Piranha 175 Operator's /Owner's Manual T2584 5_200 12PB_Gen II Garfil Fluidtech_Manual 5 200 12PB Gen Fluidtech
User Manual: T2584-5_200-12PB_GenII-Garfil-Fluidtech_Manual
Open the PDF directly: View PDF .
Page Count: 78
Download | |
Open PDF In Browser | View PDF |
Piranha P.O. Box 457 Hutchinson, Ks 67504 Voice (800) 338-5471 Fax (620) 662-1719 Web Site www.piranhafab.com No part of this manual may be stored in a retrieval system, transmitted, or, reproduced in any way. Including but not limited to photocopy, photograph, and magnetic or other record without the prior agreement and written permission of Mega Manufacturing Inc. PN: T2584-5 200-12 GEN II-Fluidtech Manual Table of Contents Safety ............................................................................................................................................1 Warning Labels .............................................................................................................................2 Tooling Installation Safety............................................................................................................3 Safety Standards & Specifications ................................................................................................5 Introduction...................................................................................................................................7 Installation.....................................................................................................................................8 Unpacking .....................................................................................................................................8 Placement ......................................................................................................................................9 Initial leveling ...............................................................................................................................9 Cleaning ......................................................................................................................................10 Precision Leveling.......................................................................................................................11 Electrical .....................................................................................................................................12 Connecting the Pedestal Control.................................................................................................13 Motor Rotation............................................................................................................................14 Operator Control .........................................................................................................................16 Pedestal controls .........................................................................................................................18 Key pad functions .......................................................................................................................18 Operating Parameters ..................................................................................................................20 Finishing Speed (Optional) .........................................................................................................21 Ram Return Modes .....................................................................................................................21 Setting Limits for Forming..........................................................................................................29 Recalling a Job ............................................................................................................................30 Bed Leveling Adjustment ...........................................................................................................33 Tooling Installation .....................................................................................................................34 Press Brake Preparation ..............................................................................................................34 Die Insertion................................................................................................................................34 Tooling Removal.........................................................................................................................35 Tool Adjustments ........................................................................................................................36 Tonnage Requirements ...............................................................................................................36 Die Rail Shimming......................................................................................................................36 Maintenance Procedures .............................................................................................................37 Maintenance Schedule ................................................................................................................37 Gib Clearance Adjustment ..........................................................................................................38 Gib Adjustment ...........................................................................................................................38 Ram Slides ..................................................................................................................................39 Hydraulic Power Unit .................................................................................................................40 Oil Filter Replacement ................................................................................................................40 Electrical Diagrams.....................................................................................................................41 Hydraulic Diagram......................................................................................................................50 Parts.............................................................................................................................................53 Ram Linkage ...............................................................................................................................53 Hydraulic Assemblies .................................................................................................................54 Ram Slides ..................................................................................................................................55 Filter Assembly ...........................................................................................................................56 Wedge Assembly ........................................................................................................................57 Die Rail Centering Screw Assembly (Optional) .........................................................................58 Punch Clamp Assembly ..............................................................................................................59 Backstop Assembly (Optional) ...................................................................................................60 Back Stop Finger Assembly (Optional)...................................................................................... 61 Die Rail (Optional) ..................................................................................................................... 62 Glossary ...................................................................................................................................... 64 Index ........................................................................................................................................... 70 Addendums ................................................................................................................................. 72 Table of Figures Figure 1: Lifting Lug Location........................................................................................................... 8 Figure 2: Leveling Plate /Foot Detail ................................................................................................. 9 Figure 3: Precision Leveling Detail.................................................................................................. 11 Figure 4: Fuse Size Chart ................................................................................................................. 13 Figure 5: Oil Level & Temperature Sight Gauge............................................................................. 14 Figure 6: Hydraulic Pump/Motor Assembly Unit............................................................................ 15 Figure 7: Main Electrical Enclosure................................................................................................. 16 Figure 8: Bed Tilt Wedge Assembly................................................................................................ 33 Figure 9: Die Rail Shimming Example ............................................................................................ 36 Figure 10: Gib Explanation .............................................................................................................. 39 Figure 11: Oil Filter Assembly Exploded View............................................................................... 40 Figure 12: Electrical Diagram 1 of 4................................................................................................ 41 Figure 13: Electrical Diagram 2 of 4................................................................................................ 42 Figure 14: Electrical Diagram 3 of 4................................................................................................ 44 Figure 15: Hydraulic Diagram 1 of 1 ............................................................................................... 49 Figure 16: Ram Linkage................................................................................................................... 53 Figure 17: Hydraulic Power Unit ..................................................................................................... 54 Figure 20: Gib Parts ......................................................................................................................... 55 Figure 21: Oil Filter Assembly Exploded View-0591550-1 ............................................................ 