PT 250 2008.12 Tecnodue PT250 User Manual

User Manual: Tecnodue PT250 User Manual

Open the PDF directly: View PDF PDF.
Page Count: 36

DownloadPT 250 2008.12 Tecnodue PT250 User Manual
Open PDF In BrowserView PDF
I.T.S. by Tecnodue

PT 250
Edition 1208
Operating Manual

I.T.S. Ital Trade Services

PT 250 Operating Manual

The technical data and information contained on this manual can be changed without any notice

2

I.T.S. Ital Trade Services

PT 250 Operating Manual

PT 250
The machine has been designed and constructed for the welding of PE, PP, PVDF and other thermoplastics pipes and fittings.

I.T.S. Ital Trade Services S.r.l.
Via Scarsellini 77 , 16149 Genova Italy
Phone
: +39-010-6423396
Fax
: +39-010-6423513
E Mail
: info@its-tecndoue.com
Web Site
: www.its-tecnodue.com

Standard Components
1. Hydraulic Unit
2. Facing Tool
3. Basic machine
4. Heating Mirror
5. Support for facing tool and heating mirror
On request can be supplied:
6. Light weight alloy reducing rings for pipes and fittings d. 63,50,75,90,110,125,140,160,180,200,225mm
7. Stub End Device
8. MDD (PT automatic mirror device)
• Short spigot fittings clamp d. 250mm
• Wooden transport box according to ISPM 15
• LDU (printing and storing data machine)
• Electric board with automatic circuit breaker
• Rollers
3

I.T.S. Ital Trade Services

PT 250 Operating Manual

SAFETY RULES ACCORDING TO DIRECTIVES CEE
( To be read carefully and apply while utilizing the PT 250 )
Due to the specific use, this machine cannot be supplied with all kind of fix and removable protections suitable to avoid any risk of accident.
The machine, therefore, must be utilized, adjusted and keep in the perfect functioning conditions by skill operators.

Warning - Rules – Obligations
The use of machines composed by electrical components and movable parts, it's always a potential danger. In order to avoid any kind of accident caused by
electrical or mechanical sources it' strongly suggested to read and follow carefully the following safety rules before operating the machine.
TRANSPORT
-.Basic Machine , Keep the maximum care while moving and it's suggested to utilize mechanical aids.
-.Facing Tool ,supplied with transport's hook.
Keep the maximum care while moving it and it's compulsory to utilize the handle also take care about the blades mounted in, it's compulsory use gloves.
-.Heating Mirror ,supplied with transport's handles
Keep the maximum care while moving it also keep the maximum care while utilizing it due to the high temperature involved always more than 200°C ,
it's strongly suggested to use suitable gloves.
In order to move from one working place to the other , the facing tool and the mirror must located into the special support , this support is heavy therefore
it's necessary to utilize the maximum care to move it
-.Hydraulic unit, supplied with transport's frame.
Keep the maximum care while moving it and in case utilize two person.
Avoid to transport the components by holding from the cable and remember to use suitable gloves.
ELECTRIC CONNECTIONS
The machine is operated by 230 Volts therefore be sure that the power supply plug is supplied with the safety devices according to the standard
requirements , also check that the power supply will be on the range of maximum 10% of the machine's nominal tension.
While the facing tool is connected to the power supply do not leave it into the basic machine but place it into the special support. In this position, even if the
start bottom is pushed the engine does not start.
Check regularly the cables and the plug and in case substitute by qualify personnel.
In case the heating mirror cable must be substitute the cable must be H07RN-F
Before carry out a reparation or maintenance all the plugs must with plug out from the power supply
ENVIRONMENTAL CONDITIONS
The working area must be clean and duly lighted. It's very dangerous to utilize the machine in case of rain or in wheat conditions or close to flammable agents.
CLOTHES
Keep the maximum care while utilizing the machine due to the high temperature involved on the heating mirror always more than 200°C , it's strongly
suggested to use suitable gloves. Avoid long clothes and avoid bracelets , necklaces that might be hooked into the machine.
CORRECT MACHINE'S OPERATION
Remember to check and read carefully the operating manual before utilizing the machine and the accessories.
KEEP ALWAYS THE MAXIMUN ATTENTION
After the heating mirror has been disconnected temperature will be hot for some minutes.
Keep the maximum care while utilizing the facing tool. Be careful to the blades , it's strongly suggested to use suitable gloves. During the facing operation
( facing tool in movement ) it's forbidden to take out the shavings
Avoid utilizing the machine after drinking or drugs use
Take care that all the people around the machine are at safety distance
While starting operating take care to avoid leave arms between the movable and fix trolleys.
SQUASHING DANGER
While starting operating take care to avoid leave legs or arms between the movable and fix trolleys. It's compulsory to be far from the basic machine
ACOUSTIC POLLUTION
The acoustic pollution of the drill engine is less than 85 dB ( value measured at 1 meter distance from the operator)
Due to some particular cases such as too much pressure during the facing the noise should be increased , therefore it's suggested to utilize some
protections.
IMPORTANT !!!!
Keep the maximum care reading and following the above Warning - Rules - Obligations the Ital Trade Services S.r.l. decline all responsibilities if are not
followed totally

Label on machine’s components
showing potential dangers

WEAR
GLOVES

4

BURNS
DANGER

ELECTRIC
DANGER

SQUASHING
DANGER

I.T.S. Ital Trade Services

PT 250 Operating Manual

1. Technical data
Operating data
Ambient temperature
Humidity (without condensation)
Transport and storing Temperature

0…50°C
95 RH%
-10…60°C

Electrical data
Voltage
Frequency
Total power installed
Heating mirror
Facing tool
Hydraulic unit

230 V
50 Hz
3.92 KW 17 A
IP 54 2.3 KW
IP 20 1.02 KW
IP 44 0.6 KW

Hydraulic data
Maximum working pressure
Cylinder’s section
Pressure gauge
Pressure gauge precision class
Hydraulic unit engine revolutions
Volumetric pump’s capacity
Pump’s capacity
Hydraulic oil
Oil tank’s capacity

100 bar
5,89 cm2
0 - 100 bar
Cl. 1.0
1400 rpm
1,2 cc/rev.
1.68 l/min
ISO 46
1.5 liter

Mechanical Data
Facing tool transmission system
Trolley maximum stroke
Trolley slide bar diameter
Distance between the cylinders centre

Gear drive
145 mm
35 mm
360 mm

Dimensions
Basic machine
Facing tool
Heating mirror
Hydraulic unit
Support for facing tool and heating mirror

900 x 510 x 520 mm
650 x 480 x 85 mm
465 x 550 x 65 mm
445 x 320 x 270 mm
415 x 510 x 370 mm

Weights
Basic machine
Facing tool
Heating mirror
Hydraulic unit
Support for facing tool and heating mirror
Wooden transport box
Stub end device
Reducing inserts complete set

45 Kg
14,5 Kg
10 Kg
26 Kg
12 Kg
55 Kg
6.5 Kg
63.5 Kg

5

I.T.S. Ital Trade Services

2.

PT 250 Operating Manual

General description and application field

Hydraulic operated butt welding machines suitable for PE,PP,PVDF and other thermoplastics pipes and fittings.
The self aligning frame and the compact dimensions make the machines highly suited for working in road constructions, ditches , aqueducts,
gas ducts , sewers and irrigation systems.
The machine is supplied complete of:
1) Basic machine d. 250 mm complete with a tools blue bag
2) Removable electric facing tool with safety switch
3) Removable PTFE coated heating mirror with a temperature control box.
4) Electro-hydraulic motor with accumulator and flexible hoses with quick couplings.
5) Support for facing tool and heating mirror

2.1 Basic machine
The basic machine is composed by:
• Two cylinders on which heads are mounted two complete
clamps d. 250 mm
• One movable clamp d.250 mm sliding on cylinder's stem and
fixable in different positions by means of using the clamps
connecting rods.
• A stiffening bar
• One side support clamp d.250 mm
• A frame including the hydraulic circuit with the anti-drop
quick couplings.
• A heating mirror disconnecting device

2.2 Facing Tool
The electric facing tool is composed by:
•
The facing tool body
•
Two disks where are mounted the blades
•
A drill engine with a safety pin that , while connected keep the facing tool
hooked to the machine.
•
An handle with safety micro-switch allowing the engine starts only
when the facing tool is fit into the machine, avoiding the start of the
engine out of this position.

2.3 Heating Mirror
The heating mirror is composed by:
•
The heating mirror coated with green color PTFE complete with
thermometer (the thermometer does not depend upon the power supply
and always survey the real temperature of the heating plate) and
connecting box
•
The support suitable for the heating mirror and the facing tool
where is located the connecting box
•
The electronic thermostat located on the connecting box .
•
LDU connector. (The below figure shows where the LDU connector is
located ).

LDU Connector

6

I.T.S. Ital Trade Services

PT 250 Operating Manual

2.3.1 Electronic thermostat – different functions
At each startup on the display will blink the writing ‘TEST’. This means that the
thermostat is testing the connection between the probe and the heating mirror.

If the test fails, the display will show 4 blinking upper scores (as per figure aside),
in this case the probe or the connection between the thermostat and the heating
mirror could be interrupted.

If the test success, the display will show the real temperature of the heating mirror and the
heating mirror warms up (the OUT1 red led is switched on) until the set point value (the selected
temperature) has been achieved (central green light led).

