COVERx FX 286 WB 021615

User Manual: FX-286

Open the PDF directly: View PDF PDF.
Page Count: 27

We’ll be Closed
The Builders’ Exchange will
be closed Monday, February 16th
in honor of Presidents’ Day.
We’ll be Closed
The Builders’ Exchange will
be closed Monday, February 16th
in honor of Presidents’ Day.
FEBRUARY 16, 2015
MAJOR PROJECTS
Project City Project Name Date
Time
5 Richmond Civic Auditorium Americans With Disabilities Act Bldg Upgrades
2/12 2PM
70 Saratoga West Valley College Main Telecommunications Room 2/12 2PM
Online 33 San Francisco CG Yerba Buena Reconfigure Offices HSCG88-10-D-PQQ007 2/12 2PM
20 Daly City Dollar Tree 2/12 10AM
Online 64 Elk Grove Smart & Final #722 2/16 2PM
Online 27 San Francisco Lowell High School New Classroom Buildings 11655 2/17 2PM
Online 37 Porterville CNG Facility Expansion 2/18 2:30PM
Online 6 Pacifica Holiday Inn Express & Suites 2/18 2PM
Online 15 Keyes New Dollar General 2/18
3PM
Online 66 Santa Cruz Student Life Seismic Corrections PH 2A Cardiff House 1329 2/18 10:30AM
Online 67 Santa Cruz Student Life Seismic Corrections PH 2A Redwood Bldg 3619 2/18 1:30PM
Online 68 San Rafael Plant Improvements 2015 Phase 1 2/18 11AM
66 Oakland 1110 Jackson Mixed Use 2/19 2PM
Online 38 Mountain View Residence Inn 2/19 12PM
Online 43 Sacramento K Street 700 Block 2/19 4PM
Online 53 Sacramento Co Twitchell Island Radio Tower Project 4255 2/19 2PM
Online 62 Antioch Buchanan Crossings 2/19 2PM
Online 51 Sonora Tuolumne County Mother Lode Regional Juvenile Detention 2/19 12:30PM
Online 16 Berkeley Hotel @ 1499 University Avenue 2/20 12PM
16 So San Francisco South San Francisco Municipal Services Bldg Atrium Restroom 2/24 2PM
Online 32 San Ramon Dougherty Valley High School Classroom Building Addition 2/25 2PM
8 Sunnyvale Lawrence Center 2/25 12PM
57 Sunnyvale Classic 300 Iowa / Paloma Place 2/27 5PM
Online 59 San Francisco Visitacion Valley Elementary School 11524 SFUSD 3/3 2PM
Online 65 Modesto YCCD District Office Building Modesto Jr. College West Campus
3/3 4PM
96E Oakland Tassafaronga Recreation Center Interior Remodel C464610 3/5 2PM
2 Cupertino Athletic Supply Buildings De Anza College #1712-206 3/11 3PM
Online 58 Rohnert Park Cabernet Village Student Housing Renovation 3030281 3/12 2PM
25 Richmond Kennedy High School Digital Fabrication Laboratory 3/12 2PM
10E San Jose #1502-003 Huff Gardens Apartments Rehab 3/12 3PM
To receive the latest updated bid information, please visit
www.onlineplanservice.com
To subscribe to our online planroom, please call the exchange or
download forms from our website.
http://www.bxscco.com/online-plans/
2015 Board of Directors
PRESIDENT: Ben Cooper, Commercial Door 408-727-5027
VICE PRESIDENT: Scott Hutts, Black Diamond Management Group, LLC 408-440-9582
SEC/TREASURER:
PAST PRESIDENT:
Dawna Cilluffo, DC Law Corporation 408-988-7946
DIRECTORS:
Burt Schraga, Bell Electric 408-727-2355
Carol Wagner
,
Abbott, Stringham & Lynch 408-377-8700
Mark Idemoto, Stevens Creek Quarry 408-640-9378
Anita Woodson, Woodson Administrative Services 408-859-9029
John Pluff, Facilities Solutions 408-982-5112
Stephanie Rocha, Miller Morton Caillat and Nevis 408-292-1765
Oskar Kabali, Kal Construction Inc. 408-988-1110
Shawna Alvarado, ODonnell Plastering 408-988-4965
STAFF:
Michael Miller, Executive Director and Safety Contact
Mary Fortin, Manager
Kanani Fonseca, Planroom Coordinator
Noreen Finegan, Admin. Asst.
Nancy Cordoba, Internet Coordinator
Theresa Touchatt, Internet Coordinator
PROJECTS OUT TO BID – INFORMATION UPDATED 02-16-2015
Please verify your information with the plans and specifications and addenda. Information
contained in this Bulletin is obtained with the realization that you depend on its accuracy. Every
reasonable effort is made to procure the most current information possible. The Builders Exchange
of Santa Clara County does not make any guarantee or warranty, or assume any liability, legal or
moral, or other responsibilities by reason of the compiled and published information.
THE DEADLINE FOR INFORMATION TUESDAY AT 8AM
#5 RICHMOND 2/12 2PM CIVIC AUDITORIUM AMERICANS WITH
DISABILITIES ACT BUILDING UPGRADES
PROJ MGR: City, Engng 510-231-3008
PROJ INFO: Building upgrades
PRE BID: Mandatory 1/15 2PM
ENG EST: $461,700.00
ADDENDUM: 1 (1-22), 2 (2-5), 3 (2-10)
A&E Emaar Albany 510-253-5337 FX 527-3614
Alten Construction Richmond 510-234-4200 FX 234-4402
Avalon Construction San Francisco 415-294-4200 FX 294-4201
B-Side Inc. Oakland 510-451-7527 FX 451-7517
Bay Construction Oakland 510-658-7225 FX 658-4890
FRC, Inc. Petaluma 707-782-9143 FX 782-9141
T Amaral’s Done Right Construction Livermore 925-989-0871 FX 000-0000
Turner Group Construction, Inc. Oakland 510-835-0400 FX 835-0444
Vila Construction Company Richmond 510-236-9111 FX 236-4979
W.E. Lyons Construction Co. Walnut Creek 925-658-1600 FX 658-1604
West Bay Builders Novato 415-456-8972 FX 459-0665
#70 SARATOGA 2/12 2PM WEST VALLEY COLLEGE MAIN
TELECOMMUNICATIONS ROOM
PROJ MGR: West Valley College District 408-741-2187
PROJ INFO: Telecommunications room renovation
PRE BID: Mandatory 1/21 2PM
ADDENDUM: 1 (2-3), 2 (2-3), 3 (2-6)
B-Side Inc. Oakland 510-451-7527 FX 451-7517
Beals Martin & Associates Redwood City 650-364-8141 FX 367-7645
California Plus Engineering Campbell 408-821-7168 FX 866-0566
Calstate Construction Fremont 510-657-1800 FX 657-1810
CLW Builders, Inc. San Francisco 415-333-9788 FX 333-9787
Coastwide Environmental Watsonville 831-761-5511 FX 761-5513
CRW Industries Santa Cruz 831-426-0743 FX 466-9597
Gonsalves & Stronck Construction San Carlos 650-802-2960 FX 802-2970
Cumiskey Construction San Francisco 650-591-2884 FX 591-2343
ICC General Contractors Sunnyvale 510-733-6656 FX 733-6657
Lewis and Tibbits San Jose 408-925-0220 FX 925-0245
RC Benson & Sons, Inc. Mountain View 650-965-3430 FX 965-7139
Ron Paris Construction San Jose 408-296-5926 FX 296-8814
Southland Construction Pleasanton 925-469-1101 FX 469-1102
Strawn Construction, Inc San Jose 408-286-1299 FX 286-1288
Swenson & Associates Campbell 408-866-7600 FX 866-7692
#ONLINE 33 SAN FRANCISCO 2/12 2PM CG YERBA BUENA RECONFIGURE OFFICES
HSCG88-10D-PQQ007 (ONLINE ONLY)
PROJ MGR: US Coast Guard 510-637-5586 Janice Preston
PROJ INFO: Reconfigure offices
PRE BID: 1/12 10AM
ENG EST: $500,000-1million
