Kaba TT1100PRX Time and Attendance Terminal User Manual TT1100 Manual 08 2013 en

Kaba GmbH Time and Attendance Terminal TT1100 Manual 08 2013 en

User Manual

               TT1100         Manual    04044239 - 08/2013  EN
      © Copyright by Kaba GmbH Albertistraße 3 D-78056 Villingen-Schwenningen Phone +49 7720/603-0 Fax +49 7720/603-102  www.kaba.com/workforce-management   All rights reserved. The document and its parts are copyrighted. Only Kaba GmbH has the right to commercialize, market and distribute this document. This document, or any part of it, may not be copied or reproduced, adapted, arranged, reworked or modified without the prior consent of Kaba GmbH.  All company, trademark or product names are trademarks or registered trademarks of their respective owners and are protected.  Subject to technical changes without notice!   Order no. 04044239 - 08/2013
  1 About this manual ............................................................................................................................ 5 2 Grouped safety messages................................................................................................................ 8 2.1 Use as directed .....................................................................................................................................................8 2.2 Mounting and Installation................................................................................................................................8 2.3 First-time operation............................................................................................................................................8 2.4 Service and Maintenance .................................................................................................................................8 2.5 Environmental protection................................................................................................................................8 2.6 Electrical dangers ................................................................................................................................................9 2.7 ESD (electrostatic discharge) protective measures..................................................................................9 3 Product description........................................................................................................................10 3.1 TT1100.................................................................................................................................................................. 10 3.2 Technical data.................................................................................................................................................... 11 3.2.1 System..................................................................................................................................................11 3.2.2 Interfaces.............................................................................................................................................11 3.2.3 Inputs/Outputs .................................................................................................................................11 3.2.4 Power supply.....................................................................................................................................12 3.2.5 Reader.................................................................................................................................................. 12 3.2.6 Environmental conditions............................................................................................................. 12 3.2.7 Weight..................................................................................................................................................13 3.2.8 Dimensions ........................................................................................................................................13 3.3 Conformity..........................................................................................................................................................14 3.4 Labeling...............................................................................................................................................................15 4 Installation ......................................................................................................................................16 4.1 Installation conditions ....................................................................................................................................16 4.1.1 General ................................................................................................................................................16 4.1.2 Installation site..................................................................................................................................16 4.2 Connections .......................................................................................................................................................16 4.3 Mounting.............................................................................................................................................................17 5 Configuration..................................................................................................................................18 5.1 Web interface parameter description .......................................................................................................19 5.1.1 How to display the web interface............................................................................................... 19 5.1.2 Configuration parameters.............................................................................................................20 5.1.3 Application parameters .................................................................................................................59 5.2 Configuration file description ......................................................................................................................63 5.3 Software update via USB stick...................................................................................................................... 63 6 Operation ........................................................................................................................................64 6.1 Fingerprint operation .....................................................................................................................................64 6.1.1 Enrollment..........................................................................................................................................64 6.1.2 Punching............................................................................................................................................. 66 7 Maintenance....................................................................................................................................67 7.1 Cleaning the housing......................................................................................................................................67 8 Packaging / returns.........................................................................................................................68 8.1 Complete devices............................................................................................................................................. 68
 8.2 Electronic assemblies...................................................................................................................................... 68 8.3 Labeling............................................................................................................................................................... 69 9 Disposal........................................................................................................................................... 70 10 Index................................................................................................................................................ 71
Manual  About this manual  1 About this manual  Validity  This manual describes the Kaba TT1100 terminal as of  Serial number: 079800-000001  Manufacturing date:  March 2013  Mainboard revision  1.5 or higher  Linux Version:  Version 0.2.41 or higher   Addressees  This manual is written exclusively for specialists. The descriptions in this manual are intended for personnel trained by the manufacturer. The information in this manual cannot substitute the product training. The contents of this manual is intended for use by the following groups of people: •  Project manager   Project manager who is responsible for the system and entrusted with project planning and realization. •  Fitter   Person specialized in mounting and installation.   Person who has an adequate technical training and sufficient experience and who has been authorized by the manufacturer after completing the training on the product. •  Service technician   Specialist for initial set-up and maintenance of the installation.   Person who has an adequate technical training and sufficient experience and who has been authorized by the manufacturer after completing the training on the product. •  Network administrator   Realizes the set-up of the device within the network and makes sure that the devices are accessible within the network. •  Software partner   Specialists for connecting the system to the user software by defining operating and booking sequences, programming the customer applications and setting the parameters of the devices.  Important! For reasons of device safety, some of the activities might only be carried out by the SERVICE PERSON. Only persons of the groups "Fitter" and "Service technician" have the status of a SERVICE PERSON according to DIN EN 60950-1:2006.  TT1100  04044239 - 08/2013  5
About this manual  Manual    Additional documentation  In addition to this document you will find a TT1100 OEM Manual, a TT1100 XML Configuration manual, and a manual for terminals that also contain the TimeKey Time and Attendance System.     The current product documentations can be found on the Internet in our Kaba Portal at the following address: https://www.kaba.biz/de. Customer no.  (leave blank) Username:   docu2010en@kbs.kaba.com Password:   r+pj8c0v   Orientation in the manual  This manual contains the following orientation aids to facilitate finding of specific topics: •  The table of contents at the beginning of the manual gives an overview of all topics. •  The header always contains the respective main chapter. •  An index in the alphabetical order is given at the end of the manual.  6  04044239 - 08/2013  TT1100
