Goliath Solutions SPIDER-10-001 Goliath Solutions Spider III RFID System User Manual Installation and

Goliath Solutions Goliath Solutions Spider III RFID System Installation and

Installation and User Manual

Download: Goliath Solutions SPIDER-10-001 Goliath Solutions Spider III RFID System User Manual Installation and
Mirror Download [FCC.gov]Goliath Solutions SPIDER-10-001 Goliath Solutions Spider III RFID System User Manual Installation and
Document ID723604
Application IDM/oMOzYuS6UEenFf3mSvRw==
Document DescriptionInstallation and User Manual
Short Term ConfidentialNo
Permanent ConfidentialNo
SupercedeNo
Document TypeUser Manual
Display FormatAdobe Acrobat PDF - pdf
Filesize245.66kB (3070703 bits)
Date Submitted2006-11-01 00:00:00
Date Available2006-11-01 00:00:00
Creation Date2006-10-23 11:35:11
Producing SoftwareAFPL Ghostscript 8.50
Document Lastmod2006-10-23 11:35:11
Document TitleMicrosoft Word - Goliath Solutions Installation and User Manual for Spider System 10-001 updated10_23_06.doc
Document CreatorPScript5.dll Version 5.2
Document Author: mspataro

Field Service Manager
Cable Installation & MEU Activation
Manual
Revision 1.B
10/23/2006
FSM Cable Installation & MEU Activation
TABLE OF CONTENTS:
RF EXPOSURE: ........................................................................................................................ 3
INTRODUCTION: .................................................................................................................... 3
REMINDER:............................................................................................................................................................ 3
THE ROLE AND RESPONSIBILITIES OF THE FSM IN THE INSTALLATION PROCESS:.................................................. 4
PRIOR TO INSTALLATION: ...................................................................................................................................... 5
IN STORE PROCEDURES:..................................................................................................... 6
CHECK-IN:............................................................................................................................................................. 6
STORE INSTALLATION: .......................................................................................................................................... 7
MEU Survey:.................................................................................................................................................... 7
Equipment Survey: ........................................................................................................................................... 9
Quality Assurance:......................................................................................................................................... 10
Test Tags:....................................................................................................................................................... 11
Display Tags: ................................................................................................................................................. 11
MEU Activation and Configuration:.............................................................................................................. 12
COMPLETE THE INSTALLATION PROCESS:............................................................................................................ 13
APPENDICES .......................................................................................................................... 14
APPENDIX A – REQUIRED EQUIPMENT AND SUPPLIES FOR AN FSM DURING INSTALLS ........................................ 14
APPENDIX B – INSTALLATION CHECK LIST ......................................................................................................... 17
APPENDIX C – MEU SUSPENSION ....................................................................................................................... 18
APPENDIX D - TEST TAGS.................................................................................................................................... 22
Suggested Test Tag Locations for Store......................................................................................................... 22
Suggested Test Tag Locations for Stock Room .............................................................................................. 22
Test Tag Inventory Sheet: .............................................................................................................................. 23
APPENDIX E – GOLIATH TAG INSTALLATION REPORT ......................................................................................... 24
APPENDIX F – ESTIMATING DISTANCES FROM THE MEU..................................................................................... 25
APPENDIX G – SAMPLE PRE-INSTALLATION SURVEY REPORT ............................................................................ 27
APPENDIX H – QA CHECKLIST ............................................................................................................................ 31
APPENDIX I – MEU CONFIGURATION .................................................................................................................. 34
Page 2 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
RF Exposure:
The antenna(s) used for this transmitter must be installed to provide a separation distance of at
least 20cm from all persons and must not be co-located or operating in conjunction with any
other antenna or transmitter.
Introduction:
The purpose of this manual is to document the responsibilities of the Field Service manager
during the Cable and MEU Activation and Installation. The FSM will be the project manager
of this process when on site.
This manual is a supplement to Cable Installation & MEU Activation Manual that is provided
to the Cable Venders. Have you copy of that manual available during the installation. This
manual has the detailed steps for the store installation. You need to be familiar with this
manual.
Reminder:
Throughout the installation you will be working in areas of the store that customers and
Walgreen’s employees need to access. Always be aware of the space you occupy and limit the
need for tools and material to be in the aisles where customers are shopping and employees
working. Be especially careful as any cables that are strewn about the aisles are a hazard which
customers may trip over.
Remember to always be polite and helpful to the Walgreens employees and customers
when you are on site.
Page 3 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
The Role and Responsibilities of the FSM in the installation process:
1) You are the project manager for this installation.
2) You are the primary interface between the Retailer, the Cable Vendor and the Goliath
Solutions Help Desk.
3) You are there to deal with any potential problems that may occur during an installation.
4) You will designate the installation location for all of the Goliath Solutions equipment.
