Greenheck Fan Make Up Air Unit 470658 Msx Users Manual
470658 MSX to the manual 607ed3d4-d8c5-4d8f-a190-90d48b12459f
2015-02-09
: Greenheck-Fan Greenheck-Fan-Make-Up-Air-Unit-470658-Msx-Users-Manual-562579 greenheck-fan-make-up-air-unit-470658-msx-users-manual-562579 greenheck-fan pdf
Open the PDF directly: View PDF .
Page Count: 40
Download | |
Open PDF In Browser | View PDF |
Part #470658 MSX Make-Up Air Unit ® Installation, Operation and Maintenance Manual Please read and save these instructions. Read carefully before attempting to assemble, install, operate or maintain the product described. Protect yourself and others by observing all safety information. Failure to comply with instructions could result in personal injury and/or property damage! Retain instructions for future reference. 2. The rotation of the wheel is critical. It must be free to rotate without striking or rubbing any stationary objects. 3. Motor must be securely and adequately grounded. 4. Do not spin fan wheel faster than maximum cataloged fan rpm. Adjustments to fan speed significantly effects motor load. If the fan RPM is changed, the motor current should be checked to make sure it is not exceeding the motor nameplate amps. 5. Do not allow the power cable to kink or come in contact with oil, grease, hot surfaces, or chemicals. Replace cord immediately if damaged. 6. Verify that the power source is compatible with the equipment. 7. Never open blower access doors while the fan is running. General Safety Information Only qualified personnel should install this unit. Personnel should have a clear understanding of these instructions and should be aware of general safety precautions. Improper installation can result in electric shock, possible injury due to coming in contact with moving parts, as well as other potential hazards. Other considerations may be required if high winds or seismic activity are present. If more information is needed, contact a licensed professional engineer before moving forward. 1. Follow all local electrical and safety codes, as well as the National Electrical Code (NEC), the National Fire Protection Agency (NFPA), where applicable. Follow the Canadian Electric Code (CEC) in Canada. DANGER IMPORTANT All factory provided lifting lugs must be used when lifting any unit. Failure to comply with this safety precaution could result in property damage, serious injury or death. WARNING Disconnect all electrical power to the fan and secure to the “OFF” position prior to inspection or servicing. Failure to comply with this safety precaution could result in serious injury or death. WARNING Improper installation, adjustment, alteration, service or maintenance can cause property damage, injury or death. Read the installation, operating and maintenance instructions thoroughly before installing or servicing this equipment. Always disconnect power before working on or near a unit. Lock and tag the disconnect switch or breaker to prevent accidental power up. CAUTION When servicing the unit, motor may be hot enough to cause pain or injury. Allow motor to cool before servicing. ® Model MSX Make-Up Air 1 Receiving Upon receiving the product check to make sure all items are accounted for by referencing the bill of lading to ensure all items were received. Inspect each crate for shipping damage before accepting delivery. Notify the carrier if any damage is noticed. The carrier will make notification on the delivery receipt acknowledging any damage to the product. All damage should be noted on all the copies of the bill of lading which is countersigned by the delivering carrier. A Carrier Inspection Report should be filled out by the carrier upon arrival and reported to the Traffic Department. If damaged upon arrival, file claim with carrier. Any physical damage to the unit after acceptance is not the responsibility of Greenheck Fan Corporation. Unpacking Verify that all required parts and the correct quantity of each item have been received. If any items are missing, report shortages to your local representative to arrange for obtaining missing parts. Sometimes it is not possible that all items for the unit be shipped together due to availability of transportation and truck space. Confirmation of shipment(s) must be limited to only items on the bill of lading. Handling Units are to be rigged and moved by the lifting brackets provided or by the skid when a forklift is used. Location of brackets varies by model and size. Handle in such a manner as to keep from scratching or chipping the coating. Damaged finish may reduce ability of unit to resist corrosion. Storage Units are protected against damage during shipment. If the unit cannot be installed and operated immediately, precautions need to be taken to prevent deterioration of the unit during storage. The user assumes responsibility of the unit and accessories while in storage. The manufacturer will not be responsible for damage during storage. These suggestions are provided solely as a convenience to the user. INDOOR — The ideal environment for the storage of units and accessories is indoors, above grade, in a low humidity atmosphere which is sealed to prevent the entry of blowing dust, rain, or snow. Temperatures should be evenly maintained between 30°F (-1°C) and 110F (43°C) (wide temperature swings may cause condensation and “sweating” of metal parts). All accessories must be stored indoors in a clean, dry atmosphere. Remove any accumulations of dirt, water, ice, or snow and wipe dry before moving to indoor storage. To avoid “sweating” of metal parts allow cold parts to reach room temperature. To dry parts and packages use a portable electric heater to get rid of any moisture build up. Leave coverings loose to permit air circulation and to allow for periodic inspection. 2 Model MSX Make-Up Air The unit should be stored at least 3½ in. (89 mm) off the floor on wooden blocks covered with moisture proof paper or polyethylene sheathing. Aisles between parts and along all walls should be provided to permit air circulation and space for inspection. OUTDOOR — Units designed for outdoor applications may be stored outdoors, if absolutely necessary. Roads or aisles for portable cranes and hauling equipment are needed. The fan should be placed on a level surface to prevent water from leaking into the unit. The unit should be elevated on an adequate number of wooden blocks so that it is above water and snow levels and has enough blocking to prevent it from settling into soft ground. Locate parts far enough apart to permit air circulation, sunlight, and space for periodic inspection. To minimize water accumulation, place all unit parts on blocking supports so that rain water will run off. Do not cover parts with plastic film or tarps as these cause condensation of moisture from the air passing through heating and cooling cycles. Inspection and Maintenance during Storage While in storage, inspect fans once per month. Keep a record of inspection and maintenance performed. If moisture or dirt accumulations are found on parts, the source should be located and eliminated. At each inspection, rotate the fan wheel by hand ten to fifteen revolutions to distribute lubricant on motor. Every three months, the fan motor should be energized. If paint deterioration begins, consideration should be given to touch-up or repainting. Fans with special coatings may require special techniques for touch-up or repair. Machined parts coated with rust preventive should be restored to good condition promptly if signs of rust occur. Immediately remove the original rust preventive coating with petroleum solvent and clean with lint-free cloths. Polish any remaining rust from surface with crocus cloth or fine emery paper and oil. Do not destroy the continuity of the surfaces. Wipe thoroughly clean with Tectyl® 506 (Ashland Inc.) or the equivalent. For hard to reach internal surfaces or for occasional use, consider using Tectyl® 511M Rust Preventive or WD-40® or the equivalent. REMOVING FROM STORAGE — As units are removed from storage to be installed in their final location, they should be protected and maintained in a similar fashion, until the equipment goes into operation. Prior to installing the unit and system components, inspect the unit assembly to make sure it is in working order. 1. Check all fasteners, set screws on the fan, wheel, bearings, drive, motor base, and accessories for tightness. 2. Rotate the fan wheel(s) by hand and assure no parts are rubbing. ® Table of Contents Installation of Indoor Unit Installation Clearance to Combustibles/Service Clearances. . 3 Indoor Unit. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Unit Arrangement DB / HZ / UB. . . . . . . . . . . . . . . 4 Roof Mounted Unit — Arrangement DBC. . . . . 5-6 Optional Evaporative Cooling Module. . . . . . . . . . 7 Electrical Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Optional Electrical Heater. . . . . . . . . . . . . . . . . . . . 9 Optional Evaporative Cooling Piping. . . . . . . 10-11 Optional Water Wizard™ . . . . . . . . . . . . . . . . . . . 12 Optional Direct Expansion (DX) Coil Piping. . 13-14 Optional Chilled Water Coil Piping. . . . . . . . . . . . 14 Optional Building Pressure Control. . . . . . . . . . . 15 Start-Up Blower. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-17 Optional Electric Heater. . . . . . . . . . . . . . . . . . . . 18 Optional Evaporative Cooling Recirculating. . . . 19 Optional Water Wizard™ . . . . . . . . . . . . . . . . 20-21 Operation Optional VAV Units . . . . . . . . . . . . . . . . . . . . . . . . Optional Recirculating Units. . . . . . . . . . . . . . . . . Electrical . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Optional Water Wizard™ . . . . . . . . . . . . . . . . . . . Troubleshooting Blower. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Motor Overamps. . . . . . . . . . . . . . . . . . . . . . . . . . Insufficient / Too Much Airflow. . . . . . . . . . . . . . . Excessive Noise or Vibration. . . . . . . . . . . . . . . . Optional Electric Heater. . . . . . . . . . . . . . . . . . . . Optional Evaporative Cooling. . . . . . . . . . . . . . . . Optional Water Wizard™ . . . . . . . . . . . . . . . . . . . 22 23 24 25 26 27 28 29 30 31 32 Maintenance Routine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33-35 Fall. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36 Reference Control Center Layout / Dirty Filter Switch. . . . . 37 Start-Up Check List . . . . . . . . . . . . . . . . . . . . . . . 38 Maintenance Log . . . . . . . . . . . . . . . . . . . . . . . . . 39 Warranty . . . . . . . . . . . . . . . . . . . . . . . . . Backcover Clearance to Combustibles / Service Clearances Insulated/ Units Non Insulated Units Install threaded hangers from ceiling supports. When locating hangers, allow enough room to open access panel(s). Two nuts must be used on the end of each threaded hanger. Ceiling supports are supplied by others. 