Emerson Series 300 Users Manual Operator's For ATS H 600 1200 A UL/CSA

300 to the manual 7a1be399-a587-4c57-a65c-76f46d2eb45c

2015-01-05

: Emerson Emerson-Series-300-Users-Manual-165404 emerson-series-300-users-manual-165404 emerson pdf

Open the PDF directly: View PDF PDF.
Page Count: 20

DownloadEmerson Emerson-Series-300-Users-Manual- Operator's Manual For Series 300 ATS H 600-1200 A UL/CSA  Emerson-series-300-users-manual
Open PDF In BrowserView PDF
Operator’s
Manual

Series 300
Automatic Transfer Switches
H–design, 600 through 1200 A

DANGER is used in this manual to warn of a
hazardous situation which, if not avoided, will
result in death or serious injury.

WARNING is used in this manual to warn of a
hazardous situation which, if not avoided, could
result in death or serious injury.

CAUTION is used in this manual to warn of a
hazardous situation which, if not avoided, could
result in minor or moderate injury.

Refer to the outline and wiring drawings provided with
your ASCO Series 300 ATS for all installation details.

Rating Label
Each automatic transfer switch contains a rating label to
define the loads and fault circuit withstand / closing ratings.
Refer to the label on the transfer switch for specific values.

Do not exceed the values on the rating label.
Exceeding the rating can cause personal injury or
serious equipment damage.
An experienced licensed electrician must install the
Automatic Transfer Switch (ATS).
TABLE OF CONTENTS
section-page
INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . 1-1
Mounting and Line Connections . . . . . . . . . 1-1
Engine Starting Contacts . . . . . . . . . . . . . . . 1-2
Input / Output Label . . . . . . . . . . . . . . . . . . . . 1-2
Functional Test . . . . . . . . . . . . . . . . . 1-3, 1-4, 1-5
SEQUENCE OF OPERATION . . . . . . . . . . . 2-1
TESTING & SERVICE . . . . . . . . . . . . . . . . . .
Preventive Maintenance . . . . . . . . . . . . . . . .
Transfer Test . . . . . . . . . . . . . . . . . . . . . . . . . .
Disconnecting the Controller . . . . . . . . . . . .
Manual Load Transfer . . . . . . . . . . . . . . . . . .
Trouble-Shooting . . . . . . . . . . . . . . . . . . . . . .

3-1
3-1
3-1
3-1
3-2
3-2

ADJUSTMENTS . . . . . . . . . . . . . . . . . . . . . . . 4-1
Time Delay and Sensor Adjustments . . . . . 4-1
How to Change a Setting . . . . . . . . . . . . . . . 4-2
CONTROL FEATURES . . . . . . . . . . . . . . . . . 5-1
Engine Exercisers . . . . . . . . . . . . . . 5-1, 5-2, 5-3
Motor Load Transfer . . . . . . . . . . . . . . . . . . . 5-4
Load Disconnect & Remote Control . . . . . . 5-4
INDEX . . . . . . . . . . . . . . . . . . . . . back of manual

600, 800, 1000 A sizes
50 Hanover Road, Florham Park, New Jersey 07932–1591 USA
For sales or service call 1 800 800–2726 (ASCO) www.ascopower.com

381333–201 G

ASCO POWER TECHNOLOGIES CANADA PO Box 1238, 17 Airport Road, Brantford, Ontario, Canada N3T 5T3

Nameplate

Catalog Number Identification

The Transfer Switch nameplate includes data for
each specific ASCO Series 300 ATS. Use the ATS
only within the limits shown on this nameplate.

H 300

Neutral

B – switched
C – overlapping
blank – solid

B

Phase Poles

2 – single Ø
3 – three Ø

3

A typical Catalog Number is shown below with its
elements explained. The example is for a Series 300
ATS with switched neutral, 3 pole, 600 ampere,
480 V, in a Type 1 enclosure:

600

Amperes

600
800
1000
1200

N

1

Voltage

C 208
D 220
E 230
F 240

K 415
L 440
M 460
N 480

H 380 Q 575
J 400 R 600

C

Controller

Enclosure

1 – standard

C – type 1
F – type 3R
G – type 4 *
L – type 12 *

1X – if
accessories
ordered

blank – open type
* available 600 – 1000 A sizes only

Controller

neutral
connections

power
connections
membrane
controls

Transfer
Switch

terminal block TB
for engine start
and switch
position contacts

power
connections

neutral
connections

600 ampere size in typical enclosure with location of customer connections

neutral
connections

Controller

power
connections
membrane
controls

Transfer
Switch

terminal block TB
for engine start
and switch
position contacts

power
connections

neutral
connections

800 and 1000 ampere sizes in typical enclosure with location of customer connections

Controller

membrane
controls

neutral
connections

power
connections

Transfer
Switch

terminal block TB
for engine start
and switch
position contacts

power
connections

neutral
connections

1200 ampere size in typical enclosure with location of customer connections

SECTION 1
Series 300 Automatic Transfer Switches are factory
wired and tested. Installation requires skid removal
then securing the enclosure to the supporting
foundation.

INSTALLATION
Testing Power Conductors

Remove the Shipping Skid
Open the front door and remove the four lag screws (2
in front, 2 in rear) securing enclosure to the wood skid.

Supporting Foundation

Do not connect the power conductors to the ASCO
Series 300 transfer switch until they are tested.
Installing power cables in conduit, cable troughs and
ceiling-suspended hangers often requires considerable
force. The pulling of cables can damage insulation and
stretch or break the conductor’s strands. For this
reason, after the cables are pulled into position, and
before they are connected, they should be tested to
verify that they are not defective or have been
damaged during installation.

NOTICE

The supporting foundation for the enclosure must be
level and straight. Refer to the applicable enclosure
outline drawing included with the Series 300 for all
mounting details including door opening space.

Protect the automatic transfer switch from
construction grit and metal chips to prevent
malfunction or shortened life of the ATS.

If bottom cable entry is used, the foundation must be
prepared so that the conduit stubs are located
correctly. Refer to the enclosure outline drawing for
specified area and location. Provide cable bending
space and clearance to live metal parts. When a
concrete floor is poured, use interlocking conduit
spacer caps or a wood or metal template to maintain
proper conduit alignment.

Connecting Power Conductors

Mounting
Refer to the applicable enclosure outline drawing
furnished with this switch and mount the Series 300
according to details and instructions shown on diagram.