To display the actual set point value of the temperature stored by the thermostat, push the key P. The display will show alternately the
writing ‘SP1’ and the set point value of the temperature. After 5 seconds the display will show again the real value of the heating
mirror temperature
To select a new value for the thermostat set point value (default value = 220°C):
1. Push the key P (The display will show alternately the writing ‘SP1’ and the set point value of the temperature)
2. By acting on the arrow keys UP and DOWN it is possibile to increase or decrease the set point value.
3. When you reach the desired value push the key P to confirm.
4. The display will show again the real value of the heating mirror temperature
5. When the heating mirror will reach the set point value on the display the central green light led will be switched on.
Warning: On the thermostat display is always shown the actual value of the heating mirror temperature (and never the set
point value!)

Temperature of the welding mirror for welding PE DVS 2207-1 norm

Mirror temperature (°C)

225
220
PE 100

215
210
205

PE80

200

0

195
0

10

20

30

40

50

60

70

pipe wall thickness (mm)

Remember
When welding PVDF, the temperature of the welding mirror should be adjusted for every wall thickness at 240°C +/- 8°C
When welding PP, the temperature of the welding mirror should be adjusted for every wall thickness at 210°C +/-10°C

7

I.T.S. Ital Trade Services

2.4

PT 250 Operating Manual

Hydraulic Unit

The basic components of the hydraulic unit are the following:
•
Electric engine
•
Hydraulic pump
•
Oil tank
•
Hydraulic unit controls
•
Pressure accumulator
•
Pressure gauge
•
Metal frame

2. 4.1 Hydraulic Unit Controls
The control lever A open and close the machine's trolley according to the
position selected.
Bring the lever A into position A2 (position with automatic return) the trolley
is opening with the maximum pressure set up into the hydraulic unit
In position A1 the lever shut down automatically the engine ( release position ).
Bring the lever A into the position A3 ( position with hooking) the trolley is
closing, the hooking of such position allow the operator handling.

The hand wheel F of the pressure control allow the setting up of the
pressure at the requested values by turning anti clockwise the
pressure release , while turning clockwise the pressure increase .
The pressure by pass lever E allow ,by turning anti clockwise the
pressure releasing , while turning clockwise allow the pressure
increasing by means of using the hand wheel F and fixing. If you
completely clockwise turn the by pass valve, the pressure will be
blocked and the hydraulic unit will maintain the same pressure in case
of engine switched off.

8

I.T.S. Ital Trade Services

PT 250 Operating Manual

2.4.2 How to use the hydraulic unit
Operating Instructions
In order to make easy the learning we shall proceed to the description step
by step of all operations need in order to complete a welding according to
the following description:
Important !
Before begin the following operation be sure that:
- The lever A is fixed into the special housing
- Substitute the metal plug with the plastic black and red plug the
plastic plug is supplied with the machine into a plastic bag.
01. Fit the two pipes to be weld ( see relative instructions )
02. By turning the lever E anticlockwise bring the pressure to zero,
checking the pressure gauge D
03. Turn clockwise the lever E until closing ( please avoid using an
excessive strength )
04. Bring the lever A into position A3
05. By turning clockwise the hand wheel F achieve the inertial pressure
value ( value of pressure need in order to allow the trolley moving )
note the value of inertial pressure read into the pressure gauge D,
then by still operating the hand wheel F , increase the inertial pressure
value by the welding theoretical pressure value as per attached table.
06. Achieved the true welding pressure value ( inertial pressure plus
theoretical welding pressure ) bring the lever A into position A2.
07. Fit the facing tool (see relative instructions )
08. By acting on lever E anticlockwise achieve a pressure value of approx 5 bar more than the inertial pressure value checked and
then proceed to the facing tool operation (taking care that the engine's overloading).
09. At the end of the facing operation bring the lever A into position A3 and remove the facing tool.
10. Fit the heating mirror taking care that the temperature of the surfaces is the one selected (see relative instructions)
11. Bring the lever A into A3 in order to have the bead formation as per attached table, this operation must be done with the true
welding pressure value.
12. After bead formation act on lever E anticlockwise in order to bring the pressure to zero and proceed to the heating time as per
attached table.
13. Elapsed the heating time at pressure zero bring the lever A into position A2 and remove the heating mirror and immediately
bring the lever A into position A3 and acting on lever E clockwise put in contact the two pipes until achieving the true welding
pressure value by checking the pressure gauge D. These operations must be done according to the time indicated into the
attached table.
14. Bring the lever A into position A1 and keep such situation for all the cooling time indicated into the attached table, taking care
that the pressure will not decrease too much, in case bring for a little while the lever A into position A3 and put back into position A1
15. Elapsed the cooling time by acting on lever E anticlockwise bring the pressure to zero.
16. Take away the pipes welded

WE STRONGLY SUGGEST TO TRY MANY TIMES AND GET FAMILIAR TO THE UNIT BEFORE CARRYING ON WITH COMPLETE WELDING.
A WRONG USE OF THE HYDRAULIC UNIT COULD COMPROMISE YOUR WELDINGS..

9

I.T.S. Ital Trade Services

PT 250 Operating Manual

3. Heating mirror disconnecting device
You can configure the machine according to the kind of welding to be executed as per the following different ways:
• Two fixed clamps and two moveable clamps Fig. 1
• One fixed clamp and three moveable clamps Fig. 2
You can change from a configuration to another in a quick way by simply acting on the two spacers and on the disconnecting device.
In the first configuration of the machine the disconnecting devices is between the two moveable clamps and the two fixed clamps.
The spacers are between the two fixed clamps.
In the second configuration of the machine the disconnecting devices is between the three moveable clamps and the fixed clamp.
The spacers are between the second and third moveable clamps.

Figure 1.Configuration 2 moveable clamps + 2 fixed clamps

Figure 2.Configuratione 3 moveable clamps + 1 fixed clamp

Figure 3.
On the left: The special shape of the spacers let a quick configuration of the machine.
You can easily chage the spacer position without using any kind of tool.
You can modify the distance between the clamps connected by the spacers.
Fix the first clamp to the hole D and the second clamp in one of the holes A,B,C
On the right (from above) Upper and lower spacer (interchangeable) and
disconnecting device

WARNING !
Only in two confirgurations you can use the disconnecting device with spacer! In the other configuration use only the spacer to
avoid serious damages to the basic machine!

10

I.T.S. Ital Trade Services

PT 250 Operating Manual

How to change the configuration from two fixed clamps and two sliding clamps into one fixed clamp and three sliding clamps

WARNING!
You can only place the upper and lower spacers in the same clamps and using the same holes. It is strictly forbidden to put the
spacer in different clamps and in different holes.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

Configuration 2 moveable clamps + 2 fixed clamps
Not completely close the trolleys
Remove the heating mirror disconnecting device
Lift the spacers as shown in the figure above
By using your hands translate the third clamps as in the figure above
Remove the spacers
Place the spacers between the two central clamps
By using your hands translate the moveable clamps until the clamp reaches the limit stop.
Fix the spacers by pushing them down
Place the heating mirror disconnecting device
To fix the heating mirror disconnecting device open the trolleys
Configuration 3 moveable clamps + 1 fixed clamp

To configure the again the machine with 2 moveable clamps you must repeat the procedure above in a reverse sense.
11

I.T.S. Ital Trade Services

3.1 Beep-beep inserts reductions

To use a beep-beep insert reduction
To use a beep-beep reduction, fix it by lightly pushing
the reduction in the direction shown as per figure
aside. As you hear a ‘click’ sound the reduction is
properly fixed.

To remove the beep-beep reduction
To safely remove the beep-beep reduction by means
of a screwdriver turn to left the screw shown in the
figure aside. As soon as the reduction is not anymore
hooked to the clamp you can remove it.

12

PT 250 Operating Manual

I.T.S. Ital Trade Services

PT 250 Operating Manual

4. Butt welding in brief
4.1

Introduction

Stated that the basic machine it's suitable for all kinds of pipe, fittings and stub end available on the nowadays market. Here follows all the
different welding configurations of the machine:
1) Pipe with Pipe, standard configuration of the machine
2) Pipe with long spigot fitting, standard configuration of the machine
3) Pipe with short spigot fitting, to achieve this kind of welding it is strongly suggested to configure the machine with three moveable
clamps and 1 fixed clamp. Furthermore you must use the upper fittings clamp to fix better the fittings to the fixed clamp
4) Fitting with short spigot stub end, to achieve this kind of welding it is strongly suggested to configure the machine with three
moveable clamps and 1 fixed clamp. To fix the stub end you must use a special accessory called stub end device. Place the 4
brackets at the appropriate size punched on the stub end device. Fix the stub end by tighten the bolt of each bracket. The stub
end device is supplied with a fixing ring and you can install it on each clamp of the machine.
5) Pipe with short spigot stub end, to achieve this kind of welding you can use two different configuration of the machine (5 or 6)
6) Pipe with short spigot stub end, to achieve this kind of welding you can use two different configuration of the machine (5 or 6)

1. PIPE WITH PIPE

4. FITTING WITH SHORT SPIGOT STUB END

2. PIPE WITH LONG SPIGOT FITTING

5. PIPE WITH SHORT SPIGOT STUB END

3. PIPE WITH SHORT SPIGOT FITTING

6. PIPE WITH SHORT SPIGOT STUB END

4.2 Machine's preparation
It's strongly suggested to use pipe rollers for the sliding of the pipes to be welded and if it's possible positioning the machine
with wooden table below, such cares will avoid additional efforts to the machine.
a)

Set up the working area so that welding is protected from the weather. Position the machine's components as per following figure
and eventually utilize wooden panels

b)

Connect the flexible hoses of the hydraulic unit to the machine
13

I.T.S. Ital Trade Services

c)
d)
e)

PT 250 Operating Manual

Connect the plugs to the power supply (Hydraulic unit, Facing tool and Heating mirror) after checking that the main power
supply is within a 10% of the specified one “ Warning Heating Mirror start to warm up ! “
Select the correct temperature on the heating mirror
In case fit the inserts of the diameter to be welded into the machine

4.3 Pipes positioning into the machine and facing operation
a)
b)
c)

d)
e)
f)

Open the movable trolley of the machine by means of acting the lever A (hyd. Unit) and take
it in position A2
Position the pipes into the machine taking care to leave enough space for the facing tool inserting
Check the pipes alignment, in case adjust it by means of tighten or loosing the clamps bolts.
The maximum misalignment could be lesser than 10% of the pipe or fittings wall thickness.
In any case the misalignment cannot be over than 2mm.
Clean the pipe ends
Fit in the facing tool between the two pipe's ends to be faced, by means of connecting the facing
tool into the special supports. Connect the safety pin and start the facing tool engine
On the facing tool there is a facer stopper (see the figure aside). In case of one of the pipe ends
has a small projection; the facer stopper let you select the only pipe to face. Put the facer stopper in
the left or in the right hole to prevent the right or left facing. To face all the pipes put the facer stopper
in the central hole.