2. Install Unit Using sheet metal screws, attach the weatherhood/ thru-wall/filter section to the blower/burner section. The flange on the weatherhood/thru-wall/filter section should overlap the flange on the blower/burner section. Raise the assembled unit into place. Using two nuts per hanger, fasten the unit supports to the hangers under the unit. Appropriate unit supports, such as the optional Greenheck hanging bracket kit or c-channel and angle iron (supplied by others) should be used. Using self tapping screws, attach ductwork to unit. Ceiling Supports Ductwork In order to prevent the unit from Hangers Unit Supports swinging and to provide Indoor Mounting a safe environment for service and maintenance, additional measures must be taken to secure the unit in all directions. NOTE Two nuts must be used on each end of each threaded hanging rod for proper support. NOTE Floor 0 inches Top 0 inches Sides 0 inches Ends 0 inches (0 mm) (0 mm) (0 mm) (0 mm) 0 inches 6 inches 6 inches 6 inches (0 mm) (152.4 mm) (152.4 mm) (152.4 mm) Clearance to combustibles is defined as the minimum distance required between the heater and adjacent combustible surfaces to ensure the adjacent surface’s temperature does not exceed 90 degrees above the ambient temperature. Recommended Minimum Service Clearances 42 inches (1066.8 mm) Housing 32 and less on the controls side of the unit 48 inches (1219.2 mm) Housing 35 and higher on the controls side of the unit Clearances for component removal (such as evaporative cooler media) may be greater than the service clearances listed. ® 1. Install Hangers Good duct practices should be followed for all ductwork. Ductwork should be installed in accordance with SMACNA and AMCA guidelines, NFPA 96 and any local codes. Reference the CAPS submittal for duct sizes. 3. Seal Wall Opening Apply sealant around the perimeter of the weatherhood to prevent water penetration and drafts into the building. Sealant Seal Wall Opening Model MSX Make-Up Air 3 Installation of Arrangement DB / HZ / UB 1. Install Curb and/or Equipment Support(s) Position curb/equipment support(s) on the roof (reference the CAPS submittal for placement of curb/ equipment support(s) in relation to the unit). Verify that unit supports are level, shim if necessary. Attach curb to roof and flash into place. Attach the equipment support(s) to the roof, remove metal cover, flash to wooden nailer and reinstall cover. Roof Curb Metal Cover NOTE The use of all lifting lugs and a set of spreader bars is mandatory when lifting the unit. NOTE Some units come with the weatherhood attached and Step 5 may not apply. 5. Assemble and Attach Weatherhood The weatherhood can now be assembled and attached to the unit. Detailed assembly instructions can be found with the weatherhood. If the optional evaporative cooling module was selected, this step does not apply, refer to the Installation of the Optional Evaporative Cooling Module section, page 7. 6. Seal Weatherhood Seam Using an appropriate sealant, seal the seam between the weatherhood and the unit. Equipment Support Roof Curb and Equipment Support 2. Install Ductwork Good duct practices should be followed for all ductwork. All ductwork should be installed in accordance with SMACNA and AMCA guidelines, NFPA 96 and all local codes. Reference the CAPS submittal for ductwork sizes. NOTE Complete Rooftop Installation The use of a duct adapter is recommended on a downblast (DB) arrangement to align the ductwork with the supply unit. The duct adapter is only a guide and is not to be used as a support for the ductwork. 3. Apply Sealant Apply an appropriate sealant around the perimeter of the curb Supply Air Ductwork and duct (Arrangement DB only) adapter(s) to isolate fan vibration and prevent Sealant water Ductwork penetration. 4. Install Unit Use a crane and a set of spreader bars hooked to the factory lifting lugs to lift and center the unit on the curb/equipment support(s). Use self-tapping sheet metal screws to fasten the unit to the curb/equipment support(s). Setting Unit 4 Model MSX Make-Up Air ® Installation of Roof Mounted Unit Arrangement DBC 1. Install Curb/Equipment Support(s) Position curb/equipment support(s) on the roof (reference the CAPS submittal for placement of curb/ equipment support(s) in relation to the unit). Verify that all unit supports are level, shim if necessary. Attach curb to roof and flash into place. Attach the equipment support(s) to the roof, remove metal cover, flash to wooden nailer and reinstall cover. Roof Curb 4. Apply Sealant Apply an appropriate sealant around the perimeter of the curb and duct adapter(s) to isolate fan vibration and prevent water penetration. Exhaust Duct Installed Exhaust Ductwork by Others Supply Ductwork by Others Sealant Supply Duct with Duct Adapter Installed Sealing Ductwork Metal Cover 5. Install Exhaust Fan Equipment Support Roof Curb and Equipment Support 2. Install Combination Extension Fasten exhaust fan to curb extension with selftapping sheet metal screws. Installing the exhaust fan prior to the supply unit will allow for easier installation of options. Model CUBE Exhaust Fan Install combination extension over curb. Lag into place using wood screws. Locate the extension so the tall vented side is over the Exhaust 1 inch exhaust opening. Inside Flange Supply Installing Exhaust Fan NOTE Combination Extension NFPA 96 requires the exhaust fan to be hinged. 3. Install Ductwork Good duct practices should be followed for all ductwork. All ductwork should be installed in accordance with SMACNA and AMCA guidelines, NFPA 96 and any local codes. Reference the CAPS submittal for ductwork size and location. 6. Install Exhaust Options Install optional Greenheck hinge kit with restraining cables and grease trap with drain connection. Exhaust Ductwork by Others Supply Ductwork by Others Ductwork NOTE The use of a duct adapter is recommended on a downblast (DBC) arrangement to align the ductwork with the supply unit. The duct adapter is only a guide and is not to be used as a support for the ductwork. ® Model MSX Make-Up Air 5 7. Install Supply Unit Use a crane and a set of spreader bars hooked to the factory lifting lugs to lift and center the unit on the extension/equipment support(s). Use self-tapping sheet metal screws to fasten the unit to the extension/equipment support(s). Installing Supply Unit NOTE The use of all lifting lugs and a set of spreader bars is mandatory when lifting unit. NOTE Some units come with the weatherhood attached and Step 8 may not apply. 8. Assemble and Attach Weatherhood The weatherhood can now be assembled and/or attached to the unit. Detailed assembly instructions can be found with the weatherhood. If the optional evaporative cooling module was selected, this step does not apply, refer to the next section, Installation of the Optional Evaporative Cooling Module. 9. Seal Weatherhood Seam Using an appropriate sealant, seal the seam between the weatherhood and the unit. Complete Combination Installation 6 Model MSX Make-Up Air ® Installation of Evaporative Cooling Module (optional) NOTE Small evaporative coolers ship attached to the base unit and require no additional mounting. 1. Locate Equipment Support(s) Position equipment support(s) on the roof (reference the CAPS submittal for placement of equipment support(s) in relation to the Metal Cover unit). Verify that all unit supports are level, shim if necessary. Attach Equipment equipment support Support to the roof, remove metal cover, flash to wooden nailer Equipment Support and reinstall cover. 2. Apply Sealant Apply an appropriate sealant around the airstream opening to create an air tight seal. 4. Secure Cooling Module to Unit Use self-tapping screws to fasten the cooling module to the base unit along the top and down both sides. Fasten at the top through the flanges. To fasten the sides, the media must be removed. To remove the media, first remove the access panel on the evaporative module and disconnect the evaporative pump(s). The media will now slide out. With the media removed, you can Roof Curbfastening points inside the evaporative access the side module. With all the screws in place, reinstall the media, reconnect the pumps and reinstall the access panel. Securing Evaporative Module NOTE Sealant When mounting the evaporative cooler, it is important that it is level to ensure proper operation and water drainage. 3. Set Evaporative Cooling Module Use a crane and a set of spreader bars hooked to the factory lifting lugs to lift and center the module on the equipment support(s). The flange on the evaporative cooler should overlap the flange on the unit. Placing Evaporative Module NOTE The use of all lifting lugs and a set of spreader bars is mandatory when lifting the evaporative cooling module. ® Model MSX Make-Up Air 7 Installation of Electrical Wiring important Before connecting power to the unit, read and understand the following instructions and wiring diagrams. Complete wiring diagrams are attached on the inside of the control center door(s). 1. Determine the Size of the Main Power Lines The unit’s nameplate states the voltage and the unit’s MCA. The main power lines to the unit should be sized accordingly. The nameplate is located on the outside of the unit on the control panel side. Voltage, Hertz, Phase important All wiring should be done in accordance with the latest edition of the National Electric Code ANSI/ NFPA 70 and any local codes that may apply. In Canada, wiring should be done in accordance with the Canadian Electrical Code. important The equipment must be properly grounded. Any wiring running through the unit in the airstream must be protected by metal conduit, metal clad cable or raceways. caution If replacement wire is required, it must have a temperature rating of at least 105°C, except for an energy cut-off or sensor lead wire which must be rated to 150°C. danger High voltage electrical input is needed for this equipment. This work should be performed by a qualified electrician. caution Any wiring deviations may result in personal injury or property damage. Greenheck is not responsible for any damage to, or failure of the unit caused by incorrect final wiring. important Greenheck’s standard control voltage is 24 VAC. Control wire resistance should not exceed 0.75 ohms (approximately 285 feet total length for 14 gauge wire; 455 feet total length for 12 gauge wire). If the resistance exceeds 0.75 ohms, an industrial-style plug-in relay should be wired in place of the remote switch. The relay must be rated for at least 5 amps and have a 24 VAC coil. Failure to comply with these guidelines may cause motor starters to chatter or not pull in, resulting in contactor failures and/or motor failures. VOLTS HZ PH SUP HP EXH HP MCA MOP Unit’s Total MCA Electrical Nameplate 2. Provide the Opening(s) for the Electrical Connections Phase Electrical openings Voltage, vary byHertz, unit size and arrangement and are field supplied. 3. Connect the Main Power VOLTS HZ PH Connect the main power lines to the disconnect switch EXH HP field connections to SUP HP and main grounding lug(s). Torque 20 in.-lbs. MCA MOP 4. Wire the Optional Convenience Outlet The convenience outlet requires a separate 115 volt power supply circuit. The circuit must include short circuit protection which may need to be supplied by others. 5. Wire the Optional Accessories Reference the Ladder Diagram on the inside of the control center door for correct wiring of the following accessories: • Blower Switch • Heat Switch • Indicating Lights • Dirty Filter Indicator • TSCP • KSCP NOTE TSCP has number-to-number wiring. 6. Wire the Optional Evaporative Cooler Reference the Ladder Diagram on the inside of the control center door for correct wiring of the pump and the optional auto-drain and flush. NOTE Large evaporative coolers may require a separate power supply. 