Honeywell Marine Instruments Yp7999A1000 Users Manual 66 2060—01 ControLinks™ Fuel Air Ratio Control Panel
YP7999A1000 to the manual 32652fc2-4acb-42f2-b7be-ab838b7ed3d5
2015-01-23
: Honeywell Honeywell-Honeywell-Marine-Instruments-Yp7999A1000-Users-Manual-261643 honeywell-honeywell-marine-instruments-yp7999a1000-users-manual-261643 honeywell pdf
Open the PDF directly: View PDF .
Page Count: 8
Download | |
Open PDF In Browser | View PDF |
YP7999A1000 ControLinks™ Fuel Air Ratio Control Panel INSTALLATION INSTRUCTIONS FEATURES • Pre-wired and ready to install • Includes the R7999A control, wiring subbase and S7999D1048 touchscreen display • Commission, monitor and control ControLinks through the touchscreen interface • Fuel selector switch • Alarm light • Reset button • Unit shutdown / Emergency stop button • Auto/manual switch • Manual operation potentiometer • S7999D touchscreen display is Modbus ready APPLICATION SPECIFICATIONS The Honeywell YP7999A1000 ControLinks Fuel Air Ratio Control Panel is a packaged, pre-wired panel that includes the R7999A ControLinks controller for linkageless fuel/air ratio control. The included S7999D color touchscreen interface allows commissioning of the ControLinks system as well as monitoring and control, all with user-friendly menus. On board selector switches, buttons and alarm lights are included for customer convenience. The ML7999A2001 universal direct coupled actuators are purchased separately. Electrical Ratings 100 – 120 Vac, 50/60 Hz, 3 Amps For individual ratings, see component literature for details. This document provides installation instructions and operation information. Other applicable publications are: — 65-0238, R7999 ControLinks Controller — 65-0240, Q7999A ControLinks Universal Wiring Subbase — 65-0239, ML7999A Universal Parallel-Positioning Actuator — 65-0321, S7999D1048 System Display Environmental Ratings Enclosure: NEMA 12. For individual ratings, see component literature for details. Humidity Install the panel where the relative humidity never reaches the saturation point. The relay module inside the panel is designed to operate in a maximum 85 percent relative humidity continuous, non-condensing, moisture environment. Vibration Do not install the panel where it could be subjected to vibration in excess of 0.5G continuous maximum vibration. General Overall panel size: 24 in. high x 24 in. wide x 8 in. deep (excluding door and door mounted components) Panel weight: approx. 64 pounds Mounting holes are 0.44 in. typical diameter, 18 in. on center. 66-2060-01 YP7999A1000 CONTROLINKS™ FUEL AIR RATIO CONTROL PANEL Electrical Connections Approvals Components are individually approved by the nationally recognized agencies. Please see component literature for details. The panel has UL 508A flame control panel approval. Panel is assembled and wired to the UL Standards. 1. 2. 3. INSTALLATION 4. When Installing This Product… 1. 2. 3. 4. 5. 6. 7. IMPORTANT Run line voltage and low voltage wiring in separate conduit to avoid signal interference. Read these instructions and the appropriate product literature carefully. Failure to follow them could damage the product or cause a hazardous condition. Refer to the installation manuals and wiring diagrams provided with this panel for the embedded products. Check the ratings given in the instructions and on the product to make sure that the product is suitable for your application. Installer must be a trained, experienced combustion service technician. Disconnect the power supply before beginning installation to prevent electrical shock and equipment damage. More than one disconnect may be involved. All wiring must comply with the National Electric Code (NEC) and any applicable local electrical codes, ordinances and regulations. After installation is complete, check out product operation as provided in the appropriate product installation instructions. Carefully check field wiring and terminal designations in this document and the associated wiring diagram. They are different from those of the individual components. Panel Inspection After mounting and wiring, but before powering the panel, inspect all internal panel wire connections. Each panel is fully tested at the factory; however, wires may loosen during transit. Verify that all internal wire connections are secure from the Q7999 subbase to the components mounted on the door and the S7999D touchscreen interface. Final Wiring Check and Static Checkout WARNING All wiring shall be in accordance with the National Electric Codes (NEC) and local electrical codes. Fire or Explosion Hazard. Can cause severe injury, death or property damage. To prevent possible hazardous burner operation, verify safety requirements each time a controller is installed on a burner. 1. 2. 