    BLiNQ Networks Inc.  X-1200 Intelligent Wireless Backhaul System  Installation Guide  Release 1.0 Issue 01 D1 April 2014
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page ii  Issue 01 D1  Revision History Date Issue Reason for Issue August 2013 01 Early Availability January 2014 1.0 Final Document April 2014 1.0 D1 Label Update (Approvals); Compliance update including Antenna  Contact Information:   BLiNQ Networks Inc.   400 March Road, Suite 240   Ottawa, ON K2K 3H4  Web Site:    http://www.blinqnetworks.com  Sales Inquiries:      Email:      sales@blinqnetworks.com   Telephone:    1-613-599-3388 x280  Customer Support:   Web:    http://www.blinqnetworks.com/support   Email:    support@blinqnetworks.com   Telephone:  1-613-599-3388 x270
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page iii  Issue 01 D1 Table of Contents 1  Important Safety and Service Notices ..........................................................................................1 1.1  Safety Warnings ............................................................................................................................ 1 1.2  Important Service and Warranty Information .............................................................................. 1 1.3  Overvoltage (Lightning/Surge) Protection .................................................................................... 2 2  System Description .....................................................................................................................4 3  Flowchart: Installation Process Overview ....................................................................................7 4  Required Installation Items .........................................................................................................8 5  Site Preparation........................................................................................................................ 11 5.1  Operating Sector Frequency Check ............................................................................................. 11 5.2  HM and RBM Pre-Installation Checks and Service Provisioning ................................................. 11 6  Installing the Modules (General) ............................................................................................... 13 6.1  General Safety Information ........................................................................................................ 13 6.2  Equipment Distance and Orientation ......................................................................................... 14 6.2.1  Hub Modules ....................................................................................................................... 14 6.2.2  Remote Backhaul Modules ................................................................................................. 14 6.3  Mounting to a Pole or Wall ......................................................................................................... 14 6.3.1  Attaching Pole Clamps to Mounting Bracket ...................................................................... 14 6.3.2  Mounting with U- or V-Clamps ........................................................................................... 16 6.3.3  Mounting with Steel Straps................................................................................................. 17 6.3.4  Mounting onto a Wall ......................................................................................................... 18 6.4  Assembling the Module Brackets ............................................................................................... 19 6.4.1  Attach Elevation Bracket ..................................................................................................... 19 6.4.2  Attach Azimuth Bracket ...................................................................................................... 21 6.5  Installing the Power Supply Unit (Optional) ............................................................................... 23 6.5.1  Installing the PSU Bracket ................................................................................................... 23 6.5.2  Installing the Power Supply Unit ......................................................................................... 24 6.6  Installing the Module onto a Mounting Bracket ......................................................................... 26 6.7  Grounding and Overvoltage Protection Instructions .................................................................. 28 6.7.1  Installing the Grounding Cable ............................................................................................ 28 6.7.2  Installing the Lightning/Surge Arrestor ............................................................................... 29 6.8  Connecting to DC Power ............................................................................................................. 31 6.9  Verifying Basic Installation .......................................................................................................... 33 6.10  Connecting to the Ethernet Backhaul Network .......................................................................... 34 6.10.1  Connecting to the RJ45 Ethernet Port ................................................................................ 34 6.10.2  Connecting to the SFP Port ................................................................................................. 36 6.11  Cable Management ..................................................................................................................... 36
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page iv  Issue 01 D1 7  Installing the Hub Module ......................................................................................................... 38 7.1  Adjusting the Hub Module .......................................................................................................... 38 7.2  Assembling the Beam Steering Antenna (If Required) ............................................................... 41 7.2.1  Installing the Bracket on to the Beam Steering Antenna ................................................... 41 7.2.2  Mounting the Antenna Assembly on to HM ....................................................................... 42 7.2.3  Connections for Antenna and Hub...................................................................................... 44 8  Installing the Remote Backhaul Module .................................................................................... 46 8.1  Using the BSI Feature and Adjusting the Module ....................................................................... 46 9  System and Network Provisioning ............................................................................................. 51 10  Appendix .................................................................................................................................. 52 10.1  BLiNQ Wireless Devices and RF Safety/Les appareils sans fil BLiNQ et la sécurité RF................ 52 10.2  Equipment Compliance ............................................................................................................... 54 10.2.1  Federal Communications Commission (FCC) Notices ......................................................... 54 10.2.2  Industry Canada Notice ....................................................................................................... 54 10.2.3  Bonded Network ................................................................................................................. 54 10.3  Troubleshooting Guide ............................................................................................................... 55 10.4  List of Acronyms .......................................................................................................................... 57  List of Figures Figure 1   Module Casing Labels .................................................................................................................................... 2 Figure 2   Hub Module ................................................................................................................................................... 6 Figure 3   Remote Backhaul Module .............................................................................................................................. 6 Figure 4   Pole/Wall Mount Bracket............................................................................................................................. 15 Figure 5   Attaching Pole Clamps to Pole/Wall Mount Bracket ................................................................................... 15 Figure 6   Attaching Assembled Pole/Wall Mount Bracket to Pole with U-Clamp or V-Clamp.................................... 17 Figure 7   Attaching Assemble Pole/Wall Mount Bracket to Pole with Straps ............................................................ 18 Figure 8   Attaching Assembled Pole/Wall Mount Bracket to Wall ............................................................................. 19 Figure 9   Elevation Bracket and Associated Hardware ............................................................................................... 20 Figure 10   Elevation Bracket Mounting Position ......................................................................................................... 20 Figure 11   Attaching Elevation Bracket to Back of Module ........................................................................................ 21 Figure 12   Azimuth Bracket and Associated Hardware ............................................................................................... 21 Figure 13   Attaching Azimuth Bracket to Elevation Bracket on Module ..................................................................... 22 Figure 14   PSU Mounting Bracket ............................................................................................................................... 23 Figure 15   Attaching PSU Bracket to Back of Module ................................................................................................. 24 Figure 16   Power Supply Unit (PSU) ............................................................................................................................ 24 Figure 17   PSU Bracket PSU Mounting Studs .............................................................................................................. 25 Figure 18   Power Connection via the PSU................................................................................................................... 26 Figure 19   Module with PSU Installed. ........................................................................................................................ 26 Figure 20   Pole/Wall Mount Bracket Locknut Hardware ............................................................................................ 26 Figure 21   Unit Installed onto the Pole/Wall Mount Bracket ..................................................................................... 27
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page v  Issue 01 D1 Figure 22   Module with Grounding Lug ...................................................................................................................... 29 Figure 23   Wiring of Lightning/Surge Arrester (Sold by BLiNQ Networks) .................................................................. 31 Figure 24   HM and RBM LED States ............................................................................................................................ 33 Figure 25   Ethernet Connector Encased in Environmental Housing ........................................................................... 34 Figure 26   Ethernet Connector Assembly - Separated ................................................................................................ 35 Figure 27   Module Cable Management ...................................................................................................................... 37 Figure 28   Hub Module Showing All Connectors ........................................................................................................ 38 Figure 29   HM Horizontal Plane Adjustment via Azimuth Bracket ............................................................................. 39 Figure 30   HM Vertical Plane Adjustment via Elevation Bracket ................................................................................ 39 Figure 31   HM Theta Adjustment Via Elevation Bracket Mounting Holes .................................................................. 40 Figure 32   HM Down-tilt Adjustment with Antenna Mount ....................................................................................... 40 Figure 33   Beam Steering Antenna Mounting Bracket ............................................................................................... 41 Figure 34   Hub Module Antenna Mounting Holes ...................................................................................................... 43 Figure 35   Antenna attached to a Hub Module .......................................................................................................... 43 Figure 36   Beam Steering Antenna RF Connections ................................................................................................... 44 Figure 37   RF Connections on the Hub Module .......................................................................................................... 44 Figure 38   RBM Module Showing All Connectors ....................................................................................................... 46 Figure 39   RBM Horizontal Plane Adjustment via Azimuth Bracket ........................................................................... 48 Figure 40   RBM Vertical Plane Adjustment via Elevation Bracket .............................................................................. 48 Figure 41   RBM Theta Adjustment Via Elevation Bracket Mounting Holes ................................................................ 49  List of Tables Table 1   X-1200 System Specifications .......................................................................................................................... 4 Table 2   Required Items for Hub Module Installation .................................................................................................. 8 Table 3   Required Items for Remote Backhaul Module Installation ............................................................................. 9 Table 4   Summary of Required Installation Tools (Not Provided by BLiNQ Networks) ................................................ 9 Table 5   Recommended Torque Values for Self-Tapping Bolts ................................................................................... 15 Table 6   Recommended Torque Values for U-Bolt or V-Clamp Bolts ......................................................................... 16 Table 7   Recommended Torque Values for Elevation Bracket Bolts ........................................................................... 20 Table 8   Recommended Torque Values for Azimuth Bracket Bolts ............................................................................ 22 Table 9   Recommended Torque Values for PSU Bracket Bolts ................................................................................... 23 Table 10   Recommended Torque Values for PSU Bolts .............................................................................................. 25 Table 11   Recommended Torque Values for Pole/Wall Mount Bracket Locknuts ...................................................... 27 Table 12   Recommended Torque Value for the RJ45 Ethernet Connection ............................................................... 34 Table 13   Recommended Torque Values for HM Bracket Bolts .................................................................................. 39 Table 14   Recommended Torque Values for Antenna Bracket Nuts .......................................................................... 42 Table 15   Recommended Torque Values for Antenna Bracket Bolts .......................................................................... 42 Table 16   Recommended Torque Values for Antenna Cable Connections ................................................................. 44 Table 17   Recommended Torque Values for RBM Bracket Bolts ................................................................................ 47 Table 18   X-1200 System Troubleshooting Guide ....................................................................................................... 55 Table 19   List of Acronyms .......................................................................................................................................... 57
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page vi  Issue 01 D1  This Page Intentionally Left Blank.
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 1  Issue 01 D1  1 Important Safety and Service Notices Read this X-1200 System Installation Guide and follow all operating and safety instructions. Installation of the X-1200 system must be done by a qualified professional installer who is experienced with  installing  telecommunications  equipment  and  networks.  Installations  must  adhere  to  the information and specifications within this X-1200 System Installation Guide. 1.1 Safety Warnings WARNING! Follow all health and safety procedures and recommendations made by BLiNQ Networks within this X-1200 System Installation Guide. Failure to do so could result in injury, death, or damage to the equipment.  The  product-marketing  label  indicates  the  power  requirements.  Do  not  exceed  the  described limits.  Each module’s power supply must have a resettable circuit breaker rated to  a maximum of 20 Amps.  The  antenna  must  be  permanently  grounded  before  making  any  of  the  connections  to  the antenna used with the Hub.  Use only a damp cloth for cleaning. Do not use liquid or aerosol cleaners. Disconnect the power before cleaning.  Disconnect the power when the unit is stored for long periods.  Do not locate the outdoor unit near power lines or other electrical power circuits.  The system must be properly grounded to protect against power surges and accumulated static electricity. It is the user’s responsibility to install this device in accordance with the local electrical codes. 1.2 Important Service and Warranty Information Keep all product information for future reference. Refer  all  repairs  to  qualified  service  personnel.  Do  not  remove  the  covers  or  modify  any  part  of  the X-1200 system, as this action will void the warranty. Be sure to do the following upon unpacking the X-1200 system modules. For each Hub Module (HM) and Remote Backhaul Module (RBM) in your system:  Locate the label on the module casing that lists the Serial Number (SN) and Media Access Control (MAC) address for the module (Figure 1, “Module Casing Labels”)  Record the SN on your registration card for future reference  Record the MAC address for future reference when provisioning the system !
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 2  Issue 01 D1   Figure 1   Module Casing Labels 1.3 Overvoltage (Lightning/Surge) Protection WARNING! A qualified professional installer should install the wireless equipment. The installer must follow local and national codes for electrical grounding and safety. Failure to meet safety requirements and/or use of non-standard practices and procedures could result in personal injury and damage to equipment. A direct lightning strike may cause serious damage even if these guidelines are followed. All outdoor wireless equipment is susceptible to lightning damage from a direct hit or induced current from  a  near strike.  Lightning  protection  and  grounding practices  in  local and  national electrical  codes serve to minimize equipment damage, service outages and serious injury. Reasons for lightning damage can be summarized as follows:  Poorly grounded antenna sites that can conduct high lightning strike energy into equipment.  Lack of properly installed lightning protection equipment that can cause equipment failures from lightning induced currents. An  overvoltage  protection  system  provides  a  means  by  which  the  energy  may  enter  earth  without passing through and damaging parts of a structure. An overvoltage protection system does not prevent lightning from striking; it provides a means for controlling it and preventing damage by providing a low resistance path for the discharge of energy to travel safely to ground. Improperly grounded connections are also a source of noise that can cause sensitive equipment to malfunction. A  good  grounding  system  disperses  most  of  the  surge  energy  from  a  lightning  strike  away  from  the building and equipment. The remaining energy on the cable can be directed safely to ground through a lightning/surge arrestor in series with the cable. !
