Gas Fired Hot Water Boiler 67001100100

User Manual: Gas-Fired Hot Water Boiler

Open the PDF directly: View PDF PDF.
Page Count: 36

Part Number 670 01 1001 00
GWA
This manual must only be used by a qualified heating installer/service technician. Failure to comply could result in
severe personal injury, death or substantial property damage.
When calling or writing about the boiler— Please have: • boiler model number from the boiler rating label and • CP number
from the boiler jacket. You may list the CP number in the space provided on the “Installation and service certificate” found on
page 18.
Contents Page
1 Prepare boiler location ........................................................2
2 Prepare boiler ..................................................................... 6
3 Install water piping ............................................................ 10
4 Install gas piping ............................................................... 13
5 Field wiring ....................................................................... 14
6 Start-up ............................................................................ 15
7 Checkout procedure ......................................................... 18
8 Sequence of operation — standing pilot boilers ................. 19
9 Lighting instructions — GWA standing pilot boilers ........... 20
10 Service and maintenance ................................................. 22
11 Troubleshooting ................................................................ 27
12 Replacement parts ........................................................... 29
13 Dimensions ...................................................................... 34
14 Ratings ............................................................................. 35
Boiler Manual
Gas-Fired Water Boilers
Hazards that will or can cause minor personal injury
or property damage.
Special instructions on installation, operation or
maintenance that are important but not related to
personal injury or property damage.
INSTALLER Read all instructions before
installing. Read page 2 first. Follow all instructions
in proper order to prevent personal injury or death.
Consider piping and installation when determining
boiler location.
Any claims for damage or shortage in shipment
must be filed immediately against the transportation
company by the consignee.
USER Please read the following. Failure to
comply could result in severe personal injury, death
or substantial property damage.
This manual is for use only by your qualified
heating installer/service technician.
Please see the Users Information Manual for your
reference.
Have the boiler serviced by a qualified service
technician, at least annually.
Hazards that will cause severe personal injury,
death or substantial property damage.
Hazards that can cause severe personal injury,
death or substantial property damage.
Hazard definitions
GWA
Gas-Fired Water Boilers – Boiler Manual
36 Part Number 670 01 1001 00
GWA
Gas-Fired Water Boilers Boiler Manual
2Part Number 670 01 1001 00
Installations must follow these codes:
Local, state, provincial, and national codes, laws, regulations
and ordinances.
National Fuel Gas Code, ANSI Z223.1latest edition.
Standard for Controls and Safety Devices for Automatically
Fired Boilers, ANSI/ASME CSD-1, when required.
National Electrical Code.
For Canada only: B149.1 or B149.2 Installation Code, CSA
C22.1 Canadian Electrical Code Part 1 and any local codes.
Certification
The GWA boiler gas manifold and controls met safe
lighting and other performance criteria when boiler
underwent tests specified in ANSI Z21.13latest
edition.
Before locating the boiler:
Check for nearby connection to:
System water piping
Venting connections
Gas supply piping
Electrical power
Check area around boiler. Remove any combustible materials,
gasoline and other flammable liquids.
Failure to keep boiler area clear and free of
combustible materials, gasoline and other flammable
liquids and vapors can result in severe personal
injury, death or substantial property damage.
Boiler must be installed so that gas control system components
are protected from dripping or spraying water or rain during
operation or service.
If new boiler will replace existing boiler, check for and correct
system problems, such as:
1. System leaks causing oxygen corrosion or section cracks
from hard water deposits.
2. Incorrectly-sized expansion tank.
3. Lack of antifreeze in boiler water causing system and boiler
to freeze and leak.
Codes & checklist
Failure to adhere to the guidelines below can
result in severe personal injury, death or
substantial property damage.
When servicing boiler
1. To avoid electric shock, disconnect electrical supply
before performing maintenance.
2. To avoid severe burns, allow boiler to cool before
performing maintenance.
Boiler operation
3. Do not block flow of combustion or ventilation air to boiler.
4. Should overheating occur or gas supply fail to shut off, do
not turn off or disconnect electrical supply to circulator.
Instead, shut off the gas supply at a location external to
the appliance.
5. Do not use this boiler if any part has been under water.
Immediately call a qualified service technician to inspect
the boiler and to replace any part of the control system
and any gas control that has been under water.
Boiler water
6. DO NOT use petroleum-based cleaning or sealing
compounds in boiler system. Water seal deterioration will
occur, causing leakage between boiler sections, circulator
flanges, diaphragm tanks or other system components.
This can result in substantial property damage.
7. DO NOT use "homemade cures" or "boiler patent
medicines". Serious damage to boiler, personnel and/or
property may result.
8. Continual fresh makeup water will reduce boiler life. Mineral
buildup in sections reduces heat transfer, overheats cast
iron, and causes section failure. Addition of oxygen and
other gases can cause internal corrosion. Leaks in boiler
or piping must be repaired at once to prevent makeup
water.
9. Do not add cold water to hot boiler. Thermal shock can
cause sections to crack.
Glycol potential fire hazard
All glycol is flammable when exposed to high temperatures. If
glycol is allowed to accumulate in or around the boiler or any
other potential ignition source, a fire can develop. In order to
prevent potential severe personal injury, death or substantial
property damage from fire and/or structural damage:
Never store glycol of any kind near the boiler or any
potential ignition source.
Monitor and inspect the system and boiler regularly for
leakage. Repair any leaks immediately to prevent possible
accumulation of glycol.
Never use automotive antifreeze or ethylene glycol in the
system. Using these glycols can lead to hazardous
leakage of glycol in the boiler system.
1 Prepare boiler locationRead this first!
GWA
Gas-Fired Water Boilers Boiler Manual
35Part Number 670 01 1001 00
Install GWA boilers for residential radiant panel systems, converted gravity
heating systems or other low water temperature applications per instructions
in this manual to avoid damage due to condensation.
GWA boilers are CSA design certified for installation on combustible
flooring.
GWA boilers are ASME rated for 50 psig working pressure.
14 Ratings
DOE
1. Based on standard test procedures prescribed by the United States Department of
Energy.
2. Net I=B=R ratings are based on net installed radiation of sufficient quantity for the
requirements of the building and nothing need be added for normal piping and pickup.
Ratings are based on a piping and pickup allowance of 1.15. An additional allowance
should be made for unusual piping and pickup loads.
3. See information at right for model number suffixes. Letters shown are model number
suffixes. An N after the model number designates natural gas. The letter after the
N designates the pilot ignition system S for standing pilot or I for spark-
ignited pilot. For example, a suffix NS means a natural standing pilot boiler.
4. Contact your International Comfort Products dealer regarding information and parts
for high altitude applications.
Boiler
model
number
0–2,000 feet altitude 2,000–4,500 feet altitude
(Canada) Net
I=B=R
ratings
(Btuh)
Boiler
water
content
(gallons)
DOE
Seasonal
efficiency
(% A.F.U.E)
Chimney
and
breeching
size
Input
(Btuh) DOE Heating Capacity
(Output) (Btuh) Input
(Btuh) Output
(Btuh) NS NI
(Note 3) (Note 1) (Note 4) (Note 2) (Note 3)
GWA052 52,000 43,000 46,800 37,400 37,000 1.5 80.2 83.0 4"I.D. x 20’
GWA070 70,000 58,000 63,000 50,400 50,000 1.5 80.1 82.2 4"I.D. x 20’
GWA105 105,000 88,000 94,500 75,600 77,000 2.1 80.4 82.9 5"I.D. x 20’
GWA140 140,000 117,000 126,000 100,800 102,000 2.7 80.4 82.5 6"I.D. x 20’
GWA175 175,000 145,000 157,500 126,000 126,000 3.3 80.5 82.2 6"I.D. x 20’
GWA210 210,000 175,000 189,000 151,200 151,000 3.8 80.5 81.8 7"I.D. x 20’
GWA245 245,000 202,000 220,500 176,400 176,000 4.4 80.5 81.4 7"I.D. x 20’
GWA
Gas-Fired Water Boilers Boiler Manual
3Part Number 670 01 1001 00
Service clearances
1. Provide minimum clearances for cleaning and servicing the
boiler and for access to controls and components as listed in
the table below:
2. Provide at least screwdriver clearance to jacket front panel
screws for removal of front panel for inspection and minor
service. If unable to provide at least screwdriver clearance,
install unions and shutoff valves in system so boiler can be
moved for servicing.
Figure 1 Minimum clearances
Clearances
Service clearances: Minimum
Top
(for cleaning flueways)
35"
Front
(for access to controls and components)
18"
Back 7"
Left side
(for cleaning and servicing)
24"
Right side 7"
Flooring and foundation
Flooring
The GWA boiler is approved for installation on combustible flooring,
but must never be installed on carpeting.
Do not install boiler on carpeting even if foundation is
used. Fire can result, causing severe personal injury,
death or substantial property damage.
Foundation
1. Provide a solid brick or minimum 2-inch thick concrete
foundation pad if any of the following is true:
floor can become flooded.
the boiler mounting area is not level.
2. See Table 1 for minimum foundation dimensions.
Residential garage installation
Take the following special precautions when installing the boiler in
a residential garage. If the boiler is located in a residential garage,
per ANSI Z223.1, paragraph 5.1.9:
Mount the boiler a minimum of 18 inches above the floor of the
garage to assure the burner and ignition devices will be no less
than 18 inches above the floor.
Locate or protect the boiler so it cannot be damaged by a moving
vehicle.
Minimum clearance to combustible materials
1. Hot water pipes must be at least ½" from combustible material.
2. Single-wall vent pipe must be at least 6 inches from combustible
material.
3. Type B double-wall metal vent pipe See vent manufacturers
recommendation for clearances to combustible material.
Small space installations
1. When the boiler is located in a closet or small space, provide
clearances no less than those shown in Figure 1. The clearances
are required to any surface, whether combustible or non-
combustible.
Table 1 Minimum foundation size
1 Prepare boiler location continued
Clearances from combustible materials: Minimum
Front (provide means of access) 3"
Back 7"
Left side (provide means of access) 6"
Right side 2"
Top GWA052 to GWA105
GWA140
GWA175
GWA210
GWA245
H
35"
35½"
38½"
39¾"
42½"
Boiler
model Minimum
foundation
length
Minimum
foundation
width
GWA052 25" 12"
GWA070 25" 12"
GWA105 25" 15"
GWA140 25" 18"
GWA175 25" 21"
GWA210 25" 24"
GWA245 25" 27"
GWA
Gas-Fired Water Boilers Boiler Manual
34 Part Number 670 01 1001 00
Figure 21 Dimensional drawing — ALL DIMENSIONS IN INCHES
13 Dimensions
Boiler
model
number
Supply
tapping
(inches NPT)
Return
tapping
(inches NPT)
Gas connection
& manifold size
(Note 3)
(inches NPT)
A
Vent
location
(inches)
D
Vent
diameter
(inches)
W
Jacket
width
(inches)
H
Damper
height
(inches)
GWA052
1
1
/
4
1
1
/
41
/
2
5 4 10 45
3
/
8
GWA070
1
1
/
4
1
1
/
41
/
2
5 4 10 52
3
/
8
GWA105
1
1
/
4
1
1
/
41
/
2
6
1
/
2
513 54
3
/
8
GWA140
1
1
/
4
1
1
/
41
/
2
8 6 16 57
7
/
8
GWA175
1
1
/
4
1
1
/
41
/
2
9
1
/
2
619 60
7
/
8
GWA210
1
1
/
4
1
1
/
43
/
4
11 722 62
1
/
8
GWA245
1
1
/
4
1
1
/
43
/
4
12
1
/
2
725 64
7
/
8
Note 3: Size gas piping from meter to boiler per local utility requirements.
GWA
Gas-Fired Water Boilers Boiler Manual
4Part Number 670 01 1001 00
1 Prepare boiler location continued
Failure to follow all instructions can result in flue gas
spillage and carbon monoxide emissions, causing
severe personal injury or death.
When removing boiler from existing common vent
system:
At the time of removal of an existing boiler, the following steps shall
be followed with each appliance remaining connected to the common
venting system placed in operation, while the other appliances
remaining connected to the common venting system are not in
operation.
a. Seal any unused openings in the common venting system.
b. Visually inspect the venting system for proper size and horizontal
pitch and determine there is no blockage or restriction, leakage,
corrosion or other deficiencies which could cause an unsafe
condition.
c. Test vent system Insofar as is practical, close all building
doors and windows and all doors between the space in which
the appliances remaining connected to the common venting
system are located and other spaces of the building. Turn on
clothes dryers and any appliance not connected to the common
venting system. Turn on any exhaust fans, such as range hoods
and bathroom exhausts, so they will operate at maximum speed.
Do not operate a summer exhaust fan. Close fireplace dampers.
d. Place in operation the appliance being inspected. Follow the
lighting/operating instructions. Adjust thermostat so appliance
will operate continuously.
e. Test for spillage at draft hood relief opening after 5 minutes of
main burner operation. Use the flame of a match or candle.
f. After it has been determined that each appliance remaining
connected to the common venting system properly vents when
tested as outlined above, return doors, windows, exhaust fans,
fireplace dampers, and any other gas-burning appliance to their
previous conditions of use.
Any improper operation of common venting system should be
corrected so the installation conforms with the National Fuel Gas
Code, ANSI Z223.1latest edition. Correct by resizing to approach
the minimum size as determined using the appropriate tables in
Part 11 of that code. Canadian installations must comply with B149.1
or B149.2 Installation Code.
Chimney or vent requirements
1. Venting must be installed according to Part 7, Venting of
Do not alter boiler draft hood or place any obstruction
or non-certified vent damper in breeching or vent
system. CSA certification will become void. Flue gas
spillage and carbon monoxide emissions will occur
causing severe personal injury or death.
Inspect existing chimney before installing boiler.
Failure to clean or replace perforated pipe or tile lining
will cause severe personal injury or death.
Vent system
Equipment, of National Fuel Gas Code, ANSI Z223.1latest
edition and applicable building codes. Canadian installations
must comply with B149.1 or B149.2 Installation Codes.
2. See Ratings on page 35 for minimum chimney or vent sizes.
Chimney or vent termination:
A chimney, or any vent other than a Type B vent with listed
vent cap, must extend at least 3 feet above the highest point
where it passes through a roof of a building, and at least
2 feet higher than any portion of a building within a horizontal
distance of 10 feet.
Type B vents with listed caps may terminate as in Figure 2
if no closer than 8 feet from a vertical wall or similar
obstruction.
Otherwise, Type B vents must terminate at least 2 feet above
the roof penetration and at least 2 feet higher than any portion
of a building within 10 feet.
3. A lined chimney is preferred and must be used when required
by local, state, provincial and national codes, laws, regulations
and ordinances. Vitreous tile linings with joints that prevent
retention of moisture and linings made of noncorrosive materials
are best. Advice for flue connections and chimney linings can
be obtained from local gas utility. Type B double-wall metal vent
pipe or single-wall vent pipe may be used as a liner.
4. Cold masonry chimneys, also known as outside chimneys,
typically have one or more walls exposed to outside air.
When any atmospheric gas-fired boiler with automatic vent
damper is vented through this type of chimney, the potential
exists for condensation to occur. Condensation can damage a
masonry chimney. Williamson-Thermoflo recommends the
following to prevent possible damage.
a. Line chimney with corrosion-resistant metal liner such as
AL29-4C® single-wall stainless steel or B-vent. Size liner
per National Fuel Gas Code ANSI Z223.1latest edition.
b. Provide drain trap to remove any condensate.
5. Where two or more gas appliances vent into a common
chimney or vent, equivalent area should be at least equal to
area of vent outlet on largest appliance plus 50 percent of vent
outlet area of additional appliance.
Figure 2 Terminations with Type B vent fitted with
listed cap, provided vent is at least 8 feet
from any vertical wall or similar obstruction
The following requirements apply when you remove
an existing boiler from a vent system shared with
other appliances. If the new boiler will not use the
common vent, you must test (as described below)
each remaining appliance operating by itself to
verify that the vent system operates adequately.
GWA
Gas-Fired Water Boilers Boiler Manual
33Part Number 670 01 1001 00
Figure 20 Gas control assembly
12 Replacement parts continued
Item
number Description Manufacturer Manufacturers
part number International
Comfort
Products
part number
Standing pilot Natural gas components
1Gas valve,
1
/
2
"x
1
/
2
", GWA052 through GWA175
Gas valve,
3
/
4
"x
3
/
4
", GWA210 and GWA245
Honeywell
Robertshaw
Honeywell
VR8200A2116
7200ER
VR8300C4050
511044360WT
511044256WT
2Pilot assembly kit with orifice International Comfort Products 510811005WT
3Tubing, pilot, aluminum 560742860WT
4Tubing, thermocouple 511724254WT
5Transformer relay 510312167WT
not
shown Wiring harness 591391862WT
GWA
Gas-Fired Water Boilers Boiler Manual
5Part Number 670 01 1001 00
Table 2 Corrosive contaminants and likely locations
To prevent potential of severe personal injury or death,
check for products or areas listed below before
installing boiler. If any of these contaminants are found:
Remove contaminants permanently.
OR
Isolate boiler and provide outside combustion air. See
national, provincial or local codes for further
information.
Please review the following information on potential combustion air
contamination problems.
See Table 2 for products and areas which may cause contaminated
combustion air.
Air contamination Air openings
Combustion air and ventilation openings must comply with Section
5.3, Air for Combustion and Ventilation, of National Fuel Gas Code
ANSI Z223.1latest edition, or applicable local building codes.
Canadian installations must comply with B149.1 or B149.2
Installation Codes.
See table below for minimum combustion/ventilation air opening
sizes. Where openings are required, provide two (2) openings
one within 12 inches of the ceiling, the other within 12 inches of the
floor, as shown in the table illustrations.
Provide adequate combustion and ventilation air to
assure proper combustion and reduce the risk of
severe personal injury, death or substantial property
damage caused by flue gas spillage and carbon
monoxide emissions.
Products to avoid
Spray cans containing chloro/fluorocarbons
Permanent wave solutions
Chlorinated waxes/cleaners
Chlorine-based swimming pool chemicals
Calcium chloride used for thawing
Sodium chloride used for water softening
Refrigerant leaks
Paint or varnish removers
Hydrochloric acid/muriatic acid
Cements and glues
Antistatic fabric softeners used in clothes dryers
Chlorine-type bleaches, detergents, and cleaning solvents found in
household laundry rooms
Adhesives used to fasten building products and other similar products
Areas likely to have contaminants
Dry cleaning/laundry areas and establishments
Swimming pools
Metal fabrication plants
Beauty shops
Refrigeration repair shops
Photo processing plants
Auto body shops
Plastic manufacturing plants
Furniture refinishing areas and establishments
New building construction
Remodeling areas
Garages with workshops
1 Prepare boiler location continued
GWA
Gas-Fired Water Boilers Boiler Manual
32 Part Number 670 01 1001 00
Figure 19 Trim assembly
12 Replacement parts continued
Item
number
Description Manufacturer Manufacturers
part number
International
Comfort
Products
part number
1Pressure relief valve, ASME, 30 PSIG, ¾"maleinlet
Pressure relief valve, ASME, 30 PSIG, ¾" female inlet
(Fittings shown are factory-installed on boiler.)
Conbraco
Watts 10-407-10
M330 511546920WT
Conbraco
Watts 10-408-05
335 511546924WT
2Combination pressure-temperature gauge, with 2½"short
shank Ametek
ENFM PTA-1088
4104 510218099WT
3Drain valve, ¾"
(Fittings shown are included with boiler.) Conbraco
Hammond Valve
Matco-Norca
Watts
31-606-01
710
205F04
BD-2C
511210423WT
4Circulator (Fittings shown are shipped loose with boiler.) Taco 007 511405113WT
5Circulator gasket, universal (2 per boiler) International Comfort Products 590317535WT
not
shown Circulator hardware kit, includes:
2 flanges, 4 nuts, 4 screws, 2 pipe nipples
1" NPT GWA052 through GWA140
1¼"NPTGWA175 through GW245
International Comfort Products
381354525WT
381354526WT
6Circulator wiring harness International Comfort Products 591319793WT
GWA
Gas-Fired Water Boilers Boiler Manual
6Part Number 670 01 1001 00
Air openings continued
2 Prepare boiler
Table 3 Manifold orifice sizing
Place boiler/crate near position
1. Leave boiler in crate and on pallet until installation site is
ready.
2. Move entire crate and pallet next to selected location.
3. Remove crate. Leave boiler on pallet.
4. Remove boiler from pallet as follows:
a. Tilt left side of boiler up and place a board under left legs.
b. Tilt boiler the other way and place a board under right legs.
c. Slide boiler backwards off pallet and into position.
Do not drop boiler or bump jacket on floor or pallet.
Damage to boiler can result.
5. Check level.
a. Shim legs, if necessary.
b. Do not alter legs.
Placement and setup 3. Level and straighten burners.
Burners must be properly seated in slots in burner
rest with their openings face up. Main burner orifices
must inject down center of burner. Failure to properly
seat burners will result in severe personal injury,
death or substantial property damage.
4. Reinstall access panel.
Do not operate boiler without access panel secured
in place. Failure to comply could cause momentary
flame rollout on ignition of main flame, resulting in
possible fire or personal injury hazard.
Inspect orifices and burners
1. Remove front jacket door. Remove base access panel (See
Figure 17, item 4, page 30).
2. Check for correctly-sized manifold orifices. See Table 3 for sizing.
(The orifice size is stamped on the orifice spud barrel.)
Correctly-sized manifold orifices must be used. Failure
to do so will result in severe personal injury, death or
substantial property damage.
1 Prepare boiler location continued
Exhaust fans and air movers
The appliance space must never be under a negative pressure.
Always provide air openings sized not only to the dimensions
required for the firing rate of all appliances, but also to handle the air
movement rate of the exhaust fans or air movers using air from the
building or space.
Motorized air dampers
If the air openings are fitted with motorized dampers, electrically
interlock the damper to:
Prevent the boiler from firing if the damper is not fully open.
Shut the boiler down should the damper close during boiler
operation.
To accomplish this interlock, wire an isolated contact (proving the
damper open) in series with the thermostat input to the boiler. The
boiler will not start if this contact is open, and will shut down should
it open during operation.
