ITB116 Project Plan CAB201 C# Coding Style Guide
User Manual:
Open the PDF directly: View PDF
.
Page Count: 12

C# Coding Conventions
1
CAB201
Programming Principles
C# Coding Style Guide
2017

C# Coding Conventions
2
Table of Contents
1 Indentation ..................................................................................................................................................3
2 Blank lines ...................................................................................................................................................5
3 Spaces ........................................................................................................................................................7
4 Line Length .................................................................................................................................................8
5 Identifiers ....................................................................................................................................................9
6 Declaration Order........................................................................................................................................9
7 Magic numbers ........................................................................................................................................ 10
8 Files ......................................................................................................................................................... 10
9 Comments ................................................................................................................................................ 11
This document specifies the coding style that should be followed by students of CAB201 Programming Principles
All coding assessment items will have marks allocated for using the conventions
explained in this coding style guide.

C# Coding Conventions
3
1 Indentation
Code should be indented one tab stop on entering any construct, and reduce one tab stop at the end of
the construct. The indentation step should be 4 columns. When indenting, use spaces, not tabs. This is
necessary because in different viewing environments the tab size may be different. This will destroy
your layout. Any good editor (including Visual Studio) allows you to set the tab length and use spaces,
or at least convert from tabs to spaces.
Some examples of the required style are:
public class SomeClass {
public void Method(int param1, bool param2) {
int local = 42;
local = local / 10;
// two-way selection
if (local==4) {
// do something
} else {
// do something else
} // end appropriate action depending on local value
// multiway selection by chained if
if (conditiona1) {
// code for condition1
} else if (condition2) {
// code for condition2
} else if (condition3) {
// code for condition3
} else {
// default - not condition1 and not condition2 and not condition3
} // end comment describing whole multiway if

C# Coding Conventions
4
// nested if
if (condition1) {
if (condition2) {
// code for condition1 and condition2
} else {
// condition for condition1 and not condition2
}
} else {
// code for not condition1
} // end nested if
// multiway selection by switch
switch (local) {
case (2):
// some code
// over several
// lines
break;
case (3):
// some more
break;
default:
// default code
break;
} // end switch
// condition-controlled loop
while (condition) {
statement1;
statement2;
...
statementn;
} // end while
// count-controlled loop
for (initialisation; guard; update) {
statement1;
statement2;
...
statementn;
} // end for

C# Coding Conventions
5
// condition-controlled loop, must execute at least once
do {
statement1;
statement2;
...
statementn;
} while (condition); // No need for end comment here
// exception handling
try {
statement;
...
} catch (SpecificException sE) {
statement;
...
} catch (OtherException oE) {
statement;
...
} finally {
statement;
...
}
} //end try - catch
NOTE: Every structured statement should use { }, even if there is only one statement. For example:
if (condition) {
statement;
}
NOT
if (condition)
statement;
NOR
if (condition) statement;
2 Braces
Opening brace are placed at the end of a line and not on a new line by themselves, see examples
above.

C# Coding Conventions
6
3 Blank lines
Use blank lines before comments and/or blocks of code which are logically related. This makes it easier
to see the higher-level structure of the code.
...
statement;
// Comment describing next few lines at a high level
statement;
statement;
statement;
// Comment for next group
...
Use 1 or 2 blank lines before a method (the above rule would require 1 anyway). It is also
recommended that methods be preceded by a distinctive comment which makes it easier to locate each
method. For example
...
} // end of previous method - comment with method name
// ---------------------------------------------------------------------
/* begin method header comment
* ...
If not, increase the between-method spacing to 2 or 3 blank lines.

C# Coding Conventions
7
4 Spaces
Use spaces:
- Between keywords and parentheses, and before braces
while (condition) {
- After commas in parameter lists
SomeMethod(param1, param2, param3);
- Around all binary operators except '.'
a = (a + b) / (someObject.c * d);
- Between the expressions of a for statement
for (int index = 0; index < length; index++) {
Do not use any spaces:
- Between unary operators and their operands.
-a index++
- Between cast and 'castee'
intVar = (int)doubleVar;
- Between method name and open bracket for parameters
public void SomeMehthod(ParType par) {
}

C# Coding Conventions
8
5 Line Length
Each line of code should be no more than 150 columns long. Some viewing environments may be
limited, so it is best to keep to reasonable line lengths. This length is also suitable when printing your
code. It is difficult to read code which contains long lines which wrap around when printed out.
Long lines should be broken
- after a comma
public static String SomeMethod(int firstParam, bool secondParam,
String thirdParam);
- before an operator
Console.WriteLine("Some text which is too long to fit "
+ "one one line of source code");
- at a higher rather than a lower level
someVariableWithALongName = variable1
+ (SomeMethod(param1, param2, param3)
- constant)
- variable3;
BUT NOT
someVariableWithALongName = variable1 + (SomeMethod(param1, param2,
param3) - constant) - variable3;
breaks inside a parameter list, in turn inside a parenthesised expression.
As in the above examples, the new line begins at the same indentation as the beginning of the
expression at the same logical level on the previous line.
Note too that many long lines can be avoided by breaking expressions into simpler components, which
enhances readability if the partial result variable names are well-chosen:
methodResult = SomeMethod(param1, param2, param3);
difference = methodResult - constant;
someVariableWithALongName = variable1 + difference - variable3;

