Itron 962 User Manual C I Gas Installation Spec Operation Manual

Silver Spring Networks C I Gas Installation Spec Operation Manual

Contents

Operational Description

  Commercial & Industrial Gas Meter IMU Interface Operational/Installation and Specification Manual   Innovatec AxisPathTM Network
     Copyright  2001 Innovatec Communications LLC 13000 West Silver Spring Drive Butler, Wisconsin  53007 Phone:  262-783-0200 Fax:  262-783-0205 Internet:  www.innovatec.com     Note  The device complies with Part 15 of the FCC rules.  Operation is subject to the following two conditions:  1. The device may not cause harmful interferences.  2. The device must accept any interferences received, including interferences that may cause undesired operation.    CAUTION  Changes or modifications not expressly approved by Innovatec Communications LLC could void the user’s authority to operate the equipment.      Confidentiality Statement:  The information, graphics, and materials in this document are confidential and proprietary. Document Revision Number:  1.0.1
 Contents______________________________________________      Preface…………………………………………………………………………………………………….   iv        Organization of Manual…………………………………………………………………………………  iv      Documentation Conventions……………………………………………………………………………  iv  PART  I    C&I Gas Interface Theory and Installation                                       .    Chapter 1     Theory of Operation……………………………………………………………………  1-1           C&I Gas Interface Purpose……………………………………………………………………….    1-1 Functionality………………………………………………………………………………………   1-1 Components……………………………………………………………………………………….   1-1  Chapter 2     Specifications……………………………………………………………………………  2-1  Chapter 3     Installation and Initialization…………………………………………………………..  3-1 Introduction……………………………………………………………………………………….   3-1 Safety Information………………………………………………………………………………...   3-1 Installation Procedures…………………………………………………………………………….  3-2 Equipment Needs………………………………………………………………………………  3-2 Download Work Orders from the Utility Network…………………………………………….  3-2 Before Installation……………………………………………………………………………… 3-3 C&I Gas Interface End-Point Device Installation……………………………………………...  3-4 Complete and Close the Task…………………………………………………………………..  3-9 After Installation………………………………………………………………………………  3-10  Chapter 4     Troubleshooting…………………………………………………………………………  4-1
 Preface_______________________________________________      Organization of Manual  This manual is divided in the following manner: • “C&I Gas Meter Interface Theory and Installation”, provides information specific to the IMU end-point device. • “Theory of Operation”, containing a basic overview of the Innovatec AxisPathTM network and how the C&I Gas Meter Interface end-point device functions within the network. • “Installation and Initialization”, containing step-by-step IMU end-point device installation and initialization instructions. • “Troubleshooting”, containing IMU-specific system troubleshooting information.    Document Conventions  This document uses a number of conventions designed to help communicate specific information.  These conventions include the following:  • Danger, Warning, and Caution:  DANGER!   Danger messages alert you to situations that will cause   personal injury or death if you do not follow the instructions   correctly.  WARNING!   Warnings alert you to situations that may potentially cause   personal injury or death if you do not follow the directions   correctly.  CAUTION   Cautions alert you to situations that may result in damage to   the hardware or software if you do not follow the   instructions correctly.
 Chapter 1___________________________________________________ Theory of Operation    C&I Gas Meter Interface Purpose The C&I Gas Meter Interface is a programmable end-point device, designed to replace or supplement a customer’s existing mechanical utility meter index.  Using a magnetic pulse output adapter to interface to the meter output, it can be installed on a variety of meter brands.  The C&I Gas Meter Interface end-point device allows for accurate, near-real-time customer utility use information, which can be read from a remote location.   Functionality  The C&I Gas Meter Interface end-point device performs two basic functions:  • Gathering and recording customer utility use information directly at the metering point.  • Sending and receiving messages to and from the utility company computer system such as:  - Utility use, status, alarm data, and similar information. - Data requests, configuration, and verification messages.  C&I Gas Meter Interface end-point devices communicate with the utility company computer system using a combination of Local Area Networks (LAN), AxisGateTM nodes, and a Wide Area Network (WAN).   Components C&I Gas Meter Interfaces are Innovatec end-point devices, containing two primary components:  a digital processor and a radio transceiver.  The digital processor within the end-point device gathers and records utility use data at the metering point.  Every time the meter drive rotates, pulses are recorded by the digital processor.  The pulses are converted into utility use data, and this data is stored until readings are requested from the utility.  Each C&I Gas Meter Interface also contains a 900MHz two-way radio frequency (RF) transceiver.  This radio provides communication between the end-point device, and an AxisGateTM node.  Depending upon the communication distance involved, and Innovatec relay might be used between the end-point device and the node, to extend RF communications.  This RF connection between the end-point device and the node, possibly through a relay, is a Local Area Network (LAN).  AxisGateTM nodes then communicate with the rest of the AxisPathTM network using a Wide Area Network (WAN).  This communication allows C&I Gas Meter Interfaces to transmit use data to the utility, or to receive requests or programming instructions from the utility, or from a technician or installer using a Field Service Unit attached to a laptop computer.
See Innovatec publication 98-00004 (System Summary) for a more detailed explanation of communications on the Local Area Network (LAN) and Wide Area Network (WAN).