After the power cables have been tested, connect them
to the appropriate terminal lugs on the transfer switch
as shown on the wiring diagram provided with this
Series 300. Make sure the lugs provided are suitable
for use with the cables being installed. Standard
terminal lugs are solderless screw type and will accept
the wire sizes listed on the drawings provided with the
Series 300. Be careful when stripping insulation from
the cables; avoid nicking or ringing the conductor.
Remove surface oxides from cables by cleaning with a
wire brush. When aluminum cable is used, apply joint
compound to conductors. Tighten cable lugs to the
torque specified on rating label.

Line Connections

Controller Ground

Refer to the Wiring Diagram provided with your Series
300 ATS. All wiring must be made in accordance with
the National Electrical Code and local codes.

A grounding wire must be connected to the controller’s
lower left mounting stud. Because the controller is
mounted on the enclosure door, a conductive strap
must be used between the enclosure and the door.
This connection provides proper grounding which does
not rely upon the door hinges.

It is unnecessary to remove pole covers from the
transfer switch. If you do remove them, reinstall them
carefully.

Harnesses
The transfer switch is connected to the left side of the
controller by a plug–in harness (two plugs).

De–energize the conductors before making any
line or auxiliary circuitry connections. Be sure
that Normal and Emergency line connections
are in proper phase rotation. Place engine
generator starting control in the OFF position.
Make sure engine generator is not in operation.

1---1

INSTALLATION (continued)
Engine Starting Contacts
Customer connections for engine control contact and
TS auxiliary contacts connections are located on
terminal block TB which is mounted on the front lower
left of the transfer switch. Refer to wiring diagram
provided with the Series 300 ATS and connect the
engine start wires to the appropriate terminals. See
Figure 1–1 and Table A.
COMMON

Table A. Engine start connections.
When normal
source fails
contact closes
contact opens

Terminals
on transfer
switch
TB1 and TB2
TB1 and TB3

FEATURE 7

closes to start

FEATURE 8

opens to start

COMMON
FEATURE 14B

closed on emergency

FEATURE 14A

left side of
transfer switch

Engine Starting
Signals
5 amps, 32 V DC
5 amps resistive 28 V DC
or 120 V AC max.

TS Auxiliary Contacts
Feature 14A & 14B
10 amps, 32 V DC
10 amps 250 V AC
general purpose

closed on normal

Auxiliary Circuits
Connect auxiliary circuit wires to
appropriate terminals on transfer
switch terminal block TB as shown
on the wiring diagram provided
with this Series 300 Automatic
Transfer Switch. Make the necessary auxiliary connections by
referring to Section 5, Control
Features.

COMMON
FEATURE 14BA

closed on emergency

FEATURE 14AA

Optional
TS Auxiliary Contacts
Feature 14AA & 14BA
10 amps, 32 V DC
10 amps 250 V AC
general purpose

closed on normal

terminal block for engine start and
auxiliary circuit connections

Connections to Controller
for other Control Features
(located on bottom of Controller)
Programmable
Load Disconnect
Engine Exerciser
Feature
connection,
Connections
if provided
(see Wiring Diagram
(refer to
& refer to page 5–4
for DIP switch settings) page 5–3)

Figure 1-1. Engine start and auxiliary circuit
terminal block TB located on the transfer switch.

Remote Control Features Connections
(refer to the Wiring Diagram &
page 5–4 for DIP switch settings)
Each control contact must be suitable
for a 5 V DC low energy circuit.

for factory
use only

Figure 1-2. Input / output label on the Controller showing possible connections to the lower terminal block.
1---2

INSTALLATION (continued)
Functional Test
The Functional Test consists of three checks: manual
operation, voltage checks, and electrical operation.

NOTICE
Do these checks in the order presented to avoid
damaging the automatic transfer switch.
Read all instructions on the Wiring Diagram and labels
affixed to the automatic transfer switch. Note the
control features that are provided and review their
operation before proceeding.

left side of
transfer switch

1 – Manual Operation Test
A detachable maintenance handle is provided on the
frame of the Transfer Switch for maintenance purposes
only. Manual operation of the transfer switch should be
checked before it is energized (operated electrically).

maintenance
handle

Do not manually operate the transfer switch until
both power sources are disconnected: open
both circuit breakers.
1.

After deenergizing both power sources, open the
enclosure door. Locate and remove the maintenance handle from the clips on the left side of the
transfer switch frame. Insert the handle into the
hole in the molded hub on the left side of the
operator. See Figures 1–3 and 1–4 and Table B.

2.

Move the maintenance handle up or down as shown
to manually operate the transfer switch. It should
operate smoothly without any binding. If it does not,
check for shipping damage or construction debris.
Table B. Maintenance handle positions.
ATS Position
Handle
Indicators
E

up

3.

N=C
lower contacts closed

E

E=C

NOTICE
Verify that the maintenance handle has been
removed before proceeding!

upper contacts closed

N

N=O
down

Return the transfer switch to the Normal position.
Observe that window indicators (right side) show the
top shaft O (open) and the bottom shaft C (closed).

Note: If Normal and Emergency connections are
reversed this operation is also reversed.
4. Remove the maintenance handle and store it on the
frame (left side) in the clips provided.

E=O

N

Emergency

hub

Figure 1-3. Maintenance handle & storage location.

upper contacts open

Normal

handle

storage clips

Now continue to 2 – Voltage Checks on next page.

lower contacts open

Emergency
contacts

UP closes the
Normal source
contacts (lower)

window
indicators
O is open
C is closed

DOWN closes the
Emergency source
contacts (upper)

contact position
indicators (right side)

Normal
contacts

frame

Figure 1-4. Maintenance handle operation and contact position indicators.
1---3

INSTALLATION (continued)

observe these lights

Figure 1–5. St andard controls and indicators.

2 – Voltage Checks
First check nameplate on transfer switch; rated voltage
must be the same as normal and emergency line
voltages.

Close the normal source circuit
breaker. The Normal Transfer
1 Switch Position and the Normal
Source Accepted lights should
come on.

Source Accepted
Normal
Emergency

Use an accurate voltmeter to
check phase to phase and
2 phase to neutral voltages present at the transfer switch normal
source terminals.

Use extreme caution when using a meter to
measure voltages in the following steps.
Do not touch power terminals; shock, burns, or
death could result !