ADDENDUM: 1 d/c (2-4)
D-Square Construction LLC Tucson AZ 520-748-9371 FX 748-9372
#20 DALY CITY 2/12 10AM DOLLAR TREE
PROJ MGR: See Bidding General For Questions Plans: Marco Contractors, Warrendale PA 724-553-3825 FX
412-291-2997
PROJ INFO: New
Marco Contractors Warrendale PA 724-553-3825 FX 412-291-2997
#ONLINE 64 ELK GROVE 2/16 2PM SMART & FINAL #722 (ONLINE ONLY)
PROJ MGR: See Bidding General For Questions Plans: Moorefield Construction, Sacramento 916-614-7888
FX 916-419-8870
PROJ INFO: Tenant Improvements
Moorefield Construction Sacramento 916-614-7888 FX 419-8870
Stuart James Construction, Inc. Rocklin 916-608-4800 FX 608-4810
#ONLINE 27 SAN FRANCISCO 2/17 2PM LOWELL HIGH SCHOOL NEW CLASSROOM
BUILDINGS 11655 (ONLINE ONLY)
PROJ MGR: SFUSD 415-355-6979
PROJ INFO: New classroom building
PRE BID: Mandatory 1/15 & 1/21 3PM
Alpha Bay Builders San Francisco 415-282-1188 FX 282-3288
Arntz Builders, Inc. Novato 415-382-1188 FX 883-3756
Alten Construction Richmond 510-234-4200 FX 234-4221
BHM Construction Napa 707-643-4580 FX 643-4581
Cal-Pacific Construction Pacifica 650-557-1238 FX 557-1239
CLW Builders Inc. San Francisco 415-333-9788 FX 333-9787
F&H Construction Lodi 209-931-3738 FX 931-4427
Gonsalves & Stronck Construction San Carlos 650-802-2960 FX 802-2970
Strawn Construction San Jose 408-286-1299 FX 286-1288
Rodan Builders, Inc. Burlingame 650-508-1700 FX 508-1705
Seward L. Schreder Construction Redding 530-229-0001 FX 229-0070
Taber Construction Inc. Concord 925-682-6133 FX 682-6122
Trico Construction San Francisco 415-543-2100 FX 543-2106
West Bay Builders, Inc. Novato 415-456-8972 FX 459-0665
Zolman Construction & Development, Inc. San Carlos 650-802-9901 FX 802-9902
Zovich Construction Hayward 510-784-1273 FX 784-0173
#ONLINE 37 PORTERVILLE 2/18 2:30PM CNG FACILITY EXPANSION (ONLINE ONLY)
PROJ MGR: City, Engng 559-782-7451
PROJ INFO: Expansion
ENG EST: $1,081,617.20
ADDENDUM: 1 (12-15), 2 d/c (12-18), 3 (1-20), 4 d/c (2-2)
American Paving Co. Fresno 559-268-9886 FX 268-2908
G. Bartlett Construction Porterville 559-781-4257 FX 781-6849
Granite Construction Co. Fresno 559-441-5768 FX 441-5791
Griffith Company Bakersfield 661-392-6652 FX 393-9525
Hobbs Construction, Inc. Fresno 559-434-6182 FX 434-6184
JTS Construction Bakersfield 661-835-9270 FX 835-8424
Lee’s Paving, Inc. Visalia 559-651-1337 FX 651-2335
Marko Construction Group Fresno 559-222-7888 FX 222-0888
Speciality Construction San Luis Obispo 805-543-1706 FX 543-1712
Western Water Constructors, Inc. Santa Rosa 707-540-9640 FX 540-9641
Whitaker Construction Inc. Paso Robles 805-226-4020 FX 226-4021
#ONLINE 6 PACIFICA 2/18 2PM HOLIDAY INN EXPRESS & SUITES (ONLINE ONLY)
PROJ MGR: See Bidding General For Questions Plans: Midstate Construction, Petaluma 707-762-3200 FX
707-762-0700
PROJ INFO: Combine existing hotel site with newly acquired northerly site into one property. Demolish existin
g
residential structure near creek to allow new addition. Demolish existing commercial bldg. in
northerly property to allow new addition & landscaping. Existing creek side landscaping to remain
& be protected during construction. Existing Hotel: Conversion of high ceiling space above
existing breakfast room to 1 guestroom at 2nd floor, enlarge 1 existing 3rd floor guestroom,
conversion of parking spaces to hotel space & motorcycle parking, convert 2 existing parking
spaces for new driveway into new parking garage. Creekside addition: addition of 9 upper floor
guest rooms, breakfast room, meeting space & back-of-house renovation. Northerly site
addition: addition of 36 upper floor guest rooms, ground floor retail & parking garage.
ADDENDUM: 1 (2-2)
Midstate Construction Petaluma 707-762-3200 FX 762-0700
Slatter Construction Santa Cruz 831-425-5425 FX 425-1406
#ONLINE 15 KEYES 2/18 3PM NEW DOLLAR GENERAL (ONLINE ONLY)
PROJ MGR: See Bidding General For Questions Plans: Stout Building Contractors, Centerville UT 801-296-
2150 FX 801-294-5085
PROJ INFO: New
Stout Building Contractors Centerville UT 801-296-2150 FX 294-5085
#ONLINE 66 SANTA CRUZ 2/18 10:30AM STUDENT LIFE SEISMIC CORRECTIONS PH 2A
CARDIFF HOUSE 1329 (ONLINE ONLY)
PROJ MGR: UCSC 831-459-2366
PROJ INFO: Seismic corrections Phase 2A Cardiff House
PRE BID: Mandatory 1/22 1:30PM
ENG EST: $750,000.00
ADDENDUM: 1 (2-10), 2 (2-10)
Cen-Con, Inc. Santa Cruz 831-459-9270 FX 459-9297
James R. Griffin Inc. Fremont 510-792-6515 FX 791-1639
#ONLINE 67 SANTA CRUZ 2/18 1:30PM STUDENT LIFE SEISMIC CORRECTIONS PH 2A
REDWOOD BUILDING & STUDENT UNION 3619
(ONLINE ONLY)
PROJ MGR: UCSC 831-459-2366
PROJ INFO: Seismic corrections Phase 2A Redwood Building & Student Union
PRE BID: Mandatory 1/22 11:30AM
ENG EST: $2,525,000.00
ADDENDUM: 1 (2-10), 2 (2-10)
Cen-Con, Inc. Santa Cruz 831-459-9270 FX 459-9297
James R. Griffin Inc. Fremont 510-792-6515 FX 791-1639
#ONLINE 68 SAN RAFAEL 2/18 11AM PLANT IMPROVEMENTS 2015 PHASE 1 (ONLINE
ONLY)
PROJ MGR: Las Gallinas Valley Sanitary District 415-472-1033 Irene Huang
PROJ INFO: Marinwood Pump Station panel installation, upgrades, digester mixingpump, plant lighting, grit
washer installation
PRE BID: Mandatory 2/4 8AM
West Bay Builders Novato 415-456-8972 FX 459-0665
#66 OAKLAND 2/19 2PM 1110 JACKSON MIXED USE
PROJ MGR: See Bidding General For Questions Plans: Branagh Inc., Oakland 510-638-6455 FX 510-562-
8371
PROJ INFO: New 71 unit multi-family apartment
ADDENDUM: 1 w/drw (2-9)
BULLETIN: 1 d/c (1-26), 2 (2-9)
Branagh Inc. Oakland 510-638-6455 FX 562-8371
#ONLINE 38 MOUNTAIN VIEW 2/19 12PM RESIDENCE INN (ONLINE ONLY)
PROJ MGR: See Bidding General For Questions Plans: SD Deacon, Citrus Heights 916-969-0900 FX 916-
735-0800
PROJ INFO: Demolition of 4 existing buildings and construction of a new Ground up 4 story 22,612 sf Guest
Tower Residence Inn with site and offsite work to include: demolition, surveying, earthwork,
erosion control, utilities, landscape, steel, rough carpentry finish carpentry / architectural
millwork, cultured marble /solid surfaces, waterproofing, insulation, metal, joint sealer, doors &
hardware, storefront, windows, lath & plaster, metal stud / drywall, ceramic tile, acoustical
painting, toilet partitions / accessories, shelving, linen chutes, residential cabinetry, window
treatment, FF&E, elevator HVAC, electrical, fire alarm, and joint trench.