C# Coding Conventions
9
6 Identifiers
All identifiers, that is variable names, method names etc, must be self-explanatory. Using meaningful
identifier names produces more readable code. This makes the code self documenting ie. less
comments are required to explain what the code is doing. Thus identifiers like i, x, x2 and temp, are
not acceptable. If in doubt, spell it out. That is the only way to be certain that no one will misinterpret
your abbreviation.
Method names should be verbs. Class, variable and parameter names should be nouns. Use a name
that tells what the method does or what the class, variable or parameter is used for (ie. what value does
it hold). For example:
public int Find(int[] numberArray, int soughtValue)
If array names don’t use the word array in them, then they should be plural
public int Find(int[] students, int soughtValue)
Use 'Pascal case' for a class name, a method name or a constant identifier. That is, the first letter of
each word making up the identifier is upper case.
Point SumOfSquares
Use 'Camel case' for variables and parameters. That is, the first letter of each word except the first is
upper case.
count numberOfPrimes minMarkForDistinction
This makes reading the code easier as you can tell at a glance what an identifier is. If it starts with a
lower case letter it is a variable, if it starts with an upper case letter it is a class or a method.
7 Declaration Order
All variables should be declared with minimum scope that is within the statement block that they are
used. Global declarations are to be avoided except for declaration of constants which can be declared
at the class level for ease of use across multiple methods.
The following convention only applies once we start writing multiple class programs.
All instance variables, class variables and class constants should be declared at the beginning of a
class. These declarations should be followed by the constructor method(s).

C# Coding Conventions
10
8 Magic numbers
Don't use them!
A magic number is a literal value like, say, 7. Why 7? Is it the number of days in a week, or the number
of floors serviced by a lift, or ... ? The meaning of 7 is not apparent - it takes 'magic' to make sense of it.
Instead, use constants with meaningful names. Our convention for naming of constants is either block
capitals or Pascal case with words separated by underscores. This makes constants easy to see in your
code.
For example:
const int DAYS_IN_WEEK = 7;
const int NUMBER_OF_FLOORS = 7;
const double Interest_Rate = 7.0/100;
Now code like
elapsedTime = numDays / DAYS_IN_WEEK;
payment = principal * Interest_Rate;
makes a lot more sense and is easier to read.
Further, if the interest rate changes from 7% to 8%, you can make the change in exactly one place. (If
you think you can change all of the 7s using your favourite editor to do a global find and replace, you
may be a bit surprised to find that the number of days in the week is now also 8, and the building has
mysteriously grown another floor.)
Keep a look out for constants already defined in libraries. Use these whenever you can. For example:
Math.PI
int.MaxValue
9 Files
Each class in your C# program should be in a separate file. The file name should mirror the class name
eg. the class Hello would appear in the file Hello.cs. The exception to the one class per file rule is in the
case of enums or exceptions. An enum type should appear in the file with the class which uses it. If
several classes use the enum, put it in the file of the one that it is most logically related to. The same for
exception classes. An exception class, if it is small, could appear in the same file as a class which
throws that type of exception. If the exception has a number of methods associated with it, then it could
go into a file by itself.

C# Coding Conventions
11
10 Comments
All of your C# code should be well commented. This means:
a header comment at the beginning of a class
a comment before every method
in-line comments to explain complex code.
The class header comment should give details about what the purpose of the class is, who wrote it and
the date. For example:
namespace TemperatureConversion {
/// <summary>
///
/// Menu driven program which provides
/// the choice of converting a temperature
/// from fahrenheit to celsius or from celsius to fahrenheit repeatedly.
///
/// Entering 0 for the menu option will terminate the program.
///
/// Author Mike Roggenkamp March 2017
///
///
/// </summary>
class Program {
The comment for a method should explain
what the method does,
what the parameters are - not the parameter types, we can see that from the declaration, but
what they are used for, or what they mean
any return value
pre and post conditions
Method comments can be block comments, line comments or XML comments. Using XML comments
can be easier if you are using Visual Studio, as typing three slashes /// on the line before the method will
automatically generate a XML comment shell for the method. Method header comments can be of the
form:
// Explanation of the what the method does, parameter
// return value. This could take a few of lines
// depending on how complex the method is.
// pre: precondition for this method
// post: postcondition for this method

C# Coding Conventions
12
OR
/* The same sort of explanation as in the previous header
* comment but using the block comment style
* pre: precondition for the method
* post: postcondition for the method
*/
OR
/// <summary>
/// The same sort of explanation as in the previous headers
/// but using XML style comments.
///
/// </summary>
/// <param name="paramName">explanation of paramName</param>
/// <returns>explanation of return value</returns>
In-line comments usually use the line comment style and are put before pieces of complex code to
explain what is happening eg:
// explanation of what the following loop is for
while (whileCondition) {
// some code here
}
In-line comments are not always necessary in method code, and you should not put a comment before
every line of code. This is unnecessary and clutters the code so that it is difficult to read. If the code in
your method is not very complex AND uses meaningful variable names, then in-line comments may not
be necessary. Of course, that does not mean that you won't need in-line comments at all. Use your
judgement – if it is not obvious what a statement does by reading the code, then use an in-line comment.