Haier Hsu 71hek03r2(db)0 303031303533383431325FB0B2D7B0CBB5C3F7CAE92E706466 User Manual To The 19506ca6 B5c0 44ee B197 Aea0aa8b4f79
User Manual: Haier hsu-71hek03r2(db)0 to the manual
Open the PDF directly: View PDF .
Page Count: 8
Download | ![]() |
Open PDF In Browser | View PDF |
Installation manual for room air conditioner HSU-26HEK03/R2(DB)/I HSU-35HEK03/R2(DB)/I HSU-53HEK03/R2(DB)/I HSU-71HEK03/R2(DB)/I HSU-26HEK03/R2(DB)/O HSU-35HEK03/R2(DB)/O HSU-53HEK03/R2(DB)/O HSU-71HEK03/R2(DB)/O Read this manual before installation and keep it for future reference. Please explain to the user how the product works and refer them to the operation manual. NO.0010553937 Content 2 Preparation p3 Accessory parts p3 Selection pipe p3 Drawing for the installation of indoor and outdoor units p3 Indoor unit p5 Outdoor unit p6 Refrigerant charge label p8 Check for installation and test run p8 Preparation Accessory parts Remote controller (1) Drain hose (1) Driver AAA dry battery (2) Cushion (4) Nibbler Mounting plate (1) Drain-elbow (1) Plastic cap (4) Ø4X25 Screw (4) Pipe supporting plate (1) Necessary tools for installation Hacksaw Hole core drill Spanner (17,19 and 26mm) Gas leakage detector or soap-and-water solution Vacuum pump Torque wrench (17mm, 22mm, 26mm) Pipe cutter Flaring tool Selection of pipe Knife Model Measuring tape HSU-26HEK03/R2(DB)/O ") 9.52mm (3/8") Reamer HSU-35HEK03/R2(DB)/O ") 9.52mm (3/8") Refrigeration gauges HSU-53HEK03/R2(DB)/O ") 12.7mm (1/2") HSU-71HEK03/R2(DB)/O ") 15.88mm (5/8") Power source Liquid pipe (Ø) Gas pipe (Ø) NOTE: The thickness of the pipe must be at least 0.8mm. Install an exclusive circuit for the power. Check the power source voltage is the same as the rating plate. Selection of installation place Indoor Unit The place chosen to install the indoor unit should be: Not affected by heat or steam generated in the vicinity, where inlet and outlet of the unit are not blocked or restricted. Where it is possible to drain easily, and where piping can be connected with the outdoor unit. Power requirements Model Max rated current HSU-26HEK03/R2(DB)/O 6.1 HSU-35HEK03/R2(DB)/O 6.0 HSU-53HEK03/R2(DB)/O 10.5 HSU-71HEK03/R2(DB)/O 13.8 Where conditioned air can be evenly distributed through the whole room. Where there is more than 1m distance from televisions, radios, wireless are on. Outdoor Unit The place chosen to install the outdoor unit should be: Strong enough to bear the unit, where vibration and noise are not increased. Where discharged air and noise do not cause a nuisance to the neighbours. Where a distance marked 3 Drawing for the installation of indoor and outdoor units Attention must be paid to the rising up of drain hose More than 5cm (26/35/53) More than 10cm (71) Optional parts for piping A Non-adhesive tape B Adhesive tape C Saddle (L.S.) with screws D Connecting electric cable for indoor and outdoor G More than 10cm E Drain hose F Heating insulating material G Piping hole cover Arrangement of piping directions More than 10cm Rear right Left the outdoor unit (Unit:mm) F Rear left A Z Right Below C X More than 10cm (26/35/53) Y X More than 15cm (71) More than 10cm (26/35/53) Model More than 20cm (71) y z 140 500 256 HSU-35HEK03/R2(DB)/O 140 500 256 HSU-53HEK03/R2(DB)/O 113.5 583 319.5 HSU-71HEK03/R2(DB)/O 113.5 633 340 HSU-26HEK03/R2(DB)/O A and G are supplied parts D pipe length is 2m. Dimensions x Fixing of outdoor unit E Fix the unit to concrete or block with horizontally. More than 60cm earthquake or strong wind. More than 15cm (9/12/18) More than 25cm (24) unit by attaching a vibration-proof mat. The picture above is just for your reference. Please refer to the actual product purchased. 4 Indoor Unit 1 Fitting of the Mounting Plate and Positioning of the Wall Hole 2 Making a Hole on the Wall and Fitting the Piping Hole Cover Make a hole of ‘B’mm in diameter, slightly descending to outside the wall. 1. Find a suitable mounting location, ensuring there is adequate support to hold the weight of the unit, check it is level, then temporarily fasten the plate. Install piping hole cover and seal it off with putty after installation. Wall hole 2. Check the plate is level, by hanging a thread with a weight from the central top of the plate or using a spirit level, then fasten securely. ØBmm 3. Determine the wall hole location ‘A’ using a measuring tape. Indoor side (Section of wall hole) Thickness of wall Outdoor side G Piping hole pipe 3 Installation of the Indoor Unit Drawing of pipe [ Rear piping ] Draw pipes and the drain hose, then fasten them with adhesive tape [ Left Left-rear piping ] HSU-26HEK03/R2(DB)/I In case of left side piping, cut away, with a nibbler, the lid for left piping. In case of left-rear piping, bend the pipes according to the piping direction to the mark of hole for left-rear piping which is marked on heat insulation materials. 