Cisco Systems ISM-BTS-R1 User Manual BTS Hardware Installation Commissioning Guide

Cisco Systems, Inc BTS Hardware Installation Commissioning Guide

Users manual

Ripwave 2.4 GHz
Base Station
Hardware
Installation and
Commissioning Guide
Version 1.0.1 Part Number 40-00019-00
Revision B
Ripwave 2.4 GHz Base Station Installation and Commissioning Guide Navini Networks, Inc.
I
Ripwave 2.4 GHz Base Station Installation and Commissioning Guide Navini Networks, Inc.
TABLE OF CONTENTS
REGULATORY INFORMATION..............................................................................................VI
SAFETY........................................................................................................................................ VII
Introduction.........................................................................................Error! Bookmark not defined.
Purpose ................................................................................................Error! Bookmark not defined.
Scope ....................................................................................................Error! Bookmark not defined.
Acronyms.............................................................................................Error! Bookmark not defined.
Electronic Forms.................................................................................Error! Bookmark not defined.
CHAPTER 1.................................................................... ERROR! BOOKMARK NOT DEFINED.
Ripwave 2.4 GHz Base Station System Installation.........................Error! Bookmark not defined.
Ripwave 2.4 GHz Base Station Equipment ......................................Error! Bookmark not defined.
Base Transceiver Station (BTS) ...................................................Error! Bookmark not defined.
Omni Directional Radio Frequency Subsystem (RFS).................Error! Bookmark not defined.
Mounting Rack and Enclosures ....................................................Error! Bookmark not defined.
Equipment Materials Specifications .................................................Error! Bookmark not defined.
Ripwave 2.4 GHz Base Station Specifications..................................Error! Bookmark not defined.
General..........................................................................................Error! Bookmark not defined.
Five watt System...........................................................................Error! Bookmark not defined.
Resources .............................................................................................Error! Bookmark not defined.
Preparing the Site ...............................................................................Error! Bookmark not defined.
Site Survey....................................................................................Error! Bookmark not defined.
Backhaul Connections ..................................................................Error! Bookmark not defined.
Power Requirements for the BTS .................................................Error! Bookmark not defined.
Ground Requirements for the BTS ...............................................Error! Bookmark not defined.
Installing the Antenna Ground Buss Bar ......................................Error! Bookmark not defined.
Installing the Base Station System Ground Buss Bar and Surge Protectors .....Error! Bookmark
not defined.
Installing the System Ground Wiring ...........................................Error! Bookmark not defined.
Installing Cables between the BTS and the RFS/GPS..................Error! Bookmark not defined.
Determining Cable Length........................................................Error! Bookmark not defined.
Installing Connectors on the Cables .........................................Error! Bookmark not defined.
Sweeping the Individual Cables ...............................................Error! Bookmark not defined.
Installing the BTS Mounting Rack and/or Enclosure...................Error! Bookmark not defined.
II
Ripwave 2.4 GHz Base Station Installation and Commissioning Guide Navini Networks, Inc.
Installing the BTS Power Supply and Batteries............................Error! Bookmark not defined.
Installing the Power Supply......................................................Error! Bookmark not defined.
Installing the Batteries ..............................................................Error! Bookmark not defined.
Connecting the Power Supply to the Batteries .........................Error! Bookmark not defined.
Run Power Supply Wiring to the BTS Chassis ............................Error! Bookmark not defined.
Installing the BTS Equipment ...........................................................Error! Bookmark not defined.
Installing the BTS Chassis............................................................Error! Bookmark not defined.
Connect the Power Supply to the BTS Chassis ............................Error! Bookmark not defined.
Check Ground Connections and Input Power...............................Error! Bookmark not defined.
Ground Connections .................................................................Error! Bookmark not defined.
Power Connections ...................................................................Error! Bookmark not defined.
Installing the GPS Antennas..............................................................Error! Bookmark not defined.
Installing the Antenna Mount and Radio Frequency Subsystem Antenna Assembly .......Error!
