Echelon 70101-0002 Utility Control Network Device User Manual Edge Control Node 7000 Series Installation Guide
Echelon Corporation Utility Control Network Device Edge Control Node 7000 Series Installation Guide
Echelon >
User Manual



















![14 Pad Mount Installation 4. Seal the top of the conduit inside the transformer cover with sealing putty or foam. This seal ensures that water and foreign objects cannot enter the transformer housing. 5. Seal the end of the conduit that is external to the transformer cover with sealing putty or foam. After the conduit and cabling are ready, you can install the ECN. See the next section, Performing the Installation. Performing the Installation To install the ECN using the pad mount method, perform the following tasks: 1. Extend the Pad Mounting Bracket 2. Attach the Pad Mounting Bracket to the transformer’s lifting nut 3. Attach the Conduit Housing to the Pad Mounting Bracket 4. Insert a Conduit Thread into the Conduit Housing 5. Attach the ECN to the Pad Mounting Bracket 6. Secure the ECN to the Pad Mounting Bracket 7. Connect the ECN to power and to the network 8. Close and lock the Conduit Housing 9. Complete the installation Each of these tasks is described in the following sections. Extend Pad Mounting Bracket You connect the ECN to the transformer using the transformer’s lifting nut, as described in Attach Pad Mounting Bracket to Lifting Nut on page 15. The Pad Mounting Bracket is designed to secure the ECN to the transformer’s lifting nut, regardless of the location of the lifting nut. The Pad Mounting Bracket is vertically adjustable (from approximately 46 cm [18 inches] to 92 cm [36 inches]) so that you can match the 1.9 cm (3/4 inch) horizontal slots with the position of the transformer lifting nut. Figure 5 on page 15 shows the Pad Mounting Bracket fully extended.](https://usermanual.wiki/Echelon/70101-0002/User-Guide-1390068-Page-22.png)