Comba Telecom RX4122-A UHF Public Safety Bi-directional Amplifier User Manual

Comba Telecom Ltd. UHF Public Safety Bi-directional Amplifier

User manual

              UHF PUBLIC SAFETY BI-DIRECTIONAL AMPLIFIER USER MANUAL Public Safety BDA RX-4122 Class A QE: 1-0-0          Comba Telecom Ltd.  CriticalPoint Public Safety BDA
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 3       The  information  contained  herein  is  the  responsibility  of  and  is  approved  by  the following, to whom all enquiries should be directed:  This  is an  unpublished  work the  copyright  in  which vests  in  Comba  International ("Comba"). All rights reserved.  The information contained herein is confidential and the property of Comba and is supplied  without  liability  for  errors  or  omissions.  No  part  may  be  reproduced, disclosed or used except as authorized by contract or other written permission. The copyright and the foregoing restriction on reproduction and use extend to all media in which the information may be embodied.
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 4      0.1  CONTENTS Section Page 0.1 CONTENTS ....................................................................................................................................... 4 0.2 INDEX TO FIGURES AND TABLES ............................................................................................. 6 0.3 HISTORY ........................................................................................................................................... 7 0.4 GLOSSARY OF TERMS ................................................................................................................. 8 0.5 SAFETY NOTICES AND ADMONISHMENTS ............................................................................ 9 1 GENERAL INFORMATION ........................................................................................................... 10 2 EQUIPMENT DESCRIPTION ....................................................................................................... 11 2.1 FUNCTIONAL BLOCK DIAGRAM ............................................................................................... 11 2.2 EQUIPMENT LAYOUT .................................................................................................................. 12 2.3 EQUIPMENT CONSTITUTION .................................................................................................... 13 3 INSTALLATION .............................................................................................................................. 14 3.1 WARNINGS AND ALERTS ........................................................................................................... 14 3.2 SITE PLANNING CONSIDERATIONS ....................................................................................... 15 3.2.1 SITE PLANNING ............................................................................................................................ 15 3.2.2 INSTALLATION CHECKLIST ....................................................................................................... 16 3.3 INSTALLATION PROCEDURES ................................................................................................. 17 3.3.1 GOODS INWARDS INSPECTION............................................................................................... 17 3.3.2 TOOLS ............................................................................................................................................. 17 3.3.3 PREPARATION .............................................................................................................................. 17 3.3.4 WALL MOUNTING ......................................................................................................................... 18 3.3.5 DRIP-LOOP ..................................................................................................................................... 18 3.4 EQUIPMENT CONNECTORS ...................................................................................................... 19 3.4.1 PS BDA CONNECTORS ............................................................................................................... 19 3.4.2 PS BDA LED Indicators ................................................................................................................. 21 3.4.3 GROUNDING CONNECTION ...................................................................................................... 21 3.4.4 RF CABLE CONNECTION ........................................................................................................... 21 3.4.5 ETHERNET CONNECTION ......................................................................................................... 21 3.4.6 DRY CONTACT CABLE CONNECTION .................................................................................... 22 4 COMMISSIONING ......................................................................................................................... 24 4.1 PRE-COMMISSIONING TASKS .................................................................................................. 24 4.2 COMMISSIONING PROCEDURE ............................................................................................... 25 5 WEB GUI ......................................................................................................................................... 27 5.1 WEB GUI CONNECTION ............................................................................................................. 27 5.2 WEB GUI INTRODUCTION .......................................................................................................... 28 5.2.1 [DEVICES] ....................................................................................................................................... 28 5.2.2 [COMMISSIONING] ....................................................................................................................... 29 5.2.3 [FIRMWARE] ................................................................................................................................... 30 5.2.4 [MANAGEMENT] ............................................................................................................................ 31 5.3 COMMISSIONING PROCEDURE ............................................................................................... 42 6 MAINTENANCE .............................................................................................................................. 47 7 APPENDICES ................................................................................................................................. 48 7.1 APPENDIX A: TOOLS ................................................................................................................... 48 7.2 APPENDIX B: DECLARATION OF HARMFUL SUBSTANCES AND CONTENT ................ 49
