort.
Remove the protective bags covering the rack.
Check the rack for extra mounting hardware or invoices. If there are additional items, remove them and
keep them for future use.
Verify the contents of the other boxes by examining their BOMs.
N O T E : Do not remove any items from their antistatic bags until you are ready to
install them.
10 Save the packaging material and the BOMs in case any of the equipment needs to be returned or moved
in the future.
37
Part ####### revision 001
2006/8/3
Pre-Installation Procedures
Review Site Deliverables List
Table 3.4 shows the paperwork that ships with each base station.
Document
Description
Anchor kit
Lists installation kit contents
BOM
Lists every component in the base station
Shelf inspection checklist
Factory inspection of each utility and radio shelf
Table 3.4
Inventory Checklists
 To check the inventory
2006/8/3
Perform an inventory check using the site deliverables list provided with the TBD package and BOMs.
Ensure that all equipment and accessories have been shipped.
Document any shortages and report them to the field support coordinator so that any missing equipment
may be produced and delivered to the site as soon as possible.
Ensure that the serial number for each piece of equipment is recorded in the base station’s on-site documentation.
Part ####### revision 001
38

Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.4
Linearized                      : No
XMP Toolkit                     : 3.1-701
Producer                        : Acrobat Distiller 7.0.5 (Windows)
Creator Tool                    : PScript5.dll Version 5.2
Modify Date                     : 2006:08:03 16:13:36+09:00
Create Date                     : 2006:08:03 16:13:36+09:00
Format                          : application/pdf
Title                           : NPM2 Installation Procedures_1600_mmds NPM2.book
Creator                         : noria
Document ID                     : uuid:5ab32a77-41a6-4567-9a4f-66c74b0ea317
Instance ID                     : uuid:6754f503-8f7a-431d-9626-c3434cafdf9f
Page Count                      : 38
Author                          : noria
EXIF Metadata provided by EXIF.tools
FCC ID Filing: AEZNPM-2000-C310

Navigation menu