Huawei Technologies RU32612G3 Remote Radio Unit User Manual Installation Guide

Huawei Technologies Co.,Ltd Remote Radio Unit Installation Guide

User Manual

RRU3261Installation GuideIssue Draft ADate 2015-07-24HUAWEI TECHNOLOGIES CO., LTD.
  Copyright © Huawei Technologies Co., Ltd. 2015. All rights reserved.No part of this document may be reproduced or transmitted in any form or by any means without prior writtenconsent of Huawei Technologies Co., Ltd. Trademarks and Permissions and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.All other trademarks and trade names mentioned in this document are the property of their respective holders. NoticeThe purchased products, services and features are stipulated by the contract made between Huawei and thecustomer. All or part of the products, services and features described in this document may not be within thepurchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,and recommendations in this document are provided "AS IS" without warranties, guarantees or representationsof any kind, either express or implied.The information in this document is subject to change without notice. Every effort has been made in thepreparation of this document to ensure accuracy of the contents, but all statements, information, andrecommendations in this document do not constitute a warranty of any kind, express or implied.       Huawei Technologies Co., Ltd.Address: Huawei Industrial BaseBantian, LonggangShenzhen 518129People's Republic of ChinaWebsite: http://www.huawei.comEmail: support@huawei.comIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.i
About This DocumentPurposeThis document describes the process of installing a DC blade RRU3261 (referred to as RRU inthis document).Product VersionThe following table lists the product version related to this document.Product Name Solution Version Product VersionDBS3900 lSRAN9.0leRAN7.0V100R009C00lSRAN10.1 and laterversionsleRAN8.1 and laterversionsV100R010C10 and laterversions Intended AudienceThis document is intended for:Base station installation engineersOrganization1 Changes in the RRU3261 Installation GuideThis chapter describes the changes in the RRU3261 Installation Guide.2 Installation PreparationsThis chapter describes the reference documents, tools, and instruments that must be ready beforethe installation. In addition, it specifies the skills and prerequisites that installation engineersmust have.3 Information About the InstallationRRU3261Installation Guide About This DocumentIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.ii
Before installing an RRU, you must be familiar with its exterior, ports, indicators, installationoptions and installation clearance requirements.4 Unpacking the EquipmentThis chapter describes how to unpack and check the delivered equipment to ensure that all thematerials are included and intact.5 Installation ProcessThe installation process involves installing an RRU and RRU cables, checking the RRUhardware installation, and powering on the RRU.6 Installing the RRUThis chapter describes the procedure for installing the RRU. The procedure for installing theRRU varies depending on installation options.7 Installing RRU CablesThis chapter describes the procedure for installing RRU cables.8 Checking the RRU Hardware Installation9 Powering On an RRUAfter all the devices are installed, check the power-on status of an RRU.10 AppendixConventionsSymbol ConventionsThe symbols that may be found in this document are defined as follows.Symbol DescriptionIndicates an imminently hazardous situation which, if notavoided, will result in death or serious injury.Indicates a potentially hazardous situation which, if notavoided, could result in death or serious injury.Indicates a potentially hazardous situation which, if notavoided, may result in minor or moderate injury.Indicates a potentially hazardous situation which, if notavoided, could result in equipment damage, data loss,performance deterioration, or unanticipated results.NOTICE is used to address practices not related to personalinjury.RRU3261Installation Guide About This DocumentIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.iii
Symbol DescriptionCalls attention to important information, best practices andtips.NOTE is used to address information not related to personalinjury, equipment damage, and environment deterioration. General ConventionsThe general conventions that may be found in this document are defined as follows.Convention DescriptionTimes New Roman Normal paragraphs are in Times New Roman.Boldface Names of files, directories, folders, and users are inboldface. For example, log in as user root.Italic Book titles are in italics.Courier New Examples of information displayed on the screen are inCourier New. Command ConventionsThe command conventions that may be found in this document are defined as follows.Convention DescriptionBoldface The keywords of a command line are in boldface.Italic Command arguments are in italics.[ ] Items (keywords or arguments) in brackets [ ] are optional.{ x | y | ... } Optional items are grouped in braces and separated byvertical bars. One item is selected.[ x | y | ... ] Optional items are grouped in brackets and separated byvertical bars. One item is selected or no item is selected.{ x | y | ... }*Optional items are grouped in braces and separated byvertical bars. A minimum of one item or a maximum of allitems can be selected.[ x | y | ... ]*Optional items are grouped in brackets and separated byvertical bars. Several items or no item can be selected. GUI ConventionsRRU3261Installation Guide About This DocumentIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.iv
The GUI conventions that may be found in this document are defined as follows.Convention DescriptionBoldface Buttons, menus, parameters, tabs, window, and dialog titlesare in boldface. For example, click OK.>Multi-level menus are in boldface and separated by the ">"signs. For example, choose File > Create > Folder. Keyboard OperationsThe keyboard operations that may be found in this document are defined as follows.Format DescriptionKey Press the key. For example, press Enter and press Tab.Key 1+Key 2 Press the keys concurrently. For example, pressing Ctrl+Alt+A means the three keys should be pressed concurrently.Key 1, Key 2 Press the keys in turn. For example, pressing Alt, A meansthe two keys should be pressed in turn. Mouse OperationsThe mouse operations that may be found in this document are defined as follows.Action DescriptionClick Select and release the primary mouse button without movingthe pointer.Double-click Press the primary mouse button twice continuously andquickly without moving the pointer.Drag Press and hold the primary mouse button and move thepointer to a certain position.RRU3261Installation Guide About This DocumentIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.v
ContentsAbout This Document.....................................................................................................................ii1 Changes in the RRU3261 Installation Guide...........................................................................12 Installation Preparations..............................................................................................................22.1 Reference Documents.....................................................................................................................................................32.2 Tools and Instruments....................................................................................................................................................32.3 Skills and Requirements for Onsite Personnel...............................................................................................................53 Information About the Installation...........................................................................................63.1 RRU Exterior..................................................................................................................................................................73.2 RRU Ports.......................................................................................................................................................................83.3 RRU Indicators.............................................................................................................................................................103.4 Installation Options.......................................................................................................................................................123.5 Installation Clearance Requirements of an