ADDENDUM: 1 (1-27), 2 (1-27), 3 (1-27), 4 (1-27), 5 (2-3)
SD Deacon Citrus Heights 916-969-0900 FX 735-0800
#ONLINE 43 SACRAMENTO 2/19 4PM K STREET 700 BLOCK (ONLINE ONLY)
PROJ MGR: TMCS, Inc. 916-779-8012 FX 916-779-8011
PROJ INFO: Scope of work: complete demolition of adjacent structures and partial demolition of existing
historical structure. Construction of a new 6-story 222,649 sf building with a new 28,834 sf 2-level
77 space parking garage including all associated site improvements, landscaping, and site
utilities. The 6-story 222,649 sf building consists of 137 residential apartments over garage
podium. The project also consists of a structural retrofit and remodel of a 57,525 sf historical
building for commercial and retail use. BP #2; Balance of project trades
PRE BID: BP #2 2/10 1PM
#ONLINE 53 SACRAMENTO CO 2/19 2PM TWITCHELL ISLAND RADIO TOWER PROJECT
4255 (ONLINE ONLY)
PROJ MGR: Co, DPW 916-874-6544
PROJ INFO: New tower includes new prefabricated communications shelter
PRE BID: 1/21 & 1/27 10AM
ENG EST: $650,000.00
ADDENDUM: 1 d/c (1-30)
American River Construction, Inc. El Dorado 530-621-1785 FX 621-0360
Bobo Construction, Inc. Sacramento 916-383-7777 FX 383-1681
BRCO Constructors, Inc. Loomis 916-652-3868 FX 652-3922
Dutra Construction San Rafael 415-258-6876 FX 459-3295
Global Tower Services, Inc. Woodland WA 360-225-8800 FX 225-8200
L.D. Strobel Co., Inc. Concord 925-686-3241 FX 686-3350
Myers and Sons Construction, LP Sacramento 916-283-9950 FX 614-9520
Robert Burns Stockton 209-943-6969 FX 943-1718
Z-Squared Construction Folsom 916-358-9056 FX 358-9286
#ONLINE 62 ANTIOCH 2/19 2PM BUCHANAN CROSSINGS (ONLINE ONLY)
PROJ MGR: See Bidding General For Questions Plans: Midstate Construction, Petaluma 707-762-3200 FX
707-762-0700
PROJ INFO: Tenant improvements
ADDENDUM: 1 (2-11), 2 (2-11)
Midstate Construction Petaluma 707-762-3200 FX 762-0700
Stuart James Construction, Inc. Rocklin 916-608-4800 FX 608-4810
Tilton Pacific Bids Due 2/18 @ 10AM Rocklin 916-630-7200 FX 630-4982
#ONLINE 51 SONORA 2/19 12:30PM TUOLUMNE COUNTY MOTHER LODE REGIONAL
JUVENILE DETENTION FACILITY (ONLINE ONLY)
PROJ MGR: Vanir CM 916-575-8888 Shawn Strohman
PROJ INFO: Construct new 30 bed detention facility
PRE BID: 2/5 1PM
ENG EST: $14 million
ADDENDUM: 1 (2-11)
Broward Builders Inc. Woodland 530-666-5635 FX 666-5723
Lewis C. Nelson And Sons, Inc. Selma 559-896-1443 FX 896-8609
Zovich Construction Hayward 510-784-1273 FX 784-0173
#ONLINE 16 BERKELEY 2/20 12PM HOTEL @ 1499 UNIVERSITY AVENUE (ONLINE
ONLY)
PROJ MGR: See Bidding General For Questions Plans: Huff Construction, Modesto 209-545-7505 FX 209-
545-4767
PROJ INFO: New construction of 19,00 sf / 3 story / 39 room hotel & related sitework
ADDENDUM: 1 thru 8 (2-6)
Huff Construction Modesto 20-545-7505 FX 545-4767
#16 SO SAN FRANCISCO 2/24 2PM SOUTH SAN FRANCISCO MUNICIPAL SERVICES
BUILDING ATRIUM RESTROOM
PROJ MGR: City, Engng 650-829-6652
PROJ INFO: Modernization
PRE BID: Mandatory 2/12 11AM
ENG EST: $345,000.00
Rodan Builders, Inc. Burlingame 650-508-1700 FX 508-1705
#ONLINE 32 SAN RAMON 2/25 2PM DOUGHERTY VALLEY HIGH SCHOOL
CLASSROOM BUILDING ADDITION (ONLINE
ONLY)
PROJ MGR: SRVUSD, Facilities 925-552-2960
PROJ INFO: Classroom building addition
PRE BID: Optional Pre Bid 2/2 4PM (1-29)
ADDENDUM: A1 (1-12), A2 d/c (1-29), A3 (2-4)
Alten Construction, Inc. Richmond 510-234-4200 FX 234-4221
Beals Martin Redwood City 650-364-8141 FX 367-7645
BHM Construction, Inc. Vallejo 707-643-4580 FX 643-4581
Bobo Construction, Inc. Sacramento 916-383-7777 FX 383-1681
Broward Builders Inc. Woodland 530-666-5635 FX 666-5723
Cal-Pacific Construction Pacifica 650-557-1238 FX 557-1239
Calstate Construction Fremont 510-657-1800 FX 657-1810
CLW Builders, Inc. San Francisco 415-333-9788 FX 333-9787
D.L. Falk Construction Inc. Hayward 510-887-6500 FX 887-6501
Diede Construction Lodi 209-369-8255 FX 368-0600
F & H Construction Lodi 209-931-3738 FX 931-4427
Flint Builders Roseville 916-757-1000 FX 797-7400
Joseph Murphy Construction Livermore 925-735-3000 FX 371-0277
Lathrop Construction Benicia 707-746-8000 FX 746-8080
Roebbelen Contracting, Inc. El Dorado Hills 916-939-1110 FX 939-4027
Rodan Builders, Inc. Burlingame 650-508-1700 FX 508-1705
SW Allen Construction Sacramento 916-344-2098 FX 344-0307
Sausal Corporation San Leandro 510-568-6600 FX 632-9769
Strawn Construction, Inc. San Jose 408-286-1299 FX 286-1288
Taber Construction, Inc. Concord 925-682-6133 FX 682-6122
Vila Construction Richmond 510-236-9111 FX 236-4979
W.A. Thomas Co. Martinez 925-228-9600 FX 228-6932
W.E. Lyons Construction Co. Walnut Creek 925-658-1600 FX 949-4658
West Bay Builders Novato 415-456-8972 FX 459-0665
Zovich Construction Hayward 510-784-1273 FX 784-0173
#8 SUNNYVALE 2/25 12PM LAWRENCE CENTER
PROJ MGR: See Bidding General For Questions Plans: Group One Construction, Campbell 408-378-8900 FX
408-378-8901
PROJ INFO: Exterior Façade Remodel of (03) buildings along with site work. Work to include testing &
inspections, progressive clean up, final clean up, building demolition, grading, asphalt paving &
seal coat, striping & signage, site concrete, landscaping & irrigation, reinforced steel, structural
concrete, stone veneer, structure steel, steel handrails, entrance tunnels, rough carpentry, roof
structure system, metal roofing, built up roofing, sheet metal flashing, roof hatches, caulking
sidewalks & building, doors / frames/ hardware, glass storefront system, lath & plaster
scaffolding, drywall & metal studs, exterior painting, signage building numbers, roof & overflow
drains, gas & condensate, fire sprinklers, plumbing, new shell & site electrical and safe-off.
Group One Construction Campbell 408-378-8900 FX 378-8901
#57 SUNNYVALE 2/27 5PM CLASSIC 300 IOWA / PALOMA PLACE
PROJ MGR: See Bidding General For Questions Plans: Nexgen Builders, East Palo Alto 650-322-5800 FX
650-322-5806
PROJ INFO: 13 single family homes w / associated on / off sitework
Nexgen Builders E Palo Alto 650-322-5800 FX 322-5806
#ONLINE 59 SAN FRANCISCO 3/3 2PM VISITACION VALLEY ELEMENTARY SCHOOL
11524 SFUSD (ONLINE ONLY)
PROJ MGR: SFUSD 415-241-6152
PROJ INFO: Modernization
PRE BID: Mandatory 2/12 & 2/19 3PM
ENG EST: $7 million
Alten Construction, Inc. Richmond 510-234-4200 FX 234-4221
Cal-Pacific Construction Pacifica 650-557-1238 FX 557-1239
CLW Builders, Inc. San Francisco 415-333-9788 FX 333-9787
Rodan Builders, Inc. Burlingame 650-508-1700 FX 508-1705
Strawn Construction, Inc. San Jose 408-286-1299 FX 286-1288
West Bay Builders Novato 415-456-8972 FX 459-0665
#ONLINE 65 MODESTO 3/3 4PM YCCD DISTRICT OFFICE BUILDING MODESTO JR.
COLLEGE WEST CAMPUS #15-1725 (ONLINE
ONLY)
PROJ MGR: Kitchell CEM 209-575-6991
PROJ INFO: New district office building
PRE BID: Required Pre Bid 12/16 10AM
ADDENDUM: 1 (2-4)
Bernards Fresno 559-420-7505 FX 500-1333
Alten Construction, Inc. Richmond 510-234-4200 FX 234-4221
Zovich Construction Hayward 510-784-1273 FX 784-0173
#96E OAKLAND 3/5 2PM TASSAFARONGA RECREATION CENTER
INTERIOR REMODEL C464610
PROJ MGR: City, DPW 510-238-3389 Woojae Kim
PROJ INFO: Interior remodel
PRE BID: 2/17 10AM
ENG EST: $450,000.00
Bay Construction Oakland 510-658-7225 FX 658-4890
DAR Construction Benicia 707-310-7667 FX 888-557-3302
Euro Style Management North Highlands 916-331-4858 FX 880-5504
Rodan Builders, Inc. Burlingame 650-508-1700 FX 508-1705
#2 CUPERTINO 3/11 3PM ATHLETIC SUPPLY BUILDINGS DE ANZA
COLLEGE #1712-206
PROJ MGR: Foothill De Anza College District 408-864-5888
PROJ INFO: Install new modular buildings
PRE BID: Mandatory 2/18 10AM
#ONLINE 58 ROHNERT PARK 3/12 2PM CABERNET VILLAGE STUDENT HOUSING
RENOVATION 3030281 (ONLINE ONLY)
PROJ MGR: TWM Archts 415-472-5770
PROJ INFO: Student housing renovation
PRE BID: 2/19 2PM
ENG EST: $3 million
ADDENDUM: 1 (2-10)
Alten Construction, Inc. Richmond 510-234-4200 FX 234-4221
Diede Construction Lodi 209-369-8255 FX 368-0600
GCCI, Inc. Santa Rosa 707-545-2134 FX 545-2156
Midstate Construction Petaluma 707-762-3200 FX 762-0700
#25 RICHMOND 3/12 2PM KENNEDY HIGH SCHOOL DIGITAL FABRICATION
LABORATORY
PROJ MGR: WCCUSD 510-307-4540 Tierra Andrews
PROJ INFO: The project consists of, but is not limited to, the conversion of an existin
g
4,133 sf vocational shop
into a computer / 3D printing classroom and support offices. Work shall include selective
demolition, wall construction, storefront installation, signage, upgrades to existing data, electrical,
lighting and HVAC systems.