56 Figure 22: Wedge Assembly ............................................................................................................ 57 Figure 23: Die Rail Centering Screw Assembly .............................................................................. 58 Figure 24: Punch Clamp Assembly.................................................................................................. 59 Figure 25: Back Gauge Assembly T14-805 ..................................................................................... 60 Figure 26: Back Stop Finger Assembly T14-995............................................................................. 61 Figure 27: Die Rail........................................................................................................................... 62 Piranha 200 Ton Press Brake Operator / Owners Manual Safety Safety must be a primary concern. When operating or performing maintenance procedures, follow all standard safety guidelines. Do not wear loose fitting clothing or any articles that may be pulled into any moving parts. Be sure that when operating the equipment, all safety devices operate properly. Never under any circumstances disable, remove, or alter the original configuration of the safety system. Should any component of the safety system become inoperable, immediately discontinue operation, and notify a supervisor. ! ! ! NEVER place fingers, hands, or any other body part in or under the ram area or other moving mechanisms. Proper eye protection must be worn at all times when operating the machine. Always insure that the machine is turned OFF before changing the tooling. Read and understand this manual prior to operating the machine. The area around the Piranha Press Brake should be well lighted, dry, and free of obstacles. The Piranha Press Brake is designed for single person operation only. Always insure that all tooling is properly secured in position before starting any operation. When servicing the machine always practice standard lockout/tag-out procedures to avoid personal injury. Qualified maintenance personnel only should perform service operations on the Piranha Press Brake. NOTE: The Run/Program keyswitch provides security for choosing initiation means and operation modes that can be supervised by the user, in accordance with ANSI B11.3 standards. The Generation II control system also provides a Footswitch Control Module. Removing the Footswitch Control Module can provide an extra level of lockout security for initiation means, if your plant safety program deems a level is needed beyond the Run/Program keyswitch. Without the Footswitch Control Module in place, Foot or Foot/Foot initiation means will not operate even if chosen using the Run/Program keyswitch. When installing a Piranha “Plug -n- Play” light curtain assembly, the light curtain connector will replace the Footswitch Control Module. 1 Piranha 200 Ton Press Brake Operator / Owners Manual Warning Labels Located around the Piranha Press Brake are labels warning the operator of various dangers and precautions to be aware of when operating or servicing the machine. Place the depth limit dog to the top position or block the ram in the up position when the machine is stopped overnight to prevent damage to the micro switches. Do not use approach speed for pressing or machine damage may result. Part – T0061 This machine is top and front heavy. Do not use a fork truck! Use an overhead crane! See manual before attempting to move. Part – T0062 Both slides are to be leveled within 0.0005 inch/foot for proper operation. Running the machine out of level will cause damage and void the warranty. Part – T0063 To prevent serious bodily injury; Never place any part of your body under the ram or within the die area. Never Operate, install dies, or maintain this machine without proper instruction and without first reading and understanding the operators or owners machine maintenance manual. Never Install dies or service this machine with the motor “on” and control in “on” position. Part – T0066 2 Piranha 200 Ton Press Brake Operator / Owners Manual Do not go near leaks High-pressure oil easily punctures skin causing injury, gangrene and even death. If injured, seek emergency medical help. Immediate surgery is required to remove oil. Do not use finger or hand to check for leaks. Lower load or relieve pressure before loosening fittings. Part – T0067 Keep hands and body parts clear of moving parts. Part – T0068 When using CNC Ram control, always set the press brake top and bottom limit switches as a safety back up of the CNC controller. Press brake bottom limit switch should be set to accommodate the deepest bend, but not enough to cause a punch die collision, while allowing for material thickness. This important safety back up guards against programming errors and CNC system malfunction. Part – T0998 Tooling Installation Safety Tool setting is a very important job. Safety of the operator, press brake and the tooling is involved. To properly prepare for the job, the tool setter should have a good working knowledge of press brakes, tools and materials. The person should also have been instructed in the use of tool trucks and other handling equipment. The person must also understand the importance of proper tool adjustment. 3 Piranha 200 Ton Press Brake Operator / Owners Manual Aside from the technical knowledge the setter must develop a sense of personal safety awareness. It is not only important that tools are correctly installed in the proper size of equipment; the task must be accomplished in an organized and safe manner to complete the job. The following steps offer a precautionary guide in the development for safe tooling installation procedures. 1. Immediately report any questionable operation, unusual action, unsafe condition or improper maintenance to the proper personnel. 2. NEVER at any time allow fingers or hands to be between the tools. 3. When working with other people insure that all persons are clear of the press brake prior to any ram motion (jogging, inching or cycling). 4. Insure that the proper safe material handling equipment (tongs, pliers, vacuum lifters or other mechanical devices) available to the press brake operator. 5. When changing the settings of press brake controls, insure that the controls are properly adjusted and test cycle the machine to verify correct operation. 6. Any locking type of controls should be adjusted by authorized personal, and the key must be removed to a secure location when not being used. 7. Insure that all devices are in proper working order. 8. Anytime that the machine has been left unattended or inoperative for even a brief time, verify the correct position of all controls and proper press brake operation. 9. Develop a sense of safety for yourself and any persons around you as well as your surrounding area. 4 Piranha 200 Ton Press Brake Operator / Owners Manual Safety Standards & Specifications Electrical System Design/Manufacture: The machines manufactured in Hutchinson, KS, are furnished with electrical/electronic products that are UL (Underwriter’s Laboratory) approved. These components have the UL numbers printed or stamped on them and can be easily traced to the point of manufacture Hydraulic System Design/Manufacture: Hydraulic components used in Piranha machines are approved by NFPA (National Fluid Power Association), and those approval numbers can be traced through the manufacturer’s part numbers. ANSI/OSHA Compliance: Mega Manufacturing meets the current ANSI construction standards for manufacturing of ironworkers, press brakes, and shears: ANSI B11.3—Power press brakes, Construction, Care, and Use The ANSI B11 standards were developed to establish levels of responsibility for manufacturing safe products, installation, training, and use of these products. The levels of responsibility are fairly evenly distributed between the manufacturer, the owner/end user of the equipment, and the operator. Specific guarding requirements are in general assigned to the owner/end user of the equipment. Please understand that this ruling places the primary burden of responsibility for maintenance of guarding on the owner /end user of the equipment. Inherent in this requirement is the responsibility of the owner/end user of the equipment to develop and maintain guarding specific to their application for the equipment. These ANSI safety requirements may be acquired from: American National Standard Institute 1430 Broadway New York, New York 10018 Telephone (212) 354-3300 PO Box 457 Hutchinson, KS 67504-0457 Phone: (800) 338-5471 Fax: (620) 669-8964 5 Piranha 200 Ton Press Brake Operator / Owners Manual 6 Piranha 200 Ton Press Brake Operator / Owners Manual Introduction The Piranha press brake is a heavy duty, high performance hydraulic powered machine that provides several important advantages surpassing other press brakes in today’s market. The Piranha’s single hydraulic cylinder mechanical linkage system provides full tonnage at any point across the bed. The machine is shipped fully assembled requiring only hydraulic oil and electrical power to become fully operational. The heavy steel “C” frames, interlocking cross members, ram and bed provides the integrity and resistance to deflection that is necessary for accurate performance. State of the art, maintenance free, aerospace Garfil® bushings provide high load capacity and low friction in the form of a walled sleeve. They are completely non-metallic and require no lubrication. Hardened microfinished oversize link pins allow the linkage to withstand high load forming and punching applications. Other standard features include: emergency stop button, Generation II control system, bed tilt adjustment, spring open die clamps with hardened clamping bolts. Hardened & ground ram slides with non-metallic ram gibs & PRS., Warranty Mega Mfg. will replace or repair with like parts, either new or rebuilt, F.O.B. the factory, or refund the purchase price for any parts on ironworkers, pressbrakes, or shears, which are defective in materials and workmanship within (12) months of the date of purchase. Provided the buyer returns the warranty registration within (30 days) of the purchase date, and, at the seller’s option, returns the defective materials freight and delivery prepaid to the seller, which shall be the buyer’s sole remedy for the defective materials. A 5-year warranty against defects in materials and workmanship applies to major structural components on pressbrakes and shears. Seller shall not be liable to purchaser or any other person for consequential or incidental damages. Hydraulic and electrical components are subject to their respective manufacturer’s warranties. This warranty does not apply to machines and/or components which have been altered in any way, or subjected to abusive or abnormal use, inadequate maintenance and lubrication, or to use beyond seller recommended capacities and specifications. Seller shall not be liable under any circumstances for labor costs expended on such goods or consequential damages. Seller shall not be liable to purchaser or any other person for loss or damage directly or indirectly arising from the use of the goods or any other cause. No employee, agent, officer, or seller is authorized to make oral representations or warranty of fitness or to waive any of the foregoing terms of sale and none shall be binding on the seller. 