American Power Conversion 240 320Kw 400V Users Manual 990 4045a(240 320).

240-320kW 400V to the manual 90bd6f49-adde-495c-9f22-9bcf2216d05d

2015-02-05

: American-Power-Conversion American-Power-Conversion-240-320Kw-400V-Users-Manual-508201 american-power-conversion-240-320kw-400v-users-manual-508201 american-power-conversion pdf

Open the PDF directly: View PDF PDF.
Page Count: 74

DownloadAmerican-Power-Conversion American-Power-Conversion-240-320Kw-400V-Users-Manual- 990-4045a(240-320).  American-power-conversion-240-320kw-400v-users-manual
Open PDF In BrowserView PDF
APC Silcon
240-320kW 400V UPS
Installation Guide

Copyright 2000 APC Denmark ApS
This manual is subject to change without
notice and does not represent a commitment
on the part of the vendor

Thank You!
Thank you for chosing the APC Silcon Series UPS. Please read this Installation Guide
thoroughly prior to installing the system. It provides important information on safe and
efficient installation.
The installation and use of this product must comply with national, federal, state, municipal
and local codes.
Safety Symbols used in this manual
WARNING!

Indicates a hazard which, if not avoided, could result in injury or death.

CAUTION!

Indicates a hazard which, if not avoided, could result in damage to the
product or other property.

NOTICE!

Read and pay attention to this important information.

WARNING!
This UPS unit contains hazardous AC and DC voltages. Only qualified electricians should install
the UPS, AC line and external batteries, and must be familiar with batteries and battery
installation.
Before installing, maintaining or servicing the UPS, shut off the UPS and disconnect all sources
of AC and DC power.
As the UPS has no built-in disconnection devices to switch off external AC and DC input power,
ensure that disconnection devices are provided as separate parts in connection with the
installation!
The installer must provide each external disconnecting device for this UPS system with labels
with the following text:
“Isolate the Uninterruptible Power Supply (UPS) as instructed in this guide before working on
circuit”
AC and/or DC voltage will always involve a potential risk of AC voltage at UPS output generated
from either batteries or mains. To avoid equipment damage or personal injury, always assume
that there may be voltage at UPS output.
This system is equipped with an auto-start function. If activated, the system may start without
warning. Refer to the “Programming” section of this guide for information on de-activation.
TEST BEFORE YOU TOUCH!
To reduce the risk of fire or electric shocks, install the UPS and external batteries in a
temperature and humidity controlled indoor area, free of conductive contaminants.
UPS batteries are high-current sources. Shorting battery terminals or DC terminals, DC busbars
can cause severe arcing, equipment damage and injury. A short circuit can cause a battery to
explode. Always wear protective clothing and eye protection and use insulated tools when
working on batteries.

CAUTION!
This unit contains components sensitive to electrostatic discharge (ESD). If you do not follow the
normal ESD procedures, you may cause severe damage to electronic components.
990-4045a

2

Installation Guide APC Silcon 240-320kW 400V UPS

Contents
1.0

Introduction

1.1

Tools and Equipment

5

2.0

Unpacking

6

3.0

Installation

7

3.1
3.1.1
3.2
3.2.1
3.2.2
3.2.3

Requirements on Site
Cabinet Dimensions
Footprint
1600mm Cabinet for 240-320kW UPS
825mm Cabinet for Isolation Transformer or Switch Gear
1600mm Cabinet for Isolation Transformer

7
7
8
8
8
8

4.0

External Connection

9

4.1
4.2
4.2.1
4.3
4.4
4.4.1
4.5
4.5.1
4.6
4.7
4.7.1
4.7.2
4.7.3
4.7.4
4.7.5
4.7.6
4.8
4.9
4.9.1
4.9.2
4.9.3

Connecting the UPS
System Integration Interface
Connections
Parallel Board
Relay Board
Relay Board/Relay Functions
Communication Interface Board
Connections
Connecting of APC Silcon Tripel Chassis
APC Silcon Triple Chassis
Safety Warnings
Product Description
Installing Management Peripherals
Powering the APC Silcon Triple Chassis
Troubleshooting
Product Specifications
APC Silcon Battery Cabinets
Battery Breaker Box/Fuse-box
Battery Breaker Box
APC Battery Breaker Box Connection Diagram
UPS with External Battery in Battery Breaker Box/Fuse-box Configuration

9
11
12
13
16
17
19
19
20
21
21
21
22
24
25
26
29
31
32
33
34

5.0

Programming Parameters

35

5.1
5.1.1
5.1.2
5.2
5.2.1
5.2.2
5.3
5.3.1
5.3.2
5.4
5.4.1

Parameters
Programming Keys
Programming Example - Switch to Bypass Operation
System Configuration
Programming Example - Change Charge Voltage to 446
Programming Example - Change to Output Isolation Transformer available
Programming Parameters for Advanced Parallel Operation
Description of Settings
Programming example
Battery Monitor
Installation of new batteries

35
36
37
37
39
40
41
41
42
42
42

6.0

Options/Accessories

43

6.1
6.1.1
6.1.2
6.1.3
6.2
6.2.1
6.2.2

Service Bypass Panel for Single Operation
Wiring up UPS with SBP in TN-C-S Network
Wiring up UPS with SBP in TN-S Network
Operating The External Service Bypass Switch
Service Bypass Panel for Parallel Redundant Operation
Two Parallel Systems with Service Bypass Panel
Parallel/Redundant Operation with Service Bypass Panel and
External Battery via MCCB
Operating External Service Bypass Switch for Parallel Systems
Isolating One UPS for Service/Maintenance
Switching Back to Normal Parallel/Redundant Operation

43
44
44
45
47
48

6.2.3
6.2.4
6.2.5

5

49
50
54
55
990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

3

6.3
6.4
6.4.1
6.4.2
6.4.3
6.5
6.5.1
6.5.2
6.5.3
6.5.4
6.5.5
6.5.6

Intersystem Synchronization Unit
Remote Display
Extension of Remote Display Communication Distance
Remote Display Installation
Remote Display Use
Isolation Transformer
Connecting Isolation Transformer
Wiring up UPS with External Yyn0 Isolation Transformer at Output
Wiring up UPS with External Yyn0 Isolation Transformer at Input
Wiring up UPS with External Optional Dzn0 Isolation Transformer at Input
Wiring up UPS with External Optional Dzn0 Isolation Transformer at Output
Wiring up UPS with External Optional Dyn11 Isolation Transformer at Input

56
57
57
59
60
61
62
65
66
67
68
69

7.0

System Specifications

70

7.1
7.2

Technical Data
Dimensions / Weight

70
70

71

8.0

Warranty

8.1

APC Silcon Series Limited Factory Warranty

71

9.0

Appendix

72

9.1

Table 1. Installation Planning Data

72

10.0

How to Contact APC

74

990-4045a

4

Installation Guide APC Silcon 240-320kW 400V UPS

Introduction
1.0 Introduction
Power regulation varies from country to country, and information given in this installation
guide can therefore only be of a general nature. Electricians should therefore always refer to
national and local electrical codes prior to installing the UPS system.

1.1

Tools and Equipment

CAUTION!
Heavy equipment. To prevent personal injury or equipment damage, take extreme care when
handling and transporting UPS cabinet and equipment.

CAUTION!
Ensure that front doors are in place and that internal front cover is fastened by screws before
attempting to lift or transport the system.
This section lists all tools and equipment required to install all UPS configurations. See also
section 4.0 of this guide for further details on connection.
Tools:
• 10mm socket
• 13mm socket-deep
• 17mm socket
• 19mm socket-deep
• 19mm combo wrench
• Small flat head/regular screwdriver
• #3 philips screwdriver
• Compression lug crimping tool
• Knock-out set (for glands)
Equipment:
• Compression lugs for cable terminations
• Cable to Service Bypass Panel from system feeder
• Cable to UPS input from Service Bypass Panel
• Cable to Service Bypass Panel from UPS output
• Cable from Service Bypass Panel to customer distribution
• Cable to UPS input from external batteries/external Battery Breaker Box
(systems with external battery)
• Solid core, control cable to UPS from Service Bypass Panel
• Solid core, control cable to UPS from external batteries/external Battery
Breaker Box

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

5

Unpacking
2.0 Unpacking

NOTICE!
Unless otherwise specified by the shipping company use a fork lift to unload equipment from
pallet

1. To unpack UPS unit, remove top and bottom screws from side plates of packaging and lift up side plates
2. Verify compliance between type label on reverse side of front door and system ordered. Check input and
output voltage
3. Copy type label data to label copy below for easy identification of system
4. Use fork lift to transport system to installation site

Copy of type label

PLEASE RECYCLE
The shipping materials for the APC Silcon UPS are recyclable. Please save them for later use or
dispose of them appropriately.

990-4045a

6

Installation Guide APC Silcon 240-320kW 400V UPS

Installation
3.0 Installation
3.1

Requirements on Site

All system parts are accessible from front or top of UPS. Cable entries are accessible from
bottom. A 1-metre free space on all sides should be allowed during installation.
After installation of the UPS, leave a free space of 600 mm to the right for system access.
(As per applicable national and/or local codes.)
For ventilation and service purposes allow for free space of minimum 1m above the unit or per
national and/or local codes and in front of UPS. Never install systems in direct sunlight.

NOTICE!
For reliability reasons do not stand on the UPS. Keep the UPS cabinet surface free of any
objects.

