Comba Telecom RX-7W22-A 700/800MHz Public Safety Bi-directional Amplifier User Manual RX 7W22 Manual
Comba Telecom Ltd. 700/800MHz Public Safety Bi-directional Amplifier RX 7W22 Manual
RX-7W22 Manual
CriticalPoint Public Safety BDA DIGITAL BAND SELECTIVE REPEATER USER MANUAL Public Safety BDA SERIES QE: 1-0-0 Comba Telecom Ltd. INSTALLATION GUIDE FOR RX-7W22 The information contained herein is the responsibility of and is approved by the following, to whom all enquiries should be directed: This is an unpublished work the copyright in which vests in Comba International ("Comba"). All rights reserved. The information contained herein is confidential and the property of Comba and is supplied without liability for errors or omissions. No part may be reproduced, disclosed or used except as authorized by contract or other written permission. The copyright and the foregoing restriction on reproduction and use extend to all media in which the information may be embodied. ENU STATUS : 1-0-0 Copyright - refer to title page Page 3 INSTALLATION GUIDE FOR RX-7W22 0.1 CONTENTS Section Page 0.1 0.2 0.3 0.4 0.5 CONTENTS ........................................................................................................................... 4 INDEX TO FIGURES AND TABLES ..................................................................................... 6 HISTORY ............................................................................................................................... 7 GLOSSARY OF TERMS ....................................................................................................... 8 SAFETY NOTICES AND ADMONISHMENTS ...................................................................... 9 GENERAL INFORMATION ................................................................................................. 10 2.1 2.2 2.3 EQUIPMENT DESCRIPTION.............................................................................................. 12 FUNCTIONAL BLOCK DIAGRAM....................................................................................... 12 EQUIPMENT LAYOUT ........................................................................................................ 13 EQUIPMENT CONSTITUTION ........................................................................................... 14 3.1 3.2 3.2.1 3.2.2 3.3 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 3.4 3.4.1 3.4.2 3.4.3 3.4.4 3.4.5 3.4.6 INSTALLATION ................................................................................................................... 15 WARNINGS AND ALERTS ................................................................................................. 15 SITE PLANNING CONSIDERATIONS ................................................................................ 16 SITE PLANNING ................................................................................................................. 16 INSTALLATION CHECKLIST .............................................................................................. 17 INSTALLATION PROCEDURES......................................................................................... 18 GOODS INWARDS INSPECTION ...................................................................................... 18 TOOLS................................................................................................................................. 18 PREPARATION ................................................................................................................... 18 WALL MOUNTING .............................................................................................................. 19 DRIP-LOOP ......................................................................................................................... 19 EQUIPMENT CONNECTORS ............................................................................................. 20 PS BDA CONNECTORS ..................................................................................................... 20 PS BDA LED Indicators ....................................................................................................... 21 GROUNDING CONNECTION ............................................................................................. 21 RF CABLE CONNECTION .................................................................................................. 21 ETHERNET CONNECTION ................................................................................................ 21 DRY CONTACT CABLE CONNECTION ............................................................................ 22 4.1 4.2 COMMISSIONING ............................................................................................................... 23 PRE-COMMISSIONING TASKS ......................................................................................... 23 COMMISSIONING PROCEDURE....................................................................................... 24 5.1 5.2 5.2.1 5.2.2 5.2.3 5.2.4 5.3 WEB GUI ............................................................................................................................. 26 WEB GUI CONNECTION .................................................................................................... 26 WEB GUI INTRODUCTION ................................................................................................ 27 [DEVICES] ........................................................................................................................... 27 [COMMISSIONING] ............................................................................................................. 29 [FIRMWARE] ....................................................................................................................... 30 [MANAGEMENT] ................................................................................................................. 31 COMMISSIONING PROCEDURE....................................................................................... 41 MAINTENANCE................................................................................................................... 46 7.1 7.2 APPENDICES...................................................................................................................... 47 APPENDIX A: TOOLS ......................................................................................................... 47 APPENDIX B: DECLARATION OF HARMFUL SUBSTANCES AND CONTENT .............. 48 ENU STATUS : 1-0-0 Copyright - refer to title page Page 4 INSTALLATION GUIDE FOR RX-7W22 7.3 7.4 7.5 7.6 APPENDIX C: LICENSE SWITCH QUICK GUIDE ............................................................. 