938 245 245 20 20 60 100 2. Insert the indoor/outdoor electric cable from the back of the indoor unit, and pull it out on the front side, then connect them. 3. Coat the seal face with refrigerant oil and connect pipes. Cover the connection part with heat insulation materials, and it with adhesive tape. 60 480 229 Indoor/outdoor electric cable 110 Heat insulation material HSU-35HEK03/R2(DB)/I Lid for right piping Lid for under piping pipe Lid for left piping Drain hose Piping Pipe supporting plate 1046 268 13 13 268 299 Fix with adhesive tape 70 85 191 70 667 135 Indoor/outdoor electric cable and drain hose must be bound with refrigerant piping by protecting tape. [ Other direction piping ] Cut away, with a nibbler, the lid for piping (according to the piping direction) and then bend the pipe according to the position of wall hole. When bending, be careful not to crush the pipes. Connect the indoor/outdoor electric cable. HSU-53HEK03/R2(DB)/I Fixing the indoor unit body Hang the unit body onto the upper notches of the mounting plate. Move the body from side to side to it is securely. 12 12 260 260 1156 320 265 1. Insert the drain hose into the cavity of heat insulation materials of indoor unit. 70 40 138 70 860 105 HSU-71HEK03/R2(DB)/I In order to the body onto the mounting plate,hold up the body on an angle from the underside and then pull it down perpendicularly. mounting plate Unloading of indoor unit body When you remove the indoor unit, use your hand to raise the body from the hooks, then lift the bottom of the body outward slightly and lift the unit on an angle until it separates from the mounting plate. Hooks mounting plate Fix a mounting bar to the side bar and lintel (sold separately), and then fasten mounting bar. the plate to the Refer to note 1, “ When the mounting plate is “, for the position of wall hole. 5 Indoor unit cont. DRED Function 6.Please consult your reseller and/or installer to determine if you have a DRED appliance. Connect output from your home's electricity power meter (where available) to the RJ45 connector on the outdoor unit, as shown. 4 Connecting the indoor/outdoor Electric Cable Removing the wiring cover Remove terminal cover at right bottom corner of indoor unit, then take off wiring cover by removing its screws. (This function is unavailable on some models.) When connecting the cable after installing the indoor unit 1. Insert from outside the room cable into left side of the wall hole, in which the pipe is fitted or installed. 2. Pull out the cable on the front side, and connect the cable making a loop. When connecting the cable before installing the indoor unit Loosen the screws and insert the cable ends fully into terminal block, then tighten the screws. Pull the cable slightly to make sure the cables have been properly inserted and tightened. After the cable connection, always fasten the connected cable with the wiring cover. 1 Installation of Outdoor Unit Install according to ‘Drawing for the installation of indoor and outdoor units’ (see page 4) 2 Connection of pipes To bend a pipe, use the correct bending tool, so as not to crush the pipe, and the bending radius should be 30 to 40 mm or longer. Connect the pipe gas side Note the terminal number of indoor When connecting the cable, and outdoor units carefully. If wiring is not correct, the system will not operate correctly. Damage to the PCB due to incorrect wiring is not covered by warranty. The connection pipe is specialized for R410A. Half union Flare nut Forcedfastening fasteningwithout without careful careful centering Forced centeringmay may damagethe thethreads threadsand and cause cause a leakage of damage of gas. gas. Pipe Diameter( ) Pipe diameter (Ø) Electrical connection Outdoor unit Indoor unit Spanner Fastening torque Fastening torque Liquid side6.35mm(1/4") Liquid side 6.35mm (1/4") 18 N.m Liquid/Gas side9.52mm(3/8") Liquid/Gas side 9.52mm (3/8") 42 N.m Gas side 12.7mm(1/2") Gas side 12.7mm (1/2") 55 N.m Gas side 15.88mm(5/8") Torque wrench Gas side 15.88mm (5/8") 60 N.m 18N.m 42 N.m 55N.m 60 N.m Be careful that foreign materials such as sand, etc. do not enter the pipe. The charge of refrigerant must be conducted by professional air conditioner engineer. Before adding additional refrigerant, perform air evacuation from the refrigerant pipes and indoor unit using a vacuum pump, then charge additional refrigerant. 