Manual  About this manual   Danger categories  Remarks with specifications or rules and restrictions to prevent injuries and property damage are particularly marked. Please read the danger warnings and user tips carefully. This information will help prevent accidents and damage to your equipment. Danger warnings are divided into the following categories.    DANGER  Describes an imminent danger that can lead to substantial bodily harm or to death.   WARNING  Describes a possibly dangerous situation that can lead to substantial bodily harm or that can lead to death.    CAUTION  Describes a possibly dangerous situation that can lead to minor injuries.    NOTICE!  Important information for proper handling of the product.  Ignoring this information can cause device malfunction and the device or something near it can get damaged.   Symbols  Depending on the source of danger, warnings are marked with symbols of the following meaning.     General hazard warning symbol   Hazardous voltage Danger for electronic components due to electrostatic discharge  Explosion hazard    Remarks  Please pay special attention to the remarks that are marked with symbols.    Tips and useful information. This information will help you to best use the product and its functionality.  TT1100  04044239 - 08/2013  7
Grouped safety messages  Manual   2 Grouped safety messages  The device has been built in accordance with state-of-the-art standards and the recognized safety rules. Nevertheless, its use may constitute a risk to persons and cause damage to material property. Read and observe the following safety instructions, before using the product.  2.1 Use as directed  The device or system is only intended for usage as described in chapter ”Product description.” Any use beyond the designated use is not according to rules. The manufacturer is not responsible for damages resulting from improper use. The user/operator is responsible for any risks associated with non-duly use.  2.2 Mounting and Installation  Mounting and installation may only be carried out by the SERVICE PERSON (see chapter 1 / Addressees).  Installation may only be carried out in places that fulfill climatic and technical conditions stated by the manufacturer.  Kaba GmbH is not liable for damages resulting from improper handling or incorrect installation.  2.3 First-time operation Check the device for visible damage during transportation or improper storage. Do not commission a damaged device!  2.4 Service and Maintenance  Maintenance work / troubleshooting  Only the SERVICE PERSON (see chapter 1 / Addressees) is entitled to remove faults and carry out the maintenance work.  Reconstruction and modification  Any reconstruction and modification of the device may only be realized by the SERVICE PERSON (see chapter 1 / Addressees). All reconstructions and modifications carried out by unauthorized personnel shall render void any liability.   2.5 Environmental protection Please do not dispose of the device in your domestic waste. Used devices contain valuable materials that should be recycled. Properly dispose of used devices. 8  04044239 - 08/2013  TT1100
Manual  Grouped safety messages   2.6 Electrical dangers  Mains voltage installations may only be carried out by a certified specialized company or authorized electricians.  2.7 ESD (electrostatic discharge) protective measures  NOTICE!  Danger for electronic components due to electrostatic discharge. Improper handling of printed circuit boards or components can cause damages that lead to complete failures or sporadic errors. •  During installation and repair of the device, the ESD protective measures must be considered. The following rules must be considered: •  Wear an ESD wristband when handling electronic components.   Connect the end of the wristband to a discharge socket or an unvarnished grounded metal component. This way, static charges are discharged from your body securely and effectively. •  Touch only the edges of circuit boards. Do not touch the circuit board nor the connector. •  Place all dismantled components on an antistatic surface or in an antistatic container. •  Avoid contact between circuit boards and clothing. The wristband only protects the printed circuit boards against electrostatic discharge from your body, but there is still a risk of damage through electrostatic discharge from your clothing. •  Transport and dispatch dismantled modules only in electrostatically shielded protective bags. TT1100  04044239 - 08/2013  9
Product description  Manual   3 Product description  3.1 TT1100    The TT1100 is a time and attendance terminal with state-of-the-art technology.  The terminal software can be updated any time. To display time data and information, the terminal has a graphic display with a resolution of 320 x 240 pixels (QVGA). The device has 24 capacitive key fields including a numeric keypad. Time data is entered with a RFID reader or a biometric CBM reader (depending on the version). An external reader (e.g. USB barcode scanner) can optionally be connected. Communication is generally established via the Ethernet network (10BASE-T/100BASE-TX).  Optionally, the terminal has 1 output (relay). 10  04044239 - 08/2013  TT1100
Manual  Product description   3.2 Technical data  3.2.1 System Gumstix overo board with an OMAP 3503 processor. Memory •  256 MB RAM / microSD up to 8 GB.  Graphic Display •  Resolution: 320 x 240 Pixel (QVGA), 24 colors. • Background illumination.  Capacitive Keypad •  24 keys for time and attendance and working data collection including numeric keypad.   3.2.2 Interfaces  Ethernet •  IEEE802.3 compatible 10BASE-T/100BASE-TX Auto sensing (optional PoE, see Power Supply). USB •  USB 2.0 (down compatible to USB 1.1) supporting HID (human interface device) USB devices.    The following interfaces are optional and possible as alternative!  RS-485 Host  3.2.3 Inputs/Outputs  1 Relay output (optional)  The relay output option is only available in combination with the RS-485 option.  • Potential-free contact •  Contact rating (max.):  1 A at 30 V AC / DC  The power source should meet applicable performance requirements for a limited power source (LPS) according to EN 60950-1.   TT1100  04044239 - 08/2013  11
Product description  Manual   3.2.4 Power supply DC In In the default configuration the device is supplied with a 24 W wall adapter:  •  Input:   100–240 V AC / 50-60 Hz / 1 A max. •  Output:   12 V DC / 2 A As an alternative a flush mount power supply can be used.  The power source should meet applicable performance requirements for a limited power source (LPS) according to EN 60950-1.  PoE (Power over Ethernet) Power supply of the terminal via the Ethernet cable,  according to IEEE 802.3af (max .12,95 W). •  Supported powering processes: −  Spare pair powering over (Fast Ethernet free) wire pairs 4/5 and 7/8 −  Phantom powering over RX wires (1/2) and TX wires (3/6) Power supply is superimposed to the data signal    3.2.5 Reader The device supports the following reader types: • RFID reader −  LEGIC prime/advant −  MIFARE Classic / DESfire −  HID Prox −  HID iCLASS •  Reader for biometric identification −  Fingerprint reader  Memory sizes for 500, 3,000, or 5,000 people. •  USB connection for external reader (option) 3.2.6 Environmental conditions •  Relative humidity: 10% to 85%, non-condensing  •  Temperature range: 0–45 °C (32–113 Fahrenheit) 12  04044239 - 08/2013  TT1100
Manual  Product description 3.2.7 Weight Without biometric reader:   848 g With biometric reader:   1000 g 3.2.8 Dimensions  Without biometric reader:   190 x 131.2 x 54 (mm) With biometric reader:  240 x 131.2 x 95 (mm) TT1100  04044239 - 08/2013  13
Product description  Manual  Konf 3.3 Conformity  This device complies with the following standards: EN 60950-1:2011  Devices with RFID reader  Devices without RFID reader   EN 302291-1 V1.1.1 (2005-07)     EN 301489-1 V1.9.2 (2011-09)  DIN EN 55022:2011   EN 301489-3 V1.5.1 (2012-07)  DIN EN 55024:2011     according to the regulations of the EU Directives  2006/95/EG Low voltage directive  1999/5/EG R&TTE Directive  2004/108/EG EMC Directive  NOTICE! If an external barcode scanner is required, please observe the following: EMC conformity is only guaranteed when using the Motorola LS2208.   This equipment complies with Part 15 of the FCC rules. Any changes or modifications not expressly approved by the Manufacturer could void the user's authority to operate the equipment. This device complies with Part 15 of the FCC rules subject to the following two conditions: 1. This device may not cause harmful interference 2. This device must accept all interference received, including interference that may cause undesired operation. FCC Interference Statement for Class B EVM devices This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures:  •  Reorient or relocate the receiving antenna.  •  Increase the separation between the equipment and receiver.  •  Connect the equipment into an outlet on a circuit different from that to which the receiver is connected.  •  Consult the dealer or an experienced radio/TV technician for help. 14  04044239 - 08/2013  TT1100
Manual  Product description    Industry Canada (IC) Compliance Notice: CAN ICES-3 (B)/NMB-3(B) This device complies with Industry Canada license-exempt RSS standard(s). Operation is subject to the following two conditions:  (1) This device may not cause interference, and  (2) This device must accept any interference, including interference that may cause undesired operation of the device. This device complies with Health Canada’s Safety Code 6 / IC RSS-210. The installer of this device should ensure that RF radiation is not emitted in excess of the Health Canada’s requirement.  Cet appareil est conforme avec Industrie Canada RSS standard exempts de licence (s). Son utilisation est soumise à Les deux conditions suivantes: (1) cet appareil ne peut pas provoquer d'interférences et  (2) cet appareil doit accepter Toute interférence, y compris les interférences qui peuvent causer un mauvais fonctionnement du dispositif. Cet appareil est conforme avec Santé Canada Code de sécurité 6 / IC RSS-210. Le programme d'installation de cet appareil doit s'assurer que les rayonnements RF n'est pas émis au-delà de l'exigence de Santé Canada.    3.4 Labeling  The identification plate is located on the bottom of the right hand side of the device.  Specified on the identification plate: • Device name • Product number • Serial number • Power data • CE identification •  WEEE labeling acc. to DIN EN 50419 TT1100  04044239 - 08/2013  15
Installation  Manual  Installation 4 Installation  4.1 Installation conditions  4.1.1 General  An accurate installation of all components is a basic requirement for a properly functioning device. The following installation instructions must be adhered to.  4.1.2 Installation site  Clearances Keep a distance of 20 cm on all sides between two devices with RFID readers.  Mounting height The recommended mounting height is 140 cm to the top edge of the terminal.  Electromagnetic fields The terminal must not be installed in the area of strong electromagnetic fields caused by switching power supply, power lines, phase controllers, etc.! Electromagnetic fields can affect the reading power or cause failures, in particular with contactless readers (RFID).  Sun exposure Direct sun exposure leads to reflections within the display area and a poor readability of the display. Please avoid installation at places with direct sunlight.  4.2 Connections  All connection cables for the terminal are plugged in at the bottom side of the terminal.  13245  1  Connector for the add-on module 2  RJ45 jack Ethernet 10/100 and PoE (optional) 3  Screw terminal for RS485 and Relay (optional) 4  DC Socket 6.5 mm for Power  Supply 12 .. 24 V DC 5  Type-A USB 2.0 Host  16  04044239 - 08/2013  TT1100