49 APPENDIX D: TROUBLESHOOTING QUICK GUIDE........................................................ 51 APPENDIX E: DEVICE REPORT EXAMPLE ..................................................................... 54 APPENDIX F: RMA (RETURN MATERIAL AUTHORIZATION) ......................................... 55 ENU STATUS : 1-0-0 Copyright - refer to title page Page 5 INSTALLATION GUIDE FOR RX-7W22 0.2 INDEX TO FIGURES AND TABLES Figure 1: Front, Side and Bottom Views of the PS BDA Enclosure ................................................................ 11 Figure 2: PS BDA Functional Block Diagram................................................................................................... 12 Figure 3: Layout of the PS BDA ....................................................................................................................... 13 Figure 4: Mounting Rack Overview .................................................................................................................. 18 Figure 5: PS BDA Wall Mounting ..................................................................................................................... 19 Figure 6: Equipment Connectors ..................................................................................................................... 20 Figure 8: Commissioning Procedure ................................................................................................................ 24 Figure 9: Input IP Address ............................................................................................................................... 26 Figure 10: Input Domain Name ........................................................................................................................ 26 Figure 11: Input User Name and Password ..................................................................................................... 26 Figure 12: Web GUI Main Screen .................................................................................................................... 27 Figure 13: Overview Screen............................................................................................................................. 28 Figure 14: 800MHz Screen .............................................................................................................................. 28 Figure 15: 700MHz Screen .............................................................................................................................. 29 Figure 16: [Commissioning] Screen ................................................................................................................. 29 Figure 17: [Firmware] Screen – MCU Firmware Upgrade ............................................................................... 30 Figure 18: [Firmware] Screen – Firmware Swap ............................................................................................. 30 Figure 19: [Firmware] Screen – Module Update .............................................................................................. 31 Figure 20: [Management] Screen .................................................................................................................... 31 Figure 21: Management – Import & Export ...................................................................................................... 32 Figure 22: Management – IP Setting ............................................................................................................... 33 Figure 23: Management – Comm. Setting ....................................................................................................... 34 Figure 24: New Site Report is for easy monitoring set up ............................................................................... 35 Figure 25: Management – Security .................................................................................................................. 35 Figure 26: Modify Password............................................................................................................................. 36 Figure 27: Management – Device Reset ......................................................................................................... 36 Figure 28: Management – License .................................................................................................................. 37 Figure 29: Management – Device Info ............................................................................................................. 38 Figure 30: Management – Isolation ................................................................................................................. 38 Figure 31: Management – Dry Contact ............................................................................................................ 39 Figure 32: Management – Test ........................................................................................................................ 39 Figure 33: Management – Report .................................................................................................................... 40 Figure 34: Commissioning Procedure – Start .................................................................................................. 41 Figure 35: Commissioning Procedure – Site Info. Setting ............................................................................... 41 Figure 36: Device Information Setting .............................................................................................................. 42 Figure 37: Commissioning Procedure – Isolation Detection ............................................................................ 42 Figure 38: Commissioning Procedure – Isolation Detection Confirm .............................................................. 43 Figure 39: Commissioning Procedure – Isolation Detection Failed ................................................................. 43 Figure 40: Commissioning Procedure – Isolation Detection Finish ................................................................. 44 Figure 41: Commissioning Procedure – Center Frequency Setting ................................................................ 44 Figure 42: Commissioning Procedure – Channel Number Setting .................................................................. 45 Figure 43: Commissioning Procedure – Finish ................................................................................................ 45 Figure 44: Input User Name and Password ..................................................................................................... 49 Figure 45: Input License Code ......................................................................................................................... 