LENNOX Furnace/Heater, Gas Manual L08A6040
User Manual: LENNOX LENNOX Furnace/Heater, Gas Manual LENNOX Furnace/Heater, Gas Owner's Manual, LENNOX Furnace/Heater, Gas installation guides
Open the PDF directly: View PDF
.
Page Count: 14
| Download | |
| Open PDF In Browser | View PDF |
GAS
& BLOWER
UNIT KITS
;/q
i_Techrllca]
i
_Publications
AND ACCESSORIES
@1994 Lennox
Industries
Inc.
503,154M
8/94
Supersedes
Datlas, Texas
Litl_o
U.S.A.
ICM2+ REPLACEMENT
MOTOR KIT
502,994M
INSTALLATION
INSTRUCTIONS
FOR REPLACEMENT
VARIABLE SPEED MOTOR
USED ON G21V, GSR21V, GSR21CV, CB21 AND CBH21 SERIES UNITS
This kit is used to replace the ICM1 variable speed
blower motor with the ICM2+ motor used on G21V,
Package 1 of 1 contains:
1- Circuit board (JPB1 jumper
GSR21V, GSR21CV, CB21-41, -51, -65 and B21-41,
-51, -65 series units. Refer to table 1 for unit model
board)
1- Mounting bracket
1- Motor control harness
number
and corresponding
4- Wiring diagrams
1- Bag assembly containing:
6-#10 x 6 x 5/8 SDST screws
kit part number.
WARNING
4-Wires (blue, red, orange, purple)
4-Wire ties with screw hole mount
2- Stickers
1- tCM2+ replacement
KIT
motor
1- Motor power harness
Motor Replacement
1- PFC choke (V3 units only)
1- Remove both access panels from unit.
TABLE 1
ICM2+ REPLACEMENT MOTOR KIT APPLICATION
FURNACE/
BLOWER UNIT
MOTOR KIT
LB- NUMBER
MOTOR KIT
PARTNUMBER
G21V5, GSR21V5
LB-85899C
63J89
GSR21CV5
LB-85899D
63J90
G21V3, GSR21V3
LB-85899E
81Jll
CB21/B21-41
LB-85899A
56J60
CB21/B21-51
CB21/B21-65
LB-85899B
56J61
2- Unplug existing ICM1 motor power harness (P48)
and control harness (P49).
3- Remove green ground wire from blower housing.
4- Remove 2 blower
btower assembly.
securing
screws
and remove
5- Loosen the motor shaft set screw and bracket
securing screws. Remove existing ICM1 motor
from blower assembly. See figure 1. Remove
belly band screw to remove motor.
TYPICAL ICM1 MOTOR REMOVAL
ICM1 MOTOR
(TO BE REPLACED)
REMOVE MOTOR
SHAFT SET SCREW
REMOVE MOTOR
BRACKET SECURING
SCREWS
FIGURE 1
Page 1
6-Place replacementmotor (ICM2+) in motor
bracketassemblyaccordingto the dimension
shown in figure 2. Position motor/bracket
assemblyso that bracketsalign with holes in
blowerhousing,
MOTOR / MOUNTING
--_
A field-installed,
power factor correcting choke is
provided for use only on G21V3 units. G21V5 units are
factory equipped with the choke.
11-Determine
a location on the blower housing to
install the circuit board and mounting
bracket.
Location
must allow for wiring
through
the
blower deck strain relief to the control box, must
not cover warning or information
stickers, and
must be accessible to service. See figure 4.
BRACKET DIMENSION
A 4--
Circuit Board and Choke Installation
ICM2+
MOTOR
TYPICAL G21V CIRCUIT BOARD
INSTALLATION AND WIRING
G21V CONTROL BOX
TERMINAL STRIP
ROUTE WIRES
THROUGH
STRAIN RELIEF
MOUNITNG
BRACKET
MODEL
NUMBER
Dim. "A"
CB21V-41
CBH21V-41
G21V3
GSR21V3
CB21V-51/65
B21V-51/65
G21V5,
GSR21VS,
GSR21CV5
3-1/2"
2-1/8"
1"
FIGURE
KIT CIRCUIT
BOARD
/1_
BLOWER
HOUSING
I
2
FIGURE 4
7- Before tightening mounting bracket screws, belly
band screw and motor shaft set screw, the
embossed arrow on the ICM2+ motor must be
pointing UP (perpendicular to the blower housing
opening). In this position, the control and power
plugs on the motor will face downward,
See
figure 3.
