General Dynamics Broand NODEBHZ Wireless Broadband Base Station User Manual NodeB V2 Installation Guide 01

General Dynamics Broadband, Inc. Wireless Broadband Base Station NodeB V2 Installation Guide 01

Contents

Installation Guide 1

Download: General Dynamics Broand NODEBHZ Wireless Broadband Base Station User Manual NodeB V2 Installation Guide 01
Mirror Download [FCC.gov]General Dynamics Broand NODEBHZ Wireless Broadband Base Station User Manual NodeB V2 Installation Guide 01
Document ID353276
Application IDeRya5NKB/O6dZSThSG0tdg==
Document DescriptionInstallation Guide 1
Short Term ConfidentialNo
Permanent ConfidentialNo
SupercedeNo
Document TypeUser Manual
Display FormatAdobe Acrobat PDF - pdf
Filesize154.22kB (1927727 bits)
Date Submitted2003-09-04 00:00:00
Date Available2003-08-22 00:00:00
Creation Date2003-08-21 17:48:04
Producing SoftwareAcrobat PDFWriter 4.05 for Windows NT
Document Lastmod0000-00-00 00:00:00
Document TitleNodeB-V2-Installation Guide 01.PDF
Document CreatorNodeB-V2-Installation Guide 01.doc - Microsoft Word
Document Author: atb