50 Figure 46: License switch success .................................................................................................................. 50 Figure 47: Alarm list ......................................................................................................................................... 51 Figure 48: Reset PA ......................................................................................................................................... 52 Table 1: Equipment Connectors ...................................................................................................................... 20 Table 2: LED Indicators .................................................................................................................................... 21 Table 3: Commissioning Task Explanation ...................................................................................................... 25 ENU STATUS : 1-0-0 Copyright - refer to title page Page 6 INSTALLATION GUIDE FOR RX-7W22 0.3 HISTORY Change No. ENU Details Of Change 1-0-0 This manual first created and issued in Aug. 2016. ENU STATUS : 1-0-0 Copyright - refer to title page Page 7 INSTALLATION GUIDE FOR RX-7W22 0.4 GLOSSARY OF TERMS Abbreviation Definition ALC Automatic Level Control ATT BTS Attenuator Base Transceiver Station CH Channel CSA dB Cross Sectional Area Decibel dBm DL Decibels relative to 1 milliwatt Downlink DT DPX Donor Terminal Duplexer FS Frequency Selection Hz ID Hertz Identification IF LNA Intermediate Frequency Low Noise Amplifier LOS Line-of-Sight MCU MHz Main Control Unit Megahertz MT MTBF Mobile Terminal Mean Time Between Failures NF OMC Noise Figure Operation & Maintenance Center OMT Operation & Maintenance Terminal PA PLL Power Amplifier Phase Locked Loop PSU RF Power Supply Unit Radio Frequency SMA Sub-Miniature A Connector UL VAC Uplink Volts Alternating Current VDC VSWR Volts Direct Current Voltage Standing Wave Ratio ENU STATUS : 1-0-0 Copyright - refer to title page Page 8 INSTALLATION GUIDE FOR RX-7W22 0.5 SAFETY NOTICES AND ADMONISHMENTS This document contains safety notices in accordance with appropriate standards. In the interests of conformity with the territory standards for the country concerned, the equivalent territorial admonishments are also shown. Any installation, adjustment, maintenance and repair of the equipment must only be carried out by trained, authorized personnel. At all times, personnel must comply with any safety notices and instructions. Specific hazards are indicated by symbol labels on or near the affected parts of the equipment. The labels conform to international standards, are triangular in shape, and are colored black on a yellow background. An informative text label may accompany the symbol label. Hazard labeling is supplemented by safety notices in the appropriate equipment manual. These notices contain additional information on the nature of the hazard and may also specify precautions. Note: The grantee is not responsible for any changes or modifications not expressly approved by the party responsible for compliance. Such modifications could void the user’s authority to operate the equipment. For compliance with the general population RF exposure limits, each individual antenna used for this transmitter must be installed to provide a separation distance greater than 67.2cm or more from all persons during normal operation and must not be co-located with any other antenna for meeting RF exposure requirements. Warning Notices: These draw the attention of personnel to hazards that may cause death or injury to the operator or others. Examples of use are cases of high voltage, laser emission, toxic substances, point of high temperature, etc. Alert: These draw the attention of personnel to hazards that may cause damage to the equipment. An example of use is the case of static electricity hazard. Caution notices may also be used in the handbook to draw attention to matters that do not constitute a risk of causing damage to the equipment but where there is a possibility of seriously impairing its performance, e.g. by mishandling or gross maladjustment. Warnings and Cautions within the main text do not incorporate labels and may be in shortened form. Disconnection of the 2 RF connectors may cause damage to the equipment when power is on. The application antenna and RF cable are not provided. The antenna gain should not exceed 10 dBi and the shortest distance from human is 75 cm. End of Section ENU STATUS : 1-0-0 Copyright - refer to title page Page 9 INSTALLATION GUIDE FOR RX-7W22 1 GENERAL INFORMATION The RX-7W22 is a new digital dual band public safety repeater (hereafter referred to as PS BDA) designed to protect the lives of first responders and building occupants. Through the use of digital filtering technology, the RX-7W22 helps eliminate adjacent channel interference to allow band selectivity and support 700MHz and 800MHz rebanding. Up to two non-contiguous frequency bands can be simultaneously supported in each of the 700MHz and 800MHz Public Safety frequencies via a web-based GUI, which provides versatility and total control to the user. Main Features PS 700MHz and 800MHz. Class A BDA, 32 channels per band. Channel selective, software programmable. Auto diagnostic. Uplink squelch, per channel. User adjustable gain control (AGC), UL and DL independent per channel. US and Canada 700MHz and 800MHz band compatible, software adjustable. Built in isolation testing (mandatory prior to commissioning the PS BDA). Easy commission and setup via Web-based GUI. Weatherproof enclosure, IP65/NEMA4. Fully compliant with the 2016 NFPA 72 Code. Competitive size and weight. Alarming output to supervised circuits for: antenna failure, signal booster failure, and etc. The following figure shows the enclosure of the PS BDA. ENU STATUS : 1-0-0 Copyright - refer to title page Page 10 INSTALLATION GUIDE FOR RX-7W22 AC 100V-240V 50Hz/60Hz MT_TEST DT_TEST DT PWR RUN ALM MT OMT ALM1 ALM2 AUX LAN Figure 1: Front, Side and Bottom Views of the PS BDA Enclosure ENU STATUS : 1-0-0 Copyright - refer to title page Page 11 INSTALLATION GUIDE FOR RX-7W22 2 EQUIPMENT DESCRIPTION 2.1 FUNCTIONAL BLOCK DIAGRAM DL 700MHz Integrated Digital Module TX TX PLL1 DL PA DT TX TX PLL1 DT Port Duplexer PLL2 RX 800MHz Integrated Digital Module MT DL PA MT Port Duplexer RX UL PA UL Figure 2: PS BDA Functional Block Diagram In the downlink path, the BTS signals are received by the donor antenna of the repeater. After the duplexer, the signals are sent to the LNA module for pre-amplification and to the digital RF integrated module for digital filtering and frequency conversion. Then the DL signals will be sent to the downlink PA to amplify power, and filter via the duplexer. After amplification, the signals are transmitted