Husky 16628 Users Manual Combo Floor Kit
16628 f7d2f914-91d8-4090-95fd-48d9f6e138ab
16628 to the manual 71ab3de2-3a01-4587-8c0e-fb8d6076350e
2015-02-04
: Husky Husky-16628-Users-Manual-368967 husky-16628-users-manual-368967 husky pdf
Open the PDF directly: View PDF .
Page Count: 8
Download | |
Open PDF In Browser | View PDF |
Important! Please follow these instructions. This kit may be different from the one specified in instruction booklet. 07/31/2006 COMBINATION 8X8 and 10X8 FLOOR KIT This floor kit will build either the 10’ wide or 8’ wide x 7’ 8-5/8” deep floor size FOR MARCO SERIES, SOLAR SHED AND MWP IMPERIAL ONLY This floor kit is for 10’ x 7’ 8-5/8” and 8’ x 7’ 8-5/8” buildings. Please refer to the appropriate pages of this instruction manual to build the floor size needed. If constructing an 8X8 storage building, you will have additional material which can be used to construct a shelf (some cutting required) or other projects. - B E F O R E Y O U B E G I N - ■ Tools required First... Read these instructions thoroughly before you begin assembly. Assembly is easiest if you follow the steps in the order shown. Lumber is graded from only one side. Check the part for the most attractive face and make sure to face it to the outside. ❑ Hammer ❑ Level ❑ Pencil ❑ Tape Measure Check all parts ❑ Chalk Line ❑ Square ❑ Nail Pouch ❑ Saw ■ Optional tools Compare parts you have to the list on page 2. If a part is missing, circle the part in question in the parts list and call us toll-free at 1-800-437-0784. Assistance required 8x8 See pages 2-3-4 We recommend that you assemble this floor on level ground in the location it will be used. Assistance is necessary to handle, fit, and secure some components. Two people maybe needed for some steps. Squareness is very Important! Keeping all 90° corners and 90° perpendiculars square throughout the assembly of this floor kit will make each succeeding step easier and is necessary to assure that all components fit together properly. Check local zoning Before starting construction, check with your local building code official for any required permits, variances, etc. 10x8 See pages 5-6 Check floor kit size Before starting construction on your floor, make sure that you check in the instruction manual to ensure that you are building the correct size floor kit for your building. Always wear OSHA-APPROVED safety glasses throughout assembly process #16628 1 Parts Needed: A 2 - 48x92-5/8x5/8" Floor Panels C 5 - 2x4x89-1/2" Floor Joist D 2 - 2x4x72" Bond Boards F 2 - 2x4x24" Bond Boards - 2" and 3" Nails F L O O R K I T I N S T RU C T I O N S FOR 8X8 BUILDINGS ACTUAL SIZE 96” WIDE x 92-5/8” DEEP NOTE: Part letters are Not stamped on floor kits. ASSEMBLY OF 8’ x 92-5/8” FLOOR FRAME IMPORTANT! If you will be storing heavy items (such as lawn tractor, motorcycle, snowmobile etc.) we recommend you upgrade from 24” on center (61 cm) to 12” on center (30.5cm) floor framing. This requires you to add the following material: • Qty. (4) of 2”x 4”x 89-1/2” (5 x 10 x 227 cm) Treated D A C • 16 ea. 3” (7.6cm) galvanized nails F C C A: Position Floor Joists C 89-1/2”, Floor Bond Boards D 72”, and Floor Bond Boards F 24” as shown. 92-5/8" Using 3” nails, nail twice through each Bond Board D & F into each end of each Joist C , keeping pieces flush at top and ends, and maintain 24” spacing. Where D & F join together use 4-3” nails. D F 24" (61 cm) 24" (61 cm) Center of Stud 24" (61 cm) Center of Stud 24" (61 cm) 96" (244 cm) C F D C D (4) 3" Nails at Joint (2) 3" Nails B Y X B: Completed Floor Frame should be positioned at building site, leveled, using shims between floor frame and ground before proceeding to Floor Panel Attachment. Square frame by making corner-tocorner measurements (X to X and Y to Y) the same. X Y 2 8X8 F L O O R K I T I N S T RU C T I O N S CONTINUED FLOOR PANEL ATTACHMENT: C: Position a 48 x 92-5/8” Floor Panel A flush to the outside edges of sides and back of Floor Frame. Secure panel with two 2” nails at outside corners and one 2” nail at other corners. C 92-5/8" A C F D 96" D: Position the other 48” x 92-5/8” Floor Panel A flush against first panel and flush to edges of Floor Frame. Secure panel with two 2” nails at outside corners and one 2” nail at each of other corners. With Floor Panels flush to outside edges of Floor Frame, nail with 2” nails every 12” through Floor Panels into all Floor Bond Boards D & F and Floor Joists C . Nails every 12" (30 cm) through Floor Panels into all Floor Bond Boards and Floor Joists D 24" (61 cm) 24" (61 cm) A F A D Note: Mark a line on the Floor Panel over the center of each Floor Joist @ 24” using a pencil and a piece of lumber from the kit (or use a chalk line) to make nailing easier. Your Floor is now complete. Check to be sure it is properly positioned and leveled to ground before beginning assembly of your Handy Home Wooden Storage Building. 