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 3  Issue 01 D1 The X-1200 system is designed with consideration for resistance to the effects of lightning on the access point  electronics.  When  installing  a  lightning/surge  arrestor  for  your  system  installation,  observe  the following general industry practices:  Install lightning/surge arrestors in series with the Ethernet and power cables at the point of entry to the building. If  the power cable does not enter the building, the  location is at  the installer’s discretion.  In each case the grounding wire should be connected to the same termination point used for the tower or mast.  Provide  direct  grounding  from  the  unit,  the  mounting  bracket,  the  antenna,  and  the  Ethernet cable  surge  protection  to  the  same  ground  bus  on  the  building.  Use  the  grounding  screws provided for terminating the ground wires.
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 4  Issue 01 D1 2 System Description The  X-1200  is  a  dual  carrier,  Point-to-Multipoint  (PMP)  intelligent  wireless  transport  system distinguished  for  its  high  performance  and  advanced  traffic  management  capabilities.  The  X-1200 platform consists of a Hub Module (HM) and up to four (eight1) Remote Backhaul Modules (RBM). BLiNQ  Networks  X-1200  system  operates  in  the  sub  6  GHz  licensed  frequency  bands.  It  offers deployment  flexibility  for  both  Line-of-Sight  (LOS)  and  Non  Line-of-Sight  (TrueNLOS™)  operation  by incorporating  advanced  Physical  Layer  (PHY)  and  Media  Access  Control  (MAC)  layer  algorithms  and techniques.  BLiNQ  Networks  has  developed  proprietary  interference  mitigation  algorithms  and incorporated  self-organizing  network  techniques  into  its  solutions  to  increase  capacity  and  reliability beyond  that  of ordinary  backhaul solutions.  This  is  because  in  a  NLOS  environment, interference  and shadowing are the two main reasons that limit capacity and link reliability. Mitigating interference and enhancing signal reliability maximizes system performance.  The  X-1200  system  delivers  11  bps/Hz  spectral  efficiency.  The  system  is  designed  for  use  in  multiple applications  that  include small  cell mobile  backhaul, optical  fiber  cable extension  and  enterprise  data backhaul services by providing up to 400 Mbps of throughput in dual 2x20 MHz channels. Table 1 lists the system specifications. Table 1   X-1200 System Specifications RADIO SPECIFICATIONS Frequency Band 3.65-3.70 GHz, 3.40-3.60 GHz, 2.50-2.69 GHz, and 5.47-5.875 GHz Tuning Resolution 50 kHz, minimum Transmit Power, 3.65 GHz -15 dBm to +27 dBm per port, 0.25 dB resolution Transmit Power, 5.8 GHz -15 dBm to +23 dBm per port, 0.25 dB resolution Channel Bandwidth 20 MHz (5/10 MHz1) Receiver Sensitivity -92 dBm with QPSK @ 1e-03 PER (typ.) Modulation & Coding QPSK/16QAM/64QAM/256QAM, bi-directional, fully adaptive PERFORMANCE Throughput Up to 400 Mbps, L2 aggregate uplink and downlink Spectral Efficiency 11 bps/Hz Physical Layer Cyclic Single Carrier Frequency Domain Equalized Operating Mode TDD Latency 3.5 msec for 4 RBM’s assigned to Hub, dual carrier mode Traffic ratios 50:50, 65:35, 75:25, 35:65, 25:75; user configurable Frame Size Up to 2016 bytes                                                            1 Future Software Release  Licensed:+26dBm for MCS 7 and +25dBm for MCS 8; Unlicensed: +22dBm for MCS 6, +21 for MCS 7 and +20 for MCS 8
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 5  Issue 01 D1 PERFORMANCE (Cont) Antenna System 2x2 MIMO, Spatial Multiplexing / Tx & Rx Diversity Remote Backhaul Module: Integral antenna, 14 dBi Hub Module: Beam Steering Antenna, 17 dBi Configuration  PTP or PMP up to 42 Remotes  Power Consumption < 72 W Power  -48 Vdc nominal, -36 to -60 Vdc range Connectivity Copper 1000BaseT Optional Fiber Gig-E (Hub only) Synchronization Integral GPS antenna and receiver, 1588v2, SyncE QoS 8 queues per service flow, 4 SF’s per RBM per direction Security AES-256 NETWORKING Configuration Ethernet bridge Attributes 802.1Q, 802.1ad, DSCP/ToS/802.1p (IPv4/IPv6) Features Per RBM service flows, Dynamic Bandwidth Sharing OPERATIONS, ADMINISTRATION AND MANAGEMENT (OAM) Configuration WebUI / CLI, radio and Ethernet performance monitoring EMS Integration SNMP v2c/v3 OAM Protocols HTTP(S), TCP/IP, UDP, (S)FTP, SSH MECHANICAL/ENVIRONMENTAL/COMPLIANCE RBM Dimensions 12.6” x 8.3” x 5.1” (32 x 21 x 13 cm) Hub Dimensions 15.0” x 18.0” x 5.1” (38 x 46 x 13 cm) Weight (Hub & RBM) RBM < 8.8 lbs. (4.0 kg); Hub < 15.5 lbs. (7.0 kg) Temperature Range -45°C to +55°C (-49 °F to 131 °F) Enclosure Protection IP67 Compliance EMC: FCC Part 15 Subpart B, C, E; ICES-003 Class B Radio: FCC Part 90z, RSS 197  Safety: UL/CSA 60950-1,-22 The X-1200 system operates in licensed Time Division Duplexing (TDD) bands including 3.65-3.70 GHz, 3.40-3.60  GHz,  2.50-2.69  GHz  bands  in  both  Point-to-Point  (PTP)  and  Point-to-Multipoint  (PMP) configurations. Additionally, the X-1200, when configured for dual-carrier mode, operates in unlicensed frequency  bands  including  5.47-5.875  GHz  bands.  It  incorporates  Multiple  Input  Multiple  Output (MIMO) technology and operates at high Modulation and Coding Scheme (MCS) rates to provide high capacity.  In  addition, the  product  incorporates BLiNQ  Networks  interference management techniques which include multiple power control algorithms to maximize performance in dense networks.                                                            2 8 in future release
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 6  Issue 01 D1 The  X-1200  system  has  a  small,  all-outdoor,  zero-footprint  form  factor  that  can  be  easily  deployed unobtrusively on towers, poles, building sidewalls or rooftops. It consists of the following modules:  Hub Module (HM): A sector controller which serves as the aggregation point controlling up to 4 Remote Backhaul Modules (RBMs), featuring an integral Beam Steering Antenna.  Figure 2   Hub Module  Remote  Backhaul  Module  (RBM):  A  subscriber  unit  that  is  installed  outdoors  on  customer premises, including public infrastructure assets such as light and utility poles in mobile backhaul applications. RBMs feature an integrated antenna.   Figure 3   Remote Backhaul Module                                                             8 in future software release. Front Back Front without Antenna Back Side
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 7  Issue 01 D1 3 Flowchart: Installation Process Overview To get started quickly, follow the process below. For more details, click on the chapter/section title.  Start Important Safety and Service Notices PAGE 1 Required Installation Items PAGE 8 Site Preparation  PAGE 11 Installing the Modules (General) PAGE 13 Installing the Hub Module PAGE 38 Installing the Remote Backhaul Module PAGE 46 System and Network Provisioning PAGE 51 Safety Warnings Important Service and Warranty Information Overvoltage (Lightning/Surge) Protection Operating Sector Frequency Check HM and RBM Pre-Installation Checks and Service Provisioning  General Safety Information Adjusting the Hub Module Using the BSI Feature and Adjusting the Module Equipment Distance and Orientation Mounting to a Pole or Wall Assembling the Module Brackets Installing the Power Supply Unit (Optional) Installing the Module onto a Mounting Bracket Grounding and Overvoltage Protection Instructions Connecting to DC Power Verifying Basic Installation Connecting to the Ethernet Backhaul Network END Assembling the Beam Steering Antenna (If Required) Cable Management
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 8  Issue 01 D1 4 Required Installation Items Table 2 lists the items required to install the X-1200 Hub Module (HM). Table 3 lists the items required to install the X-1200 Remote Backhaul Module (RBM). Table 4 lists the tools required to install the X-1200 system modules.  Table 2   Required Items for Hub Module Installation No. Description Quantity Note 1 X-1200 Hub Module (HM) Beam Steering Antenna Kit includes Antenna unit, Down-tilt antenna bracket, screws, nuts and washers for mounting to X-1200 unit, SPI control cable (x1), and RF cables NType to NType (x4) 1  2 X-1200 Module Mount Kit with Self-Tapping Screw Bolts—Includes module elevation bracket, module azimuth bracket, two pole clamps, and pole/wall mount bracket  1* Screws not provided for wall/mast side (1/4 in. holes) 3 Coaxial RF Cables: N-type male termination at both ends, outdoor rated 2 or 4* Nominal 1 m long 4 Outdoor-rated Shielded Ethernet cable, CAT5e or better < 100 meters Not provided by BLiNQ Networks 5 Ethernet cable connector and environmental housing with shielded RJ45 connectors 1 Provided by BLiNQ Networks 6 SFP, fiber and connectors (if optional fiber optic Ethernet possibility is to be used)  Not provided by BLiNQ Networks 7 Power Cable: Shielded 18 AWG 2 conductors 90C water resistant, black and white conductor jackets, outdoor rated cable, 5-8 mm thick Power Connector: Weatherized DC connector to fit on power cable 1* Option of 10m, 20m, 40m terminated cables  8 6-gauge grounding cable  1 Not provided by BLiNQ Networks  9 Power Supply Unit (PSU) Kit includes PSU, PSU bracket and associated hardware for installation. 1* Optional 10 Lightning/Surge Arrester  1* Optional 11 Access to NOC Server, Providing FTP, SysLog, SNMP Browser, and DNS Services 1  12 Basic Portable Personal Computer (PC); with NIC (Ethernet) port required 1 Not Provided by BLiNQ Networks 13 Miscellaneous hardware and software as required: for example, compass, sniffer application, FTP client as required Not Provided by BLiNQ Networks  *Sold as a separate line item by BLiNQ Networks.
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 9  Issue 01 D1 Table 3   Required Items for Remote Backhaul Module Installation No. Description Quantity Note 1 X-1200 Remote Backhaul Module (RBM) 1 Per site 2 X-1200 Module Mount Kit with Self-Tapping Screw Bolts—Includes module elevation bracket, module azimuth bracket, two pole clamps, and pole/wall mount bracket  1* Screws not provided for wall/mast side (1/4 in. holes) 3 Outdoor-rated Shielded Ethernet cable, CAT5e or better < 100 meters Not provided by BLiNQ Networks 4 Ethernet cable connector and environmental housing with shielded RJ45 connectors 1 Provided by BLiNQ Networks 5 Power Cable: Shielded 18 AWG 2 conductors 90C water resistant, black and white conductor jackets, outdoor rated cable, 5-8 mm thick Power Connector: Weatherized DC connector to fit on power cable 1* Option of 10m, 20m, 40m connectorized cables 6 6-gauge grounding cable  1 Not provided by BLiNQ Networks 7 Lightning/Surge Arrester  1* Optional 8 Access to NOC Server, Providing FTP, SysLog, SNMP Browser, and DNS Services 1  9 Basic Portable Personal Computer (PC); with NIC (Ethernet) port required 1 Not provided by BLiNQ Networks 10 Miscellaneous hardware and software as required: for example, wrench, compass as required Not provided by BLiNQ Networks 11 Power Supply Unit (PSU) Kit includes PSU, PSU bracket and associated hardware 1 each*/ RBM Optional  *Sold as a separate line item by BLiNQ Networks.   Table 4   Summary of Required Installation Tools (Not Provided by BLiNQ Networks) No. Description 1 Socket wrench with 3/8 in. driver head, with long and short ½ in. and 7/16 in. sockets  2 Slot head screwdrivers, small and medium size 3 Phillips #2 screwdriver 4 Torque wrench, 3/8 in. head with range for 4-60Nm or 3-45lbf-ft 5 Ratchet wrenches, ½ in. and 7/16 in. 6 Steel straps (for installation on pole diameters 3.5 in./9 cm or larger) 7 Four 5/16 in. or M8 wall mounting bolts, or equivalent, for wall installation (and bolt reinforcement hardware if wall material requires it) 8 Black marker  9 Crimp tool 10 Cable ties 11 Torque screwdriver ¼ head with 5-40inlb range 12 Allen drivers metric 3mm and SAE 3/16” for GND lug and Beam Steering Antenna bracket
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 10  Issue 01 D1 No. Description 13 Metric 7mm nut driver (socket) for the power supply mounting nuts 14 Metric 8mm  nut driver (socket) for Beam Steering Antenna studs mounting to bracket
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 11  Issue 01 D1 5 Site Preparation To  prepare  the  installation  site,  perform  the  following  checks  prior  to  installation  of  an  X-1200  Hub Module (HM) or Remote Backhaul Module (RBM).   Section 5.1, “Operating Sector Frequency Check”, page 11  Section 5.2, “HM and RBM Pre-Installation Checks and Service Provisioning”, page 11 5.1 Operating Sector Frequency Check The  operating  frequency  must  be  determined  prior  to  the  installation  and  be  based  on  a  cell  site frequency plan. BLiNQ Networks strongly advises that a comprehensive site survey be performed before installation  to  determine  the  optimum  antenna  orientation  and  identify  any  potential  source  of interference.  5.2 HM and RBM Pre-Installation Checks and Service Provisioning This section requires use of the BLiNQ X-1200 WebUI. The X-1200 WebUI is  the configuration tool for use  with  X-1200  HMs  and  RBMs.  It  is  a  standard  web  application  that  runs  directly  on  the  X-1200 equipment through the default port for HTTP (that is, port 80), and is accessible at URL http://<IP of the node>.  For instructions on how to use the X-1200 WebUI, refer to the X-1200 System User Guide. The default username and password for access is: admin. Browser support for X-1200 WebUI:  Mozilla Firefox  Internet Explorer 9 (IE9)  WebKit-based browsers, for example:  Apple Safari  Google Chrome Operating System (OS) support for X-1200 WebUI:  Windows  Mac OS X  Linux Note: With the exception of IE9, both web browser and OS support for the X-1200 WebUI always refer to the most recent versions. The default configuration settings on the HM and RBM include:  Fixed, non-routable local craft IP address: 169.254.1.1  Management IP address: 192.168.26.2  Operating Frequency (e.g. 3.65 GHz)  Channel bandwidth (20 MHz)
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 12  Issue 01 D1  Uplink/downlink TDD ratio on the Hub  Preamble series index value  RF transmitter disabled on the HM (not transmitting) Perform the following pre-installation checks and service provisioning on the HM and RBMs: 1. Verify the modules can be powered up and Ethernet connectivity can be established. 2. Verify and record the Media Access Control (MAC) address of each RBM unit (located on the label on the outside of the unit). 3. Using the X-1200 WebUI for HMs: a. Verify the configuration settings on the HM and update if necessary. b. Verify the active software version on the HM and upgrade if necessary. c. To  allow  the  HM  to  go  into  service  after  installation,  provision  these  HM  radio  operation parameters through the ‘Setup > Radio Interface Page’ either before or after installation:  Radio Administrative State (set to ‘Enabled’)  RF Frequency  Max. Transmit Power  Preamble Phase Index (Optional)  Rate Adaption (Optional) d. (Optional) Provision these HM system parameters as needed through the ‘Setup > System Page’ either before or after installation:  System Identification (including Name, Location, Contact, Description)  Ethernet Port Configuration  Management Interface IP Address For more information, refer to the X-1200 System User Guide. 4. Using the X-1200 WebUI for RBMs: a. Verify the configuration settings on each RBM and update if necessary. b. Verify the active software version on each RBM and upgrade if necessary. c. To  allow  the  RBM  to  go  into  service  after  installation,  provision  these  RBM  radio  operation parameters through the ‘Setup > Radio Interface Page’ either before or after installation:  Radio Administrative State (set to ‘Enabled’) d. (Optional) Provision these RBM system parameters as needed through the ‘Setup > System Page’ either before or after installation:  System Identification (including Name, Location, Contact, Description)  Ethernet Port Configuration  Management Interface IP Address For more information, refer to the X-1200 System User Guide.