Close the emergency source
circuit breaker. (Start generator,
3 if necessary.) The Emergency
Source Accepted light should
come on.

Perform steps 1 through 6 at the right. Observe the
status lights. See Figure 1–5.
O Black circle means light is on.
P White circle means light is off.

Source Accepted
Normal
Emergency

Use an accurate voltmeter to
check phase to phase and
4 phase to neutral voltages present at the transfer switch emergency source terminals.*

* If necessary, adjust voltage regulator on the
generator according to the manufacturer’s
recommendations. The Automatic Transfer Switch will
respond only to the rated voltage specified on the
Transfer Switch nameplate.

Use a phase rotation meter to
check phase rotation of emer5
gency source; it must be the
same as the normal source.

Also see page 4–1 for the HI–LOW voltage adjust
setting in the controller. The LOW setting shifts all
voltage settings down 4.2%; for example, 240 V to
230V.

Shut down the engine–generator, if applicable. The Emergency Source Accepted light should
6 go off. Then put the starting
control selector switch (on the
generator set) in the automatic
position. Close enclosure door.

A B C

Source Accepted
Normal
Emergency

Now continue to 3 – Electrical Operation on next page.

1---4

INSTALLATION (continued)

observe these lights

press this button

Figure 1–6. Standard controls and indicators.

3 – Electrical Operation
This procedure will check the electrical opertion of the
Automatic Transfer Switch. See Figure 1–6.

The normal source must be
available and the generator
1 must be ready to start.
Check that the Normal Source
Accepted light is on.
Press and hold the Transfer Test
button until the engine starts
2
and runs. This should happen
within 15 sec.

Close the transfer switch enclosure door and
tighten the screws before you test electrical
operation.

The Emergency Source
3
Accepted light should come on.

Transfer Test
Both normal and emergency sources must be available
and the emergency source generator (if used) must be
capable of being started in this procedure.

4
Perform steps 1 through 8 at the right. Observe the
status lights.
O Black circle means light is on.
P White circle means light is off.

5

NOTE: If Motor Load Transfer
feature is activated, then transfer may
not occur immediately after the
respective time delays. Transfer will
only occur when the phase relationship between sources is correct.

6

This completes the Functional Test of the ASCO
Series 300 Automatic Transfer Switch. Leave the
engine–generator starting control in the automatic
position.

7

The transfer switch should
transfer to the Emergency
position. The Emergency
Transfer Switch Position light
should come on and the Normal
light should go off.
If the transfer to emergency
delay is used the transfer
should occurs after a time delay
(up to 5 minutes).
For immediate transfer press
the Bypass Time Delay button.
The transfer switch should
transfer back to the Normal
position. The Normal Transfer
Switch Position light should
come on and the Emergency
light should go off.
If the retransfer to normal delay
is used the retransfer should
occur after a time delay
(up to 30 minutes).
For immediate retransfer press
the Bypass Time Delay button.

The unloaded running delay
keeps the generator running for
5 minutes (cool–down period).
8
Then the generator should stop
and the Emergency Source
Accepted light should go off.
1---5

Source Accepted
Normal
Emergency

Transfer
Test

Source Accepted
Normal
Emergency
Transfer Switch
Position
Normal
Emergency

Bypass
Time Delay

Transfer Switch
Position
Normal
Emergency

Bypass
Time Delay

Source Accepted
Normal
Emergency

SECTION 2 SEQUENCE OF OPERATION
Transfer To Emergency

Lights show position of transfer switch.

The sequence for load transfer to
emergency source begins automatically when normal source voltage falls
below the preset dropout point or
when Transfer Test button is pressed.
An under voltage condition on any
phase of the normal source is detected by the sensor.

Lights show the sources accepted.
Light for built–in
engine exercise timer:
³ blinks rapidly when
button is held 5 sec.
while being set
³ blinks slowly when
button is released (set)
and during 20 min.
exercise period.
³ stays on after engine
stops (exerciser is
enabled for weekly
operation)

When the normal
source voltage fails or
See page 5–1
the Transfer Test
for complete
button is pressed, the
Hold 15 sec. to
Hold 5 sec. to set
instructions
Press
to
cancel
the
SE relay de-energizes
start the engine
active exercise period 20 min. engine exercise
and relay NR begins
generator and to (stops engine now or period immediately (engine
transfer the load after cooldown) See
starts) and weekly thereafter.
its timing cycle (1 or 3
to
emergency.
page
5–1.
seconds, momentary
Figure 2–1. Membrane controls and indicator lights.
normal source outage
Retransfer to Normal
delay). The NR relay is provided with a time delay on
dropout to override momentary outages and prevent
The sequence for load retransfer to the normal source
nuisance starting of the engine-driven generator. If the
automatically begins when the voltage sensor detects
normal source voltage returns above the sensor dropout
restoration of the normal source. The voltage level
setting before the time delay expires, the NR relay timing
must rise above the preset pickup point on all phases
cycle is reset to zero and relay SE energizes.
before the sensor will accept the normal source.
If the normal source voltage does not return above the
sensor dropout setting before the time delay expires, the
NR relay de-energizes and signals the engine-driven generator to start. At the same time, a voltage and frequency sensor begins monitoring the emergency source. The
sensor will accept the emergency source only when both
voltage and frequency reach preset pickup points. Usually about ten seconds elapse from dropout of the NR relay
to acceptance by the sensor. This time span occurs because the engine-driven generator must crank, start, and
run up to nominal pickup points. For this reason, if the
Transfer Test button is pressed it must be held for 15 seconds. If the emergency source is available immediately,
the sensor may accept it as soon as NR relay drops out.

When the normal source is accepted by the sensor,
relay SE begins its timing cycle (adjustable 1 sec. to 30
min., retransfer to normal delay). For immediate
retransfer press Bypass Time Delay button. SE relay is
provided with a time delay on pickup to prevent
immediate load retransfer to the normal source. The
delay insures that the normal source has stabilized
before reconnection of vital loads. If the normal
source voltage falls below the present dropout point
before the time delay expires, the timing cycle is reset
to zero. If the emergency source fails for more than 4
seconds during the timing cycle, ER relay drops out
and the load is immediately retransferred to the
normal source, if that source is acceptable.

When the emergency source is accepted by the sensor,
relay ER begins its timing cycle (transfer to emergency
delay). ER relay is provided with an adjustable (0 to 5
minutes) time delay on pickup to delay transfer of the
load to the emergency source. For immediate transfer
press Bypass Time Delay button.

