Building

North York District
5100 Yonge Street
Toronto, ON M2N 5V7
Tel: 4163957541
Fax: 4163957589

BUILDING PERMIT
This card must be kept posted in a conspicuous place on site of construction.

17 111886 BLD 00 SR
Site Address 123 ORCHARD VIEW BLVD
Project Description SFD - Detached;
Interior Alterations
Date Issued Thursday February 16, 2017

Ann Borooah
Chief Building Official and
Executive Director
Diane E. Damiano
Deputy Chief Building Official and
Director

Building

North York District
THIS IS YOUR PERMIT TO CONSTRUCT
PERMIT NUMBER: 17 111886 BLD 00 SR

Owner:
MARK VIMR

Address:
123 ORCHARD VIEW BLVD
TORONTO, ON M4R 1C1
CANADA

WILLIAM NOVAK

123 ORCHARD VIEW BLVD
TORONTO, ON M4R 1C1
CANADA

Project Description: SFD - Detached; Interior Alterations
Project Location:

123 ORCHARD VIEW BLVD

Ward:
The issuance of this permit is based on the drawings, specifications, details and information
submitted with the application. The submitted documents have been reviewed for compliance with
the Ontario Building Code, Zoning By-laws, applicable regulations and legislation.
The referenced permit number listed above and on your permit placard also appears on all plans
reviewed for this building permit application. The validity of this permit is restricted to the
person/company named as owner. Permit ownership cannot be transferred unless prior written
authorization is given by the Chief Building Official.
The extent of construction authorized under this permit is limited to the description contained herein as follows:
Interior alterations to basement, remove existing concrete piers and install new steel beam in basement and
washroom alteration
Stated work and use must be in accordance with the plans, specifications, building permit notes and other
information issued with this building permit. Changes to any documents submitted are not to be made unless
prior authorization is obtained from the Chief Building Official or designate. False information may be grounds
for revocation of the building permit.
Notwithstanding, it is the responsibility of the owner to comply with requirements of the Ontario Building
Code and applicable laws as well as to ensure compliance ..
The permit placard must be posted in a conspicuous place on the construction site.

Diane E. Damiano
Deputy Chief Building Official
North York District

North District Issuance Team
Issued by:
Date Issued: February 16, 2017

Please see the second page of this letter for additional requirements and inspection information.

Building

North York District

Please see the second page of this letter for additional requirements and inspection information.
WHEN YOU BEGIN DEMOLITION/CONSTRUCTION ...
Site Fencing
As soon as construction or demolition starts, your site must be entirely surrounded by a
fence which is in compliance with the City of Toronto Municipal Code Chapter 363,
Article III. The minimum requirement is plastic mesh fencing, 1.2 metres high, tied to posts
spaced no more than 1.2 metres apart with an 11 gauge top and bottom wire threaded through the
mesh and looped around each post. The Municipal Code is available on the City website at:
http://www.toronto.ca/legdocs/municode/1184_363.pdf
Construction Noise
Any construction which generates noise is prohibited in residential areas between the hours of
7:00 p.m. one day to 7:00 a.m. the next day, 9:00 a.m. on Saturdays, and all day Sunday and
Statutory holidays.
When To Call For Inspection
You are required by Division C, Part 1, Article 1.3.5.1. of the Ontario Building Code, to notify
the building inspection office at several prescribed stages of construction. Please contact the
building inspection office at the telephone number listed below, when each of the following
stages are substantially complete:
Inspection Stages
* Footings/Foundations
* Interior Final Inspection

* Structural Framing
* Occupancy

* Insulation/Vapour Barrier

To Schedule your Next Mandatory Inspection
When you are ready to book your inspection, contact your local building
inspection office by telephone at 416-395-7541. Alternatively, you may also
make contact by fax 416-696-4179 or by email to NYBldgInsp@toronto.ca.
Inspections will take place within two days commencing at the start of business on the day following
your notification (Inspection Request).
Please leave a telephone number where you can be reached or a message can be left.
The inspector assigned to your project is Simon Tang (416) 395-7549
PERMIT PLANS MUST BE ON SITE
Your permit plans and specifications must be on site at all times. Inspections are conducted with your
copy of the plans.

Building
Ann Borooah
Chief Building Official and Executive Director
February 16, 2017

Toronto Building
Toronto City Hall
12th Floor, East Tower
100 Queen Street West
Toronto, Ontario, M5H 2N2