8 Model MSX Make-Up Air ® Installation of Electric Heater (optional) Warning Electrical Shock Hazard! Disconnect all power sources before doing any work on the unit. Sizing of Supply Conductors The required minimum size of supply conductors is marked at the field wiring terminals within the heater control box or reference the Supply Wire Size table included in this section. The wire gauges are calculated for 125% of the heater line current as required by the National Electric Code, Article 424-3(b) based on conductor insulation rated for 75°C (167°F). General: The requirements and practices described below are based on the National Electric Code (NEC) and The Space Heating Standard of the Underwriters Laboratories Inc. (UL). Although UL requirements are uniform throughout the country, local electrical codes may deviate from the National Electrical Code. Therefore, local inspection authorities should be consulted regarding local requirements. Electrical Wiring Instructions: 1. Use the wiring diagram supplied with the heater as a guide in correlating field wiring with the heater internal wiring. 2. All field wiring to the heater must meet the requirements of the National Electric Code and any other applicable local or state codes. 3. Wiring to the heater must be rated for 75°C (167°F) minimum. 4. The fan is interlocked by the factory to the control circuit so the electric heater will not operate unless the fan is on. 5. If heater does not have a built-in disconnect switch or main circuit breaker, install a remote disconnect (furnished by others) in accordance with the National Electric Code, Article 424-65. Calculation of Line Currents (amps): watts Single Phase Current = volts EXAMPLE: 5 kW, 208 volt 5000 watts = 24 amps 208 volts Three Phase Current = watts volts x 1.73 EXAMPLE: 14.4 kW, 208 volt 14400 watts 14400 = = 40 amps 208 volts x 1.73 360 Supply Wire Size (Not more than six conductors in Single Conduit 1) AWG or MCM Copper 3 AWG or MCM Max. Heater Line Current 2 Copper 3 14 12 0000 184 12 16 250 204 10 24 300 228 8 36 350 248 6 52 400 268 4 68 500 304 3 80 600 336 2 92 700 368 1 104 750 380 0 120 800 392 00 140 900 416 000 160 1000 436 1 For 7-24 conductors in raceway or cable, reduce allowable heater line currents to 871/2% of those shown above. 2 Based on 30°C. (86°F.) ambient temperature, for higher ambient temperature see National Electric Code table 310‑16 and 310-18 Note 13. 3 Based on 80% of ratings in the National Electric Code table 310-16 for 75°C insulation. Effect of Low Voltage on Wattage and British Thermal Unit (BTU) The heating elements may be used on voltages lower than the design voltage of the heater, however, the wattage and BTU output will be reduced to the percentages listed in the table below. De-rated Wattage For Low Voltage % of % of Heater Line Heater Heater Line Heater Voltage Voltage Wattage Voltage Voltage Wattage and BTU and BTU 480 277 240 ® Max. Heater Line Current 2 460 92 440 84 265 92 254 84 230 92 220 84 208 75 200 69 208 120 200 92 190 83 115 92 110 84 Model MSX Make-Up Air 9 Installation Evaporative Cooler Piping (optional) Evaporative Cooling with Recirculating Pump Evaporative Cooling with Auto Drain and Fill Supply Line VALVE A Supply Solenoid (Normally Closed) Supply Line Valve (Normally Closed) Drain Line Valve (Normally Open) Overflow Drain Line Sump Drain VALVE C Sump Drain Solenoid (Normally Open) VALVE B Supply Line Drain Solenoid (Normally Open) Trap Recirculating Evaporative Piping All supply solenoids, valves and all traps must be below the roof line or be otherwise protected from freezing. important The supply line should be of adequate size and pressure to resupply the amount of water lost due to bleed-off and evaporation. The drain line should be the same size or larger than the supply line. caution Provisions must be taken to prevent damage to the evaporative cooling section during freezing conditions. The sump, drain lines and supply lines must be drained prior to freezing conditions or an alternate method must be used to protect the lines and media. 1. Install the Water Supply Line Supply line opening requirements vary by unit size and arrangement and are field supplied. Connect the water supply line to the float valve through the supply line opening in the evaporative cooling unit. Install a manual shutoff valve in the supply line as shown. 2. Install the Drain Line Connect an unobstructed drain line to the drain and overflow connections on the evaporative cooler. A manual shut off valve (by others) is required for the evaporative cooler drain line. 6 in. min. Drain Trap 3. Check/Adjust Water Level Trap Drain Line Auto Drain & Fill Evaporative Piping important A trap should be used to prevent sewer gas from being drawn into the unit. Supply Line Sump Overflow 6 in. min. Important The supply line should be of adequate size and pressure to resupply the amount of water lost due to bleed-off and evaporation. The drain line should be the same size or larger than the supply line. caution All solenoids valves and traps must be installed below the roof to protect the supply water line from freezing. If they cannot be installed below the roof, an alternative method must be used to protect the lines from freezing. Important The supply solenoid (Valve A) is NOT the same as the drain solenoids (Valve B and Valve C). Make sure to use the proper solenoid for each location. Check your local code requirements for proper installation of this type of system. Auto Drain & Flush Valves (When provided by Greenheck) Assembly Number GFC ASCO Solenoid De-Energized Part Part Diameter Qty. Type Position Number Number Supply Closed 1/2 inch (12.7 mm) 1 852178 461263 8262G262 Supply Line Drain Open 1/4 inch (6.35 mm) 1 461264 8210G35 Sump Drain Open 3/4 inch 1 (19.05 mm) 461262 8210G2 Part numbers subject to change. Check the water level in the sump tank. The water level should be above the pump intake and below the overflow. Adjust the float as needed to achieve the proper water level. 10 Model MSX Make-Up Air ® Evaporative Cooling with Auto Drain and Fill continued 1. Install the Water Supply Line Supply line opening requirements vary by unit size and arrangement and are field supplied. Connect the water supply line to the float valve through the supply line opening in the evaporative cooling unit. Install the 1/2 in. normally closed solenoid (Valve A) in the supply line. Install the 1/4 in. normally open solenoid (Valve B) between the supply line and the drain line. Refer to Auto Drain & Fill Evaporative Piping drawing on previous page. 2. Install the Drain Line Connect an unobstructed drain line to the sump drain overflow connection. Install the 3/4 in. normally open solenoid (Valve C) between the sump drain connection and the drain line. 6 in. min. A trap should be used to prevent 6 in. min. sewer gas from Drain Trap being drawn into the unit. 3. Check/Adjust Water Level Check the water level in the sump tank. The water level should be above the pump intake and below the overflow. Adjust the float as needed to achieve the proper water level. ® Model MSX Make-Up Air 11 Installation of Water WizardTM (optional) To Media Pressure Gauge Evaporative Cooling with the Water Wizard™ Sump Drain Note The following instructions are provided for evaporative coolers equipped with the Water Wizard™ only. Additional instructions are provided for evaporative coolers equipped with the auto-drain and fill or bleed‑off. Warning GFC Assembly Part Number No. MSX H12/H22 DeASCO Solenoid Energized Diameter Qty. Part No. Type Position 461262 8210G2 Supply Closed 852370 Supply Line Drain 1/2 inch 1 (12.7 mm) 1/2 inch 1 (12.7 mm) MSX - H32 (<9000 cfm) 383086 8210G34 MSX - H32 (≥9000 cfm) 383088 8210G9 Supply Closed 3/4 inch 1 (19.05 mm) Supply 383086 8210G34 Line Drain 1/2 inch 1 (12.7 mm) MSX-H35, H38, H42 852371 Open Open Supply Solenoid (Normally Closed) Roof Line Supply Line Drain Solenoid (Normally Open) Field Installed Water Wizard™ Installation 3. Wire the Solenoid(s) Wire the supply line solenoid and drain solenoid as shown on the unit’s wiring diagram in the control center. Water Wizard™ Valves (When provided by Greenheck) Unit Model Manual Supply Valve Trap Disconnect and lock-out all power and gas before performing any maintenance or service to the unit. Failure to do so could result in serious injury or death and damage to equipment. Factory Installed 4. Wire the Temperature Sensor If the evaporative cooler shipped separate from the unit, the temperature sensor must be wired. The sensor wire is bundled inside the discharge end of the evaporative cooler. Wire the sensor wire to terminals AI2 and AIC on the terminal strip in the unit’s control center. Note The Water Wizard™ start-up must be completed for proper performance. Part numbers subject to change. 1. Install Normally Closed Supply Line/ Solenoid Connect the water supply line to the manual supply valve in the unit. Install the supply solenoid in the supply line, upstream of the manual supply valve and below the roof line. 2. Install Normally Open Drain Line/ Solenoid Connect the drain line to the supply line between the manual supply valve and the supply solenoid. Install a drain solenoid in the drain line, below the roof line. A trap should be installed in the drain line. Note Solenoid(s) may be provided by Greenheck (if ordered) or by others. Caution Any wiring deviations may result in personal injury or property damage. Greenheck is not responsible for any damage to, or failure of the unit caused by incorrect final wiring. 12 Model MSX Make-Up Air ® Installation of Direct Expansion (DX) Coil Piping (optional) Important Guidelines for the installation of direct expansion cooling coils have been provided to insure proper performance and longevity of the coils. These are general guidelines that may have to be tailored to meet the specific requirements of any one job. As always, a qualified party or individual should perform the installation and maintenance of any coil. Protective equipment such as safety glasses, steel toe boots and gloves are recommended during the installation and maintenance of the coil. Important All field brazing and welding should be performed using high quality materials and an inert gas purge (such as nitrogen) to reduce oxidation of the internal surface of the coil. Note If a hot gas bypass kit was provided by others, refer to the manufacturer’s instructions. 3. Install Suction Line Install suction line(s) from the compressor to the suction connection(s) which are stubbed through the side of the cabinet. 4. Install the Liquid Line and Thermal Expansion Valve (TEV) (by others) Liquid line openings vary by coil size and circuiting and are field supplied. Follow the TEV recommendations for installation to avoid damaging the valve. If the valve is externally equalized, use a tubing cutter to cut off the plugged end of the factory installed equalizer line. Use a de-burring tool to remove any loose metal from the equalizer line and attach it to the TEV. If the valve is internally equalized, the factory installed equalizer line can be left as is. Important All field piping must be self-supporting and flexible enough to allow for the thermal expansion of the coil. Coil Suction Header Distributor Liquid Line Equalizer Line Nozzle 1. Locate the Distributor(s) by Removing the Distributor Access Panel Thermal Expansion Valve (by others) Suction Line Remote Sensing Bulb Straps Suction Connection General Installation 5. Mount the Remote Sensing Bulb (by others) Distributor Access Panel The expansion valve’s remote sensing bulb should be securely strapped to the horizontal run of the suction line at the 3 or 9 o’clock position and insulated. 