Manual  Installation   4.3 Mounting   Attach the wall mounting kit with four countersunk screws to the wall.  For PoE devices just plug in the Ethernet cable. Note that the device will be started immediately if you have already connected the other end into the switch.    For all other devices plug in the Ethernet and the power cables.    Insert the terminal back plate slots into the wall mounting kit top hooks and lower.  In case of a PoE the device will be started.   If you have a fingerprint device you now have to assemble the fingerprint module. You can not assamble the fingerprint module prior to this step, because the screws are attached to the bottom of the wall mounting kit.  It is recommended to fix the right screw first.   TT1100  04044239 - 08/2013  17
Configuration  Manual   5 Configuration  Although the terminal will be delivered preconfigured it might be necessary to change some settings once it is installed.  In general you have to differentiate between two areas of settings:  •   The so called framework settings: All settings associated with the network, host, reader, date/time etc. •   The so called application settings: All settings associated with the display content, the functions to be performed if a key is pressed, the sound and the LED behaviour. These settings are defined in a configuration file, named application.xml. For changing the framework settings the terminal provides a wide parameter collection in a so-called web interface.  The application settings can only be changed by editing the configuration file. 18  04044239 - 08/2013  TT1100
Manual  Configuration   5.1 Web interface parameter description  5.1.1 How to display the web interface To connect to the web interface on an TT1100 terminal  you must enter the terminal URL in a standard web browser:  Example: http://terminal_ip_address where the “terminal ip address” is that of your TT1100 terminal.  Login with the default user admin and password admin and click on Logon. The Overview page is opened.    With a click on 1100 next to TLT in the upper left corner you can return to the Overview page any time.   TT1100  04044239 - 08/2013  19
Configuration  Manual   5.1.2 Configuration parameters To open the configuration parameter group list, click on Configuration in the left frame.   5.1.2.1 Configuration parameter groups – overview System  Terminal, Date/Time, Trace, Status, Java Statistics (for developers), Users, Linux, Database Backup. (See chapter 5.1.2.3) Network  TCP/IP, DHCP, Proxy, and FTP parameters (See chapter 5.1.2.4) Readers  Parameters for the available readers, barcode scanner and fingerprint reader. (See chapter 5.1.2.5) Peripheral devices  Display, Keyboard, LEDs and Sound. (See chapter 5.1.2.6) Communications   Parameters for the communication with the host system. (See chapter 5.1.2.7) RS485 See chapter 5.1.2.8Software Update  See chapter 5.1.2.9Logoff  No matter what parameter page is opened in the right frame you can always log off by clicking on Logoff in the left frame.  5.1.2.2 Detailed parameter description  To display the individual parameter group pages click on the text link in the menu bar in the upper part of the right frame.  On all the parameter pages you will find the buttons Save and Help. Save  This button will store your changes on the terminal.  Help  This button will display basic help text displayed in the right column. The button text changes to Help off when selected.    20  04044239 - 08/2013  TT1100
Manual  Configuration   5.1.2.3 System configuration To open the System configuration pages click on System in the Configuration menu in the left frame.    Terminal parameters  The terminal parameter page is the default page in the system parameter group.    Local terminal address The terminal address (logical ID) that is sent to the host system. (Default 01FF).  Default language The preferred language for the web interface. English and German are available, default English.  TT1100  04044239 - 08/2013  21
Configuration  Manual  Console Mode It is possible to activate or deactivate console at COM3, default YES, activated. The Serial Port supports a Linux Console that can be useful for debugging. Please refer to the chapter Serial Connection in the TT1100 OEM Manual.  Power Saving Option Activate or deactivate a power saving option. Available options: Display Switch off: if no motion is detected by the motion sensor, the display is turned off automatically. As soon as a motion is detected it is turned on again. Default No. Terminal description Input field for a description for the terminal, e. g. the location. Session Timeout Timeout for a logged-in web interface user. Valid values from 10 to 99 minutes, default 10. Memory Long Term Log If activated, memory resource information data is written into a log file for long term monitoring. Default No. Activate RS485 Module If the optional RS485 module is installed, it has to be activated here. Default No. Activate USB The USB port can be completely deactivated by selecting NO. Default YES. USB Stick Update If this mode is active, updates can be performed via USB stick, e. g. a new application.xml file, or a systemParameters.xml file to change parameters settings (without opening the webinterface). Default YES.  USB .ipk Update If this mode is active, whole update packages can be installed via USB stick. The package must be provided as .ipk file. Default YES. USB get Log files If this mode is active, all log files on the terminal will be transfered onto the USB stick. Default YES. 22  04044239 - 08/2013  TT1100
Manual  Configuration  Date/Time parameters  To open the Date/Time parameter page click on Date/Time in the menu bar in the upper part of the right frame.   or   Timezone The time zone definition of the terminal. Available choices are the standard time zones of America and Europe plus several explicit towns in America and Europe.  Actual datetime Read-only field of the actual date and time of the terminal in the time zone defined on the terminal.  Set datetime Here you can set the new date and time for the terminal. Follow the syntax shown in the Actual datetime field.  Time synchronization Time synchronization mode. Choices are No, Host, NTP, NTP Server. (Default No.) Host mode uses the data connection server. NTP mode uses an NTP Server for the time synchronization, and NTP Server mode also provides an NTP Server for a subnet. Request Interval Interval of time requests in minutes, minimum 10 minutes, default 60.  If the time synchronization mode NTP is selected, an additional field is opened: NTP Timeserver Address  TT1100  04044239 - 08/2013  23
Configuration  Manual  NTP Timeserver Address The TCP/IP address of the NTP server.  If the time synchronization mode NTP Server is selected, an additional field is opened: NTP Timeserver Subnet  NTP Timeserver Subnet In the NTP Server mode the terminal not only synchronizes its time with the NTP Server specified in the field NTP Timeserver Address, but also works a an NTP Server itself, providing Date/Time data to the subnet specified in this field.  24  04044239 - 08/2013  TT1100
Manual  Configuration  Trace parameters  To open the Trace parameter page click on Trace in the menu bar in the upper part of the right frame.     Trace levels For each component in the list different trace levels can be defined: Severe, Warning, Info, Fine, Finer, and Finest.  The default is Warning. If you experience problems with a component you can set the level to Fine. It is recommended to use the trace levels Finer and Finest only if asked to by the support team.  Logging to a file If this value is set to Yes, trace messages are written into a file named terminal.log on the terminal. Default No.   There is a size monitoring active for the file terminal.log. If a limit of 5 MB is reached, a second terminal log file is created. If the limit for this second log is reached, the first log will be re-written.  Apart from a log that can be written into a file, the terminal provides an online log with a limited size that can be read by opening the web interface page Application -> Warnings. The following parameters refer to this online log.  TT1100  04044239 - 08/2013  25
Configuration  Manual  Logging to a file If this value is set to Yes, trace messages are written into a file named terminal.log on the terminal. Default No.  Internal Buffer Online Trace The internal buffer holds the traces between 2 requests in memory. It can hold between 50 and 1000 elements, default 100.  Online Trace Refresh Time For the content of the Warnings page the automated refresh time in seconds between 60 an 600, default 120.  Max Rows Online Trace Page For the content of the Warnings page the maximum number of visible rows, default 1000. Trace Selection for Online Log For the content of the Warnings page the maximum trace level, default Warning. 26  04044239 - 08/2013  TT1100
Manual  Configuration  Status page  To display the Status page of the terminal click on Status in the menu bar in the upper part of the right frame     For the different voltage values the following ranges are valid:  •  CPU Supply Voltage: 3,3 V +/- 5% (3,135 V … 3,465 V) •  PoE Voltage: 12 V +/- 10% (10,8 V … 13,2 V) if in use. If not in use, ignore the value even if it is higher than 0 V.  •  Goldcap Voltage: 5 V +/- 5% (4,75 V … 5,25 V) Power Supply Voltage (DC In): 12 V +/- 10% (10,8 V … 13,2 V) if the terminal is not running with PoE. Otherwise ignore the value even if it is higher than 0 V.  TT1100  04044239 - 08/2013  27
Configuration  Manual  General information  In the upper part of the page you will find general information about the terminal, like Linux version, unique ID, power states, reader states and host connection state.     Condition based  Maintenance The terminal provides Condition Based Maintenance Services, i. e. different subsystem components are being monitored and if a state is reached where the intervention of a service technician is required, this is shown in the Info column.     Jar Files  On the Status page you also find a summary of the software installed, with all the jar files and their version numbers. This is useful information if you need support.     28  04044239 - 08/2013  TT1100
Manual  Configuration  User parameters  To open the Users parameter page click on Users in the menu bar in the upper part of the right frame.     Apart from the default user admin with full access to the whole web interface you can define other users with restricted access to certain pages and menus. For example a network admin user who has only access to network-relevant pages.    TT1100  04044239 - 08/2013  29
Configuration  Manual  If the new user Netadmin logs on with his password, he can only open certain pages:    Linux parameters  To open the Users parameter page click on Linux in the menu bar in the upper part of the right frame.     Restart/Shutdown    By selecting Shutdown linux, Reboot linux or Restart application, the operating system or the application is restarted or stopped. Actual root password + New root password To change the password of the user ‘root’, enter the current root password (default: root) and the new root password.  Actual admin password + New admin password To change the password of the user ‘admin, enter the current admin password (default: admin) and the new admin password. 30  04044239 - 08/2013  TT1100