4G0.75mm2 CAUTION Power cable: 3G1.5mm POWER 2 Outdoor unit HSU-26HEK03/R2(DB)/O HSU-35HEK03/R2(DB)/O B A 1 Indoor unit Indoor unit B Outdoor unit 2 A 3(C) 3G2.5mm Outdoor unit B 1. If the supply cord is damaged, it must be replaced by the manufacturer or its service agent or a similar qualified person. The type of connecting wire and power cable is H05RN-F or H07RN-F. Oil trap A HSU-53HEK03/R2(DB)/O HSU-71HEK03/R2(DB)/O Indoor unit In case the elevation A is more than 5m, oil trap shoud be installed every 5~7m Max. Length: Bmax = 15m (HSU – 26/35) = 25m (HSU – 53/71) Pre charge Base charge pipe length Additional charge amount 2. If the PC board fuse is broken replace with a T.3.15A/250VAC (Indoor) or T.25A/250VAC (Outdoor). Model 3. The wiring method should be in line with the local and national wiring standards. HSU-26HEK03/R2(DB)/O 1000g 7m 20g/m HSU-35HEK03/R2(DB)/O 1080g 7m 20g/m 4. After installation, the power isolator should be easily reached. 6 Max.Elevation: Amax = 10m (HSU – 26/35) = 15m (HSU – 53/71) Outdoor unit 2N Power cable: { 1L POWER 2 ( ) 2 ( ) 4G0.75mm Indoor unit wiring. The breaker should be 5. A breaker should be incorporated into all-pole switch and the distance between its two contacts should be not less than 3mm. HSU-53HEK03/R2(DB)/O 1550g 10m 20g/m HSU-71HEK03/R2(DB)/O 2100g 10m 50g/m Outdoor unit cont. 33 Connection of Electrical Cable Use the same method on indoor unit. Loosen the screws on terminal block and insert the plugs fully into terminal block, then tighten the screws. Step 4 Open the 2-way valve to an angle of anticlockwise 90 degrees. After 6 seconds, close the 2-way valve and test for refrigerant gas leakage. If wiring is not correct, proper operation can not be carried out and the controller may be damaged. 2-way valve Fix the cable with a clamp. 3-way valve O 4 Attaching Drain-Elbow Open 90 If the drain-elbow is used, please attach it as (Note: Only for heat pump unit.) Step 5 No gas leakage? If ok, proceed to Step 6. 455 Evacuation Method: Use vacuum pump Step 1 Remove the service port cap from the 3 way valve, the valve caps for the 2 way & 3 way valves. Connect hose to the service port (low) side of the manifold gauge. Then connect the centre hose from the manifold gauge to the vacuum pump. In case of refrigerant leakage, tighten parts of pipe connections. If leakage stops, then proceed to Step 6. If this does not stop gas leakage, reclaim all refrigerant from the service and repeating vacuuming on the system, with the port. After prescribed refrigerant level. Check again for leaks. 2-way valve Liquid Side 3-way valve Gas Side Gauge manifold (for R410A) Step 6 Detach the charge hose from the service port, open 2-way valve and 3-way valve. Turn the valve anticlockwise until closed. 2-way valve 3-way valve Tube (for R410A) Vacuum pump (for R410A) Step 2 Open the tap on the low side of the manifold and operate the vacuum pump. If the gauge (low) reaches a vacuum immediately repeat step 1 above again. Step 7 To prevent refrigerant leakage, tighten the service port’s taps and caps to ensure sealed. they are 2-way valve 3-way valve Open Valve rod cap Step 3 Vacuum for over 15min. Check the (low) gauge which should read -0.1 MPa (-76 cm Hg) at Iow pressure side. After completion of vacuuming the system, close the low tap on the manifold and turn off the vacuum pump. Check the low side gauge to see if it holds for 1-2 min. If the gauge does not and return to the beginning of Step 3. hold pressure, check all the Close Service port cap Valve rod cap Step 8 After the caps, check for refrigerant gas leakage around the caps. CAUTION If the refrigerant of the air conditioner leaks, it is necessary to reclaim all the refrigerant, then pull a vacuum BEFORE recharging the refrigerant into the air conditioner according to the amount marked on the name plate. Please do not charge with refrigerant, except as (R410A), or allow air to enter into the cooling circulation system. Otherwise, this may cause abnormal high pressure in the system which may lead to personal injuries or damage to piping. 