5) You will either install or verify the installation of test tags in the store. And you will make
sure that they are entered into SYSMON.
6) You will install the current campaign tags on the displays in the store.
7) You will configure and activate the MEU after it has been installed.
8) You will test the installed system with the Help Desk.
9) You will act as Quality Assurance to validate that the install is completed to the required
installation/cabling standards for Goliath Solutions and the Retailer. A sample of the QA
Survey is found in Appendix H. The actual QA Survey document is found on the swap
drive with the file name QA Survey 1A.doc.
10) Document any issues or problems that took place during the install.
11) Make sure the store is clean after the installation. Any mess or garbage from the
installation must be cleaned up before you leave the store.
12) Do what it takes to have a successful installation. A successful installation includes the
following items:
• The hardware installed correctly and according to the standards of Goliath Solutions
and the retailer.
• The system functioning and configured correctly.
• The store management is happy with the installation.
Page 4 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
Prior to Installation:
Prior to your installation visit the Goliath Solutions Help Desk and the Cable Installation
Vendor will have scheduled the installation with the Retailer. Your responsibility prior to the
installation is the following tasks:
1. Print a copy of the Pre-Installation Survey from QuickBase. A sample report is found
in Appendix G.
2. Review the Pre-Installation Survey.
3. If the store has an exception floor plan, print and review that floor plan.
4. If the store has a standard floor plan the store floor plans are listed in Appendix G –
Store Layouts in the Cable Installation & MEU Activation Manual.
5. Print a current copy of the Campaign List for the tags to be installed at the store.
6. Go to SYSMON and verify if Test Tags have been entered for the store. If test tags are
installed in the store print this information. (You will need this to verify if the test tags
are still present in the store.) If test tags are installed in the store go to step 9.
7. Prepare 18 RFID Test tags with batteries for the store. As you prepare the test tags
record the tag information in the Test Tag Inventory Sheet. (This is found in Appendix
D of this document.) 11 RFID test tags will be used in the store and 7 RFID test tags
will be used in the stock room.
8. Enter the test tag information into SYSMON.
9. A store will initially have about 30 active campaigns that we are tracking. Make sure
that you have enough of the following items for the store for these campaigns:
a) RFID Tags
b) Batteries
c) Tag envelopes
d) Goliath Tag Installation Report (This is found in Appendix E of this document.)
10. Always have extra RFID Tags, Batteries and Tag envelopes with you.
11. Verify that you have the equipment listed in Appendix A of this manual.
Page 5 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
In Store Procedures:
Check-In:
Upon arrival at the store the following activities must take place:
1) If possible arrive at the store prior to the scheduled arrival time of the Cabling Vendor.
2) Review the pre-installation survey detail prior to the install.
3) Locate the store manager.
a) Introduce yourself to the store manager. If the Cable Vendor is on site make sure that
they were introduced to the manager. (Please note: A photo ID will be required.)
b) Explain the reason you are on-site, the approximate length of the installation and the
areas of the store where the installation team will be working.
4) When the Cabling Vendor arrives at site introduce yourself and update the cable vendor the
current status of the install and introduce them to the manager.
5) Locate the equipment shipped to the store and verify that you have the correct number of
boxes. Check the invoice for the MEU serial number (You may have to open the MEU box
to get the serial number). The equipment is normally shipped in three cartons. They are:
• Cable – one carton containing the 110’ BNC ended plenum rated cables, 85’ BNC
ended plenum rated cables and 25’ BNC ended plenum rated cables.
• MEU – One carton containing the MEU, Power Supply, 75’ or a 110’ power cable.
• ATA/ARA Kit – One carton containing 12 ARA – Receivers and 3 ATA –
Transmitters. You may receive up to 14 receivers based upon store configuration.
6) Use your notebook PC with the Verizon Air Card and update the store record in QuickBase
with the following information:
a) MEU Serial Number.
b) Start Time (The time is entered in a 24 hour format).
If you do not have internet access or there are other issues that could prevent a
successful installation then call the Goliath help desk at 866-378-9956 and update them
on the situation.
Page 6 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
Store Installation:
During the installation process make sure to document any issues that may occur during the
install and record them in QuickBase after the installation. (Do not forget to enter the MEU
information, the start time, and the end time of the install, and the MEU Mount into
QuickBase).
After completing the store check-in procedures you will conduct a store survey. The store
survey is separated into two parts. They are the MEU Survey and the Equipment Survey. The
purpose of the MEU survey is to determine the location of the MEU. The purpose of the
Equipment Survey is to determine the location of all the transmitters and receivers in the store
and stock room.
MEU Survey:
This is your top priority after checking into the store. You must determine the location for the
MEU to be installed in the store. The location of the MEU is critical to the success of the
install.