Location Natural gas Propane gas
U. S.
Sea level
2,000 ft over
2,000 ft Sea level
2,000 ft over
2,000 ft
2.00 mm (Note 1) 1.30 mm (Note 1)
Canada
Sea level
2,000 ft 2,000
4,500 Sea level
2,000 ft 2,000
4,500
2.00 mm #49 1.30 mm #56
Note 1: For U. S. elevations above 2,000 feet, contact your International Com-
fort Products supplier for details.
GWA
Gas-Fired Water Boilers Boiler Manual
31Part Number 670 01 1001 00
Figure 18 Jacket assembly
12 Replacement parts continued
The boiler contains ceramic fiber and fiberglass materials. Use care when handling these materials per
instructions on page 23 of this manual. Failure to comply could result in severe personal injury.
Item
number Description International
Comfort
Products
part number
1Junction box, 4 x 4
(Available at local supply house)
1a Junction box, 2 x 4
(Available at local supply house)
2Jacket panel, left side, with
insulation 431223425WT
3Jacket panel, right side, with
insulation 431223426WT
4Jacket
panel,
door
GWA052 & GWA070
GWA105
GWA140
GWA175
GWA210
GWA245
431223450WT
431223451WT
431223452WT
431223453WT
431223454WT
431223455WT
Item
number Description International
Comfort
Products
part number
5Jacket
panel, top GWA052 & GWA070
GWA105
GWA140
GWA175
GWA210
GWA245
431223433WT
431223434WT
431223435WT
431223436WT
431223437WT
431223438WT
6Jacket
cross tie GWA052 & GWA070
GWA105
GWA140
GWA175
GWA210
GWA245
431223507WT
431223508WT
431223509WT
431223510WT
431223511WT
431223512WT
7Jacket
panel,
interior,
with
insulation
GWA052 & GWA070
GWA105
GWA140
GWA175
GWA210
GWA245
431223427WT
431223428WT
431223429WT
431223430WT
431223431WT
431223432WT
8Jacket
panel,
rear, with
insulation
GWA052 & GWA070
GWA105
GWA140
GWA175
GWA210
GWA245
431223444WT
431223445WT
431223446WT
431223447WT
431223448WT
431223449WT
GWA
Gas-Fired Water Boilers Boiler Manual
7Part Number 670 01 1001 00
Perform hydrostatic pressure test
Pressure test boiler before attaching water or gas piping or electrical
supply (except as noted below).
Prepare boiler for test
1. Remove the shipping nipple (from GWA supply tapping) and
remove the boiler relief valve. Temporarily plug the relief valve
tapping with a ¾" NPT pipe plug.
2. Remove 1¼" nipple, reducing tee and drain valve from
accessory bag. Install in boiler return connection as shown on
in Figure 19, item 3, page 32. Install circulator on either the
return or supply.
3. Remove 1¼" nipple, 1¼" tee, bushing and pressure/temperature
gauge from accessory bag. Pipe to boiler supply connection as
shown in Figure 19, item 2, page 32. (Use pipe dope sparingly.)
4. Connect a hose to boiler drain valve, the other end connected
to a fresh water supply. Make sure hose can also be used to
drain boiler after test.
5. Connect a nipple and shutoff valve to system supply connection
on the 1¼" tee. This valve will be used to bleed air during the fill.
(Valve and nipple are not included with boiler.)
6. Connect a nipple and shutoff valve to system return connection
(at circulator flange if circulator installed on return). This valve
will be used to bleed air during the fill. (Valve and nipple are not
included with boiler.)
7. Temporarily plug the air elimination tapping (next to supply
tapping).
2 Prepare boiler continued
Pressure test
Fill and pressure test
1. Open the shutoff valves you installed on supply and return
connections.
2. Slowly open boiler drain valve and fresh water supply to fill
boiler with water.
3. When water flows from shutoff valves, close boiler drain valve.
4. Close shutoff valves.
5. Slowly reopen boiler drain valve until test pressure of not more
than 45 psi is reached on the pressure/temperature gauge.
6. Test at no more than 45 psi for no more than 10 minutes.
Do not leave boiler unattended. A cold water fill could
expand and cause excessive pressure, resulting in
severe personal injury, death or substantial property
damage.
7. Make sure constant gauge pressure has been maintained
throughout test. Check for leaks. Repair if found.
Leaks must be repaired at once. Failure to do so can
damage boiler, resulting in substantial property
damage.
Do not use petroleum-based cleaning or sealing
compounds in boiler system. Severe damage to boiler
will occur, resulting in substantial property damage.
Drain and remove fittings
1. Disconnect fill water hose from water source.
2. Drain boiler at drain valve or out hose, whichever provides best
access to drain. Remove hose after draining if used to drain
boiler.
3. Remove nipples, valves and plus unless they will remain for
use in the system piping.
4. Remove plug from relief valve tapping. See Section 3, page 10,
to replace relief valve.
GWA
Gas-Fired Water Boilers Boiler Manual
30 Part Number 670 01 1001 00
Figure 17 Base assembly, manifold, orifices and burners
12 Replacement parts continued
Item
number Description International
Comfort
Products
part number
Base assembly kit GWA052 & GWA070
GWA105
GWA140
GWA175
GWA210
GWA245
381354200WT
381354201WT
381354202WT
381354203WT
381354204WT
381354205WT
1Base side panel (in Base assembly)
2Base front cross-tie assembly (in Base assembly)
3Base back cross-tie assembly (in Base assembly)
4Base access panel (in Base assembly)
5Base pan angle, left side (in Base assembly)
6Base pan angle, right side (in Base assembly)
7Base pan (in Base assembly)
8Burner rest (in Base assembly)
9Base insulation kit
(includes insulation for
all base parts above
plus gasket material
needed between block
assembly and base)
GWA052 to GWA140
GWA175 to GWA245 381354210WT
381354211WT
10 Boiler leg kit 590424252WT
11 Manifold GWA052
GWA070
GWA105
GWA140
GWA175
GWA210
GWA245
591126615WT
591126616WT
591126617WT
591126618WT
591126619WT
591126556WT
591126557WT
12 Main burner orifice, sea level 560528997WT
13 Burner, stainless steel 512200077WT
14 Burner with pilot
bracket
(not shown)
Standing pilot 512200079WT
Spark-ignited pilot 512200078WT
15 Screw, 10-32 x 3/8STP type D hx, washer head
slot ZP available at
local supply
house
16 Rollout thermal fuse element 512050230WT
GWA
Gas-Fired Water Boilers Boiler Manual
8Part Number 670 01 1001 00
1. Connect from draft hood or vent damper outlet to chimney or
vent with same size vent connector.
2. Where possible, vertical venting to the outside from the draft
hood or vent damper outlet will offer best performance.
3. Where horizontal vent connector is used, slope upward at least
¼" per lineal foot toward chimney or vent and support with
hangers to prevent sagging.
4. Breeching must not be connected to any portion of a mechanical
draft system that can operate under positive pressure.
Long horizontal vent connector, excessive number
of elbow or tees, or other obstructions that restrict
the flow of combustion gases should be avoided.
Severe personal injury, death or substantial property
damage could result.
Install vent piping
These systems are used on gas-fired boilers with
vent dampers as shipped from factory. Boiler will not
operate without vent damper installed.
Only vent dampers listed in the Replacement parts
list on page 29 are certified for use with GWA boilers.
Any other vent damper installed could cause severe
personal injury or death.
Damper blade
Standing pilot ignition systems See vent manufacturers
instructions to install plug (shipped with damper) in damper hole.
For standing pilot boilers only, install plug with 3
/8" diameter hole in
vent damper hole.
Spark-ignited pilot systems See vent manufacturers
instructions to install plug (shipped with damper) in damper hole.
For spark-ignited pilot boilers only, install plug with no hole in vent
damper hole.
Minimum clearances
Provide a minimum of 6" between the vent damper and any
combustible material. (See Minimum clearance to combustible
materials, page 3, for minimum clearance from jacket top to ceiling
to maintain this dimension.)
Vent damper
Draft hood installation
1. Orient draft hood with spill switch mounting holes to front of
boiler as shown in Figure 3.
2. Secure draft hood to outlet at top of boiler with sheet metal
screws.
Figure 3 Spill switch with wire harness
Draft hood & spill switch
3. Bottom of draft hood or skirt must have clearance dimension
above jacket top panel as indicated on draft hood.
Do not alter boiler draft hood or place any
obstruction or non-approved vent damper in
breeching or vent system. CSA certification will
become void. Flue gas spillage and carbon
monoxide emissions will occur causing severe
personal injury or death.
Improper orientation of spill switch may cause
boiler to shut down. The loss of heat can result in
significant damage due to freezing.
Spill switch installation
1. Fasten spill switch to draft hood as shown in Figure 3.
2. See Wiring diagram to connect wires:
a. Standing pilot boiler see page 19.
b. Spark-ignited pilot boiler see Control Supplement.
2 Prepare boiler continued
GWA
Gas-Fired Water Boilers Boiler Manual
29Part Number 670 01 1001 00
Figure 16 Section assembly, flue collector, draft hood and vent damper
12 Replacement parts
Item
number
Description International
Comfort
Products
part number
not shown Replacement
section
assembly
GWA052
GWA070
GWA105
GWA140
GWA175
GWA210
GWA245
321114501WT
321114501WT
321114502WT
321114503WT
321114504WT
321114505WT
321114506WT
1Radiation plate
(1 per joint)
460003700WT
2Collector
hood
GWA052
GWA070
GWA105
GWA140
GWA175
GWA210
GWA245
381354625WT
381354626WT
381354627WT
381354628WT
381354629WT
381354630WT
381354631WT
3Draft hood GWA052
GWA070
GWA105
GWA140
GWA175
GWA210
GWA245
450021270WT
450021271WT
450021272WT
450021273WT
450021274WT
450021275WT
450021276WT
Item
number
Description International
Comfort
Products
part number
4High limit, 30°differential,
with well
Honeywell L4080D1036
White-Rodgers 11B81-3
510312250WT
5Spill switch 510350105WT
6Vent
damper
4" GWA052
GWA070
Effikal RVGP-KS-4BKF
*Johnson Controls Q35GB-2
510512350WT
5" GWA105 Effikal RVGP-KS-5BKF
*Johnson Controls Q35GD-2
510512351WT
6" GWA140
GWA175
Effikal RVGP-KS-6BKF
*Johnson Controls Q35GF-2
510512352WT
7" GWA210
GWA245
Effikal RVGP-KS-7BKF
*Johnson Controls Q35GH-2
510512353WT
*Johnson Controls damper assemblies consist of M35BC
actuator and Y15 vent pipe
7Vent damper actuator Effikal RVGP
Johnson M35BE-1C
only with vent
damper above
8Vent damper harness 591391795WT
GWA
Gas-Fired Water Boilers Boiler Manual
9Part Number 670 01 1001 00
Figure 4 Vent damper assemblies
Damper installation
Do not modify draft hood or vent damper, or make
another connection between draft hood and vent
damper or boiler except as noted below. This will void
CSA certification and will not be covered by
Williamson-Thermoflo warranty. Any changes will
cause severe personal injury, death or substantial
property damage.
1. Install vent damper horizontally or vertically as shown in vent
damper manufacturers instructions. Vent damper must be
installed so that it serves only one boiler and so damper blade
indicator is visible to the user. See Figure 4.
2. Screws or rivets used to secure the vent damper to the draft
hood must not interfere with rotation of the damper blade.
3. Install damper harness between damper actuator and hole in
jacket left side panel. See Figure 3, page 8.
Use strain relief connectors and locknuts to secure both ends
of damper harness.
Keep wiring harness clear of all hot surfaces. Wire
insulation could be damaged, causing risk of electrical
short-circuit.
4. Read and apply the harness plug warning label (shown upper-
left) so that it is visible after installation
5. Plug damper harness receptacle into damper harness plug.
Bypassing (jumpering) vent damper will cause flue
products such as carbon monoxide to escape into
the house. This will cause severe personal injury or
death.
After boiler has operated once, if either end of harness
is disconnected, the system safety shutdown will
occur. The boiler will not operate until harness is
reconnected.
Effikal damper Damper hold open switch must be
in Automatic Operation position for system to operate
properly.
Vent damper continued
2 Prepare boiler continued
GWA
Gas-Fired Water Boilers Boiler Manual
28 Part Number 670 01 1001 00
Is 24VAC present across transformer terminals C & Y?
Is damper harness securely plugged in at both ends?
Secure connections.
Check for open thermostat, LWCO, high limit, spill switch or
rollout thermal fuse element contacts or check for loose
wire connections.
If LWCO, spill switch or rollout thermal fuse
element contacts are open, determine cause
and correct condition. Failure to do so will
cause severe personal injury, death or
substantial property damage.
Check/repair out of round stack section.
Does vent damper rotate open?
Is 24VAC present across transformer terminal C and yellow
wire on vent damper connector?
Is 24VAC present across gas valve terminals?
Open thermostat contacts for 30 seconds. Vent damper will
rotate to closed position. Close thermostat contacts. Vent
damper will rotate to open position.
Is 24VAC present across gas valve terminals?
Remove damper harness from
damper harness plug.
TEMPORARILY install jumper
between terminal 2 and
terminal 5 on damper plug in
boiler wiring harness. See
Table, right.
Does boiler fire?
No Yes
No Yes
Chart 1 — Standing pilotBoiler will not fire
Check for loose wire connections or bad relay on
transformer.
No Yes
Is vent damper rotated open?
No Yes
No Yes
Replace actuator.
Retest.
Check continuity of each wire in damper harness.
Does
continuity exist for each wire?
See Table right.
Replace damper
wiring harness.
Retest.
Replace gas valve.
Retest.
Is main flame on now?
No Yes
Retest.
No Yes
No Yes
No Yes
No Yes
Replace damper actuator.
Retest.
Turn gas valve cock to
ON position.
Retest.
Replace gas valve.
Retest.
Is gas valve cock turned to ON position?
No Yes
Before proceeding, follow "Troubleshooting sequence" on page 27. If problem persists, then:
11 Troubleshooting continued
GWA
Gas-Fired Water Boilers Boiler Manual
10 Part Number 670 01 1001 00
Table 4 Water pipe size (based on 20 °F rise)
General
If installation is to comply with ASME or Canadian requirements,
an additional high temperature limit is needed. Install control in supply
piping between boiler and isolation valve. Set second control to
minimum 20 °F above setpoint of first control. Maximum allowable
setpoint is 240 °F. See page 19 for wiring.
A low water cutoff device is required when boiler is installed above
radiation level or by certain state or local codes or insurance
companies. Use low water cutoff designed for water installations.
Electrode probe-type is recommended. Purchase and install in tee
supply piping above boiler.
Use backflow check valve in cold water supply if required by local
codes.
See Table 4 and Figure 5 (diaphragm-type or bladder-type expansion
tank) or Figure 6 (closed-type expansion tank) on page 11 for near-
boiler piping for systems designed for return water at least 130 °F.
See page 12 (Figures 8 and 9) for near-boiler piping for low-
temperature or high-volume systems.
See page 11 (Figure 7) for boilers used with refrigeration systems.
Near-boiler piping
3 Install water piping
Relief valve
Install relief valve vertically in ¾" tapping on side of boiler. See the
tag attached to the relief valve for manufacturers instructions.
To avoid water damage or scalding due to valve
operation, discharge line must be connected to relief
valve outlet and run to a safe place of disposal.
Terminate the discharge line to eliminate possibility
of severe burns should the valve discharge.
Discharge line must be as short as possible and be
the same size as the valve discharge connection
throughout its entire length.
Discharge line must pitch downward from the valve
and terminate at least 6" above the floor drain where
any discharge will be clearly visible.
The discharge line shall terminate plain, not threaded,
with a material serviceable for temperatures of 375 °F
or greater.
Do not pipe the discharge to any place where freezing
could occur.
No shutoff valve shall be installed between the relief
valve and boiler, or in the discharge line. Do not plug
or place any obstruction in the discharge line.
Failure to comply with the above guidelines could
result in failure of the relief valve to operate, resulting
in possibility of severe personal injury, death or
substantial property damage.
Test the operation of the valve after filling and
pressurizing system by lifting the lever. Make sure
the valve discharges freely. If the valve fails to operate
correctly, replace it with a new relief valve.
Water piping multiple zone systems
Install system piping using either circulator zoning or zone valve
zoning. Install expansion tank on suction side of system circulator.
Always connect fill line only at the expansion tank never at
another point in the system.
Circulator
The circulator is shipped loose (wiring pre-attached to boiler) to
allow you to locate it either in the return or supply piping, as desired.
See page 11 for a typical installation. Pipe the expansion tank to
the suction side of the circulator whenever possible. Install an air
separator in the supply piping. Connect the expansion tank to the
air separator only if the separator is on the suction side of the
circulator. Always install the system fill connection at the same point
as the expansion tank connection to the system. Figures 5 and 6
show typical near-boiler piping connections.
Expansion tank
Diaphragm-type or bladder-type expansion tank
Figure 5
1. Ensure expansion tank size will handle boiler and system water
volume and temperature. Tank must be located in boiler return
piping as close to boiler as possible, before inlet side of circulator.
See tank manufacturers instructions for details.
2. Install an automatic air vent as shown.
Closed-type expansion tank Figure 6
1. Ensure expansion tank size will handle boiler and system water
volume and temperature. See tank manufacturers instructions
for details.
2. Connect tank to ½" NPT tapping located behind supply outlet,
using ½" NPT piping. Pitch any horizontal piping up towards
tank 1 inch per 5 feet of piping.
Undersized expansion tanks cause system water to
be lost from relief valve and makeup water to be
added through fill valve. Eventual section failure can
result.
Near-boiler piping continued
Boiler model
number To
system From
system
GWA052 ¾"¾"
GWA070 1" 1"
GWA105 1" 1"
GWA140 1" 1"
GWA175 1¼" 1¼"
GWA210 1¼" 1¼"
GWA245 1½" 1½"
GWA
Gas-Fired Water Boilers Boiler Manual
27Part Number 670 01 1001 00
11 Troubleshooting
Verify proper operation after servicing. See vent
damper manufacturers instructions packed with vent
damper for additional information. Failure to comply
could result in severe personal injury, death or
substantial property damage.
Figure 15 Manually opening vent damper
Label all wires prior to disconnection when servicing
controls. Wiring errors can cause improper and
dangerous operation.
Never jumper (bypass) rollout thermal fuse element
or any other device except for momentary testing as
outlined in Chart 1, page 28. Severe personal injury,
death or substantial property damage can result.
Burner access panel must be in position during boiler
operation to prevent momentary flame rollout on
ignition of main flame. Severe personal injury or
substantial property damage will result.
Before troubleshooting:
1. Have the following items:
a. Voltmeter that can check 120 VAC and 24 VAC.
b. Microammeter with a scale range of 0-10.
c. Continuity checker.
d. U-tube manometer.
2. Check for 120 VAC (minimum 102 VAC to maximum 132 VAC)
to boiler.
3. Make sure thermostat is calling for heat and contacts (including
appropriate zone controls) are closed. Check for 24 VAC
between thermostat wire nuts and ground.
Troubleshooting sequence:
1. Before proceeding, check for:
Loose connections, blown fuse or service switch off?
High limit switch set below boiler water temperature?
Thermostat set below room temperature?
Gas not turned on at meter or boiler?
Incoming gas pressure less than:
5" w.c. for natural gas? 11" w.c. for propane gas?
2. If all of the above check correctly, check gas pressures:
a. With boiler off
13" w.c. maximum natural or propane gas pressure
upstream of gas valve.
b. With boiler on:
5" w.c. minimum natural gas pressure or 11" w.c.
propane gas pressure upstream of gas valve.
3.5" w.c. minimum natural gas pressure or 10" w.c.
propane gas pressure downstream tapping on gas
valve Can be adjusted by regulator on gas valve.
c. If gas pressure is incorrect or gas is not available to boiler,
contact gas supplier to correct before proceeding further.
3. Check pilot operation - Follow Lighting Instructions, pages 20
and 21.
If gas is available and you cannot obtain a pilot flame, try
purging the gas line and cleaning pilot and pilot gas tubing.
Follow Lighting Instructions again. If you still cannot obtain
a flame, replace pilot burner and gas tubing. If this does not
allow you to obtain a pilot flame, replace gas valve.
If you obtain a pilot flame, but pilot will not remain on, replace
thermocouple. If this does not correct problem, replace gas
valve and pilot burner.
If pilot stays on, but main gas will not come on, proceed to
page 28.
In event of vent damper failure:
Effikal vent damper
If troubleshooting chart recommends replacing actuator and actuator
is not immediately available, damper blade can be fixed in an open
position to allow boiler operation. Manually turning blade can cause
actuator damage. Follow these instructions only in case of no heat
or damper actuator malfunction.
1. Move damper service switch to Hold Damper Open position.
Apply call for heat to boiler. Damper blade should then rotate to
Open position and boiler will fire.
2. If step 1 does not open damper, manually rotate damper blade
to open position using wrench or pliers on flat shaft between
damper and actuator. Boiler will fire. Verify that damper service
switch is in Hold Damper Open position. (Figure 15)
3. Do not leave vent damper permanently in this position. Replace
actuator immediately. If vent damper is left in Open position,
boiler will not operate at published efficiencies.
Johnson Controls vent damper
If troubleshooting chart recommends replacing actuator and actuator
is not immediately available, damper blade can be fixed in an open
position to allow boiler operation. Follow these instructions only in
case of no heat or damper actuator malfunction. See Figure 15.
1. Turn off power to boiler.
Failure to turn off power to boiler can result in severe
personal injury, death or substantial property damage.
2. See vent damper manufacturers instructions for procedure to
fix vent damper in open position.
3. Turn on power to boiler.
4. Using wrench or pliers on flat shaft section, manually rotate
damper blade until green light turns on. Boiler will fire. (Figure 15)
5. Do not leave vent damper permanently in this position. Replace
actuator immediately. If vent damper is left in Open position,
boiler will not operate at published efficiencies.
GWA
Gas-Fired Water Boilers Boiler Manual
11Part Number 670 01 1001 00
Near-boiler piping continued
Figure 7 Piping refrigeration systems
Water piping refrigeration systems
Prevent chilled water from entering boiler
Install boiler so that chilled medium is piped in parallel with the
heating boiler. Use appropriate valves to prevent chilled medium
from entering boiler. See Figure 7 for typical installation of balancing
valve and check valve.
If system includes radiant heating circuits, provide
piping and controls to regulate the temperature
supplying the radiant circuits. Failure to comply could
result in substantial property damage.
