Cage Code: 81205

Tooling Supplier
Quality Operating Requirements
D6-56202

Revision T
May 15, 2015

Revision Release Date:

Content Owner: Supplier Quality - Tooling, 6-5902
(All future revisions to this document shall be approved by the content owner prior to release.)

BOEING is a trademark of Boeing Management Company

Rev T

D6-56202

1

Document Information
Document Type:

Original Release Date:

Formal

March 15, 1995

Preparing Organization (if different from owning organization):

Contract Number (if required)

Hardware and Software Used:
Word

Location of Software files (optional):
Operations Documentation
Boeing Web URL (optional):

Notes and Limitations (optional):
Released through Operations Documentation - Distribution.
Signatures for Original Release
Prepared by:
Original signed by
James R. Davenport

A-6815

931-6853

A-6815

931-6852

A-6810

931-3716

A-6601

931-2822

Prepared by:
Original signed by
Nina Y. Hardy
Approved by:
Original signed by
John P. Crowley
Approved by:
Original signed by
Quentin J. Sisco

2

D6-56202

Rev T

Table of Contents
Page
Title Page ...............................................................................................................1
Signature Page ......................................................................................................2
Table of Contents ..................................................................................................3
Abstract..................................................................................................................4
1.0
General Information ...................................................................................4
2.0
Tooling Quality Organization.....................................................................5
3.0
Quality Manual ............................................................................................5
4.0
Accountability & Retention of Configuration Records ............................5
5.0
Handling of Tools .......................................................................................5
6.0
Equipment ...................................................................................................6
7.0
Critical Processes ......................................................................................6
8.0
Non-Destructive Evaluation (NDE) ............................................................7
9.0
Supplier Welding Requirements ...............................................................7
10.0 Inspection Areas.........................................................................................7
11.0 Digital Product Definition Capabilities .....................................................7
12.0 Tool Inspection ...........................................................................................7
13.0 Supplier Quality Manager’s Responsibilities ...........................................9
14.0 Audits ..........................................................................................................10
15.0 Document Hierarchy Relationship ............................................................10
References .............................................................................................................11
Revision Record ....................................................................................................12
Active Page Record...............................................................................................22

Rev T

D6-56202

3

Abstract
The purpose of this document is to establish Quality requirements for tooling suppliers approved
to this document.
Definitions:
Boeing Quality: For the purpose of this document, a generic term to describe the Quality group
responsible for Supplier Approval/Surveillance. The title for each Boeing division’s Quality
department performing this task will vary.

1.0

General Information
1.1

This document is provided to Boeing tooling suppliers to outline Quality/Inspection
requirements. Suppliers must comply with all of the requirements outlined in this
document, as applicable to the types of products or processes they provide. Exceptions
require prior written approval from Boeing Quality Management or designee.

1.2

A Supplier Approval is valid until notified by Boeing that said approval has been
cancelled. Periodic audits will be conducted by Boeing Quality to maintain Supplier’s
approval.

1.3

Suppliers are solely responsible for the quality of their products, including any features or
processes contracted to a sub-tier supplier. If the product specification includes a
Qualified Products List (QPL), or Qualified Manufacturers List (QML) then the
manufacturer of the product must be listed on the QPL/QML. If Supplier is a Distributor or
other than the manufacturer, then the manufacturer's name and location (city and state)
shall be identified within Supplier's shipping documentation.

1.4

All Supplier inspections shall be complete prior to submitting notification to Boeing Quality
of completion. Any/all non-conformances shall be documented per internal QMS
proceeses and corrected. Suppliers are expected to be cognizant of design/safety
requirements, and shall resolve all discrepancies/concerns prior to final tool acceptance.
Boeing Quality will assist when requested.

1.5

A supplier’s failure to detect/document and correct discrepancies prior to submitting
tool(s) to Boeing Quality will be recorded. Supplier quality performance will be evaluated
based on this data. Poor quality performance and non-compliance to the requirements
noted in this document may result in the revocation of approval status.

1.6

Supplier shall promptly notify Boeing’s Authorized Procurement Representative of any
occurrence of natural disaster that diminishes Supplier’s ability to deliver conforming
goods or services.

1.7

Supplier shall notify Boeing Quality when significant changes occur in the company’s
structure and/or capability. The occurrence of any of the following can nullify approval
status and require a new survey to be conducted:
Notify Boeing Quality immediately upon:
a)
b)
c)
d)
e)

4

Name change of the company.
Relocation of company to a new facility.
Management change within the Quality Organization.
Substantial change in tooling capabilities (equipment acquisition or liquidation).
Changes in requirements and/or procedures that affect a supplier’s production or
inspection processes.
D6-56202

Rev T

2.0

Quality Organization
The supplier is required to have a Quality Representative and a documented system that assures
adequate control of quality is maintained throughout all manufacturing processes, including
receiving, packaging, and shipping. The Quality Representative must be empowered to identify
quality problems and initiate corrective actions to resolve them.