PRE BID: Mandatory 2/24 9:30AM
#10E` SAN JOSE 3/12 3PM #1502-003 HUFF GARDENS APARTMENTS REHAB
PROJ MGR: Housing Authority County Of Santa Clara email: isaura.ayala@hacsc.org Isaure Ayala
PROJ INFO: Rehab
ENG EST: $275,000.00
MISCELLANEOUS PROJECTS OUT TO BID
27E Napa Los Carneros Water District LCWD Recycled Water Pipeline CIP
#14733 2/12*
2PM
PROJ MGR: Napa Sanitation District 707-258-6000
PRE BID: Mandatory 1/8 2PM
ENG EST: $15.4 million
ADDENDUM: 1 d/c, 2, 3, 4, 5, 6
136E Contra Costa Co El Cerrito Veteran’s Hall Accessibility Improvements, 6401 Stockton
Avenue 2/12*
2PM
PROJ MGR: Co, DPW 925-313-2000
ENG EST: $128,000.00
ADDENDUM: 1
Online 4 Lodi Water Meter Program Phase 5 Meter Installation & Main Replacement
(Online Only) 2/12*
11AM
PROJ MGR: City, 209-333-6706
PRE BID: Mandatory 1/20 9AM
ADDENDUM: 1, 2
139E Santa Clara Valley Installation Of Cooling Units In Signal Bungalows C15004 2/12*
PROJ MGR: SCVTA Fax 408-955-9729 Del Sabeti 1:30PM
PRE BID: 1/29 10AM
ADDENDUM: 1, 2
138E Antioch Contra Loma Regional Park Swim Lagoon Resurfacing 06-15-260 2/12*
PROJ MGR: East Bay Regional Park District 510-544-2301 2PM
PRE BID: Mandatory 1/26 1PM
ENG EST: $144,000.00
14 Berkeley Re-Roofing & Solar Photovoltaic Project @ Cragmont Elementary
School 112.1401 2/12*
2PM
PROJ MGR: Berkeley Unified School District 510-644-6430
PRE BID: Mandatory 1/29 2PM
ADDENDUM: 1
Online 48 Fresno Generator Foundations & Securing To Foundations Pump Stations
(Online Only) 2/12*
2PM
PROJ MGR: City, Engng 559-621-1332
ADDENDUM: 1, 2
55E San Jose Capitol Expressway Soundwall, Phase 1 Between Capitol Ave &
North Jackson Avenue 2/12*
2PM
PROJ MGR: County Of Santa Clara, Roads & Airports 408-573-2485
Paul Pascoal
PRE BID: 2/3 10:30AM
ADDENDUM: 1
84E Mountain View Greening Of Library 10-34 2/12*
PROJ MGR: City, DPW 650-903-6311 2PM
ENG EST: $40,000.00-$50,000.00
ADDENDUM: 1 d/c, 2
149E Concord Todos Santos Plaza Archway 2294 2/13*
PROJ MGR: City, Engng 925-671-3361 11AM
PRE BID: Mandatory 2/6 11AM
ADDENDUM: 1
148E Monterey RFP For Design Services For ADA Upgrades To Pedestrian Signals
In Public Rights Of Way 2/13*
2PM
PROJ MGR: City, DPW 831-646-3997
ADDENDUM: 1, 2 d/c
57E Cupertino Cupertino Middle School Pedestrian Canopies 15-B07-24 2/13*
PROJ MGR: CUSD 408-252-3000 Brian Slaughter 2PM
PRE BID: Mandatory 2/3 1:30PM
ADDENDUM: 1
43E Cupertino Cupertino Middle School South Parking Lot 15-B08-24 2/13*
PROJ MGR: CUSD 408-252-3000 Brian Slaughter 3PM
PRE BID: Mandatory 2/3 2PM
ADDENDUM: 1
Online 25 San Francisco RFQ Design-Build Services Terminal 1 ( T1 ) Baggage Handling
System SFIA 10012.66 (Online Only) 2/13
2PM
PROJ MGR: SFIA Greg McCarthy email: greg.mccarthy@flysfo.com
PRE BID: 1/20 10AM
ADDENDUM: 1 d/c, 2
Online 14 Stockton Smart Classrooms Phase 2 (Online Only) 2/16
PROJ MGR: San Joaquin Delta College District 209-954-5065 2PM
PRE BID: Mandatory 2/13 9AM
ENG EST: $190,000.00
11 San Carlos Industrial Road Parallel Sanitary Sewer Project C9612-14 2/17*
PROJ MGR: City, DPW 650-802-4219 3PM
ENG EST: $4.5-5 million
ADDENDUM: 1 d & t/c, 2
Online 18 San Francisco TG08.6R Metal Ceiling Construction Services Transbay (Online Only) 2/17
PROJ MGR: Webcor / Obayashi 415-978-5700 2PM
PRE BID: 1/6 2PM
ADDENDUM: 1, 2 d/c
130E Oakland Install Motorized Rolling Gate, Security Turnstile, & Remove Fence
Man Door At OKS 15TK-160 2/17
2PM
PROJ MGR: Bart 510-464-6544
PRE BID: 2/3 10AM
ENG EST: $40,000.00-$60,000.00
Online 55 Modesto RFQ For Installation Of Shade Structure @ Pamela Monterosso
Trailhead (Online Only) 2/17
4PM
PROJ MGR: City, Parks Planning 209-571-5526
ADDENDUM: 1
65E Hayward New Highland 1530 Reservoir 604-07184 2/17*
PROJ MGR: City, Engng 510-583-4738 2PM
PRE BID: 2/5 2PM
ENG EST: $1,630,000.00
53E Monterey Perform Repairs / Replacement To Water Wells DPW-13015,
STACOM 2/17
2PM
PROJ MGR: City, DPW 831-646-3997
PRE BID: Mandatory 12/17 10AM
ADDENDUM: 1, 2 d/c, 3 d/c
121E Berkeley John Hinkel Clubhouse Emergency Demolition & Recovery Services 2/17*
PROJ MGR: City, Engng 510-981-6400 2PM
PRE BID: Mandatory 2/4 1PM
122E Pleasanton Bi-Annual Control Valve Improvements Project 141011 2/17
PROJ MGR: City, Engng 925-931-5650 2PM
19E Palo Alto City Hall Signing & Graphics 157657 2/17
PROJ MGR: City, DPW 650-329-2271 3PM
PRE BID: Mandatory 1/27 10AM
ADDENDUM: 1, 2 d/c
47E Livermore Brisa Street Sanitary Sewer Mainline Bottlenecks 1998-74 2/17*
PROJ MGR: City, Engng 925-960-4500 2:30PM
ADDENDUM: 1 d/c
91E Los Gatos Informal Bid Complete Streets: Green Bike Lane Pilot Project 2/17
PROJ MGR: Town, DPW 408-354-6824 Jason Baker 1PM
77E Monterey Street Resurfacing Slurry Seal Coat Project Springs 2015 2/17*
PROJ MGR: City, DPW 831-646-3997 2PM
ADDENDUM: 1 d/c
93E Fremont Indicator Wells Telemetry, Middlefield Reservoir Isolation Valve
Automation & Patterson Reservoir 2/17*
2PM
PROJ MGR: ACWD 510-668-4499
PRE BID: Mandatory 2/5 10AM
ENG EST: $110,000.00-$120,000.00
Online 26 Fresno Tulare Wireless ITS Project From C To Clovis Ave (Online Only) 2/17*
PROJ MGR: City, Engng 559-621-1332 3PM
PRE BID: 2/3 2PM
ENG EST: $530,000.00
ADDENDUM: 1, 2, 3
35E Alameda Co Improvement Of Haviland Avenue From Grove Way To Willow
Avenue 2188 2/17*
2PM
PROJ MGR: Co, DPW 510-670-5450
PRE BID: Mandatory 1/20 10AM
ADDENDUM: 1, 2 d/c , 3 d/c
128E Antioch Pavement Plugs & Base Repairs At Various Locations PW 328-9 2/17*
PROJ MGR: City, DPW 925-779-7050 2PM
ENG EST: $1,800,000.00
ADDENDUM: 1, 2, 3 d/c, 4
Online 47 Tracy Corral Hollow / Kavanagh Storm Drain Lift Station Rehab CIP 76065
(Online Only) 2/18
2PM
PROJ MGR: City, Engng 209-831-6454 Binh Nguyen
PRE BID: 1/28 10AM
85E Mountain View Dana Street Reconstruction 13-28 2/18*
PROJ MGR: City, DPW 650-903-6311 2PM
ENG EST: $180,000.00-$200,000.00
4E Burlingame Asphalt & Concrete Replacement & Repair Services Project 2014-
2015 2/18
2PM
PROJ MGR: City, DPW 650-558-7230
PRE BID: Mandatory 2/11 10AM
Online 52 Fresno Trailer, Solar Powered LED Message Board (Online Only) 2/18*
PROJ MGR: City, Engng 559-621-1332 3PM
13E San Francisco Gilman Playground Renovation 3211V 2/18*
PROJ MGR: City & Co, DPW 415-554-6229 2:30PM
PRE BID: 1/27 9:30AM
ENG EST: $1 million
ADDENDUM: 1 d/c, 2
Online 9 Santa Clara Trimble Road Trunk Sanitary Sewer Improvements Project CE-13-14-
02 (Online Only) 2/18*
3PM
PROJ MGR: City, 408-615-3013 Evelyn Liang
PRE BID: Mandatory 1/29 10AM
ADDENDUM: 1 d/c
32E Oakland Martin Luther King Jr Regional Shoreline Tidewater Entry