Use Figure 5 or Figure 6 only for systems designed
for return water at least 130 °F. For systems with low
return water temperature possible, such as
converted gravity systems and radiant heating
systems, install bypass piping (see page 12) to
protect boiler against condensation. Failure to prevent
low return water temperature to the boiler could cause
corrosion of the boiler sections or burners, resulting
in severe personal injury, death or substantial
property damage.
Install boiler so that chilled medium is piped in parallel
with heating boiler (Figure 7). Use appropriate valves
to prevent chilled medium from entering boiler. Consult
I=B=R Installation and Piping Guides.
If boiler is connected to heating coils located in air
handling units where they can be exposed to
refrigerated air, use flow control valves or other
automatic means to prevent gravity circulation during
cooling cycle. Circulation of cold water through the
boiler could result in damage to the heat exchanger,
causing possible severe personal injury, death or
substantial property damage.
Figure 6 Closed-type expansion tank: Piping to
single-zone system using closed-type
expansion tank. See Table 4 for piping sizes.
Figure 5 Diaphragm- or bladder-type expansion tank:
Piping to single-zone system using
diaphragm-type or bladder-type expansion
tank. See Table 4 for piping sizes.
3 Install water piping continued
GWA
Gas-Fired Water Boilers Boiler Manual
26 Part Number 670 01 1001 00
10 Service and maintenance continued
Check/test. . . . . . . . . . continued
Diaphragm- or bladder-type welded gas tight with a rubber
membrane to separate the tank pressurizing air and the water.
May be located at any point in the system, but most often found
near the boiler.
Systems with this type of expansion tank require at least
one automatic air vent, preferably located on top of an air
eliminator, as shown in examples in Manual Section 3,
page 10.
2. If relief valve has tended to weep frequently, the expansion tank
may be waterlogged or undersized.
Closed-type tank tank is most likely waterlogged. Install a
tank fitting if not already installed. Then check fill level per fitting
manufacturers instructions. If fill level is correct, check tank
size against manufacturers instructions. Replace with a larger
tank if necessary.
Diaphragm- or bladder-type first, check tank size to be
sure it is large enough for the system. If size is too small, add
additional tank(s) as necessary to provide sufficient expansion.
If tank size is large enough, remove tank from system and
check charge pressure (usually 12 psig for residential
applications). If tank wont hold pressure, membrane has been
damaged. Replace tank.
Boiler relief valve
1. Inspect the relief valve and lift the lever to verify flow as in the
following warnings, excerpted from a relief valve manufacturers
warning label. Before operating any relief valve, ensure that it is
piped with its discharge in a safe area to avoid severe scald
potential. Read Manual Section 3, page 10, before proceeding
further.
2. After following the preceding warning directions, if the relief valve
weeps or will not seat properly, replace the relief valve. Ensure
that the reason for relief valve weeping is the valve and not
over-pressurization of the system due to expansion tank
waterlogging or undersizing.
Review with owner
1. Review the Users Information Manual with the owner.
2. Emphasize the need to perform the maintenance schedule
specified in the Users Information Manual (and in this manual
as well).
3. Remind the owner of the need to call in a licensed contractor
should the boiler or system exhibit any unusual behavior.
4. Remind the owner to follow the proper shutdown procedure
and to schedule an annual start-up at the beginning of the next
heating season.
The boiler contains ceramic fiber and fiberglass
materials. Use care when handling these materials
per instructions on page 23 of this manual. Failure to
comply could result in severe personal injury.
1. Shut down boiler:
Follow To Turn Off Gas to Appliance instructions on boiler
and Lighting or Operating Instructions.
Do not drain boiler unless it will be exposed to freezing
temperatures. If using antifreeze in system, do not drain.
2. Follow shutdown procedure.
3. Remove venting system connection to boiler.
4. Remove top jacket panel. Turn back insulation.
5. Remove flue collector. Clean sealant from assembly and
sections.
6. Remove radiation plates hanging between sections.
7. Remove burners from base. Brush and vacuum burners to
remove all dust and lint. Verify that all burner ports are free of
debris.
8. Place newspapers in base of boiler to collect soot.
9. Clean between sections with wire flue brush.
10. Remove newspaper and soot. Vacuum or brush base and
surrounding area.
11. Reinstall radiation plates.
12. Replace collector box/transition assembly. Seal with sealant.
Obtain gas-tight seal to prevent flue gas spillage and carbon
monoxide emissions, resulting in severe personal injury or death.
13. Replace insulation and jacket top panel.
14. Start up boiler following section 6, pages 1517 of this manual
and the boiler Lighting Instructions, pages 20 and 21.
Excessive sooting indicates improper gas combustion. If found,
check for proper combustion and make any necessary
adjustments.
Cleaning boiler heating surfaces
Safety relief valves should be reinspected AT LEAST
ONCE EVERY THREE YEARS, by a licensed plumb-
ing contractor or authorized inspection agency, to
ensure that the product has not been affected by
corrosive water conditions and to ensure that the
valve and discharge line have not been altered or
tampered with illegally. Certain naturally occurring
conditions may corrode the valve or its components
over time, rendering the valve inoperative. Such con-
ditions are not detectable unless the valve and its
components are physically removed and inspected.
This inspection must only be conducted by a plumb-
ing contractor or authorized inspection agency not
by the owner. Failure to reinspect the boiler relief valve
as directed could result in unsafe pressure buildup,
which can result in severe personal injury, death or
substantial property damage.
Following installation, the valve lever must be oper-
ated AT LEAST ONCE A YEAR to ensure that wa-
terways are clear. Certain naturally occurring min-
eral deposits may adhere to the valve, rendering it
inoperative. When manually operating the lever, wa-
ter will discharge and precautions must be taken to
avoid contact with hot water and to avoid water dam-
age. Before operating lever, check to see that a dis-
charge line is connected to this valve directing the
flow of hot water from the valve to a proper place of
disposal otherwise severe personal injury may re-
sult. If no water flows, valve is inoperative. Shut down
boiler until a new relief valve has been installed.
GWA
Gas-Fired Water Boilers Boiler Manual
12 Part Number 670 01 1001 00
Figure 8 System bypass piping in boiler loop with
separate system circulator, using primary/
secondary piping.
Figure 9 Boiler bypass piping use only for high
water content systems DO NOT use for
radiant panel systems.
Near-boiler piping continued
Install all components specified above and adjust valves as described to prevent low temperature in the boiler. Failure to
prevent low water temperature in the boiler could cause corrosion of the boiler sections or burners, resulting in severe
personal injury, death or substantial property damage.
3 Install water piping continued
System bypass method
1. Apply bypass piping of Figure 8 to high water content systems,
radiant panel systems or any system that is likely to operate
with low return water temperature for extended periods.
2. The bypass arrangement shown protects the boiler from damage
caused by condensate corrosion due to low return water
temperature and protects low temperature systems from too
high a supply temperature.
3. Adjust the bypass valves as indicated below.
Adjust Bypass valves 1 and 2 as follows:
1. Start with valve 2 fully closed, valve 1 fully open.
2. Slowly open valve 2 while closing valve 1. Adjust the valves
until the boiler pressure/temperature gauge reads 160 °F or
higher. As you open the valves, pause long enough to allow
temperatures to level off. It takes a while for the boiler water
temperature to rise as the flow changes.
3. Bypass valve 2 allows hot boiler outlet water to blend with colder
return water, raising the supply temperature to the boiler. Bypass
valve 1 balances the pressure drop through valve 2.
4. The purpose of this piping is to raise the return water temperature
to the boiler enough to prevent condensation of flue gases.
Boiler bypass method
1. Apply bypass piping of Figure 9 to high water content systems,
such as converted gravity systems.
2. The bypass arrangement shown protects the boiler from damage
caused by condensate corrosion due to low return water
temperature. This method does not provide protection from high
temperature water being supplied to the system.
3. DO NOT apply this piping to radiant panel systems.
4. Adjust the bypass valves as indicated below.
Adjust Bypass valves 1 and 2 as follows:
1. Start with valve 1 fully closed, valve 2 fully open.
2. Slowly open valve 1 while closing valve 2. Adjust the valves
until the boiler pressure/temperature gauge reads approximately
60 °F higher than the system temperature gauge. As you open
the valves, pause long enough to allow temperatures to level
off. It takes a while for the boiler water temperature to rise as
the flow changes.
3. Bypass valve 1 controls system flow rate. Bypass valve 2
controls flow through the boiler.
4. The purpose of this piping is to cause a high enough temperature
rise in the boiler that the average temperature will be warm
enough to prevent condensation of flue gases.
GWA
Gas-Fired Water Boilers Boiler Manual
25Part Number 670 01 1001 00
Check/test. . . . . . . . . .
Air vents and air elimination
1. Inspect automatic air vents (if used). Also inspect air separators
to ensure they are operational.
2. The cap must be unscrewed one turn to allow air to escape.
3. If the air vent is leaking, remove cap and briefly push valve
then release to clean the valve seat.
4. Replace cap by twisting all the way onto valve and then
unscrewing one turn.
Limit controls and cutoffs
1. Inspect and test the boiler limit control. Verify operation by turning
control set point below boiler temperature. Boiler should cycle
off. Return dial to original setting.
2. Inspect and test additional limit controls or low water cutoffs
installed on system.
Expansion tank
1. Expansion tanks provide space for water to move in an out as
the heating system water expands due to temperature increase
or contracts as the water cools. Tanks may be open, closed or
diaphragm or bladder type. See Section 3, page 10 of this
manual for suggested locations of expansion tanks and air
eliminators.
Open-type located above highest radiator or baseboard unit,
usually in the attic or closet. Has a gauge glass and overflow
pipe to a drain.
Closed-type welded gas tight and located above boiler. Tank
is partially filled with water, leaving an air cushion for expansion.
Make sure this type of tank is fitted with a tank fitting, such
as the B & G Tank-Trol or Taco Taco-Trol. This fitting reduces
gravity circulation of air-saturated tank water back to the
system and prevents the air from bubbling up through the
water as it returns from the system.
Do not use automatic air vents in systems with closed-type
tanks. The air will escape from the system instead of
returning to the tank. Eventually, the tank will waterlog and
no longer control pressurization. The boiler relief valve will
weep frequently.
10 Service and maintenance continued
Check/test. . . . . . . . . .
Gas piping
1. Sniff near floor and around boiler area for any indication of a
gas leak.
2. Test gas piping using bubble test, per Section 4, page 13 of this
manual, if there is any indication of a leak.
Cold fill and operating pressures
1. While the system is cold, note the pressure reading on the boiler
pressure/temperature gauge. Verify that cold fill pressure is
correct.
2. Watch the pressure as the boiler and system heat up to ensure
pressure rise is normal. Too high a rise would indicate a
waterlogged or undersized expansion tank.
Start-up. . . . . . . . . .
1. Perform start-up procedures Section 6, pages 1517, including
Verify operation of burners and vent damper on page 17.
2. Verify cold fill pressure is correct and that fill system is working
properly.
3. Verify antifreeze level (if used) is at the right concentration and
that inhibitor level is correct.
4. Check gas piping, per Manual Section 4, page 13 and Section
6, page 15, verifying no indications of leakage and all piping
and connections are in good condition.
5. Read the Lighting or Operating Instructions (Manual Section 9,
pages 20 and 21 or Control Supplement) applying to the boiler.
6. Start the boiler following the Lighting or Operating Instructions
(Manual Section 9, pages 20 and 21 or Control Supplement).
Oiled-bearing circulators
1. The circulator shipped with the GWA boiler is water-lubricated.
No oiling is required.
2. Check other circulators in the system. Oil any circulators
requiring oil, following circulator manufacturers instructions.
Over-oiling will damage the circulator.
Service. . . . . . . . . .
GWA
Gas-Fired Water Boilers Boiler Manual
13Part Number 670 01 1001 00
Table 5 Pipe capacity for 0.60 specific gravity natural gas
4 Install gas piping
Natural Gas:
1. See Table 5 for pipe length and diameter. Base on rated
boiler input (divide by 1,000 to obtain cubic feet per hour).
Table 5 is only for gas with specific gravity 0.60, with a
pressure drop through the gas piping of 0.30" w.c. For
additional gas pipe sizing information, see ANSI Z223.1
(B149.1 or B149.2 for Canadian installations).
2. Inlet pressure required at gas valve inlet:
Maximum: 13" w.c.
Minimum: 5" w.c.
Manifold gas pressure: 3.5" w.c.
3. Install 100% lockup gas pressure regulator in supply line if
inlet pressure exceeds 13" w.c. Adjust for 13" w.c. maximum.
Propane Gas:
1. Contact gas supplier to size pipes, tanks and 100% lockup
gas pressure regulator.
2. Adjust propane supply regulator provided by gas supplier
for 13" w.c. maximum pressure.
3. Inlet pressure required at gas valve inlet:
Maximum: 13" w.c.
Minimum: 11" w.c.
Manifold gas pressure: 10" w.c.
Gas pipe
length
(feet)
Capacity of pipe for pipe size of:
(Capacity in standard cubic feet gas per hour)
½" ¾" 1" 1¼" 1½"
10 132 278 520 1050 1600
20 92 190 350 730 1100
30 73 152 285 590 860
40 63 130 245 500 760
50 56 115 215 440 670
75 45 93 175 360 545
100 38 79 150 305 460
150 31 64 120 250 380
1. Remove jacket front panel and see Figure 10 to pipe gas to
boiler.
a. Install drip leg at inlet of gas connection to boiler. Where
local utility requires drip leg to be extended to the floor, use
appropriate length of nipple between cap and tee.
b. Install ground joint union for servicing, when required.
c. Install manual shutoff valve in gas supply piping outside
boiler jacket when required by local codes or utility
requirements.
d. In Canada When using manual main shutoff valve, it must
be identified by the installer.
2. Support piping with hangers, not by boiler or its accessories.
3. Purge all air from gas supply piping.
4. Before placing boiler in operation, check boiler and its gas
connection for leaks.
a. Close manual main shutoff valve during any pressure
testing at less than 13" w.c.
b. Disconnect boiler and gas valve from gas supply piping
during any pressure testing greater than 13" w.c.
Do not check for gas leaks with an open flame
Use bubble test. Failure to use bubble test or check
for gas leaks can cause severe personal injury, death
or substantial property damage.
5. Use pipe dope compatible with propane gases. Apply sparingly
only to male threads of pipe joints so that pipe dope does not
block gas flow.
Failure to apply pipe dope as described in this manual
can result in severe personal injury, death or
substantial property damage.
Connecting gas supply piping to boiler
Figure 10 Gas supply piping
GWA
Gas-Fired Water Boilers Boiler Manual
24 Part Number 670 01 1001 00
The boiler should be inspected and started annually,
at the beginning of the heating season, only by a
qualified service technician. In addition, the
maintenance and care of the boiler designated in
Table 6, page 22 and explained on the following pages
must be performed to assure maximum boiler
efficiency and reliability. Failure to service and
maintain the boiler and system could result in
equipment failure.
Electrical shock hazard Turn off power to the boiler
before any service operation on the boiler except as
noted otherwise in this manual. Failure to turn off
electrical power could result in electrical shock,
causing severe personal injury or death.
The boiler contains ceramic fiber and fiberglass
materials. Use care when handling these materials
per instructions on page 23 of this manual. Failure to
comply could result in severe personal injury.
Inspect . . . . . . . . . .
Reported problems
Inspect any problems reported by owner and correct before
proceeding.
Boiler area
1. Verify that boiler area is free of any combustible materials,
gasoline and other flammable vapors and liquids.
2. Verify that boiler area (and air intake) is free of any of the
contaminants listed in Table 2 on page 5 of this manual. If any of
these are present in the boiler intake air vicinity, they must be
removed. If they cannot be removed, install combustion air piping
to the boiler in accordance with national, provincial or local
codes.
Air openings
1. Verify that combustion and ventilation air openings to the boiler
room and/or building are open and unobstructed. Check
operation and wiring of automatic combustion air dampers, if
used.
2. Verify that boiler vent discharge and air intake are clean and
free of obstructions.
Flue gas vent system
1. Visually inspect entire flue gas venting system for blockage,
deterioration or leakage. Repair any joints that show signs of
leakage in accordance with vent manufacturers instructions.
2. Verify that masonry chimneys are lined, lining is in good
condition, and there are not openings into the chimney.
Failure to inspect for the above conditions and have
them repaired can result in severe personal injury or
death.
Pilot and main burner flames
1. Visually inspect pilot burner and main burner flames as directed
under Section 6, page 17 of this manual.
10 Service and maintenance continued
Water piping
1. Check the boiler interior piping and all system piping for signs
of leaks.
2. Repair any leaks before proceeding.
Do not use petroleum-based cleaning or sealing
compounds in boiler system. Severe damage to boiler
will occur, resulting in substantial property damage.
Eliminate all system or boiler leaks. Continual fresh
makeup water will reduce boiler life. Minerals can
build up in sections, reducing heat transfer,
overheating cast iron, and causing section failure.
Leaking water may also cause severe property
damage.
Inspect . . . . . . . . . .
Boiler heating surfaces
1. Disconnect the vent pipe at the boiler draft hood and remove
draft hood after turning off power to the boiler.
2. Use a bright light to inspect the boiler flue collector and heating
surfaces.
3. If the vent pipe or boiler interior surfaces show evidence of
soot, follow Cleaning boiler heating surfaces in this manual
section, page 26. Remove the flue collector and clean the boiler
if necessary after closer inspection of boiler heating surfaces.
4. If there is evidence of rusty scale deposits on boiler surfaces,
check the water piping and control system to make sure the
boiler return water temperature is properly maintained (per this
manual).
5. Reconnect vent and draft hood. Replace all boiler components
before returning to service.
6. Check inside and around boiler for evidence of any leaks from
the boiler. If found, locate source of leaks and repair.
Burners and base
1. After turning off power to the boiler, remove the jacket door and
base access panel (Figure 17, item 4, page 30).
2. Inspect burners and all other components in the boiler base.
3. If burners must be cleaned, raise rear of each burner to release
from support slot, slide forward and remove. Then brush and
vacuum the burners thoroughly, making sure all ports are free
of debris. Carefully replace all burners, making sure burner with
pilot bracket is replaced in its original position and all burners
are upright (ports up).
4. Inspect the base insulation.
The boiler contains ceramic fiber and fiberglass
materials. Use care when handling these materials
per instructions on page 23 of this manual. Failure to
comply could result in severe personal injury.
a. Verify that the insulation is intact and secure against all four
sides of the base.
If insulation is damaged or displaced, do not operate
the boiler. Replace or reposition insulation as
necessary. Failure to replace damaged insulation can
result in a fire hazard, causing severe personal injury,
death or substantial property damage.
GWA
Gas-Fired Water Boilers Boiler Manual
14 Part Number 670 01 1001 00
For your safety, turn off electrical power supply at
service entrance panel before making any electrical
connections to avoid possible electric shock hazard.
Failure to do so can cause severe personal injury or
death.
Wiring must be N.E.C. Class 1.
If rollout thermal fuse element wire as supplied with
boiler must be replaced, type 200 °C wire or equivalent
must be used. If other original wiring as supplied with
boiler must be replaced, use only type 105 °C wire or
equivalent.
Boiler must be electrically grounded as required by
National Electrical Code ANSI/NFPA 70latest edition.
Electrical installation must comply with:
1. National Electrical Code and any other national, state, provincial
or local codes or regulations.
2. In Canada, CSA C22.1 Canadian Electrical Code Part 1, and
any local codes.
Wiring connections
Boiler is shipped with controls completely wired, except spill switch
and vent damper. See wiring diagram on page 19 for standing pilot
ignition boiler or Control Supplement for spark-ignited pilot boiler.
Circulator is shipped loose, but wiring harness is pre-attached to
the boiler. Connect wires in circulator junction box.
Figure 11 Field wiring connections service switch and thermostat (or end switch) provided by installer
5 Field wiring
Thermostat
1. Connect thermostat as shown on wiring diagram on boiler.
2. Install on inside wall away from influences of drafts, hot or cold
water pipes, lighting fixtures, television, sunrays or fireplaces.
3. If thermostat has a heat anticipator, set heat anticipator in
thermostat to match power requirements of equipment
connected to it. If connected directly to boiler, set for 0.4 amps.
For other devices, see manufacturers specifications. Wiring
diagram on boiler gives setting for control module and gas valve.
Also see instructions with thermostat.
Wiring multiple zones
See zone valve manufacturers literature for wiring and application.
A separate transformer is required to power zone valves. Zoning
with circulators requires a relay for each circulator.
Junction box (furnished)
1. Connect 120 VAC power wiring (Figure 11).
2. Fused disconnect or service switch (15 amp. recommended)
may be mounted on this box. For those installations with local
codes which prohibit installation of fused disconnect or service
switch on boiler, install a 2 x 4 cover plate on the boiler junction
box and mount the service switch remotely as required by the
code.
GWA
Gas-Fired Water Boilers Boiler Manual
23Part Number 670 01 1001 00
Handling ceramic fiber and fiberglass materials
REMOVAL OF COMBUSTION CHAMBER LINING OR BASE PANELS
The combustion chamber lining or base insulation panels in this product contain ceramic fiber materials. Ceramic
fibers can be converted to cristobalite in very high temperature applications. The International Agency for Research
on Cancer (IARC) has concluded, "Crystalline silica inhaled in the form of quartz or cristobalite from occupational
sources is carcinogenic to humans (Group 1).":
Avoid breathing dust and contact with skin and eyes.
Use NIOSH certified dust respirator (N95). This type of respirator is based on the OSHA requirements for
cristobalite at the time this document was written. Other types of respirators may be needed depending on
the job site conditions. Current NIOSH recommendations can be found on the NIOSH web site at http://
www.cdc.gov/niosh/homepage.html. NIOSH approved respirators, manufacturers, and phone numbers are
also listed on this web site.
Wear long-sleeved, loose fitting clothing, gloves, and eye protection.
Apply enough water to the combustion chamber lining or base insulation to prevent airborne dust.
Remove combustion chamber lining or base insulation from the boiler and place it in a plastic bag for disposal.
Wash potentially contaminated clothes separately from other clothing. Rinse clothes washer thoroughly.
NIOSH stated First Aid.
Eye: Irrigate immediately
Breathing: Fresh air.