3.1.1 Cabinet Dimensions

UPS

Height [mm]

Width [mm]

Depth [mm]

240kW

1800

1600

800

320kW

1800

1600

800

Cabinet

800 mm wide

APC isolation
Transformer Module
120-240kW

1600 mm wide

1800 mm

1800 mm

1800 mm

1600 mm wide

240-320kW

APC Isolation
Transformer Module
320-480kW

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

7

Installation
3.2

Footprint

3.2.1 1600mm Cabinet for 240-320kW UPS

Power cable entry

Rear

com. cable entry

Front
3.2.2 825mm Cabinet for Isolation Transformer or Switch Gear
Rear

Power cable entry
3.2.3 1600mm Cabinet for Isolation Transformer
Rear

Power cable entry

Front
990-4045a

8

Installation Guide APC Silcon 240-320kW 400V UPS

External Connection
4.0 External Connection
4.1

Connecting the UPS

Right side view

Relay board
Please refer
to “Relay Board” section

Battery

Front view

System Integration Interface

Communication Interface
Parallel Controller

NOTICE!
Check correct phase rotation of mains input voltage!!
Max. input/output cables: 3//300 mm2.
If there is no neutral input Dzn0 or Dyn11 input isolation transformer is required.

CAUTION!
This UPS unit is an EN 50091-2 product and may cause radio interference in a domestic
environment. Take preventive measures in necessary.

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

9

External Connection

CAUTION!
At a switch mode load of 100% the neutral must be rated for 200% output phase current.

UPS

External
Input
Fuses* FM
[A]
380-415V

External
Input Cable
[mm2]
380-415V

External PE
Cable
[mm2]

Maximum
External
Output
Fuses*
[A]

External
Output Cable
[mm2]

240kW

500

2//120

95

400

2//95

320kW

630

2//185

150

500

2//150

* DIN gL types

NOTICE!
All cable dimensions are recommended sizes only.
Refer to local legal regulations.

UPS

External Alarm
Cable max.
[mm2]

External System
Earth Cable
[mm2]**

External Battery
Breaker
[A]

External Battery
Cable [mm2]

240kW

2

25

400

2//95

320kW

2

25

500

2//150

PVC cables insulated to withstand ambient temperature of max. 30oC
** Must be rated as external PE cable if mains system is not supplying PE

NOTICE!
Install gland plate in bottom of unit.

990-4045a

10

Installation Guide APC Silcon 240-320kW 400V UPS

External Connection
4.2

System Integration Interface

NOTICE!
Consistent use of designations (Q001, Q002, Q003, H002, H003) in diagrams simplifies
information exchange.
System Integration Interface (SII) is the control link between UPS and system main switches
as shown in above diagram. The purpose of the SII is to ensure correct operation of switches
without losing system output power.
Auxiliary contacts on the main switches transmit the SII board inputs. Lamps on Service
Bypass Panel and Battery Breaker Box/Battery Cabinet indicate “green light” for operation of
output switches.
SII board also integrates input facilities for emergency shut-down and temperature
compensation of charge voltage for external battery (use with battery monitor). “Battery
operation” and “Common fault” are two main SII board status relay signals.

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

11

External Connection
4.2.1 Connections

Blue
Brown

990-4045a

12

Installation Guide APC Silcon 240-320kW 400V UPS

External Connection
Terminal Blocks: X003/X004 (Anxiliary Contacts)
When switching Q001, Q002, Q010, Battery Breaker 1 or Battery Breaker 2 from “ON or 1” to
“OFF or 0”, the anxiliary contact has to be open BEFORE the corresponding main contacts are
opened. When switching Q001, Q002, Q010, Battery Breaker 1 or Battery Breaker 2 the
opposite way from “OFF or 0” to “ON or 1”, the anxiliary contact has to close with a maximum
delay of 0.5 seconds from the time the corresponding main contacts are closed.
• This type of auxillary contact is called a “late make” contact. (This also means that it will
“break early” when activated in opposite direction.)
• This auxillary contact is also called “NORMALLY OPEN” (NO), because the auxillary
contact will be open when the main contacts are open.
• Please note that the above term “NORMALLY” has nothing to do with NORMAL UPS
OPERATION MODE.
When switching Q003 from “OFF or 0” to “ON or 1”, the anxiliary contact has to open BEFORE
the corresponding main contacts are closed. When switching Q003 the opposite way from “ON
or 1” to “OFF or 0”, the auxillary contact has to close with a maximum delay of 0.5 seconds from
the time when the corresponding main contacts are opened.
• This type of anxiliary contact is called an “early break” contact. (This also means that it will
“make late” when activated in the opposite direction.)
• The auxiliary contact is also called “NORMALLY CLOSED” (NC), because the auxiliary
contact will be closed when the main contacts are open.
• Please note that the above term “NORMALLY” has nothing to do with NORMAL UPS
OPERATION.
X005 (Output Relays)
Battery operation signals are received with a 30-second delay. This function is inactive during
battery test. Common fault relay facility is programmable (standard factory setting: 10 sec.)
See APC Silcon User Guide for details.
Maximum nominal voltage on contact circuits is 277VAC. If two different phases are involved,
maximum phase to neutral voltage should be below 160VAC. Please note that phase L1 is
already present on the System Integration Interface board, supplied from the Service Bypass
Panel. Therefore, if a phase is needed for alarm or signal purposes, Phase L1 should be used.

4.3

Parallel Board

CAUTION!
Control cables must be separated from AC and DC power cables.

Parallel Board
990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

13

External Connection

The built-in parallel board connects two or more UPS systems in parallel, either to obtain
increased system reliability or to obtain higher output power. The parallel board also ensures
correct load-sharing between paralled systems.

NOTICE!
For reliability reasons, APC recommends separate battery packs in redundant/parallel
conigurations.

To prepare the UPS for parallel/redundant mode, disconnect all sources of AC and DC power
supply to the UPS and connect the ribbon cable from the parallel board to the main controller
board (the ribbon cable is delivered with the UPS).

CAUTION!
DO NOT connect ribbon cable between controller and parallel card in single configurations.
Ribbon cable is for parallel operation only.

Complete the parallel system set-up by connecting the external control cables (see below).
Follow the instructions in the “Programming Parameters for Advanced Parallel” section of this
guide to execute necessary re-programming.

990-4045a

14

Installation Guide APC Silcon 240-320kW 400V UPS

External Connection

Parallel Board
X021:15-pin SUB-D female
X020:15-pin SUB-D female

External multicore cable with 14 wires + shield
to other parallel units

UPS 1

UPS 2

UPS 3

External Control Cables
External multicore cable is equipped with 15-pin SUB-D plug at either end. Connect pin 1 to
pin 1, and pin 2 to pin 2 etc. up to pin 15 - with the exception of pin 8, which is not to be
connected.
Shield is connected to plug cover at both ends.
Terminals X020 and X021 for control cables located on parallel board. Connect X020 in UPS1
to X021 in UPS2, and connect X020 in UPS2 to X021 in UPS3 etc. Connect X020 in last UPS
to X021 in UPS1.
UPS ships with cables (cable lenght: 6.5 m)
Power Cables
To optimize load-sharing in parallel operation, external power circuits must be “symmetrical”:
Power input and output cables to have same length and identical cross-sections.

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

15

External Connection
4.4

Relay Board

1
2
3

Maximum load: 8.0A – 250VAC
0.3A – 60VDC
Minimum load: 0.05A – 6VAC
0.05A – 6VDC

Relays
All relays are “fail safe”: In alarm modes, relay coil will be de-energized.

990-4045a

16

Installation Guide APC Silcon 240-320kW 400V UPS

External Connection
4.4.1 Relay Board/Relay Functions
NOTICE
If alarm mode “Communication to controller lost” is active, ALL relays will indicate failure

Relay
Number

Message

Alarm-trigging Events

1 ## (X002)

Mains outside limits

Mains voltage RMS outside limits
Mains wave form (fast detector) outside limits
Mains frequency outside limits

2 ## (X003)

Bypass outside limits

Bypass voltage RMS outside limits
Bypass wave form (fast detector) outside limits
Bypass frequency outside limits

3 ## (X004)

Output outside limits

Output voltage RMS value outside limits
Output wave form (fast detector) outside limits
Output frequency outside limits

4

(X005)

System overload

Output load exceeding 100%
Delta inverter current limiter active
Main inverter current limiter active

5

(X006)

Fan fault

Blocked or faulty fan

6

(X007)

High Equipment
Temperature or
Inverter Fuse Blown

Static switch temperature too high
Main inverter failure (temperature too high or fuse blown)
Delta inverter temperature too high
Magnetic temperature too high
Isolation transformer (option) temperature too high
Battery temperature too high

7

(X008)

MCCB battery off

Battery MCCB/Fuse not closed or released

8

(X009)

Normal operation

UPS running in normal operation mode(status)

9 ## (X010)

Battery operation

UPS running in battery operation mode(status)

10 ## (X011)

Bypass operation

UPS running in bypass operation mode(status)

11 ## (X012)

Stand-by operation

UPS in stand-by mode
(Hot stand-by - parallel systems only)

Service bypass
operation

Service bypass switch active

Boost charge
operation

UPS boost-charging on battery

12

(X013)

13 ## (X014)
14

(X015)

Battery voltage
outside limits

DC voltage too high (shut down)
DC voltage below warning level
DC voltage too low (shut down)

15

(X016)

Battery condition
fault

ABM has detected weak battery condition
ABM has detected defect battery
(ABM = Advanced Battery Monitor)

Common fault

All alarms as mentioned above
(except relays 8+9+10+11)
Internal power supply fault
System locked in operation mode
Internal memory fault
Internal communication fault

16 ## (X017)

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

17

External Connection
## Delay programmable in configuration stack : “Common fault delay”. Settings 0,10,20,30
seconds.
Maximum cable size: 2mm2
See section 5.2: System configuration

NOTICE!
Alarm Trigging Events 1-2-3-9-10-11-13 activates the corresponding alarm relay after the delay.
Alarm Trigging Events 4-5-6-7-8-12-14-15 activates the corresponding alarm relay momentarily.
Common fault relay 16 is activated at the same time as relay 1-2-3-4-5-6-7-12-13-14-15, or in
any of the below situations.:
• Internal power supply fault
• System locked in operation mode
• Internal memory fault
• Internal communication fault

990-4045a

18

Installation Guide APC Silcon 240-320kW 400V UPS

External Connection
4.5

Communication Interface Board

The 3-port ComInterface is used to establish an interaction between UPS and e.g. a computer
system. Main purpose: To ensure a controlled computer shut-down in case of a mains supply
failure.