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 13  Issue 01 D1 6 Installing the Modules (General) As needed, refer to these sections and follow these steps to properly install either the Hub Module (HM) or Remote Backhaul module (RBM):  Section 6.1, “General Safety Information”, page 13  Section 6.2, “Equipment Distance and Orientation”, page 14  Section 6.3, “Mounting to a Pole or Wall”, page 14  Section 6.3.1, “Attaching Pole Clamps to Mounting Bracket”, page 16  Section 6.3.2, “Mounting with U- or V-Clamps”, page 17  Section 6.3.3, “Mounting with Steel Straps”, page 17  Section 6.3.4, “Mounting onto a Wall”, page 18  Section 6.4, “Assembling the Module Brackets”, page 19  Section 6.4.1, “Attach Elevation Bracket”, page 19  Section 6.4.2, “Attach Azimuth Bracket”, page 21  Section 6.5, “Installing the Power Supply Unit (Optional)”, page 23  Section 6.6, “Installing the Module onto a Mounting Bracket”, page 26  Section 6.7, “Grounding and Overvoltage Protection Instructions”, page 28  Section 6.8, “Connecting to DC Power”, page 31  Section 6.9, “Verifying Basic Installation”, page 33  Section 6.10, “Connecting to the Ethernet Backhaul Network”, page 34  Section 6.11, “Cable Management”, Page 36 6.1 General Safety Information Before  performing  any  of  the  tasks  in  this  chapter,  read  the  safety  warnings  and  service  notices  in Chapter 1, “Important Safety and Service Notices”. The system requires one person to properly and safely install the X-1200 system modules.  WARNING!  Installation of the equipment must comply with local and national electrical codes.  Personnel mounting the equipment must understand grounding methods. !
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 14  Issue 01 D1 6.2 Equipment Distance and Orientation 6.2.1 Hub Modules Locate the Hub Module (HM) with as much distance as possible from other transmitting equipment. The installer must mount the Beam Steering Antenna on the HM, as it can not be remotely mounted. The HM must also have clear view of the sky for its Global Positioning System (GPS) antenna (located on top of the unit) to work and to synchronize transmissions with other HMs. When mounting the HM, ensure it is oriented so that the cable connectors/connections point downward and the GPS antenna points upward. 6.2.2 Remote Backhaul Modules When installing multiple Remote Backhaul Modules (RBMs), the  distance  required between the RBMs depends  on  the  average  transmit  power  in  use  by  the  RBMs.  Contact  your  supplier  for  the recommended distance between RBMs for your particular installation. When  mounting  the  RBMs,  ensure  they  are  oriented  so  that  the  power  cable  connectors  point downward. 6.3 Mounting to a Pole or Wall The following sections describe how to attach a mounting bracket to either a pole or wall:  Section 6.3.1, “Attaching Pole Clamps to Mounting Bracket”; recommended for pole  diameters up to 4 in./10 cm.  Section  6.3.2,  “Mounting  with  U-  or  V-Clamps”;  recommended  for  pole  diameters  up  to 4 in./10 cm  Section 6.3.3, “Mounting with Steel Straps”; recommended for pole diameters up to 3.5 in./9 cm or larger  Section 6.3.4, “Mounting onto a Wall” 6.3.1 Attaching Pole Clamps to Mounting Bracket Use the pole clamps with pole/wall mounting brackets for pole diameters up to 4 in./10 cm. If the pole is larger, see Section 6.3.3, “Mounting with Steel Straps”. Required parts and tools:  Two pole clamps, pole/wall mount bracket (Figure 4, “Pole/Wall Mount Bracket”)  Socket wrench with 3/8 in. driver head, with long and short ½ in. and 7/16 in. sockets  Torque wrench, 3/8 in. head with range for 4-60Nm or 3-45lbf-ft
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 15  Issue 01 D1               Figure 4   Pole/Wall Mount Bracket Table 5   Recommended Torque Values for Self-Tapping Bolts Item Description Torque Note 1 Self-tapping bolts (x2) 27.1Nm or 20lbf-ft — To attach the two pole clamps to the pole/wall mount bracket, refer to Figure 5 and follow these steps: 1. Place the pole  clamps within the  top  and bottom  of the  pole/wall mounting bracket,  aligning the bolt holes of the clamps with those of the bracket.  2. Use  the  socket  wrench  to  lightly  tighten  the  self-tapping  bolts  through  the  clamp  holes  into  the holes on the back of the bracket (do not over tighten). 3. Use the torque wrench to tighten down the self-tapping bolts and finish the installation of the pole clamps to the pole/wall mount bracket (do not over tighten).  See Table 5 for torque values.  Note: Pole clamps are not required for pole diameters greater than 4 in./10 cm.  Figure 5   Attaching Pole Clamps to Pole/Wall Mount Bracket Front View Back View Self-Tapping Bolts Orientation Cut-out (Up)
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 16  Issue 01 D1 6.3.2 Mounting with U- or V-Clamps Use  the  U-  or  V-clamps  for  pole  diameters  up  to  4  in./10  cm.  If  the  pole  is  larger,  see  Section  6.3.3, “Mounting with Steel Straps”. Required parts and tools:  Pole/wall mount bracket with attached pole clamps; see Section 6.3.1, “Attaching Pole Clamps to Mounting Bracket”  Two U- or V-clamps (use one type or the other; do not mix) and associated hardware, both sized either 1.5 in./4 cm, 2 in./5 cm, 2.5 in./6 cm, 3 in./8 cm, 3.5 in./9 cm, or 4 in./10 cm to match pole diameter at installation site   Socket wrench with ½ in. socket   Torque wrench, 3/8 in. head with range for 4-60Nm or 3-45lbf-ft Table 6   Recommended Torque Values for U-Bolt or V-Clamp Bolts Item Description Torque Note 1 U- or V-Clamp bolts (x4) 16.3Nm or 12lbf-ft — To install the pole/wall mount bracket onto a vertical pole up to 4 in. (10 cm) in diameter using U-clamps or V-clamps, refer to Figure 6, “Attaching Assembled Pole/Wall Mount Bracket to Pole with U-Clamp or V-Clamp” and follow these steps:  1. Select  a  mounting  location  on  the  pole  and  place  the  pole  clamp  notches  from  the  assembled pole/wall  mounting  bracket  against  the  pole.  Ensure  the  orientation  cut-out  is  pointing  up  (see Figure 4, “Pole/Wall Mount Bracket”). 2. Insert one U-bolt or V-bolt through the top of the pole/wall mount bracket. Install the washers and then hand-tighten the nuts. 3. Insert  a  second  U-bolt  or  V-bolt  through  the  bottom  of  the  pole/wall  mount  bracket.  Install  the washers and then hand-tighten the nuts. 4. Position the pole/wall mount bracket on the pole as needed before further tightening the bolts.  5. Use the socket wrench to evenly tighten all four bolts of the pole/wall mount bracket to the pole (do not over tighten). 6. Use  the  torque  wrench  to  tighten  down  all  four  bolts  and  finish  the  installation  of  the  pole/wall mount bracket to the pole (do not over tighten). See Table 6, “Recommended Torque Values for U-Bolt or V-Clamp Bolts” for torque values for more information.  7. Install the HM  or RBM onto  the mounted  pole/wall mount bracket.  See  Chapter 7,  “Installing the Hub Module” or Chapter 8, “Installing the Remote Backhaul Module” as applicable.