at the MT port to the service antenna. In the uplink path, the mobile signals are received by the service antenna. After the MT port integrated duplexer, the signals are sent to the LNA, integrated module for digital filtering, then to the PA for power amplification and to the duplexer. After that, the uplink signals are sent to the donor antenna for transmission back to the BTS. ENU STATUS : 1-0-0 Copyright - refer to title page Page 12 INSTALLATION GUIDE FOR RX-7W22 2.2 EQUIPMENT LAYOUT Shown below is the internal layout of the PS BDA. Chasis Integrated Module MCU Integrated Module Duplexer Power Supply Module Surge Arrestor Figure 3: Layout of the PS BDA ENU STATUS : 1-0-0 Copyright - refer to title page Page 13 INSTALLATION GUIDE FOR RX-7W22 2.3 EQUIPMENT CONSTITUTION The typical PS BDA unit consists of the following components: Power Amplifier (PA): It provides power amplification for both the UL and DL branches. Main Control Unit (MCU): The MCU is used to monitor and control the operation of the repeater. It also provides the communication interface for remote control and status indication. LED indicators provide the operation status of the MCU. Duplexer: The DPX is located near the MT and DT terminals and permits the uplink and downlink signals to share a common antenna. Digital Integrated Module and Power Amplifier: Consists of the Power Conversion module, RF module, digital process module and monitoring modules. The Power Conversion module converts +28V DC voltage into +9VJK and +9VRF. +9VJK, +9VRF are supplied to the monitoring unit, and the RF unit in the integrated module separately. The RF module amplifies and converts the RF signal to IF signal. The Digital process module converts the IF signal into baseband signal via AD conversion and extraction, and filtering. After that, the IF signal will be amplified and converted to an RF signal by the RF module for RF filtering and amplification. The Monitoring module monitors and controls the system parameters and is the interface for both remote monitoring and local commissioning. Power Supply Unit (PSU): The PSU converts the input voltage into a stable DC supply to provide power for the internal functional modules. ENU STATUS : 1-0-0 Copyright - refer to title page Page 14 INSTALLATION GUIDE FOR RX-7W22 3 INSTALLATION 3.1 WARNINGS AND ALERTS Radio Frequency Energies There may be situations, particularly for workplace environments near high-powered RF sources, where recommended limits for safe exposure of human beings to RF energy could be exceeded. In such cases, restrictive measures or actions may be necessary to ensure the safe use of RF energy. High Voltage The equipment has been designed and constructed to prevent, as far as reasonably practicable danger. Any work activity on or near equipment involving installation, operation or maintenance must be, as far as reasonable, free from danger. Where there is a risk of damage to electrical systems involving adverse weather, extreme temperatures, wet, corrosive or dirty conditions, flammable or explosive atmospheres, the system must be suitably installed to prevent danger. Protective Earthing Equipment provided for the purpose of protecting individuals from electrical risk must be suitable for the purpose and properly maintained and used. Handling Precautions This covers a range of activities including lifting, lowering, pushing, pulling, carrying, moving, holding or restraining an object, animal or person from the equipment. It also covers activities that require the use of force or effort, such as pulling a lever, or operating power tools. Where some of the abovementioned activities are required, the equipment must be handled with care to avoid being damaged. Electrostatic Discharge (ESD) Observe standard precautions for handling ESD-sensitive devices. Assume that all solid-state electronic devices are ESD-sensitive. Ensure the use of a grounded wrist strap or equivalent while working with ESD-sensitive devices. Transport, store, and handle ESD-sensitive devices in static-safe environments. ENU STATUS : 1-0-0 Copyright - refer to title page Page 15 INSTALLATION GUIDE FOR RX-7W22 3.2 SITE PLANNING CONSIDERATIONS 3.2.1 SITE PLANNING Site Considerations Outdoor equipment are designed to be waterproof, rainproof, and with snow protection. Temporary protection should be taken when the equipment enclosure is opened for installation or maintenance in an outdoor environment. The equipment must not be opened for installation or maintenance in bad weather (e.g. gale, storm rainfall, extreme temperatures and high humidity) Installation Location Mounting surface shall be capable of supporting the weight of the equipment. In order to avoid electromagnetic interference, a proper mounting location must be selected to minimize interference from electromagnetic sources such as large electrical equipment. Environmental Humidity has an adverse effect on the reliability of the equipment. It is recommended to install the equipment in locations having stable temperature and unrestricted air-flow. The installation location for the product should be well ventilated. The equipment has been designed to operate at the temperature range and humidity level as stated in the product specifications in the datasheet. Direct sun light exposure to the equipment should be avoided. Provide additional shelter if necessary. Power Supply The power supply unit (PSU) provides power to all modules within the equipment. Depending on the product variant, it is recommended that the PSU be operated on a dedicated circuit breaker or fused circuit. Grounding Requirement Verify that the equipment has been well grounded. This includes antennas and all cables connected to the system. Ensure lightning protection for the antennas is properly grounded. Cable Routing Depending on equipment configuration, a variety of types of cables are required. Where applicable, ensure cables are properly routed and secured so that they are not damaged. Manual Handling During transportation and installation, take necessary handling precautions to avoid potential physical injury to the installation personnel and the equipment. ENU STATUS : 1-0-0 Copyright - refer to title page Page 16 INSTALLATION GUIDE FOR RX-7W22 3.2.2 INSTALLATION CHECKLIST Working space available for installation and maintenance for each mounting arrangement. Ensure unrestricted airflow. Ensure earth ground point is within reach of the ground wire. Ensure a power source is within reach of the power cord and the power source has sufficient capacity. Where appropriate, ensure unused RF connectors are terminated. Do not locate the equipment near large transformers or motors that may cause electromagnetic interference. Reduce signal loss in feeder cable by minimizing the length and number of