Warning!!!: Always check that the speed selector of the drill engine is in position 1 (lower
speed)
g)

h)

Slowly approach the pipes ends towards the facing tool by means of acting on the hydraulic control unit (lever A Table V ) keeping
a value of pressure allowing the facing of the surfaces and avoiding an overload of the drill engine (a too much high pressure could
burnt out the drill engine). When shavings from both sides will appear continuous and homogeneous , the facing operation is
completed.
Put in contact the two pipes ends to be welded and check if the eventual disjunction is within the values of the following table:
Outside diameter
mm
< 400
> 400

Port
mm
0,5
1,0

In case the above values cannot be fulfilled the facing operation must be repeat.

4.4 Inertial pressure measurement
Before begin a welding cycle it is necessary to measure the inertial pressure. This value must be added to the pressure value shown in our
welding tables. The inertial pressure value depends on welding operating conditions (ex.: length and weight of the pipe to drag, general
condition of the machine, ambient temperature, etc.). To measure the inertial pressure follow these steps:
a) Completely open the movable trolley of the machine by means of acting the lever A and take it in position A2
b) By turning the lever F (Hyd. Unit) anticlockwise bring the pressure to zero, checking the pressure gauge
c) Turn clockwise the lever E (Hyd. Unit) until closing
d) Bring the lever A (Hyd. Unit) into position A3 (the trolleys do not move because there is no pressure)
e) By turning clockwise the hand wheel F note the inertial pressure value ( value of pressure need in order to allow the trolley moving ) by
reading it into the pressure gauge

14

I.T.S. Ital Trade Services

PT 250 Operating Manual

4.5 Welding cycle
To obtain the best result we strongly suggest allowing the use of the machine only to experienced operators
The welding phase is composed by 5 phases with 5 different times:
PHASE 1 = t1 = Time requested for the bead formation with the specified wall thickness
PHASE 2 = t2 = Time requested for the continual heating
PHASE 3 = t3 = Time requested for the change over
PHASE 4 = t4 = Time requested for bringing up the pressure
PHASE 5 = t5 = time requested for cooling down

Pressure-Time diagram for butt welding

PHASE 1 = Heating up t1
a)
b)
c)

Fit the heating mirror taking care that the temperature of the surfaces is the one selected
Bring the lever A (Hyd. Unit) into position A3 in order to have the bead formation as per attached table, this operation must be done
with the true welding pressure value: ( Inertial pressure + P1 ).
Check the Bead formation wall thickness according to the attached welding table

PHASE 2 = Heating up t2
a)

After bead formation act on lever E (Hyd. Unit) anticlockwise in order to bring the pressure nearly to zero and proceed to the heating
time t2 at pressure P2

PHASE 3 = Change over t3
a)

Elapsed the heating time at pressure P2 bring the lever A (Hyd. unit) into position A2 and remove the heating mirror and immediately
bring the lever A into position A3 and acting on lever E clockwise put in contact the two pipes

PHASE 4 = Bringing up pressure t4
a) Achieve the true welding pressure value: (Inertial pressure + P1 = P5 ) by checking the pressure gauge, This operation must be done
according to the time indicated into the attached welding table.

PHASE 5 = Cooling Down t5
a)
b)
c)

Bring the lever A into position A1 and keep such situation for all the cooling time indicated into the attached welding table, taking care
that the pressure will not decrease too much
Elapsed the cooling time by acting on lever E anticlockwise bring the pressure to zero.
Take away the pipes welded

Important !!!
In case of any doubt please refer to the specific instructions

15

I.T.S. Ital Trade Services

PT 250 Operating Manual

5. Welding Parameters for PE pipes & fittings DVS norm version 2207-1
Pressure-Time diagram for butt welding

t1 =
t2 =
t3 =
t4 =
t5 =
P1 =

Time requested for the bead formation with the specified wall thickness
Time requested for the continual heating
Time requested for the change over
Time requested for bringing up the pressure
time requested for cooling down
Pressure during the bead formation and the cooling down, this value is the result of the formula:
Pipe section( cm2 ) x Material thrust coefficient( Kg./cm2 )
____________________________________________________________ = bar
Total machine cylinders section( cm2 )

P2 =

Material thrust coefficient for PE s 63
Material thrust coefficient for PP

1,5 Kg./cm2
1,0 Kg./cm2

Total PT 250 cylinders section

5,89 cm2

Pressure during the continual heating, this value either for HDPE and PP is 0,1 Kg./cm2.

Optical checking of butt welding result

16

I.T.S. Ital Trade Services

PT 250 Operating Manual

5.1 Welding Parameters for PE & PP sheets,pipes & fittings according to DVS 2207-1 – 2207-11

Nominal Wall thickness Alignment

mm

Heating-up

Bead height on heater
plate at the end of the
alignment time (alignment
under 0.15 N/mm2)

Heating-up time= 10 x
wallthickness (heatingup 0.02 N/mm2)

mm (minimum values)

s

Changeover time

Joining pressure

Cooling time under
joining pressure p=0.15
N/mm2 0.01

S (maximum time)

s

Min (minimum values)

MATERIAL PE
Until 4.5
4.5 … 7
7 … 12
12 … 19
19 … 26
26 … 37
37 … 50
50 ... 70

0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0

Until 4.5
4.5 … 7
7 … 12
12 … 19
19 … 26
26 … 37
37 … 50

0.5
0.5
1.0
1.0
1.5
2.0
2.5

45
5
45 … 70
5…6
70 … 120
6…8
120 … 190
8 … 10
190 … 260
10 … 12
260 … 370
12 ... 16
370 … 500
16 … 20
500 … 700
20 … 25
MATERIAL PP
135
5
135 … 175
5…6
175 … 245
6…7
245 … 330
7…9
330 … 400
9 … 11
400 … 485
11 ... 14
485 … 560
14 … 17

5
5…6
6…8
8 … 11
11 … 14
14 … 19
19 … 25
25 … 35

6
6 … 10
10 … 16
16 … 24
24 … 32
32 … 45
45 … 60
60 … 80

6
6…7
6 … 11
11 … 17
17 … 22
22 … 32
32 … 43

6
6 … 12
12 … 20
20 … 30
30 … 40
40 … 55
55 … 70

Example on how to calculate the cooling down (t5) time following the DVS NORM
As per drawing above the time T corresponds to wall thickness value X in
mm. To calculate this time (t5 in minutes) please follow the formula below:

T = 6+

10 − 6
⋅ ( x − 4,5)
7 − 4,5

Example:
If you want to calculate the cooling down time for a 6mm wall thickness pipe, you must simply substitute the variable X with the value 6:

T =6+

10 − 6
⋅ (6 − 4,5) = 8,4 min
7 − 4,5

To calculate the other times (t3 and t4) you must use the same principle of linear interpolation.
To obtain the t2 (in seconds) value use the formula below where the variable wt corresponds to the nominal wall thickness

T2 (sec) = 10 ⋅ wt( mm )

17

I.T.S. Ital Trade Services

PT 250 Operating Manual

6. Welding Table for PE pipes DVS norm version 2207-1
The following tables show the values to be applied during the welding cycle as per previous instructions and graph.
However in order to clarify once again the meaning of these values please kindly note:
t1 =
Time requested for the bead formation to be done with pressure value = P1 + inertial pressure
t2 =
Time requested for the continual heating to be done with pressure value = P2 + inertial pressure
t3 =
Time requested for the change over
t4 =
Time requested for bringing up the pressure at the value of pressure = P1 + inertial pressure
t5 =
time requested for cooling down to be done with pressure value = P1 + inertial pressure
Important: Remember always to add the value checked of inertial pressure to the P1 and P2 values !!!!!!!

PT 250 - DVS 2207-1
material PE80-100

Cyl. section cm
P1

bead

2

P2

5,88
Welding range 90-250 mm
SDR 41

D

S

T

DIAMETER

WALL THICK.

TEMP.

mm

mm

°C

bar

mm

90
110
125
140
160
180
200
225

2,2
2,7
3,0
3,4
3,9
4,4
4,9
5,5

220
220
220
220
220
220
219
218

1,5
2,3
3,
3,7
4,9
6,2
7,6
9,6

0,5
0,5
0,5
0,5
0,5
0,5
1,0
1,0

0..
0..
0..
0..
0..
0..
0..
0..

0,1
0,2
0,2
0,2
0,3
0,4
0,5
0,6

22
27
30
34
39
44
49
55

0..
0..
0..
0..
0..
0..
0..
0..

250

6,1

217

11,9

1,0

0..

0,8

61

0..