6. Check Coil Piping for Leaks Thermal (by others) (by others) Installation with Hot Gas Bypass 2. Verify Nozzle Placement Inspect the refrigerant distributor and verify that the nozzle is in place. The nozzle is generally held in place by a retaining ring or is an integral part of the distributor itself. ® Retainer Ring Nozzle Pressurize the coil to 100 psig with dry nitrogen or other suitable gas. The coil should be left pressurized for a minimum of 10 minutes. If the coil holds the pressure, the hook-up can be considered leak free. If the pressure drops by 5 psig or less, re-pressurize the coil and wait another 10 minutes. If the pressure drops again, there is likely one or more small leaks which should be located and repaired. Pressure losses greater than 5 psig indicate a large leak that should be isolated and repaired. 7. Evacuate and Charge the Coil Distributor Nozzle Placement Use a vacuum pump to evacuate the coil and any interconnecting piping that has been open to the atmosphere. Measure the vacuum in the piping using a micron gauge located as far from the pump as possible. Evacuate the coil to 500 microns or less, and then close the valve between the pump and the system. If the vacuum holds to 500 microns or less Model MSX Make-Up Air 13 for one minute, the system is ready to be charged or refrigerant in another portion of the system can be opened to the coil. A steady rise in microns would indicate that moisture is still present and that the coil should be further vacuumed until the moisture has been removed. Note Failure to obtain a high vacuum indicates a great deal of moisture or a small leak. Break the vacuum with a charge of dry nitrogen or other suitable gas and recheck for leaks. If no leaks are found, continue vacuuming the coil until the desired vacuum is reached. 8. Install the Drain Line Connect an unobstructed drain line to the drain pan. A trap should be used to prevent sewer gas from being drawn into the unit. 6 in. min. 6 in. min. Drain Trap Important All traps must be installed below the roof line or be otherwise protected from freezing. Installation of Chilled Water Coil Piping (optional) Important Guidelines for the installation of the cooling coil have been provided to insure proper performance of the coils and their longevity. These are general guidelines that may have to be tailored to meet the specific requirements of any one job. As always, a qualified party or individual should perform the installation and maintenance of the coil. Protective equipment such as safety glasses, steel toe boots and gloves are recommended during the installation and maintenance of the coil. When installing couplings, do not apply undue stress to the connection. Use a backup pipe wrench to avoid breaking the weld between the coil connection and the header. All field piping must be self-supporting. System piping should be flexible enough to allow for the thermal expansion and contraction of the coil. 1. Verify Coil Hand Designation Check the coil hand Hot Return designation to ensure that Connection it matches the system. Coils are generally Entering Air Leaving Air plumbed with the supply connection located on Cold Supply Connection the bottom of the leaving air-side of the coil and the return connection at the top of the entering air-side of the coil. This arrangement provides a counter flow heat exchanger and positive coil drainage. 2. Check the Coil for Leaks Pressurize the coil to 100 psig with dry nitrogen or other suitable gas. The coil should be left pressurized for a minimum of 10 minutes. If the coil holds the pressure, the hook-up can be considered leak free. If the pressure drops by 5 psig or less, re-pressurize the coil and wait another 10 minutes. If the pressure drops again there is likely one or more small leaks which should be located and repaired. Pressure losses greater than 5 psig indicate a large leak that should be isolated and repaired. 3. Connect the Supply and Return Lines Connect the supply and return lines as shown above. 4. Install the Drain Line Connect an unobstructed drain line to the drain pan. A trap should be installed to prevent sewer gas from being drawn into the unit. 6 in. min. Drain Trap 6 in. min. Important All traps must be installed below the roof line or be otherwise protected from freezing. 14 Model MSX Make-Up Air ® Installation of Building Pressure Control (optional) 1. Mount Pressure Tap Using the factory provided bracket, mount the pressure tap to the outside of the unit. Choose a location out of the prevailing winds and away from supply or exhaust fans to assure accurate readings. 2. Run Pressure Tap Lines Run a pressure tap line from the pressure tap on the outside of the unit to the low pressure tap on the back of the photohelic gauge. Run a second pressure tap line from the high pressure tap on the back of the photohelic gauge to the space. Fifty feet of tubing is supplied with the unit. High Pressure Tap to Space Factory Wiring Low Pressure Tap to Outside Connections for Photohelic Gauge 3. Set the Building Pressure The pressure gauge is used to set the desired building pressure. The pressure is set by adjusting the knobs for the upper and lower pressure limits. Typical settings are 0.0 inch wc for the lower and 0.10 inch wc for the upper pressure setting. Pressure Indicating Needle Pressure Setting Needles Pressure Setting Knobs Typical Photohelic Gauge Settings ® Model MSX Make-Up Air 15 Start-Up - Blower Rotate the fan wheel by hand and make sure no parts are rubbing. Check the V-belt drive for proper alignment and tension (a guide for proper belt tension and alignment is provided in the Belt Maintenance section). Check fasteners, set screws and locking collars on the fan, bearings, drive, motor base, and accessories for tightness. warning Disconnect and lock-out all power and gas before performing any maintenance or service to the unit. Failure to due so could result in serious injury or death and damage to equipment. SPECIAL EQUIPMENT REQUIRED Required and recommended tools. Equivalent products may be used. Manufacturer: Fluke Model: 177 Phone: 1-800-44-FLUKE www.fluke.com Voltage & Amperage Meter Manufacturer: Fluke Model: 50 Phone: 1-800-44-FLUKE www.fluke.com Manufacturer: Fluke Model: 116 Phone: 1-800-44-FLUKE www.fluke.com Manufacturer: Dwyer Model: Slack Tube Phone: 1-219-897-8000 www.dwyer-inst.com Manufacturer: Monarch Voltage, Hertz, Phase Model: Pocket Tach 100 Phone: 1-800-999-3390 www.monarchinstrument.com Thermometer Micro Amp Meter U-Tube Manometer Tachometer VOLTS SUP HP HZ tio n Blower Housing Blower Rotation Note To reverse the rotation on three phase units, disconnect and lock-out the power, then interchange any two power leads. Note To reverse the rotation on single phase units, disconnect and lock-out the power, then rewire the motor per the manufacturer’s instructions. Important If the blower is rotating in the wrong direction, the unit will move some air, but will not perform as designed. Be sure to perform a visual inspection to guarantee the correct blower rotation. 3. Check for Vibration Check for unusual noise, vibration or overheating of the bearings. Reference the Troubleshooting section for corrective actions. Important Excessive vibration may be experienced during the initial start-up. Left unchecked, it can cause a multitude of problems including structural and/or component failure. Important Generally, fan vibration and noise is transmitted to other parts of the building by the ductwork. To minimize this undesirable effect, the use of heavy canvas duct connectors is recommended. PH 4. Motor Check EXH HP Warning MCA Check the housing, blower,MOP and ductwork for any foreign objects before running the blower. Unit’s Total MCA 1. Check the Voltage Before starting the unit, compare the supplied voltage, hertz, and phase with the unit and motor’s nameplate information. Voltage, Hertz, Phase VOLTS Open the blower access door and run the blower momentarily to determine the rotation. Arrows are placed on the blower scroll to indicate the proper direction or reference the example shown to the right. Ro Refer to the Start-Up Checklist in the Reference section before proceeding further! Pre Start-Up Check ta 2. Check the Blower Rotation HZ Measure the motor’s voltage, amps and RPM. Compare to the specifications. Motor amps can be reduced by lowering the motor RPM or increasing system static pressure. Important Additional starters and overloads may be provided in the make-up air control center for optional exhaust blowers. Any additional overloads must be checked for proper voltage, amps and RPMs. PH SUP HP EXH HP MCA MOP Electrical Nameplate 16 Model MSX Make-Up Air ® 5. Air Volume Measurement & Check Measure the unit’s air volume (cfm) and compare it with it’s rated air volume. If the measured air volume is off, adjust the fan’s RPM by changing/adjusting the drive. Note The most accurate way to measure the air volume is by using a pitot traverse method downstream of the blower. Other methods can be used but should be proven and accurate. Important Changing the air volume can significantly increase the motor’s amps. If the air volume is changed, the motor’s amps must be checked to prevent overloading the motor. Note To ensure accuracy, the dampers are to be open when measuring the air volume. 6. Set-Up Optional Components Adjust the settings on the optional components. See the Control Center Layout in the Reference section for location of optional components. • Heating Inlet Air Sensor Typical setting: 60-70°F (15-21°C) • Cooling Inlet Air Sensor Typical setting: 75°F (24°C) • Building Freeze Protection Typical setting: 5 minutes; 45°F (7°C) • Dirty Filter Gauge Typical setting: Settings vary greatly for each unit. (see Reference section for adjusting information) ® Model MSX Make-Up Air 17 Start-Up - Electric Heater (optional) Refer to the Start-Up Checklist in the Reference section before proceeding further! Pre Start-Up Check Check all electrical connections. Tighten any loose connection to all components including contactors, heating elements and main power lugs. warning Disconnect and lock-out all power before performing any maintenance or service to the unit. Failure to due so could result in serious injury or death and damage to equipment. 1. Check the Voltage Before starting the heater, compare the supplied voltage, hertz, and phase with the heater’s nameplate information. 2. Airflow Interlock With the supply fan on, verify the electric heater’s airflow interlock (DDS) is made. 3. Set the Unit’s Operating Temperature Set the operating temperature by adjusting the discharge temperature selector. Typical settings are 65-70°F (18-21°C). note If the heater is equipped with an optional inlet air sensor the heater will not energize unless the outdoor air temperature is less than the inlet air sensor’s set point. 18 Model MSX Make-Up Air ® Start-Up - Evaporative Cooling Recirculating (optional) 8. Put the Unit into Service Remove the jumper, and energize the blower(s). Verify proper operation. 1. Check the Installation The media may have been removed during installation, so its orientation 45º should be double checked. The media should be installed with Entering Air Leaving Air the steeper flute angle sloping down towards 15º the entering air Media Orientation side. important Check the media for minerals after two weeks of service and adjust the bleed-off rate accordingly. Bleed-Off Valve Pump Filter Supply Connection Float Valve Threaded Float Adjustment Overflow Verify that the stainless steel caps and distribution headers are in place. The headers should be located over the media towards the entering air side. The caps should be placed over the headers. 2. Check the Pump Filter Check that the pump filter is around the pump inlet. 3. Fill the Sump and Adjust the Float Evaporative Cooler Set-Up Turn on the water supply and allow the sump tank to fill. Adjust the float valve to shut-off the water supply when the sump is filled to within 1 inch of the bottom of the overflow. 