Modification 2/19
2PM
PROJ MGR: East Bay Regional Park District 510-544-2301
PRE BID: 1/27 10AM
ENG EST: $60,000.00
Secure 2 San Francisco Southeast Water Pollution Control Plant Sludge Thickening
Improvements, Phase 1 WW-608 Secure Project 2/19*
2PM
PROJ MGR: SFPUC 415-551-4603 (Secured Docs Please Ask Staff
For Bid Docs)
PRE BID: 2/5 10AM
ENG EST: $2.2 million
140E Richmond Street Lights Poles Replacement @ Fairmede / Hilltop Neighborhood 2/19*
PROJ MGR: City, Engng 510-621-1238 Yader Bermudez 2PM
PRE BID: Mandatory 1/23 10AM
Online 17 Dixon Wastewater Treatment Facility Water Supply Well Project (Online
Only) 2/19
2PM
PROJ MGR: City, DPW 707-678-7000
ADDENDUM: 1 d/c
40E Oakland Rehabilitation Of Sanitary Sewers Bounded By Mountain Blvd,
Joaquin Miller Rode C329144 2/19*
2PM
PROJ MGR: City, DPW 510-238-7760 Gunawan Santoso
PRE BID: 2/3 10:30AM
ENG EST: $5,154,120.00
129E San Francisco RFQ As Needed Lead-Based Paint & Asbestos Contractor Service
SFHA #14-620-QTE-0023-B 2/19
2PM
PROJ MGR: SFHA 415-715-3213
ADDENDUM: 1
Online 21 Vallejo Mare Island Western Approach Bridge Replacement (Online Only) 2/19*
PROJ MGR: City, DPW 707-648-4433 Tami Hansen 5PM
Online 36 Porterville Washer Grinder Equipment Replacement Project (Online Only) 2/19*
PROJ MGR: City, Engng 559-782-7451 2:30PM
147E Berkeley Survey Monument Replacement Project 15-10913 2/19
PROJ MGR: City, DPW 510-981-6400 2PM
Online 56 Sacramento Co Walegra Road @ Big Cloud Way Traffic Signal Project 4246 (Online
Only) 2/19
2PM
PROJ MGR: Co, DPW 916-874-6544
ENG EST: $510,000.00
ADDENDUM: 1 d/c, 2, 3
79E Oakland Lake Chabot Golf Course Driving Range Improvement C322810 2/19
PROJ MGR: City, DPW 510-238-7532 Lyle Oehler 2PM
PRE BID: 1/27 1PM
ENG EST: $445,000.00
1 Santa Clara Co Foothill Expressway Bicycle Detection 2/19
PROJ MGR: County Of Santa Clara, Roads & Airports 408-494-1390
Nora Chung 2PM
PRE BID: 2/11 2PM
48E San Jose Lawrence Expressway Median Weed Abatement Project 2/19
PROJ MGR: County Of Santa Clara, Roads & Airports 408-494-1329
Khoa Vo 2PM
62E Castro Valley Anthony Chabot Campground Fiberized Slurry Seal & Striping 2/19
PROJ MGR: East Bay Regional Park District 510-544-2301 2PM
PRE BID: Mandatory 2/5 10AM
ENG EST: $200,000.00-$225,000.00
Online 35 Fresno Slurry Seals Various Locations 14-22-C (Online Only) 2/19*
PROJ MGR: Co Of Fresno 559-600-4530 2PM
17E San Jose #1501-002 Boiler Replacement 2/19
PROJ MGR: Housing Authority County Of Santa Clara email:
isaura.ayala@hacsc.org Isaura Ayala 3PM
ENG EST: $120,000.00
ADDENDUM: 1, 2
124E Novato 12” Cast Iron Pipe Bursting South Novato Blvd-Rowland Blvd To
Sunset Parkway Project 2/20
2PM
PROJ MGR: North Marin Water District 415-761-8913 Eileen Blue
PRE BID: Mandatory 2/10 10AM
ENG EST: $130,000.00
Online 3 Stockton San Joaquin Delta Community College District Fencing Replacement
LA-8115-02 (Online Only) 2/20*
2PM
PROJ MGR: SJDCCD 209-954-5065
PRE BID: Mandatory 2/6 11AM
8E Aptos Cabrillo College Solar Water Heater Swimming Pool B15-03 2/23
PROJ MGR: Cabrillo College, Facilities 831-477-5640 2PM
PRE BID: Mandatory 2/10 10:30AM
ENG EST: $225,000.00
1E Oakland Install Safety Barriers In Right Of Way System Wide 15TF-121 2/24
PROJ MGR: Bart 510-464-6544 2PM
PRE BID: 1/27 10AM
ENG EST: $600,000.00-$800,000.00
52E Albany Pierce Street Park Construction Project C15-1 2/24
PROJ MGR: City, DPW 510-524-9543 11AM
PRE BID: 2/17 11AM
ENG EST: $975,627.00
Online 30 Stockton San Joaquin Delta Community College District Proposition 39 Year
Two Exterior Lighting 700 (Online Only) 2/24*
2PM
PROJ MGR: SJDCCD 209-954-5065
PRE BID: Mandatory 2/9 11AM
Online 60 Fresno West Avenue ITS Wireless, McKinley Avenue To Herndon Ave
(Online Only) 2/24
2PM
PROJ MGR: City, Engng 559-621-1332
PRE BID: 2/10 11AM
Online 13 San Francisco Islais Creek Phase II Maintenance & Operations Building 1279R
(Online Only) 2/24*
3PM
PROJ MGR: SFMTA 415-701-4232
PRE BID: 1/27 10AM
ADDENDUM: 1, 2 d/c
Online 39 Fresno Friant-Nees-Palm Intelligent Transportation System Palmdon (Online
Only) 2/24
3PM
PROJ MGR: City, Engng 559-621-1332
PRE BID: 2/12 1:30PM
ENG EST: $950,000.00
ADDENDUM: 1
19 Salinas E. Alisal Street & Skyway Boulevard Roundabout 9655 2/24
PROJ MGR: City, DPW 831-758-7241 2PM
ADDENDUM: 1
Online 10 Stockton Blanchard & Marcopulos Gym Floor Refinishing (Online Only) 2/24
PROJ MGR: San Joaquin Delta College 209-954-5065 11:30AM
PRE BID: Mandatory 2/12 1:30PM
ENG EST: $85,000.00
22 Monterey Neighborhood Improvement Program Traffic Calming 2/24
PROJ MGR: City, DPW 831-646-3997 2PM
109E Salinas Salinas Source Water Industrial Wastewater Diversion Project 2/24*
PROJ MGR: MRWPCA 831-883-6172 2PM
PRE BID: 2/4 10AM
ADDENDUM: 1, 2
58 Berkeley Camera & Public Address @ Multiple School Sites 901-1401 2/24
PROJ MGR: Berkeley Unified School District 510-644-6430 2PM
PRE BID: Mandatory 2/13 9AM
13 Concord Treat Boulevard / Clayton Road / Denkinger Road Intersection
Capacity Improvements 2144 2/25*
2PM
PROJ MGR: City, Engng 925-671-3422 Mark Migliore
ENG EST: $1,000,000.00-$1,250,000.00
ADDENDUM: 1 d/c, 2
16E San Francisco As-Needed Pavement Preservation FY 2015-2016 2564J 2/25
PROJ MGR: City & Co, DPW 415-554-6229 2:30PM
PRE BID: 2/11 1:30PM
ENG EST: $2.9 million
42E San Francisco Pier 49 ( J1 ) Under Pier Sewer Piping Replacement Project 2772 2/26
PROJ MGR: Port 415-274-0411 10:30AM
PRE BID: 2/12 10:30AM
ENG EST: $1,150,000.00
ADDENDUM: 1
145E Union City 2014-15 Wheelchair Ramp Project 15-03 2/26
PROJ MGR: City, DPW 510-675-5308 2PM
Secure 3 San Francisco As-Needed Ductile Iron Water Main Replacement @ Various
Locations WD-2783 Secure Project 2/26
2PM
PROJ MGR: SFPUC 415-551-4603 (Secured Docs Please Ask Staff
For Bid Docs)
PRE BID: 2/10 10AM
ENG EST: $7.3 million
Online 63 Sacramento ADA Curb Ramp Project 2015 4253 (Online Only) 2/26
PROJ MGR: Co, Department Of General Services 916-874-6544 2PM
ENG EST: $660,000.00
Online 34 Fresno Cedar Avenue Bike Lanes 14-19-C (Online Only) 2/26
PROJ MGR: Co Fresno 559-600-4530 2PM
ADDENDUM: 1
97E San Jose 6896 Sanitary Structures Cover Plate Repair 2/26
PROJ MGR: City, DPW 408-535-5666 Aziza Amiri 3PM
PRE BID: Mandatory 2/17 10AM
ADDENDUM: 1
94E San Jose 7726 On Call General Building Contract For Facilities & Parks 2/26
PROJ MGR: City, DPW 408-535-8441 Jim Wilson 3PM
98E San Jose 7132 Coyote Road & Scarlett Way Sanitary Sewer Replacement 2/26
PROJ MGR: City, DPW 408-535-8300 William Parker 3PM