SE relay energizes and ER relay is dropped out. The
TS coil is energized, the transfer switch operates, and
all switch contacts (mains, controls, auxiliaries) reverse
position. The transfer switch is now supplying the load
from the normal source again.
Upon retransfer to the normal source, NR relay begins
its timing cycle (unloaded running delay, engine cooldown).
NR relay is provided with a 5 min. time delay on pickup
to keep the engine running for a cool-down period.

ER relay energizes, the TS coil is energized, the transfer
switch operates, and all switch contacts (mains, controls,
auxiliaries) reverse position. The transfer switch is now
supplying the load from the emergency source.

NR relay energizes after the time delay and signals the
engine-driven generator to shut down. All circuits are
reset for any future normal source failure.

The transfer switch will remain in the Emergency
position until the normal source is restored. If the
Transfer Test button is used, the transfer switch will
remain on emergency until the retransfer to normal
delay times out.

Activation of standard control features shown in Section 5 will
alter the sequence of operation and introduce additional time
delays during transfer operations.

2---1

SECTION 3

TESTING & SERVICE

PREVENTIVE MAINTENANCE

S Check all cable connections & retighten them.
Torque to values shown on transfer switch label.

For high reliability and long life for the ATS:

Replacement parts. When ordering parts provide the
Serial and Catalog Nos. from the transfer switch
nameplate. Contact ASI. In the US call
1–800–800–ASCO (2726)).

Operate the switch at least once a month. Perform this
4–step Electrical Operation Test (test with load transfer).

DISCONNECTING THE CONTROLLER
The harness disconnect plugs are furnished for repair
purposes only and should not have to be unplugged.
If the controller must be isolated, follow these steps
carefully.

Disconnecting the Plugs
1. Observe the position of the transfer switch.
a. If the transfer switch is in the Normal position,
place standby engine starting control in the off
position. Then open the emergency source circuit
breaker.

Transfer Switch Test
1. Press and hold the door-mounted Transfer Test button

b. If the transfer switch is in the Emergency position,
open the normal source circuit breaker. Place the
engine starting control in the test or run position.

until the engine starts and runs. This should happen
within 15 seconds.

2. The transfer switch will operate to the Emergency

position. If the Transfer To Emergency Delay is used,
the transfer will occur after a time delay (up to 5
minutes). For immediate transfer press Bypass
Time Delay button.

2. Separate the quick disconnect plugs by squeezing
the latches. Do not pull on the harness wires.
3. Label, remove, and tape the signal wires connected
to the engine start terminals on the transfer switch:
TB1 and TB3, or TB1 and TB2.

3. The Transfer Switch will operate back to the Normal

4.

position after the Retransfer To Normal Delay (up to
30 minutes). For immediate retransfer press
Bypass Time Delay button.
Unloaded Running (Engine Cooldown) Delay allows
engine to run unloaded for 5 minutes.

Reconnecting the Plugs
1. Observe the position of the transfer switch.
a. If the transfer switch is in the Normal position, be
sure that the standby engine starting control is
still in the off position. The emergency source
circuit breaker still should be open.

Checklist for Yearly Inspection

b. If the transfer switch is in the Emergency position,
normal source circuit breaker still should be open.
2. Reconnect the signal wires connected to the
appropriate engine start terminals on the transfer
switch. See Section 1, Engine Starting Contacts.

Hazardous voltage capable of causing shock,
burns, or death is used in this switch.
Deenergize both Normal & Emergency power
sources before performing inspections!

3. The harness plugs and sockets are keyed.
Carefully align the plugs with the sockets
and press straight in until both latches click.

S Clean the enclosure. De–energize all sources,
then brush and vacuum away any excessive dust
accumulation. Remove moisture with a clean cloth.

4. Restore the opposite source as follows:
a. If the transfer switch is in the Normal position,
place the standby engine starting control in the
automatic position. Then close the emergency
source circuit breaker.

S Check the transfer switch contacts. De-energize
all sources, then remove the transfer switch barriers
and check contact condition. Replace the contacts if
they become pitted or worn excessively. Reinstall the
barriers carefully.

b. If the transfer switch is in the Emergency position,
close the normal source circuit breaker. The load
will be automatically retransferred to the normal
source after the Retransfer to Normal Delay. For
immediate retransfer, press Bypass Time Delay
button. Place the engine starting control in the
automatic position.

S Maintain transfer switch lubrication. Under
normal operating conditions no further lubricating
is required. Renew factory lubrication if the switch
is subjected to severe dust or abnormal operating
conditions or if TS coil is replaced. Order lubricant
kit 75–100.
3---1

TESTING & SERVICE (continued)
MANUAL LOAD TRANSFER

1. Open normal and emergency source circuit breakers.

This procedure will manually transfer the load if the
controller is disconnected.

2. Use the maintenance handle to manually operate
transfer switch to the opposite source. See page
1–3, Manual Operation Test.

Do not manually operate the transfer switch
until both power sources are disconnected:
open both circuit breakers.

3. If the transfer switch is in the Emergency position
manually start the engine generator and then close
the emergency source circuit breaker.

TROUBLE-SHOOTING
Note the control features that are activated or
furnished on the switch and review their operation.
Refer to Section 5, Control Features.

Proceed with care! The automatic transfer switch
is energized.

Table 3-1. Trouble-Shooting Checks.
PROBLEM
Gen-Set does not start when
the Transfer Test button is
pressed and held for 15
seconds or when the normal
source fails.

CHECK IN NUMERICAL SEQUENCE
1 OPERATION
2 GEN-SET
Hold the Transfer Test button Starting control must be in
15 sec. or the outage must be automatic position. Batteries
long enough to allow for the 1 must be charged and
or 3 sec. Momentary Normal
connected. Check wiring to
Source Outage Delay plus
engine starting contacts.
engine cranking and starting
time.

Transfer switch does not
transfer the load to
emergency source after the
gen-set starts.

Wait for Transfer to Emergency Delay (0 to 5 min.) to time
out. For immediate transfer,
press the Bypass Time Delay
button. If Motor Load Transfer
is active, wait for inphase condition (see below).

Transfer switch does not
transfer the load to normal
source when normal returns
or when Transfer Test button
is released.

Wait for Retransfer to Normal
Delay (1 sec. to 30 min.) to
time out. For immediate re–
transfer, press Bypass Time
Delay button. If Motor Load
Transfer is active, wait for inphase condition (see below).