REMOVAL OF FIBERGLASS WOOL — OR —
INSTALLATION OF FIBERGLASS WOOL, COMBUSTION CHAMBER LINING OR BASE
PANELS:
This product contains fiberglass jacket insulation and ceramic fiber materials in combustion chamber lining or base
panels in gas fired products. Airborne fibers from these materials have been listed by the State of California as a
possible cause of cancer through inhalation.
Avoid breathing dust and contact with skin and eyes.
Use NIOSH certified dust respirator (N95). This type of respirator is based on the OSHA requirements for
fiberglass wool at the time this document was written. Other types of respirators may be needed depending
on the job site conditions. Current NIOSH recommendations can be found on the NIOSH web site at http://
www.cdc.gov/niosh/homepage.html. NIOSH approved respirators, manufacturers, and phone numbers are
also listed on this web site.
Wear long-sleeved, loose fitting clothing, gloves, and eye protection.
Operations such as sawing, blowing, tear out, and spraying may generate airborne fiber concentration requiring
additional protection.
Wash potentially contaminated clothes separately from other clothing. Rinse clothes washer thoroughly.
NIOSH stated First Aid.
Eye: Irrigate immediately
Breathing: Fresh air.
10 Service and maintenance continued
GWA
Gas-Fired Water Boilers Boiler Manual
15Part Number 670 01 1001 00
Check for gas leaks
Before starting the boiler, and during initial
operation, smell near the floor and around the boiler
for gas odorant or any unusual odor. Do not
proceed with start-up if there is any indication of a
gas leak. Repair any leak at once.
Propane boilers only Your propane supplier mixes
an odorant with the propane to make its presence
detectable. In some instances, the odorant can fade
and the gas may no longer have an odor.
Propane gas can accumulate at floor level. Smell near
the floor for the gas odorant or any unusual odor. If you
suspect a leak, do not attempt to light the pilot.
Use caution when attempting to light the propane pilot.
This should be done by a qualified service technician,
particularly if pilot outages are common.
Periodically check the odorant level of your gas.
Inspect boiler and system at least yearly to make sure
all gas piping is leak-tight.
Consult your propane supplier regarding installation
of a gas leak detector. There are some products on the
market intended for this purpose. Your supplier may be
able to suggest an appropriate device.
6 Start-up
Preparation Fill the system with water
1. Close manual and automatic air vents and boiler drain cock.
2. Fill to correct system pressure. Correct pressure will vary
with each application. Typical cold water fill pressure for a
residential system is 12 psi.
3. Purge air from system:
a. Connect a hose to purge valve or valves, if installed.
Route hose to an area where water can drain and be
seen.
b. Close the boiler or system isolation valve between the
purge valve and fill connection to the system.
c. Close zone isolation valves.
d. Open quick-fill valve on cold water makeup line.
e. Open purge valve.
f. One zone at a time, open the isolation valves. Allow water
to run through the zone, pushing out the air. Run until no
noticeable air flow is present. Close the zone isolation valves
and proceed with the next zone. Follow this procedure until
all zones are purged.
g. Close the quick-fill water valve and purge valve and remove
the hose. Open all isolation valves. Watch that system
pressure rises to correct cold-fill pressure.
h. After the system has operated for a while, eliminate any
residual air by using the manual air vents located throughout
the system.
i. If purge valves are not installed in system, open manual air
vents in system one at a time, beginning with lowest floor.
Close vent when water squirts out. Repeat with remaining
vents.
4. Open automatic air vent (diaphragm-type or bladder-type
expansion tank systems only) one turn.
5. Open other vents:
a. Starting on the lowest floor, open air vents one at a time
until water squirts out.
b. Repeat with remaining vents.
6. Refill to correct pressure.
Inspect system water piping
After filling the boiler and system with water, inspect all piping
throughout the system for leaks. If found, repair immediately. Repeat
this inspection after the boiler has been started and the system
has heated up.
Leaks must be repaired at once. Failure to do so can
damage the boiler, resulting in substantial property
damage.
Do not use petroleum-based cleaning or sealing
compounds in boiler system. Severe damage to boiler
will occur, resulting in substantial property damage.
Determine if water treatment is needed
Do not use petroleum-based cleaning or sealing
compounds in boiler system. Severe damage to
boiler will occur, resulting in substantial property
damage.
Eliminate all system leaks. Continual fresh makeup
water will reduce boiler life. Minerals can build up
in sections, reducing heat transfer, overheating
cast iron, and causing section failure.
Verify water chemistry
Consult local water treatment companies for unusually hard
water areas (above 7 grains hardness) or low pH water conditions
(below 7.0). Boiler water pH of 7.0 to 8.5 is recommended.
Freeze protection (when used)
Use antifreeze made especially for hydronic systems. Inhibited
propylene glycol is recommended.
Do not use ethylene glycol, automotive or undiluted
antifreeze. Severe personal injury or death can
result.
1. Determine antifreeze quantity according to system water
content. Boiler water content is listed on page 35. Remember
to include expansion tank water content.
2. Follow antifreeze manufacturer's instructions.
3. A 50% solution of propylene glycol/water provides maximum
protection to about -30 °F.
4. Local codes may require back flow preventer or actual
disconnect from city water supply.
5. When using antifreeze in a system with automatic fill, install
a water meter to monitor water makeup. Glycol will leak before
the water begins to leak, causing glycol level to drop. Added
water will dilute the antifreeze, reducing the freeze protection
level.
Inspect base insulation
Check to make sure insulation is secure against all four sides of
the base. If insulation is damaged or displaced, do not operate boiler.
Replace or reposition insulation.
Failure to replace damaged insulation or reposition
insulation can result in a fire hazard, causing severe
personal injury, death or substantial property damage.
The boiler contains ceramic fiber and fiberglass
materials. Use care when handling these materials
per instructions on page 23 of this manual. Failure to
comply could result in severe personal injury.
GWA
Gas-Fired Water Boilers Boiler Manual
22 Part Number 670 01 1001 00
Follow the Service and maintenance procedures given throughout this manual and in component literature shipped with
the boiler. See Read this first on page 2. Failure to perform the service and maintenance could result in damage to the boiler
or system. Failure to follow the directions in this manual and component literature could result in severe personal injury,
death or substantial property damage.
Table 6 Service and maintenance schedules (service technician and owner)
10 Service and maintenance
Service technician
(see following pages for instructions) Owner maintenance
(see Users Information Manual for instructions)
ANNNUAL START-UP
Inspect:
• Reported problems
• Boiler area
• Air openings
• Flue gas vent system
• Pilot and main burner flames
• Water piping
• Boiler heating surfaces
• Burners, base and inlet air box
Service:
• Oiled-bearing circulators
Start-up:
• Perform start-up per manual
Check/test:
• Gas piping
• Cold fill and operating pressures
• Air vents and air elimination
• Limit controls and cutoffs
• Expansion tank
• Boiler relief valve
Review:
• Review with owner
Daily • Check boiler area
• Check boiler pressure/
temperature gauge
• Check air openings
Monthly • Check boiler piping
• Check venting system
• Check boiler relief valve
• Check automatic air vents (if used)
• Check pilot and main burner flames
Periodically • Test low water cutoff (if used)
Every 6 months • Operate relief valve
End of season • Shut down procedure
GWA
Gas-Fired Water Boilers Boiler Manual
16 Part Number 670 01 1001 00
Check system and boiler
Eliminate all system leaks. Continual fresh makeup
water will reduce boiler life. Minerals can build up in
sections, reducing heat transfer, overheating cast iron,
and causing section failure.
If you discover evidence of any gas leak, shut down
the boiler at once. Find the leak source with bubble
test and repair immediately. Do not start boiler again
until corrected. Failure to comply could result in
severe personal injury, death or substantial property
damage.
Do not use petroleum-based cleaning or sealing
compounds in boiler system. Severe damage to boiler
will occur, resulting in substantial property damage.
1. Check system piping for leaks. If found, shut down boiler and
repair immediately.
2. Vent air from system using manual vents. Air in the system will
interfere with circulation and cause heat distribution problems
and noise.
3. Inspect vent system thoroughly for signs of deterioration from
corrosion, physical damage or sagging. Verify that masonry
chimney liners are in good condition, with no obstructions, and
there are no openings into the chimney.
4. Check around the boiler for gas odor following the procedure of
Check for gas leaks, page 15.
5. Verify operation using procedures below. Perform Checkout
procedure, page 18, and fill in the Installation and service
certificate.
If boiler doesnt start . . . Check for:
1. Loose connections, blown fuse or service switch off?
2. High limit switch set below boiler water temperature?
3. Thermostat set below room temperature?
4. Gas not turned on at meter or boiler?
5. Incoming gas pressure less than:
5" w.c. for natural gas? 11" w.c. for propane gas?
6. If none of the above corrects the problem, see
Troubleshooting, Section 11, page 27.
6 Start-up continued
Operate boiler
DO NOT proceed with boiler operation unless boiler
and system have been filled with water and all
instructions and procedures of previous manual
sections have been completed. Failure to do so could
result in severe personal injury, death or substantial
property damage. Before starting the boiler . . .
See pages 20 and 21, for standing pilot boiler Lighting
Instructions, or the Control Supplement for spark-
ignited pilot Operating Instructions.
Verify the boiler and system are full of water (or glycol/
water mixture, if used).
Verify the Preparation procedures of page 15 have
been completed.
Start the boiler
Follow the Lighting or Operating Boiler Instructions from:
Standing pilot boilers Manual pages 20 and 21.
Spark-ignited pilot boilers See Control Supplement.
Remove boiler jacket door and note the gas valve manufacturer
and model number.
See either page 20 or page 21, depending on gas valve installed in
boiler. Use only the Lighting Instruction which applies to this gas
valve. (The Lighting Instruction label on the boiler provides the
same information.)
If boiler fails to start, see If boiler doesnt start . . . Check for: on
this page.
GWA
Gas-Fired Water Boilers Boiler Manual
21Part Number 670 01 1001 00
9 Lighting Instructions — GWA standing pilot boilers
Robertshaw 7200 gas valve
FOR YOUR SAFETY READ BEFORE LIGHTING
If you do not follow these instructions exactly, a fire or explosion may result causing
property damage, personal injury or loss of life.
1. Set the thermostat to lowest setting.
2. Turn off all electric power to the appliance if service is to be
performed.
3. Remove front panel.
4. Depress and move selector arm left to OFF.
5. Replace front panel.
LIGHTING INSTRUCTIONS
WHAT TO DO IF YOU SMELL GAS
Do not try to light any appliance.
Do not touch any electric switch; do not use any phone in
your building.
Immediately call your gas supplier from a neighbors
phone. Follow the gas suppliers instructions.
If you cannot reach your gas supplier, call the fire
department.
A. This appliance has a pilot, which must be
lighted by hand. When lighting the pilot, follow
these instructions exactly.
B. Before LIGHTING, smell all around the
appliance area for gas. Be sure to smell next
to the floor because some gas is heavier than
air and will settle on the floor. See below.
C. Use only your hand to push down the reset button or turn the gas control
knob. Never use tools. If the knob or reset button will not operate by hand,
don't try to repair it, call a qualified service technician. Force or attempted
repair may result in a fire or explosion.
D. Do not use this appliance if any part has been under water. Immediately call
a qualified service technician to inspect the appliance and to replace any
part of the control system and any gas control, which has been under water.
1. Stop! Read the safety information above on this label.
2. Set the thermostat to lowest setting.
3. When equipped with Effikal vent damper Model RVGP, place
service switch in Hold Damper Open position.
4. Turn off all electrical power to the appliance.
5. When equipped with Johnson Controls vent damper Model
M35, manually rotate damper blade in direction of arrow to
Open position indicated on damper assembly.
6. Depress and move selector arm left to OFF.
7. When equipped with vent damper, verify damper blade is in
full open position.
8. Wait five (5) minutes to clear out any gas. Then smell for
gas, including near the floor. If you smell gas, STOP! Follow
"B" in the safety information above. If you don't smell gas,
go to the next step.
9. Remove access panel located above burners.
10. Find pilot follow metal tube from gas control.
The pilot is between two burners behind the
access panel.
11. Move selector arm on gas control right
to SET position.
12. Hold selector arm in SET position and immediately light the
pilot with a match. Continue to hold selector arm to SET for
about one-half (1/2) minute after the pilot is lit.
13. Release selector arm. If pilot does not remain lit, repeat steps
6 through 13.
If the pilot will not stay lit after several tries, move selector
arm left to OFF and call your service technician or gas
supplier.
14. Replace access panel.
15. Turn selector arm left to ON.
16. Turn on all electric power to the appliance.
17. When equipped with Effikal vent damper, place service
switch in Automatic Operation position.
18. Set thermostat to desired setting.
19. Replace front panel.
TO TURN OFF GAS TO THE APPLIANCE
GWA
Gas-Fired Water Boilers Boiler Manual
17Part Number 670 01 1001 00
Check the pilot ignition system used for the boiler.
The boiler model suffix will contain an S for standing
pilot or an I for spark-ignited pilot. See Section 9,
pages 20 and 21, for standing pilot boiler Lighting
Instructions, or the Control Supplement for spark-
ignited pilot Operating Instructions.
Figure 12 Typical pilot burner flame
Verify operation
Check vent damper operation
1. Raise room thermostat to call for heat Vent damper actuator
will slowly open vent damper.
2. When vent damper is fully open Main gas valve will open
and main burners will ignite. (Spark-ignited pilot controls will
first light pilot, then allow main burners to ignite.)
Vent damper must be fully open before main burners
light. If vent damper does not fully open, flue products
such as carbon monoxide will escape into house,
causing severe personal injury or death.
3. Lower thermostat setting Main burner flames will go out, then
vent damper will close.
4. Repeat Steps 2 through 4 several times to verify operation.
5. Return thermostat to normal setting.
6. Set thermostat heat anticipator setting indicated on wiring
diagram.
Check venting system operation
1. With boiler firing, hold a candle or match below lower edge of
draft hood skirt. If flame does not blow out, but burns
undisturbed, the vent system is working properly. If flame blows
out or flickers severely, the vent system must be checked for
obstructions or other causes of improper venting.
Figure 13 Typical main burner flame
Check burner flames Main burner
Proper main burner flame (see Figure 13):
1. Yellow-orange streaks may appear (caused by dust).
Improper main burner flame:
1. Overfired Large flames.
2. Underfired Small flames.
3. Lack of primary air Yellow tipping on flames (sooting will
occur).
Check burner flame Pilot burner
Proper pilot flame (see Figure 12):
1. Blue flame.
2. Inner cone engulfing thermocouple (standing pilot) or pilot flame
sensor (spark-ignited pilot).
3. Thermocouple or pilot flame sensor glowing cherry red.
Improper pilot flame:
1. Overfired Large flame lifting or blowing past pilot flame
sensor.
2. Underfired Small flame. Inner cone not engulfing pilot flame
sensor.
3. Lack of primary air Yellow flame tip.
4. Incorrectly heated pilot flame sensor.
6 Start-up continued
GWA
Gas-Fired Water Boilers Boiler Manual
20 Part Number 670 01 1001 00
9 Lighting Instructions GWA standing pilot boilers
Honeywell VR8200/VR8300 gas valve
If you do not follow these instructions exactly, a fire or explosion may result causing
property damage, personal injury or loss of life.
A. This appliance has a pilot, which must be
lighted by hand. When lighting the pilot, follow
these instructions exactly.
B. Before LIGHTING, smell all around the
appliance area for gas. Be sure to smell next
to the floor because some gas is heavier than
air and will settle on the floor. See below.
C. Use only your hand to push down the reset button or turn the gas control
knob. Never use tools. If the knob or reset button will not operate by hand,
don't try to repair it, call a qualified service technician. Force or attempted
repair may result in a fire or explosion.
D. Do not use this appliance if any part has been under water. Immediately call
a qualified service technician to inspect the appliance and to replace any
part of the control system and any gas control, which has been under water.
Do not try to light any appliance.
Do not touch any electric switch; do not use any phone in
your building.
Immediately call your gas supplier from a neighbors phone.
Follow the gas suppliers instructions.
If you cannot reach your gas supplier, call the fire department.
1. Stop! Read the safety information above on this label.
2. Set the thermostat to lowest setting.
3. When equipped with Effikal vent damper Model RVGP, place
service switch in Hold Damper Open position.
4. Turn off all electrical power to the appliance.
5. When equipped with Johnson Controls vent damper Model
M35, manually rotate damper blade in direction of arrow to
Open position indicated on damper assembly.
6. Turn gas control knob clockwise to OFF.
7. When equipped with vent damper, verify damper blade is in
full open position.
8. Wait five (5) minutes to clear out any gas. Then smell for
gas, including near the floor. If you smell gas, STOP! Follow
"B" in the safety information above. If you don't smell gas,
go to the next step.
9. Remove access panel located above burners.
10. Find pilot follow metal tube from gas control.
The pilot is between two burners behind the
access panel.
11. Turn gas control knob counterclockwise to
PILOT.
12. Push in red reset button and hold. Immediately light the pilot
with a match. Continue to hold reset button in for about one
(1) minute after the pilot is lit.
13. Release reset button. Pilot should remain lit. If pilot goes out,
repeat steps 6 through 13.
If reset button stays depressed after release, stop and
immediately call your service technician or gas supplier.
If the pilot will not stay lit after several tries, turn the gas control
knob clockwise to OFF and call your service technician
or gas supplier.
14. Replace access panel.
15. Turn gas control knob counterclockwise to ON.
16. Turn on all electric power to the appliance.
17. When equipped with Effikal vent damper, place service switch
in Automatic Operation position.
18. Set thermostat to desired setting.
19. Replace front panel.
1. Set the thermostat to lowest setting.
2. Turn off all electric power to the appliance if service is to be
performed.
3. Remove front panel.
4. Turn gas control knob clockwise to OFF.
5. Replace front panel.
FOR YOUR SAFETY READ BEFORE LIGHTING
LIGHTING INSTRUCTIONS
TO TURN OFF GAS TO THE APPLIANCE
WHAT TO DO IF YOU SMELL GAS
GWA
Gas-Fired Water Boilers Boiler Manual
18 Part Number 670 01 1001 00
7 Checkout procedure
Boiler and heat distribution units filled with water?
Automatic air vent, if used, open one full turn?
Air purged from system?
Air purged from gas piping? Piping checked for leaks?
Correctly-sized manifold orifices installed? See Table 3,
page 6, to check size and fuel type.
Correctly sized manifold orifices must be used.
Failure to do so will cause severe personal injury,
death or substantial property damage.
Followed Lighting or Operating Instructions on boiler or in
Manual Section 9 or Control Supplement for proper start-up?
Proper burner flame observed? See Verify operation, Manual
Section 6, page 17.
Test limit control While burners are operating, move indicator
on limit control below actual boiler water temperature. Burners
should go off while circulator continues to operate. Raise setting
on limit control above boiler water temperature and burners
should reignite.
Test additional field-installed controls If boiler has a low water
cutoff, additional high limit or other controls, test for operation
as outlined by manufacturer. Burners should be operating and
should go off when controls are tested. When controls are
restored, burners should reignite.
Button on spill switch pushed in?
Test ignition system safety device:
a. Standing pilot Turn gas cock knob to PILOT position
and extinguish pilot flame. Pilot gas flow should stop in less
than 3 minutes. Put system back into operation (see
Section 6, pages 15-17).
b. Spark-ignited pilot Connect manometer to outlet side
of gas valve. Start boiler, allowing for normal start-up cycle
to occur and main burners to ignite. With main burners on,
manually shut off gas supply at manual main shutoff gas
valve. Burners should go off. Open manual main shutoff
gas valve. Manometer should confirm there is no gas
flow. Pilot will relight, flame sensing element will sense
pilot flame and main burners reignite.
Set limit control(s) to system temperature requirements.
Adjust balancing valves and controls to provide design
temperature to system.
For multiple zones, adjust flow so it is about the same in
each zone.
Verify thermostat heat anticipator (if available) set properly?
See Field wiring, Manual Section 5, page 14, Thermostat.
Cycle boiler with thermostat Raise to highest setting and
verify boiler goes through normal start-up cycle. Lower to lowest
setting and verify boiler goes off.
Measure natural gas input:
a. Operate boiler 10 minutes.
b. Turn off other appliances.
c. At natural gas meter, measure time (in seconds) required
to use one cubic foot of gas.
d. Calculate gas input:
3600 x 1000
number of seconds from step c= Btuh
e. Btuh calculated should approximate input rating on boiler
rating label.
oInstallation instructions have been followed.
oCheckout sequence has been performed.
oAbove information is certified to be correct.
oInformation received and left with owner/maintenance person.
Installation and service certificate
Check manifold gas pressure by connecting manometer to
downstream test tapping on main gas valve. Manifold pressure
for natural gas should be 3.5" w.c. and for propane gas should
be 10" w.c.
Observe several operating cycles for proper operation.
Set room thermostat to desired room temperature.
Fill in Installation and service certificate below?
Review all instructions shipped with this boiler with owner or
maintenance person. Return instructions to envelope and give
to owner or place in pocket inside front panel in boiler.
Boiler model _______________________________________________________________ Series ____________
CP number _______________________________________ Date installed _________________________________
Measured Btuh input ____________
Installer _______________________ ______________________________ ____________________________
(company) (address) (phone)
_____________________________________
(installers signature)
GWA
Gas-Fired Water Boilers Boiler Manual
19Part Number 670 01 1001 00
Figure 14 Wiring diagram Standing pilot system
8 Sequence of operation standing pilot boilers
Follow all procedures given in this manual and Lighting Instructions when
operating the boiler. Failure to do so could result in severe personal injury,
death or substantial property damage.
1. Standby mode: After pilot is manually lighted, the gas valve provides pilot gas and
maintains pilot as long as the thermocouple is satisfied. If thermocouple signal drops
for any reason, pilot must be manually lighted, following the Lighting Instructions in
this manual and on boiler. Vent damper will remain closed until a call for heat.
2. Call for heat: When thermostat circuit closes, the boiler circulator and vent damper
are energized. The vent damper drives open. When the vent damper is fully open, its
end switch energizes the main gas valve. This provides gas to the main burners.
Burners remain ignited until thermostat circuit or limit circuit opens. Burners and
circulator are de-energized when call for heat stops. Burners are de-energized, but
circulator remains on, if the limit circuit opens.
3. Limit operation: When a limit control opens, the main gas valve is de-energized, but
circulator continues to run. When the limit circuit closes again, the main gas valve is
energized if there is still a call for heat.
4. Thermostat heat anticipator: Set heat anticipator as shown on wiring diagram,
Figure 14.
