LENNOX Furnace/Heater, Gas Manual L08A6040
User Manual: LENNOX LENNOX Furnace/Heater, Gas Manual LENNOX Furnace/Heater, Gas Owner's Manual, LENNOX Furnace/Heater, Gas installation guides
Open the PDF directly: View PDF .
Page Count: 14
Download | |
Open PDF In Browser | View PDF |
GAS & BLOWER UNIT KITS ;/q i_Techrllca] i _Publications AND ACCESSORIES @1994 Lennox Industries Inc. 503,154M 8/94 Supersedes Datlas, Texas Litl_o U.S.A. ICM2+ REPLACEMENT MOTOR KIT 502,994M INSTALLATION INSTRUCTIONS FOR REPLACEMENT VARIABLE SPEED MOTOR USED ON G21V, GSR21V, GSR21CV, CB21 AND CBH21 SERIES UNITS This kit is used to replace the ICM1 variable speed blower motor with the ICM2+ motor used on G21V, Package 1 of 1 contains: 1- Circuit board (JPB1 jumper GSR21V, GSR21CV, CB21-41, -51, -65 and B21-41, -51, -65 series units. Refer to table 1 for unit model board) 1- Mounting bracket 1- Motor control harness number and corresponding 4- Wiring diagrams 1- Bag assembly containing: 6-#10 x 6 x 5/8 SDST screws kit part number. WARNING 4-Wires (blue, red, orange, purple) 4-Wire ties with screw hole mount 2- Stickers 1- tCM2+ replacement KIT motor 1- Motor power harness Motor Replacement 1- PFC choke (V3 units only) 1- Remove both access panels from unit. TABLE 1 ICM2+ REPLACEMENT MOTOR KIT APPLICATION FURNACE/ BLOWER UNIT MOTOR KIT LB- NUMBER MOTOR KIT PARTNUMBER G21V5, GSR21V5 LB-85899C 63J89 GSR21CV5 LB-85899D 63J90 G21V3, GSR21V3 LB-85899E 81Jll CB21/B21-41 LB-85899A 56J60 CB21/B21-51 CB21/B21-65 LB-85899B 56J61 2- Unplug existing ICM1 motor power harness (P48) and control harness (P49). 3- Remove green ground wire from blower housing. 4- Remove 2 blower btower assembly. securing screws and remove 5- Loosen the motor shaft set screw and bracket securing screws. Remove existing ICM1 motor from blower assembly. See figure 1. Remove belly band screw to remove motor. TYPICAL ICM1 MOTOR REMOVAL ICM1 MOTOR (TO BE REPLACED) REMOVE MOTOR SHAFT SET SCREW REMOVE MOTOR BRACKET SECURING SCREWS FIGURE 1 Page 1 6-Place replacementmotor (ICM2+) in motor bracketassemblyaccordingto the dimension shown in figure 2. Position motor/bracket assemblyso that bracketsalign with holes in blowerhousing, MOTOR / MOUNTING --_ A field-installed, power factor correcting choke is provided for use only on G21V3 units. G21V5 units are factory equipped with the choke. 11-Determine a location on the blower housing to install the circuit board and mounting bracket. Location must allow for wiring through the blower deck strain relief to the control box, must not cover warning or information stickers, and must be accessible to service. See figure 4. BRACKET DIMENSION A 4-- Circuit Board and Choke Installation ICM2+ MOTOR TYPICAL G21V CIRCUIT BOARD INSTALLATION AND WIRING G21V CONTROL BOX TERMINAL STRIP ROUTE WIRES THROUGH STRAIN RELIEF MOUNITNG BRACKET MODEL NUMBER Dim. "A" CB21V-41 CBH21V-41 G21V3 GSR21V3 CB21V-51/65 B21V-51/65 G21V5, GSR21VS, GSR21CV5 3-1/2" 2-1/8" 1" FIGURE KIT CIRCUIT BOARD /1_ BLOWER HOUSING I 2 FIGURE 4 7- Before tightening mounting bracket screws, belly band screw and motor shaft set screw, the embossed arrow on the ICM2+ motor must be pointing UP (perpendicular to the blower housing opening). In this position, the control and power plugs on the motor will face downward, See figure 3. 8-Install blower housing assembly in cabinet. Secure with screws previously removed. 9- Install the ground wire to blower housing. 10- Place one sticker on the blower housing close to the motor and the other sticker close to the unit nameplate. 12-Drill two mounting bracket holes on the blower housing, See figure 4 for an example. 