BEAD FORMATION

bar

Cyl. section cm2

PT 250 - DVS 2207-1
material PE80-100
P1

t2

HEATING UP

bead

P2

sec

t3

t4

CHANGEOV.

RAMP

sec

sec

bar

min

5
5
5
5
5
5
5
5

5
5
5
5
5
5
5
5

1,5
2,3
3,
3,7
4,9
6,2
7,6
9,6

6
6
6
6
6
6
7
8

6

6

11,9

9

D

S

T

WALL THICK.

TEMP.

mm

mm

°C

bar

mm

90
110
125
140
160
180
200
225

2,7
3,3
3,8
4,2
4,8
5,5
6,1
6,8

220
220
220
220
219
218
218
216

1,9
2,8
3,7
4,6
6,
7,6
9,4
11,9

0,5
0,5
0,5
0,5
1,0
1,0
1,0
1,0

0..
0..
0..
0..
0..
0..
0..
0..

0,1
0,2
0,2
0,3
0,4
0,5
0,6
0,8

27
33
38
42
48
55
61
68

0..
0..
0..
0..
0..
0..
0..
0..

250

7,6

215

14,7

1,5

0..

1,0

76

0..

Cyl. section cm2

PT 250 - DVS 2207-1
material PE80-100
P1

t2

HEATING UP

bar

bead

P2

sec

t3

t4

CHANGEOV.

RAMP

sec

sec

bar

min

5
5
5
5
5
5
6
6

5
5
5
5
5
5
6
6

1,9
2,8
3,7
4,6
6,
7,6
9,4
11,9

6
6
6
6
7
8
8
10

6

6

14,7

11

D

S

T

WALL THICK.

TEMP.

t2

mm

mm

°C

bar

mm

63
75
90
110
125
140
160
180
200
225

2,3
2,7
3,3
4,0
4,5
5,1
5,8
6,5
7,2
8,2

220
220
220
220
220
219
218
217
216
215

1,1
1,6
2,3
3,4
4,4
5,5
7,2
9,1
11,2
14,2

0,5
0,5
0,5
0,5
1,0
1,0
1,0
1,0
1,5
1,5

0..
0..
0..
0..
0..
0..
0..
0..
0..
0..

0,1
0,1
0,2
0,2
0,3
0,4
0,5
0,6
0,7
0,9

23
27
33
40
45
51
58
65
72
82

0..
0..
0..
0..
0..
0..
0..
0..
0..
0..

250

9,1

214

17,5

1,5

0..

1,2

91

0..

HEATING UP

bar

P5

sec

t3

t4

CHANGEOV.

RAMP

P5

t5

sec

sec

bar

min

5
5
5
5
5
5
6
6
6
6

5
5
5
5
5
5
6
6
6
6

1,1
1,6
2,3
3,4
4,4
5,5
7,2
9,1
11,2
14,2

6
6
6
6
6
7
8
9
10
11

7

7

17,5

12

COOLING

Warning!: in case of PE100 welding, temperature T must be increased to 220°c
18

t5

COOLING

5,88
Welding range 63-250 mm
SDR 27,6

DIAMETER

BEAD FORMATION

t5

COOLING

5,88
Welding range 90-250 mm
SDR 33

DIAMETER

BEAD FORMATION

P5

I.T.S. Ital Trade Services

PT 250 Operating Manual

Cyl. section cm2

PT 250 - DVS 2207-1

5,88

material PE80-100
D

S

T

DIAMETER

WALL THICK.

TEMP.

mm
63
75
90
110
125
140
160
180
200
225
250

mm
2,4
2,9
3,5
4,2
4,8
5,4
6,2
6,9
7,7
8,7
9,6

°C
220
220
220
220
220
219
217
216
215
214
213

SDR 26
P1

bead

P2

BEAD FORMATION

bar
1,2
1,7
2,4
3,6
4,6
5,8
7,6
9,6
11,8
15,
18,5

mm
0,5
0,5
0,5
0,5
1,0
1,0
1,0
1,0
1,5
1,5
1,5

t2

HEATING UP

bar
0.. 0,1
0.. 0,1
0.. 0,2
0.. 0,2
0.. 0,3
0.. 0,4
0.. 0,5
0.. 0,6
0.. 0,8
0.. 1,0
0.. 1,2

Cyl. section cm2

PT 250 - DVS 2207-1

sec
24
29
35
42
48
54
62
69
77
87
96

5,88

material PE80-100
D

S

T

DIAMETER

WALL THICK.

TEMP.

mm
63
75
90
110
125
140
160
180
200
225
250

mm
2,9
3,4
4,1
5,0
5,7
6,4
7,3
8,2
9,1
10,2
11,4

°C
220
220
220
219
218
217
216
215
214
213
212

P1

bead

P2

BEAD FORMATION

bar
1,4
2,
2,8
4,2
5,4
6,8
8,9
11,3
13,9
17,6
21,7

mm
0,5
0,5
0,5
1,0
1,0
1,0
1,5
1,5
1,5
1,5
1,5

t2

HEATING UP

0..
0..
0..
0..
0..
0..
0..
0..
0..
0..
0..

bar
0,1
0,1
0,2
0,3
0,4
0,5
0,6
0,8
0,9
1,2
1,4

Cyl. section cm2

sec
29
34
41
50
57
64
73
82
91
102
114

5,88

material PE80-100
D

S

T

WALL THICK.

TEMP.

mm
63
75
90
110
125
140
160
180
200
225
250

mm
3,0
3,6
4,3
5,2
6,0
6,7
7,6
8,6
9,5
10,7
11,9

°C
220
220
220
219
218
217
215
214
213
212
211

t3

t4

CHANGEOV.

RAMP

sec
0..
0..
0..
0..
0..
0..
0..
0..
0..
0..
0..

5
5
5
5
5
5
6
6
6
7
7

sec
5
5
5
5
5
5
6
6
6
7
7

P5

t5

COOLING

bar
1,2
1,7
2,4
3,6
4,6
5,8
7,6
9,6
11,8
15,
18,5

min
6
6
6
6
6
7
9
10
11
12
13

Welding range 63-250 mm

SDR 22

PT 250 - DVS 2207-1

DIAMETER

Welding range 63-250 mm

t3

t4

CHANGEOV.

RAMP

sec
0..
0..
0..
0..
0..
0..
0..
0..
0..
0..
0..

5
5
5
5
5
6
6
6
7
7
8

sec
5
5
5
5
5
6
6
6
7
7
8

P5

t5

COOLING

bar
1,4
2,
2,8
4,2
5,4
6,8
8,9
11,3
13,9
17,6
21,7

min
6
6
6
7
8
9
10
11
13
14
15

Welding range 63-250 mm

SDR 21
P1

bead

BEAD FORMATION

bar
1,4
2,
2,9
4,4
5,7
7,1
9,3
11,8
14,5
18,4
22,7

mm
0,5
0,5
0,5
1,0
1,0
1,0
1,5
1,5
1,5
1,5
1,5

P2

t2

HEATING UP

bar
0.. 0,1
0.. 0,1
0.. 0,2
0.. 0,3
0.. 0,4
0.. 0,5
0.. 0,6
0.. 0,8
0.. 1,0
0.. 1,2
0.. 1,5

sec
30
36
43
52
60
67
76
86
95
107
119

t3

t4

CHANGEOV.

RAMP

sec
0..
0..
0..
0..
0..
0..
0..
0..
0..
0..
0..

5
5
5
5
6
6
6
7
7
7
8

sec
5
5
5
5
6
6
6
7
7
7
8

P5

t5

COOLING

bar
1,4
2,
2,9
4,4
5,7
7,1
9,3
11,8
14,5
18,4
22,7

min
6
6
6
7
8
9
11
12
13
14
16

Warning!: in case of PE100 welding, temperature T must be increased to 220°c
19

I.T.S. Ital Trade Services

PT 250 Operating Manual

Cyl. section cm2

PT 250 - DVS 2207-1

5,88

material PE80-100
D

S

T

DIAMETER

WALL THICK.

TEMP.

mm
63
75
90
110
125
140
160
180
200
225
250

mm
3,6
4,3
5,1
6,3
7,1
8,0
9,1
10,2
11,4
12,8
14,2

°C
220
220
219
217
216
215
214
213
212
210
209

SDR 17,6
P1

bead

P2

BEAD FORMATION

bar
1,7
2,4
3,5
5,2
6,7
8,4
11,
13,9
17,2
21,7
26,8

mm
0,5
0,5
1,0
1,0
1,5
1,5
1,5
1,5
1,5
2,0
2,0

t2

HEATING UP

bar
0.. 0,1
0.. 0,2
0.. 0,2
0.. 0,3
0.. 0,4
0.. 0,6
0.. 0,7
0.. 0,9
0.. 1,1
0.. 1,4
0.. 1,8

Cyl. section cm2

PT 250 - DVS 2207-1

sec
36
43
51
63
71
80
91
102
114
128
142

D

S

T

WALL THICK.

TEMP.

mm
63
75
90
110
125
140
160
180
200
225
250

mm
3,7
4,4
5,3
6,5
7,4
8,2
9,4
10,6
11,8
13,2
14,7

°C
220
220
219
217
216
215
214
212
211
210
209

P1

bead

P2

BEAD FORMATION

S

T

WALL THICK.

TEMP.

mm
63
75
90
110
125
140
160
180
200
225
250

mm
4,6
5,5
6,6
8,1
9,2
10,3
11,8
13,2
14,7
16,5
18,4

°C
220
218
217
215
214
213
211
210
209
208
206

sec

sec
5
5
5
6
6
6
7
7
8
8
9

0..
0..
0..
0..
0..
0..
0..
0..
0..
0..
0..