4. Break-in the Media Open the bleed-off valve completely and saturate the media with the blower(s) off for no less than 20 minutes. Temperature Setting t2 settings t1 settings Note A jumper will need to be installed in the control center to power the evaporative pumps with the blower(s) off. Reference the unit’s ladder diagram to determine proper terminals. Evaporative Freeze Protection Evaporative Timer 5. Check the Flow Rate The pumps should provide enough water to saturate the media in 45 to 60 seconds. Consult the factory, if adequate flow is not achieved. 6. Adjust the Water Bleed-Off Rate The water bleed-off rate is dependent on the water’s mineral content. The bleed-off should be adjusted based on the media’s mineral deposits after two weeks of service. 7. Set the Optional Auto Drain and Fill Set the auto drain, fill timer and temperature settings. Timer settings are: t1: 1.0, 10min t2: 0.4, 60h Temperature is typically set to 45°F (7°C) ® Model MSX Make-Up Air 19 Start-Up - Water Wizard™ (optional) L1 L2 L3 Function Key Up Key 5. Check Media Start the cooling cycle and check the media after one hour of operation. If the media is continuously dry or if too much water is draining from the sump tank, refer to Troubleshooting, Water Wizard™. NOTE Enter Key Down Key Water Wizard™ User Interface Key Function Description Steps 6 through 8 are provided to adjust the minimum cooling temperature. The minimum cooling is preset to the factory recommended 75°F (24°C). Only adjust if needed. 1. Open the Solenoid NOTE Confirm that the manual water supply valve is closed. Press and hold the Function Button for one second. L3 will begin blinking (short on, long off), indicating that Flow Test Mode is active and the supply solenoid is open. 2. Set the Water Pressure With the solenoid open, set the supply water pressure to the correct setting (see table below). Use the manual supply valve to adjust the supply pressure. A pressure gauge is provided between the manual supply valve and the media. warning Opening the manual supply valve will allow water to pass to the media. Be sure the sump is safely draining before opening the manual supply valve. NOTE The manual supply valve ships closed and must be adjusted for proper performance. Recommended Water Pressure Chart Housing Size MSX-H12 MSX-H22 MSX-H32 MSX-H35 MSX-H38 MSX-H42 Media Width (inches) 30 433⁄4 60 66 96* 120* 180* 216* Water Pressure (in. wc) 20 36 61 72 42 61 37 51 *Multiple media sections. Values represent total media width. NOTE The recommended water pressure is based on media width. Refer to the table provided for proper water pressure settings. The inlet air sensor function overrides and shuts down the evaporative cooler if the outside temperature falls below the minimum cooling temperature. 6. Enter Program Mode Press and hold the Enter Key for three seconds. The display will read “Pro” when Program Mode is active. Program Display 7. Adjust the Minimum Cooling Temperature While in the Program Menu, use the Up and Down Keys to navigate the Menu Options Minimum Cooling until “toF” is Temperature Display displayed. Press the Enter Key to access the selected Menu Option setting. Use the Up and Down Keys to adjust the Minimum Cooling Temperature as needed. Press the Enter Key to save the Minimum Cooling Temperature setting and return to the Program Menu. NOTE The enter key must be pressed to save the new minimum cooling temperature. 8. Exit Program Mode After 15 seconds of idle time the controller will exit Program Mode. 3. Break-in Media Leave the supply solenoid open to saturate and break‑in media for 20 minutes with the blower off. 4. Close Solenoid With the pressure set, press the Function Key for one second to deactivate Flow Test Mode and allow the supply solenoid to close. 20 Model MSX Make-Up Air ® NOTE The Freeze Temperature is preset to the factory recommended 45°F. Steps 9-11 should only be completed if the Freeze Temperature needs adjustment. NOTE The Freeze Temperature is the temperature at which the supply solenoid closes and the drain solenoid opens to drain the supply line, preventing possible freeze damage. A drain solenoid is required for this option. 9. Enter Program Mode Press and hold the Enter Key for three seconds. The display will read “Pro” when Program Mode is active. Program Display 10. Adjust the Freeze Temperature While in Program Mode, use the Up and Down Keys to navigate through the Menu Options until “Frt” is displayed. Press the Enter Key to access the Freeze Temperature selected Menu Option Display setting. Use the Up and Down Keys to adjust the Freeze Temperature setting as needed. Press the Enter Key to set the Freeze Temperature and return to the Program Menu. NOTE The enter key must be pressed to save the new freeze temperature. 11. Exit Program Mode After 15 seconds of idle time the controller will exit Program Mode. ® Model MSX Make-Up Air 21 Check Operation - VAV Units (optional) Building Pressure Control — a variable frequency drive is controlled according to input from a pressure sensing device. NOTE Blower Start-Up, Steps 1-5 should be performed before the blower is run. NOTE For maintenance issues associated with variable frequency drives, consult the drive’s manual supplied with the unit. The drives are programmed at the factory and should not need any adjustment during installation and start-up. For kitchen applications, the drive may be located in the kitchen or in the unit. Variable Volume Operation The variable volume option is recommended when a building’s exhaust volume may vary. This option enables the make-up air volume to track with the exhaust volume, providing only the amount of makeup air required. Control strategies include 2-speed and modulating blowers. Before the unit is left in service, the variable volume control system should be tested. 2-Speed A variable frequency drive (VFD) is used to control air volumes. The VFD can be switched to low or high speed from a remote control panel. Turn the fan speed switch on the remote control panel to each position and confirm that the fan speed adjusts accordingly. Modulating Potentiometer Control — a variable frequency drive is controlled by input from a remote speed selector (potentiometer). This unit allows easy manual adjustment of make-up air volumes. To test potentiometer operation, turn the potentiometer to the two extremes. With variable volume, make sure the fan goes to maximum and minimum speed. BLOWER EXHAUST (OPTIONAL) SUPPLY MAIN VALVES HEAT Turn both knobs to the upper most pressure setting. You may have to remove the outdoor pressure tap tubing. VAV systems should go to maximum speed. Set both knobs at the lowest setting and the VAV systems should go to minimum speed. Reset the correct pressure limits before starting the unit. This picture depicts a typical photohelic setting. Typical settings are 0.0 inch wc for the lower pressure setting and 0.10 inch wc for the upper pressure setting. The needle indicates a negative building pressure. During correct operation, the indicating needle will remain between or near the setting needles. DIRTY FILTERS 75 70 80 65 (OPTIONAL) 60 85 90 55 PHOTOHELIC ® GREENHECK With Maxitrol 44 Room Thermostat Building Pressure Control Pressure Indicating Needle Pressure Setting Needles Pressure Setting Knobs Photohelic Gauge External Signal — a variable frequency drive is controlled according to input from an external 2-10 VDC or 4-20 mA signal (by others). A 2 VDC or 4 mA signal will send the blower to low speed. The blower will go to maximum speed with a 10 VDC or 20 mA signal. Variable Kitchen Control — a variable frequency drive is controlled by input from a remote speed control. This unit allows automatic adjustment of make-up air volumes based on varying cooking loads. BLOWER EXHAUST (OPTIONAL) SUPPLY MAIN VALVES HEAT DIRTY FILTERS 75 80 90 When the potentiometer is at 0, the fan speed will be at its minimum. When the potentiometer is at 100, the fan will be at its maximum speed. 22 Model MSX Make-Up Air 70 65 60 85 (OPTIONAL) 55 ® GREENHECK With Maxitrol 44 Room Thermostat Potentiometer Control ® Check Operation - Recirculating Units (optional) NOTE Blower Start-Up, steps 1-5 should be performed before the blower is run. Recirculation Operation The recirculation operation option is recommended when the ventilation equipment provides the primary source of heating for the space. Recirculation can vary from 100% return air to 100% outside air. Control strategies include 2-position and modulating dampers. Before the unit is left in service, the recirculation control system should be tested. A 2-position spring return actuator is used to control the return air amounts. The damper moves from open to closed. If power is cut to the unit, the outdoor air damper will fail to close. BLOWER (OPTIONAL) SUPPLY MAIN VALVES HEAT Turn the recirculating switch on the remote control panel to each position and confirm that the return air damper adjusts accordingly. The damper actuator may take a few minutes to open or close. RECIRCULATION DIRTY FILTERS 75 70 (OPTIONAL) 65 80 60 85 55 90 ® GREENHECK With Maxitrol 44 Room Thermostat 2-Position Damper Control Modulating Potentiometer Control — a modulating spring return actuator is used to control the return air amounts. The return air damper modulates from fully open to fully closed based on a signal from a remote potentiometer. To test potentiometer operation, turn the potentiometer to the two extremes. Confirm that the return air damper fully opens and fully closes. When the potentiometer is at 0, the return air damper will open. When the potentiometer is at 100, the return air damper will close. The damper actuator may take a few minutes to open or close. ® Turn both knobs to the upper most pressure setting. You may have to remove the outdoor pressure tap tubing. The return air damper should close. BLOWER EXHAUST (OPTIONAL) SUPPLY MAIN VALVES HEAT DIRTY FILTERS 75 70 80 65 (OPTIONAL) 60 85 90 55 PHOTOHELIC ® GREENHECK With Maxitrol 44 Room Thermostat Building Pressure Control Set both knobs at the lowest setting and the damper should open. It may take one to two minutes for the damper to reach the desired position. Reset the correct pressure limits before starting the unit. 2-Position Damper EXHAUST Building Pressure Control — a modulating spring return actuator is used to control the return air amounts. The return air damper modulates from fully open to fully closed based on a signal from a remote pressure sensing device. This picture shows a typical photohelic setting. Typical settings are 0.0 inch wc for the lower and 0.10 inch wc for the upper pressure setting. The needle in this photo indicates a negative building pressure. During correct operation, the indicating needle will remain between or near the setting needles. Pressure Indicating Needle Pressure Setting Needles Pressure Setting Knobs Photohelic Gauge External Signal — a modulating spring return actuator is used to control the return air amounts. Return air damper modulates from fully open to fully closed based on an external 2-10 VDC or 4-20 mA signal (by others). The return air damper will close with a 10 VDC or 20 mA signal. The return air damper should open with a 2 VDC or 4mA signal. The damper actuator may take a few minutes to open or close. BLOWER EXHAUST (OPTIONAL) SUPPLY MAIN VALVES HEAT DIRTY FILTERS 75 80 70 65 60 85 90 (OPTIONAL) 55 ® GREENHECK With Maxitrol 44 Room Thermostat Potentiometer Control Model MSX Make-Up Air 23 Operation - Electrical Electrical Sequence 1. Exhaust Fan