Itron 100GDLCN AMR transceiver device for utility meters User Manual

Itron Inc AMR transceiver device for utility meters 100G Datalogging Installation Guide Direct Mount

a href="https://usermanual.wiki/Itron" itemprop="url"> Itron >

users manual 2

 TDC-0823-005     100G Datalogging Installation Guide - Direct Mount  28   Proprietary and Confidential     This chapter provides the instructions to install the 100G Datalogging gas endpoint on an Itron/Sprague Meter.   Note  Itron/Sprague meters are also known as Actaris and Schlumberger meters. For these instructions, all meters are referred to as Itron/Sprague meters.  To remove the index from the meter 1. Remove the index cover screws and the index cover from the Itron/Sprague meter. Examine the mounting screws. If they are 5/8" long and not corroded, keep them to re-attach the 100G Datalogging gas endpoint assembly. If the screws are not the correct length or if the screws are corroded, discard.    Note Use the removed index cover as a temporary storage container for screws. Properly dispose all unused screws, old index covers, gaskets, tamper seals, and other leftover materials. Do not leave materials on customer premises.  CH A P T E R   4  Itron/Sprague Meter Installation
Download:
Mirror Download [FCC.gov]
Document ID1368021
Application IDT5AI6aToh1gFuilGl7ueHQ==
Document Descriptionusers manual 2
Short Term ConfidentialNo
Permanent ConfidentialNo
SupercedeNo
Document TypeUser Manual
Display FormatAdobe Acrobat PDF - pdf
Filesize236kB (2949956 bits)
Date Submitted2010-10-29 00:00:00
Date Available2010-10-29 00:00:00
Creation Date2010-07-28 11:36:50
Producing SoftwareMicrosoft® Office Word 2007
Document Lastmod2010-09-15 13:45:04
Document Title100G Datalogging Installation Guide - Direct Mount
Document CreatorMicrosoft® Office Word 2007
Document Author: TDC-0823-005
FCC ID Filing: EWQ100GDLCN

Navigation menu