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 5     7.3 APPENDIX F: RMA (RETURN MATERIAL AUTHORIZATION) ............................................. 50
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 6     0.2  INDEX TO FIGURES AND TABLES  Figure 1: Front, Side and Bottom Views of the PS BDA Enclosure ................................................................. 10 Figure 2: PS BDA Functional Block Diagram................................................................................................... 11 Figure 3: Layout of the PS BDA ....................................................................................................................... 12 Figure 4: Mounting Rack Overview .................................................................................................................. 17 Figure 5: PS BDA Wall Mounting ..................................................................................................................... 18 Figure 6: Equipment Connectors ..................................................................................................................... 19 Figure 7: Commissioning Procedure ................................................................................................................ 25 Figure 8: Input IP Address ............................................................................................................................... 27 Figure 9: Input Domain Name .......................................................................................................................... 27 Figure 10: Input User Name and Password ..................................................................................................... 27 Figure 11: Web GUI Main Screen .................................................................................................................... 28 Figure 12: Overview Screen............................................................................................................................. 28 Figure 13: 400MHz Screen 1 ........................................................................................................................... 29 Figure 14: 400MHz Screen 2 ........................................................................................................................... 29 Figure 15: [Commissioning] Screen ................................................................................................................. 30 Figure 16: [Firmware] Screen – MCU Firmware Upgrade ............................................................................... 30 Figure 17: [Firmware] Screen – Firmware Swap ............................................................................................. 31 Figure 18: [Firmware] Screen – Module Update .............................................................................................. 31 Figure 19: [Management] Screen .................................................................................................................... 32 Figure 20: Management – Import & Export ...................................................................................................... 33 Figure 21: Management – IP Setting ............................................................................................................... 34 Figure 22: Management – Comm. Setting ....................................................................................................... 35 Figure 23: Management – Security .................................................................................................................. 36 Figure 24: Modify Password............................................................................................................................. 37 Figure 25: Management – Device Reset ......................................................................................................... 37 Figure 26: Management – Device Info ............................................................................................................. 38 Figure 27: Management – Isolation ................................................................................................................. 38 Figure 28: Management – RF Setting .............................................................................................................. 39 Figure 29: Management – Alarm Setting ......................................................................................................... 39 Figure 30: Management – Report .................................................................................................................... 40 Figure 31: Management – Alarm Log .............................................................................................................. 40 Figure 32: Management – Clear History Alarm ................................................................................................ 41 Figure 33: Commissioning Procedure – Start .................................................................................................. 42 Figure 34: Commissioning Procedure – Site Info. Setting ............................................................................... 42 Figure 35: Device Information Setting .............................................................................................................. 43 Figure 37: Commissioning Procedure – Isolation Detection ............................................................................ 44 Figure 38: Commissioning Procedure – Isolation Detection Confirm .............................................................. 44 Figure 39: Commissioning Procedure – Isolation Detection Failed ................................................................. 44 Figure 40: Commissioning Procedure – Isolation Detection Finish ................................................................. 45 Figure 41: Commissioning Procedure – Center Frequency Setting ................................................................ 45 Figure 42: Commissioning Procedure – Channel Number Setting .................................................................. 45 Figure 43: Commissioning Procedure – Finish ................................................................................................ 46  Table 1: Equipment Connectors ...................................................................................................................... 19 Table 2: LED Indicators .................................................................................................................................... 21 Table 3: Pin Definition of Dry Contact Cable ................................................................................................... 22 Table 4: Commissioning Task Explanation ...................................................................................................... 26