With the floor plan and pre-install survey walk through the store and determine the location of
the following:
1) The MEU location. (This may be marked by either 2 black push pins or 2 green dots that
were placed in the early pre-installation surveys). You will be marking the location of all
MEUs and antennae with a mark placed on the floor. Use a wet erase marker found in the
tool kit to mark the floor with antenna locations the mark should be as follows R1 R2 R3
…….to the final receiver on the floor and T1, T2, T3 for the transmitter locations. This
mark should be on the floor directly below the spot of the antenna
2) The location of the LAN cabinet.
3) The location of the power by the front TV.
4) The location of the stock room.
5) The location of the furthest receivers (ARA) and transmitters (ATA) from the proposed
MEU location. You will be marking the location of all MEUs and antennae with a mark
placed on the floor. See note above in #1
Page 7 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
6) After you determine the location of the MEU the Cable Vendor can start the installation
process for the MEU.
(Work with your Cable Vendor to determine the power availability.)
You must consider the following factors when determining the best location of the MEU.
1) Location of the power for the MEU. The power will either come from an outlet by the
TV at the front entrance of the store or from the LAN Cabinet. The LAN Cabinet is
normally located in the Pharmacy or the Electric room. The MEU currently comes with a
75’ power cable, but in the future will come with a 100’ cable. The MEU has to be placed
where it can reach to one of these power sources. The power location choice should made
in the following sequence:
a) An open outlet by the TV. (This may be documented in the Pre-Install Survey)
b) The LAN Cabinet.
c) If the outlets are filled by the TV and the extension cord is not long enough to reach the
LAN Cabinet, then the Cable vendor will have to modify the power outlet by the TV to
add another outlet. This should only be done if options 1 or 2 will not work. This is
an extra cost for the install and will take extra time.
d) The location of where the MEU is plugged into the power should be documented in
your installation site report. If the Cable Vendor had to modify the power outlet by the
TV, make sure to document what they did in detail.
2) When determining the availability of power work with your Cable Vendor. We are limited
by the length of the power extension cord, either 75’ or 110’, but this cord can go directly
from the MEU to the power location. It does not have to run the length of the girders.
(Appendix F will give you examples on how to estimate the distance from the MEU to
the power location.)
3) The location of the posts in the center of the store. In an 8 aisle store this is normally aisle
3, in a 9 aisle store this is normally aisle 4, and in a 10 aisle store this is normally aisle 5.
Consider will the cables reach all the locations for the transmitters and receivers from this
location?
4) The preferred mounting method for the MEU is mounting it on a central post. This is the
standard, but there are exceptions when the MEU will have to Suspended from the ceiling.
This should only be done if the post mount location will not work for this store. (The
Suspended Mount instructions are found in Appendix C of this document.)
Page 8 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
5) The location of the Stock Room. Two receivers (ARA) and one transmitter (ATA) will be
placed on the girders in the stock room. You are limited by 110’ cables for the TX and
135’ for RXes to reach the stock room. Will the cables reach from the MEU to the stock
room? (It is possible we may not be able to install transmitters and receivers in some stock
rooms.) Since stockrooms must be cabled, the MEU may have to be located closer to the
stockroom than to electrical power in the Pharmacy area. This is an example where
electrical work is authorized.
6) The location of the furthest receivers (ARA) from the proposed MEU location. (A 135’
cable can be made using a B&C plus 110’ plus 25’ cables.) Please be sure to insulate the
connector with electrical tape.
Equipment Survey:
After the MEU location has been determined, then walk through the store, with the floor plan
to determine the exact positions of the transmitters (ATA) and the receivers (ARA). It is best
to include one of the cable team members while you do this so they can see the process and
know where the marks on the floor are placed. During this time the other cable team member
can be numbering the cables.
1) If a detailed pre-install survey was done the proposed locations for the transmitters and
receivers are marked by either colored dots or pushpins on the ceiling tiles. Verify that
these are the best locations for the transmitters (ATA) and receivers (ARA).
a) (A blue dot or pushpin indicates an ATA, a green dot or black push pin indicates the
location for ARA, and either 2 green dots or 2 black push pins indicate the MEU
Location.
2) If the location of the transmitters (ATA) and receivers (ARA) were not documented when
the pre-install survey was done, then you will have to mark the location for the Cable
Installation Vender. Use a Wet erase marker and mark the location on the floor. (Test
your marker to verify that it can be erased on an area of the floor that can’t be seen).
After the equipment is installed the marks have to be erased from the floor. You can
alternately use adhesive dots.
Page 9 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
3) Walk thru the Stock Room to determine the best location for one ATA (Transmitter
Antennae) and two ARA (Receiver Antennae). If the complete Pre-Install survey was done
the location is marked by a Yellow Dot for the ATA and Green Dots for the ARA.
Remember the restrictions in the stock room are the length of the cable from the MEU and
limited locations on the girders due to the conduit mounted on them. Transmitters and
Receivers should be a minimum of 8’ apart.