GWA
Gas-Fired Water Boilers Boiler Manual
18 Part Number 670 01 1001 00
7 Checkout procedure
Boiler and heat distribution units filled with water?
Automatic air vent, if used, open one full turn?
Air purged from system?
Air purged from gas piping? Piping checked for leaks?
Correctly-sized manifold orifices installed? See Table 3,
page 6, to check size and fuel type.
Correctly sized manifold orifices must be used.
Failure to do so will cause severe personal injury,
death or substantial property damage.
Followed Lighting or Operating Instructions on boiler or in
Manual Section 9 or Control Supplement for proper start-up?
Proper burner flame observed? See Verify operation, Manual
Section 6, page 17.
Test limit control While burners are operating, move indicator
on limit control below actual boiler water temperature. Burners
should go off while circulator continues to operate. Raise setting
on limit control above boiler water temperature and burners
should reignite.
Test additional field-installed controls If boiler has a low water
cutoff, additional high limit or other controls, test for operation
as outlined by manufacturer. Burners should be operating and
should go off when controls are tested. When controls are
restored, burners should reignite.
Button on spill switch pushed in?
Test ignition system safety device:
a. Standing pilot Turn gas cock knob to PILOT position
and extinguish pilot flame. Pilot gas flow should stop in less
than 3 minutes. Put system back into operation (see
Section 6, pages 15-17).
b. Spark-ignited pilot Connect manometer to outlet side
of gas valve. Start boiler, allowing for normal start-up cycle
to occur and main burners to ignite. With main burners on,
manually shut off gas supply at manual main shutoff gas
valve. Burners should go off. Open manual main shutoff
gas valve. Manometer should confirm there is no gas
flow. Pilot will relight, flame sensing element will sense
pilot flame and main burners reignite.
Set limit control(s) to system temperature requirements.
Adjust balancing valves and controls to provide design
temperature to system.
For multiple zones, adjust flow so it is about the same in
each zone.
Verify thermostat heat anticipator (if available) set properly?
See Field wiring, Manual Section 5, page 14, Thermostat”.
Cycle boiler with thermostat Raise to highest setting and
verify boiler goes through normal start-up cycle. Lower to lowest
setting and verify boiler goes off.
Measure natural gas input:
a. Operate boiler 10 minutes.
b. Turn off other appliances.
c. At natural gas meter, measure time (in seconds) required
to use one cubic foot of gas.
d. Calculate gas input:
3600 x 1000
number of seconds from step c= Btuh
e. Btuh calculated should approximate input rating on boiler
rating label.
oInstallation instructions have been followed.
oCheckout sequence has been performed.
oAbove information is certified to be correct.
oInformation received and left with owner/maintenance person.
Installation and service certificate
Check manifold gas pressure by connecting manometer to
downstream test tapping on main gas valve. Manifold pressure
for natural gas should be 3.5" w.c. and for propane gas should
be 10" w.c.
Observe several operating cycles for proper operation.
Set room thermostat to desired room temperature.
Fill in Installation and service certificate below?
Review all instructions shipped with this boiler with owner or
maintenance person. Return instructions to envelope and give
to owner or place in pocket inside front panel in boiler.
Boiler model _______________________________________________________________ Series ____________
CP number _______________________________________ Date installed _________________________________
Measured Btuh input ____________
Installer _______________________ ______________________________ ____________________________
(company) (address) (phone)
_____________________________________
(installers signature)
GWA
Gas-Fired Water Boilers Boiler Manual
19Part Number 670 01 1001 00
Figure 14 Wiring diagram Standing pilot system
8 Sequence of operation standing pilot boilers
Follow all procedures given in this manual and Lighting Instructions when
operating the boiler. Failure to do so could result in severe personal injury,
death or substantial property damage.
1. Standby mode: After pilot is manually lighted, the gas valve provides pilot gas and
maintains pilot as long as the thermocouple is satisfied. If thermocouple signal drops
for any reason, pilot must be manually lighted, following the Lighting Instructions in
this manual and on boiler. Vent damper will remain closed until a call for heat.
2. Call for heat: When thermostat circuit closes, the boiler circulator and vent damper
are energized. The vent damper drives open. When the vent damper is fully open, its
end switch energizes the main gas valve. This provides gas to the main burners.
Burners remain ignited until thermostat circuit or limit circuit opens. Burners and
circulator are de-energized when call for heat stops. Burners are de-energized, but
circulator remains on, if the limit circuit opens.
3. Limit operation: When a limit control opens, the main gas valve is de-energized, but
circulator continues to run. When the limit circuit closes again, the main gas valve is
energized if there is still a call for heat.
4. Thermostat heat anticipator: Set heat anticipator as shown on wiring diagram,
Figure 14.
GWA
Gas-Fired Water Boilers Boiler Manual
17Part Number 670 01 1001 00
Check the pilot ignition system used for the boiler.
The boiler model suffix will contain an “S for standing
pilot or an “I” for spark-ignited pilot. See Section 9,
pages 20 and 21, for standing pilot boiler Lighting
Instructions, or the Control Supplement for spark-
ignited pilot Operating Instructions”.
Figure 12 Typical pilot burner flame
Verify operation
Check vent damper operation
1. Raise room thermostat to call for heat Vent damper actuator
will slowly open vent damper.
2. When vent damper is fully open Main gas valve will open
and main burners will ignite. (Spark-ignited pilot controls will
first light pilot, then allow main burners to ignite.)
Vent damper must be fully open before main burners
light. If vent damper does not fully open, flue products
such as carbon monoxide will escape into house,
causing severe personal injury or death.
3. Lower thermostat setting Main burner flames will go out, then
vent damper will close.
4. Repeat Steps 2 through 4 several times to verify operation.
5. Return thermostat to normal setting.
6. Set thermostat heat anticipator setting indicated on wiring
diagram.
Check venting system operation
1. With boiler firing, hold a candle or match below lower edge of
draft hood skirt. If flame does not blow out, but burns
undisturbed, the vent system is working properly. If flame blows
out or flickers severely, the vent system must be checked for
obstructions or other causes of improper venting.
Figure 13 Typical main burner flame
Check burner flames Main burner
Proper main burner flame (see Figure 13):
1. Yellow-orange streaks may appear (caused by dust).
Improper main burner flame:
1. Overfired Large flames.
2. Underfired Small flames.
3. Lack of primary air Yellow tipping on flames (sooting will
occur).
Check burner flame Pilot burner
Proper pilot flame (see Figure 12):
1. Blue flame.
2. Inner cone engulfing thermocouple (standing pilot) or pilot flame
sensor (spark-ignited pilot).
3. Thermocouple or pilot flame sensor glowing cherry red.
Improper pilot flame:
1. Overfired Large flame lifting or blowing past pilot flame
sensor.
2. Underfired Small flame. Inner cone not engulfing pilot flame
sensor.
3. Lack of primary air Yellow flame tip.
4. Incorrectly heated pilot flame sensor.
6 Start-up continued
GWA
Gas-Fired Water Boilers Boiler Manual
20 Part Number 670 01 1001 00
9 Lighting Instructions GWA standing pilot boilers
Honeywell VR8200/VR8300 gas valve
If you do not follow these instructions exactly, a fire or explosion may result causing
property damage, personal injury or loss of life.
A. This appliance has a pilot, which must be
lighted by hand. When lighting the pilot, follow
these instructions exactly.
B. Before LIGHTING, smell all around the
appliance area for gas. Be sure to smell next
to the floor because some gas is heavier than
air and will settle on the floor. See below.
C. Use only your hand to push down the reset button or turn the gas control
knob. Never use tools. If the knob or reset button will not operate by hand,
don't try to repair it, call a qualified service technician. Force or attempted
repair may result in a fire or explosion.
D. Do not use this appliance if any part has been under water. Immediately call
a qualified service technician to inspect the appliance and to replace any
part of the control system and any gas control, which has been under water.
Do not try to light any appliance.
Do not touch any electric switch; do not use any phone in
your building.
Immediately call your gas supplier from a neighbors phone.
Follow the gas suppliers instructions.
If you cannot reach your gas supplier, call the fire department.
1. Stop! Read the safety information above on this label.
2. Set the thermostat to lowest setting.
3. When equipped with Effikal vent damper Model RVGP, place
service switch in Hold Damper Open position.
4. Turn off all electrical power to the appliance.
5. When equipped with Johnson Controls vent damper Model
M35, manually rotate damper blade in direction of arrow to
Open position indicated on damper assembly.
6. Turn gas control knob clockwise to OFF.
7. When equipped with vent damper, verify damper blade is in
full open position.
8. Wait five (5) minutes to clear out any gas. Then smell for
gas, including near the floor. If you smell gas, STOP! Follow
"B" in the safety information above. If you don't smell gas,
go to the next step.
9. Remove access panel located above burners.
10. Find pilot follow metal tube from gas control.
The pilot is between two burners behind the
access panel.
11. Turn gas control knob counterclockwise to
PILOT.
12. Push in red reset button and hold. Immediately light the pilot
with a match. Continue to hold reset button in for about one
(1) minute after the pilot is lit.
13. Release reset button. Pilot should remain lit. If pilot goes out,
repeat steps 6 through 13.
If reset button stays depressed after release, stop and
immediately call your service technician or gas supplier.
If the pilot will not stay lit after several tries, turn the gas control
knob clockwise to OFF and call your service technician
or gas supplier.
14. Replace access panel.
15. Turn gas control knob counterclockwise to ON.
16. Turn on all electric power to the appliance.
17. When equipped with Effikal vent damper, place service switch
in Automatic Operation position.
18. Set thermostat to desired setting.
19. Replace front panel.
1. Set the thermostat to lowest setting.
2. Turn off all electric power to the appliance if service is to be
performed.
3. Remove front panel.
4. Turn gas control knob clockwise to OFF.
5. Replace front panel.
FOR YOUR SAFETY READ BEFORE LIGHTING
LIGHTING INSTRUCTIONS
TO TURN OFF GAS TO THE APPLIANCE
WHAT TO DO IF YOU SMELL GAS
GWA
Gas-Fired Water Boilers Boiler Manual
16 Part Number 670 01 1001 00
Check system and boiler
Eliminate all system leaks. Continual fresh makeup
water will reduce boiler life. Minerals can build up in
sections, reducing heat transfer, overheating cast iron,
and causing section failure.
If you discover evidence of any gas leak, shut down
the boiler at once. Find the leak source with bubble
test and repair immediately. Do not start boiler again
until corrected. Failure to comply could result in
severe personal injury, death or substantial property
damage.
Do not use petroleum-based cleaning or sealing
compounds in boiler system. Severe damage to boiler
will occur, resulting in substantial property damage.
1. Check system piping for leaks. If found, shut down boiler and
repair immediately.
2. Vent air from system using manual vents. Air in the system will
interfere with circulation and cause heat distribution problems
and noise.
3. Inspect vent system thoroughly for signs of deterioration from
corrosion, physical damage or sagging. Verify that masonry
chimney liners are in good condition, with no obstructions, and
there are no openings into the chimney.
4. Check around the boiler for gas odor following the procedure of
Check for gas leaks, page 15.
5. Verify operation using procedures below. Perform Checkout
procedure, page 18, and fill in the Installation and service
certificate”.
If boiler doesnt start . . . Check for:
1. Loose connections, blown fuse or service switch off?
2. High limit switch set below boiler water temperature?
3. Thermostat set below room temperature?
4. Gas not turned on at meter or boiler?
5. Incoming gas pressure less than:
5" w.c. for natural gas? 11" w.c. for propane gas?
6. If none of the above corrects the problem, see
Troubleshooting, Section 11, page 27.
6 Start-up continued
Operate boiler
DO NOT proceed with boiler operation unless boiler
and system have been filled with water and all
instructions and procedures of previous manual
sections have been completed. Failure to do so could
result in severe personal injury, death or substantial
property damage. Before starting the boiler . . .
See pages 20 and 21, for standing pilot boiler Lighting
Instructions, or the Control Supplement for spark-
ignited pilot Operating Instructions”.
Verify the boiler and system are full of water (or glycol/
water mixture, if used).
Verify the Preparation procedures of page 15 have
been completed.
Start the boiler
Follow the Lighting or Operating Boiler Instructions from:
Standing pilot boilers Manual pages 20 and 21.
Spark-ignited pilot boilers See Control Supplement.
Remove boiler jacket door and note the gas valve manufacturer
and model number.
See either page 20 or page 21, depending on gas valve installed in
boiler. Use only the Lighting Instruction which applies to this gas
valve. (The Lighting Instruction label on the boiler provides the
same information.)
If boiler fails to start, see If boiler doesnt start . . . Check for: on
this page.
GWA
Gas-Fired Water Boilers Boiler Manual
21Part Number 670 01 1001 00
9 Lighting Instructions — GWA standing pilot boilers
Robertshaw 7200 gas valve
FOR YOUR SAFETY READ BEFORE LIGHTING
If you do not follow these instructions exactly, a fire or explosion may result causing
property damage, personal injury or loss of life.
1. Set the thermostat to lowest setting.
2. Turn off all electric power to the appliance if service is to be
performed.
3. Remove front panel.
4. Depress and move selector arm left to OFF.
5. Replace front panel.
LIGHTING INSTRUCTIONS
WHAT TO DO IF YOU SMELL GAS
Do not try to light any appliance.
Do not touch any electric switch; do not use any phone in
your building.
Immediately call your gas supplier from a neighbor’s
phone. Follow the gas suppliers instructions.
If you cannot reach your gas supplier, call the fire
department.
A. This appliance has a pilot, which must be
lighted by hand. When lighting the pilot, follow
these instructions exactly.
B. Before LIGHTING, smell all around the
appliance area for gas. Be sure to smell next
to the floor because some gas is heavier than
air and will settle on the floor. See below.
C. Use only your hand to push down the reset button or turn the gas control
knob. Never use tools. If the knob or reset button will not operate by hand,
don't try to repair it, call a qualified service technician. Force or attempted
repair may result in a fire or explosion.
D. Do not use this appliance if any part has been under water. Immediately call
a qualified service technician to inspect the appliance and to replace any
part of the control system and any gas control, which has been under water.
1. Stop! Read the safety information above on this label.
2. Set the thermostat to lowest setting.
3. When equipped with Effikal vent damper Model RVGP, place
service switch in Hold Damper Open position.
4. Turn off all electrical power to the appliance.
5. When equipped with Johnson Controls vent damper Model
M35, manually rotate damper blade in direction of arrow to
Open position indicated on damper assembly.
6. Depress and move selector arm left to OFF.
7. When equipped with vent damper, verify damper blade is in
full open position.
8. Wait five (5) minutes to clear out any gas. Then smell for
gas, including near the floor. If you smell gas, STOP! Follow
"B" in the safety information above. If you don't smell gas,
go to the next step.
9. Remove access panel located above burners.
10. Find pilot follow metal tube from gas control.
The pilot is between two burners behind the
access panel.
11. Move selector arm on gas control right
to SET position.
12. Hold selector arm in SET position and immediately light the
pilot with a match. Continue to hold selector arm to SET for
about one-half (1/2) minute after the pilot is lit.
13. Release selector arm. If pilot does not remain lit, repeat steps
6 through 13.
If the pilot will not stay lit after several tries, move selector
arm left to OFF and call your service technician or gas
supplier.
14. Replace access panel.
15. Turn selector arm left to ON.
16. Turn on all electric power to the appliance.
17. When equipped with Effikal vent damper, place service
switch in Automatic Operation position.
18. Set thermostat to desired setting.
19. Replace front panel.
TO TURN OFF GAS TO THE APPLIANCE
GWA
Gas-Fired Water Boilers Boiler Manual
15Part Number 670 01 1001 00
Check for gas leaks
Before starting the boiler, and during initial
operation, smell near the floor and around the boiler
for gas odorant or any unusual odor. Do not
proceed with start-up if there is any indication of a
gas leak. Repair any leak at once.
Propane boilers only Your propane supplier mixes
an odorant with the propane to make its presence
detectable. In some instances, the odorant can fade
and the gas may no longer have an odor.
Propane gas can accumulate at floor level. Smell near
the floor for the gas odorant or any unusual odor. If you
suspect a leak, do not attempt to light the pilot.
Use caution when attempting to light the propane pilot.
This should be done by a qualified service technician,
particularly if pilot outages are common.
Periodically check the odorant level of your gas.
Inspect boiler and system at least yearly to make sure
all gas piping is leak-tight.
Consult your propane supplier regarding installation
of a gas leak detector. There are some products on the
market intended for this purpose. Your supplier may be
able to suggest an appropriate device.
6 Start-up
Preparation Fill the system with water
1. Close manual and automatic air vents and boiler drain cock.
2. Fill to correct system pressure. Correct pressure will vary
with each application. Typical cold water fill pressure for a
residential system is 12 psi.
3. Purge air from system:
a. Connect a hose to purge valve or valves, if installed.
Route hose to an area where water can drain and be
seen.
b. Close the boiler or system isolation valve between the
purge valve and fill connection to the system.
c. Close zone isolation valves.
d. Open quick-fill valve on cold water makeup line.
e. Open purge valve.
f. One zone at a time, open the isolation valves. Allow water
to run through the zone, pushing out the air. Run until no
noticeable air flow is present. Close the zone isolation valves
and proceed with the next zone. Follow this procedure until
all zones are purged.
g. Close the quick-fill water valve and purge valve and remove
the hose. Open all isolation valves. Watch that system
pressure rises to correct cold-fill pressure.
h. After the system has operated for a while, eliminate any
residual air by using the manual air vents located throughout
the system.
i. If purge valves are not installed in system, open manual air
vents in system one at a time, beginning with lowest floor.
Close vent when water squirts out. Repeat with remaining
vents.
4. Open automatic air vent (diaphragm-type or bladder-type
expansion tank systems only) one turn.
5. Open other vents:
a. Starting on the lowest floor, open air vents one at a time
until water squirts out.
b. Repeat with remaining vents.
6. Refill to correct pressure.
Inspect system water piping
After filling the boiler and system with water, inspect all piping
throughout the system for leaks. If found, repair immediately. Repeat
this inspection after the boiler has been started and the system
has heated up.
Leaks must be repaired at once. Failure to do so can
damage the boiler, resulting in substantial property
damage.
Do not use petroleum-based cleaning or sealing
compounds in boiler system. Severe damage to boiler
will occur, resulting in substantial property damage.
Determine if water treatment is needed
Do not use petroleum-based cleaning or sealing
compounds in boiler system. Severe damage to
boiler will occur, resulting in substantial property
damage.
Eliminate all system leaks. Continual fresh makeup
water will reduce boiler life. Minerals can build up
in sections, reducing heat transfer, overheating
cast iron, and causing section failure.
Verify water chemistry
Consult local water treatment companies for unusually hard
water areas (above 7 grains hardness) or low pH water conditions
(below 7.0). Boiler water pH of 7.0 to 8.5 is recommended.
Freeze protection (when used)
Use antifreeze made especially for hydronic systems. Inhibited
propylene glycol is recommended.
Do not use ethylene glycol, automotive or undiluted
antifreeze. Severe personal injury or death can
result.
1. Determine antifreeze quantity according to system water
content. Boiler water content is listed on page 35. Remember
to include expansion tank water content.
2. Follow antifreeze manufacturer's instructions.
3. A 50% solution of propylene glycol/water provides maximum
protection to about -30 °F.
4. Local codes may require back flow preventer or actual
disconnect from city water supply.
5. When using antifreeze in a system with automatic fill, install
a water meter to monitor water makeup. Glycol will leak before
the water begins to leak, causing glycol level to drop. Added
water will dilute the antifreeze, reducing the freeze protection
level.
Inspect base insulation
Check to make sure insulation is secure against all four sides of
the base. If insulation is damaged or displaced, do not operate boiler.
Replace or reposition insulation.
Failure to replace damaged insulation or reposition
insulation can result in a fire hazard, causing severe
personal injury, death or substantial property damage.
The boiler contains ceramic fiber and fiberglass
materials. Use care when handling these materials
per instructions on page 23 of this manual. Failure to
comply could result in severe personal injury.
GWA
Gas-Fired Water Boilers Boiler Manual
22 Part Number 670 01 1001 00
Follow the Service and maintenance procedures given throughout this manual and in component literature shipped with
the boiler. See Read this first on page 2. Failure to perform the service and maintenance could result in damage to the boiler
or system. Failure to follow the directions in this manual and component literature could result in severe personal injury,
death or substantial property damage.
Table 6 Service and maintenance schedules (service technician and owner)
10 Service and maintenance
Service technician
(see following pages for instructions) Owner maintenance
(see Users Information Manual for instructions)
ANNNUAL START-UP
Inspect:
• Reported problems
• Boiler area
• Air openings
• Flue gas vent system
• Pilot and main burner flames
• Water piping
• Boiler heating surfaces
• Burners, base and inlet air box
Service:
• Oiled-bearing circulators
Start-up:
• Perform start-up per manual
Check/test:
• Gas piping
• Cold fill and operating pressures
• Air vents and air elimination
• Limit controls and cutoffs
• Expansion tank
• Boiler relief valve
Review:
• Review with owner
Daily • Check boiler area
• Check boiler pressure/
temperature gauge
• Check air openings
Monthly • Check boiler piping
• Check venting system
• Check boiler relief valve
• Check automatic air vents (if used)
• Check pilot and main burner flames
Periodically • Test low water cutoff (if used)
Every 6 months • Operate relief valve
End of season • Shut down procedure
GWA
Gas-Fired Water Boilers Boiler Manual
14 Part Number 670 01 1001 00
For your safety, turn off electrical power supply at
service entrance panel before making any electrical
connections to avoid possible electric shock hazard.
Failure to do so can cause severe personal injury or
death.
Wiring must be N.E.C. Class 1.
If rollout thermal fuse element wire as supplied with
boiler must be replaced, type 200 °C wire or equivalent
must be used. If other original wiring as supplied with
boiler must be replaced, use only type 105 °C wire or
equivalent.
Boiler must be electrically grounded as required by
National Electrical Code ANSI/NFPA 70latest edition.
Electrical installation must comply with:
1. National Electrical Code and any other national, state, provincial
or local codes or regulations.
2. In Canada, CSA C22.1 Canadian Electrical Code Part 1, and
any local codes.
Wiring connections
Boiler is shipped with controls completely wired, except spill switch
and vent damper. See wiring diagram on page 19 for standing pilot
ignition boiler or Control Supplement for spark-ignited pilot boiler.