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 7     0.3  HISTORY Change No. ENU Details Of Change  1 1-0-0 This manual first created and issued in Jan. 2018.   .
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 8     0.4  GLOSSARY OF TERMS Abbreviation  Definition  ALC  Automatic Level Control  ATT  Attenuator BTS Base Transceiver Station CH Channel  CSA Cross Sectional Area dB  Decibel  dBm  Decibels relative to 1 milliwatt DL  Downlink DT  Donor Terminal  DPX Duplexer FS Frequency Selection Hz  Hertz  ID Identification  IF Intermediate Frequency LNA  Low Noise Amplifier LOS Line-of-Sight MCU  Main Control Unit  MHz  Megahertz  MT  Mobile Terminal  MTBF  Mean Time Between Failures  NF  Noise Figure  OMC  Operation & Maintenance Center  OMT  Operation & Maintenance Terminal PA Power Amplifier PLL  Phase Locked Loop  PSU  Power Supply Unit  RF  Radio Frequency  SMA  Sub-Miniature A Connector  UL  Uplink  VAC Volts Alternating Current VDC Volts Direct Current VSWR  Voltage Standing Wave Ratio
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 9      0.5  SAFETY NOTICES AND ADMONISHMENTS This document contains safety notices in accordance with appropriate standards. In the interests of conformity with the territory standards for the country concerned, the equivalent territorial admonishments are also shown.  Any installation, adjustment, maintenance and repair of the equipment must only be carried out by trained, authorized personnel. At all times, personnel must comply with any safety notices and instructions.  Specific hazards are indicated by symbol labels on or near the affected parts of the equipment. The labels conform to international standards, are triangular in shape, and are colored black on a yellow background. An informative text label may accompany the symbol label.  Hazard labeling is supplemented by safety notices in the appropriate equipment manual. These notices contain additional information on the nature of the hazard and may also specify precautions.   Note: The grantee is not responsible for any changes or modifications not expressly approved by the party responsible for compliance. Such modifications could void the user’s authority to operate the equipment.   For  compliance  with  the  general  population  RF  exposure  limits,  each  individual  antenna  used  for  this transmitter must be installed to provide a separation distance greater than 67.2cm or more from all persons during  normal  operation  and  must  not  be  co-located  with  any  other  antenna  for  meeting  RF  exposure requirements.  Warning Notices:  These draw the attention of personnel to hazards that may cause death or injury to the operator or others. Examples of use are cases of high voltage, laser emission, toxic substances, point of high temperature, etc.  WARNING. This is NOT a CONSUMER device. It is designed for installation by FCC LICENSEES and QUALIFIED INSTALLERS. You MUST have an FCC LICENSE or express consent of an FCC Licensee to operate this device. The PS BDA can be configured as Class A Signal Booster. You MUST register Class  B  signal  boosters  (as  defined  in  47  CFR  90.219)  online  at www.fcc.gov/signal-boosters/registration.  Unauthorized  use  may  result  in  significant  forfeiture penalties, including penalties in excess of $100,000 for each continuing violation.  Alert:  These draw the attention of personnel to hazards that may cause damage to the equipment. An example of use is the case of static electricity hazard.   Caution notices may also be used in the handbook to draw attention to matters that do not constitute a risk of causing damage to the equipment but where there is a possibility of seriously impairing its performance, e.g. by mishandling or gross maladjustment. Warnings and Cautions within the main text do not incorporate labels and may be in shortened form.   Disconnection of the 2 RF connectors may cause damage to the equipment when power is on.  The application antenna and RF cable are not provided. The antenna gain should not exceed 10 dBi.      End of Section
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 10     1  GENERAL INFORMATION The RX-4122 is a new digital public safety Bi-Directional repeater (hereafter referred to as PS BDA) designed to protect the lives of first responders and building occupants. Through the use of digital filtering technology, the  RX-4122  helps eliminate  adjacent  channel interference  to  allow  band selectivity and  support  400MHz rebanding.   Main Features   PS UHF 400MHz.  Class A BDA, support 32 channels total.  Channel selective, software programmable.  Auto diagnostic.  Uplink squelch, per channel.  User adjustable gain control (AGC), UL and DL independent per channel.  Built in isolation testing (mandatory prior to commissioning the PS BDA).  Easy commission and setup via Web-based GUI.  Weatherproof enclosure, IP65/NEMA4X.  Fully compliant with the 2016 NFPA 1221 Code, FCC and UL standard.  Low AC power consumption: less than 85W  Weight: 77 lbs (not including mounting bracket and duplexers)   Alarming output to supervised circuits for: antenna failure, signal booster failure, and etc.  The following figure shows the enclosure of the PS BDA.    Figure 1: Front, Side and Bottom Views of the PS BDA Enclosure
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 11     2  EQUIPMENT DESCRIPTION 2.1  FUNCTIONAL BLOCK DIAGRAM  MobileAntDonorAntMobilePowerSupplyAlarmIndicator Main Control UnitOMTLANDT MTBTS DL Subband 01BIAS TeeDL Subband 02 PAPADL_01DL_02UL_01UL_02DL_01DL_02UL Subband 01UL Subband 02UL_01UL_02Digital Integrated moduleLNADL_01DL_02LNAUL_01UL_02 Figure 2: PS BDA Functional Block Diagram  In the downlink path, the BTS signals are received by the donor antenna of the repeater. After the circulator, the signals are sent to downlink filter and then the LNA module for pre-amplification and to the digital RF integrated module for digital filtering and frequency conversion. Then the DL signals will be sent to the downlink PA to amplify power, and filter via downlink filter, the circulator, and last, the signals are transmitted at the MT port to the service antenna.   In the uplink path, the mobile signals are received by the service antenna. After the circulator, the signals are sent to uplink filter, and then to LNA, digital integrated module for digital filtering, then to the PA for power amplification and to the uplink filter, the circulator, after that, the uplink signals are sent to the donor antenna for transmission back to the BTS.