7 Piranha 200 Ton Press Brake Operator / Owners Manual Installation BEFORE INSTALLING THIS PRESS BRAKE, READ AND UNDERSTAND THE PRESS BRAKE MANUAL WITH PARTICULAR ATTENTION TO “SAFETY TIPS FOR MAINTENANCE PERSONNEL” THE CURRENT ANSI B11-3 STANDARD-“SAFETY REQUIREMENTS FOR THE CONSTRUCTION, CARE AND USE OF POWER PRESS BRAKES.” Copies can be ordered from: American National Standards Institute, 1430 Broadway, New York, New York 10018 Unpacking CAUTION: THE PRESS BRAKE IS HEAVY IN FRONT. GUARD AGAINST TIPPING UNTIL ANCHOR BOLTS ARE SECURED. This machine was carefully packaged at the factory to avoid damage during shipment, should any accidental damage occur, contact the responsible freight company immediately and report the damage. Indicate any damage on the Bill of Lading. All Warranty information included in this packet must be returned to the factory. Figure 1: Lifting Lug Location The Piranha Press Brake must only be lifted using a crane, and the lifting lugs located in front of the hydraulic oil tank on top of the machine. Do not lift the machine from the bottom (forklift or jack) as the machine is top and front heavy and can tip resulting in serious bodily harm or death. Lifting the machine from the bottom may also result in machine damage. 8 Piranha 200 Ton Press Brake Operator / Owners Manual Placement Piranha recommends that the machine be placed on a reasonably level concrete foundation suitable to support the press brake’s total weight and in accordance with local building codes. The machine should be placed on a single concrete pad free of cracks and seams. Prior to anchoring or setting, the press brake should be leveled and shimmed. A section on leveling is included in this manual. Anchoring can be accomplished using suitable masonry anchors. Typically, only the rear feet of the machine need to be anchored. Use the machine as a template for anchoring hole locations. Placement of the machine should allow easy access around the machine for the operator and maintenance personnel. For safe operation placement should allow tooling to be installed onto the bed from the end of the machine. It is recommended that a minimum four-foot area around the Piranha Press Brake be provided. Initial leveling CAUTION: THE PRESS BRAKE IS HEAVY IN FRONT. GUARD AGAINST TIPPING BEFORE AND DURING LEVELING. Level adjusting screws are only provided on the rear feet. The rear feet of thePiranha Press Brake must be placed on two steel pads: . These pads are provided with the press brake. Figure 2: Leveling Plate /Foot Detail 1. The front feet of the press brake do not require steel leveling pads. 2. Position the 1/2" thick pad under each of the rear feet (see Figure 2 Item 3). 9 Piranha 200 Ton Press Brake Operator / Owners Manual 3. Before the riggers disconnect the lifting apparatus, check the press brake for rough level from the left to right plane. 4. Using a machinist square level, shim the front feet until the machined bottom surface of the Ram is level left to right. Desired level is within .005"-.015" inch per foot. A jack angle is located on the inside of the right C-frame to assist in leveling the machine right to left. Because of bed tilt feature, the bed cannot easily be used for leveling. Cleaning Clean the die rail, bed surface, punch holder pocket and die clamps with a mild solvent so as not to damage the paint finish on the machine. The main cylinder rod must also be free contaminants. Any contaminants left on the cylinder rod may damage the chrome finish and related hydraulic seals. The cylinder rod must be clean and dry. Wipe down the rest of the press brake with a mild cleaning solution. 10 Piranha 200 Ton Press Brake Operator / Owners Manual Precision Leveling The Piranha Press Brake must be leveled precisely prior to operation. The following steps represent the typical leveling procedure. These instructions must be followed to avoid damaging the machine. This procedure will require that the press brake have electrical power connected and hydraulic fluid installed. The press brake must be functional enough to lower the ram to the bottom stop position. Figure 3: Precision Leveling Detail Item 1 2 Description Slides Ram Table 1: Ram Slide Location Explanations 1. Before beginning the leveling procedure, turn on the press brake and lower the ram to the bottom of stroke position, then turn the press brake off. 2. It is important to keep in mind that the left and right side need only to be parallel with each other, rather than perpendicular with the floor. 3. Using a machinist square level having an accuracy of .0005” inch per foot graduation, place the level firmly against the front face of the right vertical ram slide as shown. (See Figure 3 Item1) 4. Adjust the rear-leveling bolt until the bubble on the level is centered. 11 Piranha 200 Ton Press Brake Operator / Owners Manual 5. Repeat this procedure for the left slide. Adjust leveling bolts as required. 6. The side frames must be parallel to each other within .0005” per foot. 7. Once the machine is level, place shims, having a thickness equal to the gap between the base plate and the bottom of the press brake foot under the foot. Use Shim Pak Part # T2633 8. After the shims are in place, lower the adjusting bolts and recheck the level to ensure that the left and right sides of the machine have remained parallel to each other. The overall shim pack height may need to be adjusted in order to maintain side frame parallelism. 9. The machine may now be anchored to the floor using concrete anchor lugs. 10. After tightening the floor anchor lugs, re-check the press brake level to ensure that the machine has not moved. Electrical CAUTION: ELECTRICIANS CHECKING DIRECTION OF ROTATION SHOULD BE CAUTIONED NOT TO OPERATE THE PRESS BRAKE UNTIL IT HAS BEEN THOROUGHLY CHECKED, CLEANED, LEVELED AND LUBRICATED. A WIRING DIAGRAM IS FURNISHED IN THIS MANUAL. PRESS BRAKE OPERATING MODE MUST BE IN THE OFF POSITION WHEN CHECKING MOTOR ROTATION. BEFORE DRILLING ANY HOLES IN THE ELECTRICAL ENCLOSURE, BE SURE THAT THE ELECTRONIC CIRCUIT BOARDS/EQUIPMENT ARE PROTECTED FROM METAL CHIPS CONTACTING THE CIRCUIT BOARD(S). DO NOT USE COMPRESSED AIR TO BLOW METAL DEBRIS FROM THE ENCLOSURE. USE A VACUUM TO REMOVE ANY METAL PARTICLES. 12 Piranha 200 Ton Press Brake Operator / Owners Manual Voltage requirements may be determined by comparing the fuse part number to the chart located on the inner door panel of the main electrical box. (See Figure 4) 200 TON PRESS BRAKE SHORT CIRCUIT AND OVERLOAD FUSE PROTECTION F1-F2-F3 VOLTAGE TYPE AMP 208 VOLT J 90.0 230 VOLT J 80.0 460 VOLT J 40.0 575 VOLT J 30.0 Figure 4: Fuse Size Chart Electrical connection of the 3-phase systems requires proper phasing. When connecting the press to a 3-phase power source, the rotational direction of the pump drive motor must be correct. . The motor must rotate in the direction of the arrow on the electrical motor (See Figure 6). A licensed electrician should perform all electrical connections. ! Warning - The control transformer is for machine operation only. Do not use the machine transformer to power any secondary devices. If a CNC back-gauge is installed on the machine install a dedicated 115-VAC, 60Hz, 20-Amp fused service to the CNC back gauge. Connecting the Pedestal Control Prior to operation, the pedestal control plug must be attached to the main control panel. To connect the plug, locate the receptacle on the bottom of the main electrical control box. Align the plug with the receptacle. Insert the plug and rotate the outer locking ring securing the plug to the receptacle. 13 Piranha 200 Ton Press Brake Operator / Owners Manual Hydraulic Before applying power to the Piranha Press Brake, the hydraulic reservoir must be filled with oil. To fill the reservoir, locate and remove the filler/breather cap on top of the reservoir. Fill the reservoir with Mobil DTE-13 or ISO32 equivalent, filtered to an ISO 17/15/13-cleanliness level. The proper oil level is between the red and black lines of the sight gauge found on the rear of the reservoir (See Figure 5). Do not over fill the reservoir. Replace the filler/breather cap. Figure 5: Oil Level & Temperature Sight Gauge Prior to start-up of the hydraulic unit the pump must be filled with hydraulic oil. The following steps represent the typical pump filling procedure. 1. Locate the pump case drain port (See Figure 6 Item 2). 2. Remove the tube from the fitting and remove the fitting from the port. 3. Using a small funnel, fill the case of the pump. 4. Replace the fitting and the tube. Motor Rotation Motor rotation can be verified by quickly “Bump Starting” the motor (starting and stopping quickly) and viewing the fan blade rotation through he fan blade shroud. The rotation direction of the motor fan blades must correspond with the direction arrow on the motor. If the fan blades are obscured, use a flashlight to view the fan blades through the viewing port on the fan shroud. Shine the light towards the fan blades and view the fan blade rotation. WARNING: Do not place any objects or body parts into the viewing port. Machine damage or serious personal injury will occur. 14 Piranha 200 Ton Press Brake Operator / Owners Manual Upon initial start-up of the hydraulic unit visually inspect around the machine for any possible leaks. Do not search for hydraulic oil leaks using exposed flesh; hydraulic pressure can puncture the skin. 1 2 Figure 6: Hydraulic Pump/Motor Assembly Unit Item Description 1 Direction of Rotation Arrow 2 Fan blade View port Table 2: Hydraulic Pump/Motor Assembly Descriptions 15 Piranha 200 Ton Press Brake Operator / Owners Manual Operator Control Operator selectable controls are provided on the Pedestal Control Unit and on the Right Hand Side of the press brake. Functionality of the controls are described below. Main Electrical Enclosure al enclosure is located on the right hand side of the 1 2 3 Figure 7: Main Electrical Enclosure Item 1 2 3 Description Safety Disconnect Switch Ram Safety Switch Reset Button The Ram Safety Switch be set to engage within ½” prior to the speed change point to permit proper operation of sequence modes and optional safety devices. 