Manual  Configuration  Database Backup  To open the Database Backup parameter page click on Database Backup in the menu bar in the upper part of the right frame.     Make Initial Backup By selecting YES a first backup of all web interface parameter settings is made. Typically this is done after delivery when the terminal has been installed and set at the customer site. An initial backup can only be performed once. It can be seen as “factory setting”.   Make Backup By selecting YES a backup of all current web interface parameter settings is made. This kind of backup can be repeated any time. The previous backup will be overwritten.  Recover Initial Database By selecting YES the terminal will be set back to “factory setting”. Recover Database By selecting YES the terminal will be set back to the last backup of parameter settings. Automatic Backup If set to YES backup will be performed each time a parameter setting is changed.  Date of Initial Backup, Last Backup, Last Restore Read-only field of the backup / recover history.  TT1100  04044239 - 08/2013  31
Configuration  Manual   5.1.2.4 Network parameters To open the Network configuration page click on Network in the Configuration menu in the left frame. The settings page appears.    Hostname The host name of the terminal.  Domain The name of the network domain to which the terminal belongs to.  TCP/IP address The TCP/IP address of the terminal.  TCP/IP subnet mask The TCP/IP subnet mask of the terminal (default is 255.255.255.0).  TCP/IP default Gateway The TCP/IP address of the default gateway. With the value set to NO, the default route to eth0 is used.  TCP/IP address of the name server The TCP/IP address of the name server, if used.  Activate DHCP request Allow or disallow the use of a DHCP Server for IP configuration. If this parameter is set to Yes, the five parameters above are read-only. 32  04044239 - 08/2013  TT1100
Manual  Configuration  The PIN for startup configuration The PIN to be entered at terminal startup to change the IP configuration for the terminal, default 1234. Leave blank to disable the start-up dialog. Activate Network Interface The network interface to be used, currently RJ45 only. Mac Address Read-only field showing the MAC address.  Proxy Server The IP address or name of the Proxy Server.  Proxy Port The port number of the Proxy Server.  Socks Proxy Server (For Webservice) The IP address or name of the Socks Proxy Server.   Socks Proxy Port (For Webservice) The port number of the Socks Proxy Server.  Network config By selecting Activate, the network configuration of the operating system is activated. This is required after changing a network parameter. Enable System FTP Server By default no FTP Server is running on the terminal. If it is necessary for a host system to connect to the terminal via FTP, set this parameter to YES. TT1100  04044239 - 08/2013  33
Configuration  Manual   5.1.2.5 Readers To open the Reader configuration pages click on Readers in the Configuration menu in the left frame.   Badge reader  The Badge reader parameter page is the default page in the reader’s parameter group.   Reader type Type of badge reader installed in the terminal. Choices for the reader type:       The reader type is set to the correct reader type at delivery. If the customer badge type is known at the time of production also all other reader parameters are set accordingly.  In the following only the main parameters are explained. If you need help with special badge reader settings, please contact our support. Prior to that you might find the help texts useful.   34  04044239 - 08/2013  TT1100
Manual  Configuration  Reader type HID_MCM    Badge Technology   The only valid badge technology here is PROX.  Default lengths and offsets  For the common badge format predefined settings for badge and company code lengths and offset can be used by selecting YES for this parameter. If these parameters are to be customized first choose NO and save, so that the length and offset parameters are set visible.  Badge format  Possible badge formats:  Check data parity  Should the terminal perform a parity check on the data received from the reader?   TT1100  04044239 - 08/2013  35
Configuration  Manual  Reader type OEM75 For ICLASS badges:   Reader firmware  The OEM75 module has ist own firmware. CREO2RDR1B05-01.00 is a firmware version that supports both badge technologies, iCLASS and MIFARE.  Badge Technology  For the reader type OEM75 the badge technologies iCLASS and MIFARE are valid selections.  Badge type  (not relevant) Badge format  The card data format. Possible badge formats:  26-bit, 35-bit (Corporate 1000) and 37-bit are the established formats. If the user has a different card format he has to provide the coding details. Mode  Usually the HID application area contains the relevant data. Unique card serial number can be chosen to read only the unique ID of the badge. This might also be a MIFARE badge. If the user has a different card format and needs a different mode, he has to provide the coding details.   36  04044239 - 08/2013  TT1100
Manual  Configuration  Reader type OEM75 For MIFARE badges:   Further parameters For all the other reader parameters please refer to the Help, i. e. press the button Help.  Reader type SM4200   Badge format  Possible badge formats:   TT1100  04044239 - 08/2013  37
Configuration  Manual  For badge format Variable   Further parameters For all the other reader parameters please refer to the Help, i. e. press the button Help.   Badge writer    Currently writing data on a badge is not implemented.   38  04044239 - 08/2013  TT1100
Manual  Configuration  Badge interpreter  To open the Badge interpreter page click on Badge interpreter in the menu bar in the upper part of the right frame.     For Legic   For HID Prox   For iCLASS  For MIFARE  TT1100  04044239 - 08/2013  39
Configuration  Manual  Reader setup  To open the Reader setup page click on Reader setup in the menu bar in the upper part of the right frame.     Please select option For an OEM 75 iCLASS reader select OEM75 Key Management, if you want to load and store a key for accessing a particular area of the badge data.  For an Legic reader SM4200 select SM4200 Launching Procedure if you want to launch the reader module with special stamp data,  Once you selected an option you are guided through the process. 40  04044239 - 08/2013  TT1100
Manual  Configuration  Fingerprint  To open the Fingerprint parameter page click on Fingerprint in the menu bar in the upper part of the right frame.     Fingerprint API The only possible Fingerprint API at the moment is SagemUSB, i. e. connecting a Sagem fingerprint module via (internal) USB. Note: This module will work even if USB in general is turned off (Parameter Activate USB with value NO).  Delete all Templates With this parameter you can delete all existing templates in the Sagem internal database.  Size of Sagem database The current size of the internal database on the Sagem module. Available sizes for ordering: 500, 3000, and 5000.  Free rows in Sagem database Shows the number of free datasets in the Sagem internal database.  Process async messages If this parameter is set to NO, the dialog messages from the Sagem module such as “Press harder”, “Finger up” etc. are suppressed. The default is Yes.  Process matching score messages If you need the matching score for the finger as a return value for your application, you can set this parameter to Yes. The default is No.  SW Version The fingerprint module has its own firmware, which is shown in this field.  Unique Reader ID Each fingerprint module has its own unique ID, which is shown in this field.  TT1100  04044239 - 08/2013  41
Configuration  Manual  Fingerprint distribution  To open the Fingerprint distribution parameter page click on Fingerprint distribution in the menu bar in the upper part of the right frame.    Fingerprint configuration If the user templates  should be collected on one terminal only and should be distributed from there to other terminals, select here if the terminal is to be used for enrollment – Master – or for receiving the templates – Slave.  If configured as Master:   Slave 01 to 10 The TCP/IP address of the slave terminal(s).  Templates file Before starting the transfer, the archive file with the templates has to be created. Therefore click on Archive. The text changes from NOT CREATED to CREATING and if finished to CREATED.  User name The name of the user to be used for the transfer of the template file to the slave terminal, typically the user admin  Password The password of the user to be used fort he transfer of the template file to the slave terminal.  42  04044239 - 08/2013  TT1100
Manual  Configuration If configured as Slave:   Last download Read-only field that shows the date and time of the last successful download (or „Not downloaded“, if so far no archive file was downloaded).  Templates folder Folder for unpacking the archive file for later loading the templates into the fingerprint module. Do not change this value.    Barcode Scanner  To open the Barcode scanner parameter page click on Barcode scanner in the menu bar in the upper part of the right frame.  The only choice for a barcode scanner type is Default USB.    If you define this scanner type the event interface is automatically set to hiddev0. It is recommended not to change this setting.  It is important that the barcode scanner in configured to IBM Hand-Held USB  Serial Reader   Currently no serial reader type is implemented.   TT1100  04044239 - 08/2013  43
Configuration  Manual   5.1.2.6 Peripheral devices To open the configuration pages for peripheral devices click on Peripheral devices in the Configuration menu in the left frame.    Display  The Display parameter page is the default page in the parameter group for peripheral devices.     Display type So fare the only available display type is TFT35 Display Brightness  You can change the brightness of the display where 127 is the maximum value.   44  04044239 - 08/2013  TT1100
Manual  Configuration  LED  To open the LED parameter page click on LED in the menu bar in the upper part of the right frame.     LED Brightness You can change the brightness of the two LEDs where 127 is the maximum value. LED Test You can test the LEDs e. g. after changing the brightness. Choose a color in the list – the value All results in white LEDs – and click on Save.   The LEDs will be turned on for 3 seconds in the selected color.    Apart from the general brightness parameter in the web interface here, the LED brightness can be varied each time the LEDs are called in the configuration application xml file. So you can e. g. accompany a user warning with much brighter LEDs than a punch confirmation.   TT1100  04044239 - 08/2013  45