3 Parts needed to cut: B 1 - 23-7/8x92-5/8x5/8" Floor Panel C 1 - 2x4x89-1/2" Floor Joist E 2 - 2x4x48" Bond Boards - 2" and 3" Nails 8X8 OPTIONAL SHELF I N S T RU C T I O N S Cut Cut A C B (1) - 89-1/2" Board C cut down to 88" (1) - 23-7/8x92-5/8" Panel B cut down to 23-7/8x89-1/2" Cut 23-3/16" E 24-11/16" (2) - 48" Board E cut down to 2 pieces of 24-11/16 and 23-3/16" SHELF PARTS TO CUT: Cut the 89-1/2” Board C down to 88”. Cut both 48” boards E at 24-11/16” leaving 23-3/16”. Finally cut the 23-7/8x 92-5/8” panel B to 89-1/2”. A: 24-11/16" 23-3/16" B 23-3/16" 88" 32" 24-11/16" 28" Center of Stud 3" Nails Center of Stud 3" Nails SHELF ASSEMBLY: B: Rear Wall Mark the 88” Board as shown at 28” then another 32”. Attach the 23-3/16” with (2) 3” nails as shown. Attach the 24-11/16” boards to each end of the 88” board with (2) 3” nails. 3" Nails C 3" Nails 3" Nails SHELF INSTALLATION: 3" Nails C: Install the shelf frame resting on the horizonal Back Wall Brace. Attach middle braces with 3” nails as shown. Level front of frame and nail into Side Wall Studs or Top Plate depending on your building model with 3” nails as shown. Rear Wall 2" Nails 2" Nails D 23-7/8x89-1/2" Panel SHELF PANEL INSTALLATION: D: Center the 23-7/8x89-1/2” panel on the shelf frame and attach with 2” nails as shown. 4 Parts Needed: A 2 - 48x92-5/8x5/8" Floor Panels B 1 - 23-7/8x92-5/8x5/8" Floor Panel C 6 - 2x4x89-1/2" Floor Joist D 2 - 2x4x72" Bond Boards E 2 - 2x4x48" Bond Boards - 2" and 3" Nails F L O O R K I T I N S T RU C T I O N S FOR 10X8 BUILDINGS ACTUAL SIZE 120” WIDE x 92-5/8” DEEP NOTE: Part letters are Not stamped on floor kits. ASSEMBLY OF 10’ x 92-5/8” FLOOR FRAME IMPORTANT! If you will be storing heavy items (such as lawn tractor, motorcycle, snowmobile etc.) we recommend you upgrade from 24” on center (61 cm) to 12” on center (30.5cm) floor framing. This requires you to add the following material: • Qty. (5) of 2”x 4”x 89-1/2” (5 x 10 x 227 cm) Treated D A C E NOTE: Part letters are not stamped on floor kits. ASSEMBLY OF 10’ x 92-5/8” FLOOR FRAME C C A: 92-5/8" E • 20 ea. 3” (7.6cm) galvanized nails Position Floor Joists C 89-1/2”, Floor Bond Boards D 72”, and Floor Bond Boards E 48” as shown. Using 3” nails, nail twice through each Bond Board D & E into each end of each Joist C , keeping pieces flush at top and ends, and maintain 24” spacing. Where D & E join together use 4-3” nails. D 24" 24" 24" 24" 24" (61 cm) (61 cm) (61 cm) (61 cm) (61 cm) Center of Center of Center of Center of Stud Stud Stud Stud 120" (305 cm) C E D (4) 3" Nails at Joint C D (2) 3" Nails B Y X B: Completed Floor Frame should be positioned at building site, leveled, using shims between floor frame and ground before proceeding to Floor Panel Attachment. Square frame by making corner-tocorner measurements (X to X and Y to Y) the same. X Y 5 10X8 F L O O R K I T I N S T RU C T I O N S CONTINUED FLOOR PANEL ATTACHMENT: C: D: E: Position a 48 x 92-5/8” Floor Panel A flush to the outside edges of sides and back of Floor Frame. Secure panel with two 2” nails at outside corners and one 2” nail at other corners. C 92-5/8" C Position the other 48” x 92-5/8” Floor Panel A flush against first panel and flush to edges of Floor Frame. Secure panel with one 2” nail at each of the four corners. Position the 23-7/8” x 92-5/8” Floor Panel B flush against second panel and flush to edges of Floor Frame. Secure panel with two 2” nails at outside corners and one 2” nail at each of other corners. E D 120" D With Floor Panels flush to outside edges of Floor Frame, nail with 2” nails every 12” through Floor Panels into all Floor Bond Boards D & E and Floor Joists C . A Note: Mark a line on the Floor Panel over the center of each Floor Joist @ 24” using a pencil and a piece of lumber from the kit (or use a chalk line) to make nailing easier. Your Floor is now complete. Check to be sure it is properly positioned and leveled to ground before beginning assembly of your Handy Home Wooden Storage Building. A A E D Nails every 12" (30 cm) through Floor Panels into all Floor Bond Boards and Joists E B E 6 24" (61 cm) A A 24" (61 cm) D NOTES: 7 NOTES: 8
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.4 Linearized : No Encryption : Standard V1.2 (40-bit) User Access : Print, Modify, Copy, Annotate, Fill forms, Extract, Assemble, Print high-res Modify Date : 2006:07:31 16:34:54-03:00 Create Date : 2006:07:31 16:34:33-04:00 Author : Rryan Subject : Combo Floor Kit Page Count : 8 XMP Toolkit : XMP toolkit 2.9.1-13, framework 1.6 About : uuid:c878f310-3af2-4078-8a46-34355714376c Producer : Acrobat Distiller 6.0 (Windows) Keywords : Creator Tool : Adobe PageMaker 7.0 Document ID : uuid:4a7a5492-17e5-4b7d-971c-bff410d9af1b Format : application/pdf Description : Combo Floor Kit Title : Combo Floor Kit Creator : RryanEXIF Metadata provided by EXIF.tools