Node B Installation Guide
Node B V2
Installation Guide
Version 5.0.0
Page 1 of 15
Node B Installation Guide
Information in this document and the products described are subject to change
without notice.
2000-2003 IPWireless, Inc. All rights reserved.
Reproduction, alteration, or distribution in any manner whatsover without the written
permission of IPWireless Inc, is strictly forbidden.
Trademarks used in this text: the IPWireless logo, icon and IPWireless Broadband Modeem
are trademarks of IPWireless, Inc.; Microsoft, Windows, and Windows NT are registered
trademarks of Microsoft Corporation.
Other trademarks and trade names may be used in this document to refer to either the
entities claiming the marks and names or their products, IPWireless, Inc., disclaims any
proprietary interest in trademarks and trade names other than its own.
February 2003
Version 5.0.0
Part No. IPW-0463
Page 2 of 15
Node B Installation Guide
Table of Contents
1.
Release Version ..............................................................................................5
2.
Safety Precautions..........................................................................................6
3.
General Warnings ...........................................................................................6
4.
Overview ..........................................................................................................7
5.
General Specifications....................................................................................8
6.
Installation .....................................................................................................10
Step 1- Pre-Installation .....................................................................................10
Step 2 – Parts Shipped & Tools Required.......................................................11
Step 3 Site Preparations for Node B Installation ............................................13
Step 4 Mounting Bracket Installations ............................................................15
Step 5 Conduit Installation & Cabling ................... Error! Bookmark not defined.
Step 6 Node B Installation onto Mounting Bracket ............ Error! Bookmark not
defined.
Step 7 Ground Installation ..................................... Error! Bookmark not defined.
Step 8 Service Cover Access................................. Error! Bookmark not defined.
Step 9 DC Power Connection................................. Error! Bookmark not defined.
Step 10 Backhaul Connections (Iub) to INC.......... Error! Bookmark not defined.
Step 12 Antenna Cabling - Installation.................. Error! Bookmark not defined.
Step 13 Alarm Connections ................................... Error! Bookmark not defined.
Step 14 GPS Installation & Operation ................... Error! Bookmark not defined.
Step 15 Solar Shield Installation............................ Error! Bookmark not defined.
7.
APPENDIX............................................................ Error! Bookmark not defined.
Appendix A - Installation Check Card ................... Error! Bookmark not defined.
Appendix B - Glossary ........................................... Error! Bookmark not defined.
Version 5.0.0
Page 3 of 15
Node B Installation Guide
Table of Tables
Table 2-1 : Safety Sumbols...................................................................................................... 6
Table 5-1 : Specifications......................................................................................................... 8
Table 5-2 : Node B Model Types ............................................................................................. 9
Table 6-1 : Packing List.......................................................................................................... 11
Table 6-2 : Tools Required..................................................................................................... 12
Table 6-3 : Materials Required............................................................................................... 12
Table 6-4 : Site Preparation Checklist ................................................................................... 13
Table 6-5 : T1/E1 Pin-outs .......................................................Error! Bookmark not defined.
Table of Figures
Figure 5-1 : Node B Physical Dimensions ............................................................................... 8
Figure 5-2 : General Description.............................................................................................. 9
Figure 6-1 : Unpacking Sequence ...................................................................................... 11
Figure 6-2 : Node B - Positioning Clearance ......................................................................... 14
Figure 6-3 : Mounting Bracket................................................................................................ 15
Figure 6-4: Drill template .......................................................Error! Bookmark not defined.
Figure 6-5 : Bracket Fixing to Wall - Wall.................................Error! Bookmark not defined.
Figure 6-6: Node B Securing to Uneven Wall ..........................Error! Bookmark not defined.
Figure 6-7 : Pole Mounting using Unistrut systems .................Error! Bookmark not defined.
Figure 6-8 : Node B - Rack Mounted .......................................Error! Bookmark not defined.
Figure 6-9: Flexible Conduit.....................................................Error! Bookmark not defined.
Figure 6-10: Node B onto Mounting Bracket............................Error! Bookmark not defined.
Figure 6-11 : Earth Connection ................................................Error! Bookmark not defined.
Figure 6-12 : Service Access ...................................................Error! Bookmark not defined.
Figure 6-13 : Service Area Description ....................................Error! Bookmark not defined.
Figure 6-14 : Power Connections ............................................Error! Bookmark not defined.
Figure 6-15 : Backhaul Connections........................................Error! Bookmark not defined.
Figure 6-16 : Ethernet Pin-outs using RJ45.............................Error! Bookmark not defined.
Figure 6-17 : Ethernet Pin-outs using RJ45.............................Error! Bookmark not defined.
Figure 6-18 : Antenna Connections .....................................Error! Bookmark not defined.