RRU..........................................................................................................143.5.1 Installation Clearance for Multiple RRUs.................................................................................................................143.5.2 Installation Spacing Between RRUs..........................................................................................................................164 Unpacking the Equipment.........................................................................................................175 Installation Process.....................................................................................................................196 Installing the RRU.......................................................................................................................216.1 Mounting Kits for an RRU...........................................................................................................................................226.2 Installing the RRU on a Pole........................................................................................................................................226.3 Installing the RRU on a Tower.....................................................................................................................................267 Installing RRU Cables................................................................................................................327.1 Cabling Requirements..................................................................................................................................................347.2 RRU Cable Connections...............................................................................................................................................407.3 Installing RRU Cables..................................................................................................................................................427.4 RRU Cables..................................................................................................................................................................437.5 Installing an RRU PGND Cable...................................................................................................................................447.6 Installing an RRU RF Jumper......................................................................................................................................467.7 Installing an RRU AISG Multi-Wire Cable and AISG Extension Cable.....................................................................497.8 Installing an RRU Alarm Cable....................................................................................................................................517.9 Opening the Cover Plate of an RRU Cabling Cavity...................................................................................................53RRU3261Installation Guide ContentsIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.vi
7.10 Installing a CPRI Optical Cable.................................................................................................................................557.11 Installing an RRU Power Cable..................................................................................................................................577.12 Closing the Cover Plate of an RRU Cabling Cavity..................................................................................................598 Checking the RRU Hardware Installation..............................................................................639 Powering On an RRU.................................................................................................................6410 Appendix.....................................................................................................................................6610.1 Adding a Tool-Less Female Connector (Pressfit Type) to the RRU Power Cable on the RRU Side........................67RRU3261Installation Guide ContentsIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.vii
1 Changes in the RRU3261 Installation GuideThis chapter describes the changes in the RRU3261 Installation Guide.Draft A (2015-07-24)This is a draft.RRU3261Installation Guide 1 Changes in the RRU3261 Installation GuideIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.1
2 Installation PreparationsAbout This ChapterThis chapter describes the reference documents, tools, and instruments that must be ready beforethe installation. In addition, it specifies the skills and prerequisites that installation engineersmust have.2.1 Reference DocumentsBefore the installation, you must be familiar with reference documents.2.2 Tools and InstrumentsYou must prepare the following tools and instruments before the installation.2.3 Skills and Requirements for Onsite PersonnelOnsite personnel must be qualified and trained. Before performing any operation, onsitepersonnel must be familiar with correct operation methods and safety precautions.RRU3261Installation Guide 2 Installation PreparationsIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.2
2.1 Reference DocumentsBefore the installation, you must be familiar with reference documents.The following reference documents are required during RRU installation:lRRU3261 Hardware DescriptionlDBS3900 Installation GuidelOCB User GuidelOCB-01M User Guide2.2 Tools and InstrumentsYou must prepare the following tools and instruments before the installation.Hammer drill (a φ12 bit) ESD gloves Vacuum cleanerHeat gun Phillips screwdriver (M3 toM6)Flat-head screwdriver (M3 toM6)Rubber mallet COAX crimping tool Wire stripperRRU3261Installation Guide 2 Installation PreparationsIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.3
Utility knife Cable cutter Adjustable wrench (size ≥ 32mm [1.26 in.])Torque wrenchSize: 18 mm (0.71 in.) and 32mm (1.26 in.)Combination wrenchSize: 18 mm (0.71 in.) and 32mm (1.26 in.)Level Torque screwdriver5 mm5 mm(M3 to M6)(M3 to M6)Torque socketMultimeter Marker (diameter ≤ 10 mm[0.39 in.])Measuring tapeInner hexagon wrench5 mmFixed pulley Lifting slingHydraulic pliers - - RRU3261Installation Guide 2 Installation PreparationsIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.4
2.3 Skills and Requirements for Onsite PersonnelOnsite personnel must be qualified and trained. Before performing any operation, onsitepersonnel must be familiar with correct operation methods and safety precautions.Before the installation, pay attention to the following items:lThe customer's technical engineers must be trained by Huawei and be familiar with theproper installation and operation methods.lThe number of onsite personnel depends on the engineering schedule and installationenvironment. Generally, only three to five onsite personnel are necessary.RRU3261Installation Guide 2 Installation PreparationsIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.5
3 Information About the InstallationAbout This ChapterBefore installing an RRU, you must be familiar with its exterior, ports, indicators, installationoptions and installation clearance requirements.3.1 RRU ExteriorThis section describes the exterior and dimensions of an RRU.3.2 RRU PortsThis section describes ports on the RRU panels. An RRU has a bottom panel, cabling cavitypanel, and indicator panel.3.3 RRU IndicatorsThis section describes six indicators on an RRU. They indicate the running status of the RRU.3.4 Installation OptionsThis section describes RRU installation options. RRU installation supports the centralized mode.3.5 Installation Clearance Requirements of an RRUThis section describes the requirements for the installation clearance of multiple RRUs and therequirements for the installation spacing between RRUs.RRU3261Installation Guide 3 Information About the InstallationIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.6
3.1 RRU ExteriorThis section describes the exterior and dimensions of an RRU.Figure 3-1 shows the exterior of an RRU.Figure 3-1 RRU exterior Figure 3-2 shows RRU dimensions.Figure 3-2 RRU dimensions You can obtain the RRU frequency band and power supply information from the configurationlabel on the cover plate and obtain the RRU name from the nameplate on the side of RRU thataccommodates the conversion bracket. Figure 3-3 shows the positions of the configuration labeland nameplate on the RRU.RRU3261Installation Guide 3 Information About the InstallationIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.7
