Form EIA 861 Instructions
User Manual:
Open the PDF directly: View PDF
Page Count: 15
- SCHEDULE 2 - PART A: GENERAL INFORMATION
- SCHEDULE 2 - PART B: ENERGY SOURCES AND DISPOSITION
- SCHEDULE 2 - PART C: GREEN PRICING
- SCHEDULE 3: ELECTRIC OPERATING REVENUE
- SCHEDULE 4: Sector Groupings
- SCHEDULE 5: MERGERS AND/OR ACQUISITIONS
- If a merger or acquisition has occurred during the reporting period, report those newly-acquired corporate entities whose operations are now included in this report.
- This part of the Schedule collects information on the energy and load effects of DSM programs implemented, and measures installed, for each program category by major customer sector within a State. It is divided into two subparts, Incremental Effects and Annual Effects.
- This part of the schedule collects information on actual DSM program costs in the current reporting year. Program costs consist of the cash expenditures, reported in thousands of dollars, incurred by the company. Costs should reflect the total cash expenditures for the year, reported in thousands of dollars that flow out to support DSM programs. They should be reported in the year they are incurred, regardless of when the actual effects occurred. For example, the cash expenditures to purchase 1,000 load control devices for installation in customers' homes could be incurred a year in advance of the actual load savings that result from operation of the devices.
- SCHEDULE 6 - PART C: SUPPLEMENTAL INFORMATION
- Enter the state and report the total number of AMI meters by sector.
- Energy Served Through AMI (MWh) should be entered in megawatthours for customers served.
- SCHEDULE 7: DISTRIBUTED AND DISPERSED GENERATION
- SCHEDULE 7 - PART A: NUMBER AND CAPACITY
- SCHEDULE 7 - PART B: CAPACITY BY GENERATING TYPE AND TECHNOLOGY
- SCHEDULE 5: MERGERS AND/OR ACQUISITIONS