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 17  Issue 01 D1   Figure 6   Attaching Assembled Pole/Wall Mount Bracket to Pole with U-Clamp or V-Clamp 6.3.3 Mounting with Steel Straps Use steel straps to mount the modules onto poles with diameters 3.5in./9 cm or larger. If the pole has a smaller diameter, see previous mounting methods. Required parts and tools:  Pole/wall mount bracket with attached pole clamps; see Section 6.3.1, “Attaching Pole Clamps to Mounting Bracket” Note:  When  using  straps  on  poles  greater  than  4  in./10  cm  in  diameter,  pole  clamps  are  not required for the pole/wall mounting bracket.  Customer-provided steel straps and associated hardware  Slot head screwdriver or Phillips #2 screwdriver To install the pole/wall mount bracket onto a vertical pole that is 3.5 in./9 cm in diameter or larger using metal straps, refer to Figure 7, “Attaching Assemble Pole/Wall Mount Bracket to Pole with Straps” and follow these steps: 1. Assemble the two steel straps and the assembled pole/wall mounting bracket together by threading the straps through the top and bottom strap slots of the bracket, respectively. 2. Select  a  mounting  location  on  the  pole  and  place  the  steel  straps  with  the  assembled  pole/wall mounting  bracket  around  the  pole.  Ensure  the  orientation  cut-out  is  pointing  up  (see  Figure  4, “Pole/Wall Mount Bracket”). 3. Position the pole/wall mounting bracket on the pole as needed and tighten the straps around the pole with a slot head or Philips #2 screwdriver, as applicable. Ensure the steel straps are as tight as possible.  Note: Once the steel straps are tightened to full tension, the pole/wall mounting bracket cannot be adjusted unless the straps are disassembled or cut. 4. Install the HM  or RBM onto  the mounted pole/wall mount  bracket. See  Chapter 7,  “Installing  the Hub Module” or Chapter 8, “Installing the Remote Backhaul Module”, as applicable. Top View
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 18  Issue 01 D1   Figure 7   Attaching Assemble Pole/Wall Mount Bracket to Pole with Straps 6.3.4 Mounting onto a Wall  The pole/wall mounting bracket has four wall-mounting holes that you use to mount the HM or RBM directly onto a wall. Required parts and tools:  Pole/wall mount bracket with attached pole clamps; see Section 6.3.1, “Attaching Pole Clamps to Mounting Bracket”  Four customer-provided 5/16-in. or M8 wall mounting bolts or equivalent  If  the  wall  material  requires  it,  customer-provided  bolt  reinforcement  hardware  (for  example, four wall shoe anchor bolts)   Socket wrench with 3/8 in. driver head, with long and short ½ in. and 7/16 in. sockets   Torque wrench, 3/8 in. head with range for 4-60Nm or 3-45lbf-ft  Black marker To install the  pole/wall mount bracket onto  a wall, refer to  Figure 8, “Attaching Assembled  Pole/Wall Mount Bracket to Wall” and follow these steps:  1. Identify an area on the wall that meets the safety, space, and environmental requirements for the HM or RBM. 2. Place the pole/wall mounting bracket onto the location on the wall. Mark the locations of the four wall-mounting holes using a black marker. 3. If  required,  install  the  bolt  reinforcement  hardware  onto  the  wall  at  the  four  mounting  hole locations. Note:  The  installer  should  mount  the  bolt  reinforcement  hardware  to  the  wall  with  the  correct distance apart so that when the bolts are installed through the mounting bracket wall mount holes they align with the holes in the wall. 4. Install and hand-tighten the four mounting bolts through the  pole/wall mounting bracket and into the wall. Ensure the orientation cut-out is pointing up (see Figure 4, “Pole/Wall Mount Bracket”). 5. Use the socket wrench to evenly tighten all four bolts of the pole/wall mount bracket to the wall.  Top View
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 19  Issue 01 D1 6. Use  the  torque  wrench  to  tighten  down  all  four  bolts  to  finish  the  installation  of  the  pole/wall mount bracket to the wall. Base the torque on the third-party hardware bolt specifications and wall material (do not over tighten).  7. Install the HM  or RBM onto  the  mounted pole/wall mount bracket.  See  Chapter 7,  “Installing the Hub Module” or Chapter 8, “Installing the Remote Backhaul Module” as applicable.  Figure 8   Attaching Assembled Pole/Wall Mount Bracket to Wall 6.4 Assembling the Module Brackets Assemble the HM or RBM brackets BEFORE installing the HM or RBM onto an installed pole/wall mount bracket. The mounting brackets offer three degrees of adjustment: elevation up-tilt up to 30 degrees, azimuth up to +/- 25 degrees and theta of up to +/-10%. 6.4.1 Attach Elevation Bracket Required parts and tools:  Elevation  bracket  and  associated  hardware  from  X-1200  Module  Installation  Kit  (Figure  9, “Elevation Bracket and Associated Hardware”)  Socket wrench with 3/8 in. driver head, with long and short ½ in. and 7/16 in. sockets  Torque wrench, 3/8 in. head with range for 4-60Nm or 3-45lbf-ft Clamping brackets are left in place to prevent the Pole Mount bracket from crushing during bolting. 4X Wall Mounting Bolts anywhere  within slots Orientation Cut-out
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 20  Issue 01 D1   Figure 9   Elevation Bracket and Associated Hardware  Figure 10   Elevation Bracket Mounting Position Table 7   Recommended Torque Values for Elevation Bracket Bolts Item Description Torque Note 1 Elevation bracket bolts (x4) 10.8Nm or 8lbf-ft Mount the elevation bracket in the top center on the HM or RBM. The Elevation bracket allows for an adjustment range of 0-30 degrees up-tilt only. You achieve this by moving the module assembly within two central slots on the bracket and releasing/tightening four side bolts (two at the top and two within the central slots).  Elevation Bracket Bolts and Washers Orientation Cut-out (Up) Elevation Bracket Central slot where you have a 0-30 degree up-tilt adjustment Orientation Cut-out
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 21  Issue 01 D1 To attach the elevation bracket onto the HM or RBM, refer to Figure 11, “Attaching Elevation Bracket to Back of Module” and follow these steps: 1. Place the elevation bracket on the back of the unit, in the top center position, with the orientation cut-out (triangle) pointing up. Align the four bolt holes so that they are centered with the holes on the back of the module enclosure. 2. Place a lock washer and then a washer on the back of each of the four bolts.  3. Use the socket wrench to lightly tighten all four bolts of the elevation bracket to the unit (do not over tighten). 4. Use  the  torque  wrench  to  evenly  tighten  down  all  four  bolts  and  finish  the  installation  of  the elevation  bracket  to  the  module  (do  not  over  tighten).  Follow  the  Torque  setting  from  Table  7, “Recommended Torque Values for Elevation Bracket Bolts”.  Figure 11   Attaching Elevation Bracket to Back of Module 6.4.2 Attach Azimuth Bracket Required parts and tools:  Azimuth  bracket  and  associated  hardware  from  X-1200  Module  Installation  Kit  (See  Figure  12, “Azimuth Bracket and Associated Hardware”)  Socket wrench with 3/8 in. driver head, with long and short ½ in. and 7/16 in. sockets   Torque wrench, 3/8 in. head with range for 4-60Nm or 3-45lbf-ft  Figure 12   Azimuth Bracket and Associated Hardware 6 Mounting Holes (total) Use top 4 mounting holes to attach elevation bracket Azimuth Bracket Bolts and Washers Orientation  Cut-out (Up)
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 22  Issue 01 D1 Table 8   Recommended Torque Values for Azimuth Bracket Bolts Item Description Torque Note 1 Azimuth bracket bolts (x4) 16.3Nm or 12lbf-ft — The Azimuth bracket allows for an adjustment range of +/- 15 degrees from the pole axis. The module is pivoting on a set of two vertical bolts and locked in place by another two. To attach the azimuth bracket onto the HM or RBM, refer to Figure 13, “Attaching Azimuth Bracket to Elevation Bracket on Module” and follow these steps: 1. Place  the  azimuth  bracket  within  the  installed  elevation  bracket,  aligning  the  two  bolt  holes  on either side with the bolt holes on the sides of the elevation bracket. Ensure that the azimuth bracket orientation cut-out is pointing up. 2. First, place a lock washer and then a flat washer on to each of the four bolts. 3. Thread, by hand, the four bolts through the bolt holes on both sides of the elevation bracket into the bolt holes of the azimuth bracket. Make sure the azimuth bracket sits flat within the elevation bracket while doing this step.  4. Use the socket wrench to lightly tighten all four bolts (do not over tighten).  NOTE:  During  the  final  installation  stages,  you  loosen  these  bolts  to  adjust  the  elevation  of  the module.  See  Section  8.1,  “Using  the  BSI  Feature  and  Adjusting  the  Module”  for  the  steps  on adjusting the module.  5. As  a  final  step  in  the  module  installation  (after  all  adjustments  to  module  on  the  pole),  use  the torque wrench to tighten down all four bolts and finish the installation of the azimuth bracket to the unit (do not over tighten). See  Table 8, “Recommended Torque Values for Azimuth Bracket Bolts” for torque values.  Figure 13   Attaching Azimuth Bracket to Elevation Bracket on Module 4 bolts attach azimuth bracket and at final installation, adjust the module
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 23  Issue 01 D1 6.5 Installing the Power Supply Unit (Optional)  The installation of the power supply unit (PSU) and the PSU bracket are optional. You only need to install the  PSU  and  PSU  bracket, if  you  do  NOT  have  a  direct  -48  Vdc  power  supply.  The  PSU  allows  you  to convert from another power source (i.e., North America: 120 Volts, European: 220 Volts) to -48 Vdc. If  desired, you  can  install the  PSU onto  the  PSU  bracket before  installing  the complete  PSU  assembly onto the module. If you choose this method: always ensure that the AC cable is accessible from the top of the PSU and the DC output cable is at the bottom. 6.5.1 Installing the PSU Bracket To install the PSU, the PSU bracket needs to be installed onto the module. Note: The PSU bracket is symmetrical, and there is no specific mounting orientation.  Figure 14   PSU Mounting Bracket Required parts and tools:  Power Supply Unit (PSU) bracket and associated hardware from X-1200 Power Supply Unit (PSU) Installation Kit   Socket wrench with 3/8 in. driver head, with long and short ½ in. and 7/16 in. sockets  Torque wrench, 3/8 in. head with range for 4-60Nm or 3-45lbf-ft  Cable ties, as needed Table 9   Recommended Torque Values for PSU Bracket Bolts Item Description Torque Note 1 Power supply bracket bolts (x2) 10.8Nm or 8lbf-ft Mount the bracket in the lower two (2) mounting holes on the HM or RBM. To attach the power supply bracket onto the HM or RBM, refer to Figure 15, “Attaching PSU Bracket to Back of Module” and follow these steps: 1. Place the power supply bracket on the back of the unit, in the lower center position. Align the two bolt holes so that they are centered with the holes on the back of the module enclosure. 2. Place a lock washer on each of the two bolts.  3. Thread, by hand, each of the bolts into the mounting holes. Ensure that the PSU mounting bracket holes and the holes on the module are aligned. 4. Use the socket wrench to lightly tighten the two bolts of the power supply bracket to the unit (do not over tighten). Mounting Holes (x2) Dedicated Cable Tie-down Management Slots (x4) Mounting Posts (x4)
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 24  Issue 01 D1 5. Use the torque wrench to evenly tighten down the two bolts and finish the installation of the power supply  bracket  to  the  module  (do  not  over  tighten).  Follow  the  Torque  setting  from  Table  9, “Recommended Torque Values for PSU Bracket Bolts”.  Figure 15   Attaching PSU Bracket to Back of Module 6.5.2 Installing the Power Supply Unit If you do not have a direct -48 Vdc power supply, you must install the -48 Vdc power supply unit (PSU). The PSU allows you to convert from another power source (i.e., North America: 120 Volts) to -48 Vdc. To install the PSU bracket onto the module, see Section 6.5.1, “Installing the PSU Bracket”.  Figure 16   Power Supply Unit (PSU) Required parts and tools:  Installed Power Supply Unit (PSU) bracket on module  Socket wrench ¼ in. driver head with long and short ½ in. and 7/16 in. sockets  Torque wrench, ¼ in. head with range for 4-60Nm or 3-45lbf-ft  Cable ties, as needed  If needed, outdoor weatherproof AC cabling and connectors, as required for your installation (for instance: shielded 18 AWG 2 conductors 90°C water resistant, black and white conductor jackets, outdoor rated cable, 5-8 mm thick with weatherized DC connector to fit on power cable)  6 Mounting Holes (total) Use 2 mounting holes to attach PSU bracket
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 25  Issue 01 D1 Table 10   Recommended Torque Values for PSU Bolts Item Description Torque Note 1 Power supply nuts (M4x4) 2.7Nm or 2lbf-ft Mount the PSU to the four (4) mounting holes on the PSU bracket.  Figure 17   PSU Bracket PSU Mounting Studs To install the power supply unit: WARNING!  Always ensure that the power is OFF before installing this device.  Installation of the equipment must comply with local and national electrical codes. 1. Place the PSU on top of the four (4) raised studs on the PSU bracket. Position the PSU so that the AC cable access is at the top and the DC output cable access is at the bottom. 2. Place  a  lock  washer  on  each  of  the  PSU  studs,  then  position  and  tighten  the  PSU  nuts  to  the specified  torque.  Follow  the  Torque  setting  from  Table 9,  “Recommended Torque  Values  for  PSU Bracket Bolts”. 3. Route the  AC  cable  to  allow  for  adjustments  when  the unit  swings  up  to  fine-tune the  alignment angle, ensure that the cable provides sufficient movement so that the cable is not tight. Connect the AC cable from the AC power source to the PSU AC cable using the desired connectors/method for your installation. On PSU:  Connect ACL (Brown) to AC Line (i.e., in USA - Black)  Connect ACN (Blue) to AC Neutral (i.e., in USA - White)  Connect Ground (Green/Yellow) to AC Ground 4 Mounting Studs !