13-Install circuit board mounting screws (provided). bracket using two 14-Secure circuit board to mounting provided stand-offs. bracket with 15-For G21V3 applications only- Use two SDST screws, provided, to install choke on side of blower housing. See figure 5 for installation dimensions. G21V3 AND GSR21V3 PFC CHOKE INSTALLATION LOCATION 14/2 G21V ICM2+ INSTALLATION USE 2 SDST SCREWS (PROVIDED) TO SECURE -I_ / _I- I r- t ,-3/, 3-9/16 _' D EMBOSSED ARROW ON MOTOR MUST POINT UP / ALIGN MOTOR/BRACKET ASSEMBLY WITH HOLES IN BLOWER HOUSING FIGURE 3 FIGURE 5 Page 2 Electrical Connections (Figure 12) 16- Connect motor control harness, provided with kit, between circuit board (J97-harness to P95-board) and motor (P97-harness to J49-motor). See figure 6 for correct positioning of control harness to the circuit board. KIT CONTROL HARNESS TO JPB1 CONTROL CONNECTION SIDE VIEW 19- Remove control cover to expose back of terminal board. Locate the three wires attached to the terminals behind the fuse. See detail in figure 12. 20- Remove the single wire from the right side of the left set of fuse spade connections. Install the 1/4" piggy back end of orange wire to the spade connection. Attach the previously removed wire to the piggy back connection on the orange wire, Connections should be made so that the spades are facing away from the terminal strip mounting screw. 21- Route the orange wire from the control box strain relief hole through the blower deck strain to the original motor control harness (P49). Install terminal in either socket #3 or #6 of P49. Replace control box cover. 22-Connect original motor control harness (P49) to 6-pin plug on circuit board (J95). 23- Refer to application Jumper Adjustment section specific jumper selections. for ,A WARNING FIGURE 6 17- Connect motor power harness, provided with kit, between original power harness (J96-kit harness to P48-original harness) and the motor (P96-kit harness to J48-motor). Motor Replacement 18- For G21V3 applications only- Con nect two loose wires from kit power harness (J96!P48) to PFC choke terminals. Make sure insulation tubing covers connections. Tape over tubing and wire with electrictians tape to ensure protection. See figure 7 for field wiring. G21V3 AND GSR21V3 CHOKE FIELD WIRING DIAGRAM t- 2- Unplug existing ICM1 motor power harness (P48) and control harness (P49). 3_ 7_ CONNECT TWO LOOSE 8- FIGURE 7 Page 3 blower deck harness P98/J98. 5- Remove 2 blower blower assembly. KIT CONTROL HARNESS CHOKE Unplug 4- Remove green ground wire from blower housing. 6_ HARNESS TO TERMINALS Remove both access panels from unit. securing screws and remove Loosen the motor shaft set screw and bracket securing screws. Remove existing ICM1 motor from blower assembly. See figure 1. Remove belly band screw to remove motor. Place replacement motor (tCM2+) in motor bracket assembly according to the dimension shown in figure 2. Position motor/bracket assembly so that brackets align with holes in blower housing. Before tightening mounting bracket screws, belly band screw and motor shaft set screw, the embossed arrow on the ICM2+ motor must be pointing UP. For horizontal applications, motor arrow must point to the top of the unit. For downflow applications, the arrow must point to the return air end of the furnace, tn this position, the control and power plugs on the motor wilt face downward. See figure 8. GSR21V ICM2+ INSTALLATION TYPICAL GSR21V & GSR21CV CIRCUIT BOARD INSTALLATION AND WIRING \ KIT CIRCUIT BOARD ALIGN MOTOR/BRACKET ASSEMBLY WITH HOLES IN BLOWER HOUSING / / / FIGURE 9 16- For GSR21V3 applications only- Use two SDST screws provided to install choke on side of blower housing. See figure 5 for installation dimensions. EMBOSSED ARROW ON MOTOR MUST POINT UP Electrical Connections (Figures 13 and 14) 17- Select the blue and purple wires provided in the kit. 18- install socket terminal of purple wire, provided in kit, into either socket #3 or #6 of the original motor control harness (P49), 0 19- install pin terminal end of purple wire into socket #11 of the blower deck harness jack (J98). .J DOWNFLOW HORIZONTAL FIGURE 8 9-Install blower housing assembly in cabinet. Secure with screws previously removed. 