BULLETIN - CONSTRUCTION SAFETY
The responsibilities of the City of Toronto under the Occupational Health and Safety Act apply to all our
employees regardless of the location at which they are working.
Responsibilities for the Construction Safety Regulations on construction sites are clearly spelled out in the Act
under the definitions of constructor, employer, supervisor and worker.
The City of Toronto believes that the goal of safe and injury free construction sites is a priority for all parties
involved in building construction.
Safety training for the City of Toronto Building Inspectors is mandatory. However the delivery of a safe
working environment on construction sites must include the compliance of individual builders with the
Occupational Health and Safety Act.
Safety measures include the following:
1. Temporary guards on all openings,
2. Correct use of ladders,
3. Temporary or permanent stairs above or below grade by the time the sub floor is complete,
4. Clear and safe access to the site,
5. Protection of trenches and excavation below four feet deep, and
6. Correct use of fall prevention equipment where required.
As the employer responsible for the safety of building inspectors, the City of Toronto has instructed its Building
Inspectors not to conduct inspections on sites where conditions exist that could jeopardize their health and
safety.
The following are examples of conditions which may jeopardize the health and safety of inspectors:
1. Guards are missing,
2. Ladders do not meet regulations,
3. Temporary or permanent stairs, above or below grade, to all floor levels are not provided as required.
4. Access to the site has impediments or hazards, or
5. Trenches or excavations lack required shoring or slope of bank.
Prior to calling for an inspection the appropriate safety measures shall be in place as a site inadequately
provided with these measures is not ready for inspection. The City of Toronto Building Inspectors will
cooperate with builders regarding the timing of making provision for these safety measures. However, if the
measures are not provided, an Order Not To Cover could be issued and the Ministry of Labour informed.
We look forward to working with you toward the goal of a safe environment for all workers.
Notice of Project - Please be advised that the Ministry of Labour requires a Notice of Project be filed with
them before starting any project costing $50,000 or more.
For more information about the Notice of Project form, please contact your local Ministry of Labour regional office
at 416-314-5421 or 1-800-991-7454. Ministry of Labour construction information is available on their website at:
http://www.labour.gov.on.ca/english/site/construction_info.html
Construction of the work approved in this building permit must be carried out with reasonable care to ensure
protection for everyone on the construction site from the hazards associated with all overhead and underground
power lines. Obtain further information at: http://www.torontohydro.com/powerlinesafety

TORONTO MUNICIPAL CODE 441
FEES AND CHARGES
Appendix C - Schedule 8, Toronto Building
17 111886 BLD 00 SR
123 ORCHARD VIEW BLVD
Work Proposed

Total Permit Fee

Interior Alterations

Sub

SFD - Detached
Service

Building Classification

$49.30

Index

Dollars per Square Meter

Value in Square Meters
(unless otherwise indicated)

Fee

unless otherwise indicated

B. Alterations and Renovations:
Interior Alterations (Partitions, Finishings, Etc.):
Groups C, E and F

10

4.93

Total Permit Fee
Subject to a minimum permit fee of

Page 1 of 1

As of 16/02/2017 10:11:53

49.30

$49.30
$198.59

Page 1 of 1

Building Permit 332_12
The reviewed plans and specifications must be available on site during construction/demolition. Changes to these plans and specifications
are not to be made unless prior written approval is obtained from the Chief Building Official.
The owner/permit holder is required to comply with the following Permit Notes, which are part of the reviewed permit documents:

Standards referenced in Section 1.3 of Division B shall be complied with Table 1.3.1.2.:
a) Wood - CAN/CSA- O86-01
b) Plain and Reinforced Masonry - CAN-S304-M or CSA-S304.1
c) Plain, reinforced and Pre-stressed Concrete - CAN/CSA-23.3, CAN/CSA A23.1, CAN/CSA A23.2
d) Structural Steel - CAN/CSA-S16-01
e) Parking Structures - CSA-S413
The City has relied upon the plans and drawings prepared and submitted by the owner
and their designers on this project. The issuance of a permit does not relieve the owner
and designers from the need to comply with the Ontario Building Code and referenced
standards where contravention is subsequently noted.
The City has Relied upon the plans and drawings prepared and submitted by the qualified architects and/or engineers on this project.
The issuance of a permit does not imply a complete design review of this project has been performed and does not relieve the owner and
designers from the need to comply with the Ontario Building Code and referenced standards where contravention are subsequently noted.
Footings shall rest on natural undisturbed stable soil or compacted granular fill with a minimum soil bearing capacity of 75 kPa
All structural wood elements shall be protected against termites and decay as per provisions of 9.3.2.9.

Plans reviewed for interior alterations to the
existing Single Family Dwelling. No proposed
additions or additional living space. Any other
work outside the scope of these plans is not
permitted under this building permit and must
be applied for separately.

Issuance of this permit does not permit the
enroachment onto adjacent properties, above
or below grade, including foundations, roof
overhangs and eaves.
WOOD PROTECTION REQUIREMENTSWood framing members in contact with
masonry or concrete shall be treated to
prevent decay. O.B.C. 2012, 9.23.2.2. or
separated from the concrete by min 0.05mm
polyethylene film or Type S roll roofing. O.B.
C. 2012, 9.23.2.3.

Ensure minimum 190mm of
solid masonry is provided
under beams

*

* Top plates for steel columns shall extend
across the full width of the beam.-TYP.
THUS W10x45 Beam will require a wider top
plate.

Basement to be used in conjunction with all floor levels
of the existing Single Family Dwelling. A secondary
suite is not permitted under this building permit.



Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.6
Linearized                      : No
Create Date                     : 2017:02:16 12:41:38-05:00
Modify Date                     : 2017:02:16 12:41:38-05:00
Metadata Date                   : 2017:02:16 12:41:38-05:00
Producer                        : jPDFProcess v2013R1.03 - http://www.qoppa.com
Page Count                      : 11
EXIF Metadata provided by EXIF.tools

Navigation menu