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 26  Issue 01 D1 4. Using the DC connector on the end of the PSU DC power cable, connect the -48 Vdc power supply cable  to  the  X-1200  module  DC  power  port.  Provide  a  small  loop  in  the  DC  power  cable  at  the bottom of the X-1200 to allow for movement.  Figure 18   Power Connection via the PSU 5. With cable ties, use the dedicated cable tie slots on the side of the PSU mounting bracket to neatly collect  and  contain  (dress)  the  cables  from  the  PSU.  If  needed,  see  section  6.11,  “Cable Management” for more information.  Figure 19   Module with PSU Installed. 6.6 Installing the Module onto a Mounting Bracket Prerequisites:  Attached elevation and azimuth brackets on back of HM or RBM  Mounted pole/wall mounting bracket Required parts and tools:  Pole/wall mount  bracket locknut hardware from X-1200 Module Installation Kit (See Figure 20, “Pole/Wall Mount Bracket Locknut Hardware”)  Socket wrench with 3/8 in. driver head, with long and short ½ in. and 7/16 in. sockets   Torque wrench, 3/8 in. head with range for 4-60Nm or 3-45lbf-ft  Figure 20   Pole/Wall Mount Bracket Locknut Hardware DC Power Port PSU DC Power Connector  On PSU, Dedicated Cable Tie-down Management Slots (x4) Locknut Washer
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 27  Issue 01 D1 Table 11   Recommended Torque Values for Pole/Wall Mount Bracket Locknuts Item Description Torque Note 1 Pole/wall mount bracket locknuts (x3) 16.3Nm or 12lbf-ft — To install the HM or RBM onto the mounted pole/wall mount bracket, refer to Figure 21, “Unit Installed onto the Pole/Wall Mount Bracket” and follow these steps:  Note: When installing the HM or RBM, orient it with the chassis cabling openings pointing downward. Never mount the HM or RBM with the bottom facing up or to the side. 1. Carefully fit the azimuth bracket into the pole/wall mount bracket. 2. Place a washer on each bolt protruding through the top of the azimuth bracket from the pole/wall mount bracket. Thread a locknut, by hand, onto the two bolts. 3. Place  a  washer  and  then  thread  a  locknut,  by  hand,  onto  the  one  bolt  protruding  through  the bottom of the pole/wall mount bracket from the azimuth bracket. 4. Use the socket wrench to evenly tighten all three locknuts (do not over tighten).  NOTE:  During  final  installation,  you  loosen  these  bolts  to  adjust  the  azimuth  of  the  module.  See Section, 8.1 “Using the BSI Feature and Adjusting the Module” for steps on adjusting the module. 5. As  a  final  step  in  module  installation,  use  the  torque  wrench  to  evenly  tighten  down  all  three locknuts to finish the installation of the HM or RBM to the pole or wall (do not over tighten). See Table 11, “Recommended Torque Values for Pole/Wall Mount Bracket Locknuts” for torque values.  Figure 21   Unit Installed onto the Pole/Wall Mount Bracket Optional Power Supply Washer and Lock Nut Washer and Lock Nut
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 28  Issue 01 D1 6.7 Grounding and Overvoltage Protection Instructions  Ensure that you externally ground the  X-1200 system modules. Two (2) grounding screws with  a two-hole lug are provided on the side of the module enclosure for this purpose. Connect the ground lug to the main ground to safeguard against possible lightning strikes.  Further,  to  ensure  the  survivability  of  the  indoor  or  outdoor  connecting  equipment  from  a  lightning strike, BLiNQ Networks recommends either installing the lightning/surge arrester that is sold separately by BLiNQ  Networks, or  another suitable  third-party arrester  unit. This  helps  to  provide  an equipment site that is properly grounded and protected from electrical surges. WARNING!  The X-1200 system modules MUST be externally grounded using a customer-supplied ground cable before power is applied. Contact the appropriate electrical inspection authority or a qualified electrician if you are uncertain whether suitable grounding (or shielding from electrical surge) is available.  Lightning/surge arresters may only be connected and installed by a qualified electrician (If used)   Always ensure that the power is OFF before performing any grounding or overvoltage protection tasks.   All country-specific safety regulations, rules, and laws must be observed to provide a properly grounded and overvoltage protected equipment site. In  all  X-1200  equipment  installations,  after  the  equipment  is  mounted,  you  must  provide  a  properly grounded and shielded environment for the installation site before connecting power or network cables. If used, install the lightning/surge arrester in series with the Ethernet and power cables. 6.7.1 Installing the Grounding Cable Required parts and tools:  6-gauge grounding cable  Phillips #2 screwdriver  Two (2) PH SEMS screws – ¼-20 x 3/8 in.  Crimp tool  Wire stripper !
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 29  Issue 01 D1  Figure 22   Module with Grounding Lug To ground the unit, follow these general steps:  1. If needed, strip and attach (crimp) the two-hole ground lug of the unit to the grounding cable. 2. Use the Phillips #2 screwdriver to connect the two-hole grounding lug to the unit’s grounding screws shown in Figure 22, “Module with Grounding Lug” (do not over tighten). 3. Ensure the other end of the ground wire is connected to a reliable earth ground, such as a grounding rod or an appropriate grounding point on a pole that is grounded. 4. Ensure  there  is  enough  slack  in  the  ground  cable  to  allow  for  unit  adjustments  later  on  the pole/wall.  Or  preferably,  wait  until  adjustments  to  the  module  are  complete  and  then  attach grounding lug to the unit as a final step in the module installation. 6.7.2 Installing the Lightning/Surge Arrestor To install a lightning/surge arrester (sold separately by BLiNQ Networks), follow these general steps:  1. Mount the arrester close to the entry of the building if the signals are entering a building. Mount the unit  with  the  strain  reliefs  facing  the  ground,  as  shown  in  Figure  23,  “Wiring  of  Lightning/Surge Arrester (Sold by BLiNQ Networks)”. 2. Remove the cover screws using a medium slot head screwdriver and lift off the cover.  3. Thread the incoming Ethernet cable from the data source through one of the strain reliefs on the bottom  of  the  unit.  Strip  back  the  cable  jacket  as  needed  using  wire  strippers.  Run  the  Ethernet cable  through the  copper ground  lug on  the  inside  of  the  Arrester and  clamp the  Ethernet cable, ensuring there is a good electrical connection of the Ethernet cable shield to the lug. 4. Gently  pull  the  terminal  blocks  off  of  the  Ethernet  pin  strip  terminals  (where  present—two  are typically provided). 5. Install the Ethernet conductor wires into the top Ethernet pin strip terminals (the bottom terminals are not used), in this order:  Blue  Blue/White  Orange  Orange/White Grounding Lug
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 30  Issue 01 D1   Green  Green/White  Brown  Brown/White 6. Secure and seat  the  conductors to  the pin  strip terminals by  gently  but  firmly pressing  them  into place  with the  terminal  blocks  removed  in  step  4.  Gently  pull  the  terminal blocks  off  again  when done.  7. Once all the conductors are seated to the pin strip terminals, gently press the terminal blocks into the pin strip terminals of your choice for storage.  8. Repeat steps 3 through 7 through the other strain relief for the outgoing Ethernet cable running to the X-1200 equipment.  Note: Ensure the left-side and right-side Ethernet conductor wire colors match. 9. Thread the incoming DC power cable from the power source through one of the strain reliefs on the bottom of the unit.  10. Using wire strippers, strip back the DC cable jacket about 1 in./25.4 mm to expose the two wires, then strip the insulation about 3/8 in./9.5 mm from each wire. 11. Insert  the  Ground  Return  (RTN)  wire  into  DC+  of  the  four-position  power  terminal  strip  (the  top position),  and  the  -48 Vdc  wire  into  DC-  of  the  power  terminal  strip  (the  bottom  position),  and tighten each wire down to the terminal using a small slot head screwdriver. 12. Repeat steps 9 through 11 through the other strain relief for the outgoing DC power cable running to the X-1200 equipment.  13. Confirm the left-side and right-side Ethernet conductor wire colors match between the left and right Ethernet pin strip terminals. 14. Confirm the DC power cable polarity is correct: RTN goes to DC+; -48 Vdc goes to DC- 15. Tighten the strain reliefs onto the cables (do not over tighten). 16. Reinstall the cover.  17. Connect the external ground lug on the unit to a solid Earth ground. The unit must be grounded for the arrester to work properly.
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 31  Issue 01 D1   Figure 23   Wiring of Lightning/Surge Arrester (Sold by BLiNQ Networks) 6.8 Connecting to DC Power  Before proceeding, if you do not have a direct -48 Vdc power supply, you must install the module power supply unit (PSU). The PSU allows you to convert from another power source (i.e., North America: 120V) to -48 Vdc. See Section 6.5, “Installing the Power Supply Unit (Optional)” for more information. BLiNQ  Networks  provides  a  10  m  (32.9  ft),  20  m  (65.7  ft),  or  40  m  (131.2  ft)  DC  power  cable  (as applicable for the installation site) with both the HM and RBM. One end of the cable comes equipped with  a  DC  power  connector,  while  the  other  end  comes  terminated  with  no  stripping  of  either  the external sheathing or any of the internal wires. When connecting the HM or RBM to DC power:  Ensure the input is -48 Vdc and powered from an approved AC/DC power supply or from a DC source separated from AC mains by double or reinforced insulation.  Ensure  that  the  power  can  be  conveniently  removed,  if  necessary,  by  disconnecting  the  DC power connector plug from the back of the unit. This plug should be accessible for servicing the unit.  The  HM  or  RBM  is  protected  against  an  inadvertent  reverse  polarity  connection.  Ensure  that  the  DC power supply  is  not  under-rated  and  that  it  is capable of  meeting the power  requirement  of Table 1, “X-1200 System Specifications” under various temperature and solar loading conditions.  Note: You may have to cut the cable to the specific cable length needed for your installation. External Ground Lug Four-Position Power Terminal Strips Terminal Blocks Cable Strain Reliefs Ethernet Pin Strip Terminals
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 32  Issue 01 D1 WARNING!  The X-1200 equipment must be externally grounded using a customer-supplied ground wire before power is applied. Contact the appropriate electrical inspection authority or an electrician if you are uncertain whether suitable grounding is available.  Always ensure that the power is OFF before connecting or disconnecting power to the unit. To connect the HM or RBM to a DC power source, follow these steps: 1. Verify  that  the  equipment  is  properly  grounded  as  described  in  the  Section  6.7,  “Grounding  and Overvoltage Protection Instructions”. 2. Turn off power to the DC power source at the designated circuits.  3. Align  the  DC  power  cable  connector  with  the  two-prong  key  inside  of  the  DC  power  connector receptacle on the module, then push the cable connector into the connector receptacle and hand tighten the connector screw until fully seated. 4. Connect the other end of the DC power cable to the -48 Vdc supply, ensuring that you comply with the electrical codes for your installation location. For installation, use the white wire to connect to RTN,  and  use  the  black  wire  to  connect  to  the  -48  Vdc  supply.  The  termination  method  you  use depends on the power source, for example, a junction box, at your installation site.  5. Verify the power connection cable run is weatherproof. Use a conduit in open locations to further protect the DC power cable run to the installation location against physical damage. 6. Turn on DC power at the designated circuits. The module starts up and loads the operating software. !
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 33  Issue 01 D1 6.9 Verifying Basic Installation On connection of DC power to the HM or RBM, verify its operational state by checking the LED located on the bottom of the unit. As the HM or RBM starts up, the  LED runs through the states shown  in Figure 24,  “HM and RBM LED States”.  Figure 24   HM and RBM LED States
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 34  Issue 01 D1 6.10 Connecting to the Ethernet Backhaul Network  Whether  using  the  copper  network  interface for  Ethernet on  the  HM and  RBM,  or  the  optional  fiber optical  Gigabit  network  interface  for  Ethernet  on  the  HM,  use  of  an  outdoor-rated  cable  is recommended for all X-1200 system installations. For example, for the copper Ethernet interface, use a double-shielded cable with metallic RJ45 connectors to properly ground the cable at both ends to the termination points. BLiNQ Networks supplies the environmental housing required for the RJ45 Ethernet connection at the module. Figure 25, “Ethernet Connector Encased in Environmental Housing” shows the complete copper Ethernet connector assembly encased in the environmental housing.  Figure 25   Ethernet Connector Encased in Environmental Housing Note:   Avoid leaving an excessive amount of wire wrapped in a loop at either end of the Ethernet cable run. BLiNQ Networks recommends leaving a maximum of three to four turns of cable to prevent Electrostatic Discharge (ESD) build up on cable.  Do not run the Ethernet cable close to other cables and machinery with high power (for example, pumps or elevator motors). 6.10.1 Connecting to the RJ45 Ethernet Port Table 12   Recommended Torque Value for the RJ45 Ethernet Connection Item Description Torque Note 1 RJ45 Gland Connector Body 8Nm or 5.9lbf-ft Plastic 2 RJ45 Seal Compression Cover 8Nm or 5.9lbf-ft Plastic To connect the HM or RBM to the local Ethernet backhaul network using the RJ45 copper Ethernet port, follow these steps:  1. Unscrew the cable gland from the module, if not shipped separately. The cable gland consists of the body (screws into the X-1200 unit (M25 thread)), the RJ45 seal and the seal compression cover.