99E San Jose 7871 2015 Remove & Replace Asphalt Concrete Pavement Project 2/26
PROJ MGR: City, Department Of Transportation 408-794-1962 Lam Cruz 3PM
100E San Jose 7462 Miscellaneous Sanitary Sewer Repairs FY 2014-2015 Package
III 2/26
3PM
PROJ MGR: City, DPW 408-793-4168 Mellownie Salvador
111E Alameda RFP Design Of Cross Alameda Trail Jean Sweeney Open Space Park 2/26
PROJ MGR: City, Recreation & Parks 510-747-7570 Amy Wooldridge 2PM
PRE BID: Mandatory 2/17 3PM
7E Brentwood Blue Goose Park Improvements Parking Lot Expansion 352-52421 2/26
PROJ MGR: City, Parks & Recreation 925-516-5362 Tammy Homan 2PM
ENG EST: $147,000.00
143E Los Altos Hills 2014 Pavement Rehabilitation Project 2 3/3
PROJ MGR: Town, DPW 650-941-7222 2PM
ADDENDUM: 1
78E Tiburon Dairy Knolls Stair & Path Improvements 3/3
PROJ MGR: Town, DPW 415-435-7373 3PM
ADDENDUM: 1
Online 23 Tracy 11th Street East Tracy Overhead Bridge Replacement CIP 73063
(Online Only) 3/3
2PM
PROJ MGR: City, Engng 209-831-6452 Zabih Zaca
PRE BID: 2/11 10AM
17 Cupertino Monta Vista Storm Drain Improvements 3/3
PROJ MGR: City, DPW 408-777-3354 2PM
PRE BID: 2/18 10AM
3E Brentwood Treescape Corporation Yard 542-54020 3/3
PROJ MGR: City, Engng 925-516-5420 2PM
ENG EST: $400,000.00
5E San Francisco San Francisco Ferry Terminal Utility & Roof Rehabilitation 2015-FT-
10 3/3
2PM
PROJ MGR: GGB 415-923-2334
PRE BID: 2/17 11AM
86E Burlingame Neighborhood Storm Drain Project #7 84090 3/3
PROJ MGR: City, DWP 650-558-7230 2PM
Online 49 Fresno Willow Avenue ITS From Ashlan To International Avenues (Online
Only) 3/3
3PM
PROJ MGR: City, Engng 559-621-1322
PRE BID: 2/17 1:30PM
ENG EST: $1,167,400.00
ADDENDUM: 1
Online 31 Fresno Rehabilitate 16” Diameter Well @ Pump Station 244 3360 (Online
Only) 3/3
3PM
PROJ MGR: City, Engng 559-621-1332
144E Atherton 2014 Atherton-Fair Oaks-Middlefield Maintenance Project 56065 3/4
PROJ MGR: Town, DPW 650-752-0555 David Huynh 3PM
ENG EST: $435,000.00
70E Menlo Park Belle Haven Sewer Project Replacement & Construction Of Sanitary
Sewer Mains 3/4
2PM
PROJ MGR: West Bay Sanitary District 650-321-0384
PRE BID: 2/18 10AM
Online 12 Fremont Rubber Dam No. 1 Replacement 11G14 (Online Only) 3/4
PROJ MGR: ACWD 510-668-4499 3PM
ENG EST: $1,250,000.00-$1,375,000.00
106E Sunnyvale Roof Replacement For Fire Stations #1, #3, #4, & #6 PR-14 / 04-15 3/4
PROJ MGR: City, DPW 408-730-7403 3PM
PRE BID: 2/24 10:30AM
15 Sunnyvale Pavement Rehabilitation 2015 PW 15-15 3/4*
PROJ MGR: City, DPW 408-730-7403 3PM
ADDENDUM: 1 d/c
3 Cupertino Kiosk Project De Anza College #1719-218A 3/5
PROJ MGR: Gilbane De Anza 408-864-5888 3PM
PRE BID: Mandatory 2/4 10AM
Online 8 San Francisco RFP Construction Manager / General Contractor To Provide Pre-
Construction Services 1289 (Online Only) 3/5
4PM
PROJ MGR: SFMTA 415-701-4742 Joon Park
PRE BID: 2/10 3PM
ENG EST: $135 million
56E Sacramento Tree Removal & Site Demolition Project Sacramento River East
Levee Reach 19A Florin Creek Basin Phase 1 #4266 3/5
2PM
PROJ MGR: Sacramento Area Flood Control Agency 916-874-6544
PRE BID: 2/12 10AM
ENG EST: $150,000.00-$200,00.00
Online 50 Oakley CIP 164 Main Street Rehabilitation & Resurfacing Project Bridgehead
Road To Big Break Road (Online Only) 3/5
2PM
PROJ MGR: City, DPW 925-625-7037
9 Union City Mission Boulevard Undergrounding Project Decoto Road To 7th
Street 07-06 3/5
2PM
PROJ MGR: City, DPW 510-675-5308
ENG EST: $1,261,000.00
24 Fremont Central Park Turf & Poplar Renovation 7859 3/5
PROJ MGR: City, DPW 510-494-4530 Mark Mennucci 2PM
PRE BID: 2/17 10AM
ENG EST: $866,000.00
6E Martinez Pacheco Boulevard Sidewalk Gap Closure, Phase II 3/10
PROJ MGR: Contra Costa County, DPW 925-131-2000 2PM
PRE BID: 2/23 10AM
ENG EST: $510,000.00
11E Alameda Co Drainage Inlet Structure Replacement Various Locations On Foothill
Road & Mines Road 2290 3/10
2PM
PROJ MGR: Co, DPW 510-670-5450
PRE BID: Mandatory 2/24 10AM
18 Richmond North Richmond Pump Station Diversion Project Corner Of Gertrude
Avenue & Richmond Parkway 3/10
2PM
PROJ MGR: Contra Costa Co, DPW 925-313-2000
PRE BID: 2/18 2PM
ENG EST: $345,000.00
Online 29 Fresno Orange Avenue Pavement Overlay From Butler To California (Online
Only) 3/10
3PM
PROJ MGR: City, Engng 559-621-1332
PRE BID: 2/25 10AM
ENG EST: $460,000.00
Online 61 San Francisco RFQ Project Management Support Services (PMSS) For
Consolidated Administration Campus (CAC) Phase 1 8872A.41
(Online Only)
3/10
2PM
PROJ MGR: SFIA 650-821-5317
PRE BID: 2/13 10AM
Online 2 San Francisco TG08.7 Glass Floors Transbay (Online Only) 3/10
PROJ MGR: Webcor / Obayashi 415-978-1000 2PM
PRE BID: 1/20 2PM
ADDENDUM: 1, 2
Online 54 Oakland Runway 10R-28L Shoulder Rehabilitation, North Field (Online Only) 3/11
PROJ MGR: Port 510-627-1364 2PM
PRE BID: 2/25 9:30AM
ENG EST: $311,000.00
23 Oakland Restoration Of San Leandro Creek Line P Between Hegenberger Rd
FC 12-D-195 3/11
2PM
PROJ MGR: Co Of Alameda, DPW 510-670-5450
80E Los Altos Hills Foothill College Loop Road Resurfacing Project 1717-132 3/12
PROJ MGR: Gilbane 650-949-6915 3PM
PRE BID: Mandatory 2/18 10AM
107E Concord Roof Replacement, 2099 Arnold Industrial Way 3/12
PROJ MGR: Contra Costa County, DPW 925-313-2000 2PM
PRE BID: 2/18 2PM
ENG EST: $300,000.00
Online 1 San Francisco TG13.2 Roofing / Waterproofing Transbay Center (Online Only) 3/12
PROJ MGR: Webcor / Obayashi 415-978-5700 FX 415-476-3005 2PM
PRE BID: 9/18 2PM
ADDENDUM: 1, 2, 3 d/c, 4
NOTE: ASI drawings added
2E San Leandro Site Improvement At San Leandro Station 15QH-170 3/17
PROJ MGR: Bart 510-464-6544 2PM
PRE BID: 2/23 10AM
ENG EST: $200,000.00-$250,000.00
Online 57 San Francisco TG08.4 Metal Panels Construction Services Transbay (Online Only) 3/19
PROJ MGR: Webcor / Obayashi 415-978-5700 FX 415-476-3005 2PM
PRE BID: 11/19 2PM
ADDENDUM: 1 d/c
95E San Francisco RFP For Full Elevator Preventive Maintenance & Related Services 3/27
PROJ MGR: SFHA 415-715-3213 2PM
PRE BID: 2/19 10AM
*Bid list on file at the Exchange
The bidders listed may not represent all of the potential bidders on each project. The Builders Exchange does not
assume responsibility in determining if all bidders have been identified. Any general contractor wishing to add or delete
their name from the list is requested to inform the Exchange. We receive plans that are out of our area. We do not verify
list on these projects. We do confirm our regular sources to insure lists are as complete as possible.
