Cessna_210_C210K L_T210K L_1970 1975_Parts Catalog_v1974 Cessna 210 C210K L T210K 1970 1975 Parts Catalog V1974
Cessna_210K-L_T210K-Ll_1970-1975_Parts_Catalog_v1974 Cessna_210K-L_T210K-Ll_1970-1975_Parts_Catalog_v1974
User Manual: Cessna_210_C210K-L_T210K-L_1970-1975_PartsCatalog_v1974
Open the PDF directly: View PDF
Page Count: 668 [warning: Documents this large are best viewed by clicking the View PDF Link!]
- Cover
- Introduction
- Upholstery & Interior Trim
- Alphabetical Index
- Parts Listing / Figures
- 1. Miscellaneous Bulk Items
- 2. (Sheet 1) Name Plates, Placards & Exterior Markings Installation
- 2. (Sheet 2) Name Plates, Placards & Exterior Markings Installation
- 2. (Sheet 3) Name Plates, Placards & Exterior Markings Installation
- 2. (Sheet 4) Name Plates, Placards & Exterior Markings Installation
- 2. (Sheet 5) Name Plates, Placards & Exterior Markings Installation
- 2. (Sheet 6) Name Plates, Placards & Exterior Markings Installation
- 3. Wing Assemblies Complete
- 4. Wing Structure Assembly
- 5. Wing Leading Edge Assemblies & Components
- 6. Fuel Cell Components Installation
- 7. Wing Spar Assemblies & Components
- 8. Fuel Drain Valve & Sampler Cup
- 9. Aileron Installation
- 10. Flap Installation
- 11. Fin & Dorsal Installation
- 11A. Fin & Dorsal Installation - VHF COMM Antenna
- 12. Rudder Installation
- 13. Stabilizer Installation
- 14. Elevator Installation
- 15. Fuselage Assembly
- 16. Forward Fuselage Structure Assembly
- 17. Lower Forward Fuselage Structure
- 17A. Lower Forward Fuselage Structure
- 18. Front Door Post & Bulkhead Assembly
- 19. Rear Doorpost & Main Landing Gear Bulkhead Assembly
- 20. Pedestal Installation
- 20A. Pedestal Installation
- 21. Lower Cabin Section Components
- 21A. Fuselage Belly Section Components
- 21B. Fuselage Belly Section Components
- 22. Lower Aft Cabin Structure Assembly
- 23. Main Gear Actuator Bulkhead Assembly
- 24. Floorboards & Radio Shelves Installation
- 24A. Forward Cabin Top Components
- 25. Upper Cabin Section Components (Sheet 1 of 2)
- 25. Upper Cabin Section Components (Sheet 2 of 2)
- 25A. Upper Aft Cabin Structure Assembly
- 26. Firewall Installation
- 27. Firewall Grommets Installation
- 28. Windshield Installation
- 29. Tailcone Installation
- 30. Aft Tailcone Assembly
- 31. Stinger Installation
- 32. Nose Gear Installation
- 33. Nose Gear Steering System Installation
- 34. Nose Gear Shock Strut Assembly
- 35. Nose Gear Wheel & Tire Assembly - Cleveland
- 35A. Nose Gear Wheel & Tire Assembly - McCauley
- 36. Shimmy Dampener Assembly
- 37. Main Landing Gear Installation
- 38. Main Landing Gear Wheel & Brake Installation
- 38A. Main Landing Gear Wheel & Brake Installation - McCauley
- 39. Nose Gear Doors & Torque Tube Installation
- 40. Main Landing Gear Doors Installation
- 41. Nose Gear Uplock Installation
- 42. Main Gear Uplock Mechanism Installation
- 43. Main Gear Downlock Installation
- 43A. Retractable Cabin Step Installation
- 44. Left Cabin Door Installation
- 44A. Left Cabin Door Installation
- 45. Right Cabin Door Installation
- 45A. Right Cabin Door Installation
- 46. Removable Latch Assembly
- 46A. Removable Latch Assembly
- 47. Baggage Door Installation
- 48. Cabin Top & Firewall Upholstery Installation
- 49. Cabin Door Upholstery & Trim Installation
- 50. Cabin Side Panels Upholstery Installation
- 51. Floorboard & Baggage Compartment Upholstery
- 52. Cabin Soundproofing Installation
- 53. Articulating Recline Co-pilot Seat Installation
- 53A. Articulating Recline Copilot Seat Installation (Sheet 1 of 2)
- 53A. Articulating Recline Copilot Seat Installation (Sheet 2 of 2)
- 54. Infinitely Adjustable Pilot & Co-pilot Seat Installation
- 55. Infinitely Adjustable Pilot & Co-Pilot Seat Installation (Sheet 1 of 2)
- 55. Infinitely Adjustable Pilot & Co-Pilot Seat Installation (Sheet 2 of 2)
- 56. Articulating Recline Middle Seats Installation
- 56A. Articulating Recline Middle Seats Installation
- 57. Bench Seat Installation - 5th & 6th Place
- 57A. Bench Seat Installation - 5th & 6th Place
- 58. Instrument Panel Equipment Installation
- 58A. Instrument Panel Equipment Installation
- 58B. Instrument Panel Equipment Installation
- 58C. Instrument Panel Equipment Installation
- 58D. Instrument Panel Equipment Installation
- 59. Switch Panel Installation
- 59A. Switch Panel Installation
- 60. Post Lighted Instrument Panel & Pedestal Lights Installation
- 60A. Post Lighted Instrument Panel & Pedestal Lights Installation
- 60B. Post Lighted Instrument Panel & Pedestal Lights Installation
- 60C. Post Lighted Instrument Panel & Pedestal Lights Installation
- 60D. Post Lighted Instrument Panel & Pedestal Lights Installation
- 61. Glove Box Installation
- 62. Fuselage Equipment Installation
- 62A. Shoulder Harness Installation (Sheet 1 of 2)