3.0

Quality Manual
Suppliers are required to have a Quality Manual, approved by the Supplier’s Executive
Management, documenting the processes and responsibilities used to ensure the integrity of the
products and services provided to Boeing.

4.0

3.1

The Supplier’s Quality Manual must have a controlled revision system to ensure the most
recent information is incorporated into the Quality Manual and is being used by the
inspection personnel.

3.2

Supplier shall make quality data and/or approved design data available in the English
language. Supplier shall maintain an English language translation of (1) its quality
manual, (2) the operating instructions that implement the quality manual requirements,
and (3) an index of Supplier’s procedures that contain quality requirements. Boeing may
require additional documentation to be translated, including but not limited to: shop
orders, technical specifications, certificates, reports, and nonconformance documents.

Accountability and Retention of Configuration Records
Suppliers must maintain traceability/accountability of inspection records on work performed for
Boeing. These records must include acceptance records, tool configuration non-conformance
forms (with dispositions), and any material or critical process certifications (e.g. heat treat, etc.
reference section 7.0).

5.0

4.1

All records shall be complete, accepted, and accounted for prior to product delivery. All
entries, signatures, and stamp impressions shall be complete and legible. (ref section
12.4 for BDS Tool Build Log requirements)

4.2

Records for Boeing tools must be maintained on all discrepancies that require a
disposition. The documentation is to be on supplier non-conformance forms and shall
include, at a minimum, a description of the discrepancy, corrective action taken, and
name(s)/signature(s)/stamp(s).

4.3

Inspection records for Boeing tools are to be maintained by the supplier for seven (7)
years or per contract requirements. Copies of original inspection records are acceptable
if the original records are sent to, or taken by, Boeing Quality. Electronic copying and
storage is acceptable. Ensure that all completed records are stored and protected in a
secure location.

4.4

All dimensional inspection results shall be reported in inches.

Handling of Tools
The supplier is required to have procedures in place to adequately control the handling of tooling
and Boeing supplied materials. This includes receiving, storage, and shipment.
5.1

Rev T

The supplier is to have an adequate area to store Boeing provided tools and raw
materials in a manner that will prevent their damage.
D6-56202

5

5.2

If a Master Tool is received from Boeing for tool fabrication purposes, the following
procedures will be followed:

Receiving:

Storage:
Shipping:

The “sealed” storage box will be opened in the presence of Boeing Quality for a
visual check for damage, inventory of component parts, general appearance, and
compliance to current tool drawing revisions.
Tools are to be stored in a building that will prevent atmospheric or physical
damage to the tools. Under no circumstances are the tools to be stored outside.
A.
Appropriate corrosion resistant material will be applied to all
critical surfaces subject to corrosion.
B.
Preserved gaging surfaces will be separated from any contact with the
wooden container members.
C.
Boeing Quality will verify part inventory and “seal” the storage box prior
to shipment.
D.

6.0

Tool containers will be protected from inclement weather.

Equipment
All suppliers are to have adequate equipment to inspect the tooling they fabricate. Any
equipment used for tool inspection must be calibrated and certified with standards traceable to
the National Institute of Standards Technology or national standards of other countries that are
correlated with US national standards.
6.1
The calibration methods/standards of inspection equipment must be in accordance with
ANSI/NCSL-Z540 standards and/or ISO/IEC/EN 17025, including a mandatory recall
system to remove any equipment with expired certifications from use. All equipment
must have an indicator (sticker) showing calibration date, expiration date and certifying
stamp by an approved internal process or certification house.

7.0

6.2

Equipment certifications are to be maintained and available to Boeing Quality upon
request. An inventory of the supplier’s inspection equipment and its certification status,
as well as the method of calibration, must be available to Boeing Quality during the
supplier survey and subsequent audits.

6.3

Certified inspection equipment must be controlled, adequately stored, and protected from
adverse environmental conditions.

Processes
Material processing such as plating, heat treating, stress relieving, etc., utilized in the fabrication
of tooling must be performed by a processor possessing an industry certification such as ISO
9001, NADCAP, ASME, etc.
EXCEPTION: Welding may be subcontracted only under the following conditions:
1. If the prime supplier is ISO 9001 certified and has a Boeing-recognized weld capability,
they may subcontract to a welding contractor on their approved supplier list. The prime
supplier will flow all of the pertinent contract requirements to their supplier, and will ultimately
be responsible for the quality of the welding performed.
2. If the prime supplier is not ISO 9001 certified or does not have a Boeing-recognized weld
capability, they may subcontract the welding but the welding contractor must be a Boeing
approved supplier with a Boeing-recognized weld capability. Use of a Boeing approved
supplier does not relieve the prime supplier of approving the supplier within their Quality
System and flowing the pertinent contract requirements to the welding contractor.