Circulator is shipped loose, but wiring harness is pre-attached to
the boiler. Connect wires in circulator junction box.
Figure 11 Field wiring connections — service switch and thermostat (or end switch) provided by installer
5 Field wiring
Thermostat
1. Connect thermostat as shown on wiring diagram on boiler.
2. Install on inside wall away from influences of drafts, hot or cold
water pipes, lighting fixtures, television, sunrays or fireplaces.
3. If thermostat has a heat anticipator, set heat anticipator in
thermostat to match power requirements of equipment
connected to it. If connected directly to boiler, set for 0.4 amps.
For other devices, see manufacturers specifications. Wiring
diagram on boiler gives setting for control module and gas valve.
Also see instructions with thermostat.
Wiring multiple zones
See zone valve manufacturers literature for wiring and application.
A separate transformer is required to power zone valves. Zoning
with circulators requires a relay for each circulator.
Junction box (furnished)
1. Connect 120 VAC power wiring (Figure 11).
2. Fused disconnect or service switch (15 amp. recommended)
may be mounted on this box. For those installations with local
codes which prohibit installation of fused disconnect or service
switch on boiler, install a 2 x 4 cover plate on the boiler junction
box and mount the service switch remotely as required by the
code.
GWA
Gas-Fired Water Boilers Boiler Manual
23Part Number 670 01 1001 00
Handling ceramic fiber and fiberglass materials
REMOVAL OF COMBUSTION CHAMBER LINING OR BASE PANELS
The combustion chamber lining or base insulation panels in this product contain ceramic fiber materials. Ceramic
fibers can be converted to cristobalite in very high temperature applications. The International Agency for Research
on Cancer (IARC) has concluded, "Crystalline silica inhaled in the form of quartz or cristobalite from occupational
sources is carcinogenic to humans (Group 1).":
Avoid breathing dust and contact with skin and eyes.
Use NIOSH certified dust respirator (N95). This type of respirator is based on the OSHA requirements for
cristobalite at the time this document was written. Other types of respirators may be needed depending on
the job site conditions. Current NIOSH recommendations can be found on the NIOSH web site at http://
www.cdc.gov/niosh/homepage.html. NIOSH approved respirators, manufacturers, and phone numbers are
also listed on this web site.
Wear long-sleeved, loose fitting clothing, gloves, and eye protection.
Apply enough water to the combustion chamber lining or base insulation to prevent airborne dust.
Remove combustion chamber lining or base insulation from the boiler and place it in a plastic bag for disposal.
Wash potentially contaminated clothes separately from other clothing. Rinse clothes washer thoroughly.
NIOSH stated First Aid.
Eye: Irrigate immediately
Breathing: Fresh air.
REMOVAL OF FIBERGLASS WOOL — OR —
INSTALLATION OF FIBERGLASS WOOL, COMBUSTION CHAMBER LINING OR BASE
PANELS:
This product contains fiberglass jacket insulation and ceramic fiber materials in combustion chamber lining or base
panels in gas fired products. Airborne fibers from these materials have been listed by the State of California as a
possible cause of cancer through inhalation.
Avoid breathing dust and contact with skin and eyes.
Use NIOSH certified dust respirator (N95). This type of respirator is based on the OSHA requirements for
fiberglass wool at the time this document was written. Other types of respirators may be needed depending
on the job site conditions. Current NIOSH recommendations can be found on the NIOSH web site at http://
www.cdc.gov/niosh/homepage.html. NIOSH approved respirators, manufacturers, and phone numbers are
also listed on this web site.
Wear long-sleeved, loose fitting clothing, gloves, and eye protection.
Operations such as sawing, blowing, tear out, and spraying may generate airborne fiber concentration requiring
additional protection.
Wash potentially contaminated clothes separately from other clothing. Rinse clothes washer thoroughly.
NIOSH stated First Aid.
Eye: Irrigate immediately
Breathing: Fresh air.
10 Service and maintenance continued
GWA
Gas-Fired Water Boilers Boiler Manual
13Part Number 670 01 1001 00
Table 5 Pipe capacity for 0.60 specific gravity natural gas
4 Install gas piping
Natural Gas:
1. See Table 5 for pipe length and diameter. Base on rated
boiler input (divide by 1,000 to obtain cubic feet per hour).
Table 5 is only for gas with specific gravity 0.60, with a
pressure drop through the gas piping of 0.30" w.c. For
additional gas pipe sizing information, see ANSI Z223.1
(B149.1 or B149.2 for Canadian installations).
2. Inlet pressure required at gas valve inlet:
Maximum: 13" w.c.
Minimum: 5" w.c.
Manifold gas pressure: 3.5" w.c.
3. Install 100% lockup gas pressure regulator in supply line if
inlet pressure exceeds 13" w.c. Adjust for 13" w.c. maximum.
Propane Gas:
1. Contact gas supplier to size pipes, tanks and 100% lockup
gas pressure regulator.
2. Adjust propane supply regulator provided by gas supplier
for 13" w.c. maximum pressure.
3. Inlet pressure required at gas valve inlet:
Maximum: 13" w.c.
Minimum: 11" w.c.
Manifold gas pressure: 10" w.c.
Gas pipe
length
(feet)
Capacity of pipe for pipe size of:
(Capacity in standard cubic feet gas per hour)
½" ¾" 1" 1¼" 1½"
10 132 278 520 1050 1600
20 92 190 350 730 1100
30 73 152 285 590 860
40 63 130 245 500 760
50 56 115 215 440 670
75 45 93 175 360 545
100 38 79 150 305 460
150 31 64 120 250 380
1. Remove jacket front panel and see Figure 10 to pipe gas to
boiler.
a. Install drip leg at inlet of gas connection to boiler. Where
local utility requires drip leg to be extended to the floor, use
appropriate length of nipple between cap and tee.
b. Install ground joint union for servicing, when required.
c. Install manual shutoff valve in gas supply piping outside
boiler jacket when required by local codes or utility
requirements.
d. In Canada When using manual main shutoff valve, it must
be identified by the installer.
2. Support piping with hangers, not by boiler or its accessories.
3. Purge all air from gas supply piping.
4. Before placing boiler in operation, check boiler and its gas
connection for leaks.
a. Close manual main shutoff valve during any pressure
testing at less than 13" w.c.
b. Disconnect boiler and gas valve from gas supply piping
during any pressure testing greater than 13" w.c.
Do not check for gas leaks with an open flame
Use bubble test. Failure to use bubble test or check
for gas leaks can cause severe personal injury, death
or substantial property damage.
5. Use pipe dope compatible with propane gases. Apply sparingly
only to male threads of pipe joints so that pipe dope does not
block gas flow.
Failure to apply pipe dope as described in this manual
can result in severe personal injury, death or
substantial property damage.
Connecting gas supply piping to boiler
Figure 10 Gas supply piping
GWA
Gas-Fired Water Boilers Boiler Manual
24 Part Number 670 01 1001 00
The boiler should be inspected and started annually,
at the beginning of the heating season, only by a
qualified service technician. In addition, the
maintenance and care of the boiler designated in
Table 6, page 22 and explained on the following pages
must be performed to assure maximum boiler
efficiency and reliability. Failure to service and
maintain the boiler and system could result in
equipment failure.
Electrical shock hazard Turn off power to the boiler
before any service operation on the boiler except as
noted otherwise in this manual. Failure to turn off
electrical power could result in electrical shock,
causing severe personal injury or death.
The boiler contains ceramic fiber and fiberglass
materials. Use care when handling these materials
per instructions on page 23 of this manual. Failure to
comply could result in severe personal injury.
Inspect . . . . . . . . . .
Reported problems
Inspect any problems reported by owner and correct before
proceeding.
Boiler area
1. Verify that boiler area is free of any combustible materials,
gasoline and other flammable vapors and liquids.
2. Verify that boiler area (and air intake) is free of any of the
contaminants listed in Table 2 on page 5 of this manual. If any of
these are present in the boiler intake air vicinity, they must be
removed. If they cannot be removed, install combustion air piping
to the boiler in accordance with national, provincial or local
codes.
Air openings
1. Verify that combustion and ventilation air openings to the boiler
room and/or building are open and unobstructed. Check
operation and wiring of automatic combustion air dampers, if
used.
2. Verify that boiler vent discharge and air intake are clean and
free of obstructions.
Flue gas vent system
1. Visually inspect entire flue gas venting system for blockage,
deterioration or leakage. Repair any joints that show signs of
leakage in accordance with vent manufacturers instructions.
2. Verify that masonry chimneys are lined, lining is in good
condition, and there are not openings into the chimney.
Failure to inspect for the above conditions and have
them repaired can result in severe personal injury or
death.
Pilot and main burner flames
1. Visually inspect pilot burner and main burner flames as directed
under Section 6, page 17 of this manual.
10 Service and maintenance continued
Water piping
1. Check the boiler interior piping and all system piping for signs
of leaks.
2. Repair any leaks before proceeding.
Do not use petroleum-based cleaning or sealing
compounds in boiler system. Severe damage to boiler
will occur, resulting in substantial property damage.
Eliminate all system or boiler leaks. Continual fresh
makeup water will reduce boiler life. Minerals can
build up in sections, reducing heat transfer,
overheating cast iron, and causing section failure.
Leaking water may also cause severe property
damage.
Inspect . . . . . . . . . .
Boiler heating surfaces
1. Disconnect the vent pipe at the boiler draft hood and remove
draft hood after turning off power to the boiler.
2. Use a bright light to inspect the boiler flue collector and heating
surfaces.
3. If the vent pipe or boiler interior surfaces show evidence of
soot, follow Cleaning boiler heating surfaces in this manual
section, page 26. Remove the flue collector and clean the boiler
if necessary after closer inspection of boiler heating surfaces.
4. If there is evidence of rusty scale deposits on boiler surfaces,
check the water piping and control system to make sure the
boiler return water temperature is properly maintained (per this
manual).
5. Reconnect vent and draft hood. Replace all boiler components
before returning to service.
6. Check inside and around boiler for evidence of any leaks from
the boiler. If found, locate source of leaks and repair.
Burners and base
1. After turning off power to the boiler, remove the jacket door and
base access panel (Figure 17, item 4, page 30).
2. Inspect burners and all other components in the boiler base.
3. If burners must be cleaned, raise rear of each burner to release
from support slot, slide forward and remove. Then brush and
vacuum the burners thoroughly, making sure all ports are free
of debris. Carefully replace all burners, making sure burner with
pilot bracket is replaced in its original position and all burners
are upright (ports up).
4. Inspect the base insulation.
The boiler contains ceramic fiber and fiberglass
materials. Use care when handling these materials
per instructions on page 23 of this manual. Failure to
comply could result in severe personal injury.
a. Verify that the insulation is intact and secure against all four
sides of the base.
If insulation is damaged or displaced, do not operate
the boiler. Replace or reposition insulation as
necessary. Failure to replace damaged insulation can
result in a fire hazard, causing severe personal injury,
death or substantial property damage.
GWA
Gas-Fired Water Boilers Boiler Manual
12 Part Number 670 01 1001 00
Figure 8 System bypass piping in boiler loop with
separate system circulator, using primary/
secondary piping.
Figure 9 Boiler bypass piping — use only for high
water content systems DO NOT use for
radiant panel systems.
Near-boiler piping continued
Install all components specified above and adjust valves as described to prevent low temperature in the boiler. Failure to
prevent low water temperature in the boiler could cause corrosion of the boiler sections or burners, resulting in severe
personal injury, death or substantial property damage.
3 Install water piping continued
System bypass method
1. Apply bypass piping of Figure 8 to high water content systems,
radiant panel systems or any system that is likely to operate
with low return water temperature for extended periods.
2. The bypass arrangement shown protects the boiler from damage
caused by condensate corrosion due to low return water
temperature and protects low temperature systems from too
high a supply temperature.
3. Adjust the bypass valves as indicated below.
Adjust Bypass valves 1 and 2 as follows:
1. Start with valve 2 fully closed, valve 1 fully open.
2. Slowly open valve 2 while closing valve 1. Adjust the valves
until the boiler pressure/temperature gauge reads 160 °F or
higher. As you open the valves, pause long enough to allow
temperatures to level off. It takes a while for the boiler water
temperature to rise as the flow changes.
3. Bypass valve 2 allows hot boiler outlet water to blend with colder
return water, raising the supply temperature to the boiler. Bypass
valve 1 balances the pressure drop through valve 2.
4. The purpose of this piping is to raise the return water temperature
to the boiler enough to prevent condensation of flue gases.
Boiler bypass method
1. Apply bypass piping of Figure 9 to high water content systems,
such as converted gravity systems.
2. The bypass arrangement shown protects the boiler from damage
caused by condensate corrosion due to low return water
temperature. This method does not provide protection from high
temperature water being supplied to the system.
3. DO NOT apply this piping to radiant panel systems.
4. Adjust the bypass valves as indicated below.
Adjust Bypass valves 1 and 2 as follows:
1. Start with valve 1 fully closed, valve 2 fully open.
2. Slowly open valve 1 while closing valve 2. Adjust the valves
until the boiler pressure/temperature gauge reads approximately
60 °F higher than the system temperature gauge. As you open
the valves, pause long enough to allow temperatures to level
off. It takes a while for the boiler water temperature to rise as
the flow changes.
3. Bypass valve 1 controls system flow rate. Bypass valve 2
controls flow through the boiler.
4. The purpose of this piping is to cause a high enough temperature
rise in the boiler that the average temperature will be warm
enough to prevent condensation of flue gases.
GWA
Gas-Fired Water Boilers Boiler Manual
25Part Number 670 01 1001 00
Check/test. . . . . . . . . .
Air vents and air elimination
1. Inspect automatic air vents (if used). Also inspect air separators
to ensure they are operational.
2. The cap must be unscrewed one turn to allow air to escape.
3. If the air vent is leaking, remove cap and briefly push valve
then release to clean the valve seat.
4. Replace cap by twisting all the way onto valve and then
unscrewing one turn.
Limit controls and cutoffs
1. Inspect and test the boiler limit control. Verify operation by turning
control set point below boiler temperature. Boiler should cycle
off. Return dial to original setting.
2. Inspect and test additional limit controls or low water cutoffs
installed on system.
Expansion tank
1. Expansion tanks provide space for water to move in an out as
the heating system water expands due to temperature increase
or contracts as the water cools. Tanks may be open, closed or
diaphragm or bladder type. See Section 3, page 10 of this
manual for suggested locations of expansion tanks and air
eliminators.
Open-type located above highest radiator or baseboard unit,
usually in the attic or closet. Has a gauge glass and overflow
pipe to a drain.
Closed-type welded gas tight and located above boiler. Tank
is partially filled with water, leaving an air cushion for expansion.
Make sure this type of tank is fitted with a tank fitting, such
as the B & G Tank-Trol or Taco Taco-Trol. This fitting reduces
gravity circulation of air-saturated tank water back to the
system and prevents the air from bubbling up through the
water as it returns from the system.
Do not use automatic air vents in systems with closed-type
tanks. The air will escape from the system instead of
returning to the tank. Eventually, the tank will waterlog and
no longer control pressurization. The boiler relief valve will
weep frequently.
10 Service and maintenance continued
Check/test. . . . . . . . . .
Gas piping
1. Sniff near floor and around boiler area for any indication of a
gas leak.
2. Test gas piping using bubble test, per Section 4, page 13 of this
manual, if there is any indication of a leak.
Cold fill and operating pressures
1. While the system is cold, note the pressure reading on the boiler
pressure/temperature gauge. Verify that cold fill pressure is
correct.
2. Watch the pressure as the boiler and system heat up to ensure
pressure rise is normal. Too high a rise would indicate a
waterlogged or undersized expansion tank.
Start-up. . . . . . . . . .
1. Perform start-up procedures Section 6, pages 1517, including
Verify operation of burners and vent damper on page 17.
2. Verify cold fill pressure is correct and that fill system is working
properly.
3. Verify antifreeze level (if used) is at the right concentration and
that inhibitor level is correct.
4. Check gas piping, per Manual Section 4, page 13 and Section
6, page 15, verifying no indications of leakage and all piping
and connections are in good condition.
5. Read the Lighting or Operating Instructions (Manual Section 9,
pages 20 and 21 or Control Supplement) applying to the boiler.
6. Start the boiler following the Lighting or Operating Instructions
(Manual Section 9, pages 20 and 21 or Control Supplement).
Oiled-bearing circulators
1. The circulator shipped with the GWA boiler is water-lubricated.
No oiling is required.
2. Check other circulators in the system. Oil any circulators
requiring oil, following circulator manufacturers instructions.
Over-oiling will damage the circulator.
Service. . . . . . . . . .
GWA
Gas-Fired Water Boilers Boiler Manual
11Part Number 670 01 1001 00
Near-boiler piping continued
Figure 7 Piping refrigeration systems
Water piping refrigeration systems
Prevent chilled water from entering boiler
Install boiler so that chilled medium is piped in parallel with the
heating boiler. Use appropriate valves to prevent chilled medium
from entering boiler. See Figure 7 for typical installation of balancing
valve and check valve.
If system includes radiant heating circuits, provide
piping and controls to regulate the temperature
supplying the radiant circuits. Failure to comply could
result in substantial property damage.
Use Figure 5 or Figure 6 only for systems designed
for return water at least 130 °F. For systems with low
return water temperature possible, such as
converted gravity systems and radiant heating
systems, install bypass piping (see page 12) to
protect boiler against condensation. Failure to prevent
low return water temperature to the boiler could cause
corrosion of the boiler sections or burners, resulting
in severe personal injury, death or substantial
property damage.
Install boiler so that chilled medium is piped in parallel
with heating boiler (Figure 7). Use appropriate valves
to prevent chilled medium from entering boiler. Consult
I=B=R Installation and Piping Guides.
If boiler is connected to heating coils located in air
handling units where they can be exposed to
refrigerated air, use flow control valves or other
automatic means to prevent gravity circulation during
cooling cycle. Circulation of cold water through the
boiler could result in damage to the heat exchanger,
causing possible severe personal injury, death or
substantial property damage.
Figure 6 Closed-type expansion tank: Piping to
single-zone system using closed-type
expansion tank. See Table 4 for piping sizes.
Figure 5 Diaphragm- or bladder-type expansion tank:
Piping to single-zone system using
diaphragm-type or bladder-type expansion
tank. See Table 4 for piping sizes.
3 Install water piping continued
GWA
Gas-Fired Water Boilers Boiler Manual
26 Part Number 670 01 1001 00
10 Service and maintenance continued
Check/test. . . . . . . . . . continued
Diaphragm- or bladder-type welded gas tight with a rubber
membrane to separate the tank pressurizing air and the water.
May be located at any point in the system, but most often found
near the boiler.
Systems with this type of expansion tank require at least
one automatic air vent, preferably located on top of an air
eliminator, as shown in examples in Manual Section 3,
page 10.
2. If relief valve has tended to weep frequently, the expansion tank
may be waterlogged or undersized.
Closed-type tank tank is most likely waterlogged. Install a
tank fitting if not already installed. Then check fill level per fitting
manufacturers instructions. If fill level is correct, check tank
size against manufacturers instructions. Replace with a larger
tank if necessary.
Diaphragm- or bladder-type first, check tank size to be
sure it is large enough for the system. If size is too small, add
additional tank(s) as necessary to provide sufficient expansion.
If tank size is large enough, remove tank from system and
check charge pressure (usually 12 psig for residential
applications). If tank wont hold pressure, membrane has been
damaged. Replace tank.
Boiler relief valve
1. Inspect the relief valve and lift the lever to verify flow as in the
following warnings, excerpted from a relief valve manufacturers
warning label. Before operating any relief valve, ensure that it is
piped with its discharge in a safe area to avoid severe scald
potential. Read Manual Section 3, page 10, before proceeding
further.
2. After following the preceding warning directions, if the relief valve
weeps or will not seat properly, replace the relief valve. Ensure
that the reason for relief valve weeping is the valve and not
over-pressurization of the system due to expansion tank
waterlogging or undersizing.
Review with owner
1. Review the Users Information Manual with the owner.
2. Emphasize the need to perform the maintenance schedule
specified in the Users Information Manual (and in this manual
as well).
3. Remind the owner of the need to call in a licensed contractor
should the boiler or system exhibit any unusual behavior.
4. Remind the owner to follow the proper shutdown procedure
and to schedule an annual start-up at the beginning of the next
heating season.
The boiler contains ceramic fiber and fiberglass
materials. Use care when handling these materials
per instructions on page 23 of this manual. Failure to
comply could result in severe personal injury.
1. Shut down boiler:
Follow To Turn Off Gas to Appliance instructions on boiler
and Lighting or Operating Instructions”.
Do not drain boiler unless it will be exposed to freezing
temperatures. If using antifreeze in system, do not drain.
2. Follow shutdown procedure.
3. Remove venting system connection to boiler.
4. Remove top jacket panel. Turn back insulation.
5. Remove flue collector. Clean sealant from assembly and
sections.
6. Remove radiation plates hanging between sections.
7. Remove burners from base. Brush and vacuum burners to
remove all dust and lint. Verify that all burner ports are free of
debris.
8. Place newspapers in base of boiler to collect soot.
9. Clean between sections with wire flue brush.
10. Remove newspaper and soot. Vacuum or brush base and
surrounding area.
11. Reinstall radiation plates.
12. Replace collector box/transition assembly. Seal with sealant.
Obtain gas-tight seal to prevent flue gas spillage and carbon
monoxide emissions, resulting in severe personal injury or death.
13. Replace insulation and jacket top panel.
14. Start up boiler following section 6, pages 1517 of this manual
and the boiler “Lighting Instructions”, pages 20 and 21.
Excessive sooting indicates improper gas combustion. If found,
check for proper combustion and make any necessary
adjustments.
Cleaning boiler heating surfaces
Safety relief valves should be reinspected AT LEAST
ONCE EVERY THREE YEARS, by a licensed plumb-
ing contractor or authorized inspection agency, to
ensure that the product has not been affected by
corrosive water conditions and to ensure that the
valve and discharge line have not been altered or
tampered with illegally. Certain naturally occurring
conditions may corrode the valve or its components
over time, rendering the valve inoperative. Such con-
ditions are not detectable unless the valve and its
components are physically removed and inspected.
This inspection must only be conducted by a plumb-
ing contractor or authorized inspection agency not
by the owner. Failure to reinspect the boiler relief valve
as directed could result in unsafe pressure buildup,
which can result in severe personal injury, death or
substantial property damage.