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 35  Issue 01 D1  Figure 26   Ethernet Connector Assembly - Separated 2. To  properly  pass  the  Ethernet  cable  and  the  RJ45  connector  through  the  environmental  housing: Insert  the  RJ45  cable  into  the  seal  compression  cover,  the  seal  and  then  the  gland  body.  See Figure 26, “Ethernet Connector Assembly - Separated”. 3. Assemble the connector by first ensuring that the seal is centrally aligned with the gland body and then screwing on the seal compression cover. Do not tighten yet! You want the cable to still move easily within the assembly. 4. If  needed,  remove  the  cover/cap  from  the  external  RJ45  Ethernet  connector/port  located  on  the underside of the module (if needed, see Figure 28, “Hub Module Showing All Connectors” on page 38). 5. Plug the Ethernet cable into the external Ethernet RJ45 port on the module.  6. Screw  in  the  gland  body  assembly  into  the  Ethernet  RJ45  well  on  the  module.  Tighten  the  gland body to the torque recommended in Table 12, “Recommended Torque Value for the RJ45 Ethernet Connection”. Seal Compression Cover RJ45 Seal Gland Body Ethernet Cable
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 36  Issue 01 D1 7. Now,  tighten  the  seal  compression  cover  around  the  RJ45  cable.  Ensure  that  the  environmental housing makes a good seal over the external Ethernet connector on the module.  8. Tighten the assembly to the torque recommended in Table 12, “Recommended Torque Value for the RJ45 Ethernet Connection”. 9. Verify the Ethernet cable connection run is weatherproof. Use a conduit in open locations to further protect the Ethernet cable run to the installation location against physical damage. 6.10.2 Connecting to the SFP Port To  connect  the  HM  or  RBM  to  the  local  Ethernet  backhaul  network  using  the  optional  fiber  optical Gigabit Ethernet interface, follow these steps: 1. Insert  an  outdoor-rated  Small  Form-factor  Pluggable  (SFP)  fiber  connector  into  the  SFP  housing located  on  the  underside  of  the  HM  or  RBM  (For  HM,  see  Figure  28,  “Hub  Module  Showing  All Connectors” on page 38 or for RBM, see Figure 33, “Beam Steering Antenna Mounting Bracket” on page 41).  2. Verify the Ethernet cable connection run is weatherproof. Use a conduit in open locations to further protect the Ethernet cable run to the installation location against physical damage. No further configuration is needed; however, the connection of an SFP fiber connector to the HM disables the RJ45 port. Note: The RJ45 Ethernet interface on the HM has priority over the Small Form-factor Pluggable (SFP) Gigabit Ethernet interface. If, for example, an on-site technician connects to the HM locally by the copper interface while the HM is providing network services to its users through the fiber interface, the  fiber  interface  is  then  disabled  and  taken  out  of  service.  Network  service  through  the  fiber interface is restored when the copper interface is disconnected. 6.11 Cable Management For all modules, BLiNQ Networks highly recommends that you manage the cables, in some locations this is  referred  to  as  dressing  the  cable.  The  following  method  is  a  general  recommendation;  each installation has variations, so depending on the installation, manage the cables as per the policies and procedures suitable for your location. 1. Gather all cables into a bundle to prepare the cable for termination. 2. Ensure all cables are parallel to each other. Straighten and smooth the cables until they form a neat, orderly bundle. 3. Ensure there is some slack in the cables, so that there is no tension on the cable connectors and/or connections. SPF  Connector
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 37  Issue 01 D1 4. Add a drip loop to the cabling.  Figure 27   Module Cable Management 5. Use  cable  tie  wraps  to  secure  the  cables,  for  example,  to  an  available  opening  on  the  mounting bracket or to the dedicated cable management slots on the PSU mount. If needed, evenly space the tie wraps throughout the dressed length. Tighten tie wraps by hand only. Drip Loop Cable Tie Wrap Ground Cable Cable Tie Wrap Ground  Cable Module without PSU Module with PSU
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 38  Issue 01 D1 7 Installing the Hub Module Refer to Chapter 6, “Installing the Modules (General)” and perform these steps to properly install the Hub Module  (HM). Typically, the  factory installs most of  the components  on to  the  module;  however these instructions are for when the module requires field assembly. Figure 28, “Hub Module Showing All Connectors” shows the HM with all HM connectors indicated. The Radio Frequency (RF) cables run from the HM to the RF Beam Steering Antenna.  Figure 28   Hub Module Showing All Connectors 7.1 Adjusting the Hub Module Typically, you do not need to adjust the HM, but if needed (i.e., to correctly position an antenna), the mounting brackets offer three degrees of adjustment: elevation up-tilt up to 30 degrees, azimuth up to +/- 25 degrees and theta of up to +/-10 degrees. In addition, the Beam Steering Antenna allows a down-tilt adjustment capability of 0-10 degrees. Prerequisites:  Attached elevation and azimuth brackets on back of HM   Mounted pole/wall mounting bracket  Required parts and tools:  Black marker  Ratchet wrenches, ½ in. and 7/16 in.  Socket wrench with 3/8 in. driver head, with long and short ½ in. and 7/16 in. sockets  Torque wrench, 3/8 in. head with range for 4-60Nm or 3-45lbf-ft Antenna Control Interface Connector RF Cable Connections (N-Type x4) Power Ethernet (RJ45) SFP Housing Grounding Lug Antenna Bracket Mounting Points GPS Antenna (Top center) Status LED
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 39  Issue 01 D1 Table 13   Recommended Torque Values for HM Bracket Bolts Item Description Torque Note 1 Pole/wall mount bracket locknuts (x3) 16.3Nm or 12lbf-ft — 2 Azimuth bracket bolts (x4) 16.3Nm or 12lbf-ft — 3 Elevation bracket bolts (x4) 10.8Nm or 8lbf-ft — 1. Using a sweeping motion along the horizontal plane, slowly adjust the azimuth of the HM from on its mount, taking in a large angle on either side of the expected direction of the associated RBMs. Mark  this  position  with  the  black  marker,  as  it  is  the  optimal  position  for  the  HM  along  the horizontal plane.  Figure 29   HM Horizontal Plane Adjustment via Azimuth Bracket 2. Use  the  ratchet  wrench  to  lightly  tighten  the  bottom  locknut  in  place  to  the  pole/wall  mount bracket. Do not over tighten.  3. Repeat Step 1 along the vertical plane to obtain the optimal vertical elevation position for the HM. This needs to be done while keeping the optimal horizontal position.   Figure 30   HM Vertical Plane Adjustment via Elevation Bracket 4. Use the socket wrench to lightly tighten the two bolts in place on one side of the elevation bracket (do not over tighten). 5. Use the ratchet wrench to lightly loosen the bottom locknut on the pole/wall mount bracket,  and then repeat Step 1 again along the horizontal plane while keeping the optimal vertical position. This ensures the greatest possible pointing accuracy for the HM. 6. Use  the  ratchet  wrench  to  lightly  tighten  the  bottom  locknut  in  place  to  the  pole/wall  mount bracket. Do not over tighten. +/-25 degrees 0-30 degrees
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 40  Issue 01 D1 7. As a final adjustment to the HM on its mount, gently tilt the unit slightly to the left and then to the right on its elevation bracket axis (theta), if necessary for proper orientation.  Figure 31   HM Theta Adjustment Via Elevation Bracket Mounting Holes 8. If the  Beam  Steering  Antenna is  installed on the  HM, there is also a  down-tilt adjustment of 0-10 degrees. Loosen the bolts on the sides of the Beam Steering Antenna mounting bracket. Adjust as required  and  re-tighten  the  bolts  to  the  recommended  installation  torque  (see  Table  15, “Recommended Torque Values for Antenna Bracket Bolts”).  Figure 32   HM Down-tilt Adjustment with Antenna Mount 9. Once you are satisfied that you have found the optimal horizontal and vertical position for the HM, bolt it down to its mount, as follows: Note: Depending on how elevated the HM is, some of the bolts may be hard to torque down using the torque wrench due to limited access  to the back of the unit. In those  cases, tighten the bolts down by hand. a. Use the  socket wrench to evenly tighten all three locknuts to  the  pole/wall mount bracket (do not  over  tighten),  then  use  a  torque  wrench  to  tighten  down  all  three  locknuts  to  finish  the installation (do  not over tighten). See Table 13, “Recommended Torque Values for HM Bracket Bolts” for torque values. b. Use the socket wrench to evenly tighten all four bolts on the azimuth bracket to the elevation bracket (do not over tighten), then use a torque wrench to tighten down all four bolts and finish the  installation  (do  not  over  tighten).  See  Table  13,  “Recommended  Torque  Values  for  HM Bracket Bolts” for torque values. c. Use the ratchet wrench to evenly tighten all four bolts on the elevation bracket to the back of the HM (do not over tighten), then use a torque wrench to tighten down all four bolts and finish +/- 10 degrees 0-10 degrees
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 41  Issue 01 D1 the  installation  (do  not  over  tighten).  See  Table  13,  “Recommended  Torque  Values  for  HM Bracket Bolts” for torque values. 10. Use  cable  ties  to  dress  the  cables  for  neatness  and  stability.  If  needed,  see  section  6.11,  “Cable Management” for more information. 7.2 Assembling the Beam Steering Antenna (If Required) Typically, the factory installs the antenna on to the HM;  however these instructions are for when the antenna unit requires field assembly on to the HM. If required, the Beam Steering Antenna, mounting bracket and associated hardware arrives as a kit. The kit includes:  Beam Steering Antenna unit  Down-tilt Hub integral mounting bracket  Four (4) ¼ in. bolts and washers for mounting bracket to X-1200 HM  Four  (4)  locking  nuts  (to  fit  flat  head  M5  X  0.8mm  posts)  to  mount  bracket  to  Beam  Steering Antenna  One (1) x Control cable assembly  Four (4) x RF cables (N-Type to N-Type) 7.2.1 Installing the Bracket on to the Beam Steering Antenna To make the installation easier, first install the Beam Steering Antenna onto the mounting bracket and then mount the assembled Beam Steering Antenna and bracket onto the HM.   Figure 33   Beam Steering Antenna Mounting Bracket Required parts and tools:  Beam Steering Antenna kit: Beam Steering Antenna, Beam Steering Antenna mounting bracket, Four (4) locking nuts (to fit flat head M5 X 0.8mm posts)  Socket wrench with ¼ in. driver head, with long M4 and M5 sockets  Torque wrench, ¼ in. head with range for 4-60Nm or 3-45lbf-ft Adjustable Down-tilt Mounting Holes Antenna Mounting Holes (x4)
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 42  Issue 01 D1 Table 14   Recommended Torque Values for Antenna Bracket Nuts Item Description Torque Note 1 Antenna bracket nuts (x4) 10.8Nm or 8lbf-ft Mount the antenna bracket on the antenna To attach the Beam Steering Antenna to the Beam Steering Antenna mounting bracket: 1. Position the antenna bracket on top of the four (4) raised, threaded studs on the back of the Beam Steering Antenna. Position the antenna bracket so that the adjustable holes (down-tilt) are  at the top and the single mounting holes are at the bottom of the antenna.  2. Place a lock nut on each of the antenna studs and tighten the nuts to the specified torque. Follow the Torque setting from Table 14, “Recommended Torque Values for Antenna Bracket Nuts”. 7.2.2 Mounting the Antenna Assembly on to HM The Beam Steering Antenna mounts onto the outside casing of the Hub Module (HM). There are four (4) dedicated mounting holes, two (2) on each side, of the HM. Required parts and tools:  Beam  Steering  Antenna  with  mounted  Beam  Steering  Antenna  bracket,  see  Section  7.2.1, “Installing the Bracket on to the ”  Socket wrench with ¼ in. driver head, with long M4 and M5 sockets  Torque wrench, ¼ in. head with range for 4-60Nm or 3-45lbf-ft  Four (4) antenna bracket bolts Table 15   Recommended Torque Values for Antenna Bracket Bolts Item Description Torque Note 1 Antenna bracket bolts (x4) 10.8Nm or 8lbf-ft Mount the antenna bracket on the HM Adjustable Down-tilt Mounting Holes Mounting Studs (x4) Beam Steering Antenna RF Cable Connectors (N-Type) x2 Control Interface Connector RF Cable Connectors  (N-Type) x2
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 43  Issue 01 D1 To attach the Beam Steering Antenna and antenna bracket assembly onto the HM, refer to Figure 34, “Hub Module Antenna Mounting Holes” and follow these steps: 1. Place the antenna bracket assembly on the top of the HM. Align the two bolt holes on each side of the  bracket  with  the  two  (2)  holes  on  each  side  of  the  HM.  Ensure  that  the  down-tilt  adjustable holes are aligned with the top two holes on each side of the HM enclosure.  Figure 34   Hub Module Antenna Mounting Holes 2. Place a lock washer on the back of each of the four (4) bolts.  3. Thread,  by  hand,  each  of  the  bolts  into  the  mounting  holes.  Ensure  that  you  align  the  mounting bracket holes and the holes on the module. Note: Keep the top bolts lose until antenna/HM is aligned/tuned. 4. Use the socket wrench to lightly tighten the bolts of the  antenna bracket to the unit (do not over tighten). 5. Use the torque wrench to evenly tighten down the bolts and finish the installation of the  antenna bracket  assembly  to  the  module  (do  not  over  tighten).  Follow  the  Torque  setting  from  Table  15, “Recommended Torque Values for Antenna Bracket Bolts”.   Figure 35   Antenna attached to a Hub Module Beam Steering Antenna Mounting Holes
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 44  Issue 01 D1 7.2.3 Connections for Antenna and Hub To  finalize  the  installation  of  the  Beam  Steering  Antenna  to  the  Hub  module,  connect  the  associated cables:  One (1) x control cable assembly  Four (4) x RF cables N-Type to N-Type Table 16   Recommended Torque Values for Antenna Cable Connections Item Description Torque Note 1 Control cable assembly (x1) 0.9Nm or 8lbf-in Mount the control cable from the HM to the Beam Steering Antenna 2 RF cables N-Type (x4) 0.9Nm or 8lbf-in Mount the RF cables from the HM to the Beam Steering Antenna    Figure 36   Beam Steering Antenna RF Connections  Figure 37   RF Connections on the Hub Module Control Interface Connector RF1: Licensed Band Connector RF2: Licensed Band Connector RF3: Unlicensed Band Connector RF4: Unlicensed Band Connector Control Interface Connector RF3: Unlicensed Band Connector RF4: Unlicensed Band Connector RF2: Licensed Band Connector RF1: Licensed Band Connector
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 45  Issue 01 D1 If needed, before starting this procedure, see Figure 36, “Beam Steering Antenna RF Connections” and Figure 37, “RF Connections on the Hub Module” for connector locations. To connect the cables between the Hub Module (HM) and the Beam Steering Antenna, follow these steps: 1. Connect the SPI cable from the Beam Steering Antenna SPI Connector to the X-1200 hub module SPI Connector. Thread the connector from one end of the SPI cable  onto the connector on the Beam Steering Antenna. Thread the other end of the SPI cable onto the SPI connector on the Hub Module. Finger tighten the connections. 2. Connect the  RF  cables  from  the Beam  Steering  Antenna  to  the  RF  connectors  on  the  X-1200  hub module. You need to attach the RF cables to the corresponding connectors on the HM and the Beam Steering Antenna -- Licensed band or Unlicensed band.  RF1: Radio Frequency Licensed Band  RF2: Radio Frequency Licensed Band  RF3: Radio Frequency Unlicensed Band  RF4: Radio Frequency Unlicensed Band Thread the connector from one end of the RF cable onto the RFx connector on the Beam Steering Antenna. Thread the other end of the RF cable onto the corresponding RFx connector on the Hub Module; for instance, connect RF1 (licensed) on the Beam Steering Antenna with RF1 (licensed) on the HM, RF3 (unlicensed) with the RF3 (unlicensed) on the HM, etc. Finger tighten the connections. 3. Align the Beam Steering Antenna by pointing it geographically toward the target location/signal by using the azimuth, elevation and/or the antenna brackets (if needed, see section 7.1, “Adjusting the Hub Module”). Use a torque wrench to evenly tighten down the bolts and finish the installation of the assembly (do not over tighten). Follow the Torque setting for the bracket(s) that you adjusted:  Table 7, “Recommended Torque Values for Elevation Bracket Bolts”  Table 8, “Recommended Torque Values for Azimuth Bracket Bolts”  Table 15, “Recommended Torque Values for Antenna Bracket Bolts” 4. As  required,  dress  any  cabling.  If  needed,  see  section  6.11,  “Cable  Management”  for  more information.