6

D6-56202

Rev T

Supplier must flow down the requirements of this document and any other applicable
specifications when sub-contracting processes. Supplier must also monitor the performance of
processors to assure compliance with process and quality requirements.
Suppliers must provide processor’s documented evidence of compliance for processes, including
all elements involved in the process (e.g. certification of equipment, material, time/temp charts,
etc.). Process certifications and/or test records must include the Tool Number, Unit Number,
Detail Numbers, and acceptance stamp (or equivalent) and date, to assure positive traceability.

8.0

Non-Destructive Examination (NDE)
Supplier personnel performing NDE on Boeing tools are required to maintain at least a Level II
ASNT or equivalent certification to perform the specified Non-Destructive test. The NDE
inspector must be knowledgeable of Boeing NDE requirements per D32028-1 through -5.
Supplier Inspectors performing NDE must have a steel stamp to signify acceptance on Boeing
metal tags when required. NDE stamps will have a prominent identifier indicating the inspection
type, as well as the company initials/logo and inspector number.

9.0

Supplier Welding Requirements
All welders performing work on Boeing tools must demonstrate proficiency by qualifying to a
recognized welding code or specification (ref. D32028-1).

10.0

9.1

The supplier must maintain qualification records on each of its welders per AWS
requirements.

9.2

Boeing Quality must be provided copies of Welder Qualification Records upon request.

9.3

All welds will be visually inspected by an AWS QC1 CWI (Certified Welding Inspector) or
equivalent, as required per D32028-1 Table 1 (Visual Inspection Requirements),. All
welds, except Level 3, will be inspected prior to being painted or concealed. Level 3
welds are Supplier Shop Responsibility per D32028-1.

9.4

All Non-Destructive Evaluation shall be conducted in accordance with D32028-1 through
-5. A copy of the certification card of the individual performing the test must be available
upon request (ref: 8.0).

9.5

The CWI, or equivalent, and/or NDE inspector shall provide evidence of all inspections
performed.

Inspection Areas
The supplier shall have adequate space to conduct inspection (preferably separate from the
fabrication environment). Each area shall have proper storage for inspection equipment
(reference section 6.3) and be kept sufficiently clean to conduct safe and accurate inspections.

11.0

12.0

Digital Product Definition (DPD) Capabilities
11.1

Suppliers using Boeing digital data must be DPD approved per D6-51991.

11.2

Coordinate Measurement Systems (CMS) used for product acceptance must be
approved for use by Boeing Quality (Ref section 6.0 and/or D6-51991).

Tool Inspection
12.1

Rev T

Suppliers are required to adhere to the following requirements in the acceptance of tools.
A.
Tools will be inspected per the most current released drawings, models, orders,
specifications, and documents. When inspection is performed to preliminary
D6-56202

7

B.
C.

D.

Boeing Quality shall be given the opportunity to witness CMS inspection at final
inspection/acceptance (reference section 12.2). If performing CMS inspection is
impractical when performing final inspection/acceptance, supplier shall give
Boeing Quality the opportunity to witness final CMS inspection at an in-process
inspection step.

E.

Inspection reports will include the following (as applicable): Supplier Name, name
of person performing the inspection, date of inspection, Tool Number, Unit
Number, configuration (drawing/model) revision level, applicable Detail/Assy
numbers, CMS device ID, calibration date, field check, scale bar and drift points
recorded at start and end of inspection. Include descriptive point labels, nominal
and actual values, as well as an indication of ‘out of tolerance’ points.
Discrepancies or variations between 3D Model and 2D drawing, or between
manufacturing NC data and the CMS Inspection Data, must be documented and
addressed per QMS process.
Load tests must be performed per the tool drawing diagram and witnessed by
Boeing Quality. A certificate of proof load test for all handling equipment will be
provided to the witnessing inspector. The certification will be on the Supplier’s
letterhead and include:

F.

G.