4) Verify the phone number for phone line 2. ( This is the number that the MEU uses to call
out)
5) Review with the Cable Installation Vender the selected location for all of the equipment to
be installed and the location of the phone block and the MEU. If done during your walk
through this may be able to be eliminated.
6) Verify that you have the correct equipment for the installation of this store. This means
verify that you have the correct number of ATA, ARA, and cables for this store. If not
notify the Help Desk immediately. You will have provisions in your hot spare kit but this
will need to be replenished
7) Give the Cable Installation Vender the phone number for phone line 2. Make sure they
know they can not touch the primary phone number for the store.
Quality Assurance:
During the installation process it is your responsibility to perform the following QA tasks:
1) Verify that the work area is kept as clean as possible. Make sure that it is not a hazard to
the Stores employees or customers.
2) Verify that the Cable Install Vender is compliant with Goliath Solutions’ and the Retailers
wiring standards.
3) Verify that work areas are cleaned up after the Cable Install Vendor is complete in that area
of the store.
4) Verify that push pins, dots and dry erase marks are removed from the ceiling or the floor of
the store and replaced with the labels provided by Goliath Solutions. Examples are found
in the Cable Installation & MEU Activation Manual.
5) Keep the Store Management informed during the install.
Page 10 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
Test Tags:
You will be placing Test tags in the store during the installation process if they were not
installed during the Pre-Installation survey. (Appendix D provides information on the
placement of the test tags.)
1) Check SYSMON and verify to see if the test tags were entered for this store.
2) If test tags are not in SYSMON and were not installed in the store then go to step 4.
3) If test tags were entered in SYSMON verify that they are still present in the store. If any of
the test tags are missing, replace them with new ones and then update SYSMON with the
new tags. Go to step 6.
4) Using the Test Tag Inventory Sheet place 11 test tags in the store at their designated
location and 7 test tags in the stock room.
5) Enter the Test Tag information into SYSMON.
6) You are now complete with the installation of Test Tags.
NOTE: It is best to have the test tags entered into SYSMON prior to the initial MEU dial in
from that store. This will allow the test tags to update properly and be visible in
Sysmon after the first cycle of the MEU. Otherwise you will have to allow for a
second scan and data dump before you will see your tags.
Display Tags:
During the install process you will be placing RFID tags on the displays for the current
campaign list. This should be about 25 to 30 campaigns. You will need the current campaign
list, tags, batteries, envelopes, tape, and the Goliath Tag Installation Report (Found in
Appendix E.)
1) Walk through the store finding displays for the current campaign list.
2) Place a tag on the display at the designated location and record the information in you
Goliath Tag Installation Report.
Page 11 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
3) When you have gone through the whole store and tagged the designated displays you are
done with the store part of this process. You may not find all the displays in the current
campaign list, because the store did not put out all of their displays.
4) If you have time during the installation input the Display Tag information into SYSMON.
5) Input the Display Tag information as soon a possible into SYSMON.
Note: You may have a FST, a DST or a DSM present during the install. Train and work with
them on the placement of the Display Tags for the store. You can give them the responsibility
of inputting the tag information into SYSMON. But keep a copy of the Goliath Tag
Installation Report and verify that they have input the Tag information correctly and in a
timely basis.
MEU Activation and Configuration:
This is the process of configuring and then activating the MEU for this store. This process is
done after the Cable Installation Vendor has completed the hardware installation. The Cable
Vendor can’t leave until you have configured and activated the MEU and tested it. They
need to stay until you are done. This process won’t include a call to the help desk unless
there is an issue. The FSM will check MODEMBANK prior to leaving and then verify all
antennas have reported in. You can also check Sysmon to verify this info.
The MEU comes configured with a standard configuration of 3 Transmitters, 12 Receivers for
the store and 1 Transmitter and 2 Receivers for the Stock Room. The configuration in the
MEU may have to be changed to match the configuration of the store you are installing.
Please refer to Appendix I – MEU Configuration for this process. The information you
will need is the number and location of the receivers installed in the store. For example if you
have an extra receiver in the Pharmacy (RX14) this has to be configured into the MEU.
1) Connect your PC to the MEU.
2) Configure the MEU for your store configuration.
3) Disconnect Your PC.
4) Go to the Complete Installation Process section of this manual.
Note: Transmitter 4 (TX 4) and Receivers 15 and 16 (RX15, RX16) will always be in the
stock room.
Page 12 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
Complete the Installation Process:
1) Call the Goliath help desk 847-387-8796 or complete the installation report in QB using
your laptop. Email the completed report to Bill Black in lieu of the checkout call. We
encourage you to use QB and reserve calling the help desk unless you need help to ensure
that you receive prompt assistance when help is required
2) Report that the system has been installed and configured.