3. WIRING 4. Check the power supply circuit. The voltage and frequency must match the specification listed. Check wiring terminations and routing to ensure proper connections. Follow any system checkout recommendations for individual components as found in the component literature. Restore power to the panel. CAUTION Test each limit and interlock to ensure system WARNING Electrical Shock Hazard. Can cause serious injury, death or equipment damage. Disconnect the power supply before beginning wiring to prevent electrical shock, equipment and control damage. More than one disconnect may be involved. operates correctly as defined in the 7800 Series “Checkout and Test” document (Form #65-0229). WARNING Ground Connection Explosion and Electrical Shock Hazard. Can cause serious injury, death or equipment damage. Earth ground is required for proper operation of the ControLinks system. The earth ground must be capable of conducting enough current to blow the fuse or breaker in the event of an internal short. Ensure the panel is bonded to a substantial earth ground. Make sure that mechanically tightened joints along the ground path are free of nonconductive coatings and protected against corrosion on mating surfaces. 66-2060—01 Refer to the appropriate product data sheet for details. Wire size and length will vary, depending on the component. Refer to the component literature for specific wire lengths, sizes and type recommendations. Wire according to specifications, following all local ordinances and requirements. Field knockouts are required for the wiring. When drilling holes, take care to protect the electronics from metal pieces and debris. 1. 2. 3. 2 Close all manual fuel shutoff valves before starting these tests. Use extreme care while testing the system. Line voltage is present on most terminal connections when power is on. Replace all limits and interlocks that are not operating properly. Do not bypass limit and interlocks. YP7999A1000 CONTROLINKS™ FUEL AIR RATIO CONTROL PANEL TROUBLESHOOTING System Diagnostics The S7999D touchscreen interface indicates the current fault and keeps a fault history log. The R7999 ControLinks control and the ML7999A Universal Parallel-Positioning Actuator also have LED fault blink codes. Refer to the appropriate product instruction sheet for further troubleshooting information and diagnostic codes. FIELD WIRING Table 1. Field Wiring and Terminal Designation1. Terminal # To Connecting Device 12 L1 Panel power Description GND 120Vac Power Supply, 3A Max. L1 power to circuit breaker. L2 Panel neutral Provide disconnect means and overload protection as required. Panel ground 43 L1 L1 customer convenience wire point – provided for 4 actuators – 120Vac, 50/60Hz L2 L2 customer convenience wire point – provided for 4 actuators GND Panel ground GND customer convenience wire point – provided for 4 actuators 9 HFP High Fire Proven output from ControLinks controller to burner control 10 LFP Low Fire Proven output from ControLinks controller to burner control 11 HF High Fire drive command input from burner controller 12 MV Main Valve command input from burner controller 13 LF Low Fire drive command input from burner controller 14 LCI Limit Control Input from burner limit string, including on/off control, LWCO, high-limit, etc… 2 23 3 15 LCO Limit Control Output from ControLinks controller to burner control demand/interlock inputs 2003,4 DR1 Air Actuator DR1 command input 2013,4 DR2 Air Actuator DR2 command input 2023,4 CW Air Actuator potentiometer CW output 2033,4 S Air Actuator potentiometer S output CCW Air Actuator potentiometer CCW output GND Ground Air Actuator ground 2053,4 DR1 Fuel 1 Actuator DR1 command input 2063,4 DR2 Fuel 1 Actuator DR2 command input 2073,4 CW Fuel 1 Actuator potentiometer CW output 2083,4 S Fuel 1 Actuator potentiometer S output 2093,4 CCW Fuel 1 Actuator potentiometer CCW output GND3,4 Ground Fuel 1 Actuator ground 2103,4 DR1 Fuel 2 Actuator DR1 command input 3,4 DR2 Fuel 2 Actuator DR2 command input 3,4 212 CW Fuel 2 Actuator potentiometer CW output 2133,4 S Fuel 2 Actuator potentiometer S output 2143,4 CCW Fuel 2 Actuator potentiometer CCW output GND3,4 Ground Fuel 2 Actuator ground 3,4 204 3,4 211 3 66-2060—01 YP7999A1000 CONTROLINKS™ FUEL AIR RATIO CONTROL PANEL Table 1. Field Wiring and Terminal Designation1. (Continued) Terminal # To Connecting Device 2153,4 DR1 FGR/4th Channel Actuator DR1 command input 2163,4 DR2 FGR/4th Channel Actuator DR2 command input 2173,4 CW FGR/4th Channel Actuator potentiometer CW output 2183,4 S FGR/4th Channel Actuator potentiometer S output 2193,4 CCW FGR/4th Channel Actuator potentiometer CCW output GND3,4 Ground FGR/4th Channel Actuator ground Description 223 XmA+ Auxiliary 4-20mA+ input from Stack/Water temperature sensor (used for low fire hold) 220 XmA- Auxiliary 4-20mA- input from Stack/Water temperature sensor (used for low fire hold) 224 CmA+ 4-20mA+ input from Firing Rate control 225 CmA- 4-20mA- input from Firing Rate control 2315 COM 2 A S7999D COM 2 Modbus A / Data + terminal 2325 COM 2 B S7999D COM 2 Modbus B / Data - terminal COM 2 GND S7999D COM 2 Modbus C / Ground terminal 5 228 1 Carefully check field wiring and terminal designations in this document and the associated wiring diagram. They are different from those of the individual components. 