12.2

12.3

design data, the inspection data/report must be validated to released data prior to
final acceptance. Validation results must be documented.
Evidence of inspection of all features, material, processes, etc., is required.
Statistical sampling and Sampling Plans are not allowed.
Inspections must be performed at the Supplier’s facility. If circumstances dictate
that inspection be performed at another site, prior written approval must be
obtained from Boeing Quality Management or designee. (ref section 1.1)

• EQUIPMENT/DRAWING NUMBER
• UNIT NUMBER
• SERIAL NUMBER
• LOAD MEASURING DEVICE CERTIFICATION DATES
• LOAD MEASURING DEVICE PROPERTY NUMBER
• DATE OF PROOF LOAD TEST
• PERSON PERFORMING PROOF LOAD TEST (PRINTED)
• SIGNATURE AND STAMP
H.
All non-conformities documented by Quality must be resolved prior to completion.
I.
Ensure that the Tool Order Statement of Work is clear and concise, and reflects
the correct drawing/model revision levels.
Upon completion of all requirements, the tool will be submitted to Boeing Quality for
inspection. Supplier shall provide any necessary inspection equipment and/or manpower
to facilitate Boeing inspection. Evidence of in-process inspection acceptance does not
preclude any re-inspection at final if deemed necessary by Boeing Quality.
Discrepancies/defects noted by Boeing Quality will be documented and retained in our
supplier file database. Supplier quality performance is monitored and used to help
determine Quality Improvement opportunities.
NOTE: Suppliers have the opportunity to challenge noted discrepancies per established
process.

12.4

8

Suppliers to Boeing Defense and Security shall also follow these specific requirements:

D6-56202

Rev T

NOTE: Contact your Procurement Agent to obtain forms to satisfy the following
requirements. See “References” section below for form numbers/names. Supplier has
the option to use equivalent forms to those listed in the references section.
A.

Tool Build Logs (TBL) must be produced on all tooling. These records indicate
the status of both progressive and final inspection of a tool. Records must be
kept current, legible, neat and accurate.

B.

A copy of these records must accompany the tool upon shipment to the
designated Boeing facility.
•

C.

The supplier shall establish and maintain a process for identifying the inspection
status of critical tooling details with a tolerance of (+/- .015 and less), including all
GD&T features which equate to +/-.015 or less.

D.

Prior to final acceptance of a tool, the supplier’s tool inspection will:

E.

13.0

•

Review the Tool Build Log for completeness, accuracy and legibility,
ensuring all critical dimensions (+/- .015 and less) on the tool are
recorded, acceptance stamped, and dated.

•

Detailed Dimensions - Ensure that all tooling details with critical
dimensions of (+/- .015 and less) are inspected and bare proof of quality
acceptance stamped or etched on them or the critical dimensions are
documented in the Tool Build Log.

•

Setting Dimensions - Ensure that all setting dimensions, feeler
dimensions, gaps and etc., with a tolerance of (+/- .015 and less) are
inspected and documented in the TBL.

•

Verify that all loose and removable details are accounted for, identified,
and nested.

•

Verify that all drawing notes and applicable Tool Process Instruction
Manual (TPIM) and Tool Fabrication Instruction Manual (TFIM)
specifications and applicable D-documents have been complied with.

Tool Acceptance Stamping
•

Supplier may only use a Boeing issued acceptance stamp on tools that
accompany either a Boeing tooling work order or purchase contract
issued through the Boeing Tooling Procurement Organization.

•

Under no condition is a Suppliers Tooling Stamp ever to be used on a
Boeing production part or its accompanying paperwork.

•

The use of this supplier’s Boeing issued acceptance stamp in an
unauthorized manner can result in revocation of the supplier’s authority
and subsequent removal from the Boeing Tooling Supplier base.

Supplier Quality Manager’s/Designee’s Responsibilities
13.1

Rev T

When the tool is being delivered to a non-Boeing facility, copies shall be
delivered to the designated Boeing facility and accompany the tool.

The Supplier’s Quality Manager is responsible for assuring compliance with this
document and all applicable Boeing documents and procedures. The Supplier’s Quality
Manager may, at his discretion, designate another individual from within the quality
department (Designee) to be the communication focal point to coordinate with Boeing
Quality.
D6-56202

9

Note:

14.0

Failure to comply may result in the loss of “approved supplier” status.

13.2

The Supplier’s Quality will assure all applicable process and material certifications are
available to Boeing Quality at final inspection. (Reference section 7.0)

13.3

The Supplier’s Quality is responsible for the quality acceptance of all materials received
by the supplier (e.g. Tool Material Request (TMR) items, purchased items, etc.). Material
substitutions are not permitted without Boeing Tool Engineering authorization (i.e. TPS
105 listed on drawing, or documented disposition). Boeing Quality will verify materials
used at final inspection.

13.4

The Supplier’s Quality must notify Boeing Quality when source inspection is required
following the acceptance of a tool by his/her department. It is the responsibility of the
Supplier’s Quality to coordinate with Boeing Quality far enough in advance to assure the
source inspection will be performed in a timely manner.

