123 Orchard View Blvd Drawings (Heated Floor)
123 Orchard View Blv.. 123%20Orchard%20View%20Blvd%20Drawings%20(Heated%20Floor) of /wp-content/uploads
User Manual: 123 Orchard View Blvd Drawings (Heated Floor)
Open the PDF directly: View PDF .
Page Count: 11
Download | |
Open PDF In Browser | View PDF |
Building North York District 5100 Yonge Street Toronto, ON M2N 5V7 Tel: 4163957541 Fax: 4163957589 BUILDING PERMIT This card must be kept posted in a conspicuous place on site of construction. 17 111886 BLD 00 SR Site Address 123 ORCHARD VIEW BLVD Project Description SFD - Detached; Interior Alterations Date Issued Thursday February 16, 2017 Ann Borooah Chief Building Official and Executive Director Diane E. Damiano Deputy Chief Building Official and Director Building North York District THIS IS YOUR PERMIT TO CONSTRUCT PERMIT NUMBER: 17 111886 BLD 00 SR Owner: MARK VIMR Address: 123 ORCHARD VIEW BLVD TORONTO, ON M4R 1C1 CANADA WILLIAM NOVAK 123 ORCHARD VIEW BLVD TORONTO, ON M4R 1C1 CANADA Project Description: SFD - Detached; Interior Alterations Project Location: 123 ORCHARD VIEW BLVD Ward: The issuance of this permit is based on the drawings, specifications, details and information submitted with the application. The submitted documents have been reviewed for compliance with the Ontario Building Code, Zoning By-laws, applicable regulations and legislation. The referenced permit number listed above and on your permit placard also appears on all plans reviewed for this building permit application. The validity of this permit is restricted to the person/company named as owner. Permit ownership cannot be transferred unless prior written authorization is given by the Chief Building Official. The extent of construction authorized under this permit is limited to the description contained herein as follows: Interior alterations to basement, remove existing concrete piers and install new steel beam in basement and washroom alteration Stated work and use must be in accordance with the plans, specifications, building permit notes and other information issued with this building permit. Changes to any documents submitted are not to be made unless prior authorization is obtained from the Chief Building Official or designate. False information may be grounds for revocation of the building permit. Notwithstanding, it is the responsibility of the owner to comply with requirements of the Ontario Building Code and applicable laws as well as to ensure compliance .. The permit placard must be posted in a conspicuous place on the construction site. Diane E. Damiano Deputy Chief Building Official North York District North District Issuance Team Issued by: Date Issued: February 16, 2017 Please see the second page of this letter for additional requirements and inspection information. Building North York District Please see the second page of this letter for additional requirements and inspection information. WHEN YOU BEGIN DEMOLITION/CONSTRUCTION ... Site Fencing As soon as construction or demolition starts, your site must be entirely surrounded by a fence which is in compliance with the City of Toronto Municipal Code Chapter 363, Article III. The minimum requirement is plastic mesh fencing, 1.2 metres high, tied to posts spaced no more than 1.2 metres apart with an 11 gauge top and bottom wire threaded through the mesh and looped around each post. The Municipal Code is available on the City website at: http://www.toronto.ca/legdocs/municode/1184_363.pdf Construction Noise Any construction which generates noise is prohibited in residential areas between the hours of 7:00 p.m. one day to 7:00 a.m. the next day, 9:00 a.m. on Saturdays, and all day Sunday and Statutory holidays. When To Call For Inspection You are required by Division C, Part 1, Article 1.3.5.1. of the Ontario Building Code, to notify the building inspection office at several prescribed stages of construction. Please contact the building inspection office at the telephone number listed below, when each of the following stages are substantially complete: Inspection Stages * Footings/Foundations * Interior Final Inspection * Structural Framing * Occupancy * Insulation/Vapour Barrier To Schedule your Next Mandatory Inspection When you are ready to book your inspection, contact your local building inspection office by telephone at 416-395-7541. Alternatively, you may also make contact by fax 416-696-4179 or by email to NYBldgInsp@toronto.ca. Inspections will take place within two days commencing at the start of business on the day following your notification (Inspection Request). Please leave a telephone number where you can be reached or a message can be left. The inspector assigned to your project is Simon Tang (416) 395-7549 PERMIT PLANS MUST BE ON SITE Your permit plans and specifications must be on site at all times. Inspections are conducted with your copy of the plans. Building Ann Borooah Chief Building Official and Executive Director February 16, 2017 Toronto Building Toronto City Hall 12th Floor, East Tower 100 Queen Street West Toronto, Ontario, M5H 2N2 BULLETIN - CONSTRUCTION SAFETY The responsibilities of the City of Toronto under the Occupational Health and Safety Act apply to all our employees regardless of the location at which they are working. Responsibilities for the Construction Safety Regulations on construction sites are clearly spelled out in the Act under the definitions of constructor, employer, supervisor and worker. The City of Toronto believes that the goal of safe and injury free construction sites is a priority for all parties involved in building construction. Safety training for the City of Toronto Building Inspectors is mandatory. However the delivery of a safe working environment on construction sites must include the compliance of individual builders with the Occupational Health and Safety Act. Safety measures include the following: 1. Temporary guards on all openings, 2. Correct use of ladders, 3. Temporary or permanent stairs above or below grade by the time the sub floor is complete, 4. Clear and safe access to the site, 5. Protection of trenches and excavation below four feet deep, and 6. Correct use of fall prevention equipment where required. As the employer responsible for the safety of building inspectors, the City of Toronto has instructed its Building Inspectors not to conduct inspections on sites where conditions exist that could jeopardize their health and safety. The following are examples of conditions which may jeopardize the health and safety of inspectors: 1. Guards are missing, 2. Ladders do not meet regulations, 3. Temporary or permanent stairs, above or below grade, to all floor levels are not provided as required. 