Airspan Networks MMAX56 Base station transceiver User Manual DFS Link instruction
Airspan Networks Inc Base station transceiver DFS Link instruction
Contents
- 1. Users manual
- 2. DFS link instructions
DFS link instructions
LINK REVISION: A0 INSTRUCTION Title: Link instructions for 5.6GHz DFS System Rev. ECO No. Author Description Approved By Valid Date A0 Zion L. Release Reuven B 10/5/08 --------------------------------------------------------------------------------------Doc. Link Instruction Printing Date: 11/05/08 Page 1 of 5 LINK INSTRUCTION REVISION: A0 1. Required equipment • 2* Standard PC included Serial port and LAN port. • Standard HyperTerminal Application. • 2* SDA 4S. • P.S 220VAC to 6V DC. • 2* Ethernet cables. • Crossed RS-232 cables. • 2* Y cable. 2. Testing Setup ProST Setup Figure 1 • Connect Y cable between SDA 4S DB-15 connector and MicroMAX DB-15 connector. • Connect Serial cable between MicroMAX DB-9 connector and PC 1 Serial port. • Connect LAN cable between SDA 4S port 1 and PC 1 LAN port. • Connect Y cable between SDA 4S DB-15 connector and ProST DB-15 connector. • Connect LAN cable between SDA 4S port 1 and PC 2 LAN port. EasyST Setup Figure 2 • Connect Y cable between SDA 4S DB-15 connector and MicroMAX DB-15 connector. • Connect Serial cable between MicroMAX DB-9 connector and PC 1 Serial port. --------------------------------------------------------------------------------------Doc. Link Instruction Printing Date: 11/05/08 Page 2 of 5 LINK INSTRUCTION REVISION: A0 • Connect LAN cable between SDA 4S port 1 and PC 1 LAN port. • Connect 6V DC to the EasyST DC connector. • Connect LAN cable between EasyST RJ 45 connector and PC 2 LAN port. Link Test Setup Figure 1 Figure 2 --------------------------------------------------------------------------------------Doc. Link Instruction Printing Date: 11/05/08 Page 3 of 5 LINK INSTRUCTION REVISION: A0 3. Testing process • Connect to the MicroMAX using serial cable • Use a terminal client application with the following parameters: • Connect the to electricity (through the SDA) • Verify that the following lines appear on your serial connection window(Wait about 1-2 minutes) --------------------------------------------------------------------------------------Doc. Link Instruction Printing Date: 11/05/08 Page 4 of 5 LINK REVISION: A0 INSTRUCTION • Through the serial connection type : cmd “showss” • Verify you have one SS connected and operational • For broadcasting video through Airspan Networks link please refer to the link as a normal bridge (layer 2) Note: Once the system detects a radar signal it will behave according to the standard and stop transmitting on the channel. A new channel is chosen and a startup scan is initiated on that channel. A report will be sending on the Hyper Terminal Application. Test Mode Commands • Through the serial connection type: 1. G_DEBUG_DFS_DONT_MOVE=1 //// Do not jump channel 2. G_DEBUG_DFS_DONT_MOVE=0 //// jump channel 3. cmd "setDfsParams av=0" //// Disable availability test 4. cmd "setDfsParams av=1" //// Enable availability test 5. printRf //// Print RF channel End Document --------------------------------------------------------------------------------------Doc. Link Instruction Printing Date: 11/05/08 Page 5 of 5
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.3 Linearized : No Page Count : 5 Producer : AFPL Ghostscript 8.53 Create Date : 2008:11:05 17:00:21+03:00 Modify Date : 2008:11:05 17:00:21+03:00 Title : DFS Link instruction Creator : PDFCreator Version 0.9.1 Author : zleviEXIF Metadata provided by EXIF.tools