 Chapter 2_____________________________________________ Technical Specifications    C&I Gas Meter Interface Features • Full Two-way 900 MHz spread-spectrum communications between the IMU and the utility • Direct sequence spread-spectrum communication improves security • 17 channels allow frequency coordination in dense applications with minimal interference • Software programmable configuration and control profiles • 3.6-volt lithium-based long life battery pack • Unique serial number and assignable PIN • Autonomous tamper alarms  • Virtual Shut-off capabilities • Run-away meter detection • First/Final Reading • Customer Selectable Billing Dates • Data and Intelligence Stored in the Meter      Item Specification Physical dimensions 6.67”L X 4.76”W X 2.19”H Weight 2.7 lbs. Power supply (3) 3.6 volt D-cell lithium-based battery pack  Output power >27 dBm Sensitivity >40 dBm SINAD Channels  17 (spaced at 1.5 MHz) Frequency range 902 to 928 MHz Modulation Direct Sequence Spread Spectrum Base data rate 62.5 KB / second Compliance FCC Part 15, Class C Interface RF LAN Antenna type Internal Enclosure Lexan NEMA 4X Enclosure Temperature range -40° to +85°C
 Chapter 3_____________________________________________ Installation and Initialization   Introduction  This section includes a set of detailed procedures for installation, configuration, and testing.  CAUTION Read and study the following safety information before you proceed with installation.  In addition, cautions and warnings appear within procedures and throughout the test, where appropriate, to remind you of any related safety information.   Safety Information  • Observe the following safety guidelines.  Careful planning of every job is essential.  Nothing should be taken for granted.  Do not take chances! • Read and follow all approved policies and procedures provided by your employer associated with the procedures in this manual. • Keep the work area clean and dry.  Cluttered work areas cause accidents and injuries. • Provide good lighting in the work area.  You cannot work safely if you cannot see what you are doing. • Report unsafe conditions or defective equipment to your immediate supervisor. • Select the right tool for the job.  Use tools properly.  Keep tools in good working order. • Handle materials carefully.  Lift and carry properly. • Keep unauthorized people out of the work area.  Be especially cautious of children, who tend to be drawn to work activity. • Innovatec Communications LLC assumes no liability for the customer’s failure to follow these safety guidelines.   Equipment Needs  This section lists, and briefly describes, the various pieces of equipment required for C&I Gas Meter Interface end-point device installation, initialization, and testing processes. • Laptop computer-Runs the FSA software, which stores and retrieves work order information, and configures and tests installed C&I Gas Meter Interfaces. • Field Service Unit-900 MHz two-way radio frequency (RF) transceiver, allowing communication with an IMU for initialization.’      Before Installation
 Field Service Unit Set-Up The Field Service Unit is a 900 MHz two-way radio frequency (RF) transceiver, used for configuring and testing Innovatec devices.    After arriving at the customer site, activate and test the Field Service Unit as follows:       CAUTION      DO NOT turn the Field Service Unit ON if     the antenna is not installed.  Damage to     the Field Service Unit will result.  1. Plug the Field Service Unit connection cord into the serial port of the laptop computer.  2. Plug a 9 VDC / 500 mA power supply into the Field Service Unit power socket.  CAUTION      Using anything other than a 9 VDC /  500 mA power source may damage the     Field Service Unit.  3. Turn on the Field Service Unit.  An indicator light will shine if the  Field Service Unit power supply is functioning correctly.    Installation Procedure  1. Remove index register from C&I gas meter.  For American, Rockwell and Sprague meters, remove the index register and replace with the Pulsimatic pulse output register or the RioTronics index register with pulse output.  For a Roots meter interface, attach the appropriately modified register head with pulse output to the meter before installing the pulse output pickup device. 2. Attach the Innovatec C&I Gas Meter Interface (p/n 1620-05001) to a surrounding fixture to the gas meter.  Fixturing locations can include the meter piping, meter fixturing brackets or surrounding structures.  3. Attach the cable assembly from the Pulsimatic or RioTronics pulse output generator to the Innovatec C&I Gas Meter Interface (p/n 1620-05001).  The cable assembly attaches with a ‘push and twist’ lock for the weather-resistant seal.   Start the Field Service Application  Note See Innovatec publication 98-00001 (Field Service Application User’s Guide) for a more detailed explanation of FSA operation.  1. Turn on the laptop computer. 2. Launch the FSA software.  No error messages will display if the connection between the computer and the Field Service Unit is working. 3. Log in to the Field Service Application.
Install the Pulse Output Interface Device For American/Sprague and Rockwell meters, interface with either the Pulsimatic pulse output adapter or the RioTronics adapter. • Install the Pulsimatic unit in line with the index register and upon installation of the unit, replace the index register on top of the Pulsimatic. • Install the RioTronics-enabled index register in place of the existing index register.  For Dresser Industries’ Roots meters, please follow the instructions for installation of the RioTronics Interface module.  Install the Innovatec C&I Gas Meter Interface radio device to the surrounding structure which can include the meter piping, meter fixtures/supports or some adjacent structure to the meter.  Connect the meter pulse output device to the C&I Gas Meter Interface by using the weather-resistant cable assembly from the pulse output device.   Setup the Radio for Communication through the Gateway
   Chapter 4_____________________________________________ Troubleshooting    Table 3-1  Troubleshooting the C&I Gas Meter Interface Problem Possible Solution C&I GMI end-point device ID mis -match RF channel mis -match C&I Gas Meter Interface fails to respond to the Field Service Application (FSA).   Replace C&I GMI end-point device    Table 3-2  Troubleshooting the Laptop Computer/Field Service Unit Problem Possible Solution Laptop computer does not power up Charge/replace battery Laptop computer does not start up properly and/or the Field Service Application cannot be found. Contact System Administrator Field Service Unit does not power up Check power source and power circuit connections.    Table 3-3  Troubleshooting the Field Service Application (FSA) Problem Possible Solution Error message displays when Field Service Application (FSA) starts up. Check field service unit connection.

Navigation menu