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 12     2.2  EQUIPMENT LAYOUT Shown below is the internal layout of the PS BDA.  黑色开关MTDT避雷器DL FilterUL FilterDL FilterUL FilterDT/DL IN MT/DL OUT UL IN UL OUTFront Side of 3rd Layer (Passive Unit)Back Side of 2nd Layer Front Side of 2nd Layer (Passive Unit)LoopCirculatorCirculatorUL Filter DL FilterDL FilterUL FilterPSUDistribution Board MCU+28V+28VGNDRF OUTRF IN+28VGNDRF OUTRF INDL PADigital Integrated Module+28VRef INLNA1 OUTLNA1 INLNA2 INLNA2 OUTUL INUL OUTDL OUTDL INUL PAOUT4IN4OUT3IN3OUT2IN2OUT1IN1LANRUNALMPWROMT  Figure 3: Layout of the PS BDA
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 13     2.3  EQUIPMENT CONSTITUTION The typical PS BDA unit consists of the following components:   Downlink Power Amplifier (DPA): It provides power amplification for DL branches.   Uplink Power Amplifier (UPA): It provides power amplification for UL branches.  Main  Control Unit  (MCU):  The MCU is used to monitor and control the operation of the repeater. It also provides  the communication interface  for  remote control  and  status indication. LED indicators provide the operation status of the MCU.  Downlink Filter: The filter is used to restrain the uplink signals to achieve a better isolation between downlink path and uplink path, to make sure the device can work in a normal duplex mode.  Uplink Filter: The filter is used to restrain the downlink signals to achieve a better isolation between downlink path and uplink path, to make sure the device can work in a normal duplex mode.  Digital Integrated Module: Consists of RF module, digital process module and monitoring modules. The RF module amplifies and converts the RF signal to IF signal. The Digital process module converts the IF signal into baseband signal via AD conversion and extraction, and filtering. After that, the IF signal will be amplified and converted to an RF signal by the RF module for RF filtering and amplification. The Monitoring module monitors and controls the system parameters and it is the interface for both remote monitoring and local commissioning, and at the same time control the charge and discharge of the backup battery.  Power Supply Unit (PSU): The PSU converts the input voltage into a stable DC supply to provide power for the internal functional modules.
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 14     3  INSTALLATION 3.1  WARNINGS AND ALERTS Radio Frequency Energies  There  may  be  situations,  particularly  for  workplace  environments  near  high-powered  RF  sources,  where recommended limits for safe exposure of human beings to RF  energy could be exceeded. In such  cases, restrictive measures or actions may be necessary to ensure the safe use of RF energy.   High Voltage  The equipment has been designed and constructed to prevent, as far as reasonably practicable danger. Any work  activity  on  or  near  equipment  involving  installation,  operation  or  maintenance  must  be,  as  far  as reasonable, free from danger.   Where there is a risk of damage to electrical systems involving adverse weather, extreme temperatures, wet, corrosive or dirty conditions, flammable or explosive atmospheres, the system must be suitably installed to prevent danger.   Protective Earthing  Equipment  provided  for  the  purpose  of  protecting  individuals  from  electrical  risk  must  be  suitable  for  the purpose and properly maintained and used.    Handling Precautions  This  covers  a  range  of  activities  including  lifting,  lowering,  pushing,  pulling,  carrying,  moving,  holding  or restraining an object, animal or person from the equipment. It also covers activities that require the use of force or effort, such as pulling a lever, or operating power tools.   Where some of the abovementioned activities are required, the equipment must be handled with care to avoid being damaged.   Electrostatic Discharge (ESD)  Observe  standard  precautions  for  handling  ESD-sensitive  devices.  Assume  that  all  solid-state  electronic devices  are  ESD-sensitive.  Ensure  the  use  of  a  grounded  wrist  strap  or  equivalent  while  working  with ESD-sensitive devices. Transport, store, and handle ESD-sensitive devices in static-safe environments.
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 15     3.2  SITE PLANNING CONSIDERATIONS 3.2.1  SITE PLANNING Site Considerations  Outdoor equipment are designed to be waterproof, rainproof, and with snow protection. Temporary protection should  be  taken  when  the  equipment  enclosure  is  opened  for  installation  or  maintenance  in  an  outdoor environment. The equipment must not be opened for installation or maintenance in bad weather (e.g. gale, storm rainfall, extreme temperatures and high humidity)   Installation Location  Mounting surface shall be capable of supporting the weight of the equipment.  In  order  to  avoid  electromagnetic  interference,  a  proper  mounting  location  must  be  selected  to  minimize interference from electromagnetic sources such as large electrical equipment.   Environmental  Humidity has an adverse effect on the reliability of the equipment. It is recommended to install the equipment in locations having stable temperature and unrestricted air-flow.   The installation location for the product should be well ventilated. The equipment has been designed to operate at the temperature range and humidity level as stated in the product specifications in the datasheet.  Direct sun light exposure to the equipment should be avoided. Provide additional shelter if necessary.   Power Supply  The power supply unit (PSU) provides power to all modules within the equipment. Depending on the product variant, it is recommended that the PSU be operated on a dedicated circuit breaker or fused circuit.   Grounding Requirement  Verify that the equipment has been well grounded. This includes antennas and all cables connected to the system. Ensure lightning protection for the antennas is properly grounded.    Cable Routing  Depending on equipment configuration, a variety of types of cables are required. Where applicable, ensure cables are properly routed and secured so that they are not damaged.   Manual Handling  During transportation and installation, take necessary handling precautions to avoid potential physical injury to the installation personnel and the equipment.