4.5.1 Connections

.

.

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

19

External Connection
4.6

Connecting of APC Silcon Tripel Chassis

The enclosed Triple Chassis must be connected to the serial port on the Communication
Interface Board, and to the 24V supply (cables included). Terminal locations shown below.

240/320kW

Serial ports

X50

Front view of UPS Cabinet (doors open)

X50 is a 24V supply for Triple Chassis.
Only to be used for this purpose.
Not suitable for telephone equipment.
Triple Chassis must be connected to both
X50 and a serial port.

APC Silcon Triple Chassis

For more information please refer to the following section.

990-4045a

20

Installation Guide APC Silcon 240-320kW 400V UPS

External Connection

4.7

APC Silcon Triple Chassis

The APC Silcon Triple Chassis is an American Power Conversion (APC) external management
peripheral that allows you to use monitoring and control management peripherals with your
APC Silcon series UPS. The retrofit model is for use with Silcon series UPSs that are not
equipped with a 24 VDC power port.
4.7.1 Safety Warnings
Use the APC Silcon Triple Chassis only in conjunction with an APC Silcon UPS.
Do not connect a computer to any APC Silcon Triple Chassis port using a straight-through
extension cable. Use the communications cable provided with the APC Silcon Triple Chassis.
Connections using a cable made by any other manufacturer may cause damage or improper
operation of the APC Silcon Triple Chassis, the UPS, or the computer.
4.7.2 Product Description

➊
➍

➋
➌

1 Monitoring port

3 Status LED

2 To UPS port

4 Optional Power port

4.7.2.1 Monitoring Port
The Monitoring port has two functions:
• Connecting to a terminal for configuration of the chassis. For direct connection to the
Monitoring port, you must use the Monitoring cable supplied with the chassis (APC
P/N 940-0024C).
• Connecting to other APC external management peripherals in a daisy chain.
4.7.2.2 To UPS Port
The “To UPS” port connects the chassis to the UPS, using the Silcon UPS cable (APC P/N 9400071). The cable connector plugs into a communications port on an APC Silcon UPS.

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

21

External Connection
4.7.2.3 LEDs
The APC Silcon Triple Chassis status LED provides important information concerning
operation of the chassis. Refer to the table below for a description of the conditions indicated
by the LED.
IF the LED is…

THEN the Silcon Triple Chassis…

off

is not receiving power.

flashing quickly
(5 times per second)

has not been configured. See the APC Silcon Management Quick
Start Guide provided with your chassis or the Web/SNMP
Management Card Installation Guide on the CD for more
information.

flashing slowly
(1 time per second)

is powered on but is not communicating with the UPS.

on

is operating normally.

4.7.2.4 Optional Power Input
With the Optional Power input, you can power the APC Silcon Triple Chassis from an external
source, using a 24 VDC power adapter. A universal adapter (AP9505i) or a standard adapter
(AP9505) can be purchased separately from APC.
4.7.3 Installing Management Peripherals
There are two basic types of APC management peripherals that work with the APC Silcon
Triple Chassis:
• Management peripheral cards, which fit into external management peripherals that
are equipped with a card slot.
• External management peripherals, which connect to the Monitoring (or Advanced)
port of other external management peripherals.

NOTICE!
The name “Monitoring” port varies from product to product, but its purpose is the same – to
replicate the UPS communications port.

990-4045a

22

Installation Guide APC Silcon 240-320kW 400V UPS

External Connection
4.7.3.1 Order of Management Peripheral Cards
Because UPS signals are passed between management peripherals, you must install
management peripheral cards in the correct order for them to work together properly. The card
slots are numbered 1 to 3, from left to right, as viewed from the rear of the chassis. The
following table lists the management peripheral cards, their priority, and proper position.
Management
Peripheral Card

P/N

Priority

Position

Web/SNMP Management
AP9606
Card

Highest

High-numbered slot

Out-of-Band
Management Card
(Call-UPS® II)

AP9608

Second-highest

Interface Expander

AP9607

Second lowest

Environmental
Monitoring Card
(Measure-UPS® II)

AP9612T
AP9612TH

Lowest
Low-numbered slot

4.7.3.2 Installing Management Peripheral Cards
To install management peripherals, perform the following steps.
1) Make sure that the chassis is powered off.
2) Install management peripheral cards into the housings on the rear of the chassis. See the
instructions supplied with the cards and the table above.
3) If you are daisy-chaining other APC external management peripherals to the APC Silcon
Triple Chassis: Connect the UPS cable (supplied with the management peripheral) to the
Monitoring port of the chassis and to the “To UPS” port of the other management peripheral
(Share-UPS, MasterSwitch, etc.). See “Daisy-chaining the APC Silcon Triple Chassis”.
4) Power the APC Silcon Triple Chassis and all external management peripherals.

NOTICE!
If your configuration requires additional power, connect a 24V AC/DC power adapter available
from APC (part number AP9505 or AP9505i) for all models of Triple Chassis.

4.7.3.3 Daisy-chaining the APC Silcon Triple Chassis
If you need more than the three card slots available with the APC Silcon Triple Chassis, or if
you want to use other external management peripherals, you can daisy-chain external
management peripherals together, provided that the total amperage of all installed
management peripherals — cards and external — does not exceed the supplied amperage. (See
“Determining Power Requirements:”).

NOTICE!
When daisy-chaining Triple Chassis units, you may need to use a power adapter.

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

23

External Connection
To add card slots, you can daisy-chain the APC Silcon Triple Chassis with the standard Triple
Chassis (AP9604) management peripheral, installing the APC Silcon Triple Chassis closer to
the UPS.
4.7.4 Powering the APC Silcon Triple Chassis
The APC Silcon Triple Chassis supplies power to the installed management peripheral cards
and to the Monitoring port, allowing you to power multiple management peripherals.
4.7.4.1 AP9604S Power Considerations
The AP9604S model of the APC Silcon Triple Chassis receives its power from the UPS through
the power connector of the Silcon UPS cable. If the total current required by all the installed
management peripherals exceeds 500 mA, you must use a 24 VDC power adapter. To find out
whether you need additional power, see “Determining power requirements”.
4.7.4.2 Power Adapters
APC offers two models of 24 VDC power adapter.
• The standard adapter (AP9505) can provide an additional 400 mA.
• The universal adapter (AP9505i) can provide 850 mA.
4.7.4.3 Using a Power Adapter
To use the adapter, plug it into a protected power outlet and into the Optional Power port of
the APC Silcon Triple Chassis.

NOTICE!
If the power adapter loses power because of a UPS shutdown, its attached management
peripherals may not operate properly, thus adversely affecting the UPS and its protected
equipment.

4.7.4.4 AP9604SR Power Considerations
The AP9604SR model receives its power from the UPS through the supplied 24 VDC universal
adapter. The total current required by your management peripherals must not exceed the 850
mA limit of the power adapter. See ““Determining power requirements”.
4.7.4.5 Determining Power Requirements:
To determine the total amount of current required by your management peripherals, add the
individual current requirements for each management peripheral to be installed with the APC
Silcon Triple Chassis to the current requirements of the chassis itself. Refer to this table
Part #

Management Peripheral

Draw (mA)

AP9207

Share-UPS 8-port Interface Expander

65

AP9600

Expansion Chassis

30

AP9604

Triple Chassis

20

990-4045a

24

Installation Guide APC Silcon 240-320kW 400V UPS

External Connection
AP9604S[R]

APC Silcon Triple Chassis

90

AP9606

Web/SNMP Management Card

110

AP9607

Interface Expander

45

AP9608

Out-of-Band Management Card
(Call-UPS II)

35

AP9612

Environmental Monitoring Card (Measure-UPSII)

60

AP9825i

Isolated Extension Cable

50

AP9830

Remote Power-Off Device

35

4.7.5 Troubleshooting
The following table shows the solution to common problems with the operation of the Triple
Chassis
Problem

Possible Cause

Solution

Status LED is off

The chassis is not
receiving adequate
power.

See “Powering the APC Silcon
Triple Chassis”, and verify that you
are not exceeding current
requirements.

Status LED is flashing
quickly

The chassis has not been
configured.

