User Manual
SPES2 Installation Guide Document Revision â V0.71_E IT Converged LED Lighting â SPES2  Safety precautions 1. Electrical work must be performed by a qualified licensed electrician. 2. Disconnect or turn off power before installation or servicing. 3. Do not take apart or modify the product. 4. Do not drop the product or apply a strong impact to it. 5. The manufacturer or the seller do not bear liability for damage caused by inappropriate use or application. 6. Contact the manufacturer or the seller for inquiry when there is a problem with the product. If the external flexible cable or cord of this luminaire is damaged, it shall be exclusively replaced by the manufacturer or his service agent or a similar qualified person in order to avoid a hazard. This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. CAUTION : Any Changes or modifications not expressly approved by the manufacturer could void the user's authority to operate the equipment.  Installation Guide  KMW INC. 183-6, Yeongcheon-ro, Dongtan-myeon, Hwaseong-si, Gyeonggi-do, South Korea Tel : +82-31-370-8866 / E-Mail : ledsales@gigateraled.com / Homepage : www.gigateraled.com SPES2 IT Converged LED Lighting  Product Dimension   674.5 x 403.5 x 212.4 (mm) / 26.6 x 15.9 x 8.4 (inch) 13.0 Kg / 28.7 lb  Note    Master SPES : AC Cable / LAN Cable Slave SPES : AC Cable *For the Master SPES, wire both the AC power line and LAN cable.  * For the Slave SPES, wire only the AC power line.  Installation Guide SPES2  KMW INC. 183-6, Yeongcheon-ro, Dongtan-myeon, Hwaseong-si, Gyeonggi-do, South Korea Tel : +82-31-370-8866 / E-Mail : ledsales@gigateraled.com / Homepage : www.gigateraled.com IT Converged LED Lighting  Diagram   AC Power Connect  Wire Range : AWG12 ~ AWG28 AC âL : Black or Brown AC â N : White or Blue FG : Green + Yellow   WAN Connect Connector : RJ45 male Do not connect the WAN cable when installing the slave SPES     1. 2. 3. 4. 5. 6. 7. 8. 9. SMPS to AP CAM IF to CAM IF AC to SMPS AC_IN Mot. Sensor to Node AP to CAM IF (LAN2) LED OF to LED IF CAM to CAM IF AP to CAM IF (LAN1) AC_IN to SPD   Installation Guide  KMW INC. 183-6, Yeongcheon-ro, Dongtan-myeon, Hwaseong-si, Gyeonggi-do, South Korea Tel : +82-31-370-8866 / E-Mail : ledsales@gigateraled.com / Homepage : www.gigateraled.com SPES2 IT Converged LED Lighting  Installation Instruction  1  2   Shut off the main power before installing the product. Make sure that the dimension of the light pole is correct. (diameter should be Ă60.5 mm or less) Insert the AC power line and the LAN cable into the light pole.  Remove the pole cover using a 2.5mm hex wrench. Separate the pole clamp by releasing the M10 hexagonal headed bolts. *Do not connect the WAN cable when installing the slave SPES. 3  Release the latch-fixing bolts and open the base cover. 4  Remove the caps of the AC power line and the LAN cable glands. Insert the AC power line and the LAN cable from the bottom. *Do not connect the WAN cable when installing the slave SPES. Installation Guide SPES2  KMW INC. 183-6, Yeongcheon-ro, Dongtan-myeon, Hwaseong-si, Gyeonggi-do, South Korea Tel : +82-31-370-8866 / E-Mail : ledsales@gigateraled.com / Homepage : www.gigateraled.com IT Converged LED Lighting  Installation Instruction  5  6    Refer to the wiring diagram A and B to wire the AC power line And the LAN cables. Install the caps of the AC power line and LAN cable glands. *Do not connect the WAN cable when installing the slave SPES. *Do not connect the WAN cable when installing the slave SPES. 7  8   After wiring, close the base cover and fix it using the latch and  latch-fixing bolts. When closing the cover, make sure that no wire is crushed at the joint.  After connecting the SPES2 with the light pole, fix the pole clamp and close the pole cover.   Installation Guide  KMW INC. 183-6, Yeongcheon-ro, Dongtan-myeon, Hwaseong-si, Gyeonggi-do, South Korea Tel : +82-31-370-8866 / E-Mail : ledsales@gigateraled.com / Homepage : www.gigateraled.com SPES2 IT Converged LED Lighting  Installation Instruction  9  10   When the installation is complete, adjust the LED and camera modules to the desired positions. Camera module turning radius : 350° Used : 36mm Spanner, 5.0mm Hex wrench  Connect the product to the main power supply and check whether it operates correctly. (Refer to the S/W manual to check camera operation procedures.) Contact the manufacturer or the seller for inquiry when there is a problem with the product.                    Copyright Š 2014 KMW INC. All rights reserved. / www.kmw.co.kr The information in this document is subject to change without notice. / Document Revision V 0.71 2014.12.12 Â
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf Linearized : No Page Count : 6 PDF Version : 1.4 Title : Microsoft Word - SPES2_Installation Guide_Ver 0.71 E.docx Producer : Mac OS X 10.10.1 Quartz PDFContext Creator : Word Create Date : 2014:12:12 02:05:53Z Modify Date : 2014:12:12 02:05:53ZEXIF Metadata provided by EXIF.tools