13.5

The Supplier’s Quality is responsible for providing documentation, verification,
certification of all critical processes and “safety items” (e.g. lifting hardware), prior to final
acceptance of tooling hardware by Boeing Quality.

13.6

The Supplier’s Quality is responsible for assuring that current, up-to-date Boeing Manuals
and Tooling Documents are used during inspection.

13.7

The Supplier’s Quality must be directly available to assist Boeing Quality during
inspection.

Audits
Boeing Quality will periodically perform Compliance and Capability Audits at Supplier’s facilities.

15.0

10

14.1

Audits include a comprehensive evaluation of Supplier’s adherence to its Quality System
and D6-56202 Requirements.

14.2

All audit activities will be coordinated with Supplier Quality Manager or Designee.

14.3

Findings noted during a Boeing audit will be documented in Boeing Quality’s supplier
data system. Supplier will provide Corrective Action responses in the Boeing Quality
supplier data system.

Document Hierarchy Relationship
15.1.

The D6-56202 is used to establish Quality requirements for Tooling Suppliers.

15.2.

The D6-56202-2 outlines the requirements for Delegation of Inspection Authority,
including Tool Audits.

15.3

The D6-56202-1 has been cancelled, and the D6-56202-3 has been incorporated into the
D6-56202-2.

D6-56202

Rev T

References
A.

D1-4426, “Boeing Approved Process Sources”

B.

D6-56202-2, “Tooling Supplier Inspection Delegation”

C.

D32028-1 through -5, “Requirements for Tooling Welding”

D.

D33181, “Tooling Procedures Standards” (TPS)

E.

ANSI/NCSL Z540-1, “Calibration Laboratories and Measuring and Test
Equipment – General Requirements”

F.

ISO 10012-1, “Quality Assurance Requirements for Measuring Equipment”

G.

NIST, “National Institute of Standards Technology”

H.

AWS, “American Welding Society”

I.

D6-51991, “Quality Assurance for Digital Product Definition at Boeing Suppliers”

J.

MAC1147S - Tool Build Log Summary

K.

Q.

MAC1147DA - Tool Build Log Detail Accountability
MAC1147CS - Tool Build Log Construction Point Sketch
MAC1147DB - Tool Detail Information
MAC1147E - Tool Build Log Hole Pattern
MAC1147D - Tool Build Log Documentation
MAC5420 - Quality Calibration Log
AM0044 - Laminate Tool Build Log

R.

Z36544 – Certificate of Proof Load

S.

TQOP 14.1 for St Louis tooling reference

L,
M,
N.
O.
P.

Rev T

D6-56202

11

Revision Record
Revision
Revision
A

Description

Date

Deleted B&W inspection record requirements

Approval

3/15/95

Deleted in process inspection record
requirements
for non-design tools
Deleted "Notes" page & exhibits A & B

B
C

D
E

12

Reformatted and repaginated document
Added System Audit and responsibilities for
audit.
Added non conformance forms to section
3.0 and 4.0
Added section 17.0 through 17.2 document
relationship
Renumbered D6-56202-1 to D6-56202
Modified 3.0 by changing “tooling” section
mandatory to suggested.
Added NOTE: to end of section 11.
Added Computer Aided Measuring System
12.0 and renumbered document from 12.0
through 18.0.
Modified 13.3 by changing the word
recommended to required.
Modified 14.0 to read qualifying to a
recognized weld code.
Modified 14.5 by adding written authorization
and the NOTE:
Added 100% tool inspection required and
sampling not allowed to 15.0 B.
Moved 16.10 to 15.0 C and modified with
specific requirements.
Moved 16.11 to 15.0 D and modified with
specific requirements.
Changed area code in section 16.4 and
mileage in 16.6 & 16.7.
Modified 16.0 numbering after moving 16.10
and 16.11.
Removed “Approved Pending” from section
16.12.
Added ASTM E 18 to reference page.
Reformatted and repaginated document.

D6-56202

5/13/96
6/10/96

8/2/96
7/31/98

Rev T

Revision Record
Revision

Description

Date

Revision
F

Text was added and deleted throughout the
document to improve grammar and clarify
intent.