Gen-Set does not stop after
load retransfer to the normal
source.

Wait for the 5 minute
Unloaded Running Delay to
time out.

Generator output circuit
breaker must be closed.
Generator frequency must be
at least 57 Hz.

—

3 VOLTAGE

—

Voltmeter should read at least
90% of nominal phase to
phase voltage between
transfer switch terminals EA
and EC (or EL1 and EL2 for 2
pole switches). *
* These are factory settings.
Voltmeter should read at least
90% of nominal phase to
phase voltage between
transfer switch terminals NB
and NC, NC and NA, and NA
and NB (or NL1 and NL2 for 2
pole switches).

Starting control must be in
automatic position.

—

Trouble-Shooting the Motor Load Transfer Feature (refer to page 5–4)
3. Press and hold Transfer Test button. The load
should transfer to emergency source when meter
needle is near 0 volts. If transfer does not occur,
Motor Load Transfer feature is not operating.
4. Release the Transfer Test button. The load should
retransfer back to the normal source after the
Retransfer to Normal Delay, if used. The retransfer
should occur when the needle is near 0 volts. If
retransfer does not occur after the time delay, the
Motor Load Transfer feature is not operating.
5. For immediate retransfer, press the Bypass Time
Delay button. Then disconnect the voltmeter.

Use extreme caution when using a meter to
measure voltages in the following steps. Do not
touch power terminals; shock, burns, or death
could result !
1. Connect a voltmeter (set for twice system
phase–to–phase voltage) between Transfer Switch
terminals NA and EA.
2. Manually start generator. Voltmeter needle should
sweep back and forth at a regular rate between 0
and about twice system voltage.

If the problem is isolated to circuits on the controller or the transfer switch, call your local ASCO Power Technologies
sales office, representative, or ASI. In the United States, call 1–800–800–2726. Furnish the Serial No., Bill of
Material (BOM) No., and Catalog No. from transfer switch nameplate.

3---2

SECTION 4 ADJUSTMENTS
Time Delay Adjustment

To change a setting, follow procedure on page 4-2. Use
Table 4-1 as a guide to time delay values and their corresponding adjustment DIP switch or potentiometer.

Standard time delays are set to customer specifications
(if none specified, standard factory settings are used).

Table 4-1. Time Delay Settings
DESCRIPTION

LABELS

FACTORY
SETTING

Override Momentary
Normal Source Outages

TD ES

3 seconds

Transfer to Emergency

TIMER
N/E

Unloaded Running
(Engine Cooldown)

1 second

Actuator 1 on

3 seconds

Actuator 1 off

0 minutes
(full ccw)

0 to 5
minutes

—

—

P2

—

4 seconds

non-adjustable

—

—

—

TIMER
E/N

30 minutes
(full cw)

1 second to
30 minutes

—

—

P1

—

5 minutes

non-adjustable

—

—

—

Sensor Adjustments

Any change in these settings may affect the
normal operation of the automatic transfer
switch. This change could allow the load circuits
to remain connected to a low voltage source.

Table 4-2. Voltage and Frequency Settings. (

PU / N

Pickup

90 %

95 % *

Actuator 3 off

90 %

Actuator 3 on

80 %

Emergency Source
Voltage

60 / 50 Hz

60 Hz

3 1
3,

3/1

3

––
––

60 Hz

Actuator 4 off

50 Hz

Actuator 4 on

3 phase

Actuator 6 off

1 phase

Actuator 6 on

6

60 / 50
Hz

non-adjustable
non-adjustable
non-adjustable
non-adjustable

6

90 %
75 %
95 %
85 %

4

Voltage Phases

Pickup
Dropout
Pickup
Dropout

4

Emergency Source
Frequency
eque cy

––
––
––
––

1 2

70 %

1 2

Dropout

85 %

1 2

DO / N

85 %

Actuator 1 off
Actuator 2 off
Actuator 1 on
Actuator 2 off
Actuator 1 off
Actuator 2 on
Actuator 1 on
Actuator 2 on

1 2

90 % *
Normal Source Voltage

S1 DIP
SWITCH

3

SETTING

Shaded DIP switches are standard factory settings).

% of nominal
FACT. SET
ADJ RANGE

3

LABELS

—

NOTICE

Voltage and frequency sensor pickup and dropout points
are set to customer specifications (if none specified,
standard factory settings are used). To change a setting,
follow procedure on page 4–2. Use Tables 4-2 and 4–3
for settings and corresponding DIP switch actuators.

DESCRIPTION

ADJUSTMENT
POTENTIOMETER

1

Retransfer to Normal

S3 DIP
SWITCH
1

Override Momentary
Emergency S. Outages

ADJUSTMENT
RANGE

* If dropout voltage is set to 90%, the pickup voltage must be set to 95%.
Table 4-3. Transformer Voltage Adjust.
(Low setting shifts all voltage settings down 4.2%; for example, 240 V to 230 V, or 480 V to 460 V)
FACTORY SETTING

Voltage Adjust (4.2%)
(4 2%)

LOW /
HI

HI

4---1

ADJUSTMENT

S3 DIP SWITCH

LOW

Actuator 2 off

HI

Actuator 2 on

2

LABELS

2

DESCRIPTION

ADJUSTMENTS
NOTICE

(continued)
cover

Do not make any setting changes while the
controller is energized.

thumb
latch

How to Change a Setting
1. Prevent the transfer switch from operating by disconnecting one source first, then the other, as follows:
a.

If the transfer switch is in the Normal position,
open the emergency source circuit breaker.
Turn the engine starting control to off. Then
open the normal source circuit breaker.

b.

If the transfer switch is in the Emergency
position, open the normal source circuit breaker.
Turn engine starting control to test or run. Then
open the emergency source circuit breaker.

hook on
left side

Figure 4-1. Controller cover latch.

2. Disconnect both harness plugs from controller by
squeezing the latches. Do not pull on the wires.

9 volt
alkaline
battery

3. Remove cover from the controller by releasing latch
on right side with your thumb. See Figure 4-1.

J5 battery
on/off
jumper

harness
plugs

4. Locate the appropriate adjustment potentiometer or
DIP switch for the setting that you want to change.
Refer to Table 4-1 and Table 4–2 on page 4-1 and
Figure 4-2, Figure 4–3, Figure 4–4 on page 4–2.