RF connections. Ensure VSWR of antennas system < 1.5:1. Ensure equipment will be operated within the stated environment (see datasheet) Observe handling of all cables to prevent damage. Donor antenna should have a narrow beamwidth and positioned in line-of-sight (LOS) to the donor BTS site so that the donor signal level is maximized. This allows the use of minimum gain to achieve the maximum DL output power. The UL gain is typically set lower than or equal to the DL gain to minimize noise interference to the donor BTS Service antennas should be selected based on the type of service area, e.g., indoor antenna for indoor application, and panel antenna for outdoor application. ENU STATUS : 1-0-0 Copyright - refer to title page Page 17 INSTALLATION GUIDE FOR RX-7W22 3.3 INSTALLATION PROCEDURES 3.3.1 GOODS INWARDS INSPECTION Verify the number of packages received against the packing list. Check all packages for external damage; report any external damage to the shipping courier. If there is damage, a shipping agent should be present before unpacking and inspecting the contents because damage during transit is the responsibility of the agent. Open and check each package against the packing list. If any items are missing, contact Comba. Do not remove items from anti-static packing until ready for installation. If damage is discovered at the time of installation, contact the shipping agent. 3.3.2 TOOLS See Appendix A for a full list of the recommended tools required for installation and routine maintenance. 3.3.3 PREPARATION Wall mounting with the masonry bolts supplied, which make use of the outer holes. Figure 4: Mounting Rack Overview ENU STATUS : 1-0-0 Copyright - refer to title page Page 18 INSTALLATION GUIDE FOR RX-7W22 3.3.4 WALL MOUNTING Drill four holes on the wall using the position of four holes on the mounting rack as a guide. Fix the mounting rack to the wall using four masonry bolts (M10x110mm). Install the Mounting Rack to the wall. Hang the equipment and secure the enclosure to the mounting rack. Mounting Rack Masonry bolt 4-M10x110 6-M8x25, Hex socket with washer bolt RX-7W22 Figure 5: PS BDA Wall Mounting 3.3.5 DRIP-LOOP Comba recommends that every horizontal cable entry to the equipment forms a 'U' before its entry to the equipment. Water on the cable will drip down at the bottom of the loop and will not accumulate at the equipment connectors. ENU STATUS : 1-0-0 Copyright - refer to title page Page 19 INSTALLATION GUIDE FOR RX-7W22 3.4 EQUIPMENT CONNECTORS 3.4.1 PS BDA CONNECTORS The PS BDA is designed for all cable entries from the right or left of the enclosure, as shown in the following figure. AC 100V-240V 50Hz/60Hz MT_TEST DT_TEST DT PWR RUN ALM MT OMT ALM1 ALM2 AUX LAN Figure 6: Equipment Connectors Table 1: Equipment Connectors Identifier Power Descriptions Power cable connector for a pre-installed power cord for connection to AC (e.g. AC 100-240V 50Hz/60Hz). DT Test SMA connector for DT port test, -22dB coupling to DT port, available for both downlink and uplink test. MT Test SMA connector for MT port test, -22dB coupling to MT port, available for both downlink and uplink test. DT N-Female connector for connection to donor antenna. MT N-Female connector for connection to service antenna. OMT RJ45 Connector for local WEB GUI connection. ALM1 Connector for connection to dry contact alarm 1 and 2. ALM2 Connector for connection to dry contact alarm 3 and 4. AUX Reserved. LAN RJ45 Connector for internet connection (Ethernet type only). The voltage identification is a variant due to electricity system diversity of global regions. The power cable connector might be identified for AC 110V, AC 220V, AC 110V/220V, or DC -48V respectively. Please refer to specific product or contact local sales if any doubt. ENU STATUS : 1-0-0 Copyright - refer to title page Page 20 INSTALLATION GUIDE FOR RX-7W22 3.4.2 PS BDA LED Indicators The LED indicators help user to check the equipment status easily. Table 2: LED Indicators Identifier Colour Indication PWR Green Power indicator. ON = power on; OFF = power off. RUN Green Operation indicator, flashes every second to indicate normal operation. ALM Red Alarm indicator. ON = alarm; OFF = no alarm. 3.4.3 GROUNDING CONNECTION Ground Connection To ensure safe operation of the product, a ground (earth) connection is required. For single phase AC power source, the product must be grounded by connecting the “earth wire” of the power cord to the ground terminal of the AC supply. For operating this product with DC power system (such as rectifiers), the product should not be connected to power systems that switch open the return lead because the return lead could function as the ground (earth) connection for the equipment. Protective Ground Connection The enclosure must be grounded securely by connecting a copper wire (CSA 16mm ) to the grounding terminal on the equipment/rack, and the other end to a protective ground (i.e. building earth point). An internationally acceptable color code of the ground connection wire is green/yellow. Such a ground connection implements the “Protective Ground Connection”, and must be connected to the equipment at the designated ground point. In general, do not connect the supply before establishing an adequate ground (earth) connection. Construct the ground wire, and use appropriate crimp connectors where necessary. Locate and connect the equipment grounding terminal to a protective ground (i.e. building earth point). 3.4.4 RF CABLE CONNECTION Single band PS BDA RF cables connection is as follows: PS BDA MT port Connects to the feeder cable from service antennas. PS BDA DT port Connects to the feeder cable from donor antennas. 3.4.5 ETHERNET CONNECTION Connect Ethernet with ‘LAN’ port in the panel, Ethernet type only. ENU STATUS : 1-0-0 Copyright - refer to title page Page 21 INSTALLATION GUIDE FOR RX-7W22 3.4.6 DRY CONTACT CABLE CONNECTION Below please find the pin definitions of dry contact cables. Table 3: Pin Definition of Dry Contact Cable Pin NO. Pin Input Output 1(A) 2(B) 3(C) 4(D) 5(E) 6(F) 7(G) 8(H) 9(J) 10(K) Red White Blue Black Brown Purple Green Orange Yellow Grey 1(A) 2(B) 3(C) 4(D) 5(E) 6(F) 7(G) 8(H) 9(J) 10(K) Red White Blue Black Brown Purple Green Orange Yellow Grey 1(A) 2(B) 3(C) 4(D) 5(E) 6(F) 7(G) 8(H) 9(J) 10(K) Red White Blue Black Brown Purple Green Orange Yellow Grey ALM1 10 CLOSE1 COM1 OPEN1 CLOSE2 COM2 OPEN2 RR_A RR_B NC GND 11 12 13 14 15 16 17 18 19 20 CLOSE3 COM3 OPEN3 CLOSE4 COM4 OPEN4 GND NC NC NC ALM2 AUX 21 22 23 24 25 26 27 28 29 30 EXT ALM0 EXT ALM1 EXT ALM2 EXT ALM3 EXT Li+ EXT Li+ NC GND EXT LiEXT Li- End of Section ENU STATUS : 1-0-0 Copyright - refer to title page Page 22 INSTALLATION GUIDE FOR RX-7W22 4 COMMISSIONING 4.1 PRE-COMMISSIONING TASKS After equipment installation, perform the following