- 62A. Shoulder Harness Installation (Sheet 2 of 2)
- 62B. Inertia Reel Seat Belt & Shoulder Harness Installation
- 63. Portable Stretcher Installation
- 64. Compass & Rear View Mirror Installation
- 65. Two Bladed Propeller Installation
- 66. Three Bladed Propeller Installation
- 67. Two Bladed Propeller Assembly
- 68. Three Bladed Propeller Assembly
- 69. Upper Cowl & Nose Cap Installation
- 70. Upper Cowl & Nose Cap Installation
- 70A. Upper Cowl & Nose Cap Installation
- 71. Engine Installation
- 72. Turbocharged Engine Installation
- 73. Engine Assembly
- 74. Turbocharged Engine Assembly
- 75. Engine Components & Associated Accessories IO520L Eng (no illustration)
- 76. Engine Components & Associated Accessories TSIO520H Eng (no illustration)
- 77. Induction Air Box Installation
- 78. Turbocharger Air Inlet Installation
- 79. Turbocharger Installation
- 80. Exhaust Valve & Controller Installation
- 81. Propeller Governor Assembly - Woodward
- 82. Propeller Governor Assembly - McCauley (Alternate)
- 83. Exhaust Stack Assembly
- 84. Exhaust System Components
- 85. Engine Baffles Installation
- 85A. Engine Baffles Installation
- 86. Engine Baffles Installation
- 86A. Engine Baffles Installation
- 87. Cowl Flaps System Installation
- 88. Winterization Equipment Installation
- 89. Cabin Ventilation System Installation
- 89A. Cabin Ventilation System Installation
- 89B. Wing Radio Compartment Ventilation System Installation
- 90. Heater & Defroster Installation
- 91. Heater & Defroster Installation
- 92. Brake System Installation
- 93. Brake & Rudder Pedals Installation
- 94. Brake Master Cylinder Assembly
- 95. Control Column Installation
- 96. Control Wheel & Switches Installation
- 96A. Control Wheel & Switches Installation
- 96B. Control Wheel & Switches Installation
- 97. Aileron Control System Installation
- 98. Wing Leveler Installation
- 99. Wing Leveler Installation
- 99A. Wing Leveler Components
- 100. Elevator Control System Installation
- 101. Elevator Trim Control System Installation
- 102. Elevator Electric Trim Components Installation
- 102A. Elevator Electric Trim Components Installation
- 102B. Elevator Trim Tab Actuator Assembly
- 102C. Elevator Trim Tab Actuator Assembly
- 103. Electric Flap System Installation
- 104. Flap Control Details Installation
- 105. Rudder Control System Installation
- 106. Aileron, Rudder Interconnect System
- 107. Rudder Trim Installation
- 107A. Rudder Trim Installation
- 108. Pitot System Installation
- 108A. Encoding Altimeter Installation
- 109. Fuel System Installation
- 110. Fuel Strainer & Drain Installation
- 111. Fuel Selector Valve Installation
- 112. Engine Primer System Installation
- 113. Oil System Installation
- 114. Gyros Installation - Engine Driven
- 114A. Gyro Installation - Engine Driven
- 115. Vacuum System Installation - Engine Driven
- 115A. Vacuum System Installation - Engine Driven
- 116. Hydraulic Power Pack Installation
- 116A. Hydraulic Power Pack Installation
- 117. Hydraulic Power Pack Unit Assembly
- 118. Hydraulic Power Pack Body Assembly
- 118A. Hydraulic Power Pack Body & Reservoir Assembly
- 119. Power Pack Manifold Assembly
- 119A. Power Pack Manifold Assemblies
- 120. Emergency Hand Pump Installation
- 120A. Emergency Hand Pump Assembly
- 121. Hydraulic Pump Assembly
- 122. Nose Gear & Nose Gear Doors Hydraulic System Installation
- 122A. Nose Gear & Nose Gear Doors Hydraulic System Installation
- 123. Hydraulic System Installation - Lock Out Valve to Sta. 44.00
- 123A. Hydraulic System Installation - Sta 18.00 to 44.00
- 124. Hydraulic System Installation - Sta 44.00 to 77.00
- 125. Hydraulic System Installation - Sta. 77.00 to 124.60
- 126. Nose Gear Retraction & Drag Strut Actuator Assembly
- 126A. Nose Gear Retraction & Drag Strut Actuator Assembly
- 127. Main Gear Rotary Actuator Assembly
- 128. Main Gear Doors & Nose Gear Doors Actuator Assembly
- 129. Main Gear Spring Door Actuator Assembly
- 130. Downlock Actuator Assembly
- 130A. Downlock Actuator Assembly
- 130B. Downlock Actuator Assembly
- 130C. Valve Assembly - Door Close Lock
- 130D. Door Close Lock Valve Assembly
- 131. Unlock & Sequence Actuator Assembly
- 131A. Nose Gear Unlock & Sequence Actuator Assembly
- 131B. Accumulator Assembly - Door Close
- 132. De-Ice System - Wing & Stabilizer
- 133. Propeller De-Ice System Installation
- 134. Oxygen System Installation
- 135. Electrical Equipment Installation
- 135A. Switch Installation - Gear Warning & Fuel Pump
- 136. Instrument Panel Lights & Overhead Console Installation
- 137. Instrument Panel Brow Lights Installation
- 137A. Instrument Panel Brow Lights Installation
- 138. Shock Mounted Alternator Installation
- 139. Courtesy Light Installation
- 140. Flashing Beacon Installation
- Numerical Index