P1
retransfer
to normal
time delay

5. Use a small screwdriver to turn the potentiometer
clockwise to increase the time delay or counterclockwise to decrease it. See Figure 4-3.

S1 DIP
switch
S2 DIP
switch

6. Use a ball-point pen (or similar pointed tool) to slide
the switch actuators left or right so they match the
illustration next to the setting (left = off, right =
on). Recheck the setting. See Figure 4-4.

Figure 4-2. Location of potentiometers.
clockwise to
increase
P1 or P2
potentiometer

7. Install the cover on the controller by hooking it on
the left side and latching the right side.
8. Reconnect both harness plugs to the controller by
aligning and pressing straight in until latches click.

counterclockwise
to decrease
Figure 4-3. Changing time delay potentiometers.

Close the transfer switch enclosure door.
9. Close the enclosure door, then restore both sources:
a.

If the transfer switch is in the Normal position
first close the normal source circuit breaker, then
close the emergency source circuit breaker.

b.

If the transfer switch is in the Emergency
position, close the normal source circuit
breaker. The load will be automatically
retransferred to the normal source. Then close
the emergency source circuit breaker.

P2
transfer to
emergency
time delay

S3 DIP
switch

DIP
switches
SW1
SW2
SW3

actuator
(8 on each DIP switch)
off

on

Figure 4-4. Setting DIP switch actuators.

10. Turn the engine starting control to automatic.
4---2

SECTION 5 CONTROL FEATURES – ENGINE EXERCISERS
These timers periodically exercise the emergency engine-generator plant. They can be set to exercise with or without
load transfer, or they can be completely disabled. The engine-generator should be exercised under load once a week for
a minimum time period of 20 minutes, or follow the recommendations of the engine-generator set manufacturer. Refer
to page 4–2 for location of DIP switches, battery (provided), and jumper block in the controller.

BUILT–IN ENGINE EXERCISER

DIP Switch Settings

5

8

Actuator
8 on

8

Fill in day and time set. Week Day ______ Time _______.

Actuator
8 off

S2 DIP
SWITCH
Actuator
5 on
Actuator
5 on

5

Std. Timer
Enabled
Std. Timer
Disabled
Exercise
without
Load
Exercise
with Load

7

S1 DIP
SWITCH
Actuator
7 on
Actuator
7 off

FUNCTION

7

The engine exerciser included in ASCO Series 300
Automatic Transfer Switches provides a once a week
20–minute exercise period. It occurs immediately when
the Set Engine Exerciser push button is pressed (and
held for at least 5 seconds), and then at the same time
weekly thereafter. A 9 volt alkaline battery (Duracell
MN1604, Everready 522, or Panasonic 6AM6) is
furnished and installed in the controller to maintain the
setting. The battery jumper block must be shifted to the
ON position. See Figure 4–2 on page 4–2.

Shaded DIP switches are standard factory settings.
status light

Press to cancel an active exercise
period (stops generator).

Press and hold for 5 sec. or until status light
blinks rapidly to set exercise period immediately
and every week hereafter (generator starts).

If Exercise with Load is set, retransfers load to
Normal, then stops generator after min. cooldown.

Figure 5-1. Operator panel pushbuttons and light.

If Exerciser with Load is set,
transfers load to Emergency.

Select below either Exercise without Load or Exercise with Load according to the setting of DIP switch S1, actuator 8. The
load transfers from the Normal source to Emergency source (generator) and back again if Exercise with Load is selected.

Step

1
2
3
4

Push Button
Set Engine
Exerciser
hold 5 sec.
release
press Bypass
Time Delay
—

Explanation

blinks rapidly
OPOPOP

set exercise period

Exercise the generator now and
every week at this time hereafter.

blinks slowly
OPPOPP

exercise period now active

Generator starts and runs.

O stays on

cancel active exercise period

Generator stops.

O stays on

generator off

Exerciser enabled; repeats every 7 days.

Status Light

8

Step

1

How to Set Built–In Timer

Function

Exercise with Load, DIP Switch S1, Actuator 8 on

Push Button
Set Engine
Exerciser
hold 5 sec.

8

Exercise without Load, DIP Switch S1, Actuator 8 off

How to Set Built–In Timer

Function

Explanation

blinks rapidly
OPOPOP

set exercise period

Exercise the generator now and
every week at this time hereafter.

Status Light

2

release

blinks slowly
OPPOPP

exercise period now active

3

press Bypass
Time Delay

blinks slowly
OPPOPP

cancel active exercise period

4

—

O stays on

generator off

Generator starts and runs;
the load transfers to Emergency.
The load retransfers to Normal; then
generator runs for 5 minute cooldown
( light blinks slowly during cooldown ).
Exerciser enabled; repeats every 7 days.

NOTE: Every time SET ENGINE EXERCISER push button is pressed (held 5 seconds) the exercise period is changed.
5---1

CONTROL FEATURES (continued)
Optional Accessory 11BG – SOURCE AVAILABILITY SIGNAL
& PROGRAMMABLE ENGINE EXERCISER MODULE

2–line
display

connections
for source
availability
signal contacts

3 buttons

Figure 5–2. Accessory 11BG module (mounted behind operator interface and connected to the controller)
includes source availability signal contacts and a programmable engine exerciser.

Source Availability Signal Contacts
The module provides one Form C contact each for the
normal and emergency sources signal the acceptability
of the source as sensed by the controller. The signal
contacts operate in conjunction with the Source
Accepted lights on the operator interface. Field wiring
terminals are provided as shown in Figure 5–3 and the
wiring diagram.

SOURCE
AVAILABILITY SIGNALS
2 AMPS @ 30 VDC, resistive
0.5 AMP @ 125 VAC, resistive
contacts shown de–energized

Contact ratings:
2 amps @ 30 Vdc, 0.5 amp. @ 125 Vac resistive

Figure 5–3. Source availability signal contacts.

Programmable Engine Exerciser

DIP Switch Settings in the Controller

The module includes a programmable engine exerciser
that provides for weekly or biweekly operation. This
optional exercise timer may have to be turned on
(enabled) by setting the S1 DIP switch actuator 7 to off,
and S2 DIP switch actuator 5 to off. A backup battery in
the controller (see page 4–2 and page 5–3) must be
turned on to maintain the settings and to allow
programming with the normal and emergency power
turned off (page 5–1).

