Follet 159889 Quick Start Guide
2014-07-05
: Follet Follet-159889-Quick-Start-Guide follet-159889-quick-start-guide follet pdf
Open the PDF directly: View PDF .
Page Count: 16
Download | |
Open PDF In Browser | View PDF |
Horizon™ Ice Machine Models with RIDE™ Technology Installation Instructions for Ice Storage Bins HCC1000ABS, HMC1000ABS, HCC1400ABS, HMC1400ABS, HCC1000WBS, HMC1000WBS, HCC1400WBS, HMC1400WBS, HCE1000ABS, HME1000ABS, HCE1400ABS, HME1400ABS, HCE1000WBS, HME1000WBS, HCE1400WBS, HME1400WBS (See model number configurator on page 2 for details.) Order parts online www.follettice.com self-contained lvania Pennsy NO Easton PART SINGLE PHASE OZ HZ VOLTS PROTE ALLY THERM PSIG E CTED CHARG IN MADE USA THE SIDE LOW SOR NSF UL OMRES R UL C R AMPS AMPS 208264 Stock Module Identification Plate Module No. Product Service No. 801 Church Lane • Easton, PA 18040, USA Toll free (877) 612-5086 • +1 (610) 252-7301 www.follettice.com 00159889R07 Chewblet® Ice Machine Model Number Configurations HC Icemaker MC Maestro™ Chewblet® (400 Series) HC Horizon Chewblet (1000, 1400, 1650 Series) HM Horizon Micro Chewblet Voltage C 1400 A V Series 400 up to C 208-230/60/1 (icemaking head) Self-contained only. 454 lbs D 115/60/1 (icemaking head) (206kg) Self-contained and remote. If remote 1000 up to unit, high side is 208-230/60/1. 1036 lbs E 230/50/1 (icemaking head) (471kg) Self-contained only. 1400 up to F 115/60/1 (icemaking head) 1450 lbs Remote only. High side is (658kg) 208-230/60/3. S Condenser A W R N Air-cooled, self-contained Water-cooled, self-contained Air-cooled, remote condensing unit Air-cooled, no condensing unit for connection to parallel rack system V H B J M Application Configuration Vision™ Harmony™ Ice storage bin Drop-in Ice Manager diverter valve system S RIDE™ (RIDE remote ice delivery equipment) T Top-mount 1650 up to 1580 lbs (717kg) 2 self-contained BIN • RIDE Technology Read and complete the following 8 installation steps Unpack Site preparation 1 2 Bin preparation 3 5 4 External connection Ice transport tube 6 Internal connection Front cover 7 BIN • RIDE Technology Louvered docking assembly 8 self-contained 3 Unpack Carefully unpack and inspect the contents of your Follett ice machine. 1.1 1 Unpack ice machine ➊ ➋ ➌ ➍ 1/2" 1/2" ➎ 4 ➏ self-contained BIN • RIDE Technology Site preparation Prepare the installation site. 2 Provide drainage, water supply and electrical power to within 6 feet (2m) of ice machine in accordance with local and national codes. Outdoor installation is not recommended and will void warranty. 2.1 2.1 Installation site requirements ‡ H_E1000A/W requires 15A circuit, 1.50 mm2 wire NEMA 6-15 H_C1000A/W H_E1400A/W‡ requires 20A circuit, 4.00 mm2 wire NEMA 6-20 1/4" (6,4mm) H_C1400A/W Electrical ➊ • H_C1000(A/W)BS 208-230/60/1-15 amps • H_E1000(A/W)BS 230/50/1-15 amps‡ 1' (0,3m) • H_C1400(A/W)BS 208-230/60/1-20 amps • H_E1400(A/W)BS 230/50/1-20 amps‡ (H_E1000A/W requires 15A circuit, 1.50 mm2 wire) (H_E1400A/W requires 20A circuit, 4.00 mm2 wire) ‡ Plug must be provided by end user & must conform to standard EN 60 335-2-24 of the end destination. Potable water supply ➋ • 10-70 psi (69-483kpa) • 45 to 90 F (7 to 32 C) • Follett recommends the use of an in-line water filtration system (#00130286) Condenser water supply for water-cooled systems ➌ • 10 psi min.; 150 psi max. (69kpa min.; 1034kpa max.) • 45 to 90 F (7 to 32 C) • 1.5 gallons per minute (5.68 liters per minute) Drain ➍ • The drain line from the ice machine must have at least 1/4" per foot pitch (6,4mm/0,3m) BIN • RIDE Technology self-contained 5 Bin preparation Prepare the bin 3.1 Bin top preparation 3.2 3 Bin top preparation ➋ ➊ ➌ ➊ • Remove protective tape from gaskets • Apply gaskets ➊ • Install shuttle actuator ➋ through dispenser top and secure with locking nut ➌ 6 self-contained BIN • RIDE Technology Louvered docking assembly Install the louvered docking assembly. 