5
5
5
6
6
6
7
7
8
8
9

bar
1,8
2,5
3,6
5,4
6,9
8,7
11,4
14,4
17,7
22,5
27,7

mm
0,5
0,5
1,0
1,0
1,5
1,5
1,5
1,5
1,5
2,0
2,0

0..
0..
0..
0..
0..
0..
0..
0..
0..
0..
0..

bar
0,1
0,2
0,2
0,4
0,5
0,6
0,8
1,0
1,2
1,5
1,8

Cyl. section cm2

sec
37
44
53
65
74
82
94
106
118
132
147

t3

t4

CHANGEOV.

RAMP

sec

sec
5
5
5
6
6
6
7
7
8
9
9

0..
0..
0..
0..
0..
0..
0..
0..
0..
0..
0..

5,88

5
5
5
6
6
6
7
7
8
8
9

t5

COOLING

bar
1,7
2,4
3,5
5,2
6,7
8,4
11,
13,9
17,2
21,7
26,8

min
6
6
7
9
10
11
13
14
15
17
19

P5

t5

COOLING

bar
1,8
2,5
3,6
5,4
6,9
8,7
11,4
14,4
17,7
22,5
27,7

min
6
6
7
9
10
11
13
14
16
17
19

Welding range 63-250 mm

SDR 13,6
P1

bead

BEAD FORMATION

bar
2,2
3,1
4,4
6,6
8,5
10,7
14,
17,7
21,8
27,6
34,1

mm
1,0
1,0
1,0
1,5
1,5
1,5
1,5
2,0
2,0
2,0
2,0

P2

t2

HEATING UP

bar
0.. 0,1
0.. 0,2
0.. 0,3
0.. 0,4
0.. 0,6
0.. 0,7
0.. 0,9
0.. 1,2
0.. 1,5
0.. 1,8
0.. 2,3

sec
46
55
66
81
92
103
118
132
147
165
184

t3

t4

CHANGEOV.

RAMP

sec

sec
5
5
6
6
7
7
8
9
9
10
11

0..
0..
0..
0..
0..
0..
0..
0..
0..
0..
0..

5
5
6
6
7
7
8
8
9
9
10

Warning!: in case of PE100 welding, temperature T must be increased to 220°c
20

P5

Welding range 63-250 mm

t2

HEATING UP

material PE80-100
D

t4
RAMP

SDR 17

PT 250 - DVS 2207-1

DIAMETER

t3
CHANGEOV.

5,88

material PE80-100
DIAMETER

Welding range 63-250 mm

P5

t5

COOLING

bar
2,2
3,1
4,4
6,6
8,5
10,7
14,
17,7
21,8
27,6
34,1

min
6
8
9
11
13
14
16
17
19
21
23

I.T.S. Ital Trade Services

PT 250 Operating Manual

Cyl. section cm2

PT 250 - DVS 2207-1

5,88

material PE80-100
D

S

T

DIAMETER

WALL THICK.

TEMP.

mm
63
75
90
110
125
140
160
180
200
225
250

mm
5,7
6,8
8,2
10,0
11,4
12,7
14,5
16,4
18,2
20,5
22,7

°C
218
216
215
213
212
210
209
208
207
205
204

SDR 11
P1

bead

P2

BEAD FORMATION

bar
2,6
3,7
5,4
8,
10,3
13,
16,9
21,4
26,5
33,5
41,4

mm
1,0
1,0
1,5
1,5
1,5
2,0
2,0
2,0
2,0
2,5
2,5

t2

HEATING UP

bar
0.. 0,2
0.. 0,2
0.. 0,4
0.. 0,5
0.. 0,7
0.. 0,9
0.. 1,1
0.. 1,4
0.. 1,8
0.. 2,2
0.. 2,8

Cyl. section cm2

PT 250 - DVS 2207-1

sec
57
68
82
100
114
127
145
164
182
205
227

D

S

T

WALL THICK.

TEMP.

mm
63
75
90
110
125
140
160
180
200
225
250

mm
7,0
8,3
10,0
12,2
13,9
15,6
17,8
20,0
22,2
25,0
27,8

°C
216
215
213
211
210
208
207
206
205
203
203

P1

bead

P2

BEAD FORMATION

S

T

WALL THICK.

TEMP.

mm
63
75
90
110
125
140
160
180
200
225
250

mm
8,5
10,1
12,2
14,9
16,9
18,9
21,6
24,3
27,0
30,4
33,8

°C
214
213
211
209
208
206
205
204
203
202
202

sec

sec
5
6
6
7
8
8
9
10
11
12
13

0..
0..
0..
0..
0..
0..
0..
0..
0..
0..
0..

5
6
6
7
8
8
9
9
10
10
11

P5

t5

COOLING

bar
2,6
3,7
5,4
8,
10,3
13,
16,9
21,4
26,5
33,5
41,4

min
8
10
11
14
15
17
19
21
23
26
28

Welding range 63-250 mm

bar
3,1
4,5
6,4
9,6
12,4
15,5
20,3
25,6
31,6
40,1
49,4

mm
1,0
1,5
1,5
2,0
2,0
2,0
2,0
2,5
2,5
2,5
3,0

t2

HEATING UP

0..
0..
0..
0..
0..
0..
0..
0..
0..
0..
0..

bar
0,2
0,3
0,4
0,6
0,8
1,0
1,4
1,7
2,1
2,7
3,3

Cyl. section cm2

sec
70
83
100
122
139
156
178
200
222
250
278

t3

t4

CHANGEOV.

RAMP

sec

sec
6
7
7
8
9
10
10
11
12
14
15

0..
0..
0..
0..
0..
0..
0..
0..
0..
0..
0..

5,88

material PE80-100
D

t4
RAMP

SDR 9

PT 250 - DVS 2207-1

DIAMETER

t3
CHANGEOV.

5,88

material PE80-100
DIAMETER

Welding range 63-250 mm

6
7
7
8
9
9
10
10
11
12
13

P5

t5

COOLING

bar
3,1
4,5
6,4
9,6
12,4
15,5
20,3
25,6
31,6
40,1
49,4

min
10
12
14
16
18
20
23
25
28
31
34

Welding range 63-250 mm

SDR 7,4
P1

bead

BEAD FORMATION

bar
3,7
5,3
7,6
11,3
14,6
18,3
24,
30,3
37,4
47,4
58,5

mm
1,5
1,5
2,0
2,0
2,0
2,0
2,5
2,5
3,0
3,0
3,0

P2

t2

HEATING UP

bar
0.. 0,2
0.. 0,4
0.. 0,5
0.. 0,8
0.. 1,0
0.. 1,2
0.. 1,6
0.. 2,0
0.. 2,5
0.. 3,2
0.. 3,9

sec
85
101
122
149
169
189
216
243
270
304
338

t3

t4

CHANGEOV.

RAMP

sec

sec
7
7
8
9
10
11
12
13
14
16
18

0..
0..
0..
0..
0..
0..
0..
0..
0..
0..
0..

7
7
8
9
9
10
11
11
12
14
15

P5

t5

COOLING

bar
3,7
5,3
7,6
11,3
14,6
18,3
24,
30,3
37,4
47,4
58,5

min
12
14
16
19
22
24
27
30
33
37
41

Warning!: in case of PE100 welding, temperature T must be increased to 220°c
21

I.T.S. Ital Trade Services

PT 250 Operating Manual

7. Welding Parameters for PP pipes & fittings DVS norm version 2207-11
material PP

SDR

Cylinder section cm2 5,88

PP

D

S

Temp.

P1

bead

P2

t2

t3

t4

P5

t5

mm

mm

°C

bar

Mm

bar

sec

sec

sec

bar

sec

63
75
90
110
125
140
160
180
200
225
250

1,8
1,9
2,2
2,7
3,1
3,5
3,9
4,4
4,9
5,5
6,1

210°
210°
210°
210°
210°
210°
210°
210°
210°
210°
210°

0,6
0,7
1,0
1,5
2,0
2,6
3,3
4,1
5,1
6,4
7,9

0,5
0,5
0,5
0,5
0,5
0,5
0,5
0,5
0,5
0,5
0,5

0,1
0,1
0,1
0,2
0,2
0,3
0,3
0,4
0,5
0,6
0,8

135
135
135
135
135
135
135
135
141
151
161

5
5
5
5
5
5
5
5
5
5
6

material PP

SDR

33

PP

6
0,6
360
6
0,7
360
6
1,0
360
6
1,5
360
6
2,0
360
6
2,6
360
6
3,3
360
6
4,1
360
6
5,1
418
6
6,4
504
7
7,9
590
2
Cylinder section cm 5,88

D

S

Temp.

P1

bead

P2

t2

t3

t4

P5

t5

mm

mm

°C

bar

Mm

bar

sec

sec

sec

bar

sec

63
75
90
110
125
140
160
180
200
225
250

2
2,4
2,8
3,5
3,9
4,4
5
5,6
6,2
7
7,8

210°
210°
210°
210°
210°
210°
210°
210°
210°
210°
210°

0,7
0,9
1,3
2,0
2,5
3,2
4,1
5,2
6,4
8,1
10,1

0,5
0,5
0,5
0,5
0,5
0,5
0,5
0,5
0,5
0,5
1

0,1
0,1
0,1
0,2
0,3
0,3
0,4
0,5
0,6
0,8
1,0

135
135
135
135
135
135
143
153
162
175
186

5
5
5
5
5
5
5
5
6
6
6

material PP

22

41

SDR

26

PP

6
0,7
360
6
0,9
360
6
1,3
360
6
2,0
360
6
2,5
360
6
3,2
360
6
4,1
432
6
5,2
518
7
6,4
605
7
8,1
720
8
10,1
797
2
Cylinder section cm 5,88

D

S

Temp.