3) Report any issues that will require a revisit to correct or to report any h/w over ships that
have been stored with the MEU.
4) Report if you had to change the location of the MEU from what you originally reported to
them.
5) The Goliath help desk will be able to verify that the MEU was able to communicate
outbound and determine if any component is not functioning.
6) Depending on the nature of the problem, h/w diagnosis will be confirmed and corrected by
the installation crew on site or a separate maintenance call will be scheduled. Unless the
MEU is OBF, most issues should be related to a cable or connector type issue.
7) Site will be classified as complete with outstanding issues.
8) Walk through the store and verify that:
a)
b)
c)
d)
e)
The store has been cleaned up from the installation.
All ceiling tiles are in place.
Push pins and dots have been removed.
Dry erase marks are erased.
The labels provided by Goliath have been affixed to the ceiling grids pointing to the
location of the receivers and the MEU.
9) Notify the Store manager that the install is complete and sign out.
10) When you get home that night update QuickBase with your installation report.
The Goliath help desk may be called during the installation for expert assistance is
required or to report hardware OBFs (out of box failures), antenna placement questions,
Phone/Wan issues, or other issues.
Page 13 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
Appendices
Appendix A – Required equipment and supplies for an FSM during installs
1) Notebook computer.
2) PC Interface cable for MEU
3) RS 232 Dongle (PC Interface)
4) Cell Phone
5) Digital Camera.
6) Pre-install survey for the site.
7) Cable Installation & MEU Activation Manual
8) Field Service Manager - Cable Installation & MEU Activation Manual
9) Spider Installation Manual
10) Measuring Wheel (used for calculating distances from the MEU)
11) Tool Kit – You tool kit should contain the following items:
a) Clear Packing tape.
b) Dry erase Marker
c) LED Flashlight
d) Label making kit.
Page 14 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
e) Digital Multi meter
f) Laser measuring tool
g) 6-1 Screwdriver (A multipurpose screw drive that is not magnetized)
h) Diagonal wire cutter.
12) RFID Tags
13) Batteries for Tags
14) Envelopes for Tags
15) Current Campaign List for the Displays.
16) Blank Goliath Tag Installation Report
17) Test Tag Inventory Sheet
18) Calculator
Page 15 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
19) Supplies for suspending an MEU:
a) Roll of plastic pipe hanger (can be purchased at Home Depot or at a plumbing supply a
100’ roll if available).
b) 4” zip-ties (minimum of 2 used per site).
c) Appropriate device for sending plastic pipe hanger over girder (currently 3 methods in
use: Unger “gripper”, ball with string, or 5’ length of PVC pipe of sufficient diameter
to accommodate plastic pipe hanger).
d) An item of sufficient weight to attach to the end of the plastic pipe hanger.
Page 16 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
Appendix B – Installation Check List
Task
1) Complete the pre- installation tasks.
2) Verify that you have all the supplies listed in Appendix A available for the store
installation.
3) Checked in with the Store Manager.
4) Checked in with the Goliath Help Desk.
5) Verified the location of the Goliath equipment package and its contents.
6) Performed the MEU Survey and determined the location of the MEU.
7) Performed the Equipment survey and determined the location of all the
transmitters and receivers
8) Verified that test tags were installed during the pre-installation survey and are
still present in the store or installed the Test Tags for the Store
9) Input the test tag information in SYSMON.
10) Placed the tags on the displays in the current campaign.
11) Recorded the information on the Goliath tag Installation Report.
12) Configured and activated the MEU.
13) Test the MEU with the Goliath Help Desk.
14) If the system is functioning ok, Check out with Goliath Help Desk
15) Walk through store and verify all the supplies from the installation have been
cleaned up.
16) Check out with the Store Manager and verify there are no issues with the store
17) Leave the store.
18) When you get home update QuickBase with the installation information.
19) Update SYSMON with the store information from the Goliath Tag Installation
Report or verify that it has been updated by an FST, a DST or a DSM if they
were on-site during the install.
Status
Page 17 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
Appendix C – MEU Suspension
MEU SUPSENSION
This is a simple process and the method of getting the plastic hanger over the girder can vary
according to your particular situation. It is recommended that you utilize the 5’ PVC pipe for
applications where the girder height above the ceiling makes access with big blue difficult.
1. Access MEU in ceiling.
2. Locate the girder overhead nearest to the MEU. Select girder or cross-beam orientation
that will put the least amount of stress on the MEU cables and ports AND allow for
easiest access.
3. Based on ceiling to girder height, select proper tool set. For a low ceiling to girder
height, use Unger or ball and string.
4. Using Unger or ball and string, pass one end of the plastic hanger over the lower metal
piece of the ceiling girder.
5. Pull the end of the plastic hanger down far enough so you can create a loop of
appropriate length (at the time of this writing a set height off of the ceiling tile has not
been established. Use good judgment that allows for MEU suspension off-tile, but does
not interfere with MEU access by DST and Goliath personnel using big blue).