(see page 4–2)

8

5

Actuator
8 on

S2 DIP
SWITCH
Actuator
5 off
Actuator
5 on

5

8

5---2

Actuator
8 off

7

The programmable engine exerciser incorporates a 7
day or 14 day time base. Proper controller settings must
be made to determine whether or not the test will be
done with or without load transfer (S1 DIP switch
actuator 8).
See next page for instructions on setting the timer.

Opt. Timer
Enabled
Opt. Timer
Disabled
Exercise
without
Load
Exercise
with
Load

S1 DIP
SWITCH
Actuator
7 off
Actuator
7 off

7

FUNCTION

Shaded DIP switches are standard factory settings.

CONTROL FEATURES (continued)
How to Set Optional Programmable Engine Exerciser (part of Acc. 11BG module)
NOTE: When choosing bi–weekly operation, the
exerciser will always run on the week designated “(1)”
on the date display.

Hazardous voltage capable of causing shock,
burns, or death is used in this transfer switch.
Deenergize both Normal and Emergency power
sources before programming the exerciser.

Navigating the Menu
Use the UP and DOWN arrow
keys to move through the displays.

Changing the Parameters
Use the UP and DOWN arrow
keys to move though the displays
to the parameter to be changed.
Push the ENTER key to start the
editing process. The first
parameter will flash. Use the UP
and DOWN arrow keys to adjust
the parameter to the desired
value and press the ENTER key
to save the value. The next
parameter will now flash. Repeat
the process until each parameter
is properly configured.

Run Time Display
The Run Time Display shows the run time for the engine
exerciser. The default setting from the factory is 30 min.

Time Display
The Time Display shows the present system time. The
format is “hours:minutes:seconds”.

Fast/Slow Adjust

NOTE: During total power outages, power to the
accessory is maintained by a battery in the Controller
(see page 4–2). Be sure that the 9–volt alkaline battery
is fresh and enabled (jumper in ON position) so that
the time and date settings are not lost.

Daylight Saving
Time Adjust

Date

Date Display
Time

The Date Display shows the present system date. The
format is “day of week (week) month/day of
month/year”.

Run TIme

NOTE: Week is either week 1 or week 2. This is used
in conjunction with the bi–weekly timer.

Start TIme

Daylight Savings Time Adjust Display

Engine Exerciser

This display shows whether the automatic daylight
saving time adjustment is active. The factory default is
“NO”. If enabled, the unit will automatically adjust for
daylight saving time at 2 AM on Sunday as follows:

Engine Exerciser Display
The Engine Exerciser Display shows the status of the
engine exerciser. When the unit is shipped from the
factory the programmable engine exerciser is
“Disabled” and must be set to “Enabled” by the
customer. When the engine exerciser is running, this
display will count down the remaining time until the
end of the exercise period.

Part No. 629857–001*
629857–002*
Start
first Sunday in April 2nd Sunday in March
Stop
last Sunday in Oct first Sunday in Nov
* Part no. on back of circuit board. New DST starts in 2007.

Fast / Slow Adjust Display

Start Time Display
The Start Time Display shows the engine exerciser start
time. There are four parameters that determine the start
time:
weekly (”Every”) or bi–weekly (”Alt”) operation
day of week (”Sun” through “Sat”)
start hour (0 through 23)
start minutes (0 through 59)
For example, if the user wants the exerciser to run every
other Saturday at 3 PM, the proper configuration would
be: “Alt Sat @ 15:00”

This display shows the automatic fast/slow adjustment
value. The factory default is 0. This feature can be
used to trim a clock that runs fast or slow. For example,
if your clock runs 10 seconds slow per week, change the
fast/slow adjust value to “+10” and the unit will
automatically add 10 seconds to the clock every week.
NOTE: Adjustments are made Sunday morning at 2
AM. If you want your exerciser period to start at 2 AM
on Sunday, you cannot use this feature and the
adjustment must be set to 0.
Date exerciser was set ___________________________

Fill in your settings for future reference
Weekly or Bi–weekly

Day of Week

Start Time

Every = weekly
Alt = bi–weekly

Sun through Sat

0 – 23 hour
0 – 59 minute
5---3

Run Time

0 – 23 hour
0 – 59 minute
30 min. is default setting

CONTROL FEATURES (continued)
INPHASE MONITOR
FOR MOTOR LOAD TRANSFER

LOAD DISCONNECT FEATURE

Inphase monitoring logic controls transfer and
retransfer of motor loads, so that inrush currents do not
exceed normal starting currents. It avoids nuisance
tripping of circuit breakers and mechanical damage to
motor couplings.
The Motor Load Transfer feature is built into the
controller. DIP switch S1 (actuator 5) activates this
feature: right = ON, left = OFF.
FUNCTION

S1 DIP SWITCH

enable

Actuator 5 on

5

disable

Actuator 5 off

Connect external circuits to the terminals indicated on
the Wiring Diagram provided with the ATS.
The double throw (Form C) contact is rated for
28 VDC or 120 VAC (5 amperes resistive). The contact
operates prior to a selectable 0, 3, 10, or 20 second
delay before transfer of the Automatic Transfer Switch.
The contact resets either immediately following transfer
or after the same delay as set for pre–signal before
transfer.

5

Time delay between the load disconnect control signal
and initiation of transfer is set on the controller with
DIP switch S2 (actuators 6, 7, 8) as shown below:

Delay Before Transfer

Shaded DIP switches are standard factory settings.

LD TDBT

7 8

20 seconds

7 8

10 seconds

7 8

3 seconds

If the Motor Load Transfer feature is enabled, it
will be activated following the Load Disconnect
Feature Delay Before Transfer delay.

7 8

0 (disable)

Note

S2 DIP SWITCH
Actuator 7 on
Actuator 8 on
Actuator 7 on
Actuator 8 off
Actuator 7 off
Actuator 8 on
Actuator 7 off
Actuator 8 off

Shaded DIP switches are standard factory settings.

Delay After Transfer*
LD TDAT

S2 DIP SWITCH

enable

Actuator 6 on

6

disable

Actuator 6 off

6

*Enabling the Delay After Transfer will cause the
control signal to reset after the same delay as set for the
Delay Before Transfer.

REMOTE CONTROL FEATURES
These remote control features require a customer–supplied normally closed contact suitable for a 5 V dc low energy
circuit. Refer to the Wiring Diagram provided with the ATS. Activate appropriate DIP switch S2 actuators below.