6/22/99

Approval

Added 1.5 to clarify how exceptions to the
requirements of this document are handled.
Revised Section 4 to clarify Inspection Record
Requirements and changed Record retention
requirement from 7 years to 3, in 4.2.
Modified 5.2 to improve grammar.
Added detail to Critical Process Certification
requirements in 8.0.
Section 14 (Weld Inspection Surveillance)
was moved and renumbered as Section 10.
Modified 10.5 and NOTE to clarify
requirements for delegation of weld
inspection.
Revised 10.7 by adding “Supplier” and adding
a note to clarify certification requirements.
Section 10.0 re-numbered to 11.0
Section 11.0 re-numbered to 12.0
Section 12.0 re-numbered to 13.0
Section 13.0 re-numbered to 14.0
Added 13.2 & 13.3 to describe requirements
for submitting 3D data to QA for evaluation
and deleted NOTE.
Reformatted paragraphs in Sect 15.
Revised 15.1.A to clarify intent.
Moved text in 16.2 to Sect 8.0.
Added optional notification method in 16.4
Deleted paragraphs 16.5, 16.6, and 16.7.
(Advance notification for inspection).
Added NOTE 16.6.A & B to cover Manual
Revision verification.

Rev T

D6-56202

13

Revision Record
Revision

Description

Date

Approval

Deleted 17.A (Auditor responsibility)
Moved 17.C to 17.1 to describe System Audit.
Reformatted paragraphs in Sect 17.
Revised 17.3 to eliminate ‘Pickup’ form
reference.
Revised 17.5 to clarify Audit Frequency
requirements.
Deleted reference to D6-56202-1 in 18.1 &
D6-56202-3 in 18.2.
Added 18.3 to show deletion of D6-56202-1
and incorporation of D6-56202-3 requirements
into D6-56202-2.

G

Revised REFERENCES list on last page.
Revised the document Title to more
accurately reflect content.
Moved paragraph 16.9 ‘notification
requirement’ to 1.6.
Added “designated person” to Sect 2.0.
Deleted the requirement to have inspection
stamps in Sect 5.0 and added Paragraph 4.2
to compensate. Changed title of Sect 5.0 to
NDI Stamps.
Added “approved companies” to 8.0.
Deleted all references to delegation of weld
inspection in Sect 10.0.
Changed title of Sect 12.0 to describe more
accurately the content.
Revised Sect 13.0 to add requirements for
CMS approval and use.
Revised text throughout Sect 15.0 in improve
grammar.
Revised 15.1.D. to clarify intent.
Deleted requirement to steel stamp tools and
tool details in 15.2.D.
Deleted requirement to use a Packaging Slip
Invoice (PSI).

6/1/00

.

14

D6-56202

Rev T

Revision Record
Revision

H

J

Rev T

Description
Revised 16.6 to simplify Manual Update
Process.
Revised 16.9 and moved ‘notification
requirement’ to 1.6.
Added detail to supplier requirements during
Compliance Audits.
Revised “References” on last page.
Complete Revision. General revision to
update verbiage and clarify requirements.
Added “Definitions”
Updated and rearranged verbiage in Sections
1.0 through 4.0.
Incorporated Section 5.0 into Section 9.0.
Updated verbiage in Sections 6.0 through 8.0.
Expanded Section 9.0 to include info from 5.0.
Updated verbiage in Sections 10.0 and 11.0.
Moved Section 12.0 to Appendix A.
Changed Title and updated verbiage in
Section 13.0. Moved 13.4 to Appendix B.
Incorporated Section 14.0 into Section 7.4.
Updated verbiage in Section 15.0. Eliminated
requirement for Supplier to stamp Boeing
paperwork.
Updated verbiage and eliminated
redundancies in Section 16.0.
Updated verbiage in Section 17.0.
Added Appendix A (formerly Section 12.0)
and Appendix B (formerly Section 13.4).
Textual changes throughout for clarity.
Corrected errant “Ref.” callouts throughout
document. Revised “References” list.
Added PCMM usage requirements in Sect 11.
Clarified CMM Volumetric Evaluation
requirements in 6.4.
Added Software/Version requirements in
Appendix A.
Revise data format requirements in Appendix
B.
Revised QA to Quality

D6-56202

Date

Approval

Date
10/1/01

Signature of
approvals

Gina Beal

Date
10/14/02

ORIGINAL
SIGNED

15

K

Updated Title page
Updated Table of Contents
1.3 Revised to process of notification.
3.0 Deleted superfluous examples.
4.0 Added “material” to types of certs
4.4 Revised retention period back to (7) years
9.5 & 9.7 Revised inspection requirement to
comply with D33028
12.1 Grammatical/textual clarification
13.2 & 13.3 Textual clarification
13.4 Removed requirement for written
notification of designee
13.6 Revised to current process
13.8 & 13.9 Removed “management” – not
required for this level of authorization
14.3 Revised to current process
Appendix A Grammatical correction
References Text Clarification
Updated active page record