16 Piranha 200 Ton Press Brake Operator / Owners Manual 1 2 6 3 4 5 Fig. 8: Generation II Pedestal Control Unit Item 1 2 3 4 5 6 Description Keyed Program /Run Selector Switch Ram Up Button Teach/Learn Indicator Light Motor Start Button Motor Stop Button LCD/ Keypad Unit 17 Piranha 200 Ton Press Brake Operator / Owners Manual Pedestal controls Start button: Depressing the green Start pushbutton will apply power to the electric motor that drives the Piranha Press Brake hydraulic power unit. Depressing the E-Stop pushbutton will remove power from the pump unit. Before attempting to start the hydraulic motor insure that the E-Stop control is in the armed (up) position. Stop Button: The E-Stop (Emergency Stop) control is a red, two-position maintained push button. Pressing the E-Stop button will remove electrical power from the hydraulic power unit drive motor and all base machine control circuits, stopping all machine movement. Twist the button head clockwise to reset the pushbutton. Machine movement cannot resume until the E-Stop button has been reset. Ram up Button: Depressing the Ram Up button will raise the ram from any position to the up stroke position. Program/Run keyed switch: Supervisor key switch to limit access to programming functions, run modes, and initiation means. In the Run position it allows operation of the press brake. In the program position, it enables programming functions, run mode access, and initiation means access. Dual palm Buttons: Depressing the palm buttons simultaneously will initiate a press cycle. If either palm button is released before the ram reaches the full down position, the ram will respond according to the Run mode selector switch setting. Footswitch: A footswitch is provided for use according to the initiating means. If the footswitch is released before the ram reaches the full down position the ram will react according to the Run mode selector switch setting. Key pad functions Alpha/numeric keys: Contains numeric and alpha characters used for data entries. Programs similar to a cell phone format. See the table below. Hand/Foot: Permits the operator to toggle between the various initiation means when Program/Run switch is in the Program position. Mode: Permits the operator to toggle between the various run modes when Program/Run switch is in the Program position. /Yes: Moves the cursor up and answers yes to questions requiring a positive response / No: Moves the cursor down and answers no to questions requiring a negative response Bksp: Moves the cursor backward one position per depression. Esc: Moves display back to the previous menu Decimal: Inserts a decimal point. Job/Learn: Will display a job selection menu, and inputs value during teach mode. When in the run screen, depressing the job/learn key will display the job selection menu. In the teach mode, depressing the job/learn key will input the current ram position. Clr: Clears most recent entry. 18 Piranha 200 Ton Press Brake Operator / Owners Manual Enter: Confirms data entry. Cycle counters & Timers Machine counter: Master cycle counter, tracks total number of ram cycles and is not re-settable. Maintenance counter: Cycle counter used for tracking maintenance intervals and may be reset. An access code is required to gain entry into the counter screen. Parts counter: Counter used to track the number of completed parts during a production run. May be reset from the Run Screen (Job/learn key) Hour meter: Records total “motor run” hours and is not re-settable. Memory Tag / Job Storage and Back up The Generation II control system is equipped with a battery backup circuit to prevent programmed job loss in the event of a power failure or when the machine electrical power is turned off. The battery has a nominal lifespan of three years after which time the battery discharges and all stored jobs will be lost if not saved to a memory tag. Stored jobs will also be lost when the battery is replaced unless jobs are “backed up” on a memory tag. Once a “Battery Backed Memory Fail” message appears, all stored job data and some machine parameters are lost forever. The battery must be replaced and some parameters must be restored. Jobs saved on the memory tag can be restored by using the procedure below. The backup procedure is detailed here: 1. Turn off main power to electrical enclosure. 2. Open enclosure door. 3. Insert Memory Tag into slot on front face of GII control module (Orientation does not matter). 4. Close electrical enclosure door. 5. Restore electrical power. 6. Start press brake. 7. After GII initializes, turn “Run/Program” switch to “Program.” 8. Select “Teach/Edit Job” and press Enter. 9. Use “Down Arrow” to select “Memory Tag” and press Enter. 10. Select desired function: “Backup Jobs” or “Restore Jobs” and press Enter. 11. Remove and store memory tag when data transfer is completed. NOTE: Do Not Remove Memory Stick While “Read/Write” is in progress. Memory Tag Part Number: T3132 19 Piranha 200 Ton Press Brake Operator / Owners Manual Operating Parameters (Key required for access) Initiation means Hand: When the switch is in the “Hand” position the machine is controlled from the Two-Hand control. The palm buttons must be engaged simultaneously to initiate a press cycle. Foot: When the “Foot” mode is selected, the press is controlled by the footswitch alone. Hand/Foot: This is a sequencing mode of operation, which utilizes both Hand, and Foot modes. Ram movement is initialized by Hand mode and then transferred to Foot mode at the speed change position. Simultaneously depressing and maintaining both of the palm buttons initiates the sequence. At the speed change position, the ram stops and control is transferred to the footswitch. Activation of the footswitch will complete the ram cycle. Foot/Foot: This is a sequencing mode of operation that utilizes a double Footswitch actuation. Ram movement is initiated by operating the footswitch control. The press brake ram travels downward in approach speed to the speed change point, where the ram stops movement. Reactivation of the footswitch will complete the ram cycle. Run modes Off: When the “Off” mode is selected, all Press Brake movement (up or down) is disabled. Only the hydraulic motor can be started when the Operating Mode switch is in this position. Inch: When the Inch mode is selected, the Press Brake ram will descend when the palm buttons are actuated. Releasing the palm buttons will cause the ram to stop. Re-initiating the palm buttons will restart downward ram movement. At the bottom of stroke position the ram will stop, and must be raised by depressing the Ram Up button. This mode is useful for setting or changing tooling, and setting up a job. Run 1: When the Run 1 mode is selected, the ram will descend when the ram initiation means is activated. When the initiation means is released at any point during the down stroke, the ram will pause. Downward motion will resume when the initiation means are re-activated. The ram will automatically return to the top of stroke position when the bottom stop position is reached. Run 2: When the Run 2 mode is selected, the ram will descend when the ram initiation means is activated. When the initiation means is released during the down stroke, or when the bottom stop position is reached, the ram will automatically return to the top of stroke position. Run 3: When The Run 3 mode is selected, the ram will descend when the ram initiation means is activated. When the initiation means is released during the down stroke, the ram will stop. When the ram reaches the bottom stop position, the ram may be “inched” up by “toggling the ram initiation means. Run 3 will allow the operator control of the ram with the ram initiation means during the return stroke 20 Piranha 200 Ton Press Brake Operator / Owners Manual Finishing Speed (Optional) Finishing speed is incorporated into the control configuration to permit the press brake ram to enter a slower pressing speed, enabling a greater degree of ram repeatability without the CNC control. Ram Return Modes Low Low, or “slow” return when selected, is a function where the ram will return slowly from the bottom of stroke to the top of stroke. Low / High Low, or “slow” return when selected, is a function where the ram will return slowly from the bottom of stroke to the original speed change point. At the speed change point, the ram will revert to the normal or “high” return speed High High-speed return, when selected is a function where the ram will return to the top of stroke position in high speed. Steps for Entering Names and Numbers Refer to the letters on the number keys to select the desire characters. With each press of a numeric key, the displayed character appears in the following order: Number first, then the corresponding letter on the key (Upper Case only). After a character is entered, the cursor will automatically advance to the next position Number of Times Key is Depressed Keys 1 2 3 4 1 1 2ABC 2 A B C 3DEF 3 D E F 4GHI 4 G H I 5JKL 5 J K L 6MNO 6 M N O 7PQRS 7 P Q R 8TUV 8 T U V 9WXYZ 9 W X Y 0 0 21 5 S Z Piranha 200 Ton Press Brake Operator / Owners Manual If you make a mistake while entering a name Use BKSP (Backspace) to move the cursor to the incorrect character, enter the correct character. POWER UP The following screens are displayed upon power up of the control Piranha: GENERATION II VER – 1.00 © 2001 MEGA MFG. INSTALLED OPTIONS 1. “Y” AXIS CONTROL READY: PRESS START TO RUN MAIN PUMP MOTOR Depressing the START button on the console will start the main pump motor and initialize the control for operation or programming. 22 Piranha 200 Ton Press Brake Operator / Owners Manual Machine set-up: (Security Code required for access) Programming menu items are accessed with the RUN/PROGRAM key selector in the Program mode. Use the UP and DOWN arrow keys to select from the main program screen. PROGRAM HAND SINGLE 1. TEACH/EDIT JOB 2. SET BEND NUMBER >3. MACHINE SETUP ENTER SECURITY CODE **** The main program screen displays the HAND/FOOT selection and the current operation mode. ↑/YES ↓/NO ENTER Tip: Either Use ↑↓ keys to select desired menu item then Enter, or press number corresponding to desired menu item. CODE >1.ANTI-TIE-DOWN 2.MAINT COUNTER 3.STM TEST 4.SECURITY CODE The MACHINE SETUP menu is for machine settings that can be modified by the user. The security code (9999 or code set by supervisor) must be entered to gain access to this screen. The security code field will accept up to six digits. 