P1

bead

P2

t2

t3

t4

P5

t5

mm

mm

°C

bar

Mm

bar

sec

sec

sec

bar

sec

63
75
90
110
125
140
160
180
200
225
250

2,5
2,9
3,5
4,3
4,9
5,4
6,2
7
7,7
8,7
9,7

210°
210°
210°
210°
210°
210°
210°
210°
210°
210°
210°

0,8
1,1
1,6
2,4
3,1
3,9
5,1
6,5
7,9
10,0
12,4

0,5
0,5
0,5
0,5
0,5
0,5
0,5
0,5
1
1
1

0,1
0,1
0,2
0,2
0,3
0,4
0,5
0,6
0,8
1,0
1,2

135
135
135
135
141
149
162
175
185
199
213

5
5
5
5
5
5
6
6
6
6
7

6
6
6
6
6
6
7
7
8
8
9

0,8
1,1
1,6
2,4
3,1
3,9
5,1
6,5
7,9
10,0
12,4

360
360
360
360
418
490
605
720
787
883
979

I.T.S. Ital Trade Services

material PP

PT 250 Operating Manual

SDR

17.6

Cylinder section cm2 5,88

PP

D

S

Temp.

P1

bead

P2

t2

t3

t4

P5

t5

mm

mm

°C

bar

mm

bar

sec

sec

sec

bar

sec

63
75
90
110
125
140
160
180
200
225
250

3,6
4,3
5,1
6,3
7,1
8
9,1
10,2
11,4
12,8
14,2

210°
210°
210°
210°
210°
210°
210°
210°
210°
210°
210°

1,1
1,6
2,3
3,5
4,5
5,6
7,3
9,2
11,5
14,5
17,9

0,5
0,5
0,5
0,5
1
1
1
1
1
1
1

0,1
0,2
0,2
0,3
0,4
0,6
0,7
0,9
1,1
1,5
1,8

135
135
145
164
176
189
204
220
237
255
271

5
5
5
6
6
6
6
7
7
7
8

material PP

SDR

11

PE 100

6
1,1
360
6
1,6
360
6
2,3
446
7
3,5
619
7
4,5
730
8
5,6
816
9
7,3
922
10
9,2
1027
11
11,5
1142
12
14,5
1269
13
17,9
1389
2
Cylinder section cm 5,88

D

S

Temp.

P1

bead

P2

t2

t3

t4

P5

t5

mm

mm

°C

bar

mm

bar

sec

sec

sec

bar

sec

63
75
90
110
125
140
160
180
200
225
250

5,8
6,9
8,2
10
11,4
12,8
14,6
16,4
18,2
20,5
22,8

210°
210°
210°
210°
210°
210°
210°
210°
210°
210°
210°

1,8
2,5
3,6
5,3
6,9
8,7
11,3
14,3
17,7
22,4
27,7

0,5
0,5
1
1
1
1
1
1
1
1,5
1,5

0,2
0,3
0,4
0,5
0,7
0,9
1,1
1,4
1,8
2,2
2,8

156
173
192
217
237
255
276
298
319
345
368

6
6
6
7
7
7
8
8
9
9
10

7
7
8
9
11
12
13
15
16
18
20

1,8
2,5
3,6
5,3
6,9
8,7
11,3
14,3
17,7
22,4
27,7

547
706
835
1008
1142
1269
1423
1577
1731
1929
2126

23

I.T.S. Ital Trade Services

PT 250 Operating Manual

8. Maintenance
8.1 Basic machine
It's strongly suggested to keep always the machine clean with particular care of the bolts and the cylinder's heads .
Keep attention while insert the electric facing tool and the PTFE coated heating mirror avoiding to damage the machine's slide bars.

8.2 Facing tool
It's strongly suggested to keep always clean the blades and wash the pulleys by using a detergent.
At regular intervals carry out a complete cleaning operation with a internal lubrication as well , as per following instructions:
- Remove the carter by enlighten the screws
- Take out the shavings might be present
- Enlighten the screws and remove the pulley and carry out the cleaning and the lubrication of the bearing .

8.3 Heating mirror
Please take care on handling the heating mirror in order to avoid damages to the PTFE coating.
Keep always clean the PTFE coated surfaces, cleaning must be done with surface still warm by using a soft cloth or paper, avoiding
abrasive materials in that might damage the PTFE coated surfaces. To achieve this operation you must wear protective gloves
At regular intervals we suggest you to:
- Clean the surfaces by a quick evaporation detergent (alcohol)
- Check the tightening of the screws and the cable and plug condition
- Verify the temperature differences on the heating mirror surfaces according to the following table DVS norm 2208-1 here
following table:
WELDING SURFACE OF THE MIRROR
< 250 cm2
250 …. 2000 cm2
2000 …. 5000 cm2
5000 …. 12000 cm2
> 12000

∆Τ1
5 °C
7 °C
11 °C
13 °C
14 °C

∆Τ2
3 °C
3 °C
3 °C
3 °C
3 °C

∆ΤΤΟΤ
8 °C
10 °C
14 °C
16 °C
17 °C

∆Τ1 Maximum temperature difference on the mirror surface
∆Τ2 Temperature deviation for the adjustment
∆ΤΤΟΤ Maximum accepted difference on the mirror surface

8.4 Hydraulic unit
The hydraulic unit does not need particular maintenance nevertheless the following instructions must be followed:
1. Check periodically the oil level and in case add with oil type:
ESSO NUTO H 68,SHELL TELLUS 68,MOBIL DTE 26,AGIP OSO 46
The level should not be lower than 5 cm from the tank maximum level.
A checking every 15 working days it's strongly suggested.
2. Replace totally the oil every 6 months or after 500 working hours.
3. Keep clean the hydraulic unit with particular care on the tank and quick couplings.
4. Avoid to operate with rain or high humidity (95 RH %) value and temperatures below 0°C or above + 50°C.
5. During the transport it's suggested to put the metal plug instead of the plastic one.

24

I.T.S. Ital Trade Services

PT 250 Operating Manual

9. Troubleshooting and relative solutions
9.1 Basic machine
a)

The quick couplings can't be connected:
Check if there's pressure on the hoses in case bring the pressure to zero ( see relative instructions )
Check if the quick couplings are clean
b) The machine does not move in linear way:
The above mentioned situation could happen in case of clash or in case the machine with the pipe assembled in has been fiercely
moved. If the damaged part can be located proceed to the substitution, however if the trouble still remain, kindly contact the
Customer Service
c) The nut/s is/are seizure:
Replace the complete tie rod bolt
d) Oil leakage in the cylinders:
Consult the Customer Service Dept. verify if it's necessary to replace the cylinders or just the gasket

9.2 Facing tool
a)

The engine does not start:
Unplug the facing tool and check the electric connections and the safety micro-switch
b) The engine is burnt out:
In case it's need to replace the engine the following operations must be done:
- Unplug the facing tool
- Enlighten the screws connecting the engine to the facing tool, disconnect the safety
micro-switch and wires
- Remove the engine by means of pulling in upper direction, remove the joint from the
drill
- Screw the joint on the new engine
- Mount the new drill engine by taking care to fix the joint gap in a proper way
- Tighten the screws connecting the engine to the facing tool, connect the safety
micro-switch and wires
c) The blades do not remove material:
Wear and tear of one cutting side enlighten the screws and turn the blades using the other side.
Wear and tear of both cutting side of the blades replace with original spare parts.

9.3 Hydraulic unit
a) The engine does not start:
Check that the hydraulic unit engine is switched on
The microswitch is damaged or wrongly adjusted
- To adjust the microswitch you must enlighten the screws show in the
figure below and bring the lever A to position A3.
- Move the microswitch towards the internal of the hydraulic until the
engine start and tighten the fixing screw.
- Check that in position A1the engine is switched off.
- In different case adjust the microswitch position again.

b) The engine replacement:
Check that the electric plug is disconnected
Open the electric connections box and disconnect the micro-switch cable
Enlighten the screws and take out the engine
Take out the joints and insert them on the new engine
Reassemble the engine taking care that the joints are perfectly located on
the own housings
Check the anti clockwise rotation of the electric fan

25

I.T.S. Ital Trade Services

PT 250 Operating Manual

c) If the hydraulic unit cannot increase the pressure reasons could be :
- Check the oil level
- The lever E is not closed.
- Check if they are some leakage on hydraulic circuit.
d)

If the hydraulic unit cannot maintain a constant pressure reasons could be :
- The lever E is not closed.
- The accumulator is down or damaged. To replace the pressure gauge follows the below steps:
1. Bring the pressure to zero and enlighten the bolt
2. Take out the fitting and replace the damaged accumulator with the new one
3. Tighten the bolt

9.4 Hearting mirror
a)

26

The heating mirror does not warm up:
1. Check if the light is switched off , in case check the plug
2. The light is switched on, probably a wire disconnected , check the contacts as follows:
- Take off the plug from the power
- Unscrew the nuts and take out the thermostat support
- Unscrew the screws and remove the cap
- Check all the electric connections and reassemble
- Unscrew the screws and take out the cover
- Check all the electric connections and reassemble
3. By utilizing a Tester check if all the resistances are in good condition ,if one or more are broken the heating mirror must be
changed
4. By utilizing a tester check the working of the thermostat, in case substitute
5. For additional information on electric components, please refer to our Technical Dept.

