PID Guide
User Manual:
Open the PDF directly: View PDF .
Page Count: 1
Download | |
Open PDF In Browser | View PDF |
PID guide Updates to previous version - Removal of N2 manifold Previous setup for the nitrogen gas tank for pressurizing the system was replaced with a quick disconnect, and the nitrogen gas tank will be considered as separate from the test stand. It will be a separate N2 tank that will be connected to the test stand using flexible tubing to the quick disconnect. - Valves Valves for upper fuel and LOX sections specified for designated required system pressures. - Removal of igniter system Igniter system was removed due to difficulties in machining the engine given to us. It is now a separate external system from the test stand. It is now replaced with three way fittings with caps in case of future integration of an internal igniter. - Venturi meters The venturi meters were moved to before the main fuel and LOX valve due to the need for room for the required entry length for the flow to fully develop.
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.5 Linearized : Yes Producer : Skia/PDF m77 Page Count : 1EXIF Metadata provided by EXIF.tools