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 16     3.2.2  INSTALLATION CHECKLIST   Working  space  available  for  installation  and  maintenance  for  each  mounting  arrangement.  Ensure unrestricted airflow.   Ensure earth ground point is within reach of the ground wire.   Ensure a power source is within reach of the power cord and the power source has sufficient capacity.    Where appropriate, ensure unused RF connectors are terminated.   Do  not  locate  the  equipment  near  large  transformers  or  motors  that  may  cause  electromagnetic interference.   Reduce signal loss in feeder cable by minimizing the length and number of RF connections.   Ensure VSWR of antennas system < 1.5:1.   Ensure equipment will be operated within the stated environment (see datasheet)   Observe handling of all cables to prevent damage. Donor antenna should have a narrow beamwidth and positioned in line-of-sight (LOS) to the donor BTS site so that the donor signal level is maximized. This allows the use of minimum gain to achieve the maximum DL output power. The UL gain is typically set lower than or equal to the DL gain to minimize noise interference to the donor BTS   Service antennas should be selected based on the type of service area, e.g., indoor antenna for indoor application, and panel antenna for outdoor application.
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 17     3.3  INSTALLATION PROCEDURES 3.3.1  GOODS INWARDS INSPECTION  Verify the number of packages received against the packing list.   Check all packages for external damage; report any external damage to the shipping courier. If there is damage, a shipping agent should be present before unpacking and inspecting the contents because damage during transit is the responsibility of the agent.   Open and check each package against the packing list. If any items are missing, contact Comba.   Do not remove items from anti-static packing until ready for installation. If damage is discovered at the time of installation, contact the shipping agent.   3.3.2  TOOLS See Appendix A for a full list of the recommended tools required for installation and routine maintenance.   3.3.3  PREPARATION   Wall mounting with the masonry bolts supplied, which make use of the outer holes.  382280858- 14530 Figure 4: Mounting Rack Overview
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 18     3.3.4  WALL MOUNTING    Drill four holes on the wall using the position of four holes on the mounting rack as a guide. Fix the mounting rack to the wall using four masonry bolts (M10x110mm).   Install the Mounting Rack to the wall.   Hang the equipment and secure the enclosure to the mounting rack.   Mounting RackExpansion Bolt M10X110ChassisM8X25,Hexagon Head,Flat Gasket,PadPylons ScrewWall Figure 5: PS BDA Wall Mounting  3.3.5  DRIP-LOOP Comba recommends that every horizontal cable entry to the equipment forms a 'U' before its entry to the equipment. Water on the cable will drip down at the bottom of the loop and will not accumulate at the equipment connectors.
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 19     3.4  EQUIPMENT CONNECTORS 3.4.1  PS BDA CONNECTORS The PS BDA is designed for all cable entries from the right or left of the enclosure, as shown in the following figure.   OMT LAN ALM1 ALM2 AUXRUNPWRALMDT/DL IN MT/DL OUT UL OUTIN1 OUT1 IN2 OUT2 IN3 OUT3 IN4 OUT4  Figure 6: Equipment Connectors  Table 1: Equipment Connectors Identifier Descriptions Power1 Power cable connector for a pre-installed power cord for connection to AC (e.g. AC 100-240V 50Hz/60Hz). DT /DL IN N-Female connector, It is downlink input port and uplink output port for Duplex mode; It is downlink input port only for Simplex mode.                                                  1 The voltage identification is a variant due to electricity system diversity of global regions. The power cable connector might be identified for AC 110V, AC 220V, AC 110V/220V, or DC -48V respectively. Please refer to specific product or contact local sales if any doubt.