NOTEThe actual label and nameplate may differ from what is shown in the figure.Figure 3-3 Positions of the label and nameplate(1) Configuration label (2) Nameplate (3) Frequency band(4) Power supply module (5) Module name - 3.2 RRU PortsThis section describes ports on the RRU panels. An RRU has a bottom panel, cabling cavitypanel, and indicator panel.Figure 3-4 shows the ports on the RRU panels.RRU3261Installation Guide 3 Information About the InstallationIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.8
Figure 3-4 Ports on the RRU panels Table 3-1 describes ports and indicators on the RRU panels.Table 3-1 Ports and indicators on the RRU panelsItem Silkscreen Remarks(1) Bottom ports ANT_TX/RXA TX/RX port A, supporting RET signaltransmissionANT_TX/RXC TX/RX port CANT_TX/RXD TX/RX port DANT_TX/RXB TX/RX port B, supporting RET signaltransmissionEXT_ALM Alarm monitoring port used for monitoringone RS485 signal and two dry contact signalsRET Communication port for the RET antenna,supporting RET signal transmission(2) Ports in the cablingcavityRTN(+) Power supply socket, for details about RRUpower cable experience and specifications,see RRU Power Cable.NEG(-)RRU3261Installation Guide 3 Information About the InstallationIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.9
Item Silkscreen RemarksCPRI0 Optical/electrical port 0, connected to theBBUCPRI1 Optical/electrical port 1, connected to theBBU(3) Indicator RUN For details, see 3.3 RRU Indicators.ALMACTVSWRCPRI0CPRI1 NOTElThe port for transmitting RET signals is determined by the software.lConnect the CPRI0 port to the BBU by default in the single-mode scenario.3.3 RRU IndicatorsThis section describes six indicators on an RRU. They indicate the running status of the RRU.For detailed positions of RRU indicators, see 3.2 RRU Ports.Table 3-2 describes RRU indicators.Table 3-2 RRU IndicatorsIndicator Color Status MeaningRUN Green Steady on The power input is available, but the board isfaulty.Steady off No power input is available or the board isfaulty.Blinking (on for1s and off for 1s)The board is running properly.Blinking (on for0.125s and off for0.125s)The board software is being loaded or theboard is not working.ALM Red Steady on Alarms are generated, and the module mustbe replaced.RRU3261Installation Guide 3 Information About the InstallationIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.10
Indicator Color Status MeaningBlinking (on for1s and off for 1s)Alarms are generated. The alarms may becaused by faults on the related board or ports.Therefore, you need to locate the fault beforedeciding whether to replace the module.Steady off No alarms are generated.ACT Green Steady on The board is working properly when TXchannels are enabled or software is beingloaded to a board that is not started.Blinking (on for1s and off for 1s)The board is running with TX channelsdisabled.VSWR Red Steady off No voltage standing wave ratio (VSWR)alarm is generated.Blinking (on for1s and off for 1s)VSWR alarms are generated on theANT_TX/RXB port.Steady on VSWR alarms are generated on theANT_TX/RXA port.Blinking (on for0.125s and off for0.125s)VSWR alarms are generated on theANT_TX/RXA and ANT_TX/RXB ports.CPRI0 Red andgreenSteady green The CPRI link is running properly.Steady red An optical module fails to receive or transmitsignals possibly because the optical moduleis faulty or the optical fiber is broken.Blinking red (onfor 1s and off for1s)The CPRI link is out of lock because of faultson the mutual lock of dual-mode clocksources or mismatched data rates on CPRIports.Steady off The optical module cannot be detected or ispowered off.CPRI1 Red andgreenSteady green The CPRI link is running properly.Steady red An optical module fails to receive or transmitsignals possibly because the optical moduleis faulty or the optical fiber is broken.Blinking red (onfor 1s and off for1s)The CPRI link is out of lock because of faultson the mutual lock of dual-mode clocksources or mismatched data rates on CPRIports.Steady off The optical module cannot be detected or ispowered off.RRU3261Installation Guide 3 Information About the InstallationIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.11
 NOTEVSWR indicators on RRUs providing one or more than two TX channels have two types of status:lSteady off: No VSWR alarm is generated.lSteady on: VSWR alarms are generated on one or more ports.3.4 Installation OptionsThis section describes RRU installation options. RRU installation supports the centralized mode.Figure 3-5 shows the diameter of a pole for installing an RRU.Figure 3-5 Diameter of a pole NOTICElThe diameter of a pole for installing an RRU ranges from 60 mm (2.36 in.) to 114 mm (4.49in.). The recommended diameter is 80 mm (3.15 in.).lWhen the diameter of a pole ranges from 60 mm (2.36 in.) to 76 mm (2.99 in.), a maximumof three RRUs can be installed on the pole and the side-mounted installation is recommended.lOnly a pole whose diameter ranges from 76 mm (2.99 in.) to 114 mm (4.49 in.) supportsmore than three RRUs.lThe recommended thickness of the pole wall is 3.5 mm (0.14 in.) or above.Figure 3-6 shows two RRUs installed in centralized mode.RRU3261Installation Guide 3 Information About the InstallationIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.12
Figure 3-6 Two RRUs installed in centralized modeFigure 3-7 shows three RRUs installed in centralized mode.Figure 3-7 Three RRUs installed in centralized modeFigure 3-8 shows four RRUs installed in centralized mode.RRU3261Installation Guide 3 Information About the InstallationIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.13
Figure 3-8 Four RRUs installed in centralized modeNOTEFor details about how to install RRUs on an IFS06, see DBS3900 (ICR) Installation Guide.3.5 Installation Clearance Requirements of an RRUThis section describes the requirements for the installation clearance of multiple RRUs and therequirements for the installation spacing between RRUs.3.5.1 Installation Clearance for Multiple RRUsThis section describes the recommended and minimum installation clearance for multiple RRUs.Recommended Installation Clearance for Multiple RRUs Installed in CentralizedModeFigure 3-9 shows the recommended installation clearance for multiple RRUs installed incentralized mode.RRU3261Installation Guide 3 Information About the InstallationIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.14
Figure 3-9 Recommended installation clearance for multiple RRUs installed in centralized mode Minimum Installation Clearance for Multiple RRUs Installed in Centralized ModeFigure 3-10 shows the minimum installation clearance for multiple RRUs installed in centralizedmode.Figure 3-10 Minimum installation clearance for multiple RRUs installed in centralized modeRRU3261Installation Guide 3 Information About the InstallationIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.15
 3.5.2 Installation Spacing Between RRUsThis section describes the horizontal and vertical spacing between RRUs.Figure 3-11 shows the recommended horizontal spacing between RRUs.Figure 3-11 Recommended horizontal spacing between RRUs Figure 3-12 shows the recommended vertical spacing between RRUs.Figure 3-12 Recommended vertical spacing between RRUsRRU3261Installation Guide 3 Information About the InstallationIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.16
4 Unpacking the EquipmentThis chapter describes how to unpack and check the delivered equipment to ensure that all thematerials are included and intact.ContextNOTEWhen transporting, moving, or installing the equipment, components, or parts, you must:lPrevent them from colliding with doors, walls, shelves, or other objects.lWear clean gloves, and avoid touching the equipment, components, or parts with bare hands, sweat-soaked gloves, or dirty gloves.NOTICElAfter a cabinet or an BBU is unpacked, it must be powered on within 7 days.lAfter an RRU is unpacked, it must be powered on within 24 hours.ProcedureStep 1 Check the total number of articles in each case according to the packing list.If ... Then ...The total number tallies with the packinglistGo to Step 2.The total number does not tally with thepacking listFind out the cause and report any missingarticles to the local Huawei office.Step 2 Check the exterior of the packing case.RRU3261Installation Guide 4 Unpacking the EquipmentIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.17