7 Outdoor unit cont. Refrigerant charge label Contains fluorinated greenhouse gases covered by the Kyoto Protocol 1 Power Source Installation The air conditioner must be wired with a dedicated circuit to the distribution board. The protection device should be sized to meet the current requirements of the unit as shown on page 3 and comply with local and national wiring standards. R410A 1= kg 2 2= kg 1+2= kg 1 If installing the air conditioner in a moist place, please install an earth leakage breaker. F A B C D E For installation in other places, use a circuit breaker. Protocol. Do not vent into the atmosphere. 2 Cutting and Flaring Work of Piping Refrigerant type: R410A GWP* value:1975 Pipe cutting is carried out with a pipe cutter and burrs must be removed. A Flare tool for R410A Conventional flare tool Clutch-type clutch-type(Rigid-type) Wing-nut type (Imperial-type) 0~0.5mm 1.0~1.5mm 1.5~2.0mm 1.Cut pipe Flare tooling die GWP=global warming potential 2.Remove burs be adhered in the proximity of the product charging port (e.g. onto the inside of the stop value cover). A B factory refrigerant charge of the product: see unit name plate C D total refrigerant charge 3.Insert the flare nut 4.Flare pipe E outdoor unit F refrigerant cylinder and manifold for charging Check for installation and test run Correct Incorrect Lean Damage of flare Crack Please kindly explain to our customers how to operate the unit through the instruction manual. Partial Too T outside Check items for test run Put check mark in boxes Gas leak from connecting pipe? 3 On Drainage Insulation of pipe connecting Pp ? Please install the drain hose to be always sloping downhill. Examples of incorrect Are the indoor and outdoor interconnecting cables interconnecting cables Less than 5cm It becomes The end is imm- It waves. The gap with the There is the bad high midway. ersed in water. ground is too small. smell from a ditch Is drainage securely carried out? Is the earth line securely connected? Is power source voltage correct? Is there any noise? condensate is carried to outdoor. In case that the attached drain hose is in a room, please apply insulation to drain . Is the indicator lamp lit? Are cooling and heating (when in heat pump) performing normally? Is the operation of room temperature adjustment normal? 8
Source Exif Data:
File Type : AI File Type Extension : ai MIME Type : application/vnd.adobe.illustrator PDF Version : 1.6 Linearized : No Author : 01339437 Modify Date : 2015:06:12 11:50:37+10:00 Create Date : 2015:03:03 11:17:59+08:00 For : , Bounding Box : 0 0 638 884 Creator Version : 14 Container Version : 11 Page Count : 8 Has XFA : No XMP Toolkit : XMP Core 4.1.1 Metadata Date : 2015:05:07 16:46:46+08:00 Creator Tool : PScript5.dll Version 5.2 Page Image Page Number : 1, 2 Page Image Format : JPEG, JPEG Page Image Width : 256, 256 Page Image Height : 256, 256 Page Image : (Binary data 6433 bytes, use -b option to extract), (Binary data 4878 bytes, use -b option to extract) Thumbnail Width : 188 Thumbnail Height : 256 Thumbnail Format : JPEG Thumbnail Image : (Binary data 15871 bytes, use -b option to extract) Document ID : uuid:970C09E253C1E4119132E1BA2C1AFAC7 Instance ID : uuid:edb07fab-a8e1-4d65-b198-930da8307cf0 Derived From Instance ID : uuid:53171bd9-39f5-4dc4-85b7-3dd923a0f6af Derived From Document ID : xmp.did:70A23B51225AE211BCF793A4E6DBECDF Derived From Rendition Class : proof:pdf N Pages : 1 Has Visible Transparency : False Has Visible Overprint : True Max Page Size W : 224.816941 Max Page Size H : 311.816626 Max Page Size Unit : Millimeters Font Name : ArialNarrow, Arial-BoldMT, ArialMT, TradeGothicLTStd, AdobeSerifMM, Arial Font Family : Arial, Arial, Arial, TradeGothicLTStd, AdobeSerifMM, Arial Font Face : Narrow, Bold, Regular Font Type : Open Type, Open Type, Open Type, Unknown, Unknown, Unknown Font Version : Version 2.37, Version 3.00, Version 3.00, Version 3.12, Version 3.12, Version 3.12 Font Composite : False, False, False, False, False, False Font File Name : ARIALN.TTF, ARIALBD.TTF, ARIAL.TTF, simsun.ttc, simsun.ttc, simsun.ttc Plate Names : Cyan, Magenta, Yellow, Black Swatch Group Name : 默认色板组 Swatch Group Type : 0 Doc Change Count : 5100 Format : application/pdf Title : <303031303533383431325FB0B2D7B0CBB5C3F7CAE92E706466> Creator : 01339437 Producer : PDF-XChange Viewer [Version: 2.0 (Build 47.0) (Feb 17 2010; 18:30:51)] Image Height : 884 Image Width : 638 Image Size : 638x884 Megapixels : 0.564EXIF Metadata provided by EXIF.tools