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 20     MT/DL OUT N-Female connector, It is downlink output port and uplink input port for Duplex mode; It is downlink output port only for Simplex mode. UL IN N-Female connector, It is uplink input port for Simplex mode; It is useless for Duplex mode. UL OUT N-Female connector, It is uplink output port for Simplex mode; It is useless for Duplex mode. INxx/OUTxx Reserved for extension ALM1 Connector for connection to dry contact alarm 1, 2 and 3 ALM2 Connector for connection to dry contact alarm 4, 5 and 6. AUX External alarm 1, 2, 3 and 4. LAN RJ45 connector for internet connection (Ethernet type only). OMT RJ45 connector for local connection by WEBOMT
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 21     3.4.2  PS BDA LED Indicators The LED indicators help user to check the equipment status easily.   Table 2: LED Indicators Identifier Colour Indication PWR Green Power indicator. ON = power on; OFF = power off.  RUN Green Operation indicator, flashes every second to indicate normal operation. ALM Red Alarm indicator. ON = alarm; OFF = no alarm.   3.4.3  GROUNDING CONNECTION Ground Connection  To ensure safe operation of the product, a ground (earth) connection is required. For single phase AC power source, the product must be grounded by connecting the “earth wire” of the power cord to the ground terminal of the AC supply. For operating this product with DC power system (such as rectifiers), the product should not be connected to power systems that switch open the return lead because the return lead could function as the ground (earth) connection for the equipment.   Protective Ground Connection  The enclosure must be grounded securely by connecting a copper wire (CSA 16mm2) to the grounding terminal on the equipment/rack, and the other end to a protective ground (i.e. building earth point). An internationally acceptable color code of the ground connection wire is green/yellow.   Such a  ground  connection  implements the “Protective  Ground  Connection”, and must be connected to  the equipment  at  the  designated  ground  point.  In  general,  do  not  connect  the  supply  before  establishing  an adequate ground (earth) connection.  Construct the ground wire, and use appropriate crimp connectors where necessary. Locate and connect the equipment grounding terminal to a protective ground (i.e. building earth point).   3.4.4  RF CABLE CONNECTION Single band PS BDA RF cables connection is as follows:    PS BDA MT port  Connects to the feeder cable from service antennas.  PS BDA DT port  Connects to the feeder cable from donor antennas.   3.4.5  ETHERNET CONNECTION Connect Ethernet with ‘LAN’ port in the panel, Ethernet type only.
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 22     3.4.6  DRY CONTACT CABLE CONNECTION Below please find the pin definitions of dry contact cables.   Table 3: Pin Definition of Dry Contact Cable Pin NO. Pin Input ALM1 1 CLOSE1 1 2 COM1 2 3 OPEN1 3 4 CLOSE2 4 5 COM2  5 6 OPEN2 6 7 CLOSE3 7 8 COM3  8 9 OPEN3 9 ALM2 1 CLOSE4 1 2 COM4 2 3 OPEN4 3 4 CLOSE5 4 5 COM5 5 6 OPEN5 6 7 CLOSE5 7 8 COM5 8 9 OPEN5 9 AUX 1 EXT ALM1 1 2 EXT ALM2 2 3 EXT ALM3 3 4 EXT ALM4 4 5 GND 5 6 GND 6 7 GND 7 8 GND 8 9 NC 9
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 23       Dry contact status:  Main Power Normal/Lost dry contact status:         Pin definition of ALM and AUX connectors:      End of Section
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 24     4  COMMISSIONING  4.1 PRE-COMMISSIONING TASKS After equipment installation, perform the following steps before equipment powering and commissioning:   Verify that the expected voltage, current and power levels do not violate any ratings.   Visually inspect the power connection within the equipment. Ensure that the power cable is correctly and securely connected, including the grounding wire, RF cable and other cables.   Check the grounding connection and verify that the ground resistance is less than 5Ω.  Test the antenna system and ensure  that the echo loss within working frequency is less  than  -14dB (VSWR<1.5).
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 25     4.2  COMMISSIONING PROCEDURE Perform the following procedures for system commissioning.  Start commissioning guide in WEB GUISub Band SettingRF SettingEndIsolation DetectionSite Information Setting Figure 7: Commissioning Procedure
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 26     Table 4: Commissioning Task Explanation Commissioning Tasks Observation 1.  Site Information Setting  Site ID, Dev ID, Dev Info, Longitude , Latitude, Date/time setting 2.  Sub Band Setting  Sub Band Frequency setting. 3.  Isolation detection  Detect isolation of service antenna and donor antenna. 4.  RF Setting  DL_Target and the DL frequency center, the filter bandwidth setting and the switch setting. 5.  Recommended DL and UL gain parameters  The commissioning guide will provide recommended DL/UL gain settings.   Users will still need to set all the gains manually in the “Device” pages, and the frequencies for all the independent channels in the same “Device” pages after the commissioning process is finished.    End of Section
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 27     5  WEB GUI The PS BDA can be monitored and controlled via the WEB GUI; use the following guide to finish system parameter setting and commissioning.    5.1  WEB GUI CONNECTION Step 1: Connect the OMT port to the PC RJ45 port with the supplied RJ45 cable to set up a physical connection.  Step 2: Open a browser (browser IE7.0, IE8.0, Chrome or Firefox, suggested display resolution is 1024×768), input Web GUI IP address: 192.168.8.101, click [Enter].  NOTE:   DHCP and DNS are also available to login to the Web GUI. The domain name is: www.combaomt.com.  Advise to clear all the history record of Browse before connecting BDA every time.     Figure 8: Input IP Address   Figure 9: Input Domain Name  Step 3: Input User Name: admin; Password (default password: admin). Click [Log in].    Figure 10: Input User Name and Password