10- Install the ground wire to blower housing, 11- Place one sticker on the blower housing close to the motor and the other sticker close to the unit nameplate. Circuit Board and Choke Installation A field-installed, power factor correcting choke is provided for use only on GSR21V3 units. GSR21V5 units are factory equipped with the choke. 12- Use mounting bracket as a template to mark two 7/32" mounting holes on the blower deck flange. Drill holes, See figure 9. 13-Place mounting bracket on the back side of the blower deck flange and align drilled holes with those in the mounting bracket, 20- Connect original motor control harness (P49) to 6-pin plug on circuit board (J95). 21-Trace the brown wire from the back side of the fuse located on the terminal strip to the wire bundle in the control box. See detail in figure 13, Unscrew wire nut from bundle and add the kit provided blue wire to it, Secure all wires together with wirenut, Route the opposite end of blue wire to control box side of blower deck harness and insert it into position #11 of the plug (P98). 22- Re-connect blower deck harness P98/J98. 23- Connect motor control harness, provided with kit, between circuit board (J97-harness to P95-board) and motor (P97-harness to J49-motor). See figure 6 for correct positioning of control harness to the circuit board. 24- Connect motor power harness, provided with kit, between original power harness (J96-kit harness to P48-originat harness) and the motor (P96-kit harness to J48-motor). 14-Install two screws, provided, through the flange and into the bracket to secure, Mount bracket on side of the flange. 25- For G21V3 applications only- Connect two loose wires from kit power harness (J96/P48) to PFC choke terminals, Make sure insulation tubing covers connections. Tape over tubing and wire with eiectrictians tape to ensure protection. See figure 7 for field wiring. 15-Secure circuit board to mounting provided stand-ells. 26- Refer to application bracket with Page 4 Jumper Adjustment section specific jumper selections, for 8-Install blower housing assembly in cabinet, Secure with screws previously removed. 9- Install the ground wire to hex screw on blower housing, 10- Place one sticker on the blower housing close to the motor and the other sticker close to the unit nameplate. WARNING Motor Replacement Circuit Board Installation 1- Remove blower access panel from unit, 2- Unplug existing ICM1 motor power harness (P48) and control harness (P49), 3- Removegreen ground wire from blower housing. 4- Remove two blower securing screws and remove blower assembly. 5- Loosen the motor shaft set screw and bracket securing screws. Remove existing tCM1 motor from blower assembly. See figure 1, Remove belly band screw to remove motor, 11-Determine a location on the blower housing to install the circuit board and mounting bracket, Location must allow for wiring to the control box, must not cover warning or information stickers, and must be accessible to service. See figure 11. TYPICAL CB21/B21V CIRCUIT BOARD INSTALLATION AND WIRING CB21V TERMINAL STRIP / 6-Place replacement motor (ICM2+) in motor bracket assembly according to the dimension shown in figure 2. Position motor/bracket assembly so that brackets align with holes in blower housing. 