Remote Test (terminals CP6–7)
RTSW

Remote Transfer to Emergency (CP8–9)

S2 DIP SWITCH

enable

Actuator 2 off

2

Actuator 3 off

Actuator 2 on

2

enable

disable

3

Actuator 3 on

Bypass Transfer Time Delay (CP12–13)
TD E/N BYP.

Inhibit Transfer to Emergency (CP10–11)

S2 DIP SWITCH

Actuator 4 on

enable

Actuator 4 off

4

Actuator 1 off

S2 DIP SWITCH

disable

4

enable

N/E INHIB.

1

Actuator 1 on

1

disable

S2 DIP SWITCH

3

disable

RT /E

5---4

CONTROL FEATURES (continued)
OPTIONAL STRIP HEATER (Accessory 44)
Accessory 44 Strip Heater is designed to keep ambient
temperatures within the Automatic Transfer Switch
enclosure at acceptable levels. This accessory consists
of a mounting bracket with strip heater, thermostat, and
terminal block. A transformer with fuses is included
when the power for the assembly is derived from
voltages above 120 V ac. The 120 V ac customer
powered assembly does not include a transformer. This
optional accessory is available factory installed or in kit
form.

thermostat
dial

turn counterclockwise
to lower temperature

Turn the thermostat’s dial to required setting as shown.

turn clockwise
to raise temperature

Figure 5–4. Thermostat.

AVAILABLE KITS
Controls

Strip Heater – Accessory 44

Description

Accessory

Kit

Description

Accessory

Kit

Programmable Engine Exerciser
& Source Availability Contacts

11BG

K629830

120 volt
customer supplied voltage
(without transformer)

44A

K613127–001

Serial Communication Module

72A

K601110
208 – 480 volt
ATS derived voltage
(with transformer)

44G

K613127–002

380 volt
ATS derived voltage
(with transformer)

44G

K613127

550 – 600 volt
ATS derived voltage
(with transformer)

44G

K613127–003

5---5

A
accessories, 5–2, 5–5
auxiliary circuits, 1–2

B
battery, 4–2, 5–1
buttons, push, 3–1
bypass time delay, 1–5, 2–1, 3–1

C

G

INDEX

strip heater, 5–5

P

ground, controller, 1–1

H

parts, 3–1
problem, 3–2

handle, maintenance, 1–3
warning, 1–3

programmable engine exerciser, 5–2,
5–3

harness, 1–2
disconnect plugs, 3–1

R

HELP
800–800–2726 (ASCO)
customercare@asco.com

rating label, cover

cable
lugs, 1–1
preparation, 1–1

inphase monitor, 5–4

catalog number, inside cover

remote control features, 5–4
bypass transfer time delay, 5–4
inhibit transfer to emergency, 5–4
remote test, 5–4
remote transfer to emergency, 5–4

inspection, 3–1

replacement parts, 3–1

cleaning, 3–1

installation, 1–1

connections
engine control contact, 1–2
line, 1–1
contact position indicators, 1–3
contacts
auxiliary, 1–2
engine control, 1–2
main, 1–3, 3–1
source availability signal, 5–2
control features, 5–1
load disconnect, 5–4
motor load transfer, 5–4
plant exerciser, 5–1, 5–2, 5–3
controller, 4–1, 4–2
codes, cover
cover removal, 4–2
disconnecting, 3–1
time delay potentiometers, 4–2

D
DIP Switches, 4–1, 4–2, 5–1, 5–2, 5–4

E
electrical operation, 1–5
engine exerciser, 5–1, 5–2, 5–3
engine starting contacts, 1–2

F
features, see control features
frequency, pickup and dropout
settings, 4–1
functional test, 1–3, 1–4, 1–5
Printed in U.S.A.

I

S

L

service, call 800–800–2726 (ASCO)

labels,
engine starting contacts, 1–2
inputs / outputs, 1–2
rating, cover

set engine exerciser, 5–1, 5–2, 5–3
settings
changing, 4–1
factory, 4–1
frequency, 4–1
phase, 4–1
time delay, 4–1
voltage, 4–1

lights, 1–4, 5–1
load disconnect feature, 5–4
lubrication, 3–1

M

source accepted lights, 1–4, 1–5

maintenance, preventive, 3–1

T

manual load transfer, 3–2
warning, 3–2

terminal block, 1–2
test, functional, 1–3, 1–4, 1–5

manual operation, 1–3
warning, 1–3

time delay
adjustment, 4–1
gen–set cooldown, 4–1
how to change, 4–2
override momentary outages, 4–1
transfer to emergency, 4–1
transfer to normal, 4–1

motor load transfer feature, 5–4

N
nameplate, cover

O

timer (plant exerciser), how to set,
5–1, 5–2, 5–3

operation
electrical, 1–5
manual, 1–3
illustration of, 1–3
warning, 1–3
sequence of, 2–1

transfer switch position lights, 1–4,
1–5
transfer test, 1–5, 3–1
trouble–shooting, 3–2

optional accessories
programmable engine exerciser
& source availability signal
contacts, 5–2, 5–3
serial communication module, 5–5

V
voltage, phase, 4–1
voltage, pickup and dropout settings,
4–1

Copyright --- ASCO Power Technologies, L.P. 2011



Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.6
Linearized                      : Yes
XMP Toolkit                     : 3.1.1-111
Modify Date                     : 2011:10:10 13:41:35-04:00
Create Date                     : 2011:10:10 11:56:49-04:00
Metadata Date                   : 2011:10:10 13:41:35-04:00
Creator Tool                    : PScript5.dll Version 5.2.2
Format                          : application/pdf
Title                           : Operator's Manual for Series 300 ATS H 600-1200 A UL/CSA
Creator                         : sshippey
Description                     : Print black & white on 11 x 17 standard 20 lb paper, 5 leaves, back-to-back, collated, folded, saddle-stitch stapled
Document ID                     : uuid:7b338e2e-d3ee-4b0d-b99b-130b3a4998ab
Instance ID                     : uuid:9e8cccc1-4ea0-4e49-bd25-2eb91bad9e17
Producer                        : Acrobat Distiller 8.3.1 (Windows)
Has XFA                         : No
Page Count                      : 20
Subject                         : Print black & white on 11 x 17 standard 20 lb paper, 5 leaves, back-to-back, collated, folded, saddle-stitch stapled
Author                          : sshippey
EXIF Metadata provided by EXIF.tools

Navigation menu