Configure the Silcon Triple
Chassis. See the APC Silcon
Management Quick Start Guide
provided with your chassis or the
Web/SNMP Management Card
Installation Guide on the CD for
more information.

Status LED is flashing
slowly

The chassis is not
communicating with the
UPS.

Verify that the supplied UPS cable
is properly connected to the Triple
Chassis and to a communications
port on the UPS.

Attached management
peripheral cannot
identify UPS model or
nominal output voltage.

The management
peripheral firmware
does not support 3-phase
UPSs.

You may be able to upgrade the
firmware of the management
peripheral. Call APC Customer
Support.

4.7.5.1 If Problems Persist
For problems not covered in the troubleshooting chart or for persistent problems, follow this
procedure:
1) Note the serial number and date of purchase of the APC Silcon Triple Chassis. Contact APC
Customer Support at the phone number or address that is listed in this manual.
2) Be prepared to provide a description of the problem. A technician will help solve the
problem over the phone, if possible, or will give you a return material authorization (RMA)
number.
3) If the APC Silcon Triple Chassis is under warranty, repairs are free of charge. If the
warranty has expired, there will be a nominal charge for repair.
990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

25

External Connection
4) Pack the APC Silcon Triple Chassis carefully in its original packaging, if possible. Do not
use polystyrene beads for packing. Damage sustained in transit is not covered under the
warranty. Enclose a letter in the package with your name, address, RMA number, a copy of
the sales receipt, daytime phone number, and payment (if applicable).
5) Mark the RMA number clearly on the outside of the shipping carton. The factory will not
accept any materials without this marking.
6) Return the Triple Chassis by insured, prepaid carrier to the address given to you by APC
Customer Support.
4.7.6 Product Specifications
4.7.6.1 Monitoring Port Pin Assignments
The Monitoring port is a 9-pin communications port. The port operates with no flow control at
a rate of 2400 baud. The data format is 8 data bits with 1 start bit, 1 stop bit, and no parity.
When the Triple Chassis operates with simple signalling, the following limitations and
capabilities apply to the Monitoring port:
• Pins 3, 5, and 6 are open collector outputs which must be pulled up to a common
referenced supply no greater than +40 VDC. The transistors are capable of a noninductive load of 25 mA. Use only Pin 4 as the common.
• The output at Pin 2 generates a low-to-high RS-232 level when the device is
signalling an On Battery condition. The pin is normally at a low RS-232 level.
• The UPS is signalled to shut down when a high RS-232 level is applied to Pin 1 for
4.5 seconds. Shutdown is also dependent on the UPS status.
When the Triple Chassis operates with advanced signalling, the following limitations and
capabilities apply to the Monitoring port:
• Pin 7 is unassigned.
• DC operating voltage is available on Pin 8. This voltage may be from the UPS or from
an external adapter, whichever is greater.

990-4045a

26

Installation Guide APC Silcon 240-320kW 400V UPS

External Connection

Normally Open
Line Fail Signal
Normally Open
Low Battery Signal
Normally Closed
Line Fail Signal

Common
UPS Shut Down RS-232 Input or
Advanced Mode RS-232 Data RX In
Line Fail RS-232 Output or
Advanced Mode RS-232 Data TX Out
Unregulated
+24 VDC Output
Chassis

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

27

External Connection
4.7.6.2 Power, Physical, and Environmental Specifications.
Item

Specification

Power
Turn on voltage:

> 22 VDC

Turn off voltage:

< 16 VDC

Current draw (normal operation):

90 mADC

Current draw
(voltage < 16 VDC):

< 1 mADC

Physical
Size (H xW x D):

1.75 x 17.0 x 5.0 in
(44 x 432 x 127 mm)

Weight:

4.02 lb (1.81 kg)

Shipping weight:

8.12 lb (3.65 kg)

Environmental
Elevation (above MSL):
Operating
Storage

0 to 10,000 ft (0 to 3000 m)
0 to 50,000 ft (0 to 15 000 m)

Temperature:
Operating
Storage

32 to 113˚F (0 to 45˚C)
-4 to 158˚F (-20 to 70˚C)

Relative humidity:
Operating
Storage

0 to 95%, non-condensing
0 to 95%, non-condensing

Electromagnetic immunity:

FCC Class A
EN50082-1 verified

990-4045a

28

Installation Guide APC Silcon 240-320kW 400V UPS

External Connection
4.8

APC Silcon Battery Cabinets

IMPORTANT SAFETY INSTRUCTIONS
a

The installation of battery drawers in UPS cabinets requires battery knowledge and should be
made or supervised by qualified personnel only. Keep unauthorized personnel away from
batteries.

b

Use identical battery types and numbers when replacing batteries. See battery supplier
manual for further details.

c

CAUTION - Do not dispose of batteries in a fire. Battery may explode.

d

CAUTION - Batteries are fully charged on delivery. Do not short battery terminals or DC
terminals.

e

CAUTION - Avoid rough treatment and opening of batteries. Released electrolyte is harmful
to skin and eyes and may be toxic.

f

CAUTION - Batteries may cause electric shocks and high voltage short-circuit current. Follow
below precautions when working with batteries:
1

Remove watches, rings and other metal objects.

2

Use tools with insulated handles.

3

Wear rubber gloves and boots.

4

Do not leave tools or metal parts on top of batteries.

5

Disconnect charging source prior to connecting batteries.

Installation and use of this product must comply with all national, federal, state, municipal or
local codes. If you need assistance, please have your UPS model and serial number ready and
call APC, see “How to Contact APC” in this guide.
For more information on the APC World Wide Web site at http://www.appc.com.

WARNING!
The entire system contains HAZARDOUS AC/DC VOLTAGES from several power sources.
Some terminals and components are live even with the system being switched off!
ONLY qualified electricians should carry out installations according to national and local codes.
NO UPS types may have built-in batteries when connected to external batteries!
NEVER install batteries not complying with APC specifications. Failing that, the installer takes
over full responsibility!
NEVER lift or transport connected or installed batteries.
NOTICE!
For reliability reasons do not stand on the UPS. keep the UPS cabinet surface free of any objects.

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

29

External Connection

4.8.0.6 Installation of Batteries
See Installation Guide for Battery Cabinet for:
• Preparing Batteries and UPS
• Dimensions and Weight
• Connecting Batteries

WARNING!
Before proceding, ensure that power supplies have been disconnected from UPS for a minimum
of 5 minutes.

CAUTION!
Follow “Start-up Procedure” in APC Silcon User Guide.

Diagram - UPS with
Battery Cabinet

System Integration Interface

APC
UPS
Silcon

Battery Breaker trip for EPO
(Emergency Power Off)

Battery Cabinet

990-4045a

30

Installation Guide APC Silcon 240-320kW 400V UPS

External Connection
4.9

Battery Breaker Box/Fuse-box

CAUTION!
Batteries connected to a UPS out of service for a period exceeding 8 days may be damaged.
Refer to Section 7.0 Power Disconnection in this guide.

Battery Breaker Box/Fuse-box provides overcurrent and short-circuit protection for UPS
installations with external batteries.

NOTICE!
If battery has been disconnected, refer to Section: - UPS Start Up in the APC Silcon User Guide.

APC Silcon UPS

Battery Breaker Box/
Fuse-box

Battery

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

31

External Connection
4.9.1 Battery Breaker Box

UPS

Ampere
Rating
[A]

Connection
Cable
[mm2]

Max.
shortcircuit
current [kA]

Dimensions
HxWxD [mm]

Weight
[kg]

240 kW
320 kW

400
500

2//95
2//150

40
40

1035x835x300
1035x835x300

100
100

990-4045a

32

Installation Guide APC Silcon 240-320kW 400V UPS

External Connection

UPS
Battery 2

UPS
Battery 1

Battery 2

Battery 1

4.9.2 APC Battery Breaker Box Connection Diagram

Main cables are connected directly
to component terminals

X009 LED signal from UPS “OK to operate corresponding MCCB”
X010 MCCB position signals for UPS
X011 Trip for emergency stop (220-240V AC)

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

33

External Connection
4.9.3 UPS with External Battery in Battery Breaker Box/Fuse-box Configuration

990-4045a

34

Installation Guide APC Silcon 240-320kW 400V UPS

Programming Parameters
5.0 Programming Parameters
Below table shows operating parameters programmable from keyboard. Only qualified users
should re-set programming parameters.

5.1

Parameters

Parameter

Setting*

Comments

Bypass operation

YES, NO

YES will switch the system into bypass mode

Language

GB, D, F
DK, S, SF
NL, PL, CZ
E, P, SK, H

Language of text in display

Autostart

YES, NO

Automatic restart by mains return
(1 min.delay). Ensures quick battery recharge

Remote shutdown active

YES, NO

Shutdown of UPS by remote signal when in
battery operation. Saves battery energy

Remote shutdown

HIGH, LOW

Nature of remote shutdown signal level

Remote shutdown time

0, 1, 2, 3, 4
5, 6, 7, 8, 9
10 min.

Time delay on remote shutdown of UPS

Battery capacity test

---

Initiates back-up time check.
Time measured from start until it reaches low
DC warning level.
(See User Guide section 6 )

Battery monitor test**

---

Initiates checks of battery condition by 25%
discharging

Automatic battery test**

OFF, 3, 6 months

Activates the battery monitor test in cyclic
intervals

Battery monitor reset**

---

Press the

and

key

to resets alarm (flashing light)!