7- Before tightening mounting bracket screws, belly band screw and motor shaft set screw, the embossed arrow on the ICM2+ motor must be pointing UP. For upflow applications, motor arrow must point to the blower housing opening. For downflow applications, the arrow must point to the return air end of the furnace. In this position, the control and power plugs on the motor will face downward. For horizontal applications, motor arrow must point to the back of the unit with the power and control plugs toward the access panel side. See figure 10. CB21/B21V ICM2+ INSTALLATION ALIGN MOTOR/BRACKET ASSEMBLY WITH )LES IN BLOWER HOUSING Y KIT CIRCUIT BOARD BLOWER HOUSING FIGURE 11 12- Use mounting bracket as a template to mark two 7/32" mounting holes on the blower housing. Drill holes and secure bracket to blower housing with two screws provided. See figure 11, 13-Secure circuit board to mounting bracket with provided stand-offs. Electrical Connections (Figure 15) 14- Connect motor power harness, provided with kit, between original power harness (J96-kit harness to P48-original harness) and the motor (P96-kit harness to J48-motor). 15- Connect motor controt harness, provided with kit, between circuit board (J97-harness to P95-board) and motor (P97-harness to J49-motor), .... /_ ARROW ON MOTOR MUST POINT UP FOR HORIZONTAL, PLUG FACES ACCESS PANEL HORIZONTAL FIGURE 10 UPFLOW o _......... -DOWNFLOW 16-Connect original motor control harness (P49) to 6-pin ptug on circuit board (J95). 17- Install red wire, provided in kit, into either socket #3 or #6 of the original motor control harness (P49). 18- Install opposite end of red wire (spade connection) to terminal "R" on the thermostat terminal strip. 19- Refer to Jumper Adjustment section for application specific jumper selections, Page 5 TYPICAL G21V ICM2+ WIRING DIAGRAM 2#V A z_CONNECT WIRE TO THE FUSEHOLDER SPADE ON BACK SIDE OF LOW VOLTAGE TERMINAL BOARD. (OPPOSIDE SIDE OF FUSE FROM TRANSFORMER BLUE LEAD.) USE COPPER CONDUCTORS ONLY. REFER TO UNIT RATING PLATE FOR MINIMUM CIRCUIT AMPACITY AND MAXIMUM FUSE 51ZE NEC/CEC CONTROL CLASS 2 FI 72 • P72 GVI EOUIP GROUND ACC A KEY &3 &24 53 _6 =I 3VI J46 J48 J49 J72 J73 _43 LI5 "46 "4B "49 "72 "73 51 510 _51 572 578 rl rBI FB2 I ULSCH[HIION COMPONENT :ONTROL BURNER :ONTROL VSP _O_OR BLOWER _OTOR COMB AIR BLOWER :USE TRANSFORMER.TI /ALVE GAS JACK OUTPUT JACK MOTOR.VAR.SPD JACK MOTOR,VAR.SPD. JACK PRIMARY CONTROL JACK VSP CONTROL RELAY ECONOMIZER COIL CHOKE _LUG OUTPUT "LUG MOTOR,VAR.SPD. "LUG MOTOR,VAR.SPD. CONTROL JLUG VSp CONTROL HERMOSTAT ROOM _W[_CH L[MIT,PR[ GAS _WITCH DOOR INTERLOCK _W[TCH DIFF. PRESSURE _WITCH MODULATION CONTROL rRANSFORMER CONTROL ERMINAL STRIP LOW VOLTAGE tERMINAL STRIP UNIT z_ LI3 WIRED IHP MOTOR AS SHOWN. [V5 UNIT5) B3 _2) _OENOTES _FY _53 1£5 J96 J97 _95 "96 P97 --LINE OPTIONAL COMPONENTS MOTOR KIT COMPONENTS DESCRIPTION COMPONFNTS ]ONTROL JP61 SPEED £ELECTOF JACK JPBI SPEED SELECTOR JACK OPBI POWER INTERFACE JACK JPBI/B5 INTERFACE JLUG JPBI SPEED SELECTOR PLUG JPBI PO#ER INTERFACE "LUG JPBI/B5 INTERFACE VOLTABE FIELD WIRING CLASS [[ VOLTAGE FIELD INSTALLED EXISTING WIRE (PIGGY BACK TO ORANGE KIT WIRE) _ _._ i! ORANGE KIT WIRE (WITH PIGGY BACK CONNECTION)_ H BLUE WIRE TO TRANSFORMER BACK OF TERMINAL STRIP TERMINALS FIGURE 12 Page 6 ON BACK OF FUSE TYPICAL GSR21V ICM2+ WIRING DIAGRAM A USE COPFER CONDUCTORS &'e..Y. REFER TO UNIT RATINS R.AII_FOR Q INII/AJM CIRCUIT AMPACITY AND MAXIli_Id FUSE SIZE NEC/CEC CLASS 2 El0 SZl CONNECT WIRE TO WIR_ NUT CONTAININO WIDE FUSE HOLDER. CONTAINS K43-1 [] 521 JON ECON P 15 AUTO RESET ON UNITS ONLY, Ut_ITE.) FI S,OA TypEI MEX 2 J72 NOTE-JP98 IS LDEATEI ON BL(7_ZR DECK A24 _.COOL S7B 2 _}__ON___ THIS WIRE NOT tPSED ON JOHNSONBURNER CONTR(JL Y2 YI PLACE OUTDOORUNIT AND/ON TEMPERATLJI_ CONTROLDI ABRAM DEDE, _,P7Z WIRE IS FIELD INSTALLED IN ,_ SOCKET ,II OF BLOWER DECK PLON & JACK(_.JON).WIDE 15 PROVIDED IN THE MOTOR REPLACEMENT KIT. V ONOONDEQUIP /.'