If ... Then ...The outer packing is intact Go to Step 3.The outer packing is severely damaged orsoakedFind out the cause and report it to the localHuawei office.Step 3 Check the type and quantity of the equipment in the cases according to the packing list.If ... Then ...Types and quantity of the article tally withthose on the packing listSign the Packing List with the customer.Either shipment shortage, wrong shipmentor damaged articles.Report to the local Huawei office.CAUTIONlTo protect the equipment and prevent damage to the equipment, you are advised to keep theunpacked equipment and packing materials indoors, take photos of the stocking environment,packing case or carton, packing materials, and any rusted or eroded equipment, and then filethe photos.lVerify that the insulation layers of all RRU cables are intact. If the insulation layers aredamaged or broken, water will penetrate into the cables, which may cause damages to RRUsor human injury.----EndRRU3261Installation Guide 4 Unpacking the EquipmentIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.18
5 Installation ProcessThe installation process involves installing an RRU and RRU cables, checking the RRUhardware installation, and powering on the RRU.Figure 5-1 shows the process of installing an RRU.RRU3261Installation Guide 5 Installation ProcessIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.19
Figure 5-1 Process of installing an RRURRU3261Installation Guide 5 Installation ProcessIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.20
6 Installing the RRUAbout This ChapterThis chapter describes the procedure for installing the RRU. The procedure for installing theRRU varies depending on installation options.6.1 Mounting Kits for an RRUThis section describes the mounting kits for an RRU in centralized mode.6.2 Installing the RRU on a PoleThis section describes the procedure for installing the RRU on a pole in centralized mode.6.3 Installing the RRU on a TowerThis section describes the procedure for installing the RRU on a tower in centralized mode.RRU3261Installation Guide 6 Installing the RRUIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.21
6.1 Mounting Kits for an RRUThis section describes the mounting kits for an RRU in centralized mode.Figure 6-1 shows the mounting kits for an RRU in centralized mode.Figure 6-1 Mounting kits for an RRU(1) Bracket assembly (2) Backplane (3) L plate6.2 Installing the RRU on a PoleThis section describes the procedure for installing the RRU on a pole in centralized mode.ProcedureStep 1 Install the upper mounting bracket on the pole, use a level to check that the mounting supportis level, and tighten the screws on the mounting bracket to 40 N·m (354.03 lbf·in.) to 45 N·m(398.28 lbf·in.), as shown in Figure 6-2.RRU3261Installation Guide 6 Installing the RRUIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.22
Figure 6-2 Securing the upper mounting bracket on the poleStep 2 Install screws on the backplane, and secure the backplane to the RRU by tightening the screwsto 5 N·m (44.25 lbf·in.), as shown in Figure 6-3.Figure 6-3 Securing the backplane to the RRUNOTICEThe installing method in Figure 6-4 is incorrect.RRU3261Installation Guide 6 Installing the RRUIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.23
Figure 6-4 Incorrect installing methodStep 3 Install the RRU on the upper mounting bracket, and tighten the screws on the bracket to 40 N·m(354.03 lbf·in.) to 45 N·m (398.28 lbf·in.), as shown in Figure 6-5.Figure 6-5 Installing the RRU on the upper mounting bracketStep 4 Install the lower mounting bracket on the RRU and pole (An L plate is required at the bottomof the backplane), use a level to check that the mounting support is level, and tighten the screwson the bracket to 40 N·m (354.03 lbf·in.) to 45 N·m (398.28 lbf·in.), as shown in Figure 6-6.RRU3261Installation Guide 6 Installing the RRUIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.24
Figure 6-6 Securing the lower mounting bracketStep 5 Install the backplane on the second RRU, similar to step2.Step 6 Install the second RRU on the upper mounting bracket on the pole, and tighten the screws onthe bracket to 40 N·m (354.03 lbf·in.) to 45 N·m (398.28 lbf·in.),as shown in Figure 6-7.Figure 6-7 Installing the RRU on the poleStep 7 Install the backplane and L plate on the lower mounting bracket, and tighten the screws on thebracket to 40 N·m (354.03 lbf·in.) to 45 N·m (398.28 lbf·in.), as shown in Figure 6-8.RRU3261Installation Guide 6 Installing the RRUIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.25
Figure 6-8 Installing the backplane and L plate on the lower mounting bracketNOTEInstall the third RRU and the RRU on the other side of the pole the same way as the second RRU. Thetightening torque is similar to that for the first RRU.----End6.3 Installing the RRU on a TowerThis section describes the procedure for installing the RRU on a tower in centralized mode.ProcedureStep 1 Hoist the RRU onto a tower.1. Install upper and lower mounting brackets on a pole, and then bind the pole using a liftingsling, as shown in Figure 6-9.RRU3261Installation Guide 6 Installing the RRUIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.26
Figure 6-9 Installing upper and lower mounting brackets and binding the pole(1) Traction sling (2) Lifting sling2. Install the backplane on the RRU, and bind the RRU using a lifting sling and traction sling,as shown in Figure 6-10.Figure 6-10 Installing the backplane and binding the RRU(1) Handle (2) Lifting sling (3) Traction eye (4) Traction slingRRU3261Installation Guide 6 Installing the RRUIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.27
NOTICElThe handle has a capacity of bearing at least four times the weight of the RRU.lThe binding methods in Figure 6-11 and Figure 6-12 are incorrect.Figure 6-11 Incorrect binding method (1)Figure 6-12 Incorrect binding method (2)3. Hoist the pole onto the tower, as shown in Figure 6-13.RRU3261Installation Guide 6 Installing the RRUIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.28
Figure 6-13 Hoisting the pole onto the tower(1) Traction sling (2) Lifting sling (3) Fixed pulley4. Hoist the RRU onto the tower, as shown in Figure 6-14.RRU3261Installation Guide 6 Installing the RRUIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.29
Figure 6-14 Hoisting the RRU onto the tower (1) Lifting sling (2) Fixed pulley (3) Traction slingStep 2 Install the RRU on the tower.1. Align the backplane with the holes on the upper mounting bracket, install screws on theholes, and secure the backplane to the upper mounting bracket by tightening the screws, asshown in Figure 6-15.RRU3261Installation Guide 6 Installing the RRUIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.30
Figure 6-15 Installing the RRU on the pole2. Install the backplane and the L plate on the lower mounting bracket, as shown in Figure6-16.Figure 6-16 Installing the backplane and the L plate on the lower mounting bracket----EndRRU3261Installation Guide 6 Installing the RRUIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.31
7 Installing RRU CablesAbout This ChapterThis chapter describes the procedure for installing RRU cables.7.1 Cabling RequirementsCables must be laid out according to the specified cabling requirements to prevent signalinterference.7.2 RRU Cable ConnectionsThis section describes RRU cable connections.7.3 Installing RRU CablesThis chapter describes the procedure for installing RRU cables.7.4 RRU CablesThis section describes RRU cable connections.7.5 Installing an RRU PGND CableThis section describes the procedure for installing an RRU PGND cable.7.6 Installing an RRU RF JumperThis section describes the procedure for installing an RRU RF jumper.7.7 Installing an RRU AISG Multi-Wire Cable and AISG Extension CableThis section describes the procedures for installing an RRU AISG multi-wire cable and AISGextension cable.7.8 Installing an RRU Alarm CableThis section describes the procedure for installing an RRU alarm cable.7.9 Opening the Cover Plate of an RRU Cabling CavityThis section describes the procedure for opening the cover plate of an RRU cabling cavity.7.10 Installing a CPRI Optical CableThis section describes the procedure for installing a CPRI optical cable.7.11 Installing an RRU Power CableThis section describes the procedure for installing an RRU power cable.7.12 Closing the Cover Plate of an RRU Cabling CavityRRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.32
This section describes the procedure for closing the cover plate of an RRU cabling cavity.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.33
