KMW SPES2-080-E IT Converged Lighting User Manual

KMW INC. IT Converged Lighting

User Manual

Download: KMW SPES2-080-E IT Converged Lighting User Manual
Mirror Download [FCC.gov]KMW SPES2-080-E IT Converged Lighting User Manual
Document ID2482840
Application IDF5IfPEnUbELr4/vo8sc9kA==
Document DescriptionUser Manual
Short Term ConfidentialNo
Permanent ConfidentialNo
SupercedeNo
Document TypeUser Manual
Display FormatAdobe Acrobat PDF - pdf
Filesize347.34kB (4341772 bits)
Date Submitted2014-12-23 00:00:00
Date Available2014-12-23 00:00:00
Creation Date2014-12-12 02:05:53
Producing SoftwareMac OS X 10.10.1 Quartz PDFContext
Document Lastmod2014-12-12 02:05:53
Document TitleMicrosoft Word - SPES2_Installation Guide_Ver 0.71 E.docx
Document CreatorWord

SPES2
Installation Guide
Document Revision – V0.71_E
IT Converged LED Lighting
⏏ SPES2
	
  
Safety precautions
1. Electrical work must be performed by a qualified licensed electrician.
2. Disconnect or turn off power before installation or servicing.
3. Do not take apart or modify the product.
4. Do not drop the product or apply a strong impact to it.
5. The manufacturer or the seller do not bear liability for damage caused by inappropriate use or application.
6. Contact the manufacturer or the seller for inquiry when there is a problem with the product.
If the external flexible cable or cord of this luminaire is damaged, it shall be exclusively replaced by
the manufacturer or his service agent or a similar qualified person in order to avoid a hazard.
This device complies with Part 15 of the FCC Rules.
Operation is subject to the following two conditions:
(1) This device may not cause harmful interference, and
(2) this device must accept any interference received, including interference that may cause undesired operation.
CAUTION : Any Changes or modifications not expressly approved by the manufacturer could void the user's
authority to operate the equipment.	
  
Installation Guide
  
KMW INC.
183-6, Yeongcheon-ro, Dongtan-myeon, Hwaseong-si, Gyeonggi-do, South Korea
Tel : +82-31-370-8866 / E-Mail : ledsales@gigateraled.com / Homepage : www.gigateraled.com
SPES2
IT Converged LED Lighting
  
Product Dimension	
  
	
  
674.5 x 403.5 x 212.4 (mm) / 26.6 x 15.9 x 8.4 (inch)
13.0 Kg / 28.7 lb
  
Note	
  
	
  
	
  
Master SPES : AC Cable / LAN Cable
Slave SPES : AC Cable
*For the Master SPES, wire both the AC power line and LAN cable.	
  
* For the Slave SPES, wire only the AC power line.	
  
Installation Guide
SPES2
  
KMW INC.
183-6, Yeongcheon-ro, Dongtan-myeon, Hwaseong-si, Gyeonggi-do, South Korea
Tel : +82-31-370-8866 / E-Mail : ledsales@gigateraled.com / Homepage : www.gigateraled.com
IT Converged LED Lighting
  
Diagram	
  
	
  
AC Power Connect
	
  
Wire Range : AWG12 ~ AWG28
AC –L : Black or Brown
AC – N : White or Blue
FG : Green + Yellow	
  
	
  
WAN Connect
Connector : RJ45 male
Do not connect the WAN cable
when installing the slave SPES	
  
	
  
  
  
1.
2.
3.
4.
5.
6.
7.
8.
9.
SMPS to AP
CAM IF to CAM IF
AC to SMPS AC_IN
Mot. Sensor to Node
AP to CAM IF (LAN2)
LED OF to LED IF
CAM to CAM IF
AP to CAM IF (LAN1)
AC_IN to SPD	
  
	
  
Installation Guide
  
KMW INC.
183-6, Yeongcheon-ro, Dongtan-myeon, Hwaseong-si, Gyeonggi-do, South Korea
Tel : +82-31-370-8866 / E-Mail : ledsales@gigateraled.com / Homepage : www.gigateraled.com
SPES2
IT Converged LED Lighting
  
Installation Instruction	
  
1	
  
2	
  
	
  
Shut off the main power before installing the product.
Make sure that the dimension of the light pole is correct.
(diameter should be Ø60.5 mm or less)
Insert the AC power line and the LAN cable into the light pole.
	
  
Remove the pole cover using a 2.5mm hex wrench.
Separate the pole clamp by releasing the M10 hexagonal headed bolts.
*Do not connect the WAN cable when installing the slave SPES.
3	
  
Release the latch-fixing bolts and open the base cover.
4	
  
Remove the caps of the AC power line and the LAN cable glands.
Insert the AC power line and the LAN cable from the bottom.
*Do not connect the WAN cable when installing the slave SPES.
Installation Guide
SPES2
  
KMW INC.
183-6, Yeongcheon-ro, Dongtan-myeon, Hwaseong-si, Gyeonggi-do, South Korea
Tel : +82-31-370-8866 / E-Mail : ledsales@gigateraled.com / Homepage : www.gigateraled.com
IT Converged LED Lighting
  
Installation Instruction	
  
5	
  
6	
  
	
  
	
  
Refer to the wiring diagram A and B to wire the AC power line
And the LAN cables.
Install the caps of the AC power line and LAN cable glands.
*Do not connect the WAN cable when installing the slave SPES.
*Do not connect the WAN cable when installing the slave SPES.
7	
  
8	
  
	
  
After wiring, close the base cover and fix it using the latch and 	
  
latch-fixing bolts.
When closing the cover,
make sure that no wire is crushed at the joint.
	
  
After connecting the SPES2 with the light pole,
fix the pole clamp and close the pole cover.
  
  
Installation Guide
  
KMW INC.
183-6, Yeongcheon-ro, Dongtan-myeon, Hwaseong-si, Gyeonggi-do, South Korea
Tel : +82-31-370-8866 / E-Mail : ledsales@gigateraled.com / Homepage : www.gigateraled.com
SPES2
IT Converged LED Lighting
  
Installation Instruction	
  
9	
  
10	
  
	
  
When the installation is complete,
adjust the LED and camera modules to the desired positions.
Camera module turning radius : 350°
Used : 36mm Spanner, 5.0mm Hex wrench
	
  
Connect the product to the main power supply and
check whether it operates correctly.
(Refer to the S/W manual to check camera operation procedures.)
Contact the manufacturer or the seller for inquiry when there is a
problem with the product.
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
Copyright Š 2014 KMW INC. All rights reserved. / www.kmw.co.kr
The information in this document is subject to change without notice. / Document Revision V 0.71 2014.12.12
  

Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
Linearized                      : No
Page Count                      : 6
PDF Version                     : 1.4
Title                           : Microsoft Word - SPES2_Installation Guide_Ver 0.71 E.docx
Producer                        : Mac OS X 10.10.1 Quartz PDFContext
Creator                         : Word
Create Date                     : 2014:12:12 02:05:53Z
Modify Date                     : 2014:12:12 02:05:53Z
EXIF Metadata provided by EXIF.tools
FCC ID Filing: ORI-SPES2-080-E

Navigation menu