steps before equipment powering and commissioning: Verify that the expected voltage, current and power levels do not violate any ratings. Visually inspect the power connection within the equipment. Ensure that the power cable is correctly and securely connected, including the grounding wire, RF cable and other cables. Check the grounding connection and verify that the ground resistance is less than 5Ω. Test the antenna system and ensure that the echo loss within working frequency is less than -14dB (VSWR<1.5). ENU STATUS : 1-0-0 Copyright - refer to title page Page 23 INSTALLATION GUIDE FOR RX-7W22 4.2 COMMISSIONING PROCEDURE Perform the following procedures for system commissioning. Start commissioning guide in WEB GUI Set unit parameters Isolation detection Set Control channel frequency Input power detection from control channel Set channel total numbers Get the recommended DL and UL parameters Set frequency and gain for each channel in ‘Device’ page, and turn on RF switches Fine tuning DL/UL gains for channels End Figure 7: Commissioning Procedure ENU STATUS : 1-0-0 Copyright - refer to title page Page 24 INSTALLATION GUIDE FOR RX-7W22 Table 4: Commissioning Task Explanation Commissioning Tasks 1. Isolation detection Observation Detect isolation of service antenna and donor antenna. Enter the center frequency of the main control channel, the commissioning guide will provide recommended DL/UL gain settings based on main control channel input power and the total channel numbers. Users can skip this step and directly finish the commissioning guide even if the frequency information or the total channel numbers are unknown. Users are able to set the DL/UL gain manually any time after the isolation detection has been completed and passed. 2. Set control channel frequencies 3. Set Channel No. Enter the total channel numbers The commissioning guide will provide recommended DL/UL gain settings. Users will still need to set all the gains manually in the “Device” pages, and the frequencies for all the independent channels in the same “Device” pages after the commissioning process is finished. 4. Recommended DL and UL gain parameters End of Section ENU STATUS : 1-0-0 Copyright - refer to title page Page 25 INSTALLATION GUIDE FOR RX-7W22 5 WEB GUI The PS BDA can be monitored and controlled via the WEB GUI; use the following guide to finish system parameter setting and commissioning. 5.1 WEB GUI CONNECTION Step 1: Connect the OMT port to the PC RJ45 port with the supplied RJ45 cable to set up a physical connection. Step 2: Open a browser (browser IE7.0, IE8.0, Chrome or Firefox, suggested display resolution is 1024×768), input Web GUI IP address: 192.168.8.101, click [Enter]. NOTE: DHCP and DNS are also available to login to the Web GUI. The domain name is: www.combaomt.com. Figure 8: Input IP Address Figure 9: Input Domain Name Step 3: Input User Name: admin; Password (default password: admin). Click [Log in]. Figure 10: Input User Name and Password ENU STATUS : 1-0-0 Copyright - refer to title page Page 26 INSTALLATION GUIDE FOR RX-7W22 5.2 WEB GUI INTRODUCTION After log in, the Web GUI main screen will appear. Indicates the equipment status Shows the basic information about the PS BDA Figure 11: Web GUI Main Screen On Comba Web GUI Home Screen, there are four Menu bars: [Devices], [Commissioning], [Firmware] and [Management]. 5.2.1 [DEVICES] The [Devices] Screen shows the equipment status, such as PA status, alarm information, etc. ENU STATUS : 1-0-0 Copyright - refer to title page Page 27 INSTALLATION GUIDE FOR RX-7W22 Overview Screen Indicating alarm status Click to enable /disable alarm Indicating alarm status Click to enable /disable alarm Figure 12: Overview Screen 800MHz Screen This screen is only available for the dual band PS BDA or 800MHz PS BDA. RFU parameters Click to initiate batch setting for CH01-08. Selecting sub band Sub band information Center frequency information Bandwidth information Click to set bandwidth, UL/DL ATT, enable/disable RF switch. Figure 13: 800MHz Screen ENU STATUS : 1-0-0 Copyright - refer to title page Page 28 INSTALLATION GUIDE FOR RX-7W22 700MHz Screen This screen is only available for the dual band PS BDA or 700MHz PS BDA. RFU parameters Click to initiate batch setting for CH01-08. Selecting sub band Sub band information Center frequency information Bandwidth information Click to set bandwidth, UL/DL ATT, enable/disable RF switch. Figure 14: 700MHz Screen 5.2.2 [COMMISSIONING] A work flow of the commissioning process is shown on [Commissioning] Screen. Click the [Start] button, the software will guide you through the commissioning step by step. For details, please refer to chapter 5.3. Figure 15: [Commissioning] Screen ENU STATUS : 1-0-0 Copyright - refer to title page Page 29 INSTALLATION GUIDE FOR RX-7W22 5.2.3 [FIRMWARE] There are two functions on the [Firmware] bar: [upgrade] and [swap]. [Upgrade] is used to upgrade software, and [Swap] is to replace the current firmware version with the previous one. Follow the steps shown below figure to upgrade the firmware. Step 2: Click to finish the software upgrading. Step 1: Click to select the file for upgrading. Figure 16: [Firmware] Screen – MCU Firmware Upgrade Click to swap the firmware to the previous version Figure 17: [Firmware] Screen – Firmware Swap ENU STATUS : 1-0-0 Copyright - refer to title page Page 30 INSTALLATION GUIDE FOR RX-7W22 Step 1: Check the module that needs to be updated. Step 2: Click to select the file. Step 3: Click to finish the upgrading. Figure 18: [Firmware] Screen – Module Update 5.2.4 [MANAGEMENT] Other parameters can be configured on the [Management] Screen. Management menu, click to enter each page for parameters setting. Figure 19: [Management] Screen ENU STATUS : 1-0-0 Copyright - refer to title page Page 31 INSTALLATION GUIDE FOR RX-7W22 There are nine function bars list on the left side of the [Mangement] Screen. Inport&Export Click to import/export the configuration parameters. Figure 20: Management – Import & Export The parameters that can be imported / exported include sub band, alarm enable, ATT value, RF switch, and DL output power. This function can help users quickly configure PS BDA parameters. For example, if one PS BDA is finished configuration, users can export the parameters and save it as a file on the PC, and then import this file to other PS BDAs for faster set up of additional PS BDAs. ENU STATUS : 1-0-0 Copyright - refer to title page Page 32 INSTALLATION GUIDE FOR RX-7W22 IP Setting Configure the IP address for remote monitoring. Figure 21: Management – IP Setting Note: For remote monitoring, the IP Address must be set correctly based on the location IP of the remote connection. If more than one piece of equipment is connected to the public network through the same router, the router’s local IP CANNOT be set as 192.168.8.