_,K43 i Z_ FIELD INSTALLED WIRE IN OPEN SOCKETOF PAD PLUG {EITDER '3 ON '6} PROVIDED WITH BLOWER MOTORREPLACEMENTKIT. 24V LCmae}N c / 397 0000 JACK-MOTOR• VAR.SPD. JACK-BLOY4ERDECK A¥- B3 MOTORNIT COMPONENTS -- LINE VOLTADE FIELD IIRIN6 -- CLASS II VOLTAGE FIELD WIRINS BLUE WIRE TO TRANSFORMER _ BACK OF FUSE ON TERMINAL WIRE NUT _ P98 LOCATED AT BLOWER DECK BUNDLE STR,P _ BLUE KIT WIRE (CONNECT TO WIRE NUT BUNDLE AND TO POSITION #11 IN P98) FIGURE 13 Page 7 TYPICAL GSR21CV ICM2+ WIRING DIAGRAM P?(/ 170 (}FI FIGURE 14 Page 8 PTO 2 3 B TYPICAL CB21/B21-41 & CB21/B21-51/65 FIELD WIRING FOR ECB21 UNITS WITHOUT CIRCUIT BREAKERS FIELD UNITS CIRCUIT 4 CBB A C[RCUITLI LI _ ICM2+ WIRING DIAGRAM WIRING FOR ECB21 WITH CIRCUIT BREAKERS CIRCUIT A _ CIRCUIT A co_A ,,_I__/T_ z_ 2 A c°'A LI _/T _- L2 _2 L2 _ AL3...,_ AL__A L2 _L3 _ A A CONNECT POWER WIRES FROM HEATER LABELED LI,L2 ON "P" VOLTAGE UNITS AND LI,LB,L3 ON "Y" VOLTAGE UNITS TO TOG TERMINAL STRIP IN INDOOR UNIT. Z_ EQUIPMENT IN GROUND LOCATED INDOOR :A THE NUMBER OF CIRCUITS VARY UNIT _ACCOROINB TO HEATER MOOEL. REFER TO FAN COiL NAMEPLATE FOR ACTUAL NUMBER EMPLOYEO A Z_ REFER CHART TO FACTORY BLOWER SPEED TAP SELACT[ON ON UNIT FOR BLOWER SPEED iNFORMATION Z_ USE COPPER FOR CONDUCTORS ONLY. TO UNIT NAMEPLATE MINIMUM CIRCUIT REFER AMPACITY ANO MAXIMUM OVERCURRENT PROTECTION 51ZE ECBBI SERES J2 > ' 2#V R POWER 1 05 BLOWER G Ao×MEAT , WI I I FI W2 z_ _ _ AGX HEAT 2 A_ A Y2 • AF4_ C°°L/BEAT 2 m_Oj_ 5 _ _ L_ EQUIP GROUND J4B J4E I Z_ O VALVE YI LqE]_ (I_ CIRCUIT REV COOL/HEATI WHEN TWO SPEED THERMOSTAT IS USED,CONNECT SECOND STAGE HEAT BULB TO TERMINAL "W2" AND REMOVE JUMPER BETWEEN TERMINALS "R" & "W2" /x WHEN OUTDOOR THERMOSTAT IS USEO,CONNECT LEADS _TO TERMINALS "R" AND "WB" AND REMOVE JUMPER CBB LI CONNECT L2_ JUMPER BETWEEN WHEN CBBI 15 MATCHEO UNIT, CONNECT JUMPER A _ "YI & "YB" WITH CONOENS[NB BETWEEN "R" & "0" WHEN HUMIO[TY CONTROL {ABO] [5 NOT USEO COMBINATIO WiTH TWO 5PEEO COMPRESSOR, CONNECT JUMPER BETWEEN "Y2" ANO "OS" A 49 A IN WHEN HUMIOITY CONTROL [A20) [5 NOT UBEO iN COMBINATION WITH SINGLE SPEED COMPRESSOR, CONNECT JUMPER BETWEEN "YI" AND "05" --LINE CLASS VOLTAGE F[ELO WIRING [i VOLTAGE FIELO WIRING BAV COMMON 1P97 CB21 SERIES MOTOR KiT COMPONENTS (EY _15 CB21 SERIES 13 :B5 :I J_5 J46 J4B JAB (20_ J2 _46 _48 rl rBl DESCRIPTION COMPONENT5 CONTROL JPBI SPEED SELECTOR JACK JPBI 5PEEO SELECTOR POWFR [NTFRFARF JACK JPBI/B3 INTERFACE PLUG JPBI 5PEEO SELECTOR PLUG JPBI POWER iNTERFACE _LUG JPBI/B3 INTERFACE (EY k53 J95 Jg6 J97 _95 _96 J97 B3 DESCRIPTION COMPONENT CONTROL BLOWER DRIVE MOTOR BLOWER CIRCUIT BRKR BLO MTR USE TRANSFORMER JACK INPUT JACK OUTPUT JACK MOTOR,VAR SPO JACK MOTOR,VAR SPD I,_ RELAY BLOWER JACK ELECT. HEAT PLUG iNPUT "LUG OUTPUT LENNOX_o.,.o._°o. W[RiNGOiAGRAMIg/g3 COILS BLOWER COIL UNITS "LUG MOTOR_VAR BPD "LUG MOTOR,VAR BPO TRANSFORMER CONTROL TERM STRIP CLASS ]I VOLT C821 41,51,65 IP CBH21 41 IP 821 51,65 WITH MOTOR KIT COIL SECTION 1846 £up_r_d_ Form N_ N_w F_rm IP N_ 529,854W @1993 Lannox Industrlas FIGURE 15 Page 9 Inu Lilh¢ U.S.