2 The circuit protection incorporated into this control panel is designed to serve as supplemental protection only. It is the responsibility of the end user to provide appropriate protection on the service to this control panel. Refer to the National Electric Code and UL standard 1077 for more information on this subject. Use 16 AWG MTW wire. 3 Low voltage wire to the firing rate actuators must be run in separate conduit. Line voltage wiring to actuators may be obtained from terminals 4, 2 and GND or provided by customer. Run line voltage wires in separate conduit. Refer to the ML7999A product sheet for details. 4 Connect the shield ground of the ML7999A actuator(s) to the earth ground strip provided in the Q7999 universal subbase, on the low voltage side. Connect the shield at the controller end only. Refer to the ML7999A product sheet for details. 5 COM 2 on the S7999D is wired to field terminals for customer use. Customer may wire an existing Modbus-capable RM78xxL burner control and/or Modbus-enabled UDC2500/3200/3500 controls in a daisy-chain fashion to the customer terminals for display on the S7999D. Refer to the S7999D, S7800A or S7810M and UDC control product manuals for further information on wiring and S7999D display set-up. 6 Installation, operation and maintenance shall conform with National Fire Protection Association standards, national and local codes and authorities having jurisdiction. 7 For detailed device wiring information, refer to the R7999, Q7999A, ML7999A and S7999D1048 product sheets. 66-2060—01 4 YP7999A1000 CONTROLINKS™ FUEL AIR RATIO CONTROL PANEL 24 (610) SS104 P9100 FUEL PUSH TO STOP TWIST TO START 24 (610) LT104 CONTROLINKS ALARM SS103 PB114 CONTROL CONTROLINKS RESET MANUAL OPERATOR MANUAL AUTO 5K OHMS WARNING ADVERTISEMENT M34890 Fig. 1. Panel front dimensions in in. (mm). Table 2. Wire Code. Function Color AWG 120 VAC (HOT) RED 16 (MTW) 120 VAC (NEUTRAL) WHITE 16 (MTW) GROUND GREEN 16 (MTW) DRY CONTACTS YELLOW 16 (MTW) VDC BLUE 16 (MTW) 24 VAC BROWN 16 (MTW) TYPE K THERMOCOUPLE YELLOW/RED 20 (POLYVINYL) FSG RESET/CONTROLINKS RESET/POTENTIOMETER BELDEN 8760 18 AWG TWISTED PAIR ACTUATOR INTERFACE BELDEN 9535 24 AWG, 5 CONDUCTOR DISPLAY TO TERMINAL STRIP BELDEN 9535 24 AWG, 5 CONDUCTOR DISPLAY COM1 & COM2 (FROM TERM STRIP TO DEVICES) BELDEN 8770 18 AWG, 3 CONDUCTOR TEMP CTRL MODBUS BELDEN 8770 18 AWG, 3 CONDUCTOR 5 66-2060—01 YP7999A1000 CONTROLINKS™ FUEL AIR RATIO CONTROL PANEL M34891 Fig. 2. Wiring diagram (part 1). 66-2060—01 6 YP7999A1000 CONTROLINKS™ FUEL AIR RATIO CONTROL PANEL (L) (N) M34892 Fig. 3. Wiring diagram (part 2). Wiring Diagram Key Wiring Notes 1. Indicates terminals and wiring in control panel (main terminal block). Indicates external wiring. Indicates terminals in valves. 2. Indicates component terminals. 7 The circuit protection incorporated into this control panel is designed to serve as supplemental protection only. It is the responsibility of the end user to provide appropriate protection on the service to this control panel. Refer to the National Electric Code and UL Standard 1077 for more information. Wire to the firing rate actuator must be run in separate conduit. 66-2060—01 YP7999A1000 CONTROLINKS™ FUEL AIR RATIO CONTROL PANEL 3. 4. Ground shield to subbase earth ground screw on low voltage side of subbase. Installation, operation, and maintenance shall conform with National Fire Protection Association standards, national and local codes, and authorities having jurisdiction. 21 (533) FU100 3A FU121 .5A 1 SPARE SPARE SPARE SPARE SPARE SPARE SPARE 21 (533) FUEL/AIR CONTROL M34893 Fig. 4. Equipment mounting panel dimensions in in. (mm). Automation and Control Solutions Honeywell International Inc. 1985 Douglas Drive North Golden Valley, MN 55422 customer.honeywell.com ® U.S. Registered Trademark © 2013 Honeywell International Inc. 66-2060—01 M.S. 06-13 Printed in United States
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.6 Linearized : No Encryption : Standard V4.4 (128-bit) User Access : Print, Copy, Extract, Assemble, Print high-res Author : Honeywell ECC Technical Communications Create Date : 1999:07:07 12:30:47Z Modify Date : 2013:06:03 09:13:07-05:00 Subject : Installation instructions XMP Toolkit : Adobe XMP Core 4.2.1-c043 52.372728, 2009/01/18-15:08:04 Format : application/pdf Title : 66-2060—01 - YP7999A1000 ControLinks™ Fuel Air Ratio Control Panel Creator : Honeywell ECC Technical Communications Description : Installation instructions Creator Tool : FrameMaker 9.0 Metadata Date : 2013:06:03 09:13:07-05:00 Producer : Acrobat Distiller 9.3.0 (Windows) Document ID : uuid:e864ae17-5275-4e2c-bb05-86eb0455cde1 Instance ID : uuid:1cb69ad6-698e-43ed-81aa-0f1c73394fca Page Mode : UseOutlines Page Count : 8EXIF Metadata provided by EXIF.tools