*. ENU STATUS : 1-0-0 Copyright - refer to title page Page 33 INSTALLATION GUIDE FOR RX-7W22 Comm. Setting Figure 22: Management – Comm. Setting Note: There are 4 available communication types: SMS, PS, SNMP and ETHERNET. You can choose a suitable type for remote monitoring. ENU STATUS : 1-0-0 Copyright - refer to title page Page 34 INSTALLATION GUIDE FOR RX-7W22 Maintenance Figure 23: New Site Report is for easy monitoring set up Security Figure 24: Management – Security ENU STATUS : 1-0-0 Copyright - refer to title page Page 35 INSTALLATION GUIDE FOR RX-7W22 Click , [Modify Password] window will pop-up. Figure 25: Modify Password Note: Username cannot be modified. Device Reset Figure 26: Management – Device Reset Note: Click , all the parameters and alarms will be reset to factory default value. The Device Reset process will last about 2~4 minutes. For PMU monitor reset, users need to re-login to the WEB GUI. ENU STATUS : 1-0-0 Copyright - refer to title page Page 36 INSTALLATION GUIDE FOR RX-7W22 License Figure 27: Management – License For the CriticalPoint BDA, users are able to switch the configuration anytime by changing the license in the WEBOMT. There are 3 difference licenses: 700MHz single band license, 800MHz single band license and 700MHz/800MHz dual band license. Both 700MHz and 800MHz single band licenses are provided with a single band unit. Users can switch between 700MHz configuration and 800MHz configuration. To upgrade from single band to dual band, users need to purchase the dual band upgrade license. If the equipment is in dual band originally, no license will be provided, because the equipment already comes with dual band activated. For more information please refer to appendix B for the license switch guide. ENU STATUS : 1-0-0 Copyright - refer to title page Page 37 INSTALLATION GUIDE FOR RX-7W22 Device Info Click here to get PC time. Input device information. Figure 28: Management – Device Info Note: Users can input a maximum of 30 characters in Device Info. Isolation Figure 29: Management – Isolation Note: This Step is the same as step 3 of [Commissioning]. Users can check isolation again by clicking the Check button. ENU STATUS : 1-0-0 Copyright - refer to title page Page 38 INSTALLATION GUIDE FOR RX-7W22 Dry Contact Step 1: Click the drop down menu to select the desired parameters for dry contact 3 and 4. Step 2: Click to finish the dry contact setting. Figure 30: Management – Dry Contact Test Click to start the alarm test. Figure 31: Management – Test ENU STATUS : 1-0-0 Copyright - refer to title page Page 39 INSTALLATION GUIDE FOR RX-7W22 Report Figure 32: Management – Report Note: Click Create to create the report (the report can’t be created in IE browser) and make sure that PDF Reader software is installed on the computer. If not, the report will not be visible. The device basic information, an overview of RF information and sub-band RF information are included in this report. Please refer to appendix D for an example of device report. ENU STATUS : 1-0-0 Copyright - refer to title page Page 40 INSTALLATION GUIDE FOR RX-7W22 5.3 COMMISSIONING PROCEDURE To complete the installation and commissioning, users need to follow the steps below. Step 1: Click the Menu bar [Commissioning] on home screen, a work flow will be displayed. Figure 33: Commissioning Procedure – Start Step 2: Click to start the process. Figure 34: Commissioning Procedure – Site Info. Setting ENU STATUS : 1-0-0 Copyright - refer to title page Page 41 INSTALLATION GUIDE FOR RX-7W22 Step 3: Click , to set the site information. Figure 35: Device Information Setting It is mainly used to record device location and Date/Time provides a time reference. Clicking the Config Value of Date/Time will update the Date/Time automatically. NOTE: Make sure the device is connected with appropriate donor and service antennas before proceeding to step 4. Step 4: Click to enter to Isolation Detection Screen. Figure 36: Commissioning Procedure – Isolation Detection ENU STATUS : 1-0-0 Copyright - refer to title page Page 42 INSTALLATION GUIDE FOR RX-7W22 Select a frequency band (RFU) that needs to be commissioned. Click Click to start Isolation Detecting, then a [Confirm] window will pop-up. to continue. If isolation detection passes, the process will go to the RF Settiing Screen shown as Figure 38. If failed, a Tips window will pop-up, users need to check whether the system isolation is adequate. NOTE: At the end of the first frequency band commissioning, users can start other frequency band commissioning. Figure 37: Commissioning Procedure – Isolation Detection Confirm Figure 38: Commissioning Procedure – Isolation Detection Failed ENU STATUS : 1-0-0 Copyright - refer to title page Page 43 INSTALLATION GUIDE FOR RX-7W22 Figure 39: Commissioning Procedure – Isolation Detection Finish Step 5: RF Setting Screen for setting the center frequency. Step 3: Click to finish the setting. Step 2: Input the desired value. Step 1: Click to open the parameter setting page. Step 4: Click next to continue RF setting. Figure 40: Commissioning Procedure – Center Frequency Setting ENU STATUS : 1-0-0 Copyright - refer to title page Page 44 INSTALLATION GUIDE FOR RX-7W22 Step 3: Click to finish the setting. Step 2: Input the desired value. Step 1: Click to set up the channel number. Step 4: Click next to continue. Figure 41: Commissioning Procedure – Channel Number Setting Step 7: Click to finish the commissioning. In this window, a summary of device setting is shown. Figure 42: Commissioning Procedure – Finish End of Section ENU STATUS : 1-0-0 Copyright - refer to title page Page 45 INSTALLATION GUIDE FOR RX-7W22 6 MAINTENANCE The PS BDA is designed for trouble-free operation and generally does not need maintenance. Maintenance activities should only be carried out by trained personnel. Periodic inspection of the repeater equipment(s) is recommended, the recommended tasks includes: Verify the direction and position of antennas. Re-align if necessary. Make sure the cable connector and sealing on the RF cable connectors are not damaged. Verify lightning and grounding protection is in good condition. End of Section ENU STATUS : 1-0-0 Copyright - refer to title page Page 46 INSTALLATION GUIDE FOR RX-7W22 7 APPENDICES 7.1 APPENDIX A: TOOLS The following are the recommended list of tools for new installation and routine maintenance. Slotted Screwdriver Philips Screwdriver Ring Spanner (Assorted size: 12~20mm) Electrically operated drill and masonry drill bits 12mm Anti-static Wrist Strap Side Cutter Frequency Counter (e.g. FLUKE PM6685R) RF Power Meter (e.g. Bird 5000) ENU STATUS : 1-0-0 Copyright - refer to title page Page 47 INSTALLATION GUIDE FOR RX-7W22 7.2 APPENDIX B: DECLARATION OF HARMFUL