# "ADJUST" The ADJUSTpinsallowthe motorto run at normal speed,approximately10%higher,or approximately 10%lowerthannormalspeed.Table9 givesthreerows ( +, NORMAL,and -) with their respectiveCFM volumes.Noticethatthenormaladjustmentsettingfor heatspeedposition#3 is 2000CFM,The+ adjustment settingfor that positionis 2180CFMand for the adjustmentsettingis 1800CFM.Afterthe adjustment setting has been determined,chosethe remainder speedjumpersettingsfromthoseofferedin thetable. The TEST pin is available to bypass the JPB1 control and run the motor at approximately 70% to test that the motor is operational. This is beneficial primarily in troubleshooting. for motor to run. G must be energized "H EAT" The HEAT jumper is used to set the blower speed to obtain the required CFM for heating. G21V and GSR21V unit require a jumper between HB and W2 to allow HEAT to control heating speed. For G2 lVand GSR2 lVunits - If a lower heating speed (than one that is listed in HEAT SPEED section) is IMP( IRTANT To change jumper positions, gently pull the jumper off the pins and place it on the desired set of pins. The following section outlines the different jumper selections available and conditions associated with each one, Refer to figure 16 for identification. Adjust circuit board jumpers for High, Low, Heat and Adjust according to tables 2, 3, and 4 for G21V, GSR21V and GSR21CV units, table 5 for CB21V-41 and CBH21V-41 units, and table 6 for CB21V-51, CBH21V-51, CB21V-65, CBH21V-65 and B21V-51/65 units. The entire group of CFM options are shown in table 9 for G21V, table 10 for GSR21V, table 11 for GSR21CV units, table 12 for CB21V-41 and CBH21V-41 units, and table 13 for CB21V-51, CBH21V-51, CB21V-65, CBH21V-65 and B21V-51i65 units. Note that speeds selected must all come from the same row because the Adjust determines the speeds available, required, the LOW jumper may be used to set the heating speed. This is done by first placing the LOW jumper in the desired CFM position and then removing a jumper between HB and W2 on the unit S _, ADJUST HEAT 2 1 TE_ST "HIGH" HIGH LOW The HIGH jumper is used to determine the CFM during cooling speed. These jumper selections are activated when G and DS terminals are energized for G21V, GSR21V or GSR21CV and when G, DS and O are energized for the CB21. / J95 The LOW jumper is used to determine CFM during low speed cooling. These jumper selections are activated when G is energized. The LOW jumper may also be used for low speed heating for G21V and GSR21V units only. See the "HEAT" section for details. Page lO position "A53" JPB1 KIT BLOWER BOARD terminal strip. Doing so will activate the low speed jumper setting when W1 is energized. The heat speed is not operable on GSR21CV units. "LOW" jumper FIGURE 16 P95 TABLE 2 G21V3 and GSR21V3 SERIES UNITS ICM1 SPEED TAP TO ICM2+ JUMPER SELECTIONS (ForStaticPressure0.0" to 0.8" w.g.) ORIGINAL MOTOR SPEED TAP POSITION ORIGINAL MOTOR APPROXk MATE CFM CIRCUIT BOARD JUMPER POSITION 2 490 LOW 1" TABLE 4 GSR21CV5 SERIES UNITS ICM1 SPEED TAP TO ICM2+ JUMPER SELECTIONS (For Static Pressure O.O" to 1.2" w.g.) ADJUSTMENT JUMPER POSITION ORIGINAL MOTOR SPEED TAP POSITION ORIGINAL MOTOR APPROXIMATE CFM CIRCUIT BOARD JUMPER POSITION 2 905-1020 LOW 2 NORM 3 945-!030 LOW 2 NORM 4 1170-1330 LOW 3 NORM NORM NORM ADJUSTMENT JUMPER POSITION 3 635 LOW 2* NORM 4 760 LOW 3* NORM 5 1345-1500 LOW 4 / HIGH 1 5 880 LOW 4* NORM 6 !510-1700 HIGH 2 "-" 6 1030 HEAT 1 / HIGH 1 NORM 7 1700-1850 HIGH 2 NORM 7 1140 HEAT 2 / HIGH 2 NORM 8 1885-2000 HIGH 2 "+" 9 2010-2100 HIGH 3 NORM 10 2000-2200 HIGH 4 NORM 11 2000-2200 HIGH 4 NORM 8 1220 HEAT 3 / HIGH 3 NORM 9 1345 HEAT 3 / HIGH 3 "+" 10 1420 HEAT 4 / HIGH 4 "+" 11 1420 HEAT 4/HIGH "+" 4 *HEAT is not used on GSR2 I CV units. TABLE CB21V/CBH21V-41 *HEAT will be the heating speed if a jumper is present between terminals HB and W2 on the unit terminal strip. For LOW to be the heating speed, remove the jumper between terminals HB and W2 on unit terminal strip, if present. TABLE 3 G21V5 and GSR21V5 SERIES ICM1 SPEED TAP TO ICM2+ JUMPER ICM1 2 ORIGINAL MOTOR APPROXlMATE CFM 770 CIRCUIT BOARD JUMPER POSITION LOW 1" TAP TO ICM2+ (For Static Pressure 0.0" to 