Following installation, the valve lever must be oper-
ated AT LEAST ONCE A YEAR to ensure that wa-
terways are clear. Certain naturally occurring min-
eral deposits may adhere to the valve, rendering it
inoperative. When manually operating the lever, wa-
ter will discharge and precautions must be taken to
avoid contact with hot water and to avoid water dam-
age. Before operating lever, check to see that a dis-
charge line is connected to this valve directing the
flow of hot water from the valve to a proper place of
disposal otherwise severe personal injury may re-
sult. If no water flows, valve is inoperative. Shut down
boiler until a new relief valve has been installed.
GWA
Gas-Fired Water Boilers Boiler Manual
10 Part Number 670 01 1001 00
Table 4 Water pipe size (based on 20 °F rise)
General
If installation is to comply with ASME or Canadian requirements,
an additional high temperature limit is needed. Install control in supply
piping between boiler and isolation valve. Set second control to
minimum 20 °F above setpoint of first control. Maximum allowable
setpoint is 240 °F. See page 19 for wiring.
A low water cutoff device is required when boiler is installed above
radiation level or by certain state or local codes or insurance
companies. Use low water cutoff designed for water installations.
Electrode probe-type is recommended. Purchase and install in tee
supply piping above boiler.
Use backflow check valve in cold water supply if required by local
codes.
See Table 4 and Figure 5 (diaphragm-type or bladder-type expansion
tank) or Figure 6 (closed-type expansion tank) on page 11 for near-
boiler piping for systems designed for return water at least 130 °F.
See page 12 (Figures 8 and 9) for near-boiler piping for low-
temperature or high-volume systems.
See page 11 (Figure 7) for boilers used with refrigeration systems.
Near-boiler piping
3 Install water piping
Relief valve
Install relief valve vertically in ¾" tapping on side of boiler. See the
tag attached to the relief valve for manufacturers instructions.
To avoid water damage or scalding due to valve
operation, discharge line must be connected to relief
valve outlet and run to a safe place of disposal.
Terminate the discharge line to eliminate possibility
of severe burns should the valve discharge.
Discharge line must be as short as possible and be
the same size as the valve discharge connection
throughout its entire length.
Discharge line must pitch downward from the valve
and terminate at least 6" above the floor drain where
any discharge will be clearly visible.
The discharge line shall terminate plain, not threaded,
with a material serviceable for temperatures of 375 °F
or greater.
Do not pipe the discharge to any place where freezing
could occur.
No shutoff valve shall be installed between the relief
valve and boiler, or in the discharge line. Do not plug
or place any obstruction in the discharge line.
Failure to comply with the above guidelines could
result in failure of the relief valve to operate, resulting
in possibility of severe personal injury, death or
substantial property damage.
Test the operation of the valve after filling and
pressurizing system by lifting the lever. Make sure
the valve discharges freely. If the valve fails to operate
correctly, replace it with a new relief valve.
Water piping multiple zone systems
Install system piping using either circulator zoning or zone valve
zoning. Install expansion tank on suction side of system circulator.
Always connect fill line only at the expansion tank never at
another point in the system.
Circulator
The circulator is shipped loose (wiring pre-attached to boiler) to
allow you to locate it either in the return or supply piping, as desired.
See page 11 for a typical installation. Pipe the expansion tank to
the suction side of the circulator whenever possible. Install an air
separator in the supply piping. Connect the expansion tank to the
air separator only if the separator is on the suction side of the
circulator. Always install the system fill connection at the same point
as the expansion tank connection to the system. Figures 5 and 6
show typical near-boiler piping connections.
Expansion tank
Diaphragm-type or bladder-type expansion tank
Figure 5
1. Ensure expansion tank size will handle boiler and system water
volume and temperature. Tank must be located in boiler return
piping as close to boiler as possible, before inlet side of circulator.
See tank manufacturers instructions for details.
2. Install an automatic air vent as shown.
Closed-type expansion tank — Figure 6
1. Ensure expansion tank size will handle boiler and system water
volume and temperature. See tank manufacturers instructions
for details.
2. Connect tank to ½" NPT tapping located behind supply outlet,
using ½" NPT piping. Pitch any horizontal piping up towards
tank 1 inch per 5 feet of piping.
Undersized expansion tanks cause system water to
be lost from relief valve and makeup water to be
added through fill valve. Eventual section failure can
result.
Near-boiler piping continued
Boiler model
number To
system From
system
GWA052 ¾" ¾"
GWA070 1" 1"
GWA105 1" 1"
GWA140 1" 1"
GWA175 1¼" 1¼"
GWA210 1¼" 1¼"
GWA245 1½" 1½"
GWA
Gas-Fired Water Boilers Boiler Manual
27Part Number 670 01 1001 00
11 Troubleshooting
Verify proper operation after servicing. See vent
damper manufacturers instructions packed with vent
damper for additional information. Failure to comply
could result in severe personal injury, death or
substantial property damage.
Figure 15 Manually opening vent damper
Label all wires prior to disconnection when servicing
controls. Wiring errors can cause improper and
dangerous operation.
Never jumper (bypass) rollout thermal fuse element
or any other device except for momentary testing as
outlined in Chart 1, page 28. Severe personal injury,
death or substantial property damage can result.
Burner access panel must be in position during boiler
operation to prevent momentary flame rollout on
ignition of main flame. Severe personal injury or
substantial property damage will result.
Before troubleshooting:
1. Have the following items:
a. Voltmeter that can check 120 VAC and 24 VAC.
b. Microammeter with a scale range of 0-10.
c. Continuity checker.
d. U-tube manometer.
2. Check for 120 VAC (minimum 102 VAC to maximum 132 VAC)
to boiler.
3. Make sure thermostat is calling for heat and contacts (including
appropriate zone controls) are closed. Check for 24 VAC
between thermostat wire nuts and ground.
Troubleshooting sequence:
1. Before proceeding, check for:
Loose connections, blown fuse or service switch off?
High limit switch set below boiler water temperature?
Thermostat set below room temperature?
Gas not turned on at meter or boiler?
Incoming gas pressure less than:
5" w.c. for natural gas? 11" w.c. for propane gas?
2. If all of the above check correctly, check gas pressures:
a. With boiler off
13" w.c. maximum natural or propane gas pressure
upstream of gas valve.
b. With boiler on:
5" w.c. minimum natural gas pressure or 11" w.c.
propane gas pressure upstream of gas valve.
3.5" w.c. minimum natural gas pressure or 10" w.c.
propane gas pressure downstream tapping on gas
valve Can be adjusted by regulator on gas valve.
c. If gas pressure is incorrect or gas is not available to boiler,
contact gas supplier to correct before proceeding further.
3. Check pilot operation - Follow Lighting Instructions, pages 20
and 21.
If gas is available and you cannot obtain a pilot flame, try
purging the gas line and cleaning pilot and pilot gas tubing.
Follow Lighting Instructions again. If you still cannot obtain
a flame, replace pilot burner and gas tubing. If this does not
allow you to obtain a pilot flame, replace gas valve.
If you obtain a pilot flame, but pilot will not remain on, replace
thermocouple. If this does not correct problem, replace gas
valve and pilot burner.
If pilot stays on, but main gas will not come on, proceed to
page 28.
In event of vent damper failure:
Effikal vent damper
If troubleshooting chart recommends replacing actuator and actuator
is not immediately available, damper blade can be fixed in an open
position to allow boiler operation. Manually turning blade can cause
actuator damage. Follow these instructions only in case of no heat
or damper actuator malfunction.
1. Move damper service switch to Hold Damper Open position.
Apply call for heat to boiler. Damper blade should then rotate to
Open position and boiler will fire.
2. If step 1 does not open damper, manually rotate damper blade
to open position using wrench or pliers on flat shaft between
damper and actuator. Boiler will fire. Verify that damper service
switch is in Hold Damper Open position. (Figure 15)
3. Do not leave vent damper permanently in this position. Replace
actuator immediately. If vent damper is left in Open position,
boiler will not operate at published efficiencies.
Johnson Controls vent damper
If troubleshooting chart recommends replacing actuator and actuator
is not immediately available, damper blade can be fixed in an open
position to allow boiler operation. Follow these instructions only in
case of no heat or damper actuator malfunction. See Figure 15.
1. Turn off power to boiler.
Failure to turn off power to boiler can result in severe
personal injury, death or substantial property damage.
2. See vent damper manufacturers instructions for procedure to
fix vent damper in open position.
3. Turn on power to boiler.
4. Using wrench or pliers on flat shaft section, manually rotate
damper blade until green light turns on. Boiler will fire. (Figure 15)
5. Do not leave vent damper permanently in this position. Replace
actuator immediately. If vent damper is left in Open position,
boiler will not operate at published efficiencies.
GWA
Gas-Fired Water Boilers Boiler Manual
9Part Number 670 01 1001 00
Figure 4 Vent damper assemblies
Damper installation
Do not modify draft hood or vent damper, or make
another connection between draft hood and vent
damper or boiler except as noted below. This will void
CSA certification and will not be covered by
Williamson-Thermoflo warranty. Any changes will
cause severe personal injury, death or substantial
property damage.
1. Install vent damper horizontally or vertically as shown in vent
damper manufacturers instructions. Vent damper must be
installed so that it serves only one boiler and so damper blade
indicator is visible to the user. See Figure 4.
2. Screws or rivets used to secure the vent damper to the draft
hood must not interfere with rotation of the damper blade.
3. Install damper harness between damper actuator and hole in
jacket left side panel. See Figure 3, page 8.
Use strain relief connectors and locknuts to secure both ends
of damper harness.
Keep wiring harness clear of all hot surfaces. Wire
insulation could be damaged, causing risk of electrical
short-circuit.
4. Read and apply the harness plug warning label (shown upper-
left) so that it is visible after installation
5. Plug damper harness receptacle into damper harness plug.
Bypassing (jumpering) vent damper will cause flue
products such as carbon monoxide to escape into
the house. This will cause severe personal injury or
death.
After boiler has operated once, if either end of harness
is disconnected, the system safety shutdown will
occur. The boiler will not operate until harness is
reconnected.
Effikal damper Damper hold open switch must be
in Automatic Operation position for system to operate
properly.
Vent damper continued
2 Prepare boiler continued
GWA
Gas-Fired Water Boilers Boiler Manual
28 Part Number 670 01 1001 00
Is 24VAC present across transformer terminals C & Y?
Is damper harness securely plugged in at both ends?
Secure connections.
Check for open thermostat, LWCO, high limit, spill switch or
rollout thermal fuse element contacts or check for loose
wire connections.
If LWCO, spill switch or rollout thermal fuse
element contacts are open, determine cause
and correct condition. Failure to do so will
cause severe personal injury, death or
substantial property damage.
Check/repair out of round stack section.
Does vent damper rotate open?
Is 24VAC present across transformer terminal C and yellow
wire on vent damper connector?
Is 24VAC present across gas valve terminals?
Open thermostat contacts for 30 seconds. Vent damper will
rotate to closed position. Close thermostat contacts. Vent
damper will rotate to open position.
Is 24VAC present across gas valve terminals?
Remove damper harness from
damper harness plug.
TEMPORARILY install jumper
between terminal 2 and
terminal 5 on damper plug in
boiler wiring harness. See
Table, right.
Does boiler fire?
No Yes
No Yes
Chart 1 — Standing pilotBoiler will not fire
Check for loose wire connections or bad relay on
transformer.
No Yes
Is vent damper rotated open?
No Yes
No Yes
Replace actuator.
• Retest.
Check continuity of each wire in damper harness.
Does
continuity exist for each wire?
See Table right.
Replace damper
wiring harness.
• Retest.
Replace gas valve.
• Retest.
Is main flame on now?
No Yes
Retest.
No Yes
No Yes
No Yes
No Yes
Replace damper actuator.
• Retest.
Turn gas valve cock to
ON position.
• Retest.
Replace gas valve.
• Retest.
Is gas valve cock turned to ON position?
No Yes
Before proceeding, follow "Troubleshooting sequence" on page 27. If problem persists, then:
11 Troubleshooting continued
GWA
Gas-Fired Water Boilers Boiler Manual
8Part Number 670 01 1001 00
1. Connect from draft hood or vent damper outlet to chimney or
vent with same size vent connector.
2. Where possible, vertical venting to the outside from the draft
hood or vent damper outlet will offer best performance.
3. Where horizontal vent connector is used, slope upward at least
¼" per lineal foot toward chimney or vent and support with
hangers to prevent sagging.
4. Breeching must not be connected to any portion of a mechanical
draft system that can operate under positive pressure.
Long horizontal vent connector, excessive number
of elbow or tees, or other obstructions that restrict
the flow of combustion gases should be avoided.
Severe personal injury, death or substantial property
damage could result.
Install vent piping
These systems are used on gas-fired boilers with
vent dampers as shipped from factory. Boiler will not
operate without vent damper installed.
Only vent dampers listed in the Replacement parts
list on page 29 are certified for use with GWA boilers.
Any other vent damper installed could cause severe
personal injury or death.
Damper blade
Standing pilot ignition systems See vent manufacturers
instructions to install plug (shipped with damper) in damper hole.
For standing pilot boilers only, install plug with 3
/8" diameter hole in
vent damper hole.
Spark-ignited pilot systems See vent manufacturer’s
instructions to install plug (shipped with damper) in damper hole.
For spark-ignited pilot boilers only, install plug with no hole in vent
damper hole.
Minimum clearances
Provide a minimum of 6" between the vent damper and any
combustible material. (See Minimum clearance to combustible
materials, page 3, for minimum clearance from jacket top to ceiling
to maintain this dimension.)
Vent damper
Draft hood installation
1. Orient draft hood with spill switch mounting holes to front of
boiler as shown in Figure 3.
2. Secure draft hood to outlet at top of boiler with sheet metal
screws.
Figure 3 Spill switch with wire harness
Draft hood & spill switch
3. Bottom of draft hood or skirt must have clearance dimension
above jacket top panel as indicated on draft hood.
Do not alter boiler draft hood or place any
obstruction or non-approved vent damper in
breeching or vent system. CSA certification will
become void. Flue gas spillage and carbon
monoxide emissions will occur causing severe
personal injury or death.
Improper orientation of spill switch may cause
boiler to shut down. The loss of heat can result in
significant damage due to freezing.
Spill switch installation
1. Fasten spill switch to draft hood as shown in Figure 3.
2. See Wiring diagram to connect wires:
a. Standing pilot boiler see page 19.
b. Spark-ignited pilot boiler see Control Supplement.
2 Prepare boiler continued
GWA
Gas-Fired Water Boilers Boiler Manual
29Part Number 670 01 1001 00
Figure 16 Section assembly, flue collector, draft hood and vent damper
12 Replacement parts
Item
number
Description International
Comfort
Products
part number
not shown Replacement
section
assembly
GWA052
GWA070
GWA105
GWA140
GWA175
GWA210
GWA245
321114501WT
321114501WT
321114502WT
321114503WT
321114504WT
321114505WT
321114506WT
1Radiation plate
(1 per joint)
460003700WT
2Collector
hood
GWA052
GWA070
GWA105
GWA140
GWA175
GWA210
GWA245
381354625WT
381354626WT
381354627WT
381354628WT
381354629WT
381354630WT
381354631WT
3Draft hood GWA052
GWA070
GWA105
GWA140
GWA175
GWA210
GWA245
450021270WT
450021271WT
450021272WT
450021273WT
450021274WT
450021275WT
450021276WT
Item
number
Description International
Comfort
Products
part number
4High limit, 30°differential,
with well
Honeywell L4080D1036
White-Rodgers 11B81-3
510312250WT
5Spill switch 510350105WT
6Vent
damper
4" GWA052
GWA070
Effikal RVGP-KS-4BKF
*Johnson Controls Q35GB-2
510512350WT
5" GWA105 Effikal RVGP-KS-5BKF
*Johnson Controls Q35GD-2
510512351WT
6" GWA140
GWA175
Effikal RVGP-KS-6BKF
*Johnson Controls Q35GF-2
510512352WT
7" GWA210
GWA245
Effikal RVGP-KS-7BKF
*Johnson Controls Q35GH-2
510512353WT
*Johnson Controls damper assemblies consist of M35BC
actuator and Y15 vent pipe
7Vent damper actuator Effikal RVGP
Johnson M35BE-1C
only with vent
damper above
8Vent damper harness 591391795WT
GWA
Gas-Fired Water Boilers Boiler Manual
7Part Number 670 01 1001 00
Perform hydrostatic pressure test
Pressure test boiler before attaching water or gas piping or electrical
supply (except as noted below).
Prepare boiler for test
1. Remove the shipping nipple (from GWA supply tapping) and
remove the boiler relief valve. Temporarily plug the relief valve
tapping with a ¾" NPT pipe plug.
2. Remove 1¼" nipple, reducing tee and drain valve from
accessory bag. Install in boiler return connection as shown on
in Figure 19, item 3, page 32. Install circulator on either the
return or supply.
3. Remove 1¼" nipple, 1¼" tee, bushing and pressure/temperature
gauge from accessory bag. Pipe to boiler supply connection as
shown in Figure 19, item 2, page 32. (Use pipe dope sparingly.)
4. Connect a hose to boiler drain valve, the other end connected
to a fresh water supply. Make sure hose can also be used to
drain boiler after test.
5. Connect a nipple and shutoff valve to system supply connection
on the 1¼" tee. This valve will be used to bleed air during the fill.
(Valve and nipple are not included with boiler.)
6. Connect a nipple and shutoff valve to system return connection
(at circulator flange if circulator installed on return). This valve
will be used to bleed air during the fill. (Valve and nipple are not
included with boiler.)
7. Temporarily plug the air elimination tapping (next to supply
tapping).
2 Prepare boiler continued
Pressure test
Fill and pressure test
1. Open the shutoff valves you installed on supply and return
connections.
2. Slowly open boiler drain valve and fresh water supply to fill
boiler with water.
3. When water flows from shutoff valves, close boiler drain valve.
4. Close shutoff valves.
5. Slowly reopen boiler drain valve until test pressure of not more
than 45 psi is reached on the pressure/temperature gauge.
6. Test at no more than 45 psi for no more than 10 minutes.
Do not leave boiler unattended. A cold water fill could
expand and cause excessive pressure, resulting in
severe personal injury, death or substantial property
damage.
7. Make sure constant gauge pressure has been maintained
throughout test. Check for leaks. Repair if found.
Leaks must be repaired at once. Failure to do so can
damage boiler, resulting in substantial property
damage.
Do not use petroleum-based cleaning or sealing
compounds in boiler system. Severe damage to boiler
will occur, resulting in substantial property damage.
Drain and remove fittings
1. Disconnect fill water hose from water source.
2. Drain boiler at drain valve or out hose, whichever provides best
access to drain. Remove hose after draining if used to drain
boiler.
3. Remove nipples, valves and plus unless they will remain for
use in the system piping.
4. Remove plug from relief valve tapping. See Section 3, page 10,
to replace relief valve.
GWA
Gas-Fired Water Boilers Boiler Manual
30 Part Number 670 01 1001 00
Figure 17 Base assembly, manifold, orifices and burners
12 Replacement parts continued
Item
number Description International
Comfort
Products
part number
Base assembly kit GWA052 & GWA070
GWA105
GWA140
GWA175
GWA210
GWA245
381354200WT
381354201WT
381354202WT
381354203WT
381354204WT
381354205WT
1Base side panel (in Base assembly)
2Base front cross-tie assembly (in Base assembly)
3Base back cross-tie assembly (in Base assembly)
4Base access panel (in Base assembly)
5Base pan angle, left side (in Base assembly)
6Base pan angle, right side (in Base assembly)
7Base pan (in Base assembly)
8Burner rest (in Base assembly)
9Base insulation kit
(includes insulation for
all base parts above
plus gasket material
needed between block
assembly and base)
GWA052 to GWA140
GWA175 to GWA245 381354210WT
381354211WT
10 Boiler leg kit 590424252WT
11 Manifold GWA052
GWA070
GWA105
GWA140
GWA175
GWA210
GWA245
591126615WT
591126616WT
591126617WT
591126618WT
591126619WT
591126556WT
591126557WT
12 Main burner orifice, sea level 560528997WT
13 Burner, stainless steel 512200077WT
14 Burner with pilot
bracket
(not shown)
Standing pilot 512200079WT
Spark-ignited pilot 512200078WT
15 Screw, 10-32 x 3/8STP type D hx, washer head
slot ZP available at
local supply
house
16 Rollout thermal fuse element 512050230WT
GWA
Gas-Fired Water Boilers Boiler Manual
6Part Number 670 01 1001 00
Air openings continued
2 Prepare boiler
Table 3 Manifold orifice sizing
Place boiler/crate near position
1. Leave boiler in crate and on pallet until installation site is
ready.
2. Move entire crate and pallet next to selected location.
3. Remove crate. Leave boiler on pallet.
4. Remove boiler from pallet as follows:
a. Tilt left side of boiler up and place a board under left legs.
b. Tilt boiler the other way and place a board under right legs.
c. Slide boiler backwards off pallet and into position.
Do not drop boiler or bump jacket on floor or pallet.
Damage to boiler can result.
5. Check level.
a. Shim legs, if necessary.
b. Do not alter legs.
Placement and setup 3. Level and straighten burners.
Burners must be properly seated in slots in burner
rest with their openings face up. Main burner orifices
must inject down center of burner. Failure to properly
seat burners will result in severe personal injury,
death or substantial property damage.
4. Reinstall access panel.
Do not operate boiler without access panel secured
in place. Failure to comply could cause momentary
flame rollout on ignition of main flame, resulting in
possible fire or personal injury hazard.
Inspect orifices and burners
1. Remove front jacket door. Remove base access panel (See
Figure 17, item 4, page 30).
2. Check for correctly-sized manifold orifices. See Table 3 for sizing.
(The orifice size is stamped on the orifice spud barrel.)
Correctly-sized manifold orifices must be used. Failure
to do so will result in severe personal injury, death or
substantial property damage.
1 Prepare boiler location continued
Exhaust fans and air movers
The appliance space must never be under a negative pressure.
Always provide air openings sized not only to the dimensions
required for the firing rate of all appliances, but also to handle the air
movement rate of the exhaust fans or air movers using air from the
building or space.
Motorized air dampers
If the air openings are fitted with motorized dampers, electrically
interlock the damper to:
Prevent the boiler from firing if the damper is not fully open.