Revision Letter

L

Changes in This
Revision

Updated Content Owner name and org, and added Boeing trademark info
Grammatical edits for clarification in 1.1, 2.0, 4.2
Deleted 4.2
Removed Volumetric Evaluation requirement from 6.4 and deleted Appendix A
Revise Appendix B to be Appendix A
Clarified stamp requirement in 8.0
Replaced “Boeing Quality” with “CWI” in Section 9
Added Delegation requirement to 11.1
Added inspection requirement to 12.2
Added note to 14.4

Authorization for
Release
AUTHOR:

APPROVAL:

DOCUMENT RELEASE:

16

Jeffrey Johnson

66-Z6-5946

March 20, 2006

First Name MI Last Name

Org. Number

Date

Dale P. Wolfe

66-Z6-5946

March 20, 2006

First Name MI Last Name

Org. Number

Date

Scott B. Pace

D6-56202

G-823A

March 28, 2006

Org. Number

Date

Rev T

Revision Letter

M

Changes in This
Revision

Revised 11.1 by removing delegation requirement.

Authorization for
Release
AUTHOR:

APPROVAL:

DOCUMENT RELEASE:

Jeffrey Johnson

66-Z6-5902

January 19, 2009

First Name MI Last Name

Org. Number

Date

Dale P. Wolfe

66-Z6-5902

January 19, 2009

First Name MI Last Name

Org. Number

Date

Scott B. Pace

G-823A

January 22, 2009

Org. Number

Date

Revision Letter

N

Changes in This
Revision

Revised Title to current naming convention
Revised 1.2 – Audit frequency
Revised 7.0 – Allows use of ISO certified processors
Revised 8.0 – Revised naming convention
Revised 9.0 – Incorporates D32028 requirements
Revised 11.4 – Requires Boeing Quality presence at CMS final inspection
Revised 11.5 – Specifies Inspection Report format requirements
Revised 12.1 – Update verbiage to clarify intent
Revised 12.2 – Clarify rules for in-process inspection acceptance
Revised 14.0 – Update to new Audit naming convention

Authorization for
Release
AUTHOR:

APPROVAL:

DOCUMENT RELEASE:

Rev T

Jeffrey Johnson

66-Z6-5902

November 17,
2009

First Name MI Last Name

Org. Number

Date

Dale P. Wolfe

66-Z6-5902

November 17,
2009

First Name MI Last Name

Org. Number

Date

Scott B. Pace

G-823A

Nov. 19, 2009

Org. Number

Date

D6-56202

17

Revision Letter

P

Changes in This
Revision

Revised 1.3, 1.4 – 1.3 split into two sub-paragraphs
Revised 7.0 – Removed requirement to use D1-4426
Revised 7.0 – Exception added for Welding
Revised 7.0 – Added requirement to flow down Boeing specs
Revised 9.0 – Removed superfluous language already specified in AWS specs
Revised 11.2 – Removed exception for CMM (Coordinate Measuring Machine)
Revised 12.1.H – Removed reference to CSN’s (obsolete)

Authorization for
Release
AUTHOR:

APPROVAL:

Jeffrey Johnson

66-C6-1E34

August 31, 2011

First Name MI Last Name

Org. Number

Date

Dale P. Wolfe

66-C6-1E34

August 31, 2011

First Name MI Last Name

Org. Number

Date

Org. Number

Date

DOCUMENT RELEASE:

Revision Letter

Q

Changes in This
Revision

Added QPL/QML requirements to 1.3
Added 1.6 to address natural disasters
Added 3.2 to add English language requirement
Revised 7.0 to add sub-tier performance monitoring requirement
Revised 11.1 to update DPD Approval requirement
Added 12.4 to specify BDS TBL requirements

Authorization for
Release
AUTHOR:

APPROVAL:

APPROVAL:

APPROVAL:

18

Jeffrey Johnson

66-C6-1E34

April 25, 2012

First Name MI Last Name

Org. Number

Date

Dale P. Wolfe

66-C6-1E34

April 25, 2012

First Name MI Last Name

Org. Number

Date

Timothy R Ditch

HM-01-D78G

April 25, 2012

First Name MI Last Name

Org. Number

Date

Joseph M Hale

GT-01-815

April 25, 2012

D6-56202

Rev T

First Name MI Last Name

Org. Number

Date

Org. Number

Date

DOCUMENT RELEASE:

Revision Letter

R

Changes in This
Revision

Deleted 11.7 (Supplier notification to Boeing for use of PCMS)
Re-numbered section 11 due to deletions
Updated 12.3 to current process
Added “Note” to 12.4 to provide info regarding forms
Re-formatted 12.4.D – bullets were not clear
Updated section 13 for clarity of intent
Deleted 13.8 (obsolete)
Deleted 13.9 – requirement covered in section 14
Updated 14.3.A to current process
Updated “References” section