Bookmark not defined.
Installing the Antenna Mount .......................................................Error! Bookmark not defined.
Verify RFS Operation...................................................................Error! Bookmark not defined.
Installing the RFS Antenna Assembly..........................................Error! Bookmark not defined.
Install the Surge Protectors on the RFS........................................Error! Bookmark not defined.
Install the Cables Between the RFS and the BTS.........................Error! Bookmark not defined.
Install Grounding Kit on Cables ...................................................Error! Bookmark not defined.
Connect Ground Wires to the Ground Buss Bar...........................Error! Bookmark not defined.
Testing the RFS and Cables..........................................................Error! Bookmark not defined.
Weatherize Outdoor Connections.................................................Error! Bookmark not defined.
Connecting the RF cables and Alarms to the BTS .......................Error! Bookmark not defined.
Install the BTS Circuit Cards into the Chassis ................................Error! Bookmark not defined.
CHAPTER 2.................................................................... ERROR! BOOKMARK NOT DEFINED.
BTS System Test and Commissioning ..............................................Error! Bookmark not defined.
BTS System Power Up and Provisioning..........................................Error! Bookmark not defined.
BTS Provisioning Configuration .......................................................Error! Bookmark not defined.
BTS Configuration Setup..............................................................Error! Bookmark not defined.
BTS Power Up and Configuration................................................Error! Bookmark not defined.
Standard boot initialization sequence .......................................Error! Bookmark not defined.
Invoking BTS Configuration ....................................................Error! Bookmark not defined.
Boot Prompt..............................................................................Error! Bookmark not defined.
Ethernet WAN Configuration...................................................Error! Bookmark not defined.
T1/ATM WAN Configuration..................................................Error! Bookmark not defined.
T1/IMA WAN Configuration ...................................................Error! Bookmark not defined.
Boot sequence line items ..........................................................Error! Bookmark not defined.
Calibration of the BTS .......................................................................Error! Bookmark not defined.
III
Ripwave 2.4 GHz Base Station Installation and Commissioning Guide Navini Networks, Inc.
RF Sanity Test.....................................................................................Error! Bookmark not defined.
Equipment Required .....................................................................Error! Bookmark not defined.
Loss Procedure for Test Cable......................................................Error! Bookmark not defined.
Receive verification ......................................................................Error! Bookmark not defined.
Transmitter verification ................................................................Error! Bookmark not defined.
Drive Study Procedures......................................................................Error! Bookmark not defined.
Drive Test .....................................................................................Error! Bookmark not defined.
Equipment required...................................................................Error! Bookmark not defined.
Drive Test Procedure ................................................................Error! Bookmark not defined.
Location Test ................................................................................Error! Bookmark not defined.
Equipment required...................................................................Error! Bookmark not defined.
Location Testing Procedure ......................................................Error! Bookmark not defined.
EMS Commissioning ..........................................................................Error! Bookmark not defined.
BTS Commissioning for the Primary EMS......................................Error! Bookmark not defined.
APPENDIX A: RFS AND CABLE TESTING............ ERROR! BOOKMARK NOT DEFINED.
Introduction.........................................................................................Error! Bookmark not defined.
Testing the RFS Data/Power Cable...................................................Error! Bookmark not defined.
Required Equipment .....................................................................Error! Bookmark not defined.
Continuity test with VOM ............................................................Error! Bookmark not defined.
Continuity test with Power/Data cable tester................................Error! Bookmark not defined.
Sweep Test of the RF cables and the RFS ........................................Error! Bookmark not defined.
Required Equipment .....................................................................Error! Bookmark not defined.
Calibration of test setup ................................................................Error! Bookmark not defined.
RF Cable Insertion Loss ...............................................................Error! Bookmark not defined.
Navini RFS Test Box setup ..........................................................Error! Bookmark not defined.
RFS only Transmit (TX) Mode Verification ................................Error! Bookmark not defined.
