Amerimax Home Material Fl 5896 Users Manual Soffit 8.5x11

Home Material to the manual 60695a43-84b7-4d0e-9e34-21b6c4f8d083

2015-02-05

: Amerimax Amerimax-Home-Material-Fl-5896-Users-Manual-508572 amerimax-home-material-fl-5896-users-manual-508572 amerimax pdf

Open the PDF directly: View PDF PDF.
Page Count: 2

DownloadAmerimax Amerimax-Home-Material-Fl-5896-Users-Manual- Soffit 8.5x11  Amerimax-home-material-fl-5896-users-manual
Open PDF In BrowserView PDF
www.amerimax.com
(800) 347-2586
Lancaster, PA 17604

MATERIAL SELECTION GUIDE
AND INSTALLATION INSTRUCTIONS
* Note – When product is installed in Florida see
Approval # FL 5896 for installation instructions with specific
adherence to the 2004 Florida Building Code.

MEASURING FOR YOUR PROJECT
A. TOTAL OVERHANG LENGTH (feet)
Measure the length (L) of overhang on all sides of your house. Add all these
measurements to get the total overhang length, in feet.

B. OVERHANG DEPTH (inches)
Identify your project from the illustrations
below and measure the overhang depth,
in inches, to the nearest 1/8 of an inch.
L1

http://www.floridabuilding.org/pr/pr_detl.asp?IPT=5896&RV=0&fm=ROSrch

INSTALLING A
HORIZONTAL OVERHANG

Overhang
Depth

INSTALLING AN
INCLINED OVERHANG

Overhang
Depth

Project I using
Front Trim

L2

ang
Overh
Depth

ang
Overh
Depth

Project II not
using Front Trim

Project III using
Front Trim

Project IV not
using Front Trim

MATERIAL SELECTION GUIDE
Attractive:

Aluminum won’t split, rot, or warp.
Baked on finish resists peeling, cracking,
chipping, and blistering.

PANEL SUPPORTS: J-CHANNEL OR FRIEZE MOULDING (twelve foot lengths)
For projects I and III

Easy To Work With:

Aluminum can be cut with a sharp blade,
metal snips, or circular saw. Fasten it with a
hammer and (aluminum) nails. It’s lightweight
but strong.

The Permanent
Outdoor Material:

Proven over the past 50 years in siding, storm,
and screen doors and many other applications.

COMPONENTS
PANEL SUPPORTS
(twelve foot lengths)
Used to support the overhang panels.

Divide total overhang length (in feet) by 12 and round up to the nearest whole number.
If not using double channel at mitred corners, add one additional length if overhang
turns a corner.
Example: Total Overhang Length = 80 feet
80 ÷ 12 = 6 8/12 lengths
You need 7 twelve foot lengths plus one length if overhang turns a corner
and you are not using a double channel runner at mitred corner.

For projects II and IV
Divide total overhang length ( in feet) by 6 and proceed as above.
Example: Total Overhang Length = 80 feet
80 ÷ 6 = 13 2/6 lengths
You need 14 twelve foot lengths plus one length if overhang turns a corner
and you are not using double channel runner at mitred corner.

OVERHANG PANELS: SOFFIT (12" x twelve foot lengths)
J-channel

(Decorative)
Frieze Moulding

LOCATE YOUR OVERHANG DEPTH
From 7" to 8 1/8"

Divide total overhang length (in feet) by 18 and round up
to nearest whole number.
Example: total overhang length = 80 feet
80 ÷ 18 = 4 8/18 lengths
You need 5 twelve foot lengths.

OVERHANG PANELS (SOFFIT)
(twelve foot lengths)
These lengths are cut into individual
panels to match the depth of your overhang.
They come either solid or vented.

12" wide Panels

FRONT TRIM
(twelve foot lengths)
Used to cover the wood trim to which your gutter is
attached. Now is a good time to decide on replacing
your old gutters with an AMERIMAX RAIN CARRYING
SYSTEM. The front trim may be slipped under the
existing gutter if it is not removed. If front trim is not
used, additional panel supports are required.