Configuration  Manual  Keyboard parameters  To open the Keyboard parameter page click on Keyboard in the menu bar in the upper part of the right frame.    Keyboard Type The only available choice is the keyboard type TT1100.  The use of this page is that a user can deactivate keys that are not in use and / or not even printed on the front cover. For example the user can deactivate the numeric keypad by clicking with the left mouse button on the corresponding keys and then save. The result looks like this:   46  04044239 - 08/2013  TT1100
Manual  Configuration  Sound  To open the Sound parameter page click on Sound in the menu bar in the upper part of the right frame.    With these parameters you can change the volume of the terminal speaker. Note that the maximum volume is equivalent to 87 dB. Volume Gain Changes the gain value (amplification factor) of the volume, valid values 0 – 2.  Volume Coarse Changes the coarse adjustment of the volume, valid values 0 – 17. Volume Fine Changes the fine adjustment of the volume, valid values 0 – 63.  Volume Test To test the volume changes, select Volume Test On and Save. A sample sound file is played. TT1100  04044239 - 08/2013  47
Configuration  Manual   5.1.2.7 Communications parameters To open the Communications configuration pages click on Communications in the Configuration menu in the left frame. With the Communications parameters you configure your host connection.   Upload  The Upload parameter page is the only page in the Communications parameter group. It describes the communication from the terminal to the host.     Connection type The protocol to be used for sending messages to the host. Choices are TCP-Client, TCP-Server, Web Service, and FTP. (A TCP-Server is waiting for a connection request and a TCP-Client is trying to open the connection.) Default TCP-Client.  TCP/IP address The TCP/IP address used for the host data connection.  TCP/IP port The TCP/IP port used for the host data connection, default 1089.  48  04044239 - 08/2013  TT1100
Manual  Configuration  Message format Defines the format in which the messages are to be sent to the host. Default XML. Time-out for host reaction [ms] Time-out interval for a confirmation message from the host (ms). Default 10000.  Server alive check The interval in seconds between the server alive checks, default 180. If during this interval no alive check exchange happens, the terminal is offline. Use time intervals for upload? Currently only for the connection type FTP. If this option is set to Yes, the connection to the FTP server will be established every n minutes, where n is the connection interval you specify in the next field. Default No.    Upload connection interval The time interval in minutes you want the connection to the FTP server to be established. Choose an interval not less than 10. Use time slots for upload? By using online time slots you can restrict the permanent host connection to the specified periods of time. If you set this parameter to Yes you have to at least define one start-end-pair, during which the connection to the host is to be established. You can define up to 10 time slots. Default No.   …   Interval n Start [HH:MI] The time to go online in the format hh:mi.  Interval n End [HH:MI] The time to go offline in the format hh:mi. If lower than the start time, the next day is assumed. Note that for the connection type FTP only the start time applies. TT1100  04044239 - 08/2013  49
Configuration  Manual  After choosing and saving the Connection Type option FTP, the following parameters are added to the page:    FTP host IP address The IP address of the FTP server.  FTP user name The name of the authorized user on the FTP server. Default admin.  FTP password The password for the FTP user. Default admin. FTP directory The directory on the FTP server to which the file transfer should take place. If this parameter is left empty, the connection will be established to the default directory set up for the user.  FTP file name The name of the FTP file. Default bookings.dat.  Change file name The rule for changing the file name on the FTP server. Either no change or change by adding a timestamp to the file name. Default No.  FTP send timeout The waiting time in case the previous version of the specified file has not been removed from the server. During this time the file will be resent. Default 120000 (ms).  Use SFTP If you set this parameter to Yes, all transfers are executed with Secure FTP. Default No. 50  04044239 - 08/2013  TT1100
Manual  Configuration   In order to activate the FTP connection either the parameter Use time intervals? or Use time slots? has to be set to Yes. When using time slots only the start time is considered, not the end time. After choosing and saving the Connection Type option Web Service, the page content changes to the following:    Special web service parameters:  Use HTTPS? If this mode is active, a secure communication is used. The terminal first has to request a certificate from the web server though. Default No.  Server Address The IP address or the hostname of the server.  Server Port The port of the server to connect to. Default 8080 for http.  User The authenticated user for the web service.  Password The password of the web service user.  TT1100  04044239 - 08/2013  51
Configuration  Manual  Web Service Implementation The class name of the web service implementation, default com.edata.connection.webservice.WSServerConnectionTL (For USA more often used: …WSServerConnectionTLUS) Endpoint address for Transactions The servlet (complete path) for receiving the transactions.  Endpoint address for Device Manager The servlet (complete path) for processing other device messages such as the heart beat.  Id to use for requests The ID used for server requests. This can be either the logical ID (the field Local terminal address on the terminal parameter page) or the name (the field Hostname on the network parameter page, by default the MAC address). Heartbeat Interval [min] The interval between heart beat messages in minutes, minimum 5 minutes, default 10 minutes.  Heartbeat Reconnect Interval [s] For the offline case: the interval between reconnection tries in seconds, minimum 10 seconds, default 60 seconds.  Startup Connect Interval [s] For the offline case at startup: the interval between reconnection tries in seconds, minimum 10 seconds, default 30 seconds.  It is recommended to set the parameter Timeout for host reaction to 45 seconds (value 45000).  Also it is recommended to set the parameter Server alive check to 0, because the alive check with Web service is done by heartbeats.  52  04044239 - 08/2013  TT1100
Manual  Configuration   5.1.2.8 RS-485 parameters RS-485 Configuration  To open the RS-485 parameter pages click on RS485 in the Configuration menu in the left frame. With the RS-485 parameters you configure the optional RS-485 module.     Start RS485 Devices This parameter defines if the RS-485 Manager is to be started or not.  The RS-485 Manager can only be started if the parameter Activate RS485 module on the Terminal parameter page is set to YES.  The terminal examines whether the RS-485 module hardware is in fact installed. It only makes sense to configure the RS-485 device, if the read-only parameter at the bottom of the page shows Installed.    TT1100  04044239 - 08/2013  53
Configuration  Manual  Available Channels This is an information list of USB Serial Converters recognized by the USB-Serial driver.  Typically the TT1100 RS485 module resides on channel ttyUSB12 Reader Communication Config The baud rate configuration for the serial communication protocol. Default 9600. Reader Protocol The reader communication protocol. Fix value HADP (HID HADP Protocol).  Badge Configuration The length of the company code and badge number. Specify the values coma separated. If you need a company code length of 5 and a badge length of 10, then set this value to 5,10.  HID iCLASS cards are recognized automatically, Supported are iCLASS 26 Bit H10301 or 37 Bit Cards H10304.  Note that the records stored in the booking storage files contain the badge number with a certain length definition. Make sure that the length defined here is the same or longer than defined for a record (in the application.xml file in the storage section). Config Group You can configure the connected readers, e. g. one reader collects IN punches and the other one OUT punches. To differentiate the two types you can use configuration groups. For each group the following values can be configured: −  LED color when online: RED, GREEN, AMBER −  Transaction type when valid OK −  Transaction type when invalid To which group a reader belongs is defined in the validation group.xml file (in the syntax format <data trmid="1201" group="OUT" /> where trmid is the channel and reader ID).  Blink Config Group For each of the 3 groups you can configure a separate LED blink behavior. The field value consists of 10 comma-separated parts, the first 5 for valid transactions, the second 5 for invalid transactions, each in the format Time, TimeOn, TimeOFF, ColorON, ColorOFF −  Time: total blink time in 1/10 seconds, maximum 49  −  TimeOn: time for LED on −  TimeOff: time for LED off −  ColorON: Color LED on −  ColorOff: Color LED off Example: 10,5,5,GREEN,OFF,25,1,1,RED,OFF 54  04044239 - 08/2013  TT1100
Manual  Configuration  Buzzer Configuration Configure the buzzer (the acoustic signal) for valid and invalid transactions. The field value consists of 6 comma-separated parts, the first 3 for valid transactions the second 3 for invalid transactions, each in the format Retries,TimeOn (1/10 sec), TimeOFF(1/10 sec).  Example: 1,3,1,3,1,1 means 1 buzzer retry for 300ms on and 100ms off for valid punches, 3 buzzer retries for 100ms on and 100ms off.  Buzzer Exclude List Reader list for a special buzzer configuration. The field value consists of the channel ID with reader ID for the designated reader(s), like 00000101 for channel 0 reader 0 and channel 1 reader 1.  Buzzer Configuration Exclude List Buzzer configuration for the reader(s) in the exclude list.  For the field value see Buzzer Configuration above.  USB Hub Default Internal. The internal Hub supports one channel and two Readers on that channel.  Event Mode The Reader Events can be worked from a native Library Functionality. This is necessary if you have a lot of readers because of performance issues.  If you have at most 2 readers connected the Reader Events can be worked by the application.xml procedure. Event Mechanism The Library Mode supports two mechanisms: Asynchronous work of Reader events and Synchronous work of reader Events.  The asynchronous mode is to support best performance. Recommended is Synchronous mode! Accept Without Schedule For users that are found in the access.xml (validation file for punch permission check) but not in the schedules.xml file (validation file for punch permission per date and time), this parameter decides whether punches are valid (setting YES) or invalid (setting NO).  Validation Debug To see more details during the validation of tables leading to valid or invalid punches, set this parameter to YES. It is recommended to set it back to NO as soon as possible.  Relay Test The optional RS485 module for the internal USB hub also provides a relay which can be tested here. By choosing Yes and pressing Save the relay contacts are opened for three seconds.  TT1100  04044239 - 08/2013  55