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 28     5.2  WEB GUI INTRODUCTION After log in, the Web GUI main screen will appear.   Figure 11: Web GUI Main Screen  On Comba Web GUI Home Screen, there are four Menu bars:  [Devices], [Commissioning], [Firmware] and [Management].   5.2.1  [DEVICES] The [Devices] Screen shows the equipment status, such as PA status, alarm information, etc.   Overview Screen   Figure 12: Overview Screen       Shows the basic information about the PS BDA Indicates the equipment status Indicating alarm status Click to enable /disable alarm Indicating alarm status Click to enable /disable alarm
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 29     400MHz Screen  This screen is only available for the dual band PS BDA or 800MHz PS BDA.   Figure 13: 400MHz Screen 1    Figure 14: 400MHz Screen 2  5.2.2  [COMMISSIONING] A work flow of the commissioning process is shown on [Commissioning] Screen. Click the [Start] button, the software will guide you through the commissioning step by step. For details, please refer to chapter 5.3.  Selecting sub band Frequency information RFU parameters Click to set frequency information, , enable/disable RF switch. Selecting sub band Click to set bandwidth, UL/DL ATT, enable/disable RF switch. Sub band switch status Center frequency of channel Channel bandwidth Sub band switch status
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 30      Figure 15: [Commissioning] Screen 5.2.3  [FIRMWARE] There are two functions on the [Firmware] bar: [upgrade] and [swap]. [Upgrade] is used to upgrade software, and [Swap] is to replace the current firmware version with the previous one.  Follow the steps shown below figure to upgrade the firmware.                                                 Figure 16: [Firmware] Screen – MCU Firmware Upgrade  Step 1: Click to select the file for upgrading. Step 2: Click to finish the software upgrading.
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 31      Figure 17: [Firmware] Screen – Firmware Swap    Figure 18: [Firmware] Screen – Module Update   5.2.4  [MANAGEMENT] Other parameters can be configured on  the [Management] Screen.  Click to swap the firmware to the previous version Step 2: Click to select the file. Step 3: Click to finish the upgrading. Step 1: Check the module that needs to be updated.
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 32      Figure 19: [Management] Screen    Management menu, click Enter to each page for parameters setting.
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 33     There are nine function bars list on the left side of the [Mangement] Screen.    Inport&Export   Figure 20: Management – Import & Export  The parameters that can be imported / exported include sub band, alarm enable, ATT value, RF switch, and DL output power.  This function can help users quickly configure PS BDA parameters. For example, if one PS BDA is finished configuration, users can export the parameters and save it as a file on the PC, and then import this file to other PS BDAs for faster set up of additional PS BDAs.      Click to import/export the configuration parameters.
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 34      IP Setting    Figure 21: Management – IP Setting  Note: For remote monitoring, the IP Address must be set correctly based on the location IP of the remote connection. If more than one piece of equipment is connected to the public network through the same router, the router’s local IP CANNOT be set as 192.168.8.*.     Configure the IP address for remote monitoring.
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 35      Comm. Setting   Figure 22: Management – Comm. Setting   Note: There are 4 available communication types: SMS, PS, SNMP and ETHERNET. You can choose a suitable type for remote monitoring.
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 36       Security    Figure 23: Management – Security
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 37     Click , [Modify Password] window will pop-up.    Figure 24: Modify Password  Note: Username cannot be modified.    Device Reset   Figure 25: Management – Device Reset  Note: Click  , all the parameters and alarms will be reset to factory default value. The Device Reset process will last about 2~4 minutes. For PMU monitor reset, users need to re-login to the WEB GUI.
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 38       Device Info   Figure 26: Management – Device Info  Note: Users can input a maximum of 30 characters in Device Info.    Isolation    Figure 27: Management – Isolation   Note: This Step is the same as step 5 of [Commissioning]. Users can check isolation again by clicking the Check button, the detection range is from 65dB to 125dB.            Click here to get PC time. Input device information.
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 39       RF setting    Figure 28: Management – RF Setting   Alarm Setting   Figure 29: Management – Alarm Setting     Click to start the alarm test.
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 40      Report            Figure 30: Management – Report   Note: Click Create to create the report (the report can’t be created in IE browser) and make sure that PDF Reader software is installed on the computer. If not, the report will not be visible.   The device basic information, an overview of RF information and sub-band RF information are included in this report. Please refer to appendix D for an example of device report.    Alarm Log   Figure 31: Management – Alarm Log           Click to export alarm log or clear alarm log
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 41      Clear History Alarm   Figure 32: Management – Clear History Alarm      Click to clear history alarm
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 42     5.3  COMMISSIONING PROCEDURE To complete the installation and commissioning, users need to follow the steps below.   Step 1: Click the Menu bar [Commissioning] on home screen, a work flow will be displayed.   Figure 33: Commissioning Procedure – Start  Step 2: Click   to start the process.   Figure 34: Commissioning Procedure – Site Info. Setting  Step 3: Click , to set the site information.