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 46  Issue 01 D1 8 Installing the Remote Backhaul Module Refer to Chapter 6, “Installing the Modules (General)” and perform these steps to properly install the Remote Backhaul Module (RBM). Figure 38, “RBM Module Showing All Connectors” shows the RBM with all RBM connectors indicated.  Figure 38   RBM Module Showing All Connectors 8.1 Using the BSI Feature and Adjusting the Module Pointing Mode or Best Signal Indicator (BSI) is an RBM operating mode which allows you, the installer, to easily  determine the  direction of  the  best  quality  RF  signal  from  the  desired HM,  and  point the  RBM toward that HM before tightening the RBM down to its mount. You enable and disable the BSI feature through the X-1200 WebUI. While in BSI mode, the RBM emits a continuous varied-pitch tone to reflect the quality/strength of the RF signal it receives from the HM. When the frequency of the tone from the RBM is louder and higher, this indicates that the RF signal from the HM is of better quality. You move the RBM on its axis and bolt it down to its mount when the loudest and highest frequency tone is heard — indicating the best signal from  the  HM  has  been  found.  You  then  create  a  radio  link  by  inserting  an  Ethernet  cable  into  the Ethernet port on the RBM. This allows the RBM to lock on to the signal and exit BSI mode. Following is a more detailed list of the RBM’s expected behavior tones when it is in BSI mode:  On detection of the desired HM, the RBM sounds a continuous tone.  If the  RBM  does  not steadily sound  a  continuous tone after  2-3 minutes in  a specific direction that indicates it is not able to find the desired HM in that direction.  When changing the direction, as the received signal quality increases, so will the frequency and volume of the tone and vice versa. RJ45 Ethernet Connector Grounding Lug Power Connector Status LED SFP Connector: Can be a cap or gland
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 47  Issue 01 D1  After synchronization of the best signal, the RBM emits the highest tone when directed towards the strongest signal from the HM. Typically, due to the tone frequency response, the amplitude increases with the tone. Note:   While the RBM is in BSI mode, it cannot create a radio link; it is not transmitting — only receiving. BSI mode times out automatically after 30 minutes.  If for some reason, you cannot use the BSI feature, for example, due to high volume noise at the installation  site,  or  due  to  the  outside  temperature  being  -30°C  or  colder,  the  RBM  may  be pointed  to  the  desired  HM  using  general  line-of-sight.  However,  the  recommended  pointing method  under  any  condition,  especially  when  installing  RBMs  at  Non-Line-of-Sight  (NLOS) locations, is to use the BSI feature. Prerequisites:  Attached elevation and azimuth brackets on the back of an RBM  Mounted pole/wall mounting bracket Required parts and tools:  Portable computer (to log in and access the X-1200 WebUI)  Black marker  Ratchet wrenches, ½ in. and 7/16 in.  Socket wrench with 3/8 in. driver head, with long and short ½ in. and 7/16 in. sockets  Torque wrench, 3/8 in. head with range for 4-60Nm or 3-45lbf-ft Table 17   Recommended Torque Values for RBM Bracket Bolts Item Description Torque Note 1 Pole/wall mount bracket locknuts (x3) 16.3Nm or 12lbf-ft — 2 Azimuth bracket bolts (x4) 16.3Nm or 12lbf-ft — 3 Elevation bracket bolts (x4) 10.8Nm or 8lbf-ft — To use the audible tone of the BSI feature when installing RBMs (as feedback to indicate the strongest, best RF signal from the serving HM), follow these steps: 1. Typically, the RBM automatically enters BSI mode on power up, during initial installation, when the Ethernet link/connections are not enabled (Ethernet cable is not plugged in); however, if the RBM does not enter BSI mode, follow steps 2 to 5. Skip to step 6, if the RBM is in BSI mode. 2. Use your computer browser to connect to the local Craft IP address of the unit: http://169.254.1.1 3. Log on to the system. The default username and password are admin. 4. When initially configuring the RBM prior to installation, use the X-1200 WebUI to set the ‘Pointing Mode (BSI)’ button to ‘Enabled’ on the Setup > Radio Interface Page so that when the RBM restarts next with  no Ethernet cable attached, it enters BSI mode. You  are then  able to  find the  optimum position for the RBM by moving it on its mount axis, based on the signal quality from the HM.  Note: Once you plug the Ethernet cable into the Ethernet port on the RBM to create the radio link to the Hub,  the RBM exits  BSI mode, and  the WebUI  ‘Pointing Mode (BSI)’  can  be set  to ‘Disabled’. This prevents the  RBM from entering BSI mode  again while up on  its mount  due to, for  example,
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 48  Issue 01 D1 scheduled maintenance or software upgrade activities, that in turn prevents the RBM from seeing its Ethernet connection, causing the RBM to enter BSI mode again. 5. Activate the Pointing Mode/BSI feature by powering up or resetting the RBM, making sure that the Ethernet  cable  (if  connected  to  the  RBM)  is  not  connected  at  the  other  end.  The  RBM  may  emit several beeps  before settling down  to  a continuous  tone.  This is  the  audible  tone of  the  Pointing Mode/BSI feature. 6. Using a sweeping motion along the horizontal plane, slowly adjust the azimuth of the RBM from on its  mount,  taking  in  a  large  angle  on  either  side  of  the  expected  HM  direction  (Figure  39,  “RBM Horizontal  Plane  Adjustment  via  Azimuth  Bracket”).  The  loudest  and  highest  frequency  BSI  tone indicates  the  strongest,  best  RF  signal  direction  from  the  HM.  Mark  this  position  with  the  black marker, as it is the optimal position for the RBM along the horizontal plane.    Figure 39   RBM Horizontal Plane Adjustment via Azimuth Bracket 7. Use  the  ratchet  wrench  to  lightly  tighten  the  bottom  locknut  in  place  to  the  pole/wall  mount bracket. Do not over tighten.  8. Repeat Step 6 along the vertical plane to obtain the optimal vertical elevation position for the RBM (Figure  40,  “RBM  Vertical  Plane  Adjustment  via  Elevation  Bracket”).  This  needs  to  be  done  while keeping the optimal horizontal position.   Figure 40   RBM Vertical Plane Adjustment via Elevation Bracket 9. Use the socket wrench to lightly tighten the two bolts in place on one side of the elevation bracket (do not over tighten).  +/-25 degrees  0-30 degrees
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 49  Issue 01 D1 10. Use the ratchet wrench to lightly loosen the bottom locknut on the pole/wall mount bracket,  and then repeat Step 6 again along the horizontal plane while keeping the optimal vertical position. This ensures the greatest possible pointing accuracy for the RBM. 11. Use  the  ratchet  wrench  to  lightly  tighten  the  bottom  locknut  in  place  to  the  pole/wall  mount bracket. Do not over tighten.  12. As a final adjustment to the RBM on its mount, gently tilt the unit slightly to the left and then to the right on its elevation bracket axis (theta), if necessary for proper orientation. Again, the loudest and highest frequency BSI tone indicates the strongest, best RF signal direction from the HM.  Figure 41   RBM Theta Adjustment Via Elevation Bracket Mounting Holes 13. Once you are satisfied that you have found the optimal horizontal and vertical position for the RBM, bolt it down to its mount, as follows: Note: Depending on how elevated the RBM is, some of the bolts may be hard to torque down using the torque wrench due to limited access to the back of the unit. In those cases, tighten the bolts down by hand. a. Use the  socket wrench to evenly tighten all three locknuts to  the  pole/wall mount bracket (do not  over  tighten),  then  use  a  torque  wrench  to  tighten  down  all  three  locknuts  to  finish  the installation (do not over tighten). See Table 17, “Recommended Torque Values for RBM Bracket Bolts” for torque values. b. Use the socket wrench to evenly tighten all four bolts on the azimuth bracket to the elevation bracket (do not over tighten), then use a torque wrench to tighten down all four bolts and finish the  installation  (do  not  over  tighten).  See  Table  17,  “Recommended  Torque  Values  for  RBM Bracket Bolts” for torque values. c. Use the ratchet wrench to evenly tighten all four bolts on the elevation bracket to the back of the RBM (do not over tighten), then use a torque wrench to tighten down all four bolts and finish the  installation  (do  not  over  tighten).  See  Table  17,  “Recommended  Torque  Values  for  RBM Bracket Bolts” for torque values. 14. For  safety,  power  down  the  RBM,  terminate  the  Ethernet  cable  by  connecting  both  ends;  this cancels BSI mode and creates an RF link with the HM. Apply power again, ensuring that you are a minimum of 50 cm (19.7 in.) away from the unit. 15. Use the X-1200 WebUI to set the ‘Pointing Mode (BSI)’ button to ‘Disabled’ on the Setup > Radio Interface Page. If needed, refer to steps 2 and 3 of this procedure. +/- 10 degrees
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 50  Issue 01 D1 This prevents the RBM from entering BSI mode again while up on its mount due to, for example, a power  outage, scheduled  maintenance or  software  upgrade  activities, which  in  turn  prevents  the RBM from seeing its Ethernet connection, causing the RBM to enter BSI mode again (if was still set to ‘Enabled’).
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 51  Issue 01 D1 9 System and Network Provisioning Once  the  mounting  and  installation  of  the  X-1200  system  modules  is  complete  and  their  operational states have been verified as normal, perform the tasks described in the chapter “System Provisioning” of the X-1200 System User Guide, as applicable for your network.