*

Boost charge

YES, NO

YES results in boost charge (10 hours)

Autoboost charge

YES, NO

YES results in boost charge after battery
operation. (10 hours)

Enter new date

YYMMDD

Set tolocal date

Enter new time

HHMMSS

Set to local time (24 hour clock)

Factory settings in bold

** Only for systems with Battery Monitor active
*** Do not leave system running in bypass mode (Static bypass) for extended periodes of time,
as batteries are not recharged in bypass mode.

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

35

Programming Parameters
5.1.1 Programming Keys

NOTICE!
Display accuracy is + 1%, + digit.

Scrolls up
through list
Scrolls down
through list

Displays time

Stores
parameters/
enter parameter
stack

Exits a mode
Silences the
audible alarm
Accesses
alarm stack

Chooses parameters

990-4045a

36

Installation Guide APC Silcon 240-320kW 400V UPS

Programming Parameters
5.1.2 Programming Example - Switch to Bypass Operation

NOTICE!
Do not leave in by-pass mode for extended periods in order not to affect battery capacity.

Return to normal operation

Follow same procedure to program other parameters.

5.2

System Configuration

System configuration parameters are vital for correct system operation and are passwordprotected.

CAUTION!
Incorrect programming may damage battery or cause output voltage to be lost during operation!

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

37

Programming Parameters
System Configuration Parameters (password protected)

Parameter

Setting*

Comments

Isolation Transformer Input

YES, NO

YES if optional input isolation transformer is available

IsolationTransformer
Output

YES, NO

YES if optional output isolation transformer is available

Delta Soft Start Time

1, 10, 20, 40 sec.

Input current switching in ramp function. Use higher
values for smaller/unstable diesel generators

External SSW present

YES, NO

YES for systems with external static bypass switch

Normal Charge Voltage

410-460V
438V

Setting of float charge voltage at 20°C
(Automatic compensation for temperature deviations)

Boost Charge Voltage

438-460V
438V

Setting of boost charge voltage at 20°C
(Automatic compensation for temperature deviations)

Low Battery warning

336-384V
336V

Discharged Battery warning

Low Battery shut-down

310-336V
326V

Switches off system at min. permissible battery
voltage

Synchronization

0.25, 0.5, 1, 2, 4
Hz/sec.

Syncronization speed.

High Battery Temperature

15-40°C
35°C

Alarm - Ambient temperature for battery too high

Common fault delay

0, 10, 20,
30 sec.

Delay before common fault alarm relay is activated

Reset operation mode lock

YES, NO

YES resets system locked in bypass or battery
operation mode caused by system failures (only
applicable for service personnel)

Expected back-up time
(min.)

0.1-999.9
5.0

Expected UPS back-up time in minutes when running
at 100% ohmic load. Time used by ABM**

Battery Capacity in (Ah)

0.1-999.9
7.0

Total Battery capacity in Ah.
Setting used by ABM**.

Highest Station Address

2-9

Highest station address in parallel system

Station Address

1-9

Station address in parallel system

APM Mode Active
(Advanced Power
Management)

Disabled
Redundant +1
Parallel +1

Use only in parallel systems.
Disabled: Advanced power management off.
Redundant +1: Redundant operation with one unit
being inactive in parallel system
Parallel +1: Redundant operation with all units in
operation.

APM Test Mode Active

YES, NO

YES, if APM test mode is active

Battery Connection

Common,
Separate

Common: if common battery is used in parallel system.
Separate: if separate battery is used

* Bold text refers to factory standard setting
**Advanced Battery Monitor
990-4045a

38

Installation Guide APC Silcon 240-320kW 400V UPS

Programming Parameters
5.2.1 Programming Example - Change Charge Voltage to 446

NOTICE!
Change charge voltages, battery warning limit, shut down voltage and high battery temperature
limit by entering the actual value. See example above.

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

39

Programming Parameters
5.2.2 Programming Example - Change to Output Isolation Transformer available

NOTICE!
Change parameters by pressing the

key once or several times. See example above.

990-4045a

40

Installation Guide APC Silcon 240-320kW 400V UPS

Programming Parameters
5.3

Programming Parameters for Advanced Parallel Operation

To use the advanced parallel functions, the following parameters must be programmed:
1. “Station number”
2. “Highest station address”
3. “Advanced power management”
4. “APM test mode active”
5. “Battery connection”
5.3.1 Description of Settings
1. “Station number”
• Valid station numbers: 1-9 stating the UPS parallel address in system.
2. “Highest station number”
• Valid station numbers: 2-9 stating the number of UPSs in system.
3. “Advanced power management”
• “Disabled”: Advanced Power Management is inactive.
• “PARALLEL+1”: Advanced Power Management is activated when the system operates
as PARALLEL N+1, meaning that one system can be isolated without overloading the
remaining systems (N systems/UPSs).
• “REDUNDANT+1”: Advanced power management is activated when the system
operates as REDUNDANT N+1, meaning that one system can be isolated without
overloading the remaining systems (N systems/UPSs) with one spare system.
4. “APM test mode active”
• “No”: Stand-by-time will be 24 hours - on-line time will be 48 hours (xN systems).
• “Yes”: Stand-by-time will be 1 min. - on-line time will be 2 min (xN systems).
5. “Battery connection”
• “Separate”: Separate battery for this UPS.
• “Common”: Common battery in a parallel system.
NOTICE!
“Common”: Common battery in a parallel system. When this setting is chosen, the highest
battery temperature that can be found in the parallelled systems (for charge voltage
compensation).

NOTICE!
Common battery pack is a technical possibility.
However, APC recommend separate battery pack due to a higher safety degree in connection
with redundant/parallel operation.
The UPS system is designed for both situations.

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

41

Programming Parameters
5.3.2 Programming example
Example with four systems in parallel with separate batteries.
• Programme the station addresses 1-4: 1 for UPS 1, 2 for UPS 2, 3 for UPS 3, and 4 for
UPS 4.
• All UPS systems have to be programmed to “Highest station address”:4.
• If APM is not to be tested, “APM test mode active” must be “NO”.
• If a system is isolated due to service, the station numbers must be reprogrammed for the
remaining active systems starting with number 1 and ending with maximum. number
of active systems. No number must be left in this sequence. Furthermore, “Highest
station address” must be changed to number of active UPSs in parallel.

5.4

Battery Monitor

5.4.1 Installation of new batteries
To avoid false alarms, the above procedure MUST be followed.

NOTICE!
Contact your local dealer if you have any questions regarding changing parameters.
990-4045a

42

Installation Guide APC Silcon 240-320kW 400V UPS

Options/Accessories
6.0 Options/Accessories
Please contact your local APC representative for information on options/accessories available
in your region. See “How to Contact APC” in this guide.

6.1

Service Bypass Panel for Single Operation

UPS

External
System
Input
Fuse
[A]

Max.
Prospective
ShortCircuit
Current
[kA]

System
Input/
UPS
Input
Cable
[mm2]
**

System
Output/
UPS
Output
Cable
[mm2]
**

240kW

500

45

2x120

320
kW

630

45

2x185

Max.
External
System
Output
Fuse
[A]***

Dimensions
HxWxD [mm]

Weight
[kg]

2x95

400

1272x775
x350(410*)

175

-

2x150

500

1825x
1160x620
(680*)

230

-

Fixing
Centres
AxB
[mm]

***

If no external System Output fuses are available or if it has a higher value than
indicated above, System Output and UPS Output cables should be dimensioned as
System Input and UPS Input cables.

**

Sizes according to IEC 364-5-532 for PVC insulated copper cables (max. ambient
temperature: 30oC). Installation method B: Insulated conductors in wall conduit.
Also refer to local legal regulations.
Beware that single-phase Switch Mode Power supply loads will increase neutral
current! At a 100% SMPS load, neutral cable should be dimensioned for 200% of
phase current.

*

Depth of enclosure includes switch handles

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

43

Options/Accessories
6.1.1 Wiring up UPS with SBP in TN-C-S Network

6.1.2 Wiring up UPS with SBP in TN-S Network

990-4045a

44

Installation Guide APC Silcon 240-320kW 400V UPS

Options/Accessories

6.1.3 Operating The External Service Bypass Switch

Action

1. Press

on the keyboard

Display shows

2. Press

or

Bypass operation
:NO

3. Press

on the keyboard

4. Press

on the keyboard

on the keyboard until

Bypass operation
:YES

Lamp indication
on Service Bypass Panel
5. Check lamp indication on the Service Bypass Panel

The Green lamp (H003)
above the bypass switch
handle (Q003) lights

6. Turn the external bypass switch (Q003)
to position ”1“

The Green lamp (H002)
above the output switch
handle (Q002) lights

7. Turn the output switch (Q002) to position ”0“

Only the lamp (H002)
above the output switch
handle (Q002) lights now

Display shows
8. Open the front door and press both the green
”ON“ and the red ”OFF“ keys simultaneously

** System OFF **

The acoustic alarm sounds for 30 sec.*

9. Turn the input switch to position ”0“
The red alarm LED below the display lights
and the acoustic alarm sounds for 30 sec.

*

The acoustic alarm can be reset by the

key

EMERGENCY (UPS not alive)
1.
2.
3.
4.

Turn the input switch (Q001) to position ”0“.
Turn the output switch (Q002) to position ”0“.
Change any released system input fuse(s).
Turn the bypass switch (Q003) to position ”1“.