MEU Suspended from Ceiling
Girders at the correct height
Page 18 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
6. Once you have chosen your preferred length, cut the plastic hanger to size and close the
loop by matching up the pre-punched holes at the end of each side and zip-tying them
together.
7. Repeat steps 4 thru 6 with another length of plastic hanger.
8. You will now have two loops of equal length which you can rest your MEU in.
Plastic Hanger affixed
to Ceiling Girders.
9. Make sure the MEU is turned off and carefully disconnect the end cables on either side
of the MEU. You will also need to remove the phone and power cords as well.
10. Slide one strap over the left end and the other over the right end of the MEU. Position
them between the last two antenna ports on either side of the MEU.
11. Carefully re-attach the antenna cables to their correct ports while keeping the strap
situated between them. Make sure you reconnect the phone and power.
Page 19 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
Plastic Hanger
attached to the MEU
If you prefer, or get into a situation where the ceiling height above the girder is difficult to
access, you can select the PVC pipe installation method:
1. Thread plastic pipe hanger up thru the bottom of 5’ PVC pipe until it appears at the top.
2. Attach your selected item of weight to the protruding end of the pipe hanger at the top
of the 5’ PVC pipe section. Metal fasteners (nut and bolt) have been used with success.
3. Extend PVC pipe up to bottom metal piece of girder you are going to suspend the MEU
from.
4. Carefully continue to thread plastic hanger thru PVC so that the end in the ceiling goes
over the girder and comes down on the other side.
5. Pull the end of the plastic hanger down far enough so you can create a loop of
appropriate length (at the time of this writing a set height off of the ceiling tile has not
been established. Use good judgment that allows for MEU suspension off-tile, but does
not interfere with MEU access by DST and Goliath personnel using big blue).
6. Once you have chosen you preferred length, cut the plastic hanger to size and close the
loop by matching up the pre-punched holes at the end of each side and zip-tying them
together.
7. Repeat steps 1 thru 6 with another length of plastic hanger.
8. You will now have two loops of equal length which you can rest your MEU in.
Page 20 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
9.
Make sure the MEU is off and carefully disconnect the end cables on either side of the
MEU. You will also need to remove the phone and power cords as well.
10. Slide one strap over the left end and the other over the right end of the MEU. Position
them between the last two antenna ports on either side of the MEU.
11. Carefully re-attach the antenna cables to their correct ports while keeping the strap
situated between them. Make sure you reconnect the phone and power.
As the final step, please verify the power to the MEU is
switched on and then push the reset button.
Page 21 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
Appendix D - Test Tags
Suggested Test Tag Locations for Store
Test Tag
Number
TT1
Store
10 Aisle
Location Store
Front
9 Aisle
Store
8 Aisle
Store
TT2
Front
TT3
TT4
TT5
TT6
TT7
TT8
TT9
TT10
TT11
Front
Front
Middle
Middle
Middle
Back
Back
Back
Back
5-6
8-9
1-2
5-6
8-9
1-2
5-6
8-9
Pharmacy
5-6
7-8
1-2
5-6
7-8
1-2
5-6
7-8
Pharmacy
4-5
6-7
1-2
4-5
6-7
1-2
4-5
6-7
Pharmacy
Location
Side of store, above beginning
of cosmetics.
Middle of the B10 display in
cosmetics, on bottom lip of
display
End cap
End cap
End cap
End cap
End cap
End cap
End cap
End cap
Behind signs or under counter.
Note: The store will always get 11 test tags. The test tags are normally taped to the back of
signs on the end caps in the above listed aisles. Sometimes they may be installed in a
permanent display such as the battery display.
Suggested Test Tag Locations for Stock Room
Test Tag
Number
Location
SR1
Mounted on the wall next to the loading dock door. It is mounted on the side of
the door where the loading ramp is located.
Sequentially counter clockwise from the location of SR1 covering the
circumference of the room. Normally mounted near doors.
SR2 – SR7
Note: The stock room will always get 7 test tags. The other 6 test tags (SR2 – SR7) are placed
in a counter clockwise sequence around the stock room. Place tags above or near
doors. Don’t place on shelves below where a liquid is stored. The test tags are
normally taped on the wall or on a wood area on a stock shelf.
Page 22 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
Test Tag Inventory Sheet:
Store Number:
Test Tag Bag #:
Test Tag ID
TT1 (Test
Tag)
TT2
Test Tag Serial Number
Date:
Test Tag Campaign Key
TT3
00-001 Test - Cosmetics Primary A10A
00-002 Test - Cosmetics Primary Valley B10A
00-003 Test - Cashier - L10
TT4
00-004 Test - Photo - Y10
TT5
TT6
00-005 Test - Middle Store - Cos. Sec.