5.INCH/MM DISPLAY 6.MACHINE-COUNTER 7.HOUR METER 8.LIGHT CURTAIN 9.PEAK/TRACK 0.BACKGAUGE Tip: Either Use ↑↓ keys to select desired menu item then Enter, or press number corresponding to desired menu item. >1 ANTI-TIE-DOWN TIMERS: ANTI-TIE-DOWN 500 NOTE: 500 MS is a default parameter. This value may be changed for a specific job application if required. MS >2 MAINT COUNTER MAINT COUNTER PRESS CLR TO RESET Cycle counter used for tracking maintenance intervals and may be reset by depressing the CLR (Clear) button.. 123456 23 Piranha 200 Ton Press Brake Operator / Owners Manual >3 STM TEST (Stop Time Measurement) >STM TEST CYCLE HAND SPEED CONST LIGHT CURTAIN MOS ↑ / YES ↓ / NO ENTER >STM TEST CYCLE STM TEST CYCLE PRESS ENTER TO START STM TEST READY PRESS PALM BUTTONS AND HOLD UNTIL STOP ESC TO ABORT >HAND SPEED CONST STM TEST: HAND SPEED CONST NOTE: 63 in/sec is a default parameter. This value may be changed for a specific job application if required. 63 IN/SEC >LIGHT CURTAIN MOS (Minimum Object Sensitivity) STM TEST: LIGHT CURTAIN MOS NOTE: This inch value is the minimum object sensitivity of the light curtain. 1.00 INCHES >4 SECURITY CODE SEC CODE: TO CHANGE SEC CODE ENTER SEC CODE Code To change the security code, enter desired code. May be a combination of Alpha/Numeric symbols up to six digits long.. NOTE: Once this security code is changed, the default security code (9999) will not longer be active. >5 INCH/MM DISPLAY DISPLAY MODE ↑ / YES INCH DISPLAY Inch/mm ↓ / NO 24 ENTER Piranha 200 Ton Press Brake Operator / Owners Manual >6 MACHINE COUNTER MACHINE COUNTER 12345678 Displays ram cycles and is not re-settable PRESS ESC TO EXIT >7 HOUR METER HOUR METER 1234567.1 Displays motor run hours and is not re-settable PRESS ESC TO EXIT >8 LIGHT CURTAIN LIGHT CURTAIN: LIGHT CURTAIN OFF ↑/ YES ↓ / NO ENTER ↓ / NO ENTER OFF/ON >9 PEAK/TRACK TONNAGE: PEAK / TRACK PEAK MODE ↑ / YES PEAK/TRACK >0 BACKGAGUE BACKGAUGE: TYPE NONE ↑ / YES ↓ / NO ENTER NONE/HURCO/AUTOMEC/PIRANHA 25 Piranha 200 Ton Press Brake Operator / Owners Manual Programming Jobs (Key required for access) PROGRAM >1.TEACH NEW JOB 2.EDIT JOB 3.SAVE CURRENT JOB 4.DEL CURRENT JOB 5.MEMORY TAG ↑/ YES ↓ / NO ENTER >1 TEACH NEW JOB TEACH NEW JOB: ENTER NEW JOB # TEACH NEW JOB: ENTER JOB DESC DEFAULT__ DEFAULT__ TEACH NEW JOB: FINISHING SPEED 100_ % TEACH NEW JOB: PROCEED TO BENDS? YES OR NO TOP POSITION JOB# TOP POSITION (ACTL POS/LEARN POS) X.XXXXIN X.XXXXIN RETURN SPEED MODE JOB# RETURN SPEED MODE PRESSING POSITION JOB# PRESSING POSITION (ACTL POS/LEARN POS) X.XXXXIN X.XXXXIN TEACH NEW JOB: PRESSING SPEED # 100_ % NO YES BOTTOM POSITION JOB# BOTTOM POSITION (ACTL POS/LEARN POS) X.XXXXIN X.XXXXIN TON VALVE SETTING (Optnl) JOB# TON VALVE % Another Bend? Yes/No HIGH ESC 100% >1.TEACH NEW JOB 2.EDIT JOB 3.SAVE CURRENT JOB 4.DEL CURRENT JOB 5.MEMORY TAG Press #3 to Save Job when complete, and press ESC to exit back to main menu. 26 Piranha 200 Ton Press Brake Operator / Owners Manual >2 EDIT JOB >EDIT JOB EDIT BEND DELETE BEND INSERT BEND Tip: Use ↑↓ keys to select desired menu item then Enter. EDIT JOB EDIT CURRENT JOB ENTER NEW JOB # EDIT CURRENT JOB: ENTER JOB DESC DEFAULT_ DEFAULT EDIT CURRENT JOB PRESSING SPEED EDIT CURRENT JOB FINISHING SPEED 100% 100% Note: Ability to change finishing speed is optional. EDIT BEND EDIT CURRENT JOB JOB# DEFAULT EDIT CURRENT JOB ENTER JOB DESC BEND #1 DEFAULT_ JOB# TOP POSITION JOB# PRESSING POSITION JOB# BOTTOM POSITION X.XXXXIN X.XXXXIN X.XXXXIN JOB# RETURN SPEED MODE HIGH JOB# TON VALVE % 100% DELETE BEND EDIT CURRENT JOB JOB# DEFAULT Enter YES or NO to delete a bend displayed for the current job. DELETE BEND #1 27 Piranha 200 Ton Press Brake Operator / Owners Manual INSERT BEND EDIT CURRENT JOB JOB# DEFAULT INSERT BEND #1 1.TEACH NEW JOB 2.EDIT JOB >3.SAVE CURRENT JOB 4.DEL CURRENT JOB 5.MEMORY TAG #3 Save job when complete, and press ESC to exit back to main menu. RUN Run Jobs 1- Choose Program JOB LEARN >1.SEARCH FOR JOB 2.SCROLL JOB LIST 3.CLEAR PARTS COUNT Choose Menu 1. or 2. to choose job to run. Tip: Either Use ↑↓ keys to select desired menu item then Enter, or press number corresponding to desired menu item. 2- Reset Parts Counter JOB LEARN >1.SEARCH FOR JOB 2.SCROLL JOB LIST 3.CLEAR PARTS COUNT Choose Menu 3. To clear parts counter. Run job after making selection. 28 Piranha 200 Ton Press Brake Operator / Owners Manual Setting Limits for Forming WARNING: NEVER GRASP THE MATERIAL WITH FINGERS OR THUMBS ON TOP OF THE MATERIAL. IF WIDE SHEETS MUST BE HELD DURING FORMING, SUPPORT THE MATERIAL FROM BELOW WITH THE OPEN PALM, KEEPING FINGERS AND THUMBS UNDER THE MATERIAL. KEEP ALL PARTS OF THE BODY CLEAR OF THE UPWARD TRAVEL OF THE MATERIAL Programming a Simple Job NOTE: The Generation II software version 3.10 and higher have a “carry forward” feature when programming subsequent steps. The ram TOS, Speed change, Pinch point and BOS positions are automatically inserted. The backgauge fields also “carry forward” Only the fields that are different from the previous step need to be modified. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. Start Press Brake motor by depressing the green START button. Rotate keyed Programming switch to “PROG” (program) Mode. Press #1 on keypad. On new screen, ensure arrow is on #1 (>1), press ENTER. Key in a job number (max 11 characters) and press ENTER. Key in a job description (max 21 characters) and press ENTER (To bypass description screen, press CLR (clear) then ENTER) Key in Pressing Speed to desired value and press ENTER. Key in Finishing Speed to desired value and press ENTER. Press “Yes” button to proceed to bends. Key in desired Top of Stroke position and press ENTER –orMove press ram to desired position, then press JOB LEARN button to save position. Press ENTER. Key in desired Speed Change position and press ENTER –orMove press ram to desired position, then press JOB LEARN button to save position. Press ENTER. Key in desired Bottom of Stroke position and press ENTER –orMove press ram to desired position, then press JOB LEARN button to save position. Press ENTER. Select Return Speed mode by toggling the UP or DOWN arrows and press ENTER. Set Bend Tonnage (if equipped) and press ENTER. To program additional bends, press YES and repeat steps 7-15. If additional bends are not required, press NO. Press #3 to save job. Rotate Keyed Programming switch to “RUN” Mode and cycle press. Edit a Bend 1. With Press Brake motor running and current job enabled, Rotate keyed Programming switch to “PROG” (program) Mode. 2. Press #1 on keypad. 3. On new screen, ensure arrow is on “EDIT BEND”(>EDIT BEND), press ENTER. 4. Arrow to EDIT BEND and press ENTER 5. Arrow to desired bend number (or bend function) and press ENTER, 6. If editing ram position, use either arrow key for minute position changes or program new ram position and press ENTER 7. Rotate keyed Program switch to “RUN” 29 Piranha 200 Ton Press Brake Operator / Owners Manual Recalling a Job 1. 2. 3. 4. Start Press Brake motor by depressing the green START button. Rotate keyed Programming switch to “RUN” Mode. Press “JOB/LEARN” button on keypad. Select from Three Options: a. SEARCH FOR JOB b. SCROLL JOB LIST c. CLEAR PARTS COUNT 5. Choose the desired option by depressing the corresponding number on the keypad or by depressing the “↑” or “↓” arrow keys until the desired job has a “>” next to it. Proceed as follows: Search For Job Option 1. Enter job name/number or beginning search string identifier and press ENTER on keypad. 2. Depress the “↑” or “↓” arrow keys until the desired job has a “>” next to it and press ENTER. 3. Press ESC twice to return to the RUN screen. 4. Job is active and may be “run.” Scroll For Job Option 1. Displays complete database in alphabetical/numeric order. 2. Depress the “↑” or “↓” arrow keys until the desired job has a “>” next to it and press ENTER. 3. Press ESC twice to return to the RUN screen. 4. Job is active and may be “run.” Clear Parts Count 1. Permits the parts counter to be reset. 2. Follow onscreen instructions. 3. After confirming clear, press ESC on keypad until standard RUN screen is displayed. Steps To Turn Off A CNC Control In Gen II 1. Rotate keyed selector switch to PROGRAM 2. Type “3” for MACHINE SETUP 3. Enter Supervisor Code and press “ENTER” 4. Use ↑ and ↓ until “>” is to the left of BACK GAUGE option and press ENTER 5. Use ↑ and ↓ until NONE is showing and press ENTER 6. Press ESC NOTE: If the CNC is deactivated, the press ram will not cycle until the CNC bypass jumper “Plug” replaces the CNC interface plug. The bypass plug is located inside the main press brake electrical enclosure. Unplug the CNC connector and replace with the bypass plug for Generation II control. 30 Piranha 200 Ton Press Brake Operator / Owners Manual 1. 2. 3. 4. 5. 6. 7. 8. Steps To Turn On A CNC Control In Gen II Rotate keyed selector switch to PROGRAM Type “3” for MACHINE SETUP Enter Supervisor Code and press ENTER Use ↑ and ↓ until “>” is to the left of BACK GAUGE option and press ENTER Use ↑ and ↓ until AUTOMEC or HURCO is showing and press ENTER Press ESC – Only option 3-MACHINE SETUP should be available now Rotate keyed selector switch to RUN CNC is in control. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. Change Speed When A 3rd Party CNC Is Running: Rotate keyed selector switch to PROGRAM Type “3” for MACHINE SETUP Enter Supervisor Code and press “ENTER” Use ↑ and ↓ until “>” is to the left of BACK GAUGE option and press ENTER Use ↑ and ↓ until NONE is showing and press ENTER Press ESC Type “1” for TEACH/EDIT JOB Type “2” for EDIT CURRENT JOB Use ↑ and ↓ until “>” is to the left of EDIT JOB and press ENTER Press ENTER until PRESSING SPEED is displayed Type in desired Pressing Speed % and press ENTER Press ESC three times until Main Program Menu is showing Type “3” for MACHINE SETUP Enter Supervisor Code and press ENTER Use ↑ and ↓ until “>” is to the left of BACK GAUGE option and press ENTER Use ↑ and ↓ until AUTOMEC or HURCO is showing and press ENTER Press ESC – Only option 3-MACHINE SETUP should be available now Rotate keyed selector switch to RUN CNC is in control. 31 Piranha 200 Ton Press Brake Operator / Owners Manual Procedure for setting the LOWER RAM LIMIT for AUTOMEC CNC Back Gauges 1. Assuming that AUTOMEC has been chosen as the Back Gauge in the 3-MACHINE SETUP menu 2. Turn the key switch to PROGRAM 3. Type “3” for the 3-MACHINE SETUP menu 4. Enter the Supervisor Code (factory default is 9999) and hit ENTER 5. Use the ↑ or ↓ buttons until the “>” is next to LOWER RAM LIMIT and hit ENTER 6. Change the LOWER RAM LIMIT to 0”, this moves the Generation II LOWER RAM LIMIT out of the way and hit ENTER CAUTION – This overrides the factory set LOWER RAM LIMIT and can allow the user to bottom out the cylinder! 