Authorization for
Release
AUTHOR:

APPROVAL:

APPROVAL:

APPROVAL:

Jeffrey Johnson

66-C6-1E34

July 18, 2012

First Name MI Last Name

Org. Number

Date

Dale P. Wolfe

66-C6-1E34

July 18, 2012

First Name MI Last Name

Org. Number

Date

Timothy R Ditch

HM-01-D78G

July 18, 2012

First Name MI Last Name

Org. Number

Date

Joseph M Hale

GT-01-815

July 18, 2012

First Name MI Last Name

Org. Number

Date

Org. Number

Date

DOCUMENT RELEASE:

Revision Letter

S

Changes in This
Revision

Revised Table of Contents
Revised 1.7 for clarity
Revised 3.2 for clarity
Added 4.4 to specify inches

Rev T

D6-56202

19

Revised 12.1.A & B due to misinterpretation of intent by suppliers
Revised 14.1 & 3 for clarity
Authorization for
Release
AUTHOR:

APPROVAL:

APPROVAL:

APPROVAL:

DOCUMENT RELEASE:

Jeffrey Johnson

66-C6-1E34

June 6, 2014

First Name MI Last Name

Org. Number

Date

Dale P. Wolfe

66-C6-1E34

June 6, 2014

First Name MI Last Name

Org. Number

Date

Timothy R Ditch

HM-01-D78G

June 6, 2014

First Name MI Last Name

Org. Number

Date

Joseph M Hale

GT-01-815

June 6, 2014

First Name MI Last Name

Org. Number

Date

Alicia E. Otero

9M-ST-EUB0

July 23, 2014

Org. Number

Date

Revision Letter

T

Changes in This
Revision

Revised Table of Contents
Revised 1.4 & 1.5 to clarity intent
Added Reference to 4.1
Updated Calibration Standards in 6.1
Revised “Exception” in 7.0 to specify when/where welding may be subcontracted
Added verbiage in 8.0 to clarify intent
Added reference standard to 9.0
Deleted 11.3 and 11.6
Moved 11.4 and 11.5 to 12.1 (D & E)
Deleted Torque Witness requirement in 12.1 (was E)
Reorganized 12.1.A thru I for clarity
Revised 12.4 to clarify intent, including use of Boeing issued acceptance stamps
Added “Manager” to 13.1 to specify responsibility

Authorization for
Release
AUTHOR:

APPROVAL:

20

Jeffrey Johnson

66-C6-1E34

May 14, 2015

First Name MI Last Name

Org. Number

Date

Dale P. Wolfe

66-C6-1E34

May 14, 2015

First Name MI Last Name

Org. Number

Date

D6-56202

Rev T

APPROVAL:

APPROVAL:

DOCUMENT RELEASE:

Timothy R Ditch

HM-01-D78G

May 14, 2015

First Name MI Last Name

Org. Number

Date

Joseph M Hale

GT-01-815

May 14, 2015

First Name MI Last Name

Org. Number

Date

Alicia E. Otero

9M-ST-EUB0
Org. Number

Rev T

D6-56202

May 15, 2015
Date

21

Active Page Record
Page
Numbers

Revision
Level

Revision Type
(Added, Deleted)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

Rev T
Rev T
Rev T
Rev T
Rev T
Rev T
Rev T
Rev T
Rev T
Rev T
Rev T
Rev T
Rev T
Rev T
Rev T
Rev T
Rev T
Rev T
Rev T
Rev T
Rev T
Rev T

Added

22

Page
Numbers

D6-56202

Revision
Level

Revision Type
(Added, Deleted)

Rev T



Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.5
Linearized                      : Yes
Author                          : The Boeing Company
Company                         : The Boeing Company
Create Date                     : 2015:05:13 13:50:28-07:00
Modify Date                     : 2015:08:17 13:40:41-07:00
Source Modified                 : D:20150513204754
Has XFA                         : No
Language                        : EN-US
Tagged PDF                      : Yes
XMP Toolkit                     : Adobe XMP Core 5.2-c001 63.139439, 2010/09/27-13:37:26
Metadata Date                   : 2015:08:17 13:40:41-07:00
Creator Tool                    : Acrobat PDFMaker 11 for Word
Document ID                     : uuid:aab47407-2d71-44ae-a8ac-e322c269d193
Instance ID                     : uuid:138d9602-ef27-4880-86a1-8a866491f6ec
Subject                         : 3
Format                          : application/pdf
Title                           : Cage Code: 81205
Creator                         : The Boeing Company
Producer                        : Adobe PDF Library 11.0
Page Layout                     : OneColumn
Page Count                      : 22
EXIF Metadata provided by EXIF.tools

Navigation menu