4 WARNING • Docking station must be secured in accordance with these instructions to ensure ice machine stability. • Ventilation openings in the louvered docking station should be clear of obstruction 4.1 Wall bracket accessory 4.2 • Mount louvered docking assembly to wall bracket accessory BIN • RIDE Technology self-contained Machine stand accessory • Mount louvered docking assembly to machine stand accessory 7 Ice transport tube 5 Install the ice transport tube. 5.1 Ice transport tube installation Hot Water 160 F (71 C) 1/4˝ (6,4mm) ¡ ¢ 1' (0,3m) Ice transport tube tips • Insulate entire length of ice transport tube ➊ • Secure ice transport tube ➋ as needed to prevent dips and traps from forming. For long tube runs see guide on page 14. • Pitch ice transport tube at least 1/4" per foot (6,4mm/.3m) ➌ • Ice transport tube must drain towards ice machine Ice transport tube to bin • Be sure tube ends are square ➍ • Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers before making connection to ease assembly • Push ice transport tube onto ice machine nipple • Install hose clamp ➐ ➎ ➏ Ice transport tube to Ice machine • Be sure tube ends are square ➑ • Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers before making connection to ease assembly • Push ice transport tube onto ice machine nipple • Install hose clamp ➓ 8 ➎ ➒ self-contained BIN • RIDE Technology External connections Connect utilities to louvered docking assembly. 6.1 Air-cooled ice machines only 6.2 Water-cooled ice machines only ➋ ➌ ➋ ➍ ➊ ➊ • Remove access panel if necessary • Install drain line ➊. The rigid drain line from the ice machine must have at least 1/4" per foot pitch (6,4mm/0,3m). • Install ice machine potable water supply ➋ • Replace access panel BIN • RIDE Technology self-contained 6 • Remove access panel if necessary • Install drain line ➊. The rigid drain line from the ice machine must have at least 1/4" per foot pitch. • Connect cooling water supply ➋ and return ➌ • Install ice machine potable water supply ➍ • Replace access panel 9 Internal connections Connect louvered docking assembly to ice machine. 7 CAUTION • Plug must be accessible after final installation. • H_E1400A/W 230/50/1 requires a 20A circuit (4.00 mm2 wire) Air-cooled ice machines – follow steps 7.1 through 7.4. 7.1 7.2 Ice transport tube Potable water line ➊ ➋ ➋ ➊ ➋ ➊ • Slide ice machine into louvered docking assembly ➊ • Insert ice transport tube all the way into coupling and tighten nut firmly ➋ • Insert potable water line into valve • Push drain line over hose barb on back of evaporator mount ➋ 7.3 7.4 Power cord ➊ Power cord ➊ • Remove twist tie • Carefully pass plug thru opening and plug into wall outlet 10 • Position plate into opening and secure with supplied screw self-contained BIN • RIDE Technology Water-cooled ice machines – follow steps 7.5 through 7.10. 7.5 7.6 Cooling lines Ice transport tube ➋ Out In ➊ • Install ice machine cooling water lines to louvered docking assembly • Slide ice machine into louvered docking assembly ➊ • Insert ice transport tube into coupling and tighten nut firmly ➋ 7.7 7.8 Potable water and drain lines Cooling lines and power ➊ ATTENTION INSTALLER Valve is preset at factory. Do not adjust. Adjustment will void warranty and may damage equipment. ➋ ➋ ➊ ➊ ➋ • Insert potable water line into valve ➊ • Push drain line over hose barb on back of evaporator mount ➋ BIN • RIDE Technology self-contained • Connect cooling water lines to ice machine ➊ • Water valve is set at the factory. DO NOT remove seal or adjust water valve ➋ 11 7.9 7.10 Power cord • Remove twist tie • Carefully pass plug thru opening and plug into wall outlet 12 Power cord • Position plate into opening and secure with supplied screw self-contained BIN • RIDE Technology Front cover Install front cover to ice machine. 8.1 8 Water-cooled ice machines only ➋ ➊ • Slide ice machine cover over machine ensuring that tabs on back of cover slip under louvers on back of louvered docking assembly ➊ • Insert and tighten two screws through cover and into louvered docking assembly ➋ NOTICE Ice machine MUST be sanitized prior to operation! Consult Operation and Service Manual provided with ice machine for sanitizing instructions. BIN • RIDE Technology self-contained 13 Long tube run recommendations max. 2 ft (0,6m) 1/4" (6,4mm) 1' (0,3m) • Pitch ice transport tube to allow melt water to drain towards ice machine ➊ • Secure insulated ice transport tube at least every 2 ft (0,6m) to prevent dips or traps 14 self-contained ➋ BIN • RIDE Technology BIN • RIDE Technology self-contained 15 Horizon, Maestro, Harmony, Ice Manager, SafeCLEAN, Sani-Sponge, RIDE and Vision are trademarks of Follett Corporation. Chewblet is a registered trademark of Follett Corporation, registered in the US. 801 Church Lane • Easton, PA 18040, USA Toll free (877) 612-5086 • +1 (610) 252-7301 www.follettice.com 00159889R07 3/12