Configuration  Manual  Internal RS485 Hub (Read-only) Shows if the hardware for the internal RS-485 hub is installed.  RS485 Reader Configuration  To open the RS485 Reader Configuration Update page click on this entry in the menu bar in the upper part of the right frame.    Slaves – internal channel Choose the ID(s) of the readers you connect to the channel. If the reader is online, the blue symbol changes to green. On the other hand the symbol is red, as long as the reader is offline.  56  04044239 - 08/2013  TT1100
Manual  Configuration   5.1.2.9 Software Update To open the Software update pages click on Software Update in the Configuration menu in the left frame.    With the software update whole packages can be installed automatically.  Installed Packages  This page provides an overview of all packages that have been successfully installed on the terminal. Each row shows one type of package with the latest installed version of this package.    TT1100  04044239 - 08/2013  57
Configuration  Manual  Manual Update  To open the Manual Update page click on Manual Update in the menu bar in the upper part of the right frame.    Click on Add and browse on your local or remote disk drive for the desired ipk file. After you selected a file, the package will be examined, e. g. if it contains an older version than already installed. If the package is OK, it is display in the following list:    You can now delete the previously selected package, add further packages or click on Install. If you confirm the message “Press OK to start the Software Update. The Terminal will restart after Installation”, the terminal will restart and install the package(s) during startup.    There is an alternative for updating software: you can use an USB stick with the appropriate ipk file(s). Please refer to chapter 5.3.  58  04044239 - 08/2013  TT1100
Manual  Configuration   5.1.3 Application parameters To open the application parameter group list, click on Application in the left frame.   5.1.3.1 Application parameter groups – overview Bookings  For resending bookings to the host system, that have already been transferred before.  Reports   To show certain transaction according to your selection criteria. Validation  To show the content of validation tables or search for certain keys.  Warnings  Online monitoring.   5.1.3.2 Resend bookings parameters If the transactions that are stored in the transaction booking file on the terminal are to be sent again to the host system, the desired period of time and/or the badge number can be specified. According to this value the transactions are extracted from the bookings files and resent to the host.    Transfer Punches From The start date/time for the retransmission of bookings. The format is DDMMYYYYHHMISS, e. g. 15052005120000.  Transfer Punches Until The end date/time for the retransmission of bookings. The format is DDMMYYYYHHMISS, e. g. 15052005235959.  Source file The name of the file, from which the punches should be selected and sent again (as defined in the application.xml file, e.g. bookings.dat). Default bookings.dat. TT1100  04044239 - 08/2013  59
Configuration  Manual  Badge Number The badge number for which the bookings should be resent. If no badge number is entered, the transactions for all badge numbers are resent.  5.1.3.3 Reports parameters To open the Reports parameter page click on Reports in the Application menu in the left frame.    Report type Currently Transactions only.  Select filter 1 | 2 The field in the transaction record by which the records will be filtered. The fields depend on the definition in the application.xml file. By default the fields timestamp (format DDMMYYYYHHSS), badgeNo (badge number), deviceId (local terminal address), function (booking type) are defined.  Filter expression 1 | 2 The value for the filter 1 | 2.  Timestamp from  The start date for the list of transactions (format DDMMYYYYHHMISS).  Timestamp until The end date for the list of transactions (format DDMMYYYYHHMISS).  Name of storage The name of the transaction storage file (as defined in the application.xml file, e.g. bookings.dat). Default bookings.dat.  60  04044239 - 08/2013  TT1100
Manual  Configuration  Status of Transactions The status of the transactions to be selected.    After clicking on Save the report will be shown in the bottom part of the page:     In the general part of the report the total amounts of processed, unprocessed and dirty bookings is listed, no matter what status of transaction has been chosen.  In the lower part the transactions meeting the selection criteria are shown.  TT1100  04044239 - 08/2013  61
Configuration  Manual 5.1.3.4 Validation To open the Validation parameter page click on Validation in the Application menu in the left frame.    Validation File The name of the validation table to be searched.   Even if no fingerprint module is installed you will always see the fingerprint table names in the list.   Key The key you are looking for in the selected table, e. g. a certain badge number. If you leave this field empty, all keys in the selected table are listed.  5.1.3.5 Warnings To open the Warnings page click on Warnings in the Application menu in the left frame.   This page allows you to monitor your terminal online, i.e. without having to log traces into a file, connect to the terminal and look into the log file.  62  04044239 - 08/2013  TT1100
Manual  Configuration   5.2 Configuration file description The configuration file named application.xml consists of elements (xml tags), which then can contain further information, the so called attributes.  For a complete description of all elements and attributes please refer to the TT1100 XML Configuration Description manual.  One of the outstanding features is the ability to play videos (in mp4 format) and to play user-specific sound files (in wav format). With these means it is quite easy to e. g. implement a help function.   5.3 Software update via USB stick You can update the terminal (software and also Linux) by copying the corresponding .ipk files to an USB stick (root directory).  Then insert the stick in the USB port. A warning in the display appears that you should not remove the stick. The terminal will restart, unpacking and installing the ipk files and tell you in another display message when you can remove the stick.   In order to be able to use the update via USB stick function the following parameters in the web interface have to be set to YES:  For more information see chapter 5.1.2.3.   TT1100  04044239 - 08/2013  63
Operation  Manual   6 Operation  6.1 Fingerprint operation In order to use a terminal with biometric reader for collecting bookings, templates (fingerprints) for all users have to be enrolled (registered) first.  By default these templates are stored inside the biometric reader module. If the internal database of the reader module is still empty and the user wants to perform a booking, the reader will not be activated, but an error message will be displayed „Sagem database empty“. 6.1.1 Enrollment The exact enrollment procedure is defined in the application.xml configuration file. In any case two fingers have to be scanned three times each, and the best template for each finger is stored. Also it is required to enter an enrollment ID for storing the templates which is later used like a badge number for a booking record.  Typically the enrollment dialog must be released first by an administrator, who has to enter the appropriate PIN. The administrator key   leads to this PIN protected dialog.  Sequence:  After pressing the administrator key a PIN prompt is displayed. The PIN corresponds to the PIN used for the startup dialog, by default 1234. After successful login the main menu is displayed, similar to the following:  Please select option:  1 Enroll person  2 Delete person 3 Delete All Option 1 is used to enroll new users, option 2 to delete the templates of one user according to an ID, and option 3 is used to delete the whole database of the Sagem module, i. e. all enrolled templates. 64  04044239 - 08/2013  TT1100
Manual  Operation 6.1.1.1 Enroll a person  After pressing key 1 (for option 1) the administrator is prompted to enter the enrollment ID, typically the personnel number. Then the biometric module (its red light) is activated. The two fingers (e. g. the right and left forefinger) are read 3 times each to guarantee high quality templates. For better user guidance an image of the scanned finger is shown in a white field. As soon as a green frame appears around this field, the scan has been successful.   If the finger is not placed correctly the user is prompted to move the finger up, down, left, right, press harder etc.   The red light turns off and on again after each successful read operation. A message is shown if the enrollment of the two templates has been successful. In case of an error the user has to repeat the enrollment steps.  6.1.1.2 Delete a person By selecting option 2 – Delete person – the administrator can delete the templates for a certain user on the basis of his ID.  After pressing key 2 the administrator is prompted to enter the ID. After that he has to answer a confirmation prompt. Only if he confirms with the OK key, the templates for this ID are deleted from the Sagem module.  6.1.1.3 Delete all By selecting option 3 – Delete All – the administrator can delete all templates stored in the Sagem module. This option corresponds to the web interface parameter „Delete all templates" on the page „Fingerprint“ of the reader parameter group. It is recommended to act with caution when using this option, because there is no way to recover the content of the Sagem module and all users have to re-enroll after the delete. Therefore the administrator is prompted twice to confirm the deletion of all templates in the module.  TT1100  04044239 - 08/2013  65
Operation  Manual 6.1.2 Punching As soon as two templates for a user are enrolled, it is possible to perform bookings. After pressing the Clock In or Out key the red light of the reader is turned on. Now the user has to put one of his enrolled finger on the module, until the red light is turned off. Depending on the configuration there might be a green frame around the white image field. If the finger is not placed correctly, the user is prompted to move the finger up, down, press harder, etc. Then the scanned template is compared with the content of the Sagem module database. If a match is found, the corresponding ID is processed for the booking record. Otherwise a message is displayed like "Identification failed" or "No authorization".   Displaying finger images during enroll and identify is only meant to support the user in increasing the template quality. These images are not stored anywhere at any time. Since displaying images is defined in the configuration file application.xml, this setting can be changed any time, e. g. displaying only the quality value and not the image.  But to improve enroll results it is recommended to keep displaying images during the enroll process and to withdraw from showing them when punching.   66  04044239 - 08/2013  TT1100