Contact (S1) Closed (optional) • Power passes through N.C. contact on exhaust fan overload (ST2 OL), which is closed if exhaust fan (M2) has not overloaded • Power passes to exhaust fan starter (ST2) • N.O. contact on exhaust fan starter (ST2) is energized and closed • Power passes to exhaust fan • Exhaust fan (M2) starts 2. Supply Fan Contact (S2) Closed • Power passes through N.C. field supplied fire contact (FSC) • Power passes through optional N.O. contact on exhaust fan starter (ST2), which is closed when the optional exhaust starter (ST2) is activated • Power passes through N.C. contact on supply starter overload (ST1 OL), which is closed if the supply fan has not overloaded • Power passes through N.C. contact on optional freeze protection timer (RT4) which remains closed if the temperature has remained above the set point • Power passes to and energizes optional inlet damper (D1), which opens • Power passes through optional N.O. damper limit switch (DL1), which is energized and closed when the optional inlet damper is open. It may take several minutes for the damper to fully open and for the damper limit switch to close • Power passes to and energizes fan relay (RF) • Power passes through N.O. contact on fan relay (RF), which closes when the fan relay (RF) is energized • Power passes to and energizes supply fan starter (ST1) • N.O. contact on supply fan starter (ST1) is energized and closed • Supply fan (M1) starts differential switch (PDS), which closes when proper airflow is achieved • Power passes through N.C. automatic and manual reset temperature cutouts (A and M), which remain closed if the maximum temperature has not been reached • Power passes to and energizes operating contactor relay (C1) • Power passes through N.O. contacts on operating contactor (C1), which is closed • Electric heater modulates/stages to maintain temperature set point 4. Evaporative Cooling Contact (S4) Closed* (optional) • N.O. contact on fan relay (RF) is energized and closed • Power passes through N.O. contact on optional inlet air sensor (TS4), which is energized and closed if the inlet air temperature is above the set point • Power passes to and energizes cool relay (RC) • N.O. contact on cool relay (RC) is energized and closed • Power passes to optional evaporative cooling pump (P1) *If DX or chilled water coils are used rather than an evaporative cooler, the cooling sequence of operation will depend on the coil controls. Cooling coil controls are supplied by others. 3. Electric Heat Contact (S4) Closed (optional) • Power passes through N.O. contact on fan relay (RF), which is energized and closed • Power passes through N.C. contact on optional inlet air sensor (TS4), which is closed if the inlet air temperature is below the set point • Power passes to and energizes heat relay (RH) • Power passes through N.O. contact on heat relay (RH), which closes when the heat relay (RH) is energized • Power passes through N.O. contact on pressure 24 Model MSX Make-Up Air ® Operation - Water Wizard™ (optional) L1 L2 L3 Function Key Up Key Dry Bulb Temperature The dry bulb temperature is visible on the home screen. If a number is not visible, wait 15 seconds and use the Up and Down Keys until a number is displayed. Wet Bulb Temperature Enter Key Down Key Water Wizard™ User Interface Key Function Description Drain Mode Drain Mode locks open the drain solenoid and drains the supply line between the supply solenoid and the media. To activate Drain Mode simultaneously, press the Function and Enter Keys (L2 will light). To deactivate Drain Mode and unlock the drain solenoid, simultaneously press the Function and Enter Keys again. Flow Test Mode Activating Flow Test Mode opens the supply solenoid and allows water to pass to the manual supply valve. To activate Flow Test Mode, press and hold the Function Key for one second (L3 will flash). To deactivate Flow Test Mode and allow the supply solenoid to close, press and hold the Function Key again for one second. To view the Wet Bulb Temperature, simultaneously press and hold the Up and Down Keys. Indicating Lights Three indicating lights are located across the top of the display to indicate the status of the Water Wizard™. Light Status Indicating Light L1 On Off Blinking (Long on, Short Off) Blinking (Short on, Long Off) Call for cooling No call for cooling Call for cooling. Outdoor temperature lockout. N/A L2 Drain solenoid open Drain solenoid closed N/A Supply solenoid open. (Drain solenoid closed). L3 Cooling on Cooling off Supply solenoid locked closed Flow test mode active Caution The sump drain line must be clear and draining to a safe location before using Flow Test Mode. Caution Be aware of the water level in the sump tank at all times when using the Flow Test Mode. Program Mode Program Mode allows the user to view the Program Menu and edit the factory default settings. To access Program Mode and view the Program Menu press and hold the Enter key for three seconds. While viewing the Program Menu press the Up and Down keys to scroll through the Menu Options. To view the setting of the selected Menu Option, press the Enter key. To edit the setting, press the Up or Down key while viewing the setting. To save the setting and return to the Program Menu, press the Enter key. To return to the Program Menu without saving the change, wait 10 seconds. To exit Program Mode from the Program Menu, wait 10 seconds. warning Changing the default settings will significantly affect performance. Only change a setting after reading and understanding this entire manual. warning The Enter key must be pressed to save any changes made to a setting. ® Model MSX Make-Up Air 25 Troubleshooting Blower Does Not Operate Proper supply power at main disconnect No Check main voltage (See Blower Start-Up Step #1) Main Disconnect (DS1) Off (Turn Main Disconnect DS1 On) Primary fuses blown (Replace fuses) Yes 24 VAC between terminals R and X? No Main Transformer (TR1) Defective (Replace transformer) Yes 24 VAC between terminals G and X? No Yes 24 VAC across terminals 3 and X? No Yes 24 VAC across terminals 4 and X? No Yes Supply Fan Overload (ST1 OL) tripped (Reset and check motor amps. Reference Blower Start-Up #4) Optional Exhaust Fan Interlocks (ST2-ST5) open (Correct/Replace) (Optional) Freeze Protection (RT4) Tripped (Reset) Yes 24 VAC across A2 and A1 on supply contactor (ST1) Supply Switch (S2) Off (Turn Supply Switch (S2) On) Fire System Contact (FSC) tripped/not installed (Correct/Replace) No (Optional) Damper Limit Switch (DL1) holding (Wait for actuator to open fully or adjust limit switch) (Optional) Damper Limit Switch jumper missing (Install jumper. Reference the unit’s ladder diagram for terminals) Fan Relay (RF) is not energized (Check for loose connection) (Repair or replace relay) Broken fan Bbelt (Replace. Reference Maintenance section) Defective motor or capacitor (Repair/Replace) Blown motor fuse (Replace) One or more legs of 3 phase is out (Restore missing legs) At this time the supply contactor (ST1) should pull in, passing power to the supply motor and the blower should start. 26 Model MSX Make-Up Air ® Troubleshooting Motor Overamps Air volume too high? Yes Adjust drives or increase external static pressure as needed. No (Reference Blower Start-Up Step #5) Actual static pressure lower than design? Yes Adjust drives to reduce blower RPM. No (Reference Blower Start-Up Step #5) Blower rotation correct? No Reverse blower rotation. Yes (Reference Blower Start-Up Step #2) Motor voltage correct? No Provide proper power supply. Yes (Reference Blower Start-Up Step #1) Motor horsepower too low? Yes No Shorted windings in motor? Yes Resize motor. Yes Replace motor. Everything is working properly, consult factory. ® Model MSX Make-Up Air 27 Troubleshooting Insufficient Airflow Damper(s) not fully opened? Yes Adjust damper linkage(s), or replace faulty actuator(s). No (Damper actuators may take a few minutes to open) System static losses too high? Yes No Blower speed too low? Reduce losses by improving ductwork. Yes Adjust drives as needed. No (Reference Blower Start-Up Step #5) Filters dirty or clogged Yes Clean or replace filters. No (Reference Filter Maintenance in the Maintenance section). Leaks in ductwork Yes No Belt slipping Repair leaks. Yes Replace or tighten belt. Yes (Reference V-Belt Maintenance in the Maintenance section) Everything is working properly, consult factory. Too Much Airflow Blower speed too high? Yes No Adjust drives as needed. (Reference Blower Start-Up Step #5) Filters not in place? Yes No Insufficient external static pressure? Install filters. Yes No Everything is working properly, consult factory. 28 Model MSX Make-Up Air Increase external static pressure. ® Troubleshooting Excessive Noise or Vibration Belts worn or loose? Yes Replace worn belts or tighten loose belts. (Reference V-Belt Drive Maintenance in the Maintenance section) No Sheaves aligned? No Align sheaves. (Reference V-Belt Drive Maintenance in the Maintenance section) Yes Wheel unbalanced? Yes Clean and/or balance wheel(s). No Bearings worn or need lubrication? Yes Replace worn bearings or lubricate bearings as needed. (Reference Bearing Maintenance in the Maintenance section) No Wheel rubbing on inlet? Yes Adjust wheel(s) or inlet. No At this time noise and vibration should be at acceptable levels. ® Model MSX Make-Up Air 29 Troubleshooting Electric Heater Does Not Operate (optional) Supply fan must be on for heater to operate 24 VAC between terminals W1 and X? No Yes 24 VAC between terminals 22 and 21? No Main Transformer (TR2) defective (Replace transformer) Yes 24 VAC between terminal A2 on heat relay (RH) and X? No (Optional) Inlet Air Sensor (TS4) holding (Adjust (TS4) setting. Reference Blower Start-Up Step #6) Yes 24 VAC between terminals T1 and 21? No Heat Relay (RH) is not energized (Check for loose connections). (Repair or replace Heat Relay (RH)) Yes 24 VAC between terminals I and 21? Yes Heat Switch (S4) Off (Turn Heat Switch (S4) On) Heat Switch not wired (Wire Heat Switch (S4)) No Pressure Differential Switch (PDS) open (Check on cause of control loss) Automatic and/or Manual Reset Cutouts (A and M) tripped (Reset/Replace Automatic and/or Manual Reset Cutouts (A and M)) (Check on cause of control loss) At this time the heater should be energized. (The heating elements will not be on if the leaving air temperature is above its set point on the Remote Adjuster (RA)) 30 Model MSX Make-Up Air ® Troubleshooting Evaporative Cooler does not Operate (Recirculating pump) Supply fan must be on for cooler to operate 24 VAC between terminals Y1 and X No Cool Switch (S4) off (Turn Cool Switch (S4) on) Cool Switch not wired (Wire Cool Switch (S4)) Yes 24 VAC between terminal A2 on Cooling Relay (RC) and X Optional Inlet Air Sensor (TS4) holding (Adjust TS4 setting. Reference Blower Start-Up Step #6) Yes 115 VAC between terminals 102 and 101 No Cooling Transformer (TR4) defective (Replace transformer) Yes 115 VAC between terminal 114 and 101 No Cooling Relay (RC) is not energized (Check for loose connections) (Repair or replace relay) Yes At this time the evaporative cooler pumps should be on Water Blows through Evaporative Cooler Are the headers in place and located near the entering air side of the media? No Replace headers and/or move the headers. (Reference Evaporative Cooler Start-Up Step #1) Yes Water supply greater than evaporation and bleed-off rate? Yes Use the main supply valve to reduce the supply of water. No Air velocity greater than specified? Yes Reduce the air velocity through the media. (Reference Blower Start-Up Step #5) No At this time the evaporative cooler should be operating without water blowing through. ® Model MSX Make-Up Air 31 Troubleshooting Water Wizard™ — Improper Water Supply note note If the water supply is too low, the media will continuously appear dry. note Changing the On Time Factor by (1) will change the water supply by approximately 3%. important If the water supply is too high, the media will be saturated and excessive water will be draining from the sump tank. note Some water drainage is desired to keep the media flushed, but it should be minimized to utilize the Water Wizard™. The enter key must be pressed to save the new On Time Factor. 