A40
00-006 Test - Middle Store - L40
TT7
00-007 Test - Middle Store - Y40
TT8
TT9
00-008 Test - Rear Store - Cos. Sec A99
00-009 Test - Rear Store - Center - L99
TT10
00-010 Test - Rear Store - Y99
TT11
00-011 Test - Pharmacy Pick Up - Low
Ceiling
00-131 TEST TAG - Back Room 1
SR1 (Stock
Room)
SR2
00-132 TEST TAG - Back Room 2
SR3
00-133 TEST TAG - Back Room 3
SR4
00-134 TEST TAG - Back Room 4
SR5
00-135 TEST TAG - Back Room 5
SR6
00-136 TEST TAG - Back Room 6
SR7
00-137 TEST TAG - Back Room 7
Page 23 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
Appendix E – Goliath Tag Installation Report
Page 24 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
Appendix F – Estimating distances from the MEU
When you are estimating the distance from the MEU to any of the transmitters
(ATA) or receivers (ARA) you can estimate this by using a Measuring Wheel or counting
ceiling tiles. (Standard Ceiling tiles are 2’ by 4’). You should check the distance of the
furthest ATA and ARA from the selected MEU Location. The cables to the ATA and ARA are
normally run along the length of the ceiling girders in a straight line. You don’t normally go
strait from the MEU to the ATA or ARA.
During the install process during the MEU Survey you must estimate the distance from the
MEU to the power location. This is the one case where you can do a straight line for the
shortest distance. One way you could estimate this would be use the Pythagorean Theorem.
You will measure the distance from the MEU to the end of the aisle. Then you would measure
the distance from the end of the aisle to as close as possible to the LAN Cabinet location,
basically forming a right angle triangle. Then put the distances in the formal below.
Page 25 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
a = distance from MEU to the End of Aisle.
b = distance from end of aisle to the Location
Location of
LAN Cabinet
of the LAN Cabinet
c = distance from MEU to LAN Cabinet
Pythagorean Theorem
a2 + b2 = c2
End of
Aisle
MEU
Location
The following is an example on how to use the above formula
a = distance from the MEU to end of aisle = 40’
b = distance form end of aisle to LAN Cabinet = 35’
40*40 + 35*35 = 1600 + 1225 = 2825
The square root of 2825 = 53.15, so the value of c = 53.15
So the distance from the MEU to the LAN cabinet is 53.15’. Now you have to add in an
additional 10’. This is the estimate for the power cable to go from the ceiling to the LAN
Cabinet. The net result is the LAN Cabinet is about 63.15’ from the MEU. In this example
you could power from the LAN Cabinet using the 75’ cable. 110’ ft cables are expected at
the end of September.
Page 26 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
Appendix G – Sample Pre-Installation Survey Report
Page 27 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
Page 28 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
Page 29 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
Page 30 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
Appendix H – QA Checklist
The QA Checklist is on the following two pages. The actual document is on the Goliath Swap
drive. The document is called:
QA Survey 1A.doc
Page 31 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
Page 32 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
Page 33 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
Appendix I – MEU Configuration
To configure and active the MEU you must be online with your Notebook PC using the
Verizon Air card. You will need access to online Goliath Solutions applications. The
activation and configuration of the MEU consists of the following steps:
1. Enter the MEU Information into SYSMON.
a) Prior to starting the MEU, the FSM must add the MEU serial number to the store’s
record in SYSMON.
b) Login to SYSMON and bring up the store’s record in SYSMON. Scroll down on
the screen to the “MEUs” section.
c) Click the Add MEU button.
d) Enter the MEU information as shown in the following picture and click the Enter
MEU button.
e) Once the MEU is added to the store’s record, the user may click the Go button to
return to the store’s detail.
Page 34 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
2. Enter the MEU Information Into QuickBase.
a) Login to QuickBase.
b) Click to open the “GOLSOL Masterdeploy” database from the “My QuickBase”
screen.
c) In the “Views” menu at left, click the “site – view specific site” link to retrieve a
store’s QuickBase record.
d) Click the Edit button at left.
e) Scroll down the screen to “Install Comments”.
f) Fill in the information as necessary for the specific site as shown in the following
picture.
g) You may or may not wish to flag ‘Y’ in the “Move to Production” drop-down. This
depends on having an auditor that is able to visit the site twice per week. You may
wish to wait and correct any staffing issues before flagging this.
h) Once all of the information is entered for the site, you may click the Save button at
top or bottom-left.
Page 35 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
3. Configure the HyperTerminal for Interfacing the Notebook PC with the MEU
(Hyper Terminal must be configured properly in order to interface properly with
the MEU).
a) Open Hyper Terminal on the notebook PC.
b) Type a name for the connection that is to be created and click OK. See the
following picture.