7.1 Cabling RequirementsCables must be laid out according to the specified cabling requirements to prevent signalinterference.NOTEIf a cable listed below is not required, skip the cabling requirements of the cable.General Cabling RequirementsBending radius requirementslThe bending radius of a 7/8'' feeder must be greater than 250 mm (9.84 in.), and the bendingradius of a 5/4'' feeder must be greater than 380 mm (14.96 in.).lThe bending radius of a 1/4'' jumper must be greater than 35 mm (1.38 in.). The bendingradius of a super-flexible 1/2'' jumper must be greater than 50 mm (1.97 in.), and the bendingradius of an ordinary 1/2'' jumper must be greater than 127 mm (5 in.).lThe bending radius of a power cable or PGND cable must be at least three times its diameter.lThe bending radius of a fiber optic cable is at least 20 times of its diameter, and the bendingradius of a breakout cable is at least 30 mm (1.18 in.).lThe bending radius of an E1/T1 cable must be at least three times its diameter.lThe bending radius of a signal cable must be at least five times its diameter.Cable binding requirementslCables of the same type must be bound together.lDifferent types of cables must be separately laid out and bound, with a minimum distanceof 30 mm (1.18 in.) from each other.lThe cables must be bound tightly and neatly. The sheaths of the cables must not be damaged.lThe cable ties must face the same direction, and those at the same horizontal line must bein a straight line.lThe excess of the indoor cable ties is cut off. The excess of 5 mm (0.197 in.) of the outdoorcable ties is reserved, and the cut surfaces are smooth without sharp edges.lAfter cables are installed, labels or nameplates must be attached to the cables at their ends,curves, and interconnection positions.Security requirementslWhen routing cables, avoid sharp objects, for example sharp edges on the wall. If necessary,use tubes to protect the cables.lWhen routing cables, keep the cables away from heat sources and use heat insulationmaterials to insulate the cables from the heat sources.lReserve a proper distance (0.1 m or 3.937 in. is recommended) between equipment andcables especially at the cable curves to protect the cables and equipment.Indoor cabling requirementslRoute each cable into the room through the feeder window.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.34
lReserve drip loops for all cables outside the feeder window before routing them into theroom. Ensure that the radiuses of the drip loops are greater than or equal to the minimumbending radiuses of the cables.lWhen routing a cable into the room, ensure that a person is assisting you in the room.lApply waterproof treatment to the feeder window.Outdoor Cabling RequirementslAfter being connected to a ground clip on power cables, a ground cable must be routeddownwards to prevent water from entering the equipment to which the power cablesconnect.lProtect outdoor cables against potential damage. For example, put the cables through tubes.lThe cables to be protected include AC power cables, transmission cables, and cables laidout underground.lWhen routing cables through tubes on the ground below the cabinet, put a 30 mm to 50mm (1.18 in. to 1.97 in.) length of the tubes into the base of the cabinet but do not put thetubes into the cabinet. Use waterproof tape or waterproof silicon gel to block both ends ofthe tubes and use sheet metal tabs to secure the tubes to the cable holes in the base.lWhen routing cables through tubes along a metal cable trough below the cabinet, do notput the tubes into the base of the cabinet but cover the cable trough and connect the tubesto the cable holes in the base.lWhen routing RRU cables, ensure that the highest positions of the routes of all RRU cables(except RF cables and AISG cables) must be lower than the bottom of the RRU.lUse clips to secure cables outdoors. For the method of installing a clip, see the installationguide delivered with the clip.lArrange cables neatly along the routing direction and use clips to secure the cables.lDetermine the positions where the clips are installed according to the actual situation. Forexample, 7/8" feeders are secured with clips at an interval of 1.5 m to 2 m (4.92 ft to 6.56ft), CPRI fiber optic cables and power cables are secured with clips at an interval of 1 mto 1.5 m (3.28 ft to 4.92 ft). Ensure that the clips are evenly spaced and in the same direction.lWhen fastening cables with a clip, ensure that the cables are aligned neatly and are routedthrough the holes in the clip. Do not stretch the cables too tightly.NOTEThere are two types of clips: 3-hole clip and 6-hole clip, which are described as follows:lA 3-hole clip is shown by illustration a in the following figure. It is often used to fasten feeders.lA 6-hole clip is shown by illustration b in the following figure. It is often used to fasten power cables andCPRI fiber optic cables.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.35
Figure 7-1 Exterior of the clips(1) Cable hole for feeders (2) Cable hole for fiber optic cables (3) Cable hole for power cables The following figure shows the cables secured on a cable tray.Figure 7-2 Cables secured on a cable tray(1) 3-hole clip (2) 6-hole clip The following figure shows the cables secured on a tower.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.36
Figure 7-3 Cables secured on a tower(1) 3-hole clip (2) 6-hole clip Special Cabling RequirementsCabling of power cableslPower cables must be installed in the position specified in engineering design documents.lIf the length of power cables is insufficient, replace the cables rather than adding connectorsor soldering joints to lengthen the cables.lCables can only be laid out under well-planned instructions. The cabling activities of fiberoptic cables are allowed only when qualified personnel and communication facilities areavailable.lDo not circle and twist cables.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.37
lAfter routing a DC power cable onto the platform on a tower, route it along the shortestpath to the rails surrounding the platform, and route it along the inside of the rails.lAfter routing a DC power cable close to the equipment on a tower, use clips to secure thepower cable onto a pole or the rails surrounding the platform. Ensure that there is noexcessively long distance between the equipment and the position where the power cableis secured.Cabling of PGND cableslPGND cables for a base station must be connected to the same group of ground bars.lPGND cables must be buried in the ground or routed indoors.lThe external conductor of the coaxial wire and the shield layer of the shielded cable musthave proper electrical contact with the metal surface of the equipment to which they areconnected.lPGND cables and signal cables must be installed separately. A certain distance must bereserved between them to prevent interference from each other.lSwitches or fuses must not be installed on the PGND cables.lOther devices must not be used for electrical connections of the PGND cables.lAll the metal parts in the housing of the equipment must be reliably connected to the groundterminal.Cabling of E1 cableslE1 cables must not cross power cables, PGND cables, or RF cables when laid out. Iftransmission cables are laid out with power cables, PGND cables, or RF cables in parallel,the spacing between them must be greater than 30 mm (1.18 in.).lE1 cables are lined up straight and bound neatly with cable ties.lSufficient slack is provided for E1 cables at turns.lE1 cables must not be pressed by the door of the cabinet when routed, as shown in thefollowing figure.Figure 7-4 E1 cables routed in the cabinet Cabling of fiber optic cableslAt least three people are required for laying out fiber optic cables. The cabling activitiesof fiber optic cables are allowed only when qualified personnel and communicationfacilities are available.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.38
lThe operating temperature of fiber optic cables ranges from -40ºC to +60ºC (-40ºF to+140ºF). If the actual temperature is beyond this range, take protective measures or selectanother route.lDo not circle and twist cables.lDo not bind a fiber optic cable at the position where it bends.lDo not stretch, step on, or place heavy objects on fiber optic cables. Keep the fiber opticcables away from sharp objects.lWhen fiber optic cables are routed, the excess of the fiber optic cables must be coiled aroundspecial devices, such as a fiber coiler.lAn unarmored fiber optic cable must be bound using binding straps. If a fiber optic patchcord needs to be secured in a cabinet or a piece of equipment, use binding straps to bind itand then use cable ties to secure the binding straps to the cabinet or equipment. Ensure thatthe fiber optic cables can flexibly move in the cable ties. Do not bend the fiber optic cablessharply. The following figure shows how to bind the fiber optic cables correctly.Figure 7-5 Binding fiber optic cables lWhen coiling fiber optic cables, apply even strength. Do not bend the fiber optic cableswith force.lUnused optical connectors must be covered with dustproof caps.lThe fiber optic cables must not be pressed by the door of the cabinet when routed, as shownin the following figures.Figure 7-6 CPRI fiber optic cables routed in the cabinet (1) RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.39