Shut the boiler down should the damper close during boiler
operation.
To accomplish this interlock, wire an isolated contact (proving the
damper open) in series with the thermostat input to the boiler. The
boiler will not start if this contact is open, and will shut down should
it open during operation.
Location Natural gas Propane gas
U. S.
Sea level
2,000 ft over
2,000 ft Sea level
2,000 ft over
2,000 ft
2.00 mm (Note 1) 1.30 mm (Note 1)
Canada
Sea level
2,000 ft 2,000
4,500 Sea level
2,000 ft 2,000
4,500
2.00 mm #49 1.30 mm #56
Note 1: For U. S. elevations above 2,000 feet, contact your International Com-
fort Products supplier for details.
GWA
Gas-Fired Water Boilers Boiler Manual
31Part Number 670 01 1001 00
Figure 18 Jacket assembly
12 Replacement parts continued
The boiler contains ceramic fiber and fiberglass materials. Use care when handling these materials per
instructions on page 23 of this manual. Failure to comply could result in severe personal injury.
Item
number Description International
Comfort
Products
part number
1Junction box, 4 x 4
(Available at local supply house)
1a Junction box, 2 x 4
(Available at local supply house)
2Jacket panel, left side, with
insulation 431223425WT
3Jacket panel, right side, with
insulation 431223426WT
4Jacket
panel,
door
GWA052 & GWA070
GWA105
GWA140
GWA175
GWA210
GWA245
431223450WT
431223451WT
431223452WT
431223453WT
431223454WT
431223455WT
Item
number Description International
Comfort
Products
part number
5Jacket
panel, top GWA052 & GWA070
GWA105
GWA140
GWA175
GWA210
GWA245
431223433WT
431223434WT
431223435WT
431223436WT
431223437WT
431223438WT
6Jacket
cross tie GWA052 & GWA070
GWA105
GWA140
GWA175
GWA210
GWA245
431223507WT
431223508WT
431223509WT
431223510WT
431223511WT
431223512WT
7Jacket
panel,
interior,
with
insulation
GWA052 & GWA070
GWA105
GWA140
GWA175
GWA210
GWA245
431223427WT
431223428WT
431223429WT
431223430WT
431223431WT
431223432WT
8Jacket
panel,
rear, with
insulation
GWA052 & GWA070
GWA105
GWA140
GWA175
GWA210
GWA245
431223444WT
431223445WT
431223446WT
431223447WT
431223448WT
431223449WT
GWA
Gas-Fired Water Boilers Boiler Manual
5Part Number 670 01 1001 00
Table 2 Corrosive contaminants and likely locations
To prevent potential of severe personal injury or death,
check for products or areas listed below before
installing boiler. If any of these contaminants are found:
Remove contaminants permanently.
OR
Isolate boiler and provide outside combustion air. See
national, provincial or local codes for further
information.
Please review the following information on potential combustion air
contamination problems.
See Table 2 for products and areas which may cause contaminated
combustion air.
Air contamination Air openings
Combustion air and ventilation openings must comply with Section
5.3, Air for Combustion and Ventilation, of National Fuel Gas Code
ANSI Z223.1latest edition, or applicable local building codes.
Canadian installations must comply with B149.1 or B149.2
Installation Codes.
See table below for minimum combustion/ventilation air opening
sizes. Where openings are required, provide two (2) openings
one within 12 inches of the ceiling, the other within 12 inches of the
floor, as shown in the table illustrations.
Provide adequate combustion and ventilation air to
assure proper combustion and reduce the risk of
severe personal injury, death or substantial property
damage caused by flue gas spillage and carbon
monoxide emissions.
Products to avoid
Spray cans containing chloro/fluorocarbons
Permanent wave solutions
Chlorinated waxes/cleaners
Chlorine-based swimming pool chemicals
Calcium chloride used for thawing
Sodium chloride used for water softening
Refrigerant leaks
Paint or varnish removers
Hydrochloric acid/muriatic acid
Cements and glues
Antistatic fabric softeners used in clothes dryers
Chlorine-type bleaches, detergents, and cleaning solvents found in
household laundry rooms
Adhesives used to fasten building products and other similar products
Areas likely to have contaminants
Dry cleaning/laundry areas and establishments
Swimming pools
Metal fabrication plants
Beauty shops
Refrigeration repair shops
Photo processing plants
Auto body shops
Plastic manufacturing plants
Furniture refinishing areas and establishments
New building construction
Remodeling areas
Garages with workshops
1 Prepare boiler location continued
GWA
Gas-Fired Water Boilers Boiler Manual
32 Part Number 670 01 1001 00
Figure 19 Trim assembly
12 Replacement parts continued
Item
number
Description Manufacturer Manufacturer’s
part number
International
Comfort
Products
part number
1Pressure relief valve, ASME, 30 PSIG, ¾"maleinlet
Pressure relief valve, ASME, 30 PSIG, ¾" female inlet
(Fittings shown are factory-installed on boiler.)
Conbraco
Watts 10-407-10
M330 511546920WT
Conbraco
Watts 10-408-05
335 511546924WT
2Combination pressure-temperature gauge, with 2½"short
shank Ametek
ENFM PTA-1088
4104 510218099WT
3Drain valve, ¾"
(Fittings shown are included with boiler.) Conbraco
Hammond Valve
Matco-Norca
Watts
31-606-01
710
205F04
BD-2C
511210423WT
4Circulator (Fittings shown are shipped loose with boiler.) Taco 007 511405113WT
5Circulator gasket, universal (2 per boiler) International Comfort Products 590317535WT
not
shown Circulator hardware kit, includes:
2 flanges, 4 nuts, 4 screws, 2 pipe nipples
1" NPT GWA052 through GWA140
"NPTGWA175 through GW245
International Comfort Products
381354525WT
381354526WT
6Circulator wiring harness International Comfort Products 591319793WT
GWA
Gas-Fired Water Boilers Boiler Manual
4Part Number 670 01 1001 00
1 Prepare boiler location continued
Failure to follow all instructions can result in flue gas
spillage and carbon monoxide emissions, causing
severe personal injury or death.
When removing boiler from existing common vent
system:
At the time of removal of an existing boiler, the following steps shall
be followed with each appliance remaining connected to the common
venting system placed in operation, while the other appliances
remaining connected to the common venting system are not in
operation.
a. Seal any unused openings in the common venting system.
b. Visually inspect the venting system for proper size and horizontal
pitch and determine there is no blockage or restriction, leakage,
corrosion or other deficiencies which could cause an unsafe
condition.
c. Test vent system Insofar as is practical, close all building
doors and windows and all doors between the space in which
the appliances remaining connected to the common venting
system are located and other spaces of the building. Turn on
clothes dryers and any appliance not connected to the common
venting system. Turn on any exhaust fans, such as range hoods
and bathroom exhausts, so they will operate at maximum speed.
Do not operate a summer exhaust fan. Close fireplace dampers.
d. Place in operation the appliance being inspected. Follow the
lighting/operating instructions. Adjust thermostat so appliance
will operate continuously.
e. Test for spillage at draft hood relief opening after 5 minutes of
main burner operation. Use the flame of a match or candle.
f. After it has been determined that each appliance remaining
connected to the common venting system properly vents when
tested as outlined above, return doors, windows, exhaust fans,
fireplace dampers, and any other gas-burning appliance to their
previous conditions of use.
Any improper operation of common venting system should be
corrected so the installation conforms with the National Fuel Gas
Code, ANSI Z223.1latest edition. Correct by resizing to approach
the minimum size as determined using the appropriate tables in
Part 11 of that code. Canadian installations must comply with B149.1
or B149.2 Installation Code.
Chimney or vent requirements
1. Venting must be installed according to Part 7, Venting of
Do not alter boiler draft hood or place any obstruction
or non-certified vent damper in breeching or vent
system. CSA certification will become void. Flue gas
spillage and carbon monoxide emissions will occur
causing severe personal injury or death.
Inspect existing chimney before installing boiler.
Failure to clean or replace perforated pipe or tile lining
will cause severe personal injury or death.
Vent system
Equipment, of National Fuel Gas Code, ANSI Z223.1latest
edition and applicable building codes. Canadian installations
must comply with B149.1 or B149.2 Installation Codes.
2. See Ratings on page 35 for minimum chimney or vent sizes.
Chimney or vent termination:
A chimney, or any vent other than a Type B vent with listed
vent cap, must extend at least 3 feet above the highest point
where it passes through a roof of a building, and at least
2 feet higher than any portion of a building within a horizontal
distance of 10 feet.
Type B vents with listed caps may terminate as in Figure 2
if no closer than 8 feet from a vertical wall or similar
obstruction.
Otherwise, Type B vents must terminate at least 2 feet above
the roof penetration and at least 2 feet higher than any portion
of a building within 10 feet.
3. A lined chimney is preferred and must be used when required
by local, state, provincial and national codes, laws, regulations
and ordinances. Vitreous tile linings with joints that prevent
retention of moisture and linings made of noncorrosive materials
are best. Advice for flue connections and chimney linings can
be obtained from local gas utility. Type B double-wall metal vent
pipe or single-wall vent pipe may be used as a liner.
4. Cold masonry chimneys, also known as outside chimneys,
typically have one or more walls exposed to outside air.
When any atmospheric gas-fired boiler with automatic vent
damper is vented through this type of chimney, the potential
exists for condensation to occur. Condensation can damage a
masonry chimney. Williamson-Thermoflo recommends the
following to prevent possible damage.
a. Line chimney with corrosion-resistant metal liner such as
AL29-4C® single-wall stainless steel or B-vent. Size liner
per National Fuel Gas Code ANSI Z223.1latest edition.
b. Provide drain trap to remove any condensate.
5. Where two or more gas appliances vent into a common
chimney or vent, equivalent area should be at least equal to
area of vent outlet on largest appliance plus 50 percent of vent
outlet area of additional appliance.
Figure 2 Terminations with Type B vent fitted with
listed cap, provided vent is at least 8 feet
from any vertical wall or similar obstruction
The following requirements apply when you remove
an existing boiler from a vent system shared with
other appliances. If the new boiler will not use the
common vent, you must test (as described below)
each remaining appliance operating by itself to
verify that the vent system operates adequately.
GWA
Gas-Fired Water Boilers Boiler Manual
33Part Number 670 01 1001 00
Figure 20 Gas control assembly
12 Replacement parts continued
Item
number Description Manufacturer Manufacturer’s
part number International
Comfort
Products
part number
Standing pilot Natural gas components
1Gas valve,
1
/
2
"x
1
/
2
", GWA052 through GWA175
Gas valve,
3
/
4
"x
3
/
4
", GWA210 and GWA245
Honeywell
Robertshaw
Honeywell
VR8200A2116
7200ER
VR8300C4050
511044360WT
511044256WT
2Pilot assembly kit with orifice International Comfort Products 510811005WT
3Tubing, pilot, aluminum 560742860WT
4Tubing, thermocouple 511724254WT
5Transformer relay 510312167WT
not
shown Wiring harness 591391862WT
GWA
Gas-Fired Water Boilers Boiler Manual
3Part Number 670 01 1001 00
Service clearances
1. Provide minimum clearances for cleaning and servicing the
boiler and for access to controls and components as listed in
the table below:
2. Provide at least screwdriver clearance to jacket front panel
screws for removal of front panel for inspection and minor
service. If unable to provide at least screwdriver clearance,
install unions and shutoff valves in system so boiler can be
moved for servicing.
Figure 1 Minimum clearances
Clearances
Service clearances: Minimum
Top
(for cleaning flueways)
35"
Front
(for access to controls and components)
18"
Back 7"
Left side
(for cleaning and servicing)
24"
Right side 7"
Flooring and foundation
Flooring
The GWA boiler is approved for installation on combustible flooring,
but must never be installed on carpeting.
Do not install boiler on carpeting even if foundation is
used. Fire can result, causing severe personal injury,
death or substantial property damage.
Foundation
1. Provide a solid brick or minimum 2-inch thick concrete
foundation pad if any of the following is true:
floor can become flooded.
the boiler mounting area is not level.
2. See Table 1 for minimum foundation dimensions.
Residential garage installation
Take the following special precautions when installing the boiler in
a residential garage. If the boiler is located in a residential garage,
per ANSI Z223.1, paragraph 5.1.9:
Mount the boiler a minimum of 18 inches above the floor of the
garage to assure the burner and ignition devices will be no less
than 18 inches above the floor.
Locate or protect the boiler so it cannot be damaged by a moving
vehicle.
Minimum clearance to combustible materials
1. Hot water pipes must be at least ½" from combustible material.
2. Single-wall vent pipe must be at least 6 inches from combustible
material.
3. Type B double-wall metal vent pipe See vent manufacturers
recommendation for clearances to combustible material.
Small space installations
1. When the boiler is located in a closet or small space, provide
clearances no less than those shown in Figure 1. The clearances
are required to any surface, whether combustible or non-
combustible.
Table 1 Minimum foundation size
1 Prepare boiler location continued
Clearances from combustible materials: Minimum
Front (provide means of access) 3"
Back 7"
Left side (provide means of access) 6"
Right side 2"
Top GWA052 to GWA105
GWA140
GWA175
GWA210
GWA245
H
35"
35½"
38½"
39¾"
42½"
Boiler
model Minimum
foundation
length
Minimum
foundation
width
GWA052 25" 12"
GWA070 25" 12"
GWA105 25" 15"
GWA140 25" 18"
GWA175 25" 21"
GWA210 25" 24"
GWA245 25" 27"
GWA
Gas-Fired Water Boilers Boiler Manual
34 Part Number 670 01 1001 00
Figure 21 Dimensional drawing — ALL DIMENSIONS IN INCHES
13 Dimensions
Boiler
model
number
Supply
tapping
(inches NPT)
Return
tapping
(inches NPT)
Gas connection
& manifold size
(Note 3)
(inches NPT)
A
Vent
location
(inches)
“D”
Vent
diameter
(inches)
“W”
Jacket
width
(inches)
“H”
Damper
height
(inches)
GWA052
1
1
/
4
1
1
/
41
/
2
5 4 10 45
3
/
8
GWA070
1
1
/
4
1
1
/
41
/
2
5 4 10 52
3
/
8
GWA105
1
1
/
4
1
1
/
41
/
2
6
1
/
2
513 54
3
/
8
GWA140
1
1
/
4
1
1
/
41
/
2
8 6 16 57
7
/
8
GWA175
1
1
/
4
1
1
/
41
/
2
9
1
/
2
619 60
7
/
8
GWA210
1
1
/
4
1
1
/
43
/
4
11 722 62
1
/
8
GWA245
1
1
/
4
1
1
/
43
/
4
12
1
/
2
725 64
7
/
8
Note 3: Size gas piping from meter to boiler per local utility requirements.
GWA
Gas-Fired Water Boilers Boiler Manual
2Part Number 670 01 1001 00
Installations must follow these codes:
Local, state, provincial, and national codes, laws, regulations
and ordinances.
National Fuel Gas Code, ANSI Z223.1latest edition.
Standard for Controls and Safety Devices for Automatically
Fired Boilers, ANSI/ASME CSD-1, when required.
National Electrical Code.
For Canada only: B149.1 or B149.2 Installation Code, CSA
C22.1 Canadian Electrical Code Part 1 and any local codes.
Certification
The GWA boiler gas manifold and controls met safe
lighting and other performance criteria when boiler
underwent tests specified in ANSI Z21.13–latest
edition.
Before locating the boiler:
Check for nearby connection to:
System water piping
Venting connections
Gas supply piping
Electrical power
Check area around boiler. Remove any combustible materials,
gasoline and other flammable liquids.
Failure to keep boiler area clear and free of
combustible materials, gasoline and other flammable
liquids and vapors can result in severe personal
injury, death or substantial property damage.
Boiler must be installed so that gas control system components
are protected from dripping or spraying water or rain during
operation or service.
If new boiler will replace existing boiler, check for and correct
system problems, such as:
1. System leaks causing oxygen corrosion or section cracks
from hard water deposits.
2. Incorrectly-sized expansion tank.
3. Lack of antifreeze in boiler water causing system and boiler
to freeze and leak.
Codes & checklist
Failure to adhere to the guidelines below can
result in severe personal injury, death or
substantial property damage.
When servicing boiler
1. To avoid electric shock, disconnect electrical supply
before performing maintenance.
2. To avoid severe burns, allow boiler to cool before
performing maintenance.
Boiler operation
3. Do not block flow of combustion or ventilation air to boiler.
4. Should overheating occur or gas supply fail to shut off, do
not turn off or disconnect electrical supply to circulator.
Instead, shut off the gas supply at a location external to
the appliance.
5. Do not use this boiler if any part has been under water.
Immediately call a qualified service technician to inspect
the boiler and to replace any part of the control system
and any gas control that has been under water.
Boiler water
6. DO NOT use petroleum-based cleaning or sealing
compounds in boiler system. Water seal deterioration will
occur, causing leakage between boiler sections, circulator
flanges, diaphragm tanks or other system components.
This can result in substantial property damage.
7. DO NOT use "homemade cures" or "boiler patent
medicines". Serious damage to boiler, personnel and/or
property may result.
8. Continual fresh makeup water will reduce boiler life. Mineral
buildup in sections reduces heat transfer, overheats cast
iron, and causes section failure. Addition of oxygen and
other gases can cause internal corrosion. Leaks in boiler
or piping must be repaired at once to prevent makeup
water.
9. Do not add cold water to hot boiler. Thermal shock can
cause sections to crack.
Glycol potential fire hazard
All glycol is flammable when exposed to high temperatures. If
glycol is allowed to accumulate in or around the boiler or any
other potential ignition source, a fire can develop. In order to
prevent potential severe personal injury, death or substantial
property damage from fire and/or structural damage:
Never store glycol of any kind near the boiler or any
potential ignition source.
Monitor and inspect the system and boiler regularly for
leakage. Repair any leaks immediately to prevent possible
accumulation of glycol.
Never use automotive antifreeze or ethylene glycol in the
system. Using these glycols can lead to hazardous
leakage of glycol in the boiler system.
1 Prepare boiler locationRead this first!
GWA
Gas-Fired Water Boilers Boiler Manual
35Part Number 670 01 1001 00
Install GWA boilers for residential radiant panel systems, converted gravity
heating systems or other low water temperature applications per instructions
in this manual to avoid damage due to condensation.
GWA boilers are CSA design certified for installation on combustible
flooring.
GWA boilers are ASME rated for 50 psig working pressure.
14 Ratings
DOE
1. Based on standard test procedures prescribed by the United States Department of
Energy.
2. Net I=B=R ratings are based on net installed radiation of sufficient quantity for the
requirements of the building and nothing need be added for normal piping and pickup.
Ratings are based on a piping and pickup allowance of 1.15. An additional allowance
should be made for unusual piping and pickup loads.
3. See information at right for model number suffixes. Letters shown are model number
suffixes. An “N” after the model number designates natural gas. The letter after the
“N” designates the pilot ignition system “S” for standing pilot or “I” for spark-
ignited pilot. For example, a suffix NS means a natural standing pilot boiler.
4. Contact your International Comfort Products dealer regarding information and parts
for high altitude applications.
Boiler
model
number
0–2,000 feet altitude 2,000–4,500 feet altitude
(Canada) Net
I=B=R
ratings
(Btuh)
Boiler
water
content
(gallons)
DOE
Seasonal
efficiency
(% A.F.U.E)
Chimney
and
breeching
size
Input
(Btuh) DOE Heating Capacity
(Output) (Btuh) Input
(Btuh) Output
(Btuh) NS NI
(Note 3) (Note 1) (Note 4) (Note 2) (Note 3)
GWA052 52,000 43,000 46,800 37,400 37,000 1.5 80.2 83.0 4"I.D. x 20’
GWA070 70,000 58,000 63,000 50,400 50,000 1.5 80.1 82.2 4"I.D. x 20’
GWA105 105,000 88,000 94,500 75,600 77,000 2.1 80.4 82.9 5"I.D. x 20’
GWA140 140,000 117,000 126,000 100,800 102,000 2.7 80.4 82.5 6"I.D. x 20’
GWA175 175,000 145,000 157,500 126,000 126,000 3.3 80.5 82.2 6"I.D. x 20’
GWA210 210,000 175,000 189,000 151,200 151,000 3.8 80.5 81.8 7"I.D. x 20’
GWA245 245,000 202,000 220,500 176,400 176,000 4.4 80.5 81.4 7"I.D. x 20’
Part Number 670 01 1001 00
GWA
This manual must only be used by a qualified heating installer/service technician. Failure to comply could result in
severe personal injury, death or substantial property damage.
When calling or writing about the boiler— Please have: • boiler model number from the boiler rating label and • CP number
from the boiler jacket. You may list the CP number in the space provided on the “Installation and service certificate” found on
page 18.
Contents Page
1 Prepare boiler location ........................................................2
2 Prepare boiler ..................................................................... 6
3 Install water piping ............................................................ 10
4 Install gas piping ............................................................... 13
5 Field wiring ....................................................................... 14
6 Start-up ............................................................................ 15
7 Checkout procedure ......................................................... 18
8 Sequence of operation — standing pilot boilers ................. 19
9 Lighting instructions — GWA standing pilot boilers ........... 20
10 Service and maintenance ................................................. 22
11 Troubleshooting ................................................................ 27
12 Replacement parts ........................................................... 29
13 Dimensions ...................................................................... 34
14 Ratings ............................................................................. 35
Boiler Manual
Gas-Fired Water Boilers
Hazards that will or can cause minor personal injury
or property damage.
Special instructions on installation, operation or
maintenance that are important but not related to
personal injury or property damage.
INSTALLER Read all instructions before
installing. Read page 2 first. Follow all instructions
in proper order to prevent personal injury or death.
Consider piping and installation when determining
boiler location.
Any claims for damage or shortage in shipment
must be filed immediately against the transportation
company by the consignee.
USER Please read the following. Failure to
comply could result in severe personal injury, death
or substantial property damage.
This manual is for use only by your qualified
heating installer/service technician.
Please see the Users Information Manual for your
reference.
Have the boiler serviced by a qualified service
technician, at least annually.
Hazards that will cause severe personal injury,
death or substantial property damage.
Hazards that can cause severe personal injury,
death or substantial property damage.
Hazard definitions
GWA
Gas-Fired Water Boilers – Boiler Manual
36 Part Number 670 01 1001 00

Navigation menu