7. ESC out to the menu which shows 3-MACHINE SETUP 8. Change the run MODE to INCH or RUN 3 – Mode that stops the machine at the bottom of stroke 9. Turn the key switch to RUN 10. Setup and run job using the AUTOMEC CNC 11. At the bottom of stroke, note the scale reading shown on the dual palm pedestal 12. Complete the stroke 13. Turn the key to PROGRAM 14. Type “3” for 3-MACHINE SETUP menu 15. Enter the Supervisor Code and hit ENTER 16. Use ↓ to get to LOWER RAM LIMIT and hit ENTER 17. Change the LOWER RAM LIMIT to a number that does not interfere with the AUTOMEC’s control of the bottom of the bend but meets the following AUTOMEC instructions: IMPORTANT SAFETY NOTICE TO PRESS BRAKE OPERATORS AND SET UP PERSONNEL ALWAYS SET PRESS BRAKE LOWER RAM LIMIT WITH PUNCH AND DIE IN PLACE BEFORE OPERATING SYSTEM. SET LOWER RAM LIMIT TO ALLOW FOR THE DEEPEST BEND BUT NOT DEEP ENOUGH TO ALLOW A PUNCH / DIE COLLISION. BE SURE TO ALLOW FOR MATERIAL THICKNESS. THIS IMPORTANT SAFETY BACK UP GUARDS AGAINST PROGRAMMING ERRORS AND SYSTEM MALFUNCTION. CAUTION – This allows the user to override the factory set LOWER RAM LIMIT! 18. Hit ESC to get out of MACHINE SETUP menu 19. Turn the key to RUN 20. Machine is ready to run 32 Piranha 200 Ton Press Brake Operator / Owners Manual Bed Leveling Adjustment Located on the left-hand side when facing the front of the machine, is the Bed Leveling Adjustment Assembly. The Bed Leveling Assembly provides a means of adjusting the Ram to Bed parallelism, adjustment also permits an out of parallel condition to produce tapered bends. Item Description Rear Bed Holding 1 Bolt 2 Front Bed Holding Bolt 3 Bed Adjusting Bolt #1, not all press brake models have this Bolt. * * Figure 8: Bed Tilt Wedge Assembly The following steps represent the typical bed leveling procedure. 1. To adjust the bed, loosen the six bed holding bolts. Two are located on the rear side of the bed, one on each end of the press. The other four are located front side of the bed, two on each end of the bed. (See Figure 8 Items 1 &2). 2. Rotate the adjusting bolt clockwise to lift the bed and counterclockwise to lower. (See Figure 8 Item 3). 3. Snug the bed holding bolts. The bed holding bolts should only be snug enough to compress the lock washers, but should not be over tightened. (See Figure 8 Item 1 & 2) Note: Do not adjust bed tilt with the bed under load. 33 Piranha 200 Ton Press Brake Operator / Owners Manual Tooling Installation Before attempting to install, set or remove any tooling from the press brake, the safety section of this manual must be read and understood. The exact procedure for installation, setting and removal of tooling may vary with the type of tool used. The following steps are a generalized representation and may be tempered to suit the particular application, though not to the extent of being unsafe. Always review the instructions provided in this manual and observe the press brake safety rules! ! NEVER install chipped, cracked, or damaged tooling. Insure that the tools are of the correct size and type for the press brake, reducing the risk of overloading the machine. Insure that no tools, bolts or other articles are in the tooling area prior to operating the press brake. Locate any available safety handling tools as required. Keep the floor and surrounding area clean and free of obstruction, debris and oil. Press Brake Preparation 1. Start the hydraulic power unit. 2. Lower the ram to the bottom position. 3. Remove all power from the press brake. 4. Turn the operating mode to the Off position. Die Insertion ! NEVER at any time allow fingers or hands to be between the dies. 1. Insure that the Press Brake Preparation procedure has been completed before continuing with the insertion of dies. 2. Loosen the die rail set screws and punch clamps. 3. Insert the lower die from the end of the press brake, leaving several inches overhanging the end of the bed 4. Compare the distance between the ram and the lower die to the punch height, verifying sufficient clearance for insertion of the punch. 5. Adjust the position of the ram as required to allow the punch to rest on the lower die with the tongue of the die engaged in the punch clamp. 34 Piranha 200 Ton Press Brake Operator / Owners Manual 6. Safely transport the punch to the press brake and rest it on the extended portion of the lower die, aligning the tongue of the punch with the ram groove. 7. Slide the punch into the punch clamp groove aligning the ends of the punch and lower dies. 8. Adjust the ram bottom position until the dies “touch,” forcing the punch to fully engage in the punch clamp groove. 9. Tighten the punch clamps and the die rail set screws, securing the dies in the press brake. 10. Return the ram to the up position. Tooling Removal ! NEVER at any time allow fingers or hands to be between the tools. 1. Lower the ram to have a few thousandths gap between the punch and lower die. 2. Loosen the die rail set screws and punch clamps. 3. Raise the ram position slightly upward and verify that the punch will remain resting in the lower die. If not, the punch clamps may require further loosening. 4. If additional clearance is required to allow die removal, adjust the ram position to loosen the die, yet keeping it well confined. 5. With the punch partially disengaged and guided in the loosened punch clamps, push both the upper and lower dies several inches out the end of the press brake. With hands at the end of the dies, push the dies from the end. NEVER place hands or fingers between the dies. 6. Properly position the die transport device at the end of the press brake to accept the punch. 7. With hands at the end of the punch, push the punch towards the transport device, allowing several inches to remain in the punch clamp. 8. Prepare the transport device to completely support the punch, securing the punch from falling as required. 9. Position the transport device to accept the lower die and slide it from the bed. 35 Piranha 200 Ton Press Brake Operator / Owners Manual Tool Adjustments The following steps are a generalized representation and may be tempered to suit the particular application though not to the extent of being unsafe. It is a good practice to allow for several sample parts during set up operation, lowering the ram in small increments until the desired bend angle is achieved without overloading the machine. 1. Insert a sample piece of material. 2. Adjust the ram limits as required until the desired bend angle is attained. Avoid over- adjusting the ram. Note: Shimming may be required to compensate for punch and die wear and any bed or ram deflection. Tonnage Requirements See bending tonnage chart located on side of press brake for approximate bending requirements. Die Rail Shimming The Piranha Press Brake is manufactured without a crown in the bed. Occasionally due to deflection, shimming may be required. If shimming is required under the die rail, shims must be placed in progressively thicker increments from each end of the bed (see Figure 9). Typically, shimming is required to compensate for bed deflection and must be performed by trained personnel. The following diagram is for reference purposes only as each application will have different requirements. Figure 9: Die Rail Shimming Example 36 Piranha 200 Ton Press Brake Operator / Owners Manual Maintenance Procedures BEFORE MAINTAINING OR REPAIRING THE PRESS BRAKE, READ AND UNDERSTAND THE CURRENT ANSI B11.3 STANDARD. This section describes the procedures and requirements for maintaining and repairing the major components of the Piranha Press Brake. Maintenance Schedule This section outlines the suggested points and intervals for regular scheduled maintenance. The hydraulic power unit is very sensitive to dirt and other contaminants, but will provide many years of reliable service with a minimum amount of service. The operating temperature and the cleanliness of the oil directly affect the life of the hydraulic oil. Regular oil and filter changes will keep the system clean and free of sticking and clogged valves. Because hydraulic cylinders are lubricated with every stroke, keeping them clean and free of scratches and dings that may damage the cylinder rod seals is most important. The Piranha Press Brake is shipped with an extra hydraulic oil filter. It is important that after the first forty hours of operation the oil filter be replaced. Upon using the included extra oil filter it is suggested that a replacement filter be ordered for the next scheduled filter change. See parts list for correct filter part number. 1. After First 40 hours: • Change hydraulic filter • Check fluid level • Check gib clearances • Grease ram slides • Clean oil cooler by blowing air through radiator portion of the cooler • Check fittings, bolts, nuts for tightness 2. Every 40 hours (weekly) thereafter: • Grease ram slides. • Clean oil cooler by blowing air through radiator portion of the cooler • Check fittings, bolts, nuts for tightness 3. Every 3 months: • Change hydraulic filter. It is recommended that the filter element be changed every 3 months depending on workload and environmental conditions. • Check hydraulic fluid level • Check gib clearances • Check machine level 4. Every Year: • Grease electric motor (maximum 1 “shot”) 5. Every Two (2) years: • Change hydraulic fluid 37 Piranha 200 Ton Press Brake Operator / Owners Manual Gib Clearance Adjustment Proper maintenance of the gibs will require periodic adjustment of the gib clearances. Gib Adjustment 1. Position the press brake ram so the ram slide is in full contact with the gibs. 2. Loosen the Rear Adjustment Screw Jam Nuts on both ends of the press brake. (See Figure 10 Item 1) 3. Using a torque wrench of the correct torque range, torque the top and bottom setscrews to 150-in. lbs. (12.5-ft. lbs.). 4. Tighten the remaining setscrews (between top and bottom set screws) to the same torque. 5. Repeat steps 2 & 3. 6. Back off the set screws 1/8 turn and the tighten jam nuts. 7. Repeat this procedure for the other end of the press brake. Side Thrust Gib Adjustment 1. Position the press brake ram so the ram slide is in full contact with the gibs. 2. Verify that the ram is aligned with the bed (left to right). 3. Loosen the Slide Mounting Bracket Jam Nuts on both ends of the press brake. (See Figure 10 Item 2) 4. Using a torque wrench of the correct torque range, torque the top and bottom setscrews to 150-in. lbs. (12.5-ft. lbs.). 