Figure 7-7 CPRI fiber optic cables routed in the cabinet (2) Figure 7-8 FE/GE fiber optic cables routed in the cabinet lAfter routing a fiber optic cable onto the platform on a tower, route it along the shortestpath to the rails surrounding the platform, and route it along the inside of the rails.lAfter routing a fiber optic cable close to the equipment on a tower, use clips to secure thefiber optic cable onto a pole or the rails surrounding the platform. Ensure that there is noexcessively long distance between the equipment and the position where the cable issecured.lCoil the excess of the fiber optic cables near the equipment on the tower before securingthe cables on the tower.7.2 RRU Cable ConnectionsThis section describes RRU cable connections.NOTEThe RRU does not support power cable cascading.Figure 7-9 shows the cable connections of a single RRU.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.40
Figure 7-9 Cable connections of a single RRU(1) RRU PGND cable (2) RRU RF jumper (3) RRU AISG multi-wire cable(4) RRU AISG extension cable (5) RRU power cable (6) CPRI optical fiber(7) RRU alarm cable - - Figure 7-10 shows the cable connections of multiple RRUs.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.41
Figure 7-10 Cable connections of multiple RRUs(1) RRU PGND cable (2) RRU RF jumper (3) RRU power cable(4) CPRI optical fiber - - 7.3 Installing RRU CablesThis chapter describes the procedure for installing RRU cables.Figure 7-11 shows the procedure for installing RRU cables.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.42
Figure 7-11 Procedure for installing RRU cables 7.4 RRU CablesThis section describes RRU cable connections.Table 7-1 lists RRU cables.Table 7-1 RRU cablesCable One End The Other EndConnector InstallationPositionConnector InstallationPositionRRU PGNDCableOT terminal(M6, 16 mm2 or0.025 in.2)Groundterminal on theRRUOT terminal(M8, 16 mm2 or0.025 in.2)Ground terminalon the ground barRRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.43
Cable One End The Other EndConnector InstallationPositionConnector InstallationPositionRRU PowerCableTool-less femaleconnector(pressfit type)NEG(-) andRTN(+) portson the RRUDepending onthe power supplyequipmentExternal powerequipmentRRU AlarmCableDB15 maleconnectorEXT_ALMport on theRRUCord endterminalExternal alarmdeviceCPRI FiberOptic CableDLC connector CPRI0 port onthe RRUDLC connector CPRI port on aboard in the BBURRU RF Jumper DIN maleconnectorRF ports onthe RRUDIN maleconnectorAntenna systemRRU AISGMulti-WireCableDB9 waterproofmale connectorRET port onthe RRUStandard AISGfemaleconnectorStandard AISGmale connectoron the RCU or onthe AISGextension cableRRU AISGExtension CableStandard AISGmale connectorStandardAISG femaleconnector onthe AISGmulti-wirecableStandard AISGfemaleconnectorStandard AISGmale connectoron the RCU 7.5 Installing an RRU PGND CableThis section describes the procedure for installing an RRU PGND cable.ContextThe cross-sectional area of an RRU PGND cable is 16 mm2 (0.025 in.2). The cable has an M6OT terminal at one end and an M8 terminal at the other end.DANGERInstall RRU PGND cables by strictly following the following operations. Otherwise, damage tothe RRU or personal injury may occur.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.44
ProcedureStep 1 According to the actual cable route, cut the PGND cable into a proper length to prepare an RRUPGND cable. Then, add an OT terminal at each end of the cable according to the instructions inAssembling the OT Terminal and the Power Cable.Step 2 Install the RRU PGND cable.Connect the M6 OT terminal at one end of the PGND cable to the ground terminal at the RRUbottom and the M8 OT terminal at the other end to the external ground bar, as shown in Figure7-12.Figure 7-12 Installing an RRU PGND cable NOTECrimp OT terminals in correct positions, as shown in Figure 7-13.Figure 7-13 Correct position of an OT terminal RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.45
Step 3 Label the installed cable according to the instructions in Attaching a Cable-Tying Label.----End7.6 Installing an RRU RF JumperThis section describes the procedure for installing an RRU RF jumper.ProcedureStep 1 Connect the DIN male connector at one end of the RRU RF jumper to the ANT port on the RRU,and use a torque wrench to tighten the connector to 25 N·m (221.27 lbf·in.), as shown in Figure7-14.Figure 7-14 Installing an RRU RF jumper NOTICEOn AC-powered electric railways, such as high-speed railways, when leaky cables are connectedto RRUs installed in tunnels, high-voltage-resistance DC blocks must be installed between RRURF jumpers and the leaky cables to protect the RRUs against damage.Step 2 Connect the other end of the RF jumper to the external antenna system.Step 3 Waterproof the connectors of the RF jumper by referring to Figure 7-15.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.46
Figure 7-15 Waterproofing a connector of the RF jumper (1) Waterproof tape (2) PVC insulation tapeNOTElBefore wrapping waterproof tape, stretch the tape evenly until the length of the tape becomes twice itsoriginal length.lDo not stretch the PVC insulation tape when wrapping the PVC insulation tape.lWrap each layer of tape around the connector tightly and neatly, and ensure that each layer of tape overlapsmore than 50% of the preceding layer. Ensure that neighboring layers are stuck to each other.lEnsure that the adhesive surface of the tape overlaps the lower layer.lWhen cutting off the cable ties, reserve a redundant length of 3 mm (0.12 in.) to 5 mm (0.2 in.).1. Wrap three layers of waterproof tape on the connector, first from bottom up, then from topdown, and finally from bottom up. Start wrapping the connector at a position 50 mm (1.97in.) away below the bottom of the connector to the top of the connector, first from bottomup, then from top down, and finally from bottom up. Cut off the redundant tape after threelayers are wrapped. Wrap each layer of tape around the connector tightly.2. Wrap three layers of PVC insulation tape. Start the wrapping at a position 30 mm (1.18 in.)away below the bottom of the waterproof tape to the top of the connector, first from bottomup, then from top down, and finally from bottom up. Cut off the redundant tape after threelayers are wrapped. Wrap each layer of tape around the connector tightly.3. Start binding cable ties to the cable at a position 3 mm (0.12 in.) to 5 mm (0.2 in.) awayfrom one end of the PVC insulation tape.Step 4 Check the dustproof caps on antenna connectors. In outdoor scenarios, dustproof caps must bewaterproofed, as shown in Figure 7-16.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.47
NOTICEDo not remove dustproof caps from vacant antenna connectors.Figure 7-16 Waterproofing a dustproof cap(1) Dustproof cap (2) Waterproof tape (3) PVC insulation tapeNOTElBefore wrapping waterproof tape, stretch the tape evenly until the length of the tape becomes twice itsoriginal length.lDo not stretch the PVC insulation tape when wrapping the PVC insulation tape.lWrap each layer of tape around the connector tightly and neatly, and ensure that each layer of tape overlapsmore than 50% of the preceding layer. Ensure that neighboring layers are stuck to each other.lEnsure that the adhesive surface of the tape overlaps the lower layer.lWhen cutting off the cable ties, reserve a redundant length of 3 mm (0.12 in.) to 5 mm (0.2 in.). 1. Verify that dustproof caps are not removed.2. Wrap three layers of waterproof tape on the connector, first from bottom up, then from topdown, and finally from bottom up. Wrap each connector with three layers of waterprooftape, from bottom up, then from top down, and finally from bottom up. Do not cut the tapeuntil all the three layers of the tape are already wrapped. Cut off the redundant tape afterthree layers are wrapped. Wrap each layer of tape around the connector tightly.3. Wrap three layers of PVC insulation tape. Wrap each connector with three layers ofwaterproof tape, from bottom up, then from top down, and finally from bottom up. Do notcut the tape until all the three layers of the tape are already wrapped. Cut off the redundanttape after three layers are wrapped. Wrap each layer of tape around the connector tightly.4. Start binding cable ties to the cable at a position 3 mm (0.12 in.) to 5 mm (0.2 in.) awayfrom one end of the PVC insulation tape.Step 5 Route the cables according to the instructions in Cabling Requirements, and then use cable tiesto bind the cables.Step 6 Label the installed cables according to the instructions in Attaching a Sign Plate Label.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.48