0.6" w.g.) UNITS SELECTIONS ORIGINAL MOTOR SPEED TAP POSITION ORIGINAL MOTOR APPROXk MATE CFM CIRCUIT BOARD JUMPER POSITION 1 676 LOW 1 NORM 2 750 LOW 1 NORM 3 850 LOW 2 NORM 4 926 LOW 3 NORM 5 1025 LOW 4 / HIGH 1 NORM 6 1125 HEAT I / HIGH 2 NORM 7 !225 HEAT 2 / HIGH 3 NORM 8 1325 HEAT 3 / HIGH 3 NORM NORM (For Static Pressure0.0" to 0.8" w.g.) ORIGINAL MOTOR SPEED TAP POSITION SPEED 5 SERIES UNITS JUMPER SELECTIONS ADJUSTMENT JUMPER POSITION NORM ADJUSTMENT JUMPER POSITION 3 1015 LOW 2* NORM 4 1305 LOW 3* NORM 9 1400 HEAT 4 / HIGH 4 5 1510 LOW 4* NORM 10 !550 HEAT 4/HIGH 4 "+" "-" 11 1550 HEAT 4/HIGH 4 "+" 6 1685 HEAT 2 / HIGH 2 7 1820 HEAT 2 / HIGH 2 NORM 8 2010 HEAT 2 / HIGH 2 "+" 9 2050 HEAT 3 / HIGH 3 NORM 10 2100 HEAT 3 / HIGH 3 NORM 11 2100 HEAT 3 / HIGH 3 NORM TABLE 6 CB21V / CBH21V / B21V-51/65 ICM1 SPEED TAP TO ICM2+ SERIES JUMPER UNITS SELECTIONS (For Static Pressure O.0" to 0.6" w.g.) *HEAT will be the heating speed if a jumper is present between terminals HB and W2 on the unit terminal strip. For LOW to be the heating speed, remove the jumper between terminals HB and W2 on unit terminal strip, if present. Page 11 ORIGINAL MOTOR SPEED TAP POSITION ORIGINAL MOTOR APPROXk MATE CFM CIRCUIT BOARD JUMPER POSITION ADJUSTMENT JUMPER POSITION 1 750 LOW 1 NORM 2 850 LOW 1 NORM 3 950 LOW 2 NORM 4 1150 LOW 3 NORM 5 1300 LOW 4 NORM 6 !500 HEAT 1 / HIGH 1 NORM 7 1650 HEAT 2 / HIGH 2 NORM 8 1800 HEAT 3 / HIGH 3 NORM 9 !950 HEAT 4/HIGH 4 NORM 10 2100 HEAT 4/HIGH 4 "+" 11 2100 HEAT 4/HIGH 4 "+" TABLE 7 G21V3-60/80 ICM2+ (For Static ADJUST JUMPER SETTING BLOWER Pressure LOW SPEED JPB1 JUMPER POSITION MOTOR PERFORMANCE 0.0" to 0,8" w.g.) HIGH (COOL) SPEED JPB1 JUMPER POSITION HEAT SPEED JPB1 JUMPER POSITION 1 2 3 4 1 2 3 4 1 2 3 4 + 540 700 830 1000 1150 1260 1400 1410 1150 1250 1350 1400 NORM 490 630 740 880 1040 1140 1240 1265 1030 1140 1220 1300 440 560 670 800 940 1030 1140 1160 920 1020 1100 1190 NOTE: ADJUST position on JPB1 ("NORM", GSR21V3-80 "+", or "-") determines ICM2+ (For Static ADJUST JUMPER SETTING the row of CFM available TABLE 8 BLOWER MOTOR Pressure LOW SPEED JPB1 JUMPER POSITION to use. PERFORMANCE 0.0" to 0.8" w.g.) HIGH (COOL) SPEED JPB1 JUMPER POSITION HEAT SPEED JPB1 JUMPER POSITION 1 2 3 4 1 2 3 4 1 2 3 4 + 520 670 800 960 1110 1220 1340 ! 420 1110 1210 13!0 1420 NORM 480 600 740 880 1070 1160 1270 !300 1000 1100 1200 1280 420 550 650 770 950 1040 1150 ! 170 900 1000 1100 1! 50 NOTE: ADJUST position on JPB1 ("NORM _, "+", or "-") determines G21V5-80/100 ADJUST Pressure LOW SPEED JPB1 JUMPER POSITION JUMPER SETTING TABLE 9 BLOWER MOTOR ICM2+ (For Static the row of CFM available to use. PERFORMANCE 0.0" to 0,8" w.g.) HIGH (COOL) SPEED JPB1 JUMPER POSITION HEAT SPEED JPB1 JUMPER POSITION 1 2 3 4 1 2 3 4 1 2 3 4 + 800 1050 14!0 1620 1710 2030 2270* 2270* 1900 2140 2270* 2270* NORM 720 950 1280 1500 1570 1850 2100 2220 1700 1940 2080 2200 850 1120 1310 1420 1650 1860 !990 1520 1730 1860 1940 620 NOTE: ADJUST position on JPB1 ("NORM", "+", or "-") determines the row of CFM available to use. *2300 CFM @ 0.2" w.g.; 2250 CFM @ 0.5" w.g.; 2200 CFM @ 0.8" w.g. TABLE GSR21V5-80/100 ICM2+ (For Static ADJUST JUMPER SETTING 10 BLOWER Pressure LOW SPEED JPB1 JUMPER POSITION MOTOR PERFORMANCE 0.0" to 0,8" w.g.) HIGH (COOL) SPEED JPB1 JUMPER POSITION HEAT SPEED JPB1 JUMPER POSITION 1 2 3 4 1 2 3 4 1 2 3 4 + 860 1100 1460 1740 1800 2090 2100- 2100- 1930 2100- 2100- 2100- NORM 770 1020 1390 1580 1720 1990 2100" 2100" 1800 2000 2100" 2100" 680 900 1180 1400 1450 1690 1940 2040 1580 1780 1920 2010 NOTE: ADJUST position on JPB 1 ("NORM ", "+", or "-") determines the row of CFM available *2200 CFM @ 0.2" w.g.; 2100 CFM @ 0.5" w.g.; 2000 CFM @ 0.8" w.g. Page12 to