5. Repeat step 3 on opposite end of the press brake. 6. Tighten the remaining setscrews (between the top and bottom setscrews) to the same torque. 7. Repeat step 3 on the opposite end of the press brake. 8. Re-torque the set screws on both ends of the press brake. 9. Back off the setscrews 1/8 turn and tighten the jam nuts on left side of the press only. 10. Tighten the jam nuts on the right side of the press brake. 38 Piranha 200 Ton Press Brake Operator / Owners Manual Ram Slides Figure 10: Gib Explanation 39 Piranha 200 Ton Press Brake Operator / Owners Manual Hydraulic Power Unit The hydraulic power unit is a sophisticated and complex system. Only trained personnel should attempt to perform adjustment procedures on the unit. The power unit generates very high pressures. Never check for leaks using hands. Before servicing the hydraulic system, block the ram and turn power off. Oil Filter Replacement Verify the exact element number prior to ordering the replacement element. Figure 11: Oil Filter Assembly Exploded View Item 1 2 3 4 Description Filter Body Filter Element Fitting - inlet Filter Bowl Table 3: Oil Filter Assembly Descriptions The following steps represent a typical filter element replacement. 1. Insure the main electric power is locked out at the safety disconnect. 2. Place a small container (½-gallon) under the filter bowl. 3. Remove the filter bowl by turning in a counterclockwise direction. 4. Remove the filter element by pulling and turning at the same time. 5. Lubricate the O-ring on the new filter with hydraulic oil and slide into place. 6. Wipe the inside of the filter element bowl; lubricate the O-ring and replace. 40 Piranha 200 Ton Press Brake Operator / Owners Manual Hydraulic & Electrical Diagrams Electrical Diagrams Figure 12: Electrical Diagram 1 of 4 41 Piranha 200 Ton Press Brake Operator / Owners Manual Figure 13: Electrical Diagram 2 of 4 42 Piranha 200 Ton Press Brake Operator / Owners Manual Canadian CSA Wring Configuration 43 Piranha 200 Ton Press Brake Operator / Owners Manual Figure 14: Electrical Diagram 3 of 4 44 Piranha 200 Ton Press Brake Operator / Owners Manual Electrical Diagram 4 of 4 45 Piranha 200 Ton Press Brake Operator / Owners Manual Electrical Parts List DESCRIPTION QTY DISCONNECT 1 DISCONNECT 1 DISCONNECT 1 DISCONNECT 1 DISCONNECT SHAFT 1 FUSES, MOTOR SHORT CIRCUIT 3 FUSES, MOTOR SHORT CIRCUIT 3 FUSES, MOTOR SHORT CIRCUIT 3 FUSES, MOTOR SHORT CIRCUIT 3 FUSE BLOCK, MOTOR SHORT CIRCUIT 1 FUSE BLOCK, MOTOR SHORT CIRCUIT 1 FUSE BLOCK, MOTOR SHORT CIRCUIT 1 FUSE BLOCK, MOTOR SHORT CIRCUIT 1 STARTER, M1 1 STARTER, M1 1 STARTER, M1 1 STARTER, M1 1 STARTER AUX. CONTACT BLOCK 1 HEATERS, OVERLOAD, MOTOR M1 3 HEATERS, OVERLOAD, MOTOR M1 3 HEATERS, OVERLOAD, MOTOR M1 3 HEATERS, OVERLOAD, MOTOR M1 3 FUSE HOLDER, TRANSFORMER PRIMARY 1 TRANSFORMER PRIMARY FUSES 2 TRANSFORMER PRIMARY FUSES 2 TRANSFORMER PRIMARY FUSES 2 POWER SUPPLY, 24 VDC 1 GENERATION II CONTROL MODULE 1 MOTOR POWER MODULE 1 MOTOR POWER MODULE 1 MOTOR POWER MODULE 1 MOTOR POWER MODULE 1 TRANSFORMER 1 TRANSFORMER 1 TRANSFORMER 1 TRANSFORMER 1 DISCONNECT OPERATOR 1 RESET BUTTON W/ SHAFT 1 RECP. DUAL PALM 1 RECP. FOOTSWITCH CONTROL MODULE 1 MICRO PULSE SCALE 1 LIMIT SWITCH 1 FUSE HOLDER, CONTROL AND AUTOMEC CNC 5 FUSE, CONTROL AND AUTOMEC CNC 2 46 HP/VOLTAGE 20 HP 208V 20 HP 230V 20 HP 460V 20 HP 575V ALL 20 HP 208V 20 HP 230V 20 HP 460V 20 HP 575V 20 HP 208V 20 HP 230V 20 HP 460V 20 HP 575V 20 HP 208V 20 HP 230V 20 HP 460V 20 HP 575V ALL 20 HP 208V 20 HP 230V 20 HP 460V 20 HP 575V ALL ALL HP 208/230V ALL HP 460V ALL HP 575V ALL ALL 20 HP 208V 20 HP 223V 20 HP 460V 20 HP 575V 20 HP 208V 20 HP 230V 20 HP 460V 20 HP 575V ALL ALL ALL ALL ALL ALL ALL ALL PIRANHA PT# FIG. # 591602 1 591602 1 531605 1 531605 1 0591602 2 T0781 3 T0780 3 T0777 3 T0775 3 T0784 4 T0784 4 T0782 4 T0783 4 T0729 5 T0729 5 T2257 5 T2257 5 T2253 6 T0786 7 T0788 7 O531638 7 T2258 7 T1302 8 T1138 9 T1139 9 T2279 9 T2560 10 T2267 11 T2277-208V 12 T2277-223V 12 T2277-460V 12 T2277-575V 12 T1134 13 T1135 13 T1135 13 T1136 13 0531604 14 0531686-1 15 T1311 16 T2561 17 T1976 18 0531615 19 T0733 T01140 20 21 Piranha 200 Ton Press Brake Operator / Owners Manual Pedestal Front View 10 9 8 Generation II Control System 7 UP RUN 7 piranha PROG www.piranhafab.com 6 TEACH ACTIVE 5 START EMEG 1 2 4 5 6 7 8 9 . 0 3 11 STOP 4 3 1 2 PIRANHA TITLE DRAWING DATE REV # DRAWN BY PAGE # 47 PREMIUM PEDESTAL T1951_1 12-5-01 BOB RILEY 1 OF 2 Piranha 200 Ton Press Brake Operator / Owners Manual Pedestal Back View INSIDE AND BACK VIEW OF ENCLOSURE 11 PROGRAM SELECTA 14 UP 15 7 7 16 PILOT LIGHT DISPLAY 5 16 17 EMEG STOP START 17 13 12 PIRANHA TITLE DRAWING DATE REV # DRAWN BY PAGE # 48 PREMIUM PEDESTAL T1951_2 12-5-01 BOB RILEY 2 OF 2 Piranha 200 Ton Press Brake Operator / Owners Manual Pedestal Component List DESCRIPTION FOOT SWITCH CORD/CONDUIT FOOT SWITCH E STOP OPERATOR START OPERATOR TEACH ACTIVE PILOT LIGHT, AMBER LED AMBER PILOT LENS DUAL PALM OPERATOR UP OPERATOR, EXTD. YELLOW PROGRAM SELECTA SWITCH OPERATOR DECAL DISPLAY MODULE CONTACT BLOCK W/ BASE, N/C CONTACT BLOCK W/ BASE. N/O CONTACT BLOCK W/ BASE, N/C CONTACT BLOCK W/ BASE, N/O CONTACT BLOCK W/ BASE, N/O CONTACT BLOCK, N/C 49 QTY 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 2 2 FIG. # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 PIRANHA PT# T2595 T0746 T0737-1 05316101-1 T2596 T2300 T0748-1 T1668-1 0531694-1 T1952 T2268 05316121-1 0531696-1 05316121-1 0531696-1 0531696-1 0591596-1 Piranha 200 Ton Press Brake Operator / Owners Manual Hydraulic Valve Block Diagram 50 Piranha 200 Ton Press Brake Operator / Owners Manual Hydraulic Schematic 51 Piranha 200 Ton Press Brake Operator / Owners Manual Hydraulic Schematic / Canadian CSA Version 52 Piranha 200 Ton Press Brake Operator / Owners Manual Parts Diagrams are provided for the major assemblies of the press brake. The accompanying parts lists provide item references and descriptions. Part numbers and quantities are provided only where applicable. Repair parts are available for the Piranha Press Brake from the manufacturer. Always provide the model and complete serial number of the press brake along with the part number description and quantity of the desired parts. Ram Linkage Figure 15: Ram Linkage Item 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Description Cylinder Lever Garfil® Bushing Cylinder Lever Pin Long Lever Linkage Pin Link Brass Screws ¼ x ½ Link Ram Garfil® Bushing Bed Ram Ram Phenolic Hinge Pin Garfil® Bushing Hinge Pin C-Rod Garfil® Bushing Short Lever C-Rod Pin Lock Washer 1/2 X 5 SHCS C-Rod 53 Part # T2443 T12329 T2776 T12332 T12325 T0070 T2455 T3030-1 T0679 T06783 T2462 T12331 T2446 T2777 T12334 T0709 0571055 T12324 Qty. 1 1 1 4 4 20 4 1 1 2 2 2 2 1 2 12 12 1 Piranha 200 Ton Press Brake Operator / Owners Manual Hydraulic Assemblies 5 1 2 3 Figure 16: Hydraulic Power Unit Item 1 2 3 4 5 Description Motor 20 HP - 208 Volt 20 HP - 220/440 Volt 20 HP – 575 Volt Filter Assembly Valvepak Assembly Cylinder Assembly Cylinder Seal Kit Pump Part # Qty. 0571662-2 0571660-2 0571665-2 0591550-1 T2271-2 T3565 T T 1 1 1 1 1 1 1 1 Table 4: Hydraulic Power Unit Descriptions 54 Piranha 200 Ton Press Brake Operator / Owners Manual Ram Slides Figure 17: Gib Parts Item 30-1 30-2 30-3 30-4 30-5 30-6 30-7 Description Side/Rear Ram Slide Bearing Grease Zerk 1/3” pipe Ram Slide Right (Opposite End) Ram Slide Left Slide Mounting Bracket 3/8 x 3 ½ SHCS Rear/ Side Adjustment Screw 3/8 X 2-1/4 SSS Rear/Side Adjustment Nut 55 Part # T0682 0531360 T0672 T0673 T0681 0521030 T0078 Qty 4 2 1 1 2 12 28 0531210 28 Piranha 200 Ton Press Brake Operator / Owners Manual Filter Assembly Figure 18: Oil Filter Assembly Exploded View-0591550-1 Figure-Item 31-1 & 4 31-2 31-3 Description Filter Body & Bowl Part # 0591550-1 Filter Element Fitting – inlet 0591551-1 56 Piranha 200 Ton Press Brake Operator / Owners Manual Wedge Assembly 4 7 5 6 8 13 14 10 Figure 19: Wedge Assembly Figure-Item 32-1 32-2 32-3 32-4 32-5 32-6 32-7 32-8 32-9 32-10 32-11 32-12 32-13 32-14 12 Description Key plate 5/8 x 2 SHCS 5/8 LW Wedge assembly Wedge adjustment bolt assembly Hem 8-12 SHCS 3/8 – 16 x 1-1/4 Wedge bottom half Wedge top half Wedge thrust washer Wedge bolt and nut assembly 175 Wedge thrust bearing Wedge bottom plate 175 Roll pin 1/8 x 1-1/2 Wedge adjust bolt Wedge bolt nut 57 Qty. Part # 2 T2767 4 T0080 4 0531304 1 T2742 1 T0620 1 05131051 1 T2746 4 T2745 2 T462 1 T0610 1 T440 1 T2749 1 T0694 1 T2750 1 T2753 9 Piranha 200 Ton Press Brake Operator / Owners Manual Die Rail Centering Screw Assembly (Optional) Figure 20: Die Rail Centering Screw Assembly Figure-Item 33-1 33-2 33-3 Description Die Rail Adjusting Hand Screw 3/8”-16 x 1-½” HHCS Die Rail Adjusting Block 58 Qty. 6 6 6 Part # T0056 T0186 T9202 Piranha 200 Ton Press Brake Operator / Owners Manual Punch Clamp Assembly Figure 21: Punch Clamp Assembly Figure - Item Description 35-1 ½-13 x 1-½” Socket Head Cap Screws 35-2 Punch Clamp Spring 35-3 Punch Clamp 59 Qty 18 12 6 Part # T0474 T0050 T2321 Piranha 200 Ton Press Brake Operator / Owners Manual Backstop Assembly (Optional) 4 5 3 1 2 9 10 8 6 7 Figure 22: Back Gauge Assembly T14-805 Figure - Item 36-1 36-2 36-3 36-4 36-5 36-6 36-7 36-8 36-9 36-10 Description Spacer Plate, Back Gauge ½” Flat Washer, ¼” Thick, 1-1/2” OD HHCS ½” x 2-¼” Back Stop Finger Assembly Back Stop Bar Weldment T-Nut 5/8” Back Gauge Mount Bracket Weldment HHCS 5/8” x 2” Washer 5/8” Hand Adjusting Screw 60 Qty 2 2 2 2 1 2 2 2 2 2 Part # T9655 T0057 0581108 T14-995 T37231 0531723 T37311 T0080 0531311 T0056 Piranha 200 Ton Press Brake Operator / Owners Manual Back Stop Finger Assembly (Optional) 11 2 10 9 1 7 3 4 8 6 5 Figure 23: Back Stop Finger Assembly T14-995 Figure - Item 37-1 37-2 37-3 37-4 37-5 37-6 37-7 37-8 37-9 37-10 37-11 Description Mounting Block Top Back Stop Finger Bar Adjusting Block Adjusting Bar Adjusting Nut Locking Nut Locking Bolt T-Nut 5/8 Flat Washer 1/2” Hex Nut 1/2” HHCS 1/2 x 2-1/4 61 Qty 1 1 1 1 1 1 1 1 2 1 1 Part # T9048 T3801 T0084 T0086 T0087 T0088 T0085 0531723 T0057 0581195 0581108 Piranha 200 Ton Press Brake Operator / Owners Manual Die Rail (Optional) Figure 24: Die Rail Figure-Item 38-1 38-2 38-3 38-4 Description ½” x 2 ¾” HHCS ½” Hard Flat Washer 3/8”-16 x ¾” SSS Cup Point Die Rail 200-12 62 Qty. 3 3 26 1 Part # 0581105 T0057 0531056 T2334 Piranha 200 Ton Press Brake Operator / Owners Manual This page is intentionally left blank. 