I.T.S. Ital Trade Services

PT 250 Operating Manual

10. Drawings
10.1 Thermostat connection

10.2 Facing tool and hydraulic unit engines connection

27

I.T.S. Ital Trade Services

10.3 Hydraulic plan

28

PT 250 Operating Manual

I.T.S. Ital Trade Services

PT 250 Operating Manual

11. Exploded view and spare parts list

29

I.T.S. Ital Trade Services

PT 250 Operating Manual

PT 250 Basic Machine , Code: PT250B

PT 250 Basic Machine , Code: PT250B

Pos.

Code

Description

Qty

Pos.

Code

Description

Qty

1
2
3
4+5
6
7
8
9
10
11
12
13
14
15+16
17
18+19
20
21
22
23+24
25
26
27
28

PT250B01
PT250B02
PT250B03
PT250B04+05
PT250B06
PT250B07
PT250B08
PT250B09
PT250B10
PT250B11
PT250B12
PT250B13
PT250B14
PT250B15+16
PT250B17
PT250B18+19
PT250B20
PT250B21
PT250B22
PT250B23+24
PT250B25
PT250B26
PT250B27
PT250B28

side support
screw TCEI UNI 5931 8.8 8x35
Nut fixing cylinder’s tie rod
first clamp (04+05)
cylinder’s tie rod
quick coupling M/F 1/4
Tee fitting TN 96 10 LR
Fitting TN 126 10 LR
Danger label
Upper Cylinder
washer bonded 1/4
Technical data label
Serial no. label
Second clamp (15+16)
35.40 FB1 bush
Third clamp (18+19)
Back nut for spacer
Screw TSPEI 5933 10.9 8x30z
Spacer
Fourth clamp c/w support (23+24)
Screw TCEI UNI 5931 8.8 10x40z
Beep beep coupler system
Nut tie rods
Washer for tie rods

1
2
8
1
8
1
2
2
2
1
4
1
1
1
2
1
3
3
2
1
2
16
8
8

29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52

PT250B29
PT250B30
PT250B31
PT250B32
PT250B33
PT250B34
PT250B35
PT250B36
PT250B37
PT250B38
PT250B39
PT250B40
PT250B41
PT250B42
PT250B43
PT250B44
PT250B45
PT250B46
PT250B47
PT250B48
PT250B49
PT250B50
PT250B51

Tie rod closer
Tie rod pivot
Screw STEI UNI 5923 45h 6x14z
Front nut for spacer
Screw TSPEI 5933 10.9 10x45z
H. mirror disconnecting device pin
H.mirror disconnecting dev. hooker
H.mirror disconnecting dev. body
Lower Cylinder
Oil collector hose
Black plastic plug 60x30
Covers ABS 22X2
Screw TCEI UNI 5931 8.8 8x16z
Fitting TN 92 10 LR (1/4)
transport pipe
Stop limit label
Ground support
rivet tt UNI 9200 3x7 all
ITS – TECNODUE label
blind nut UNI 5721 8 m 10 z
washer UNI 6592 m 10 z
Third bar tie rod
Third bar

8
8
8
3
3
1
1
1
1
2
4
4
4
2
2
2
2
4
1
1
1
1
1

PT 250 Upper Cylinder , Code: PT250B11

PT 250 Lower Cylinder , Code: PT250B37

Pos.

Code

Description

Qty

Pos.

Code

Description

Qty

1
2
3
4
5
6
7
8
9
10
11
12

PT250B1101
PT250B1102
PT250B1103
PT250B1104
PT250B1105
PT250B1106
PT250B1107
PT250B1108
PT250B1109
PT250B1110
PT250B1111
PT250B1112

Gasket GHK 313 35.0 43.6 5.3 38.0
35.30 FB1 bush
Upper cylinder head
Gasket I/GR 0350 NCR
O-ring 3187 NBR 70 2.62x47.30 (134)
Gasket ring
Gasket E/GR 0400 NPS
Cylinder’s housing
Cylinder’s stem
Stopper ring
Screw TCEI UNI 5931 8.8 6x10 z
Washer 6x12x1,5

2
2
2
2
2
2
1
1
1
2
2
2

1
2
3
4
5
6
7
8
9
10

PT250B3701
PT250B3702
PT250B3703
PT250B3704
PT250B3705
PT250B3706
PT250B3707
PT250B3708
PT250B3709
PT250B3710

Gasket GHK 313 35.0 43.6 5.3 38.0
35.30 FB1 bush
Upper cylinder head
Gasket I/GR 0350 NCR
O-ring 3187 NBR 70 2.62x47.30 (134)
Gasket ring
Gasket E/GR 0400 NPS
Cylinder’s housing
Cylinder’s stem
Stopper ring

2
2
2
2
2
2
1
1
1
2

Beep Beep coupler system, Code: PT250B26

PT 250 Gasket kit, Code: PT250B37KT

Pos.

Code

Description

Qty

Pos.

Code

Description

Qty

1
2
3

PT250B2601
PT250B2602
PT250B2603

Pivot for beep beep coupler system
Hook for beep beep coupler system
Spring for beep beep coupler system

1
1
1

1
4
5
7

PT250B3701
PT250B3704
PT250B3705
PT250B3707

Gasket GHK 313 35.0 43.6 5.3 38.0
Gasket I/GR 0350 NCR
O-ring 3187 NBR 70 2.62x47.30 (134)
Gasket E/GR 0400 NPS

2
2
2
1

30

I.T.S. Ital Trade Services

PT 250 Operating Manual

31

I.T.S. Ital Trade Services

PT 250 Operating Manual

PT 250 Hydraulic Unit , Code: PT160A

PT 250 Hydraulic Unit , Code: PT160A

Pos.

Code

Description

Qty

Pos.

Code

Description

Qty

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

PT160A01
PT160A02
PT160A03
PT160A04
PT160A05
PT160A06
PT160A07
PT160A08
PT160A09
PT160A10
PT160A11
PT160A12
PT160A13
PT160A14
PT160A15
PT160A16
PT160A17
PT160A18
PT160A19
PT160A20
PT160A21
PT160A22
PT160A23
PT160A24
PT160A25
PT160A26
PT160A27
PT160A28
PT160A29
PT160A30
PT160A31
PT160A32
PT160A33
PT160A34
PT160A35
PT160A36
PT160A37
PT160A38

Hose R1T M 1/4 + FD 1/4 L=2500
Oil tank LT.1
washer ½
Plug 1/2
Filter UP 100
Screw TCEI uni 5931 8.8 8x85 zin
Washer grower UNI 1751 m8 z
Gear pump PS-1/1.25 S
O-ring 2037 NBR 1.78x9.25 (012)
O-ring 3106 NBR 2.62x26.65 (121)
O-ring 4450 NBR 3.53x113.9 (246)
Max pressure valve FPMDC15P35
Pump body HY 10 K3P0-01 ¼ BB
Screw TCEI uni 5931 8.8 6x35 zin
O-ring 2056 NBR 1.78x14.00 (015)
Check valve RPC 04 / 2.5 00 00
Distributor shaft TC2 dr. C0618
Distributor block HD 104
Lever protection HD 104
By pass valve V03/M
Handle
Distributor lever HD 104 L.185
Complete distributor TC2
Pressure regulating valve VEN 06
Screw TCEI UNI 5931 8.8 4x10 z
Washer UNI 6592 m 4 zin
Nut UNI 7473 8 m4
Plastic cap
Screw TCEI UNI 5931 8.8 4x35z
Microswitch ASITZ 7141
Screw STEI UNI 5923 45h 10x14 z
Nut UNI 5589 8 m 10 zin
Spring latch
Ball 5/16”
Washer 1/4
Screw TCEI UNI 5931 8.8 8x70z
Generic danger label
Connector FT 299 44 M ¼”

2
1
1
1
1
2
2
1
1
1
1
1
1
4
2
1
1
1
1
1
1
1
1
1
2
6
2
1
2
1
2
1
1
1
9
2
1
1

39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75

PT160A39
PT160A40
PT160A41
PT160A42
PT160A43
PT160A44
PT160A45
PT160A46
PT160A47
PT160A48
PT160A49
PT160A50
PT160A51
PT160A52
PT160A53
PT160A54
PT160A55
PT160A56
PT160A57
PT160A58
PT160A59
PT160A60
PT160A61
PT160A62
PT160A63
PT160A64
PT160A65
PT160A66
PT160A67
PT160A68
PT160A69
PT160A70
PT160A71
PT160A72
PT160A73
PT160A74
PT160A75

Plug d. 8
Nipples M 1/4
Washer 18X1.5
accumulator L 01/8 with 20 g. oil
Hydraulic unit control label
Carter for valves protection
Screws TBEI 10.9 6X10 z
Serial number label
Technical data label
Carter
Rivet tt uni 9200 3x7 all
ITS - TECNODUE 80X25 label
Screw TC CR UNI 6954 3.5X19 zin
light switch 16A + cap
Electric danger label
Box FMA 63 / 71
Fan cover MEC 71
Fan MEC 71
Condenser 20MF
Cable H07 RNF 2G1 TITANEX
Engine MEC 71 HP 0.5 B14 230V 4P
Cable H07 RNF 3G1 TITANEX
Hollow screw
Plug 1/4
Pressure gauge support
Pressure gauge D.100 range 0-100 BAR
Screw TCEI UNI 5931 8.8 6x16 zin
Engine flange c.a. HP 0.33/0.5 FLCA71
Joint HP 0.33/0.50
Pump joint g. 1 x 0.27 reinf.
Washer fl m 10x30x2,5 zin
Screw TCEI UNI 5931 8.8 10x25 zin
Support 18-20
Frame
Unit model HY10 130 complete
Nut DIN 6923 8 m 6
quick coupling M/F 1/4

1
1
1
1
1
1
4
1
1
1
4
1
4
1
1
1
1
1
1

32

0,35

1
3
1
1
1
1
8
1
1
1
2
2
4
1
1
4
1

I.T.S. Ital Trade Services

PT 250 Operating Manual

PT 250 Facing Tool , Code: PT250F

PT 250 Facing Tool , Code: PT250F

Pos.