use. TABLE 11 GSR21CV5-80/100 ICM2+ BLOWER MOTOR PERFORMANCE (For Static Pressure O.O" to 1.2" w.g.) ADJUST JUMPER SETTING LOW SPEED STATIC NORM HIGH (COOL) JPR1 JUMPER POSITION JPB1 JUMPER POSITION JPB1 JUMPER POSITION 1 2 3 4 1 2 3 4 1.2 750 1080 1440 1670 1790 2000 2000 2000 1.0 790 1090 1450 1660 1800 2080 2070 2080 840 1130 1460 1640 1770 2100 2230 2210 1.2 680 940 1340 1510 1490 1870 2020 2000 1.0 700 960 1350 1510 1500 1880 2110 2070 0.5 750 1030 1360 1520 1500 1840 2130 2220 1.2 590 790 1160 1330 1410 1670 1920 1980 1.0 610 830 1180 1350 1420 1660 1940 2010 0.5 670 900 1200 1360 1440 1640 1920 2010 CB21V-41 (Operating ADJUST JUMPER on JPB 1( "NORM", TABLE 12 CBH21V-41 BLOWER AND at 0.00 through 0,60 in. w.g. LOW SPEED JPB1 JUMPER POSITION 2 1 0.5 NOTE: HEA Tspeed tap is not used on GSR21CV units. ADJ USTposition CFM available to use. SETTING HEAT SPEED SPEED "+" or "-') 3 determines 4 the row of PERFORMANCE External Static Pressure) HIGH (COOL) SPEED JPB1 JUMPER POSITION HEAT SPEED JPB1 JUMPER POSITION 1 2 3 4 1 2 3 4 1 2 3 4 + 850 950 1060 1!50 1150 1250 1490 !600 1230 1346 1480 1600 NORM 750 850 950 1025 1025 1125 1325 !425 1125 1225 1325 1425 650 730 830 900 900 1000 1190 !260 980 1080 1190 1260 NOTE: ADJUST position on BDC-2 ("NORM'; "+", or "-") determines TABLE CB21V-51, CBH21V-51, (Operating ADJUST JUMPER SETTING the row of CFM available to use. 13 CB21V-65, CBH21V-65 AND B21V-51/65 BLOWER PERFORMANCE at 0,0O through 0.60 in. w.g. External Static Pressure) LOW SPEED JPB1 JUMPER POSITION HIGH (COOL) SPEED JPB1 JUMPER POSITION HEAT SPEED JPB1 JUMPER POSITION 1 2 3 4 1 2 3 4 1 2 3 4 + 935 1060 1265 1425 1650 1780 1955 2160 1650 1800 2000 2200 NORM 850 950 1150 1300 1500 1650 1800 !950 1500 1650 1800 1956 850 1026 1!10 1350 1485 1560 !760 1340 1480 1630 1760 the row of CFM available to use. 750 NOTE: ADJUST position on BDC-2 ("NORM _, "+", or "-") determines Page13 Tocheck-outtheICM2+refertofigure17andfollowthe check-outprocedureasoutlined.If theblowerfailsany of thesetests,do not attemptto repairthe motor. ICM2+ Therearenofieldserviceable partsin thiscomponent. Replace themotorandrepeatthecheck-outprocedure, CHECK-OUT A kit is available from the Lennox parts center to use in testing the variable speed motor. The kit 70J 11 includes a test plug harness to facilitate vsm check-out. Follow testing procedures outlined in the instructions provided with the kit. The testing procedures are different than those listed below. If not using the kit to test the motor, follow the procedure below. NOTE-Any A. C. voltage source less than 30 volts or any D.C. voltage source less than 20 volts may be used to check out the motor. An ordinary 9 volt battery is recommended, Unit transformer T1 secondary may be used in lieu of a battery. A 9 volt battery will last for about one day of normal operation. If transformer T1 is used, double check all wiring connections before placing CHECK-OUT 1 2 3 4 5 6 7 8 9 10 unit back in operation. PROCEDURE 11 1 1234- Disconnect power to unit. Disconnect 11 pin plug located on JPB1. Connect voltage shown above. ICM2+ LOW source SPEED as CHECK-OUT Turn on power to unit. Blower should operate at low speed. 2 3 4 5 6 7 8 9 10 _1 ICM2+ HIGH SPEED CHECK-OUT 5- Disconnect power to unit. 6- Connect voltage source as shown above. 7- Turn on power to unit. Blower should operate at high speed. 1 2 3 4 5 6 7 8 9 10 11 wn above. r should o e,a eed FIGURE 17 Page 14
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.2 Linearized : No Page Count : 14 Page Layout : SinglePage Page Mode : UseNone Producer : Goby Monitor Application version 4, 0, 0, 13 Create Date : Sun Jul 20 21:11:22 2008 Author : Title : Subject :EXIF Metadata provided by EXIF.tools