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

45

Options/Accessories
6.1.3.1 Switching from External Bypass to Normal UPS Operation

Action

Display shows

1. Turn the input switch (Q002) to position ”0“

** System OFF **

2. Open the UPS front door and press the
green "ON” key

Normal operation
load power %

3. Press

on the keyboard

4. Press

or

5. Press

on the keyboard

6. Press

on the keyboard

on the keyboard until

Bypass operation
:NO
Bypass operation
:
:YES

Lamp indication
on Servive Bypass Panel
7. Check lamp indication on the bypass panel

The Green lamp (H002)
above the output switch
handle (Q002) lights

8. Turn the output switch (Q002) to position ”1“

Now also the green lamp
(H003) above the bypass
switch handle (Q003)
lights

9. Turn the bypass switch (Q003) to position ”0“

Only the Green lamp
(H003) above the bypass
switch handle (Q003)
lights
Display shows

10. Press

on the keyboard

11. Press

or

12. Press

on the keyboard

Bypass operation
:NO

11. Press

on the keyboard

Normal operation
load power xx %

11. Press

on the keyboard

on the keyboard until

Bypass operation
:
:YES

No lamps on the Service
Bypass Panel light any
longer

990-4045a

46

Installation Guide APC Silcon 240-320kW 400V UPS

Options/Accessories
6.2

Service Bypass Panel for Parallel Redundant Operation

Service Bypass Panel (SBP)

System Output

Q003

Mains Supply

Q004

Q002b Q002a

Q001a Q001b

X020
X021

Control
cables

APC Silcon
400V UPS

Battery Breaker/
Fuse Box

Battery

X020 APC Silcon
X021 400V UPS

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

47

Options/Accessories
6.2.1 Two Parallel Systems with Service Bypass Panel

990-4045a

48

Installation Guide APC Silcon 240-320kW 400V UPS

Options/Accessories
6.2.2 Parallel/Redundant Operation with Service Bypass Panel and External
Battery via MCCB

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

49

Options/Accessories
6.2.3 Operating External Service Bypass Switch for Parallel Systems
6.2.3.1 Bypassing Parallel UPS Systems

H002a

CAUTION!
Batteries connected to a UPS out of service for a period exceeding 8 days may be damaged.

990-4045a

50

Installation Guide APC Silcon 240-320kW 400V UPS

Options/Accessories

Action
Step 1-4 can be carried out with any of the parallel systems, however this will switch
all systems into bypass operation.
Display shows
1. Press

on the keyboard

2. Press

or

3. Press

on the keyboard

4. Press

on the keyboard

Bypass operation
:NO

on the keyboard until

Bypass operation
:YES

Bypass operation

All systems will transfer to bypass operation
Do not switch off any of the UPS systems
until step 5-8 has been completed.

Lamp indication
on bypass panel
5. Check lamp indication on the Service Bypass Panel

The green lamp (H003)
above the bypass switch
handle (Q003) lights

6. Turn the external bypass switch (Q003)
to position ”1“

The green lamp (H004)
above the output isolator
(Q004 and the green lamps
(H002) above the output
switch handles (Q002) lights

7. Turn the output isolator (Q004) to position ”0“

The green lamps (H002)
above the output switch
(Q002) light and the green
lamp (H004) above the output
switch (Q004) lights

8. Turn the output switches (Q002) to position ”0“

Now the lamps (H002)
above the output switch
handles (Q002) light and the
green lamp (H004) above the
output switch (Q004) lights
Display shows

9. Open the front door and press both the green
”ON“ and the red ”OFF“ keys simultaneously in
any of the systems
The acoustic alarm sounds for 30 sec.*
Repeat for (all) other system(s).

** System OFF **

10. Turn all input switches (Q001) to position ”0“
The red alarm LED below the display lights
and the acoustic alarm sounds for 30 sec.

*

The acoustic alarm can be reset by the

key

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

51

Options/Accessories
6.2.3.2 Switching Parallel System from External Bypass into Normal UPS Operation

H002a

990-4045a

52

Installation Guide APC Silcon 240-320kW 400V UPS

Options/Accessories

Action

Display shows

1. Check that output switch (Q004) is in
position “0”
2. Check that all output switches (Q002)
are in position “0”
3. Turn input switches (Q001) to position “1”

** System OFF **

4. Open the UPS front door and press the
green “ON” push-botton

Normal operation
load power 0%

5. Press

on the keyboard

6. Press

or

7. Press

on the keyboard

8. Press

on the keyboard

on the keyboard until

All systems will transfer to bypass operation

Bypass operation
:NO
Bypass operation
:YES

Bypass operation
Lamp indication
on Service Bypass Panel

9. Check that all output switches (Q002) are in
position “0”

10. Turn all output switches (Q002) to position ”1“

The green lamps (H002)
above all the output
switch handles (Q002)
lights.
The green lamp
(H004) above the output
switch (Q004) handle also
lights.

11. Turn the output switch (Q004) to position ”1“

The green lamps (H002)
above all the output switch
handles (Q002) light. The
green lamp (H004) above
the output switch (Q004)
handle and the green lamp
(H003) above the bypass
switch light.

12. Turn the bypass switch (Q003) to position “0”

The green lamps (H002)
and (H004) do not light any
longer. (H003) will light
until normal operation.
990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

53

Options/Accessories

The following can be carried out on any UPS

Display shows

13. Press

on the keyboard

Bypass operation
:YES

14 Press

or

Bypass operation
:NO

15. Press

on the keyboard

16. Press

on the keyboard

on the keyboard until

All the systems will transfer to normal operation.

Normal operation
load power xx%
No lamps on the bypass
panel lights any longer

6.2.4 Isolating One UPS for Service/Maintenance
In a redundant system, one UPS may be isolated for service/maintenance without affecting
other UPSs.
1. Check that remaining UPS(s) is capable of carrying the load in the event that one UPS is isolated
2. Switch off system to be isolated for maintenance purposes by pushing green “ON” and red
“OFF” buttons simultaneously
3. To disconnect battery, mains and output, open battery MCCB/fuse and set input switch (Q001)
and output switch (Q002) to position “0”
With Q002 in position “0”, UPS will be operational and may be tested as a single system
without affecting other parallel UPS(s).

990-4045a

54

Installation Guide APC Silcon 240-320kW 400V UPS

Options/Accessories

H002a

6.2.5 Switching Back to Normal Parallel/Redundant Operation
1. Turn input switch (Q001) and output switch (Q002) to position “1”
2. Charge capacitor, connect battery and start up UPS
UPS will automatically switch to normal operation and start load-sharing with other
parallelled UPS(s).

WARNING!
System will discharge built-in capacitors, but check terminal voltage before proceding.

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

55

Options/Accessories
6.3

Intersystem Synchronization Unit

Intersystem Synchronization Unit System (ISU System)
The ISU system consists of inter-connected ISUs. One ISU system may consist of up to 5 ISUs,
regardles of ISU configuration. The ISU system synchronizes the voltage of parallel operation
systems running in battery operation.
The ISU system may also include one or more external synchronization sources,
e.g. a gen-set or a non-APC Silcon UPS system.
Synchronization accuracy of the ISU is better than 2o.
Schematic overview of ISU system (example):

UPS 1A

UPS 1B

UPS 2B

Parallel
Operation
System 1

Parallel
Operation
System 2
UPS 1C

UPS 2A

ISU
1

UPS 2C
ISU
2

ISU System

ISU
4
UPS 4

ISU
3

ISU
5

Ext.
sync
Source

Parallel
Operation
System 3
UPS 3A

UPS 3C

UPS 3B

Intersystem Synchronization Unit (ISU)
The ISU is an active part of an ISU system, serving as the interface to the sources and the ISU
system.
The ISU can be connected to a parallel UPS configuration, using the standard parallel
communication controller in the parallel operation system.
(See Intersystem Synchronization Unit User’s Manual for further details.)

990-4045a

56

Installation Guide APC Silcon 240-320kW 400V UPS

Options/Accessories
6.4

Remote Display

With the remote display unit data may be displayed at distances of up to 25 m from UPS. For
extended communication distance, see section below.
Remote display may easily be connected to UPS via one of the two serial communication ports
on the communication interface board.
To obtain a transmission distance of up to 3.2 km normal RS232C signal levels must be
converted to a long distance communication standard. The converter must be placed outside
the UPS cabinet.
6.4.1 Extension of Remote Display Communication Distance
Remote display communicates with the UPS through a 3-wire RS232 interface. Remote display
is a DTE (Data Terminal Equipment) employing a SUB-D 9-pin female connector.
Communication speed: 9600 bps.
For communication distances, see Table 1. Insert converters if longer distances are necessary,
or if communication cables are led through magnetically noisy areas. Converters must comply
with local regulations
Table 1: Remote Display Communication Extensions
Standard
(RS232)

Short-haul
Modem Async

Max. distance

80/25 ft/m

10000/3200 ft/m

Converter Manufacture
Art. Code

No converter

BLACK BOX
ME800A-R2

RS232 BLACK BOX connector

Sub-D 25-pin female

BLACK BOX interconnector

4-screw terminal

Two converter boxes are required for a communication distance extension: One
box near the UPS for the conversion from RS232C to a long distance communication standard,
and another box at the other end to convert back to RS232C, which is to be connected to the
Remote Display. The converter provides optical signal insulation. Both converter boxes must
be supplied by an uninterruptible power source.
990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

57

Options/Accessories
6.4.1.1 Connections Without Converter
Connect a 25-pin female Sub-D and a 9-pin male Sub-D connector with a 3-wire shielded cable,
as shown in the table below. Connect shield at one end only.
Pin Connection for Interconnection Cable (without converter):
Host (DTE)

Remote Display (DTE)

25-pin female
pin No.