SUBSTANCES AND CONTENT Product Name: Public Safety BDA Model: RX-7W22 Harmful substance and content of this product as below table shown: Part Name Harmful Substance Pb Hg Cd Cr (VI) PBB PBDE × ○ ○ ○ ○ ○ × ○ ○ ○ ○ ○ Note: Above table complies with SJ/T 11364. ○: Indicates that the harmful substance content in all homogeneous materials for corresponding part is under the limited requirement of GB/T 26572. ×: Indicates that the harmful substance content in at least one single homogeneous material for the corresponding part exceeds the limited requirement of GB/T 26572. Remark: The content of the parts marked with “×”above exceeds the requirement as there is still no mature alternative technologies to achieve the replacement of poisonous and harmful materials or elements. ENU STATUS : 1-0-0 Copyright - refer to title page Page 48 INSTALLATION GUIDE FOR RX-7W22 7.3 APPENDIX C: LICENSE SWITCH QUICK GUIDE For CriticalPoint BDA, users are able to switch the configuration anytime by changing the license in the WEBOMT. There are 3 difference licenses: 700MHz single band license, 800MHz single band license and 700MHz/800MHz dual band license. Both 700MHz and 800MHz single band licenses are provided with a single band unit. Users can switch between 700MHz configuration and 800MHz configuration. To upgrade from single band to dual band configurations, users need to purchase the dual band upgrade license.. If the equipment is in dual band originally, no license will be provided, because the equipment already comes with dual band activated. Please follow the steps to switch configuration by license: Step 1: Connect the unit “OMT port” to a laptop with an Ethernet cable. Step 2: Wait approximately 1 minute until the IP address is established. Open the browser (Chrome or Firefox is recommended), login to WEBGUI with: www.combaomt.com or 192.168.8.101. Step 3: Input User Name: admin; Password: (default: admin). Click [Log in]. Figure 43: Input User Name and Password ENU STATUS : 1-0-0 Copyright - refer to title page Page 49 INSTALLATION GUIDE FOR RX-7W22 Step 4: Go to Management -> License as shown in figure blow. Input the license code in the License field and click submit to continue. The license code is presented as a label on the equipment. Enter the license code here and click Submit. Figure 44: Input License Code Step 5: Refresh the page from the browser, and if the Dev Authorization Status shows the specific band is authorized, it means the license switch was successful. Figure 45: License switch success ENU STATUS : 1-0-0 Copyright - refer to title page Page 50 INSTALLATION GUIDE FOR RX-7W22 7.4 APPENDIX D: TROUBLESHOOTING QUICK GUIDE Alarm list: Signal Booster Failure Dry contact alarm Over Temperature alarm Low Input alarm PLL alarm VSWR alarm Antenna Malfunction Dry contact alarm LNA alarm DL PA alarm Shutdown alarm High input alarm Figure 46: Alarm list Troubleshooting: Alarms Causes and actions Low input (for DT port) DT composite input power lower than -80dBm will trigger the alarm 1. Donor antenna/passive system failure 2. Wrong channel frequency setting 3. Site is not commissioned yet VSWR Service antenna/passive system failure Over temperature Environment temperature shall be lower than 140degF (60degC) PLL (Phase lock loop) Hardware failure, RMA the equipment LNA (Low noise amp.) Hardware failure, RMA the equipment 1. Handling RF connectors when RF power is ON may damage LNA 2. High power injection to DT/MT port may damage LNA DL PA (Downlink amp.) Fix any other existing alarms first, then reset PA (see next page) If alarm still exists, RMA the equipment Shutdown Other critical alarm causes the equipment shutdown Follow instructions to fix other alarms first High input (for DT port) Check input power to DT port, the power shall be lower than -30dBm 1. Avoid other inference 2. Put attenuator between antenna and PS BDA, if donor signal is high ENU STATUS : 1-0-0 Copyright - refer to title page Page 51 INSTALLATION GUIDE FOR RX-7W22 Reset PA: The Downlink PA will try to automatically reboot during the first 2 hours after alarms occur and then may shutdown permanently if alarms still exist. Users need to manually reset the PA in WEBOMT after fixing the alarm. Go to Management -> Device Reset: Click the Reset button at the lower table to reset DL PA for 800MHz or 700MHz Figure 47: Reset PA Power detection: The power detection can be done from the reading number in WEBOMT, available in: Downlink input power (per channel) Downlink output power (composite) Uplink input power (per channel) Or from the test ports for DT/MT, which are 22dB lower than the DT/MT port respectively, the test ports are able to detect both DL and UL signals Isolation: The system doesn’t allow users to set a gain higher than isolation-20dB. The PS BDA has a mandatory process to check the isolation during commissioning, when isolation is not good (lower than 110dB, even though the PS BDA passes the commissioning process), a check on isolation (between donor and service antennas) is always recommended. The maximum system gain that can be set must be 20dB lower than the isolation. (For example, if the isolation is 110dB, then the maximum gain that can be set is 90dB.) The PS BDA has an automatic process that prevents the gain being set to a value that does not follow this parameter. If this gain is insufficient, then the isolation situation must be corrected to provide a higher isolation value. ENU STATUS : 1-0-0 Copyright - refer to title page Page 52 INSTALLATION GUIDE FOR RX-7W22 Safety operation to protect the LNA (low noise amplifier): 1. Connect RF cables before powering on. 2. Any changes or handling of the RF connection requires user to switch off RF power (RF switch off in WEBOMT) or power off the unit first. ENU STATUS : 1-0-0 Copyright - refer to title page Page 53 INSTALLATION GUIDE FOR RX-7W22 7.5 APPENDIX E: DEVICE REPORT EXAMPLE ENU STATUS : 1-0-0 Copyright - refer to title page Page 54 INSTALLATION GUIDE FOR RX-7W22 7.6 APPENDIX F: RMA (RETURN MATERIAL AUTHORIZATION) End of Section End of Document ENU STATUS : 1-0-0 Copyright - refer to title page Page 55 INSTALLATION GUIDE FOR RX-7W22 ENU STATUS : 1-0-0 Copyright - refer to title page Page 56
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.6 Linearized : No Author : vivian Create Date : 2017:04:26 10:10:55+08:00 Modify Date : 2017:04:26 10:11:11+08:00 Language : zh-CN Tagged PDF : Yes XMP Toolkit : Adobe XMP Core 4.2.1-c041 52.342996, 2008/05/07-20:48:00 Format : application/pdf Creator : vivian Creator Tool : Microsoft® Word 2010 Metadata Date : 2017:04:26 10:11:11+08:00 Producer : Microsoft® Word 2010 Document ID : uuid:5532ac9a-5b51-417f-991e-f79f2ca56eb0 Instance ID : uuid:bebb7377-7584-44a1-87b2-af6368db48dd Page Count : 55EXIF Metadata provided by EXIF.tools