Cisco Systems BTS-R3 Broadband Data BTS User Manual

Cisco Systems, Inc Broadband Data BTS Appendix Pt 1 40 00047 08 F I C TTA

a href="https://usermanual.wiki/Cisco-Systems" itemprop="url"> Cisco Systems >

Manual app 1

Navini Networks, Inc.                      Ripwave Base Station I&C Guide Part #40-00047-00 Rev F v1.0 (TTA)                            109 October 23, 2003    Appendix A:  Sample Statement of Work (SoW)   The following is an example of a Statement of Work. The Statement of Work outlines the general activities that must be conducted in order to complete the installation and commissioning tasks for a Ripwave Base Station.   Example: Statement of Work for Standard Installation Services  The following statement of work will be used to outline the areas of responsibilities for the Navini Networks antenna (known as the RFS) and Base Station (known as the BTS) installations to be completed with Navini Networks Client (referred to as Client in this document).   Client may choose to hire a contractor or tower crew to assist with its activities.  Navini Networks has no formal contract relationship with the contractor, who will be managed by Client.  The following work items are suggested content only - - final scope and terms to be negotiated directly with Client.  Navini  Networks support personnel will be on site for the entire installation and commissioning process, and will provide technical expertise, information, and recommendations with respect to site design and installation.  It is recommended that contractor have a Non-Disclosure Agreement (NDA) in place with Client and Navini Networks prior to execution of work.  Contractor shall not publicly disclose any information concerning this deployment or trial with any other parties, unless approved in writing in advance by Client and Navini Networks.  Navini Networks    1.  Provide Field Engineer to consult with Client and Contractor for planning efforts.  Review Site design sketches and BOM prepared by others. 2.  Review network architecture information (connection diagram and logical addresses) prior to start of installation. 3.  Review Sweep results with Client and contractor.  Sweep to be provided of RFS after shipment, of coax cables and RF path on tower, and of cables and RFS after installation, before power up. 4.  Review AC and DC power system installation.  Review DC power system test with Client and contractor. 5.  Review backhaul circuit installation test results with Client. 6.  Review GPS antenna and cable installations. 7.  Review and Verify Cable and Antenna System Installation Work 8.  Site walk with contractor and Client for Punchlist. 9.  Load EMS software on Client supplied workstation, and verify connectivity to BTS.
Download:
Mirror Download [FCC.gov]
Document ID386809
Application IDtmbvx+crgFcbAUlp90WU9w==
Document DescriptionManual app 1
Short Term ConfidentialNo
Permanent ConfidentialNo
SupercedeNo
Document TypeUser Manual
Display FormatAdobe Acrobat PDF - pdf
Filesize187.24kB (2340481 bits)
Date Submitted2004-01-07 00:00:00
Date Available2004-01-06 00:00:00
Creation Date2003-12-09 16:09:50
Producing SoftwareAcrobat PDFWriter 4.0 for Windows NT
Document Lastmod0000-00-00 00:00:00
Document Title_Appendix Pt 1_ 40-00047-08 _F_ I&C _TTA_.PDF
Document Creator(Appendix Pt 1) 40-00047-08 (F) I&C (TTA) (Read-Only) - Microsoft Word
Document Author: DOaks
FCC ID Filing: PL6-BTS-R3

Navigation menu