Step 7 Attach color-coding to the installed RF jumper according to the instructions in Attaching theColor Ring.----End7.7 Installing an RRU AISG Multi-Wire Cable and AISGExtension CableThis section describes the procedures for installing an RRU AISG multi-wire cable and AISGextension cable.ContextWhen the distance between an RRU and a Remote Control Unit (RCU) is longer than 5 m (16.4ft.), an AISG multi-wire cable is not long enough to connect the RRU and the RCU. In this case,an AISG extension cable is used to extend the AISG multi-wire cable.ProcedurelInstall an AISG multi-wire cable that is not configured with an AISG extension cable.1. Use an M3 flat-head screwdriver to loosen the screws on the dustproof cap on the RETport and remove the dustproof cap.2. Link the waterproofed DB9 connector at one end the AISG multi-wire cable to theRET port on the RRU bottom, as shown in Figure 7-17.Figure 7-17 Installing an RRU AISG multi-wire cable RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.49
3. Use an M3 Phillips screwdriver to tighten the posts on both sides of the waterproofDB9 connector to 0.4 N·m (3.54 lbf·in.).4. Connect the other end of the cable to the standard AISG male connector on the RCU.5. Route the cables according to the instructions in Cabling Requirements, and then usecable ties to bind the cables.6. Label the installed cables according to the instructions in Attaching an L-ShapedLabel.lInstall an AISG multi-wire cable that is configured with an AISG extension cable.1. Use an M3 flat-head screwdriver to loosen the screws on the dustproof cap on the RETport and remove the dustproof cap.2. Link the waterproofed DB9 connector at one end of the AISG multi-wire cable to theRET port on the RRU bottom, and link the other end to the standard AISG maleconnector of the AISG extension cable, as shown in Figure 7-18.Figure 7-18 Installing an RRU AISG multi-wire cable 3. Use an M3 Phillips screwdriver to tighten the posts on both sides of the waterproofDB9 connector to 0.4 N·m (3.54 lbf·in.).4. Connect the other end of the AISG extension cable to the standard AISG maleconnector on the RCU, as shown in Figure 7-19.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.50
Figure 7-19 Installing an RRU AISG extension cable 5. Route the cables according to the instructions in Cabling Requirements, and then usecable ties to bind the cables.6. Label the installed cables according to the instructions in Attaching an L-ShapedLabel.----End7.8 Installing an RRU Alarm CableThis section describes the procedure for installing an RRU alarm cable.ProcedureStep 1 Use an M3 Phillips screwdriver to loosen the screws on the dustproof cap on the EXT_ALMport and remove the dustproof cap.Step 2 Connect the waterproof DB15 connector at one end of the RRU alarm cable to theEXT_ALM port on the RRU, as shown in Figure 7-20.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.51
Figure 7-20 Installing an RRU alarm cable NOTEInstall the waterproof DB15 male connector on the RRU alarm cable with caution, preventing the pin assignmentfrom being damaged.Step 3 Use an M3 Phillips screwdriver to tighten the posts on both sides of the waterproof DB15 maleconnector to 0.4 N·m (3.54 lbf·in.).Step 4 Connect the eight cord end terminals at the other end to external alarm devices.NOTElRemove insulated protective tubes from the cord end terminals before connecting the cord end terminals todevices, as shown in Figure 7-21.lUse insulating adhesive tapes to wrap cord end terminals that are not in use and fix them at a proper positionbased on the onsite situations. This prevents false alarm reporting and equipment damage due to contact ofexposed cables. Figure 7-22 shows the method for handling cord end terminals not in use.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.52
Figure 7-21 Removing insulated protective tubes from the cord end terminals Figure 7-22 Method for handling cord end terminals that are not in use Step 5 Route the cables according to the instructions in Cabling Requirements, and then use cable tiesto bind the cables.Step 6 Label the installed cables according to the instructions in Attaching an L-Shaped Label.----End7.9 Opening the Cover Plate of an RRU Cabling CavityThis section describes the procedure for opening the cover plate of an RRU cabling cavity.ProcedureStep 1 Wear ESD gloves.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.53
NOTICETake proper ESD protection measures, for example, wear ESD gloves, to prevent electrostaticdamage to the boards, modules, or electronic components.Step 2 Use an M5 Phillips screwdriver to loosen the three screws on the cover plate of the RRU cablingcavity, and open the cover plate, as shown in Figure 7-23.Figure 7-23 Opening the cover plate of the RRU cabling cavity(1) Cover plate (2) Cabling cavity (3) Clip(4) Cable trough for the power cable (5) Waterproof block (6) Cable trough for the fiber optical cable Step 3 Loosen the screws on the clip using an M4 Phillips screwdriver, and open the clip, as shown inFigure 7-24.NOTEOpen the clip only for the associated cable.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.54
Figure 7-24 Opening clips Step 4 Remove the waterproof block.NOTERemove only the waterproof blocks for the cables to be installed.----End7.10 Installing a CPRI Optical CableThis section describes the procedure for installing a CPRI optical cable.PrerequisitesBefore the installation, single-mode optical modules can be distinguished from multimodeoptical modules in either of the following ways:lSM and MM labels on an optical module: SM indicates a single-mode optical module, andMM indicates a multimode optical module.lColor of the puller on an optical module: Blue indicates a single-mode optical module, andblack or gray indicates a multimode optical module.NOTICEThe optical modules to be installed must match CPRI rates.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.55
ContextlA CPRI optical cable transmits CPRI signals between a BBU and an RRU.ProcedureStep 1 Lower the pullers of two optical modules, insert one optical module into the CPRI0 port on theRRU and the other optical module into the CPRI port on the BBU, and raise the pullers, as shownin Figure 7-25.Figure 7-25 Installing an optical moduleNOTICEThe performance of an optical module that is exposed to the air for more than 20 minutes maybe abnormal. Therefore, you must insert an fiber optic cable into an unpacked optical modulewithin 20 minutes.Step 2 Connect the end labeled 1A and 1B of the optical cable to the optical module on the RRU side,as shown in Figure 7-26.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.56
Figure 7-26 Installing a CPRI optical cableNOTICETo avoid any damage to optical cables, the cables connected to the RRU must be installedaccording to the installation process. For details about the installation process, see 7.3 InstallingRRU Cables.Step 3 Connect the end labeled 2A and 2B of the optical cable to the optical module on the BBU side.Step 4 Route the cables according to the instructions in Cabling Requirements, and then use cable tiesto bind the cables.Step 5 Label the installed cables according to the instructions in Attaching an L-Shaped Label.----End7.11 Installing an RRU Power CableThis section describes the procedure for installing an RRU power cable.PrerequisiteslA tool-less female connector (pressfit type) is added to the RRU power cable on the RRUside. For details, see 10.1 Adding a Tool-Less Female Connector (Pressfit Type) to theRRU Power Cable on the RRU Side.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.57
lA connector or OT terminals are added to the RRU power cable on the power device side.For details, see DBS3900 Installation Guide.ContextIf a power device provided by the customer is used, the recommended specification of the circuitbreaker on this power device is 20 A to 30 A.Table 7-2 describes the RRU power cable.Table 7-2 RRU power cableCable On the RRUSideOn thePowerDevice SidePowerDeviceColorRRUpowercableTool-less femaleconnector(pressfit type)Tool-lessfemaleconnector(pressfit type)EPU A cable with a black jacket and twowires insidelNorth American standards: TheRTN(+) wire is black and theNEG(-) wire is blue.lEuropean standards: The RTN(+) wire is brown and the NEG(-) wire is blue.DCDU-11BEPC5connectorDCDU-12B CAUTIONlBefore installing the RRU power cable, ensure that the upper-level circuit breaker isswitched off and the power cable has no voltage.lA drip loop is required for the position between the RRU port and the cable, preventingrain from damaging the RRU.lWhen installing the RRU power cable, connect the power cable to the RRU connector firstand then to the power equipment connector. Incorrect connection sequence or reverseconnection of positive and negative poles may damage the RRU or cause personal injury.ProcedureStep 1 Connect the tool-less female connector (pressfit type) at one end of the RRU power cable to thepower supply socket on the RRU, as shown in Figure 7-27.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.58