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 52  Issue 01 D1 10 Appendix 10.1 BLiNQ Wireless Devices and RF Safety/Les appareils sans fil BLiNQ et la sécurité RF REMARQUE: La traduction française suit le texte anglais. All BLiNQ Networks products are evaluated to ensure they conform to the Radio Frequency (RF) energy emission safety limits adopted by the Federal Communications Commission (FCC). These evaluations are conducted  using  the  compliance  rules  and  guidelines  adopted  by  both  the  FCC  and  Industry  Canada. They  are  based  on  the  results  of  the  Maximum  Permissible  Exposure  (MPE)  studies  by  the  FCC  for mobile or fixed devices, which dictate MPE limits for human exposure to RF energy.  Before selling any wireless networking device to the public, BLiNQ Networks submits its devices to the FCC  and  Industry  Canada  for  MPE  (that  is,  RF  emissions)  studies  and  evaluation.  These  studies  must demonstrate  that  the  device  meets  the  accepted  regulatory  limits  for  safe  RF  emissions,  or  it  is  not approved  for  sale  by  the  FCC  and  thus  cannot  be  sold  to  the  public.  This  means  that  when  wireless networking devices  purchased  from  BLiNQ  Networks are  installed  and  operated  as  instructed,  the  RF emissions from the devices is equal to or less than the levels accepted as safe by the FCC and Industry Canada.  When used as intended, BLiNQ wireless networking devices do not pose health risks. Like other devices that emit RF energy (such as computers and microwave ovens), the level of RF emissions from BLiNQ devices is too low to cause harm. Further, BLiNQ wireless networking devices emit far lower levels of RF energy than cellular and cordless telephones, and are almost always used further away from the human body.  To prevent unnecessary exposure to RF energy:  Always install the X-1200 system so as to provide and maintain a minimum separation distance from all persons.  When  the  X-1200  system  is  operational,  avoid  standing  directly  in  front  of  Hub  Module  (HM) antennas or in front of Remote Backhaul Modules (RBMs) and their internal antennas. RF energy fields may be present when the transmitter is on.   When  the  X  1200  system  is  operational,  maintain  a  distance  of  at  least  50  centimeters  (19.7 inches) from the Hub Module (HM) antennas or the Remote Backhaul Modules (RBMs) internal antennas.  Do  not  install the  X-1200 system  in  a  location  where  it  is  possible  for  people  to  stand or  walk inadvertently in front of an antenna. Antenna Statement: When  used  with  an  external  antenna,  this  device  has  been  designated  to  operate  with  a  SP-4642 Selectable Multi-beam and Sector Antenna manufactured by Plasma Antennas having a maximum gain of  17  dB.  Any  other  antenna  having  a  gain  greater  than  17  dB  is  strictly  prohibited  for  use  with  this device. The required antenna impedance is 50 ohms. The antenna used for this transmitter must be installed to provide a separation distance of at least 50 cm from all persons and must not be co-located or operating in conjunction with any other antenna or
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 53  Issue 01 D1 transmitter. Users and installers must be provided with antenna installation instructions and transmitter operating conditions for satisfying RF exposure compliance.  BLiNQ  Networks  évalue  l'ensemble  de  ses  produits  afin  de  s'assurer  qu'ils  sont  conformes  à  la  limite d'émission  énergétique  sécuritaire  de  radiofréquence  (RF)  adoptée  par  la  «Federal  Communications Commission» (FCC). BLiNQ Networks effectue ces évaluations en utilisant les règles et lignes directrices adoptées  à  la  fois  par  le  FCC  et  Industrie  Canada.  Elles  sont  basées  sur  les  résultats  de  l'exposition maximale admissible, études menées par le FCC sur les appareils mobiles ou fixes, qui dictent les limites de l'exposition maximale admissible pour l'exposition humaine aux énergies RF. Avant de vendre tout appareil de  réseau sans  fil au  public, BLiNQ Networks présente ses appareils au FCC  et  à  Industrie  Canada  pour  l'évaluation  de  l'exposition  maximale  admissible.  Ces  études  doivent démontrer  que  l'appareil  est  conforme  aux  limites  réglementaires  acceptées  pour  les  émissions  RF, sinon les appareils ne sont pas approuvés pour la vente par la FCC et ne peuvent donc pas être vendus au public. Cela signifie que lorsque des équipements sans fil, achetés auprès de BLiNQ Networks, sont installés  et  utilisés  conformément  aux  instructions,  les  émissions  RF  provenant  des  dispositifs  sont inférieures ou égales aux niveaux acceptés comme étant sécuritaire par la FCC et Industrie Canada. Lorsqu'utilisés comme prévu, les périphériques sans fil BLiNQ ne posent pas de risques pour la santé. De la même façon que les autres appareils qui émettent de l'énergie RF (comme les ordinateurs et les fours à  micro-ondes),  le  niveau  des  émissions  RF  des  dispositifs  BLiNQ  est  trop  faible  pour  causer  des dommages. En outre, les dispositifs de réseau sans fil BLiNQ émettent des niveaux beaucoup plus faibles d'énergie  RF  que  les  téléphones  cellulaires  et  sans  fil,  et  sont  presque  toujours  utilisés  loin  du  corps humain. Pour éviter toute exposition inutile à l'énergie RF :  Installer  toujours  le  système  X  -1200  afin  de  fournir  et  de  maintenir  une  distance  minimale  de séparation avec toutes les personnes.  Lorsque le système X -1200 est opérationnel, éviter de se tenir directement devant les antennes du «Hub Module» (HM) ou devant «Remote Backhaul Module» (RBM) et leurs antennes internes. Les champs d'énergie RF peuvent être présents lorsque l'émetteur est en marche.  Lorsque  le  système  X  -1200  est  opérationnel,  maintenir  une  distance  d'au  moins  50  centimètres (19.7 pouces) à partir des antennes du HM ou des antennes internes modules du RBM.  Ne  pas  installer  le  système  X  -1200  dans  un  endroit  où  il  est  possible  pour  les  gens  de  se  tenir debout ou de marcher en face d'une antenne. Déclaration d’antenne: Lorsqu'il  est  utilisé  avec  une  antenne  externe,  ce  dispositif  a  été  conçu  pour  fonctionner  avec  une antenne SP-4642 fabriqué par Plasma Antennas ayant un gain maximal de 17 dB. L’utilisation de toute autre antenne ayant un gain supérieur à 17 dB est strictement interdit avec ce dispositif. L'impédance requise de l’antenne est de 50 ohms. L'antenne utilisée pour cet émetteur doit être installé de façon à créer une distance de séparation d'au moins 50 cm de toute personne et ne  doit  pas être co-localisées ou opérant en conjonction avec une autre  antenne  ou  émetteur.  Les  utilisateurs  et  les  installateurs  doivent  avoir  reçus  des  instructions d'installation  de  l'antenne  et  des  conditions  de  fonctionnement  de  l'émetteur  pour  satisfaire  la conformité aux expositions RF.
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 54  Issue 01 D1 10.2 Equipment Compliance 10.2.1 Federal Communications Commission (FCC) Notices This  equipment  has  been  tested  and  found  to  comply  with  the  limits  for  a  Class  B  digital  device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in  a  particular  installation.  If  this  equipment  does  cause  harmful  interference  to  radio  or  television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures:  Reorient or relocate the receiving antenna.  Increase the separation between the equipment and receiver.  Connect  the  equipment  into  an  outlet  on  a  circuit  different  from  that  to  which  the  receiver  is connected.  Consult the dealer or an experienced radio/TV technician for help. This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1)  This  device may  not  cause  harmful  interference, and  (2)  this  device  must  accept  any  interference received, including interference that may cause undesired operation. CAUTION: Any changes or modifications not expressly approved by BLiNQ Networks could void the user's authority to operate this equipment. 10.2.2 Industry Canada Notice This device complies with Industry Canada licence-exempt RSS standard(s). Operation is subject to the following two conditions: (1) this device may not cause interference, and (2) this device must accept any interference, including interference that may cause undesired operation of the device. Le présent appareil est conforme aux CNR d'Industrie Canada applicables aux appareils radio exempts de licence. L'exploitation est autorisée aux deux conditions suivantes : (1) l'appareil ne doit pas produire de brouillage, et (2) l'utilisateur de l'appareil doit accepter tout brouillage radioélectrique subi, même si le brouillage est susceptible d'en compromettre le fonctionnement. CAN ICES-3 (B)/NMB-3(B) 10.2.3 Bonded Network The X-1200 modules are suitable for installation as part of a Common Bonded Network (CBN). The  Common  Bonded  Network  (CBN)  refers  to  the  metallic  bond  that  forms  within  a  building,  by deliberate or incidental connections, that offers the means for effective bonding and grounding within the building. Some of the components within a building that form this bond are:  building steel,  water pipes,  cable racks,
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 55  Issue 01 D1  vertical and horizontal equalizer conductors,  bonding conductors and  electrical metallic raceways. Typically, you connect to the CBN via equipment frames which reduces voltage differences to acceptable levels when current flows through these frames, either during fault occurrences in the ac or dc power systems, or when lightning strikes. 10.3 Troubleshooting Guide Table  18,  “X-1200  System  Troubleshooting  Guide”  provides  helpful  hints  and  solutions  for troubleshooting the X-1200 system. Table 18   X-1200 System Troubleshooting Guide  Symptom Possible Cause Solution The downlink Modulation and Coding Scheme (MCS) is low on a Remote Backhaul Module (RBM) The Received Signal Strength Indication (RSSI) is very high on the RBM (>-35dB) Reduce the transmitted power of the Hub Module (HM). Change the pointing on the RBM to reduce the received signal. The Carrier to Interference plus Noise Ratio (CINR) level is low Increase the transmitted power of the HM. Change the pointing on the RBM to increase the received signal. State LED cycles continuously between green and amber The link is not being formed Verify that the frequency and preamble index settings are correct. If the LED is continuously going between amber and green (within a few seconds), the unit may be defective Remove and return the unit to BLiNQ Networks. Contact BLiNQ Networks to arrange for a replacement.  RBM not going into Best Signal Indicator (BSI) mode RBM is powered up, but BSI feature is not activated Verify that the BSI option is properly enabled.  Note: the BSI feature does not become active if an Ethernet connection is present on the RBM. HM not transmitting  Wrong frequency setting  No ping responses from X-1200 system Wrong IP address set Verify that the IP address, netmask, and gateway address (if used) are correct.   Dynamic Host Configuration Protocol (DHCP) to an unknown IP address If DHCP is being used on the RBM, check the assigned IP address from the HM side to confirm it is correct.  Unit is powering up Wait until the LED goes green and try to ping again. Attempting to ping management IP of the RBM This IP is only accessible from the HM side of the link and not from the local craft Ethernet (only IP accessible is the craft IP address). Personal Computer (PC) does not have an IP address in the same subnet as the X-1200 system Statically assign an IP address from the same subnet as the X-1200 system to the PC.
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 56  Issue 01 D1 Symptom Possible Cause Solution Software upgrade fails File Transfer Protocol (FTP) issue, for example, invalid credentials, incorrect server IP, directory, or file name Contact local network administrator for assistance.   Routing problem, for example, not able to ping the server  RBM not replying to ping over the air RBM may be in BSI mode The BSI feature times out after 30 minutes. Connect to the RBM over the air through the X-1200 WebUI and disable the BSI feature.  Link is down From the HM, verify that the RBM is connected. If it is, verify that the IP address assigned to the RBM is correct.  RBM not coming into service on HM HM not transmitting The HM is not synchronized to the Global Positioning System (GPS). This process can take up to 45 minutes on initial deployment.  Wrong frequency Verify that the HM is using the correct frequency. If possible, verify this also on the RBM.   Four RBMs already in service on the HM cluster The HM already has four associated RBMs in service; further RBM requests are rejected.  RBM Media Access Control (MAC) address does not match the predefined RBM in the RBM list In the event of the HM being configured to use the individual service flows, the MAC address of the RBM must match one from the HM list. If this is not the case, the RBM does not form a link with the HM.  Networking problem No ping over the air Verify that the service flow definitions are correct. They could be disallowing Internet Control Message Protocol (ICMP) packets.  Nothing connects on the RBM Ethernet port Verify that the device being pinged is actually in service and connected to the Ethernet port of the RBM.
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 57  Issue 01 D1 10.4 List of Acronyms Table 19   List of Acronyms AWG American Wire Gauge BE Best Effort BSI Best Signal Indicator B-SON Backhaul – Self-Organizing Network CBN Common Bonded Network CINR Carrier to Interference plus Noise Ratio COTS Commercial Off the Shelf DC Direct Current DHCP Dynamic Host Configuration Protocol DL Downlink DNS Domain Name System ESD Electrostatic Discharge FCC Federal Communications Commission  FTP File Transfer Protocol GHz Gigahertz GBR Guaranteed Bit Rate GPS Global Positioning System HM Hub Module HTTP Hyper Text Transfer Protocol ICMP Internet Control Message Protocol IE9 Internet Explorer 9 IP Internet Protocol lbf-ft Pounds force per foot LOS Line-of-Sight MAC Media Access Control Mbps Megabits per second MCS Modulation and Coding Scheme MHz Megahertz MIMO Multiple Input Multiple Output MPE Maximum Permissible Exposure NIC Network Interface Controller (on PC) nLOS Near Line-of-Sight NLOS Non Line-of-Sight Nm Newton Meters NOC Network Operations Center OAM Operations, Administration & Maintenance
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication  Page 58  Issue 01 D1 OFDM Orthogonal Frequency Division Multiplexing OS Operating System PC  Personal Computer PH Pan Head PHY Physical Layer PMP Point-to-Multipoint PTP Point-to-Point PSU Power Supply Unit QAM Quadrature Amplitude Modulation QoS Quality of Service RBM Remote Backhaul Module RF Radio Frequency RSSI Received Signal Strength Indication RTN Ground Return SEMS Preassembled screw and washer SFP Small Form-factor Pluggable SFTP Secure File Transfer Protocol SN Serial Number SNMP Simple Network Management Protocol SPI Serial Peripheral Interface TDD Time Division Duplexing UL Uplink URL Universal Resource Locator Vdc Volts Direct Current
BLiNQ Networks Inc.  X-1200 System Installation Guide  Release 1.0  Confidential - Restricted Use and Duplication    Issue 01 D1    © Copyright 2012-2014 BLiNQ Networks Inc. All rights reserved. CONFIDENTIAL INFORMATION RESTRICTED USE AND DUPLICATION The  information  contained  herein  is  the  property  of  BLiNQ  Networks  Inc.  and  is  strictly  confidential.  Except  as  expressly authorized in writing by BLiNQ Networks Inc., the holder shall keep all information contained herein confidential, shall disclose it only to its employees with a need to know, and shall protect it, in whole or in part, from disclosure and dissemination to third parties with the same degree of care it uses to protect its own confidential information, but with no less than reasonable care. Except  as  expressly  authorized  in  writing  by  BLiNQ  Networks  Inc.,  the  holder  is  granted  no  rights  to  use  the  information contained herein. BLiNQ  and  BLiNQ  Networks  Inc.  corporate  logo  are  trademarks  of  BLiNQ  Networks  Inc.  All  other  trademarks  used  in  this document are the property of their respective owners. The use of the word partner does  not imply a partnership relationship between BLiNQ and any other company. Disclaimer   The  statements,  configurations,  technical  data,  and  recommendations  in  this  document  are  believed  to  be  accurate  and reliable, but are presented without  express or  implied warranty.  Additionally,  BLiNQ Networks  makes  no  representations  or warranties,  either  expressed  or  implied,  regarding  the  contents  of  this  product.  BLiNQ  Networks  shall  not  be  liable  for  any misuse regarding this product. The information in this document is subject to change without notice.