9-pin male
pin No.

2 (TXD)

2 (RXD)

3 (RXD)

3 (TXD)

7 (GND)

5 (GND)

House (shield)

No Connection

6.4.1.2 Connections With Converter
Connections to be made according to converter manual.

Pinconnection example only:

Pin Connections for cable
from host to ME800A-R2.

Pin connection for cable from
ME800A-R2 to Remote Display

Host
(DTE)

ME800A-R2
(DCE)

ME800A-R2
(DCE)

Remote Display
(DTE)

25-pin female
pin No.

25-pin male
pin No.

25-pin male
pin No.

9-pin male
pin No.

2 (TXD)

3

3

2 (RXD)

3 (RXD)

2

2

3 (TXD)

7 (GND)

7

7

5 (GND)

House (Shield)

No connection

No connection

House (Shield)

The ME800A-R2 must be set up as a DCE with no RTS/DTR control.
The interconnection cable between the two ME800A-R2 boxes is a 4-wire twisted pair
telephone cable with or without shield. The shield improves noise immunity but reduces
maximum communication distance.

990-4045a

58

Installation Guide APC Silcon 240-320kW 400V UPS

Options/Accessories
6.4.2 Remote Display Installation
6.4.2.1 Connecting RS232C and Mains Adapter

CAUTION!
Wiring for alarm and signal circuit field to be rated 300V (minimum).

Rear view

Rear view

Front view

1. Turn 180° to loosen
the 4 screws
2. Remove front cover

3. Mont back plate
4. Connect cables

DP9-F

Cable entry from bottom and rear

Mains adapter

6.4.2.2 Remote Display Power Supply
The remote display is supplied by normal AC power with no battery back-up. For UPS data
transmission to remote display to remain unaffected during power failure, the remote display
must be supplied from an uninterruptible power source.
Converters used to extend communication distance must also be supplied from uninterruptible
power sources.
6.4.2.3

Remote Display Cables

RS232C to RS232C cable:
APC Silcon, DB25-F

Remote Display, DB9-M

X

Connect shield at one end only!
Rating: Refer to Local/National electrical codes.
Communication voltage +15VDC
990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

59

Options/Accessories
6.4.3

Remote Display Use

The remote display is an inactive unit unable to influence the operation of the UPS: Some of
the alarms visible on the internal display are also available on the remote display (See the
Alarm section in the APC Silcon User Guide).
6.4.3.1 Initiating the Remote Display
After having connected the supply the display will show:
Remote Display: “APC Silcon UPS”
6.4.3.2 Communication Fault
Communication fault between UPS and remote display will appear in the display as follows:
“Data transmission interrupted”
6.4.3.3 Remote Display Setting
Use # Stack to select language and type of UPS connected to remote display.

Parameter

Setting

Comments

Language

GB,D,F,DK, S, SF,NL, PL, CZ,
E, P, SK, H, I

Language

Host

SDC charger, DP300E, 300E

Type of UPS connected to remote
display

6.4.3.4 Operation
See the Operation section in the APC Silcon User Guide.
6.4.3.5 Display of Measured Value
See Display of Measured Value in the APC Silcon User Guide.
Time reading not visible from the remote display.
6.4.3.6 Alarms
See Alarms section in the APC Silcon User Guide.

990-4045a

60

Installation Guide APC Silcon 240-320kW 400V UPS

Options/Accessories
6.5

Isolation Transformer

1800mm

1600 mm wide

APC Isolation
Transformer module
320-480kW

UPS

Height [mm]

Width [mm]

Depth [mm]

Weight [kg]

240kW
320kW

1800
1800

800
1600

800
800

1240
1470

Example of Transformer
Configuration (Yyno)

PE

PE

NOTICE!
APC isolation transformers are available in various configuration. Contact your local APC
representative for further information. See “How to Contact APC” in this guide.
990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

61

Options/Accessories
6.5.1 Connecting Isolation Transformer

UPS

External
Input Fuses*
FM [A]
380-415V

External
Input Cable
[mm2]
380-415V

External PE
Cable [mm2]

External
Output
Cable
[mm2]

External
Temp. Switch
Cable
Max.[mm2]

240kW

500

2//120

95

2//120

2

*DIN gL types
PVC cables insulated to withstand a maximum ambient temperature of 30oC

990-4045a

62

Installation Guide APC Silcon 240-320kW 400V UPS

Options/Accessories

NOTICE!
If an MCCB is used in stead of external input fuses, the MCCB load capacity must be 8xIn
(nominal current) for minimum 10 ms.

NOTICE!
Check correct phase rotation of mains input voltage! Maximum input/output cables: 3//300 mm2.
If input neutral is not available, an optional Dzn0 or Dyn11 input isolation transformer must be
used.

NOTICE!
All external cable dimensions are recommended sizes only. Refer to local legal regulations.

NOTICE!
Make sure that gland plate is installed in bottom of cabinet.

CAUTION!
At 100% switch mode load, neutral must be rated for 200% phase current.

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

63

Options/Accessories

Isolation
Transformer

External
Input
Fuses* FM
[A]
380-415V

External
Input Cable
[mm2]
380-415V

External PE
Cable
[mm2]

External
Output
Cable [mm2]

External
Temp.
Signal
Cable
Max.[mm2]

320kW

630

2//185

150

2//185

2

*DIN gL types
PVC cables insulated to withstand a maximum ambient temperature of 30oC

990-4045a

64

Installation Guide APC Silcon 240-320kW 400V UPS

Options/Accessories
6.5.2 Wiring up UPS with External Yyn0 Isolation Transformer at Output

WARNING!
Isolation transformer provides galvanic isolation between mains supply and load. Load will loose
galvanic isolation if isolation transformer is bypassed

NOTICE!
Refer to local legal regulation for wiring information.
990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

65

Options/Accessories
6.5.3 Wiring up UPS with External Yyn0 Isolation Transformer at Input

WARNING!
Isolation transformer provides galvanic isolation between mains supply and load. Load will loose
galvanic isolation if isolation transformer is bypassed.

NOTICE!
Refer to local legal regulation for wiring information.
990-4045a

66

Installation Guide APC Silcon 240-320kW 400V UPS

Options/Accessories
6.5.4 Wiring up UPS with External Optional Dzn0 Isolation Transformer at Input

WARNING!
Isolation transformer provides galvanic isolation between mains supply and load. Load will loose
galvanic isolation if isolation transformer is bypassed.

NOTICE!
Refer to local legal regulation for wiring information.
990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

67

Options/Accessories
6.5.5 Wiring up UPS with External Optional Dzn0 Isolation Transformer at Output

WARNING!
Isolation transformer provides galvanic isolation between mains supply and load. Do not bypass
isolation transformer in order to avoid damaging circulation currents and to prevent load from
loosing galvanic isolation.

NOTICE!
Refer to local legal regulation for wiring information.
990-4045a

68

Installation Guide APC Silcon 240-320kW 400V UPS

Options/Accessories
6.5.6 Wiring up UPS with External Optional Dyn11 Isolation Transformer at Input

WARNING!
Isolation transformer provides galvanic isolation between mains supply and load. Do not bypass
isolation transformer in order to avoid damaging circulation currents and to prevent load from
loosing galvanic isolation.

NOTICE!
Refer to local legal regulation for wiring information.
990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

69

System Specifications
7.0 System Specifications
7.1

Technical Data
Voltage
Input

Output

Voltage tolerance
Normal operation
Bypass operation

+15%
+10% (standard)
+4, 6, 8% (programmable)

Frequency

50Hz/60Hz
+6 standard
+0.5-8% (programmable)

Input power factor

load 25% minimum 0.97
load 100% minimum 0.99

Current distortion

Max. 5%

Voltage

3x380/400/415V

Voltage tolerance

+1% static symmetrical load
+3% static symmetrical load
+5% 0-100% load step

Voltage distortion

max. 3% linear load
max. 6% non-linear load

Load power factor

0.9 lead to 0.8 lag

Frequency

50Hz/60Hz (mains synchronized)
+0.1% free-running

Overload capacity
Mains operation
Mains operation
Battery operation
Bypass operation
General

200% - 60 seconds
125% - 10 minutes
150% - 30 seconds
125% - continuous

Ambient temperature

0-40oC (Temperatures above 25oC will
reduce battery lifetime)

Humidity
Protection class
Safety

Max. 95% non-condensing
IP30
EN 50091-1
CE Mark
EN 50091-2
Built-in
Programmable
Programmable

Emission and Immunity
Static bypass switch
Auto restart
Economy mode

7.2

3x380/400/415V

Dimensions / Weight
Type

240kW

320kW

Height [mm]

1800

1800

Width [mm]

1600

1600

Depth [mm]

800

800

Weight [kg]

1400

1400

990-4045a

70

Installation Guide APC Silcon 240-320kW 400V UPS

Warranty
8.0 Warranty
8.1

APC Silcon Series Limited Factory Warranty

APC warrants that the unit, when properly installed and commissioned by APC or APC authorized
service personnel, shall be free from defects in materials and workmanship for a period of (1) year
from the date of installation or maximum 18 months after manufacturing. In the event that the unit
fails to meet the foregoing warranty, APC shall for a period of one (1) year repair or replace any
defective parts, without charge for on-site labor and travel if trained & authorized APC personnel
has conducted start-up of the unit.
An APC Start-Up Service must be performed/completed by APC or APC authorized service
personnel or the on-site factory warranty will be voided and replacement of defective parts only will
be covered. APC shall have no liability and no obligation to repair the installed unit if non-authorized
APC personnel performed the start-up and such start-up caused the unit to be defective.