CALTRANS PROJECTS OUT TO BID
(* = Addendums on Project)
# Bid Date Bid Time Zone & Project Location
C-25 2/12 2PM 04-1J5204 04-SM,Ala-84
Install Sidewalk, Site Furnishings
C-27 2/12 2PM* 01-0B4604 01-Hum-299
Soldier Pile Retaining Wall
C-30 2/12 2PM* 03-1F4204 03-Butt-99
Widen Shoulder On Structure
C-22 2/18 2PM 03-4M7904 03-But-99
PCC Grinding & Replace Slabs
C-11 2/18 2PM* 04-259404 (Online Only) 04-Nap-29
Overlay, Roadway, Widening
C-01 2/18 2PM 05-1F8804 05-SCr-152
Slurry Seal Existing Roadbed
C-26 2/19 2PM* 04-4A4804 04-Ala-260
Replace Guardrail
C-17 2/24 2PM 10-1C9004 10-Sta-132
Repair Failed Areas
C-07 2/25 2PM* 01-0B4104 01-Hum-101
Rock Slope Protection
C-04 2/25 2PM 02-0H0104 02-Sis-89
Place HMA
C-14 2/25 2PM 06-0S1904 06-Tul-198
Construct Individual Slab Replacement
C-32 2/25 2PM* 10-0W5604 10-SJ-12
Repair Pavement Failure
C-06 2/26 2PM 02-4G3404 02-Mod-299
Cold In Place Recycle HMA
C-16 2/26 2PM 10-0Y9404 10-Ama-88
Rubberized HMA Resurfacing
C-28 2/26 2PM* 02-0E3604 02-Teh-5
Rehabilitate & Reconstruct Safety Roadside Rest Areas
C-03 3/3 2PM 01-262054 01-Men-101
Wetland & Riparian Planting
C-21 3/3 2PM 03-0G1904 03-Sac-104
Hot Applied Chip Seal
C-12 3/4 2PM* 04-013524 04-SF-Ala-80
Remove Bridge (Portion)
C-05 3/5 2PM* 04-264094 (Online Only) 04-Mrn,Son-101
Realign Highway
C-20 3/5 2PM 03-0G1704 03-Pla-28
Micro Surfacing
C-23 3/5 2PM 05-1F8704 05-SLO-46
Remove Wire Mesh Fences
C-09 3/11 2PM 03-4F7004 03-Pla-80
Increase On & Off-Ramp Radius
C-18 3/12 2PM 04-4G1204 05-Tri-3,36
Cold In Place Recycle
C-24 3/17 2PM 06-0M0204 06-Fre-168
Construct Retaining Walls
C-02 3/18 2PM 04-235624 04-SCl,SM-101
Replace Bridge
C-15 4/8 2PM* 04-0J9404 04-Ala-5706
Install Wash Racks
BID RESULTS & APPARENT LOW BIDDER
Location Project Bid Date & Amt
San Francisco SFUSD McKinley Elementary School 2-3-15
Cal Pacific Const. $4,218,000.00
Sonoma Co State Route 12 Corridor Improvement Project Phase II, Stage 2 2-4-15
O.C. Jones & Sons, Inc. $5,233,133.60
Alameda Alameda Interceptor Rehabilitation SD-365 2-4-15
California Trenchless $2,390,000.00
San Carlos Fire Station No. 16 Seismic Upgrade Project 2-4-15
CWS Const. $33,800.00
San Francisco Alamo Elementary Safe Routes To School 2199J 2-4-15
Bay Area Lightworks, Inc. $304,779.00
Soquel Mountain ES Sitework For New PC Portable Classroom Buildings 15-01 2-5-15
CRW Industries $211,664.00
Sacramento Co Main Line Lining For Root Mitigation Project 2 4267 2-5-15
Insituform Technologies $914,390.00
Mountain View Landfill Gas Flare Replacement 14-52 2-5-14
D. W. Nicholson Corp. $435,390.00
Hayward HVAC Upgrade At San Felipe Community Center 2-5-15
Trimline Sheet Metal HVAC $109,445.00
Porterville Miscellaneous Repair Of Downtown Parking Lots Project 2-5-15
Bush Engineering, Inc. $445,217.00
Sacramento Co Flow Equalization (FEQ) Sacramento Regional Wastewater Treatment Plant 2-5-15
Steve P. Radeos, Inc. $100,060.00
Sacramento Co Place High Friction Surface Treatment 03-4F1304 2-5-15
Western Structures $2,076,611.25
San Francisco Site Remediation At 520 John Muir Drive WD-2750 2-5-14
ERRG, Inc. $9,210,716.00
Sacramento Co Howe Avenue Elementary Safe Routes To School El Camino Avenue 4237 2-5-15
Sierra National Const. $670,588.00
San Carlos El Camino Real Lighting And Landscaping-Bush To Arroyo C9490 2-6-15
W. Bradley Electric, Inc. $443,921.50
Dublin Irrigation System Upgrades 14-16 2-9-15
POMS Landscaping Inc. $99,140.00
Sacramento Co Site Preparation Project 4206 2-10-15
C. Overra & Co. $3,121,000.00
Fremont Winter 2015 Potable Water Storage Facilities Cleaning & Inspection 2-10-15
DRS Marine Inc. $67,350.00
Martinez Treatment Plant Safety Enhancements, Phase 4 7311 2-10-15
Aztec Consultants, Inc. $724,000.00
Antioch Sidewalk & Pedestrian Improvements PW #409-3 2-10-15
J.J. R. Const., Inc. $594,841.00
Prime Owner Address City Date
Agbayani Constr Corp County of Santa Clara East Wing Patio ADA San Jose 1/12/2015
Agbayani Constr Corp County of Santa Clara 701 South Abel Street Milpitas 1/12/2015
Agbayani Constr Corp County of Santa Clara 70 West Hedding San Jose 1/12/2015
Agbayani Constr Corp County of Santa Clara Public Defender Office Palo Alto 1/12/2015
Anaya Constr Santa Clara Unified Sch Dist Santa Clara H S Santa Clara 1/12/2015
Blydan Corp Clarum Hansen Lane LLC 421 Mundell Way Los Altos 1/12/2015
Brookfield Brookside LLC Brookfield Brookside LLC 1817 Sycamore Creek San Jose 1/13/2015
Calstate Constr Inc City of San Jose Happy Hollow Park San Jose 1/13/2015
Casey Constr City of San Jose Various Locations San Jose 1/13/2015
CM Floor Covering Inc Santa Clara Unified Sch Dist Santa Clara H S Santa Clara 1/13/2015
Cratus Inc City of San Jose Various Locations San Jose 1/13/2015
D R Horton Bay Inc D R Horton Bay Inc 238 Windsong Way Gilroy 1/13/2015
Degan Dev Corp City of San Jose 3382 Woodside Lane San Jose 1/13/2015
Dividend Homes Inc MH Connemara 2013 LLX 15165 La Alameda Morgan Hill 1/13/2015
Firoz Fradpah City of San Jose Margaret Street at 13th San Jose 1/13/2015
Flores Remodeling Flora Juarez 1424 Bal Harbor Way San Jose 1/13/2015
Green Valley Corp City Heights Dev LP 175 West Saint James Street # 1502 San Jose 1/13/2015
Guerra Constr Group Santa Clara Unified Sch Dist 1925 Scott Blvd Santa Clara 1/13/2015
Guerra Constr Group Santa Clara Unified Sch Dist 3421 Monroe Street Santa Clara 1/13/2015
Ibarra Wiring Systems Santa Clara Unified Sch Dist Santa Clara H S Santa Clara 1/13/2015
Integrated Water Svcs Inc City of Santa Clara 909 Kiely Blvd Santa Clara 1/14/2015
Jensen Corp Landcsape Santa Clara Unified Sch Dist Wilcox Santa Clara 1/14/2015
Jos J Albanese Inc Santa Clara Unified Sch Dist Wilcox Santa Clara 1/14/2015
K Hovnanian at Gilroy 60 lLC K Hovnanian at Gilroy 60 lLC 43 Sister City Way Gilroy 1/14/2015
KB Home So Bay Inc KB Home So Bay Inc 110 Palomino Place Gilroy 1/14/2015
KB Home So Bay Inc KB Home So Bay Inc 130 Palomino Place Gilroy 1/14/2015
Landmark Property Placer Oaks LP 105 Placer Oaks Court Los Gatos 1/14/2015
Pacific Underground Constr City of San Jose Various Locations San Jose 1/14/2015
Pullman Constr Foothill DeAnza Comm College Dist 21250 Stevens Creek Blvd Cupertino 1/15/2015
Pulte Home Corp Pulte Home Corp 1138 Genco Terr San Jose 1/15/2015
Pulte Home Corp Pulte Home Corp 2083,2087,2091,2095,2099,2105 Vincenzo Walk
w
San Jose 1/15/2015
Pulte Home Corp Pulte Home Corp 2123 Vincenzo Walkway San Jose 1/15/2015
Pulte Home Corp Pulte Home Corp 1134 Genco Terr San Jose 1/15/2015
Pulte Home Corp Pulte Home Corp 1100 Genco Terr 1113 Calamint Terr San Jose 1/15/2015
RC Benson & Sons Inc Foothill DeAnza Comm College Dist 21250 Stevens Creek Blvd Cupertino 1/15/2015
Silverado Contractor Inc City of Gilroy 7400 Railroad Street Gilroy 1/15/2015
Stephen Ciari Plumbing Santa Clara Unified Sch Dist Monticello Restroom Santa Clara 1/15/2015
Summerhill 660 W El Camino LLC Summerhill 660 W El Camino LLC 506 Holthouse Terr Sunnyvale 1/15/2015
Summerhill W El Camino LLC Summerhill W El Camino LLC 508 Holthouse Terr Sunnyvale 1/15/2015
Sycamore Homes Inc Siri Development Inc 11765 Winding Way Los Altos 1/15/2015
Sycamore Homes Inc Old Mountain View Dev 365 Villa Street Mountain View 1/15/2015
Sycamore Homes Inc Aron Dev LLC 1201 W Campbell Ave Campbell 1/15/2015
Taylor Morrison of Ca LLC Taylor Morrison of Ca LLC 16710 San Dimas Lane Morgan Hill 1/15/2015
Tico Constr Co Inc Shapell Norcal Rental Prop LLC 4035 Evergreen Village Sq # 40, # 30 San Jose 1/15/2015
Trumark Constr Svcs Inc Capitol Berryessa LLC 1315 Ventiri Drive # 3 San Jose 1/15/2015
Urban Pacific Constr Inc Urban West HCC LLC 1571 Fairway Drive Los Altos 1/15/2015
V S Fencing Company Santa Clara Unified Sch Dist Wilcox H S Santa Clara 1/16/2015