Figure 6-19 : Alarm Outputs & Inputs ......................................Error! Bookmark not defined.
Figure 6-20 : GPS Antenna......................................................Error! Bookmark not defined.
Figure 6-21 : Solar Shield Fitting .............................................Error! Bookmark not defined.
Figure 6-22 : Solar Shield Securing .........................................Error! Bookmark not defined.
Figure 6-23 : Solar Shield Hooked on Node B.........................Error! Bookmark not defined.
Version 5.0.0
Page 4 of 15
Node B Installation Guide
1. Release Version
Date
th
8 April 2003
Version 5.0.0
Version
Author
Reason For Change Issue
5.0.0
L.Mujegu
Initial Version
Page 5 of 15
Node B Installation Guide
2. Safety Precautions
Table 2-1 : Safety Sumbols
GENERAL
WARNING
GENERAL
SAFETY
PRECAUTION
ELECTRICAL
HAZARD
BURN/HEAT
HAZARD
CORROSIVE
MATERIALS
GROUND
VOLTAGE:
HEAT:
CORROSIVE:
GROUND:
Direct contact with
these areas could
result in severe
physical harm and
property damage
Direct contact with
this surface will
result in severe
burns
Direct contact with
this surface will
result in chemical
burns.
NOT USED
Site for grounding
equipment
These cautionary signs are used on the physical equipment and throughout this manual.
For safety of personnel and protection of equipment observe these precautions when
installing, operating or servicing the equipment and surrounding areas.
3. General Warnings
Electrical
Power Supply – cord fitted for AC or DC. DO NOT adapt to a different configuration.
Power supply circuits carry high voltages. Remove rings, watches, and other jewellery
before working with this type of equipment.
Batteries – Certain installation of this equipment require working with lead acid batteries,
batteries present chemical, electric and gaseous hazards. Batteries are not supplied by
IPWireless for the Node B equipment although UPS systems may be coupled with the
device in order to provide back up power in case of power outages.
Physical
Weight – Each Node B weighs 25kgs (55 pounds). Precautions should be taken, depending
on the installation site conditions, in lifting and hoisting the device.
Environmental
There are different precautions to take within each environment. Specific precautions are
listed in the installation section for that environment.
Site Location
The NodeB basestation is designed to be installed in restricted access locations only. The
site locations are accessible by suitably trained service/installation personnel only.
Network Connections
The NodeB basestation is not suitable for direct connection to Public Switched Networks.
This means that the Node B is not suitable for direct connection to TNV circuits
Version 5.0.0
Page 6 of 15
Node B Installation Guide
4. Overview
Node B is the European Technical Standards Institute’s (ETSI) name for the radio base
station. The basic function of the Node B is to convert 100 Base T packet data into the
UTRAN TD-CDMA air interface used between the Node B and the 3G Modem. The Node B
can be configured to operate in configurations ranging from a single sector or omni mode, up
to a 6 sector arrangement. One Node B is required for each sector of coverage, in the case
of an omni configuration one Node B will be required. The Node B is controlled by an INC
(Integrated network Controller) Generally co located at the site in a separate cabinet.
The Node B supports both 768 mega chips (10MHz) and 385 mega chips (5MHz) without
any hardware modification.
Scope
This document covers the physical installation and mountint of the NodeB using bracketry
supplied. It does not detail custom or specialised installations or applications.
Additionally, antenna rigging/mounting, lightning protection, tower work, feeder installation /
termination are all considered to be outside the scope of this document.
If in any doubt about the suitability of this document to successfully install at the proposed
location, then please consult IPWireless technical support for assistance.
Version 5.0.0
Page 7 of 15
Node B Installation Guide
5. General Specifications
Table 5-1 : Specifications
Unit
Specification
566 H x 380 W x 202 D mm
Measurements
22.5 H x 15 W x 8 D inch
Measurements with Solar Shield attached
566 H x 380 W x 294 D mm
22.5 H x 15 W x 11.5 D inch
Node B Weight
25Kgs / 55 lbs
Node B Weight with solar shield and mounting
Bracket
30Kgs / 66 lbs
Power Consumption
200 Watts max
Input Power
-48 V DC
Input Range
-36V to -72V DC
Ambient Operational Temp Range
-40ºC to +55ºC
Cooling
Passive
Operating Frequencies
Node B without
Solar shield or Bracket
MMDS
2500 MHz – 2700 MHz
UMTS
1900MHz – 2100MHz
Figure 5-1 : Node B Physical Dimensions
406mm
406mm
Node B with
Solar shield & Bracket
10"
202mm
560mm
Version 5.0.0
560mm
Page 8 of 15
Node B Installation Guide
Table 5-2 : Node B Model Types
Node B Frequency
Model Number
1900-1905 MHz
Model GM
1905-1910 MHz
Model GN
1910-1915 MHz
Model GP
1915-1920 MHz
Model GQ
2053-2082 MHz
Model HV
2010-2015 MHz
Model JG
2500-2686 MHz
Model HZ
Figure 5-2 : General Description
406mm
406mm
10"
202mm
NODE B
UNIT
560mm
560mm
ACCESS
COVER
GPS ANTENNA
CONNECTIONS
MOUNTING
BRACKET
CABLE
GLANDS
RF ANTENNA
CONNECTIONS
Version 5.0.0
EXTERNAL
STATUS LEDS
SOLAR
SHIELD
Page 9 of 15
Node B Installation Guide
6. Installation
This section describes the steps to be followed to physically install the Node B.
Step 1- Pre-Installation
This section describes the initial checks that should be carried out to ensure that preparation
for the installation is complete.
For Installation Check Card please see Appendix A at the back of this manual.
1. Review site construction drawings to determine if site was constructed
according to the drawings.
2. Review drawings and actual installation to determine location of Node B
installation.
3. Check availability of electrical, grounding and antenna connections.
4. Complete site survey.
5. Check structural strength of wall, pole or mounting frame to support Node B
weight of 25Kgs (55lbs).
Version 5.0.0
Page 10 of 15
Node B Installation Guide
Step 2 – Parts Shipped & Tools Required
This section reviews the parts, ancillary materials and tools required to install the Node B.
Use this checklist to check quantity and quality of parts as they are unpacked: The Node B unit is packaged with the following items, the packing list on the inside top of the
packing shall list these items.
The carton is packed to facilitate the intended sequence of installation. The figure below
shows the sequence of removal from the packing.
Table 6-1 : Packing List
Description
Qty