63 Piranha 200 Ton Press Brake Operator / Owners Manual Glossary AC Motor An electric motor designed to operate using AC power. Accuracy The deviation of a value from its theoretical value after the device has been correctly calibrated. Air Bending The forming of sheet pr plate using a “V” die where the desired angle is achieved before the work pieces is compressed between the upper and lower tools. Ambient Condition The surrounding atmosphere and environment. ANSI American National Standards Institute. A national, nonprofit organization. Its principle function is to establish industry-wide standards that are put in place through a process of consensus among qualified participants. Backlash Mechanical clearances that exists or may develop through wear between a driven component and a drive source. Ball Bushing/Linear Bearing A tubular shaped ball bearing assembly designed for linear movement on a shaft. Bed The stationary member of the press brake that supports the tooling and other associated equipment. Bolster (bolster plate) The plate(s) attached to the bed or ram having means for attaching die components. Bottom Bending The forming of sheet or plate using “V” die where e desired angel is completed after the work piece is compressed between the upper and lower tools. Typically requires 3-5 times the tonnage for air bending. C Frame Vertical side frame of the press brake. Circuit Breaker A device used with electrical equipment to provide overload protection. Closed Height See shut height. 64 Piranha 200 Ton Press Brake Operator / Owners Manual Coining A method of bottom bending were additional force is applied during the bend to make the work piece conform to the shape of the upper and lower tools. Typically uses “V” dies with opening of 6 times the material thickness and requires 5-7 the tonnage for air bending. Coupling (Shaft) A mechanical device used to join a motor output shaft to a machine part, typically a roller. Cycle A series of events or operations that recur regularly and usually lead back to the start. Cylinder A piston-type actuator. DC Power Supply An electrical device used to convert incoming AC power to regulated DC power. Die (s) The tooling used in a press brake for forming metal. Die Holder The plate or rail to which the lower portion of the die member is attached. Die rail See die holder. Die Shimming Method to raise for fill a void between two surfaces. Typically used to compensate for machine deflection or worn tooling. Die Space The space between the bed and ram. Dies, Bending Dies used in press brakes to perform bending and forming operations on a variety of work pieces. Electrical Spike An unpredictable and infrequent momentary high electrical voltage which can harm electrical/electronic devices. Encoder A device typically electromechanical, that translates motion into electrical pulses. See also Resolver, Tachometer, or Transducer. Feedback The return to an input of a part of the output of a machine or control system, or process. Fuse Electrical overload protection device. Fuse Block A holder for a fuse or fuses including wire termination. 65 Piranha 200 Ton Press Brake Operator / Owners Manual Gauge A stop against which the material or workpiece is placed to locate it within the point of operation. Gibs The machine members used for guiding the ram. Grease zerk Fitting designed to accept grease for lubricating components. Hydraulics The branch of mechanics, which uses controlled hydraulic oil flow, and pressure to provide force to an actuator. Inertia A property of matter by which it stays at rest or in uniform motion in the same straight line unless acted on by an external force. Lifting lugs Steel plates with large holes that are attached to the press brake to assist in lifting the machine. Limit Switch Typically, an electrical device that provides position information to a control system. Low Voltage A voltage reading that is lower than the required or expected voltage. Machinist Square Level Machinists level having four sides. Permits’ measuring vertical surfaces as well as horizontal surfaces. Motor Starter A relay capable of withstanding inductive load generated when starting an electric motor (AC or DC). Open Loop A control concept in which feedback is not used to modify the characteristics of the output. Operator Interface Typically, a control or control panel provided for an operator to modify or monitor system variables. Photo Sensor An electronic sensor that uses light wavelengths to detect the position or presence of an object. Point of Operation The location in the press brake where the material or a workpiece is positioned and work is performed. 66 Piranha 200 Ton Press Brake Operator / Owners Manual Pressure Reducer Typically, a hydraulic component that senses secondary pressure to maintain that output pressure regardless of the incoming pressure. Pressure Relief Typically, a hydraulic component that uses a spring to hold an orifice closed until system pressure overcomes the spring and allows flow to the reservoir. Proximity Sensor An electrical device capable of detecting the presence of an object. PSI Acronym. Available Force expressed in Pounds per Square Inch Punch The male part of the tool (die). Pushbutton A small button or knob actuated by pushing, provided for operator control, electrical, pneumatic, or mechanical. Ram The linear moving press brake member configured to carry a portion of the tooling. Relay An electromechanical device for remote or automatic control that is actuated in variation of conditions of an electrical circuit and that operates other devices in an electrical circuit. Repeatability The closeness of agreement among multiple measurements of an output, for the same value of the measured signal under the same operating conditions, approaching from the same direction for full range traverses. Reset To restart or arm a control or safety system. RPM Acronym. Rotational speed expressed as Revolutions per Minute. Safeguarding A method for protection of personnel from hazards using guards, safety devices, or safe work procedures. Selector Switch A small button or knob actuated by turning, provided for operator control, electrical, pneumatic, or mechanical. Service (Safety) Disconnect Typically, a large mechanical switch that is provided to completely remove incoming power for the purpose of storage or service of a machine. 67 Piranha 200 Ton Press Brake Operator / Owners Manual Setup The process of adjusting the press brake and the installation and adjustment of work holding devices or tooling and appropriate safeguarding to ensure proper and safe operation of the press brake. Shield (foil or braided) Typically, a metallic encasement surrounding wiring or components to avoid interference from RF signals. Shut Height The distance from the bed to the ram when the ram is at the bottom of its stroke (in the closed position). Solenoid Valve Typically, a pneumatic or hydraulic valve actuated by an electromagnetic coil. Throat An opening or recess in the ram (housing) to permit the positioning of material or workpieces. Tool (Die) The cutting or shaping component used in a machine. Transducer A device typically electromechanical, that translates motion into electrical pulses. Transformer An electrical device that employs the principle of mutual induction to convert variations of current in a primary circuit into variations of voltage and current in a secondary circuit. V-Bending The forming of sheet metal material using a pair of “V” shaped tools that bend the workpiece by applying a three-point load. Valve Any of numerous mechanical devices by which the flow of liquid, gas, or loose material in bulk may be started, stopped, or regulated by a moveable part that opens, shuts, or partially obstructs one or more ports or passageways. 68 Piranha 200 Ton Press Brake Operator / Owners Manual This page is intentionally left blank. 69 Piranha 200 Ton Press Brake Operator / Owners Manual Index Installation, 8 Introduction, 7 A Adjusting Screws, 9 Anchoring, 9 Anchoring Hole Locations, 9 Ansi, 8 B Bed, 7, 9, 36 Bed adjusting bolt, 33 Bed leveling adjustment, 33 Bed tilt, 10 Bed tilt wedge assembly, 33 C C Frame, 7 Cleaning, 10 Connecting The Pedestal Control, 13 L Level Adjusting Screws, 9 Lifting, 8 Lifting Lugs, 8 M Machinist square level, 10 Main control panel, 16 Maintenance procedures, 37 Masonry anchors., 9 Motor rotation, 14 O Oil Filter Assembly Descriptions, 40, 57 Oil Filter Replacement, 40 Oil Level & Temperature Sight Gauge, 14 Operator Control, 16 D Die Insertion, 34 Die Rail, 7 Die Rail Shimming, 36 Die Rail Shimming Example, 36 Direction Of Rotation Arrow, 15 P Pads, 9 Parts, 50 Placement, 9 Precision Leveling, 11 Precision Leveling Detail, 11 Prior To Start-Up, 14 Programming A Simple Job, 29 Pump Case Drain Tube, 15 E Electrical, 12 F Filling The Pump, 14 Foundation, 9 Front Bed Holding Bolt, 33 Fuse Size Chart, 13 R Ram Linkage, 50 Ram Safety Switch, 16 Ram Slide, 11, 56 Ram Slides, 39, 56 Rear Bed Holding Bolt, 33 Rear Ram Slide Bearing, 56 Rotational Direction, 13; Rotation Arrow, 13 G Gib Clearance Adjustment, 38 Gib Explanation, 39 Gibs, 7, 38 Grease Zerk, 56 H Hydraulic, 14 Hydraulic Assemblies, 51 Hydraulic Power Unit, 40, 51 Hydraulic Pump/Motor Assembly Descriptions, 15 Hydraulic Pump/Motor Assembly Unit, 15 I Initial Leveling, 9 70 S Safety, 1 Setting Limits For Forming, 29 Shim, 10, 12 Side Adjustment Screw, 56 Side Thrust Gib Adjustment, 38 Sight Gauge, 14 Slide Mounting Bracket, 56 Speed Control Fuse, 16 Spring Open Die Clamp, 7 Square Level, 10 Steel Pads, 9 Piranha 200 Ton Press Brake Operator / Owners Manual T V Temperature Sight Gauge, 14 test cycle, 4 Tonnage Requirements, 36 Tool Adjustments, 36 Tooling Installation, 34 Tooling Removal, 35 Tooling Installation Safety, 3 Valve Body Assembly, 52 W Warning Labels, 2 Warranty, 7 U Unpacking, 8 71 Piranha 200 Ton Press Brake Operator / Owners Manual Addendums 72
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.4 Linearized : Yes Page Count : 78 XMP Toolkit : XMP toolkit 2.9.1-13, framework 1.6 About : uuid:4bf2a3c1-e4cb-4268-bef4-2952de39f7a7 Producer : Acrobat Distiller 6.0 (Windows) Keywords : T0717-2 Manual Company : SS&E Document 0020number : T0717-2 Manual Revision 0020 Date : Dec. 3,2000 Source Modified : D:20050516131646 Headline : Piranha 175 Press Brake Create Date : 2005:05:16 08:58:39-05:00 Creator Tool : Acrobat PDFMaker 6.0 for Word Modify Date : 2005:05:16 09:01:35-05:00 Metadata Date : 2005:05:16 09:01:35-05:00 Document ID : uuid:49e3419f-96c4-400e-920f-56aebeb29f0d Version ID : 299 Format : application/pdf Title : Piranha 175 Operator's /Owner's Manual Creator : Mike Doerflinger Description : Piranha 175 Press Brake Subject : T0717-2 Manual Tagged PDF : Yes Author : Mike Doerflinger Document Number : T0717-2 Manual Revision Date : Dec. 3,2000EXIF Metadata provided by EXIF.tools