DOUBLE CHANNEL RUNNER
(twelve foot lengths)
May be used instead of butting
J channels at mitred corners.

Over 8 ½" to 9 ¾"

Divide total overhang length (in feet) by 15 and proceed as above.

Over 9 ¾" to 12 1/8"

Divide total overhang length (in feet) by 12 and proceed as above.

Over 12 1/8" to 16 1/8"

Divide total overhang length (in feet) by 9 and proceed as above.

Over 16 1/8" to 24 1/8"

Divide total overhang length (in feet) by 6 and proceed as above.

Over 24 1/8" to 48 1/8"

Divide total overhang length (in feet) by 3 and proceed as above.

Remember: Decide on how many solid and how many vented panels you want. The
answers you get above are the total number of panels you need.
Fascia 4",
6", 8", 10"
heights
available

1" Fascia
Runner

11/4" TRIM
NAILS

A WORD ABOUT VENTED OVERHANG PANELS

Amerimax vented panels allow outside air to pass through the roof rafters into your
attic. Your attic exhaust system completes this important air circulation loop. Adequate
ventilation is required to prevent:
• Energy losses in summer
from a super-heated attic
• Energy losses in winter
caused by attic insulation
that has soaked up
condensation and moisture.
• Peeling paint and rotting wood
caused by condensation buildup inside the framework of the house.
A solid wooden overhang allows none of this vital air circulation.
For adequate ventilation, Amerimax recommends that a minimum of 1/3
of the aluminum overhang panels be vented panels.

FRONT TRIM: Fascia or 1" Fascia Runner (twelve foot lengths)
Divide total overhang length (in feet) by 12 and round up to nearest whole number.
Example: total overhang length = 80 feet
80 ÷ 12 = 6 8/12 lengths
You need 7 twelve foot lengths.

NAILS:
Only aluminum nails should be used. One box (¼ pound) of Amerimax 1¼" aluminum trim
nails should be sufficient for your entire project.
Circular saw
with fine
tooth blade
for cutting
metal

TOOLS
REQUIRED

Measuring tape

Chalkline
Sharp knife

Metal snips

CAUTION:
When nailing aluminum, hammer only until nail head touches
aluminum surface. Further hammering may prevent normal
expansion and cause buckling.

Carpenter’s square

Hammer
Level

Remove Any
Existing Trim

Before You Begin
Remove an existing trim. Consider possible obstructions such as utility lines. Panels may
be cut to fit around them or contact your utility company for removal or replacement.

STEP 1. INSTALL PANEL SUPPORTS
(J-CHANNEL or FRIEZE MOULDING)

FOR PROJECTS I AND III
Insert each panel into support and
approximately even with outside edge of
wooden front trim. Install each successive
panel, pushing it up against the previous panel
until it interlocks, before nailing into the bottom
of the wooden front trim.

• Always start at one end of the house.
• No overlap is needed where lengths meet.
• Nail on approximate 16" centers.

FOR PROJECTS I AND III, WHERE NEW OVERHANG WILL BE ON
THE SAME ANGLE AS EXISTING OVERHANG OR RAFTERS
Install along wall of house by nailing through long leg into existing wooden
overhang or rafters.

FOR PROJECTS II AND IV

Fig. A

Project I

Install the panel by sliding it into the tracked
formed by the two panel supports. Install
each successive panel, pushing it against the
previous panel until it interlocks. Proceed until
panel support against wall is filled. Install one
additional length of panel support against the
wall, as before. Proceed with installation of
panels and panel supports.

Project II

FOR PROJECT I, WHERE YOU ARE CHANGING FROM AN
INCLINED OVERHANG TO A HORIZONTAL OVERHANG
Mark point on wall level with bottom edge of wooden front trim
at both corners (A). Strike a chalkline between the two points.
Make 1” wide nailing flanges on long edge of panel
supports by notching with metal snips and bending
up. Fasten panel supports to wall with long side
up and top horizontal edge even with
chalkline, nailing through flanges.