Node B Unit
Node B Mounting Bracket
Solar Shield Assembly
Unit Mounting Bracket Fixings Kit
contains:
4 x M8 bolts
GPS Antenna Kit incl Mounting
Mounting
Bracket
contains:
1 x gps antenna
1 x gps antenna mounting
Alarm Connector Kit
contains:
2 x 2 alarm connectors
1 x 12 way alarm connector
3 strain relief cable ties
Cable Gland Kit
Node B Unit
contains:
5 off cable glands plain-single Ø7-4mm
5 off emc cable glands- Ø8-4mm
2 x dual inserts 5mm diam cable
2 x dual inserts 6mm diam cable
Service Access Cover – Tool
KITS
1. Mounting Kit
2. GPS Kit
3. Alarm Kit
4. Gland Kit
5. Service AccessTool
Solar Shield
Figure 6-1 : Unpacking Sequence
Version 5.0.0
Page 11 of 15
Node B Installation Guide
In addition to standard construction equipment, the following tools and materials should be
available prior to installation:
Table 6-2 : Tools Required
Tools
Description
Access Tool
Tool for Node B service area access
Drill and Drill Bits
M6 or No8 Masonry Drill Bit
Voltmeter
Fluke meter
Alarm Cable Insertion Tool
1mm flat blade Screwdriver
Basic telecommunications tool kit
Includes screwdriver, socket wrenches, etc.
Cable Stripper & Crimper
RJ 45 crimper connector
Ethernet cable test set
Test for all Ethernet cables
Compass or Handheld GPS with signal indicator
Test for GPS signal at site location
Table 6-3 : Materials Required
Description
Material
Armoured conduit- UL-1211
Ducting UL rated 12x18mm Diameter
Cable conduit attached to cable glands
CAT5 - 4 pair, double screened cable, recommended
Alcatel LANmark-5 F TP or equivalent
IUB / LMT / T1 / E1 Cable
RJ45 Connectors
IUB / LMT / T1 / E1 Connections
CSA 7mm or Ø3mm or 9AWG (Max) for each
2 core power cable
DC Power Cable 2 core
CAT5 - 4 pair, double screened cable, recommended
Alcatel LANmark-5 F TP or equivalent
Alarm distribution cable
10 mm2 maximum Ground cable
Grounding termination
M10 ring terminal
Grounding termination
BNC Right Angle Connectors
Connectors for E3/T3 Connections
RG59 B/U-LSF and UV stabilised or equivalent
Cable for E3/T3 Connections
Version 5.0.0
Page 12 of 15
Node B Installation Guide
Step 3 Site Preparations for Node B Installation
The section specifies the facilities that need to be available at the site prior to installation. The
table below is a site checklist that should be completed prior to installation.
It is assumed that the site has already been selected from RF network planning and that site
acquisition or permission has been granted.
Table 6-4 : Site Preparation Checklist
Facility
Mains power supply –48Vdc
Availability of suitable Ethernet, E1, T11, E3 or T3 Interfaces
connections and trunking/conduits for interfaces
Suitable earth
Structure suitable to mount the NodeB
Clearance around the NodeB for cable entry and cooling
Complete
Yes/No
- see figure below
Assumptions
It is assumed that prior to Node B installation all civil, electrical distribution, structured
cabling termination work has been completed.
Additionally, all antenna rigging, feeder runs and terminations, associated lightning
protection and earthing, has been done, with certification for safety / compliance issued as
required by local regulations.
It is also strongly recommended that all VSWR plots of the feeder / antenna installations
should be available for inspection.
Positioning the Node B
Depending on the flatness of the wall the bracket can either be mounting directly to the wall
or can be mounted offset from the wall using 'Unistrut'.
Selection of a suitable position for the Node B shall be done by surveying possible sites with
regard to the availability of facilities i.e. power, relative position to the INC and consulting the
site plans.
The Node B should be sited not more than 100m from the INC using Shielded Category 5
Ethernet cable as specified. Care should be taken to position the Node B where it can be
easily accessed via the front access cover.
The Node B will need to be connected near the feeder terminations and earthing points as
provided on site.
Note: Where the Node B is installed using a microwave link ensure that the microwave link
can support the Ethernet requirements for the IUB interface i.e. 10 or 100 Mbps / full / half
duplex as the Node B and INC may need to be configured manually in order to support this
configuration.
Version 5.0.0
Page 13 of 15
Node B Installation Guide
General Considerations
The following consideration and checks are applicable to all mounting types :-
Ø Consider the earthquake zone requirements for the given site being considered
and ensure that the mounting arrangement and location complies.
Ø Review the GPS installation guidelines (Step 7) to ensure that the location will
allow proper operation of the Node B GPS remote antenna. i.e. a Southern
Exposure is required for outside installations (Northern Hemisphere), a GPS
repeater may be necessary in areas where the active GPS antenna cannot
reach.
Ø Depending on the installation it may be required to fit the cable conduit to the
cable glands prior to mounting Node B to the bracket.
Ø There should be a minimum clearance of 1m above and below the Node B.
Ø Ensure that the wall or mounting surface is sufficiently strong to support the
Node B and structure.
Ø The Node B should be upright to permit adequate heat dissipation.
Figure 6-2 : Node B - Positioning Clearance
Min 1m
Min 1m
Version 5.0.0
Page 14 of 15
Node B Installation Guide
Step 4 Mounting Bracket Installations
There are three ways of installing the Node B:-
Ø Wall,
Ø Pole
Ø Rack Mounts.
This section explains how to mount the Node B bracket in all three instances. The securing
of the Node B to the mounting bracket is the same for the three mounts and shall be
described in step 10.
Mounting Bracket
The figure below illustrates the key features of the mounting bracket.
Figure 6-3 : Mounting Bracket
(c)
(a)
(b)
a) wall mounting fixing holes & keyslots (various)
b) unit mounting keyslots to mount nodeb to bracket (4off)
c) fixing points – to secure Node B to bracket (4off-M8 Bolts)
Version 5.0.0
Page 15 of 15

Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.2
Linearized                      : No
Page Count                      : 15
Creator                         : NodeB-V2-Installation Guide 01.doc - Microsoft Word
Create Date                     : 2003:08:21 17:48:04
Title                           : NodeB-V2-Installation Guide 01.PDF
Author                          : atb
Producer                        : Acrobat PDFWriter 4.05 for Windows NT
EXIF Metadata provided by EXIF.tools
FCC ID Filing: PKTNODEBHZ

Navigation menu