4. Exit Program Mode After 15 seconds of idle time the controller will automatically exit Program Mode 1. Adjust the Manual Supply Valve Adjust the manual supply valve (refer to Start-Up, Water Wizard™). If the recommended water pressure does not provide enough water, increase the pressure until the desired water supply is achieved. If the recommended water pressure provides too much water, decrease the water pressure until the desired water supply is achieved. caution Only proceed to Steps 2 and 3 if Step 1 does not correct the problem. 2. Enter Program Mode Press and hold the Enter key for three seconds to enter Program Mode. The display will read “Pro” when Program Mode is active. Program Display 3. Adjust the On Time Factor While in the Program Menu, use the Up and Down keys to navigate through the menu options until “ont” is displayed. With “ont” displayed, press the Enter key to access the setting. With the setting displayed, use the Up and Down keys to adjust the setting as needed. Increase the factor to increase the water supply or decrease the factor to decrease the water supply. Press the Enter key to save the new On Time Factor and return to the Program Menu. On Time Factor Display 32 Model MSX Make-Up Air ® Maintenance - Routine Snow Accumulation Caution Lock-out the gas and the electrical power to the unit before performing any maintenance or service operations to this unit. V-Belt Drives V-belt drives must be checked on a regular basis for wear, tension, alignment, and dirt accumulation. Check the tension by measuring the deflection in the belt as shown below. Check the alignment by using a straight edge across both sheaves as shown below. Clear snow away from roof mounted units. Keep the snow clear of the intake and access doors. Motors Motor maintenance is generally limited to cleaning and lubrication (where applicable). Cleaning should be limited to exterior surfaces only. Removing dust and grease build-up on the motor assures proper motor cooling. Motors supplied with grease fittings should be greased in accordance with the manufacturer’s recommendations. important important Premature or frequent belt failures can be caused by improper belt tension, or misaligned sheaves. • Abnormally high belt tension or drive misalignment will cause excessive bearing loads and may result in failure of the fan and/or motor bearings. • Abnormally low belt tension will cause squealing on start-up, excessive belt flutter, slippage, and overheated sheaves. important Do not pry belts on or off the sheave. Loosen belt tension until belts can be removed by simply lifting the belts off the sheaves. important Do not allow water or solvents to enter the motor or bearings. Motors and bearings should never be sprayed with steam, water or solvents. important Greasing motors is only intended when fittings are provided. Many motors are permanently lubricated, requiring no additional lubrication. Wheels Wheels require little attention when moving clean air. Occasionally oil and dust may accumulate on the wheel causing imbalance. When this occurs the wheel and housing should be cleaned to assure proper operation. When replacing V-belts on multiple groove drives, all belts should be changed to provide uniform drive loading. important Do not install new belts on worn sheaves. If the sheaves have grooves worn in them, they must be replaced before new belts are installed. FAN MOTOR MOTOR FAN Deflection = Belt Span 64 Belt Span Belt Tension Drive Alignment ® Model MSX Make-Up Air 33 Maintenance - Routine continued Bearings Filters The bearings for Greenheck fans are carefully selected to match the maximum load and operating conditions of the specific class, arrangement and fan size. The instructions provided in this manual and those provided by the bearing manufacturer will minimize any bearing problems. Filter maintenance is generally limited to cleaning and replacement. IMPORTANT If disposable filters are installed, they can be checked by holding up to a light source. If light cannot pass through the filter, it should be replaced. Lubricate bearings prior to periods of extended shutdowns or storage and rotate shaft monthly to aid in corrosion prevention. If the fan is stored more than three months, purge the bearings with new grease prior to start-up. Recommended Bearing Lubrication Schedule (in Months*) Fan RPM Bearing Bore Size (inches) ⁄2 - 1 11⁄8 - 11⁄2 15⁄8 - 17⁄8 115⁄16 - 23⁄16 27⁄16 - 3 250 6 6 6 6 6 500 6 6 6 5 4 750 6 5 4 3 3 1000 5 3 2 1 1 1250 5 3 2 1 1 1500 5 2 1 1 0.5 2000 5 1 1 0.5 0.25 1 *Suggested initial greasing interval is based on 12 hour per day operation and 150°F (66°C) maximum housing temperature. For continuous (24 hour) operation, decrease greasing interval by 50% • If extended grease lines are present, relubricate while in operation, only without endangering personnel. • For ball bearings (operating) relubricate until clean grease is seen purging at the seals. Be sure not to unseat the seal by over lubricating. • For ball bearings (idle) add 1-2 shots of grease up to 2 inch bore size, and 4-5 shots above 2 inch bore sizes with a hand grease gun. • For roller bearings add 4 shots of grease up to 2 inch bore size, and 8 shots for 2-5 inch bore size with a hand grease gun. • Adjust relubrication frequency based on condition of purged grease. • A high quality lithium based grease conforming to NLGI Grade 2 consistency, such as those listed here: Mobil 532 Mobilux #2 Texaco Multifak #2 Texaco Premium #2 If aluminum mesh filters are installed, they can be washed in warm soapy water. An adhesive spray can be added to aluminum mesh filters to increase their efficiency. IMPORTANT When reinstalling filters, be sure to install them with the airflow in the correct direction. An airflow direction arrow is located on the side of the filters. IMPORTANT Replacement filters should be from the same manufacturer and the same size as the original filters provided with the unit. Evaporative Coolers The media should be periodically brushed lightly with a soft bristle brush in an up and down motion while flushing with water. This aids in reducing the amount of mineral build-up. For large amounts of mineral build-up, clean or replace the media and increase the water bleed-off or flush rate. The cooling media has a useful life of 3 to 5 years depending on the water quality and the bleed-off or flush rate. important When reinstalling the evaporative media, make sure that it is installed correctly. Reference the drawing shown below. important Replacement media should be from the same manufacturer and be the same size as the original media provided with the unit. 45º B Shell Alavania #2 Exxon Unirex #2 Entering Air Leaving Air 15º Media Orientation 34 Model MSX Make-Up Air ® Maintenance - Routine continued Cooling Coils warning Repair and replacement of the coil and the connecting piping, valves, etc., should be performed by a qualified individual. Inspect the coil for signs of corrosion and/or leaks. Repair any leaks as required. Inspect the coil’s surface for foreign material. If the coil surface needs cleaning, clean the coil from the leaving air-side so that foreign material will be washed out of the coil rather than pushed farther in. Inspect and clean the drain pan to prevent the growth of algae and other organisms. important Be sure to read and follow the manufacturer’s recommendations before using any cleaning fluid. caution Caution should be used to avoid injury when venting the coil. High pressure and/or high temperature fluids can cause serious injuries. Chilled Water Coils Test the circulating fluid for sediment, corrosive products and biological contaminants. Make the necessary corrective measures. Maintain adequate fluid velocities and proper filtering of the fluid. If automatic air vents are not utilized, periodic venting of the coil is recommended to remove accumulated air. ® Model MSX Make-Up Air 35 Maintenance - Fall Evaporative Coolers The water should be shut off and all the lines drained when the outside temperature drops below 45°F. Remove drain plugs for the winter. Clean all interior parts of any mineral deposits or foreign materials that may have built-up during the cooling season. Replace any worn or non-functioning parts. Winterizing Chilled Water Coils During the winter, chilled water coils need to be protected against freezing. Greenheck recommends protecting the coils by either blowing-out the coils or by flushing the coils. Blowing-Out Coils 1. Close valves on the supply and return lines. 2. Open drain valves and/or drain plug. Remove vent plug to allow coil to drain faster. 3. After coil is fully drained, connect a blower to the caps. Do not connect the blower to the air vent or drain plug. 4. Close the vent plug on the header that the blower is connected to. Open the drain valve or cap on the other header. 5. Turn on blower for 30 minutes. Place mirror at discharge. If the mirror fogs up, repeat procedure until no fog appears on the mirror. 6. After drying the coil, wait a few minutes then repeat Step #5. 7. Leave drains open and do not install plugs until beginning of cooling season. Flushing Coils Greenheck recommends the use of inhibited glycol (such as propylene or ethylene) to flush water coils to protect against freezing. Additionally, the use of inhibited glycol provides corrosion protection. The table below indicate the percentage of glycol required to prevent freezing in a coil at a given outdoor air freeze point. Completely fill coil with solution. Drain coil. Residual glycol fluid per these concentrations can be left in the coil without concern of freezing. Recovered fluid can be used to flush other coils. Percent of Ethylene Glycol by Volume Freeze Point °F ºC Percent of Propylene Glycol by Volume Freeze Point °F ºC 0 32 0 0 32 0 10 25 -4 10 26 -3 20 16 -9 20 19 -7 30 3 -16 30 8 -13 40 -13 -25 40 -7 -22 50 -34 -37 50 -28 -33 60 -55 -48 60 -60 -51 36 Model MSX Make-Up Air ® Reference Typical Control Center Layout MSX Unit Control Center Layout 10 3 1 2 5 4 9 11 7 15 12 13 1. Primary Fuses — provides proper fusing to low voltage transformer. 2. Low Voltage Transformer — provides low voltage to controls and optional evaporative cooling controls. 3. Low Voltage Fuse — provides proper fusing to controls and optional evaporative cooling controls. 4. Control Terminal Block — provides wiring access to controls. 5. Building Freeze Protection Timer (optional) — prevents the discharge of cold air into the building. 6. Fan Relay — allows power to pass to energize motor starter. 7. Supply Motor Starter — 24 volt magnetic contacts for starting supply motor. 8. Supply Overload — provides electronic overload protection to supply motor. 9. Auxiliary Contact (optional) — provides one normally closed and one normally open contact for other equipment. 17 16 14 6 8 18 10. Exhaust Fuses (optional) — provides proper fusing for exhaust fan motor(s). 11. Exhaust Motor Starter (optional) — 24 volt magnetic contacts for starting exhaust motor. 