APC SHALL NOT BE LIABLE UNDER THE WARRANTY IF ITS TESTING AND EXAMINATION
DISCLOSE THAT THE ALLEGED DEFECT IN THE PRODUCT DOES NOT EXIST OR WAS
CAUSED BY PURCHASER’S OR ANY THIRD PERSON’S MISUSE, NEGLIGENCE, IMPROPER
INSTALLATION OR TESTING, UNAUTHORIZED ATTEMPTS TO REPAIR OR MODIFY, OR ANY
OTHER CAUSE BEYOND THE RANGE OF THE INTENDED USE, OR BY ACCIDENT, FIRE,
LIGHTNING OR OTHER HAZARD.
THERE ARE NO WARRANTIES, EXPRESSED OR IMPLIED, BY OPERATION OF LAW OR
OTHERWISE, OF PRODUCTS SOLD, SERVICED OR FURNISHED UNDER THIS AGREEMENT
OR IN CONNECTION HEREWITHIN. APC DISCLAIMS ALL IMPLIED WARRANTIES OF
MERCHANTABILITY, SATISFACTION AND FITNESS FOR A PARTICULAR PURPOSE. APC’S
EXPRESS WARRANTIES WILL NOT BE ENLARGED, DIMINISHED, OR AFFECTED BY AND NO
OBLIGATION OR LIABILITY WILL ARISE OUT OF, APC’S RENDERING OF TECHNICAL OR
OTHER ADVICE OR SERVICE IN CONNECTION WITH THE PRODUCTS. THE FOREGOING
WARRANTIES AND REMEDIES ARE EXCLUSIVE AND IN LIEU OF ALL OTHER WARRANTIES
AND REMEDIES. THE WARRANTIES SET FORTH ABOVE, CONSTITUTE APC’S SOLE
LIABILITY AND PURCHASER’S EXCLUSIVE REMEDY FOR ANY BREACH OF SUCH
WARRANTIES. APC’S WARRANTIES RUN ONLY TO PURCHASER AND ARE NOT EXTENDED
TO ANY THIRD PARTIES.
IN NO EVENT SHALL APC, ITS OFFICERS, DIRECTORS, AFFILIATES OR EMPLOYEES BE
LIABLE FOR ANY FORM OF INDIRECT, SPECIAL, CONSEQUENTIAL OR PUNITIVE
DAMAGES, ARISING OUT OF THE USE, SERVICE OR INSTALLATION, OF THE PRODUCTS,
WHETHER SUCH DAMAGES ARISE IN CONTRACT OR TORT, IRRESPECTIVE OF FAULT,
NEGLIGENCE OR STRICT LIABILITY OR WHETHER APC HAS BEEN ADVISED IN ADVANCE
OF THE POSSIBILITY OF SUCH DAMAGES.

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

71

Appendix
9.0 Appendix
9.1

Table 1. Installation Planning Data
Q3
Service Bypass Panel

Main Input
Breaker *

Output
Breaker *

Q2

Q1
UPS Module

Field
Wiring*

Field
Wiring *

Battery Bank**

* Not supplied by APC
** Internal Batteries available for 40kW units and smaller

Installation Planning Data
APC Silcon Series
AC Input
Power rating

Source

Nom.

Max. (per phase) Protection*

Vn

load

AC Output

IMax

Disch Disch

Load side
In

Heat

Overcurrent Dissipation

(Vdc)

P(kW)

(A)

(A)

(A)

Protection*

(kW)

1

380 50/60 256.6 307.5 421.7
400
403.5
415
386.6

463.9
443.8
425.3

2//120mm2

500 A

2x384

252.7

329

388

363.6
347.8
333.3

400 A

9.2

320 320

1

380 50/60 333.9 407.4 558.8
400
507.3
415
512.3

614.7
588.0
563.5

2//185mm2

630 A

2x384

334.8

436

514

484.8
463.8
444.4

500 A

10.6

3a

3b

4a

6, 7

13

1b

Max.

Overcurrent

INom

Pf

1a

Nom.

Cable

Full

kW kVA

NOTES

Hz

I (A)

Input

240 240

COLUMN

V

P (kW)

Battery System DC
Min. Input

1c

1d

1e

1f

1g

1h

2a

2b

2c

2d

3

4

1

2

9

5, 6, 13

8

12

10

11

* Provided by others

990-4045a

72

Installation Guide APC Silcon 240-320kW 400V UPS

Appendix
Notes:

1. Nominal input current based on rated load.
2. Maximum input current based on rated load + full battery recharge. Full battery recharge
assumed to increase input current with 10%.
3.

Nominal power consumption (column 1c) based on nominal input current (1e) and the
corresponding input voltage (1a).

4. Maximum power consumption (1d) based on maximum input current (1f) and the corresponding
input voltage (1a).
5. Suggested input overcurrent protection (1h) based on continous full load maximum input current
(1f). MCCB breaker selection based on continous full load nominal input current (1e) is
acceptable, provided battery recharge time is short.
6. Fuses according to DIN LV HRC type gL, 500V assumed. MCCB load capacity must be 8xIn
(nominal current) for minimum 10ms.
7. Suggested load side overcurrent protection (3b) based on nominal output current (3a).
8. Nominal battery voltage assumed to be 2V/cell (Lead technologi).
9. Recommended cable sizes, see "External Connection" section of this guide.
CAUTION! Cable sizes must comply with national and/or local legal regulations.
10. Nominal battery discharge current (2c) based on full rated load and nominal battery
voltage (2V/cell).
11. Maximum battery discharge current (2d) based on full rated load and battery voltage at end of
discharge (1.7V/cell).
12. Full load discharge power from battery based on nominal battery discharge current
(2c) x nominal battery voltage (2x192cells x 2V/cell), or maximum battery discharge current
(2d) x battery voltage at end of discharge (2x192cells x 1.7 V/cell).
13. Heat dissipation based on nominal full load capacity and linear load.

990-4045a

Installation Guide APC Silcon 240-320kW 400V UPS

73

How to Contact APC
10.0 How to Contact APC

APC Corporate
132 Fairgrounds Road
West Kingston, RI 02892
USA

APC Australia
Level 27, 100 Miller St. Northpoint
NSW 2076, North Sydney
Australia

Telephone: +1 401 789-5735
Fax:
+1 401 789-3710
Pre-sales Technical Support
+1 877-474-5266
Post-sales Technical Support
+1 877-287-7835

Telephone: + 61 2 9955 9366
Fax:
+ 61 2 9955 2844

APC Denmark
Silcon Allé
DK-6000 Kolding
Denmark
Telephone: + 45 75 54 22 55
Fax:
+ 45 72 19 03 50
Pre-sales Technical Support
+ 45 72 19 04 90
Fax:
+ 45 72 19 03 51

APC Ireland
Ballybrit Business Park
Galway
Ireland
Telephone: + 353 917 02000
Fax:
+ 353 917 56909
Post-sales Technical Support
+ 353 91 70 2000

Web: www.apc.com/support

APC Singapore
100 Beach Road #13-08
Shaw Towers Singapore
Telephone: + 65 398 1000
Fax:
+ 65 398 1415
APC Japan
BR Gotanda, 7th Floor
2-30-4 Nishi-Gotanda,
Shinagawa-Ku,
Tokyo, Japan 141
Telephone: + 813 5434 2021
Fax:
+ 813 5434 2022
APC Beijing Rep.
Rm 401, North Building,
Kerry Centre
1 GuangHua Road,
Chao Yang District,
Beijing 100020
Telephone: + 8610 8529 9888
Fax:
+ 8610 8529 9158
APC Hong Kong
Room 903, 9/F, Mass Mutual Tower
38 Gloucester Road
Wanchai
Hong Kong
Telephone: + 852 2834 5001
Fax:
+ 852 2834 8876
APC Taiwan Office
12F, No 2, Section 5, Hsin-I Road, Taipei
Taiwan, R.O.C
Telephone: + 8862 27224457, + 8862 27587917
Fax:
+ 8862 27587893
APC Korea
Rm 402, Cheongwon Building,
828-5 Yeoksam-Dong
Kangnam-Ku, Seoul,
Korea 135-080
Telephone: + 822 501 6492
Fax:
+ 822 501 6369
APC (I) P LTD - Bangalore
27 Lavelle Road,
Karnataka, Bangalore
India 560001
Telephone: + 91 80 2213875/847/2997514
Fax:
+ 91 80 2213816

990-4045a

74

Installation Guide APC Silcon 240-320kW 400V UPS



Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.3
Linearized                      : Yes
Create Date                     : 2001:05:15 17:18:30
Producer                        : Acrobat Distiller 4.0 for Macintosh
Author                          : G3/LNC
Creator                         : FrameMaker 6.0: AdobePS 8.6 (219)
Title                           : 990-4045a(240-320).fm.
Modify Date                     : 2001:05:17 15:08:00+02:00
Page Count                      : 74
EXIF Metadata provided by EXIF.tools

Navigation menu