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 43      Figure 35: Device Information Setting  It is mainly used to record device location and Date/Time provides a time reference. Clicking the Config Value of Date/Time will update the Date/Time automatically.  Step 4 : Click  to enter to Sub Band Setting.  Reminder:   Make sure the frequency of sub-bands match the actual frequency of filters, or BDA cannot work normally.  If the frequency is within [450MHz,470MHz], the bandwidth between DL Freq Low and DL Freq High can be adjusted from 0.2 to 5MHz only. If the frequency is within[ 470,512], the bandwidth between DL Freq Low and DL Freq High can be adjusted from 0.2-3MHz.  The frequency edges of two sub bands can be overlap, but they cannot be cross-contained.  The channel center frequency must be within the frequency range of its relative sub-band, if it is not within the range, the system will show a reminder window to show the setting unsuccessful.  If the sub band is off, all the channels belong to the sub band are auto set to off.  The procedure of sub band switch on: sub band 1 is first, and then 2, 3, 4. The procedure of sub band switch off: sub band 4 is first, and then 3, 2, 1. And the isolation use sub band 1 to test, so make sure sub band 1 is always on when BDA is working.  NOTE:  Make  sure  the  device  is  connected  with  appropriate  donor  and  service  antennas  before proceeding to step 5.
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 44     Step 5: Click   to enter to Isolation Detection Screen.  Figure 36: Commissioning Procedure – Isolation Detection    Click   to start Isolation Detecting, then a [Confirm] window will pop-up.   Click   to continue. If isolation detection passes, the process will go to the RF Settiing Screen shown as Figure 39. If failed, a Tips window will pop-up, users need to check whether the system isolation is adequate.  NOTE: At the end of the first frequency band commissioning, users can start other frequency band commissioning.    Figure 37: Commissioning Procedure – Isolation Detection Confirm   Figure 38: Commissioning Procedure – Isolation Detection Failed
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 45                                          Figure 39: Commissioning Procedure – Isolation Detection Finish  Step 5: RF Setting Screen for setting the center frequency.    Figure 40: Commissioning Procedure – Center Frequency Setting   Figure 41: Commissioning Procedure – Channel Number Setting Step 1: Click to open the parameter setting page. Step 2: Input the desired value. Step 3: Click to finish the setting. Step 4: Click next to continue RF setting. Step 1: Click to open the parameter setting page. Step 2: Input the desired value.
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 46     Step 7: Click    to finish the commissioning. In this window, a summary of device setting is shown.    Figure 42: Commissioning Procedure – Finish      End of Section
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 47     6  MAINTENANCE The PS BDA is designed for trouble-free operation and generally does not need maintenance. Maintenance activities should only be carried out by trained personnel.   Periodic inspection of the repeater equipment(s) is recommended, the recommended tasks includes:    Verify the direction and position of antennas. Re-align if necessary.  Make sure the cable connector and sealing on the RF cable connectors are not damaged.   Verify lightning and grounding protection is in good condition.    End of Section
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 48     7  APPENDICES 7.1  APPENDIX A: TOOLS The following are the recommended list of tools for new installation and routine maintenance.    Slotted Screwdriver   Philips Screwdriver   Ring Spanner (Assorted size: 12~20mm)   Electrically operated drill and masonry drill bits 12mm   Anti-static Wrist Strap   Side Cutter   Frequency Counter (e.g. FLUKE PM6685R)   RF Power Meter (e.g. Bird 5000)
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 49     7.2  APPENDIX  B:  DECLARATION  OF  HARMFUL  SUBSTANCES  AND CONTENT  Product Name: Public Safety BDA Model: RX-4122  Harmful substance and content of this product as below table shown:  Part Name Harmful Substance Pb Hg Cd Cr (VI) PBB PBDE A × ○ ○ ○ ○ ○ B × ○ ○ ○ ○ ○ Note: Above table complies with SJ/T 11364.   ○:  Indicates  that  the  harmful  substance  content  in  all  homogeneous  materials  for  corresponding  part  is  under  the  limited requirement of GB/T 26572. ×: Indicates that the harmful substance content in at least one single  homogeneous material  for the corresponding part exceeds the limited requirement of GB/T 26572.  Remark: The content of the parts marked with “×”above exceeds the requirement as there is still no mature alternative technologies to achieve the replacement of poisonous and harmful materials or elements.
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 50        7.3  APPENDIX F: RMA (RETURN MATERIAL AUTHORIZATION)    End of Section
INSTALLATION GUIDE FOR RX-4122  ENU STATUS : 1-0-0 Copyright - refer to title page Page 51

Navigation menu