12. Exhaust Overload (optional) — provides electronic overload protection to exhaust motor. 13. Inlet Air Sensor (optional) — outdoor air stat that automatically controls the cooling based on outdoor air temperature. 14. Cooling Relay (optional) — allows power to pass to cooling controls. 15. Reset Timer (optional) — resets cooling system to run a time interval. 16. Auto Drain Relay (optional) — assures supply pump does not operate during drain interval. Allows pump to operate in cooling mode. 17. Cooling Timer (optional) — allows for automatic draining of the evaporative cooling system based on time schedule. 18. Dirty Filter Switch (optional) — monitors filter pressure drop, turns on indicating light when pressure drop is above field adjustable set point. Dirty Filter Switch Common Normally Open Normally Closed CCW to Decrease Trip Point CW to Increase Trip Point Negative Pressure after the filters Positive Pressure before the filters ® Model MSX Make-Up Air 37 Start-Up Checklist Start-Up Checklist Unit Model Number ________________________________ (e.g. MSX-120-H32-DB) Unit Serial Number ________________________________ (e.g. 10111000) Start-Up Date ________________________________ Start-Up Personnel Name___________________________ Start-Up Company ________________________________ Phone Number ________________________________ Pre Start-Up Checklist – check boxes as items are completed. o Check tightness of all factory wiring connections o Verify control wiring wire gauge o Hand-rotate blower to verify free rotation o Verify supply voltage to the main disconnect o Verify the supply gas pressure o Verify remote controls wiring Start-Up Electric Heater (optional) – refer to Electric Heater Start-Up section for further detail. o Check line voltage L1-L2___________ L2-L3 ___________ L1-L3___________ o Set the unit’s operating temperature _________ °F Start-Up Evaporative Cooler (optional) – refer to Evaporative Cooler Start-Up section for further detail. o Check media orientation o Check for proper water flow to distribution headers o Check for distribution header orientation to prevent water spillage Start-Up Blower Checklist – refer to Blower Start-Up section for further detail. L1-L2___________ L2-L3 ___________ L1-L3___________ o Check blower rotation o Check for vibration o Supply fan RPM __________ RPM o Motor nameplate amps __________ Amps o Actual motor amps __________ Amps o Actual CFM delivered __________ CFM o Check line voltage Optional Accessories – refer to Blower Start-Up section, Step #6 for further detail. o Heating Inlet Air Sensor _________ Actual Setting Typical setting 60º-70ºF (15º-21ºC) o Cooling Inlet Air Sensor _________ Actual Setting Typical setting 75ºF (24ºC o Building Freeze Protection _________ Actual Setting Typical setting 5 minutes; 45ºF (7ºC) o Dirty Filter Gauge _________ Actual Setting Typical setting varies 38 Model MSX Make-Up Air ® Maintenance Log Date___________________ Time______________ AM/PM Date___________________ Time______________ AM/PM Notes:___________________________________________ Notes:___________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ Date___________________ Time______________ AM/PM Date___________________ Time______________ AM/PM Notes:___________________________________________ Notes:___________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ Date___________________ Time______________ AM/PM Date___________________ Time______________ AM/PM Notes:___________________________________________ Notes:___________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ Date___________________ Time______________ AM/PM Date___________________ Time______________ AM/PM Notes:___________________________________________ Notes:___________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ Date___________________ Time______________ AM/PM Date___________________ Time______________ AM/PM Notes:___________________________________________ Notes:___________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ Date___________________ Time______________ AM/PM Date___________________ Time______________ AM/PM Notes:___________________________________________ Notes:___________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ ® Model MSX Make-Up Air 39 Warranty Greenheck warrants this equipment to be free from defects in material and workmanship for a period of one year from the shipment date. Any units or parts which prove defective during the warranty period will be replaced at our option when returned to our factory, transportation prepaid. Motors are warranted by the motor manufacturer for a period of one year. Should motors furnished by Greenheck prove defective during this period, they should be returned to the nearest authorized motor service station. Greenheck will not be responsible for any removal or installation costs. As a result of our commitment to continuous improvement, Greenheck reserves the right to change specifications without notice. Greenheck Catalogs MSX provide additional information describing the equipment, fan performance, available accessories, and specification data. AMCA Publication 410-96, Safety Practices for Users and Installers of Industrial and Commercial Fans, provides additional safety information. This publication can be obtained from AMCA International, Inc. at: www.amca.org. ® Phone: (715) 359-6171 • Fax: (715) 355-2399 • E-mail: gfcinfo@greenheck.com • Web site: www.greenheck.com • Model MSX Make-Up Air, Rev. 3, May 2011 40 470658 Copyright 2011 © Greenheck Fan Corporation
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.5 Linearized : Yes XMP Toolkit : Adobe XMP Core 4.0-c316 44.253921, Sun Oct 01 2006 17:14:39 Instance ID : uuid:4cc09c21-cb8d-4fbb-9ca6-5b988cfb35a5 Document ID : xmp.did:FD9763E4C89DE011A57AD655E4A27D66 Original Document ID : adobe:docid:indd:9f764a22-8e63-11dd-9b3e-970b9798f1fa Rendition Class : proof:pdf Derived From Instance ID : xmp.iid:9FC9C4B5C89DE011A57AD655E4A27D66 Derived From Document ID : xmp.did:A4B4EAF80199E011A041D0D8573230DD Derived From Original Document ID: adobe:docid:indd:9f764a22-8e63-11dd-9b3e-970b9798f1fa Derived From Rendition Class : default History Action : saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved, saved History Instance ID : xmp.iid:81662EF6341BDF1186D6864397B13B5C, xmp.iid:82662EF6341BDF1186D6864397B13B5C, xmp.iid:83662EF6341BDF1186D6864397B13B5C, xmp.iid:84662EF6341BDF1186D6864397B13B5C, xmp.iid:794BADF3E635DF118683EA1F303CED13, xmp.iid:7A4BADF3E635DF118683EA1F303CED13, xmp.iid:497F7AE1E835DF11BB06EA61A7E122D5, xmp.iid:4A7F7AE1E835DF11BB06EA61A7E122D5, xmp.iid:4B7F7AE1E835DF11BB06EA61A7E122D5, xmp.iid:4C7F7AE1E835DF11BB06EA61A7E122D5, xmp.iid:4D7F7AE1E835DF11BB06EA61A7E122D5, xmp.iid:4E7F7AE1E835DF11BB06EA61A7E122D5, xmp.iid:48C4AB0E373CDF119989BDD4E62340F2, xmp.iid:49C4AB0E373CDF119989BDD4E62340F2, xmp.iid:4AC4AB0E373CDF119989BDD4E62340F2, xmp.iid:4BC4AB0E373CDF119989BDD4E62340F2, xmp.iid:4CC4AB0E373CDF119989BDD4E62340F2, xmp.iid:983E951CE977E011A3D9F05950581087, xmp.iid:993E951CE977E011A3D9F05950581087, xmp.iid:F72BAF43E977E011A3D9F05950581087, xmp.iid:2645A244E977E011A3D9F05950581087, xmp.iid:BBD878BEE977E011806EBBD1152FBC59, xmp.iid:52A1621FEC77E011806EBBD1152FBC59, xmp.iid:ACB86F47EC77E011806EBBD1152FBC59, xmp.iid:ADB86F47EC77E011806EBBD1152FBC59, xmp.iid:6292E3555D7DE011B8948BA052FD5DAE, xmp.iid:6392E3555D7DE011B8948BA052FD5DAE, xmp.iid:C6847633A497E01190C1D073B68361F9, xmp.iid:E40603A6A497E01190C1D073B68361F9, xmp.iid:03AEE312FC98E011A041D0D8573230DD, xmp.iid:A4B4EAF80199E011A041D0D8573230DD, xmp.iid:8CA1AA6F1899E011A041D0D8573230DD, xmp.iid:3A05A0EB1999E011A041D0D8573230DD, xmp.iid:78CAABC61B99E011A041D0D8573230DD, xmp.iid:1D0236752299E011A041D0D8573230DD, xmp.iid:387492332399E011A041D0D8573230DD, xmp.iid:C88A0D452399E011A041D0D8573230DD, xmp.iid:4BC2654D2399E011A041D0D8573230DD, xmp.iid:8FB3CB8B2399E011A041D0D8573230DD, xmp.iid:132B3BA22399E011A041D0D8573230DD, xmp.iid:2525D9F42399E011A041D0D8573230DD, xmp.iid:2625D9F42399E011A041D0D8573230DD, xmp.iid:2B416D9D2799E011A041D0D8573230DD, xmp.iid:5B56F5F94F9BE0119358C31D804510A4, xmp.iid:8B2F895A509BE0119358C31D804510A4, xmp.iid:09937D7F509BE0119358C31D804510A4, xmp.iid:992768F8559BE0119358C31D804510A4, xmp.iid:5280DACA5A9BE0119358C31D804510A4, xmp.iid:1F365DCA029DE0119C7CA3E498DBDA55, xmp.iid:A858C7F3029DE0119C7CA3E498DBDA55, xmp.iid:E546EE55C89DE011A57AD655E4A27D66, xmp.iid:E646EE55C89DE011A57AD655E4A27D66, xmp.iid:9EC9C4B5C89DE011A57AD655E4A27D66, xmp.iid:9FC9C4B5C89DE011A57AD655E4A27D66, xmp.iid:FD9763E4C89DE011A57AD655E4A27D66, xmp.iid:9B1C784BCD9DE011A57AD655E4A27D66, xmp.iid:7FFC6F63E937E1119109A1A0B601EF0F, xmp.iid:9B5D5B90E937E1119109A1A0B601EF0F History When : 2010:02:16 13:53:32-06:00, 2010:02:16 13:53:33-06:00, 2010:02:16 13:54-06:00, 2010:02:16 13:54-06:00, 2010:03:22 14:13:09-05:00, 2010:03:22 14:13:09-05:00, 2010:03:22 14:26:57-05:00, 2010:03:22 14:31:11-05:00, 2010:03:22 14:32:40-05:00, 2010:03:22 14:33:06-05:00, 2010:03:22 14:35:27-05:00, 2010:03:22 14:38:55-05:00, 2010:03:30 15:01:41-05:00, 2010:03:30 15:03:08-05:00, 2010:03:30 15:03:59-05:00, 2010:03:30 15:04:30-05:00, 2010:03:30 15:04:31-05:00, 2011:05:06 08:59:51-05:00, 2011:05:06 08:59:51-05:00, 2011:05:06 09:00:56-05:00, 2011:05:06 09:00:58-05:00, 2011:05:06 09:04:22-05:00, 2011:05:06 09:21:24-05:00, 2011:05:06 09:22:31-05:00, 2011:05:06 09:27:34-05:00, 2011:05:13 07:34:24-05:00, 2011:05:13 07:37:13-05:00, 2011:06:15 18:10:22-05:00, 2011:06:15 18:10:23-05:00, 2011:06:17 11:50:55-05:00, 2011:06:17 11:50:57-05:00, 2011:06:17 14:31:45-05:00, 2011:06:17 14:42:23-05:00, 2011:06:17 14:55:39-05:00, 2011:06:17 15:43:29-05:00, 2011:06:17 15:48:48-05:00, 2011:06:17 15:49:18-05:00, 2011:06:17 15:49:32-05:00, 2011:06:17 15:51:17-05:00, 2011:06:17 15:51:54-05:00, 2011:06:17 15:54:13-05:00, 2011:06:17 15:55:25-05:00, 2011:06:17 16:20:24-05:00, 2011:06:20 10:14:22-05:00, 2011:06:20 10:17:04-05:00, 2011:06:20 10:18:06-05:00, 2011:06:20 10:57:16-05:00, 2011:06:20 11:31:47-05:00, 2011:06:22 14:06:53-05:00, 2011:06:22 14:08:02-05:00, 2011:06:23 13:40:58-05:00, 2011:06:23 13:41:31-05:00, 2011:06:23 13:43:39-05:00, 2011:06:23 13:44:52-05:00, 2011:06:23 13:44:57-05:00, 2011:06:23 14:16:28-05:00, 2012:01:05 16:05:33-06:00, 2012:01:05 16:06:48-06:00 History Software Agent : Adobe InDesign 6.0, Adobe InDesign 6.0, Adobe InDesign 6.0, Adobe InDesign 6.0, Adobe InDesign 6.0, Adobe InDesign 6.0, Adobe InDesign 6.0, Adobe InDesign 6.0, Adobe InDesign 6.0, Adobe InDesign 6.0, Adobe InDesign 6.0, Adobe InDesign 6.0, Adobe InDesign 6.0, Adobe InDesign 6.0, Adobe InDesign 6.0, Adobe InDesign 6.0, Adobe InDesign 6.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0, Adobe InDesign 7.0 History Changed : /, /metadata, /metadata, /, /metadata, /, /, /, /, /, /, /, /, /, /, /metadata, /, /;/metadata, /metadata, /metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /metadata, /;/metadata, /metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata, /metadata, /;/metadata, /;/metadata, /;/metadata, /;/metadata Create Date : 2012:01:05 16:07:38-06:00 Modify Date : 2012:01:09 11:18:52-06:00 Metadata Date : 2012:01:09 11:18:52-06:00 Creator Tool : Adobe InDesign CS5 (7.0.4) Page Image Page Number : 1, 2 Page Image Format : JPEG, JPEG Page Image Width : 256, 256 Page Image Height : 256, 256 Page Image : (Binary data 12072 bytes, use -b option to extract), (Binary data 12074 bytes, use -b option to extract) Doc Change Count : 445 Format : application/pdf Producer : Adobe PDF Library 9.9 Trapped : False Page Count : 40 Creator : Adobe InDesign CS5 (7.0.4)EXIF Metadata provided by EXIF.tools