Manual  Maintenance   7 Maintenance  7.1 Cleaning the housing To clean the housing, use a soft, lint-free cloth and a soft window cleaning agent!  Observe the following instructions in order to avoid producing damage to the housing and the reader window of the biometric reader (if any) during the cleaning process: • Do not use alcohol, such as ethyl alcohol or isopropyl • Do not use aggressive solvents • Do not use cleaning agents with added powder •  Avoid scratching and abrasive movements  TT1100  04044239 - 08/2013  67
Packaging / returns  Manual   8 Packaging / returns  Not properly packaged components and devices can cause costs due to damages during shipping. Please observe the following information when sending products to Kaba. Kaba GmbH is not liable for products that have been damaged due to negligent packaging.  8.1 Complete devices  The original packaging has been specifically designed to fit the device. It offers maximum protection against damage in transit.  Always use the original packaging for returning the products!   If this is not possible, packaging which ensures that the device is not damaged during shipping and handling must be provided. •  Use a robust and thick-walled transport box or cardboard box. Approximately 8 to 10 cm of space needs to be allowed on either side of the device. •  Wrap the device with a suitable foil or put it into a bag. •  Generously stuff foam pads or air cushions, for example, all around device. Movements of the device inside the packaging must be excluded. •  Use only dustless and environmentally friendly padding material.  8.2 Electronic assemblies  ESD sensitive electronic assemblies such as printed circuit boards, readers, etc. must be stored, transported, and shipped in appropriate ESD protective bags. Electronic assemblies may only be packed at ESD secure workplaces and by persons familiar with general ESD safety standards and who apply them on a regular basis. Returning electronic assemblies in packaging with sufficient ESD protection is a prerequisite for •  the submission of warranty claims after functional failures of any type. •  replacement of printed circuit boards and electronic components in exchange. Electronic components delivered in packaging without sufficient ESD protection are --in order to maintain a high quality standard-- neither analyzed nor repaired but directly disposed of. 68  04044239 - 08/2013  TT1100
Manual  Packaging / returns   8.3 Labeling  Complete return documents and a correct labeling allow for fast processing. Please make sure that each package includes a delivery note. The delivery note should contain the following information: •  Number of devices or components per package. •  Product numbers, serial numbers, specifications. •  Name and address of your company / contact person. •  Reason for return, e.g. repair exchange. •  Meaningful and detailed error description. Returns from countries outside the European Union require a customs invoice stating the real customs value. Some countries (e.g. Switzerland) require a preference. TT1100  04044239 - 08/2013  69
Disposal  Manual   9 Disposal   This product complies with the WEEE directive and is, according to DIN EN standard 50419, marked with the “Crossed out garbage can” symbol. See chapter 3.4 Labeling. The symbol refers to separated disposal of electric and electronic devices in EU countries. Please do not dispose of device in your regular garbage. Used devices contain valuable materials that should be recycled. Used devices should therefore be disposed of via your country’s take back system. At the end of use of the goods supplied, Kaba GmbH will take them back for a proper disposal in accordance with the legal regulations (German law on the disposal of electrical equipment (ElektroG)). Charges incurred for transport to the manufacturer will be at the expense of the owner of the waste electrical equipment. In the EU and Switzerland, electronic devices have to be disposed of according to national disposal and environmental legislation.    Please dispose of in an environmentally responsible way. The packaging materials are recyclable. Please do not throw packaging material into your regular garbage can. Always take it to a recycling center or have it picked up by your local waste recycler.   70  04044239 - 08/2013  TT1100
Manual  Index  10 Index   A Accept Without Schedule.....................................................55 Activate DHCP request...........................................................32 Activate Network Interface...................................................33 Activate RS485 Module..........................................................22 Activate USB ..............................................................................22 Actual datetime........................................................................23 Application parameters.........................................................59 Automatic Backup...................................................................31 Available Channels..................................................................54 B Badge Configuration ..............................................................54 Badge interpreter ....................................................................39 Badge number..........................................................................60 Badge reader.............................................................................34 Badge writer..............................................................................38 Barcode Scanner ......................................................................43 Blink Config Group..................................................................54 Buzzer Configuration..............................................................55 C Capacitive Keypad...................................................................11 CE conformity............................................................................14 Change file name.....................................................................50 Cleaning the housing.............................................................67 Cleaning the reader window ...............................................67 Communications parameters..............................................48 Condition based Maintenance............................................28 Config Group.............................................................................54 Configuration............................................................................18 Configuration file description .............................................63 Configuration parameters ....................................................20 Conformity.................................................................................14 Connection type ......................................................................48 Connections...............................................................................16 Console Mode...........................................................................22 D Database Backup .....................................................................31 Date of Initial Backup .............................................................31 Date/Time parameters...........................................................23 DC In.............................................................................................12 Default language .....................................................................21 Delete all Templates ...............................................................41 Dimensions................................................................................13 Display..................................................................................11, 44 Disposal.......................................................................................70 Distances between two devices with RFID reader .......16 Domain........................................................................................32 E Electromagnetic fields............................................................16 EMC Directive............................................................................14 Enable System FTP Server.....................................................33 Endpoint address.....................................................................52 Environmental conditions.....................................................12 Environmental protection.......................................................8 ESD (electrostatic discharge) protective measures ........9 Ethernet.......................................................................................11 Event Mechanism.....................................................................55 F Filter..............................................................................................60 Fingerprint..................................................................................41 Fingerprint API..........................................................................41 Fingerprint configuration......................................................42 Fingerprint distribution .........................................................42 Fingerprint reader....................................................................12 Free rows in Sagem database..............................................41 FTP directory..............................................................................50 FTP file name .............................................................................50 FTP host IP address..................................................................50 FTP password ............................................................................50 FTP user name...........................................................................50 G General information................................................................28 Graphic Display.........................................................................11 H Heartbeat Interval....................................................................52 Heartbeat Reconnect Interval..............................................52 HID_MCM....................................................................................35 Hostname ...................................................................................32 I Identification plate ..................................................................15 Inputs/Outputs .........................................................................11 Installation..................................................................................16 Installation conditions............................................................16 Installed Packages....................................................................57 Interfaces ....................................................................................11 Internal Buffer Online Trace..................................................26 J Jar Files ........................................................................................28 K Keyboard parameters.............................................................46 Keypad.........................................................................................11 TT1100  04044239 - 08/2013  71