Figure 7-27 Installing an RRU power cable NOTICEEnsure that the exposed shield layer of the power cable is properly tightened using the clip.Step 2 Connect the connector at the other end of the RRU power cable to the corresponding positionon the power device.NOTElA DCDU-11B/DCDU-12B can supply power to a maximum of six RRUs. Ensure that the RRU powercable is connected to one of LOAD0 to LOAD5 ports on the DCDU-11B/DCDU-12B.lOne EPU can supply power to a maximum of six RRUs. Ensure that the RRU power cable is connectedto one of RRU0 to RRU5 ports on the EPU.lWhen the RRU power cable is connected to the EPU, the blue core wire in the tool-less female connector(pressfit type) is connected to the upper port on the EPU, and the black/brown core wire is connectedto the lower port on the EPU.Step 3 Route the cables according to the instructions in Cabling Requirements, and then use cable tiesto bind the cables.Step 4 Label the installed cables according to the instructions in Attaching a Cable-Tying Label.----End7.12 Closing the Cover Plate of an RRU Cabling CavityThis section describes the procedure for closing the cover plate of an RRU cabling cavity.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.59
ProcedureStep 1 Close the clips for the installed cables. Use an M4 torque screwdriver to tighten the screws oneach clip to 1.4 N·m (12.39 lbf·in.), as shown in Figure 7-28.NOTICEEnsure that the exposed shield layer of the power cable is properly tightened using the clip.Figure 7-28 Closing clips Step 2 Insert waterproof blocks into vacant cable troughs in the cabling cavity, as shown in Figure7-29.NOTICEEnsure that cables and waterproof blocks are properly inserted into troughs.RRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.60
Figure 7-29 Correct placement of waterproof blocks Step 3 Close the cover plate of the RRU cabling cavity. Use an M5 torque screwdriver to partiallytighten the screws on the cover plate in the sequence shown in Figure 7-30. Then tighten thescrews to 2 N·m (17.7 lbf·in.) in the same sequence.NOTICEThe RRU cabling cavity must be securely tightened to prevent water.Figure 7-30 Closing the cover plate of an RRU cabling cavityRRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.61
 Step 4 Take off the ESD gloves, and pack up all the tools.----EndRRU3261Installation Guide 7 Installing RRU CablesIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.62
8 Checking the RRU Hardware InstallationTable 8-1 provides the checklist for the RRU hardware installation.Table 8-1 Checklist for the RRU hardware installationSN Item1The position for each device conforms to the engineering drawing and meets thespace requirement. Sufficient space is reserved for equipment maintenance.2 The RRU is securely installed.3 The cover plate is securely installed on the RRU cabling cavity.4 Waterproof blocks are securely installed in vacant cable troughs of the RRU cablingcavity, and the cover plate for the cabling cavity is securely installed. In addition,vacant RF ports are covered with dustproof caps and the caps are tightened.5 There are no connectors or joints on each power cable or PGND cable.6 The terminals at two ends of each power cable or PGND cable are securely solderedor crimped.7 None of power cables and PGND cables can be short-circuited or reverselyconnected. In addition, these cables are not damaged or broken.8 Power cables and PGND cables are separately bound from other cables.9 The protection grounding of the RRU and the surge protection grounding of thebuilding share one group of ground conductors.10 The connectors of each signal cable are intact and securely linked, and these cablesare not damaged or broken.11 Labels are correct, legible, and complete at both ends of each cable, feeder, andjumper.12 All ground cables are properly grounded.RRU3261Installation Guide 8 Checking the RRU Hardware InstallationIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.63
9 Powering On an RRUAfter all the devices are installed, check the power-on status of an RRU.NOTICEAfter you unpack an RRU, you must power on it within 24 hours. If you power off the RRU formaintenance, you must restore power to the RRU within 24 hours.Figure 9-1 shows the RRU power-on check process.NOTEFor details about how to power on an RRU, see Powering On an RRU. For details about how to power offan RRU, see section "Powering-Off the RRU" in RRU Maintenance Guide.RRU3261Installation Guide 9 Powering On an RRUIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.64
Figure 9-1 RRU power-on check process(a) The normal input voltage of an RRU is -48 V DC. The voltage of the external power supply should rangefrom -36 V DC to -57 V DC.(b) The RUN indicator on the RRU is on for 1s and off for 1s. The ALM indicator is steady off.RRU3261Installation Guide 9 Powering On an RRUIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.65
10 AppendixAbout This Chapter10.1 Adding a Tool-Less Female Connector (Pressfit Type) to the RRU Power Cable on theRRU SideThis section describes the procedure for adding a tool-less female connector (pressfit type) tothe RRU power cable on the RRU side.RRU3261Installation Guide 10 AppendixIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.66
10.1 Adding a Tool-Less Female Connector (Pressfit Type)to the RRU Power Cable on the RRU SideThis section describes the procedure for adding a tool-less female connector (pressfit type) tothe RRU power cable on the RRU side.ContextFigure 10-1 shows the cable diagram on labels.Figure 10-1 Cable diagram on labels(1) Cable diagram on labels NOTICEPrepare a Tool-Less Female Connector (Pressfit Type) to the RRU Power Cable on the RRUSide by strictly following the following operations. Otherwise, damage to the RRU or personalinjury may occur.ProcedureStep 1 Determine the length of the power cable for different operations based on the labels, as shownin Figure 10-2.Figure 10-2 Determining the length of the power cableRRU3261Installation Guide 10 AppendixIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.67
 Step 2 Strip the specified length of the sheath off the power cable, as shown in Figure 10-3.Figure 10-3 Stripping the specified length of sheath Step 3 Strip a specified length of sheath off each core wire. The length must be consistent with thelength of the notch in the tool-less female connector (pressfit type), as shown in Figure 10-4.Figure 10-4 Stripping the sheath off each core wire Figure 10-5 Matched length Step 4 Add a tool-less female connector (pressfit type) to two core wires.1. Tighten the screws using a Phillips screwdriver, as shown in Figure 10-6.RRU3261Installation Guide 10 AppendixIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.68
Figure 10-6 Tightening screws 2. Connect the blue core wire labeled NEG(-) to the - port and the black/brown core wirelabeled RTN(+) to the + port on the tool-less female connector (pressfit type), and thentighten the screws using a Phillips screwdriver, and then use a torque screwdriver to tightenthe M4 screws to 1.4 N·m (12.39 lbf·in.), as shown in Figure 10-7.DANGERDo not reversely connect the positive and negative poles. Reverse connection of positiveand negative poles may result in equipment malfunctions or personal injury. Therefore,check the power cable connection before powering on the RRU.Figure 10-7 Adding a tool-less female connector (pressfit type) to two core wires 3. After the core wires are installed, ensure that each core wire is securely installed after beingdragged with a torque of 30 N•m and all copper wires are inserted in the connector terminalsocket.Step 5 Strip the specified length of the sheath off the power cable to expose the intact shield layer, asshown in Figure 10-8.RRU3261Installation Guide 10 AppendixIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.69
Figure 10-8 Stripping the sheath off the power cable NOTICEEach core wire is exposed outside the tool-less female connector (pressfit type) for 1.5 mm(0.059 [in.]), as shown in Figure 10-9.Figure 10-9 Inserting core wires into the tool-less female connector (pressfit type)----EndRRU3261Installation Guide 10 AppendixIssue Draft A (2015-07-24) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.70

Navigation menu