Going Around Corners
If inside or outside corners are involved, make
a mitre joint by butting two J-channels back
to back as shown, or use Double Channel
Runner. Cut the soffit panels at the proper
angle to fit.
A
Fig. B

A

STEP 3: INSTALL FRONT TRIM
(Fascia or 1" Fascia Runner)

Fig. C

FOR PROJECTS II AND IV
WHERE NEW OVERHANG WILL
BE ON THE SAME ANGLE AS
EXISTING OVERHANG RAFTERS

Note: If you are removing your existing gutter, mark the locations of the rafters so you can
remount your gutter by fastening into the rafters, which is preferred over fastening to the
wooden front trim.

Install along inside of wooden front trim
by nailing through long leg or into existing
overhang or rafters.

When turning a corner
Wrap-around should be about 2". Cut out the
bottom lip with metal snips and blend front trim
as shown. The first piece used after turning the
corner should overlap and come completely
to the corner. Starting at one end, place front
trim with bottom lip snug against the overhang
panels. The top edge may be slipped under box
style guttering it if it has not been removed. Nail
as shown on approximate 16" centers. Do not
overdrive nails. When installing the next length,
overlap the first by ½" to 1" and nail through
the overlap joint.

Fig. D

Project III

Project IV

2"

2"
Bend
90

ROOF GABLE BOARDS
At one end of house, install only one length along the wall by nailing through long leg into
existing wooden overhang or rafters (see Fig. A). Successive lengths will be installed along
the wall after the overhang panels have been installed into the previous lengths.

Amerimax Fascia can also be used to cover
Gable Boards. Follow, the same procedure as
above, mitre cutting the panels at the peak.

CLEANING INSTRUCTIONS

FOR PROJECT II, WHERE YOU ARE CHANGING FROM
AN INCLINED OVERHANG TO A HORIZONTAL OVERHANG
Install along inside of wooden front trim (see Fig. D). Follow procedure illustrated in Fig. B
to strike a chalkline on wall. Chalkline should be level with bottom leg of panel support. At
one end of house, install only one length along the wall by forming 1” wide nailing flanges
and nailing to wall with bottom horizontal edge even with chalkline. Successive lengths will
be installed along the wall after the overhang panels have been installed into the previous
lengths.

Aluminum can be cleaned by using a mild
soap and water solution. You should never use
abrasive cleaners or pads.

STEP 2. INSTALL OVERHANG PANELS (Soffit)
FOR ALL PROJECTS:
Subtract ¼ inch (for clearance)
from your measured overhang
depth. Using this new
dimension, cut the twelve foot
lengths into individual panels,
using your circular saw with
fine tooth metal cutting blade.

Overhang
Panel

Panel Support

Square

Interlocking
Nailing
Edge

Always start at one end of
the house. The first panel
must be installed with
interlocking-nailing edge square with the wall and positioned to receive the next panel.

Important: Decide on the solid vs. vented pattern you wish to use. If you are covering an
existing overhang you should cut a hole in the old overhang (to the approximate panel
size) at each vented panel in order to achieve the desired air circulation.

www.amerimax.com
(800) 347-2586
Lancaster, PA 17604



Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.4
Linearized                      : Yes
Page Count                      : 2
XMP Toolkit                     : XMP toolkit 2.9.1-13, framework 1.6
About                           : uuid:fd20c210-b575-4026-a26b-9f33fe5236b7
Producer                        : Acrobat Distiller 6.0 (Windows)
Create Date                     : 2006:01:31 09:03:45-05:00
Creator Tool                    : Adobe InDesign CS (3.0.1)
Modify Date                     : 2006:01:31 09:03:45-05:00
Document ID                     : uuid:590553da-404e-4a3f-8fb6-34fef4adfdd4
Format                          : application/pdf
Title                           : Soffit 8.5x11.indd
Creator                         : David Meshaw
Author                          : David Meshaw
EXIF Metadata provided by EXIF.tools

Navigation menu