Index  Manual L Labeling...................................................................................... 15 Last Backup................................................................................ 31 Last download.......................................................................... 43 Last Restore ............................................................................... 31 LED ...............................................................................................45 Linux parameters..................................................................... 30 Local terminal address........................................................... 21 Logging to a file................................................................ 25, 26 Login............................................................................................ 19 Low voltage directive............................................................. 14 M Mac Address.............................................................................. 33 Maintenance ............................................................................. 67 Make Backup............................................................................. 31 Make Initial Backup................................................................. 31 Manual Update......................................................................... 58 Max Rows Online Trace Page...............................................26 Memory....................................................................................... 11 Memory Long Term Log........................................................ 22 Message format........................................................................49 microSD ...................................................................................... 11 Mounting....................................................................................17 Mounting height......................................................................16 N Network config......................................................................... 33 Network parameters............................................................... 32 NTP Timeserver Address ....................................................... 24 NTP Timeserver Subnet......................................................... 24 O OEM75......................................................................................... 36 Online Trace Refresh Time.................................................... 26 P Password .................................................................................... 51 Peripheral devices................................................................... 44 PIN for startup configuration............................................... 33 Power over Ethernet............................................................... 12 Power Saving Option ............................................................. 22 Power supply ............................................................................ 12 Process async messages........................................................ 41 Process matching score messages .................................... 41 Product description................................................................ 10 Protection class ........................................................................ 12 Proxy Port................................................................................... 33 Proxy Server...............................................................................33 R R&TTE........................................................................................... 14 RAM.............................................................................................. 11 Reader ......................................................................................... 12 Reader Communication Config.......................................... 54 Reader Protocol........................................................................ 54 Reader setup..............................................................................40 Reader type................................................................................34 Readers........................................................................................34 Recover Database....................................................................31 Recover Initial Database........................................................31 Relative humidity.....................................................................12 Relay output ..............................................................................11 Relay Test....................................................................................55 Reports parameters.................................................................60 Request Interval .......................................................................23 Resend bookings parameters..............................................59 Restart/Shutdown ...................................................................30 RFID reader.................................................................................12 RS-485 Host................................................................................11 RS-485 parameters ..................................................................53 RS485 Reader Configuration................................................56 S Serial Reader..............................................................................43 Server Address..........................................................................51 Server alive check ....................................................................49 Server Port..................................................................................51 Session Timeout.......................................................................22 Set datetime ..............................................................................23 Size of Sagem database.........................................................41 Slave.............................................................................................42 SM4200........................................................................................37 Socks Proxy Port.......................................................................33 Socks Proxy Server...................................................................33 Software Update......................................................................57 Software update via USB stick.............................................63 Sound...........................................................................................47 Source file...................................................................................59 Start RS485 Devices.................................................................53 Startup Connect Interval.......................................................52 Status of Transactions ............................................................61 Status page ................................................................................27 Sun exposure.............................................................................16 SW Version .................................................................................41 System .........................................................................................11 System configuration.............................................................21 T TCP/IP address ...................................................................32, 48 TCP/IP address of the name server ....................................32 TCP/IP default Gateway.........................................................32 TCP/IP port.................................................................................48 TCP/IP subnet mask ................................................................32 Technical data...........................................................................11 Temperature range .................................................................12 Templates file............................................................................42 Templates folder......................................................................43 Terminal description...............................................................22 Terminal parameters ..............................................................21 Time synchronization.............................................................23 Time-out for host reaction....................................................49 Timestamp .................................................................................60 72  04044239 - 08/2013  TT1100
Manual  Index Timezone....................................................................................23 Trace levels.................................................................................25 Trace parameters .....................................................................25 Trace Selection for Online Log............................................26 Transfer Punches......................................................................59 U Unique Reader ID.....................................................................41 Upload.........................................................................................48 Upload connection interval .................................................49 USB................................................................................................11 USB .ipk Update........................................................................22 USB get Log files ......................................................................22 USB Hub......................................................................................55 Use as directed ........................................................................... 8 Use HTTPS ..................................................................................51 Use time intervals for upload...............................................49 Use time slots for upload.......................................................49 User parameters .......................................................................29 V Validation....................................................................................62 Validation Debug.....................................................................55 Volume Coarse..........................................................................47 Volume Fine...............................................................................47 Volume Gain ..............................................................................47 Volume Test ...............................................................................47 W Warnings.....................................................................................62 Web interface ............................................................................19 Web Service Implementation ..............................................52 Weight .........................................................................................13  TT1100  04044239 - 08/2013  73

Navigation menu