RFS only Receive (RX) Mode Verification .................................Error! Bookmark not defined.
RFS and Cables, Transmit (TX) mode verification......................Error! Bookmark not defined.
RFS and Cables, Receive (RX) Mode Verification......................Error! Bookmark not defined.
IV
Ripwave 2.4 GHz Base Station Installation and Commissioning Guide Navini Networks, Inc.
Permissions, trademarks, and distribution
Copyright © November 2001 - 2002, Navini Networks, Inc. All information contained herein and
disclosed by this document is confidential and the proprietary property of Navini Networks, Inc.
and all rights therein are expressly reserved. Acceptance of this material signifies agreement by the
recipient that the information contained in this document is confidential and that it will be used
solely for the purposes set forth herein. Acceptance of this material signifies agreement by the
recipient that it will not be used, reproduced in whole or in part, disclosed, distributed, or conveyed
to others in any manner or by any means – graphic, electronic, or mechanical, including
photocopying, recording, taping, or information storage and retrieval systems – without the
express written permission of Navini Networks, Inc.
Navini Networks™, Internet at the Speed of Thought™, zero-install™, and Ripwave™ are
registered trademarks of Navini Networks, Inc. Other product and company names mentioned
herein may be trademarks and/or service marks of their respective owners.
Nothing herein constitutes any representation, warranty, assurance, or guaranty of any kind.
Because of continuing developments and improvements in design, manufacturing, and
deployment, material in this document is subject to change without notification and does not
represent any commitment or obligation on the part of Navini Networks, Inc.
Navini Networks, Inc. shall have no liability for any error or damages resulting from the use of this
document.
The logo and all other Navini Networks trademarks are the property of
Navini Networks, Inc. Unauthorized usage is strictly prohibited without the express written
permission of Navini Networks, Inc.
Ó 2001 – 2002 Navini Networks, Inc. All rights reserved.
V
Ripwave 2.4 GHz Base Station Installation and Commissioning Guide Navini Networks, Inc.
Regulatory Information
FCC Compliance and Advisory Statement
This equipment has been tested and found to comply with the limits for a class A digital
device, Pursuant to Part 15 of the FCC rules. The operation is subject to the following two
conditions:
(1) this device may not cause harmful interference, and
(2) this device must accept any interference received, including
interference that may cause undesired operation.
These limits are designed to provide reasonable protection against harmful interference
when the equipment is operated in a commercial environment. This equipment generates,
uses, and can radiate radio frequency energy and, if not installed and used in accordance
with the instruction manual, may cause harmful interference to radio communications.
Operation of this equipment in a residential area is likely to cause harmful interference in
which case the user will be required to correct the interference at their own expense.
INFORMATION TO USER
Any changes or modifications of equipment not expressly approved by Navini Networks
could void the user’s authority to operate the equipment and the company’s warranty.
WARNING: This device is intended to be used with an antenna professionally installed on a
fixed, outdoor structure. A minimum separation distance of 1.5 meters should be
maintained in order to ensure compliance with the FCC rules for Radio Frequency
Exposure. Installation where this minimum distance cannot be maintained may result in
exposure to RF levels that exceed the FCC limits and is discouraged.
VI
Ripwave 2.4 GHz Base Station Installation and Commissioning Guide Navini Networks, Inc.
Safety
To optimize safety and expedite installation and service, read this document thoroughly.
Follow all warnings, cautions, and instructions marked on the equipment and/or included in
this document.
Navini Networks, Inc. expressly requires that only technically qualified and authorized personnel
be allowed to install, service, or operate the equipment.
To aid in the prevention of injury and damage to property, cautionary symbols have been placed in
this document to alert the reader to known potentially hazardous situations, equipment, or
procedures. The symbols are placed before the procedures to which they apply. However, any
situation that involves heavy equipment and/or electricity can become hazardous, and caution and
safety should be practiced at all times when installing, servicing, or operating the equipment.
VII

Navigation menu