Page 36 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
c) Select “COM1” in the “Connect Using” drop-down and click OK. See following
picture.
Page 37 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
d) In the following picture is the proper configuration for interfacing with a 1.7G+
MEU.
Page 38 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
4. Initial MEU startup in the following picture.
a) Note the firmware version code and phone number are present and correct (red
underline).
b) Note the MEU serial number is shown on-screen (thicker red underline). The
number starts directly after the ‘10’ and extends 8 characters.
c) When the MEU is turned on or RESET, you will have 10 seconds to press the ‘*’
key. This will cause the MEU to enter Command Mode. The timer will be increased
in later releases of Spider.
5. MEU Antenna Configuration
a) It is very important that the FSM perform an auto-configuration before performing
any manual configuration that may be necessary.
a. SHIFT + ‘Y’ = 3-Tx & 12-Rx auto-configuration
b. SHIFT + ‘T’ = 3-Tx & 13-Rx auto-configuration
b) Performing an auto-configuration reprograms the MEU with the appropriate sleep
time & phone number as well as facilitating less typing.
c) Manual configuration is done by pressing the ‘K’ key and typing the number of the
TX they wish to configure followed by the ENTER key. Then the FSM types the
Page 39 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
number of each receiver they wish to associate with that TX followed by the
ENTER key each time.
d) The FSM may verify the overall stored antenna configuration by pressing SHIFT +
‘K’.
e) In all stores, the FSM must manually configure the MEU to accept the 4th TX and
15th & 16th Rx’s in the stockroom (Pic_5).
f) If a store layout calls for a 14th Rx, then that must be manually configured for TX’s
1-3 via the procedure outlined above.
Page 40 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
6. Running the Dot Animation process.
a) Once the MEU is properly configured for the specific location, the FSM must run a
“Dot Animation” sequence.
b) This sequence is basically a quick-cycle. It will send and receive a signal on each of the
52 channels utilizing each TX & Rx combination individually.
c) Each character that appears represents 1 of the 52 channels that the MEU scans with
each TX &Rx combination.
d) The asterisk indicates that no tags were read on that channel using a specific TX & Rx
combination.
e) A single-character number indicates the number of tags that were read on that channel
using a specific TX & Rx combination.
f) At the end of each line, the ‘34% T: 1 R: 1’ tells the user that a tag was read on 34% of
the 52 channels tested using the Tx-1 & Rx-1 antenna combination.
g) Any combination that displays 0% must be looked into. This could be a symptom of
incorrect antenna configuration, incorrect cabling, incorrect port usage, or defective
Page 41 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
equipment. Troubleshooting procedures should be implemented to narrow the problem
down.
h) If an antenna combination does not appear despite the equipment being present and
plugged-in, then an incorrect antenna configuration is the cause.
7. Dialing Out.
a) Once the “Dot Animation” sequence is complete, the MEU will attempt to dial out
and dump its data to the Modem Bank server via the telephone line.
b) If the MEU functions as it should, the user will see the modem initialize and after a
few seconds, see the line, “Connected at 38,400 baud!” This indicates a successful
connection to the Modem bank server.
c) The user will then see incomprehensible lines of code scroll upward on the screen.
This indicates the MEU is dumping its data to the server.
d) Once the data dump is complete, the user will see a summary line.
e) After a minute or so, the user should see, “140 minutes to go”, or something
similar. This indicates that the MEU is counting down to its next full-cycle.
f) If the display shows, “No Carrier” or “No Dial Tone” more than 3 times,
troubleshoots the phone line.
g) If the display shows, “Busy” more than 2 times, check the phone line for activity.
Page 42 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.
FSM Cable Installation & MEU Activation
h) In some cases, brand new MEU’s may take 2-3 attempts to dial out before
successfully doing so.
8. Resetting the MEU
a) After performing the above tasks, the user will have successfully configured and
tested the MEU.
b) The MEU must be reset via the RESET button located next to the “SER DEBUG”
port on the front of the MEU.
c) The RESET button must be depressed for 3 seconds.
d) Failure to reset the MEU may result in abnormal function and reporting.
Page 43 of 43
Rev. 1A, Rev. Date: 8/31/2006
Use or Disclosure of this document is covered under the Non-Disclosure Agreement executed between the
prospective vendor and Goliath Solutions LLC.

Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.3
Linearized                      : No
Page Count                      : 43
Producer                        : AFPL Ghostscript 8.50
Create Date                     : 2006:10:23 11:35:11
Modify Date                     : 2006:10:23 11:35:11
Title                           : Microsoft Word - Goliath Solutions Installation and User Manual for Spider System 10-001 updated10_23_06.doc
Creator                         : PScript5.dll Version 5.2
Author                          : mspataro
EXIF Metadata provided by EXIF.tools
FCC ID Filing: UML-SPIDER-10-001

Navigation menu