V S Fencing Company Santa Clara Unified Sch Dist 1925 Scott Blvd Santa Clara 1/16/2015
Wattis Constr Co Inc County of Santa Clara Alma Storm Pump Station San Jose 1/16/2015
Wattis Constr Co Inc County of Santa Clara Coyote Creek Trail Repairs Santa Clara County 1/16/2015
William Lyon Homes Inc Ora Murphy Ranch 285 LLC 645 Fernleaf Drive Milpitas 1/16/2015
XS Industries Party City 1600 Saratoga Ave # 303 San Jose 1/16/2015
Santa Clara Notice of Completion
Through January 16, 2015
This publication contains information that California Subcontractors Association believes to be correct and reliable but we assume no responsibility for errors or
omissions. You may verify any information contained herein by inspecting the original public records. No entity or individual may duplicate or reproduce any part of this
document without written consent of Thomas A. Heinzelmann California Subcontractors Association (408) 727-2252.
Capitol Connection Q&A for Contractors
Week of 2/16/14
By Shauna Krause of Capitol Services, Inc.
Some things can change, and sometimes remain the same as our first contractor learns. We ‘dash’ the
hopes of another contractor who has discovered you can’t work without ‘DOSH’. What you don’t know
can hurt you, as a Nevada contractor gets a tax bill from California he didn’t know was coming…
Q: We will soon be making some structural changes to our corporation. It will keep the same EIN num-
ber and Secretary of State registration number but we will be changing the name and Officers on our
license. Is there a certain amount of time that we have to report these changes to the CSLB? Will this
require the need for a new license number?
A: The CSLB allows 90 days to report a name and/or Officer change. Please note that for the name
change you must first register the change with the CA Secretary of State. As long as your registration
number with the Secretary of State remains the same, you do not need to apply for a new license num-
ber.
Q: When a contractor has the ASB (Asbestos) Certification, doesn’t that also require them to have the
Division of Occupational Safety and Health, or DOSH, registration in order to perform asbestos abate-
ment? Is there any restriction if they don’t also have the DOSH?
A: Yes, if a contractor has the Asbestos Certification they are required to register with DOSH. They can-
not perform asbestos abatement without it.
Q: My Sole Proprietor license was revoked last year and I was wondering if I may form a corporation
with an Responsible Managing Officer (RMO) in order to do business? I would be the owner and Vice
President but he would be President/Secretary/Treasurer/RMO so he would be the only one on the con-
tractor’s license.
A: According to B&P Code 7121.5 an individual who was the Qualifying individual on a revoked license
“shall be prohibited from serving as an officer, director, associate, partner, manager, or qualifying indi-
vidual of a licensee”. In order to act in any other capacity other than a bona fide non-supervising em-
ployee for a contractor, is with the CSLB’s approval and most likely a disciplinary bond.
Q: We are a Nevada corporation and you helped us get licensed years ago in California. We did a cou-
ple jobs but haven’t worked out there in several years and we let our contractor’s license expire. I was
just made aware that we were still being taxed and I want to cancel our corporate status in CA so that we
don’t incur any further taxes. Are we required to pay back taxes prior to closing the CA corporation?
A: Yes. In order to surrender the corporation you must file any delinquent tax returns and file a final/
current year tax return. You should contact your CPA or tax professional for more information or assis-
tance with this process.
While knowledge is power, knowing where to go for the answers is half the battle. Get expert assistance
immediately when you call 866-443-0657, email info@cutredtape.com, or write us at Capitol Services,
Inc., 1225 8th St. Ste. 500, Sacramento, CA 95814. Research past columns at www.cutredtape.com.
Tailgate Topics
X
X
X
X
X
Supervisors Signature
Meeting Attended By:
X
X
X
X
X
Tailgate topic provided courtesty of State Compensation Insurance Fund. For more
tailgate topics, check out the State Fund website at:
http://www.statefundca.com/safety/safetymeeting/SafetyMeetingTopics.aspx
The above evaluations and/or recommendations are for general guidance only and should not be relied upon for legal compliance
purposes. They are based solely on the information provided to us and relate only to those conditions speci cally discussed. We do
not make any warranty, expressed or implied, that your workplace is safe or healthful or that it complies with all laws, regulations
or standards.
Chainsaw Safety
Any tool powerful enough to slice through wood can do the same to human esh, so chainsaw injuries are often serious. Before
you operate a chainsaw, make sure you read and understand the operators manual and make sure you have the right chainsaw
for the job. The instruction manual should describe the saw’s capabilities. If you rent a saw, be sure to get a demonstration of
how it works, including its safety features. Then make sure your saw is sharp, properly tensioned, and in good condition.When
you’re going to use a chain saw, wear protective clothing which includes a hard hat, safety goggles, gloves to give you a good
grip, hearing protection, steel-toed shoes with nonslip soles, and trim- tting clothes that won’t get caught in the chain.
Start your chainsaw according to the manual’s direction. Clear the work area so the chain won’t touch anything but the wood
you want to cut and place the saw on a level surface; never rest a saw on your leg or drop-start it. Stand to the side of the saw
so you won’t follow the cut through into your leg and stand on the uphill side of your work so it won’t roll into you. Hold
the saw parallel to the ground with your left arm straight for better control and to reduce the chance of the saw pushing into
you if it kicks back.Keep both hands on the saw while its running. Work slowly, don’t rush. Let the chainsaw do the work;
never force it. Avoid cutting above mid-chest height. Never attempt to cut a tree with a diameter greater than the length of the
chainsaw blade and watch for branches that may spring back as you cut. Always be aware of what is in the saw’s downward
path after the cut. It’s a good idea to take frequent breaks from cutting so you don’t operate the saw when you’re tired.
Although some chainsaw injuries are caused by operator error, kickback is the greatest cause of chainsaw injuries. In kickback,
the upper chain “grabs” in the wood or an obstruction and forces the saw backward, causing operator to either lose control of
the saw or lose balance, bringing the saw into contact with the body. Some chainsaws have chain brakes that are designed to
instantly stop the saw after kickback. While these don’t prevent kickback, they can reduce the severity of injury from it.
Carry the saw below your waist, with the engine off and guide bar pointed to the rear, so if you trip the saw drops behind you.If
your saw is electric, make sure you use an extension cord that’s approved for outdoor use and don’t use the saw in a damp
environment. Fuel gasoline-powered chainsaws outdoors, being careful not to over ll or spill the fuel. Never refuel a hot saw.
Let it cool down rst, and have a re extinguisher nearby.
It’s dangerous to work alone with a chainsaw. Have a companion within calling distance, but keep bystanders and helpers at a
safe distance from operation so that they will not be injured by the saw, ying chips, sawdust or by what you’re working on.

Navigation menu