Code

Description

Qty

Pos.

Code

Description

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

PT250F01
PT250F02
PT250F03
PT250F04
PT250F05
PT250F06
PT250F07
PT250F08
PT250F09
PT250F10
PT250F11
PT250F12
PT250F13
PT250F14
PT250F15
PT250F16
PT250F17
PT250F18
PT250F19
PT250F20
PT250F21
PT250F22
PT250F23
PT250F24
PT250F25
PT250F26
PT250F27
PT250F28

Generic danger label
Electric danger label
Plastic stub 142X3.6
Ring UNI 7434 c70 4
Bush
Lever
Pivot
Nut
Spring
Facing tool stopper pivot
Cable H07 RNF 3G1
Double insulating pipe 2x2.5mm2 P=10MM blue
Cable stopper PG11 163/11
Switch
Screw TCEI UNI 5931 8.8 5x35 zin
Cable holder 604 / 6
Screw UNI 6107 4.8 3x8z
Wheel for reducing gear
3 holes blade
Screw tspi UNI 6109 4x12 a2
Screw TCEI UNI 5931 8.8 8x60
Left disk
Screw TSPEI 5933 10.9 5x12 z
Flange
Bearing 16008
Rivets tt UNI 7346 2,5x6,5 brass
label ITS - TECNODUE 80X25
Facing tool body PT 160

1
1
2
2
1
1
1
1
1
1
0,6
1
2
1
2
1
2
1
2
6
2
1
6
1
2
4
1
1

29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55

PT250F29
PT250F30
PT250F31
PT250F32
PT250F33
PT250F34
PT250F35
PT250F36
PT250F37
PT250F38
PT250F39
PT250F40
PT250F41
PT250F42
PT250F43
PT250F44
PT250F45
PT250F46
PT250F47
PT250F48
PT250F49
PT250F50
PT250F51
PT250F52
PT250F53
PT250F54
PT250F55

End connector M4
Washer fl UNI m 4x12x1.5 zin
Facing tool stopper
Screw spacer
Washer fl UNI m 5x15x1,5 zin
Insulating pipe 1.5mm2 P=8MM red
Screw TCEI UNI 5931 8.8 5x25 z
Cable H07 RNF 3G1,5 TITANEX
Cable stopper PG11
Screw TCEI UNI 5931 8.8 4x10 zin
Serial no. label
Technical data label
Box cover
Terminal mm2 2,5
Terminal mm2 4
Double ins. pipe 2X1.5mm2 P=8MM black
Cable stopper PG9 163/9
Stopper
Screw TCEI UNI 5931 8.8 8x45 zin
Right disk
Bearing 51100
Bearing 6002 ZZ
Screw for reducing gear
Bearing 6003 ZZ
Ring UNI 7437 c 70 35
Drill joint
drill PERLES PSB 7

Qty
1
1
1
1
1
3
1
3,3
1
5
1
1
1
3
1
3
1
1
1
1
1
1
1
1
1
1
1
33

I.T.S. Ital Trade Services

PT 250 Operating Manual

PT 250 Heating Mirror , Code: PT250T

PT 250 Heating Mirror , Code: PT250T

Pos.

Code

Description

Qty

Pos.

Code

Description

Qty

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

PT250T01
PT250T02
PT250T03
PT250T04
PT250T05
PT250T06
PT250T07
PT250T08
PT250T09
PT250T10
PT250T11
PT250T12
PT250T13
PT250T14
PT250T15
PT250T16
PT250T17
PT250T18
PT250T19
PT250T20
PT250T21
PT250T22
PT250T23
PT250T24
PT250T25
PT250T26
PT250T27
PT250T28
PT250T29

Thermometer
o-ring 2200 NBR 1.78x50.52 (033)
Danger and compulsory label
Screw TCEI UNI 5931 a2 5x12
Thermometer holder cover
Insulating red pipe D.5 1.5V

1
1
3
2
1
0,2
1
8
8
7
3
6
1
2
3,3
1
4
1
1
4
1
1
1
1
1
1
1
1
4

30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57

PT250T30
PT250T31
PT250T32
PT250T33
PT250T34
PT250T35
PT250T36
PT250T37
PT250T38
PT250T39
PT250T40
PT250T41
PT250T42
PT250T43
PT250T44
PT250T45
PT250T46
PT250T47
PT250T48
PT250T49
PT250T50
PT250T51
PT250T52
PT250T53
PT250T54
PT250T55
PT250T56
PT250T57

Screw TCEI UNI 5931 8.8 4x10Z
Relay 230 VAC 30A
Nut UNI 5588 m 4 zin
Red female connector 6.35x0.8
Yellow insulating pipe 1 mm2 P=8MM
Red insulating pipe 1,5 mm2 P=8MM
3 studs terminal
5 studs terminal
Black flame retardant wire 1 mm2
Nut ISO M25x1.5 CE
Brass nut PG11 169/11
Washer UNI 6593 m 4
Nut UNI 7473 8 m 4
Cable stopper PG11
Cable H07 RNF 3G1,5 TITANEX
Female terminal
Nut UNI 5588 m 3 brass
Connector UTG 012-8S
Connector 8 pins
Screw TSPI UNI 6109 3x12 brass
Screw TCI UNI 6107 3x10 brass
Black plastic stub 99x2.5
Ring 3.5 type 0
Ring 3.5 type 1
Ring 3.5 type 2
Ring 3.5 type 3
Ring 3.5 type 5
Gasket for TLK38 thermostat 33X74

2
1
2
2
8
7
1
1
2
1
1
4
4
1
3,3
4
4
1
1
1
3
6
1
5
2
1
1
1

34

O-ring 2400 NBR 70 1.78x101.32 (045)

Screw TCEI UNI 5931 a2 5x30
Washer grower UNI 1751 m5 z
terminal mm2 2,5
terminal 4/6 mm2
Red cap for wire 2x1mm2
Handle with hole for cable st.
Cable stopper M25
Cable H07 RNF 7G1,5 TITANEX
Heating plate PT 250
Gasket
Probe PT100 2+2 wires
Spacer
Gasket
Box
Rubber handle D. 30
Thermostat TLK38
Electric danger label
ITS – TECNODUE 80X25 label
Technical data label
Serial no. label
Thermostat box
Screw TC CR 7687 4.8 4x16 zin

I.T.S. Ital Trade Services

PT 250 Operating Manual

PT 250 Stub Device , Code: PT250S

PT 250 Stub Device , Code: PT250S

Pos.

Code

Description

Qty

Pos.

Code

Description

Qty

1
2
3
4
5

PT250S01
PT250S02
PT250S03
PT250S04
PT250S05

Plateau PT 250
Cursor
Screw STEI UNI 5927 45h 8x35 zin
Bracket
screw TCEI UNI 5931 8.8 8x20 zin

1
4
4
2
4

6
7
8
9
10

PT250S06
PT250S07
PT250S08
PT250S09
PT250S10

Fixing stub end bracket
Screw STEI UNI 5927 45h 5x8 zin
Upper stopper
Screw STEI UNI 5923 45h 8x20
Screw for fixing s.e. braket

2
2
2
2
2

Pos.

Code

Description

Qty

Pos.

Code

Description

1
2
3
4

PT160TK01
PT160TK02
PT160TK03
PT160TK04

Screw TCEI UNI 5931 8.8 6x50 zin
Socket wrench
Setscrew wrench UNI 6753 s 4
Setscrew wrench UNI 6753 s 5

8
1
1
1

5
6
7

PT160TK05
PT160TK06
PT160TK07

Setscrew wrench UNI 6753 s 6
Plug ½ for hydraulic unit
Screw driver

Pos.

Code

Description

Qty

Pos.

Code

Description

1

PT250U01

Support

1

2

PT250U02

Black plug 60x30

PT 250 Tools kit, Code: PT250TK

PT 250 Tools kit, Code: PT250TK

PT 250 Support, Code: PT250U

1
2

Description
Half wide ring av. sizes:
63,75,90,110,125,140,160,180,200,225mm
Half narrow ring av. sizes:
63,75,90,110,125,140,160,180,200,225mm

1
1
1

PT 250 Support, Code: PT250U

PT 160 Half reduction
Pos.

Qty

Qty
4

PT 250 Short spigot fit. clamp, Code: PT250G
Qty

Pos.

Code

Description

1

PT250G02

Short Spigot fittings clamp

Qty
1

35

I.T.S. Ital Trade Services

PT 250 Operating Manual

This manual has been printed on December 2008
The technical data and information contained in this manual can be changed without any notice
36



Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.4
Linearized                      : Yes
Author                          : Administrator
Create Date                     : 2009:05:05 12:56:05+02:00
Modify Date                     : 2016:09:22 00:29:34+08:00
Subject                         : 
XMP Toolkit                     : Adobe XMP Core 5.2-c001 63.139439, 2010/09/27-13:37:26
Producer                        : GPL Ghostscript 8.63
Keywords                        : 
Creator Tool                    : PDFCreator Version 0.9.6
Metadata Date                   : 2016:09:22 00:29:34+08:00
Document ID                     : e3cb24e9-3bbe-11de-0000-f6ce42bea240
Instance ID                     : uuid:7491cc19-ec2c-464c-bd2a-09e705fc26c0
Format                          : application/pdf
Title                           : PT  250 2008.12
Creator                         : Administrator
Description                     : 
Page Count                      : 36
EXIF Metadata provided by EXIF.tools

Navigation menu