4. Access to the site has impediments or hazards, or 5. Trenches or excavations lack required shoring or slope of bank. Prior to calling for an inspection the appropriate safety measures shall be in place as a site inadequately provided with these measures is not ready for inspection. The City of Toronto Building Inspectors will cooperate with builders regarding the timing of making provision for these safety measures. However, if the measures are not provided, an Order Not To Cover could be issued and the Ministry of Labour informed. We look forward to working with you toward the goal of a safe environment for all workers. Notice of Project - Please be advised that the Ministry of Labour requires a Notice of Project be filed with them before starting any project costing $50,000 or more. For more information about the Notice of Project form, please contact your local Ministry of Labour regional office at 416-314-5421 or 1-800-991-7454. Ministry of Labour construction information is available on their website at: http://www.labour.gov.on.ca/english/site/construction_info.html Construction of the work approved in this building permit must be carried out with reasonable care to ensure protection for everyone on the construction site from the hazards associated with all overhead and underground power lines. Obtain further information at: http://www.torontohydro.com/powerlinesafety TORONTO MUNICIPAL CODE 441 FEES AND CHARGES Appendix C - Schedule 8, Toronto Building 17 111886 BLD 00 SR 123 ORCHARD VIEW BLVD Work Proposed Total Permit Fee Interior Alterations Sub SFD - Detached Service Building Classification $49.30 Index Dollars per Square Meter Value in Square Meters (unless otherwise indicated) Fee unless otherwise indicated B. Alterations and Renovations: Interior Alterations (Partitions, Finishings, Etc.): Groups C, E and F 10 4.93 Total Permit Fee Subject to a minimum permit fee of Page 1 of 1 As of 16/02/2017 10:11:53 49.30 $49.30 $198.59 Page 1 of 1 Building Permit 332_12 The reviewed plans and specifications must be available on site during construction/demolition. Changes to these plans and specifications are not to be made unless prior written approval is obtained from the Chief Building Official. The owner/permit holder is required to comply with the following Permit Notes, which are part of the reviewed permit documents: Standards referenced in Section 1.3 of Division B shall be complied with Table 1.3.1.2.: a) Wood - CAN/CSA- O86-01 b) Plain and Reinforced Masonry - CAN-S304-M or CSA-S304.1 c) Plain, reinforced and Pre-stressed Concrete - CAN/CSA-23.3, CAN/CSA A23.1, CAN/CSA A23.2 d) Structural Steel - CAN/CSA-S16-01 e) Parking Structures - CSA-S413 The City has relied upon the plans and drawings prepared and submitted by the owner and their designers on this project. The issuance of a permit does not relieve the owner and designers from the need to comply with the Ontario Building Code and referenced standards where contravention is subsequently noted. The City has Relied upon the plans and drawings prepared and submitted by the qualified architects and/or engineers on this project. The issuance of a permit does not imply a complete design review of this project has been performed and does not relieve the owner and designers from the need to comply with the Ontario Building Code and referenced standards where contravention are subsequently noted. Footings shall rest on natural undisturbed stable soil or compacted granular fill with a minimum soil bearing capacity of 75 kPa All structural wood elements shall be protected against termites and decay as per provisions of 9.3.2.9. Plans reviewed for interior alterations to the existing Single Family Dwelling. No proposed additions or additional living space. Any other work outside the scope of these plans is not permitted under this building permit and must be applied for separately. Issuance of this permit does not permit the enroachment onto adjacent properties, above or below grade, including foundations, roof overhangs and eaves. WOOD PROTECTION REQUIREMENTSWood framing members in contact with masonry or concrete shall be treated to prevent decay. O.B.C. 2012, 9.23.2.2. or separated from the concrete by min 0.05mm polyethylene film or Type S roll roofing. O.B. C. 2012, 9.23.2.3. Ensure minimum 190mm of solid masonry is provided under beams * * Top plates for steel columns shall extend across the full width of the beam.-TYP. THUS W10x45 Beam will require a wider top plate. Basement to be used in conjunction with all floor levels of the existing Single Family Dwelling. A secondary suite is not permitted under this building permit.
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.6 Linearized : No Create Date : 2017:02:16 12:41:38-05:00 Modify Date : 2017:02:16 12:41:38-05:00 Metadata Date : 2017:02:16 12:41:38-05:00 Producer : jPDFProcess v2013R1.03 - http://www.qoppa.com Page Count : 11EXIF Metadata provided by EXIF.tools