8-Install
blower housing
assembly
in cabinet.
Secure with screws previously removed.
9- Install the ground wire to blower
housing.
10- Place one sticker on the blower housing close to
the motor and the other sticker close to the unit
nameplate.
12-Drill two mounting bracket holes on the blower
housing, See figure 4 for an example.
13-Install circuit board mounting
screws (provided).
bracket using two
14-Secure circuit board to mounting
provided stand-offs.
bracket
with
15-For G21V3 applications
only- Use two SDST
screws, provided, to install choke on side of
blower housing. See figure 5 for installation
dimensions.
G21V3 AND GSR21V3 PFC CHOKE
INSTALLATION LOCATION
14/2
G21V ICM2+ INSTALLATION
USE 2 SDST SCREWS
(PROVIDED) TO SECURE
-I_
/
_I-
I
r- t ,-3/,
3-9/16 _'
D
EMBOSSED ARROW ON
MOTOR MUST POINT UP
/
ALIGN MOTOR/BRACKET
ASSEMBLY WITH HOLES
IN BLOWER HOUSING
FIGURE 3
FIGURE 5
Page 2
Electrical Connections (Figure 12)
16- Connect motor control harness, provided with kit,
between
circuit
board
(J97-harness
to
P95-board)
and
motor
(P97-harness
to
J49-motor). See figure 6 for correct positioning of
control harness to the circuit board.
KIT CONTROL HARNESS TO
JPB1 CONTROL CONNECTION
SIDE VIEW
19- Remove control cover to expose back of terminal
board. Locate the three wires attached to the
terminals behind the fuse. See detail in figure 12.
20- Remove the single wire from the right side of the
left set of fuse spade connections. Install the 1/4"
piggy back end of orange wire to the spade
connection. Attach the previously removed wire
to the piggy back connection on the orange wire,
Connections should be made so that the spades
are facing away from the terminal strip mounting
screw.
21- Route the orange wire from the control box strain
relief hole through the blower deck strain to the
original
motor control
harness (P49). Install
terminal in either socket #3 or #6 of P49. Replace
control box cover.
22-Connect
original motor control harness (P49) to
6-pin plug on circuit board (J95).
23- Refer
to
application
Jumper
Adjustment
section
specific jumper selections.
for
,A WARNING
FIGURE 6
17- Connect motor power harness, provided with kit,
between original power harness (J96-kit harness
to P48-original
harness) and the motor (P96-kit
harness to J48-motor).
Motor Replacement
18- For G21V3 applications only- Con nect two loose
wires from kit power harness (J96!P48) to PFC
choke terminals.
Make sure insulation
tubing
covers connections. Tape over tubing and wire
with electrictians tape to ensure protection. See
figure 7 for field wiring.
G21V3 AND GSR21V3 CHOKE
FIELD WIRING DIAGRAM
t-
2- Unplug existing ICM1 motor power harness (P48)
and control harness (P49).
3_
7_
CONNECT TWO LOOSE
8-
FIGURE 7
Page 3
blower deck harness P98/J98.
5- Remove 2 blower
blower assembly.
KIT CONTROL HARNESS
CHOKE
Unplug
4- Remove green ground wire from blower housing.
6_
HARNESS TO TERMINALS
Remove both access panels from unit.
securing
screws
and remove
Loosen the motor shaft set screw and bracket
securing screws. Remove existing ICM1 motor
from blower assembly. See figure 1. Remove
belly band screw to remove motor.
Place replacement
motor
(tCM2+) in motor
bracket assembly according to the dimension
shown
in figure
2. Position
motor/bracket
assembly so that brackets align with holes in
blower housing.
Before tightening mounting bracket screws, belly
band screw and motor shaft set screw, the
embossed arrow on the ICM2+ motor must be
pointing UP. For horizontal applications,
motor
arrow must point to the top of the unit. For
downflow applications, the arrow must point to
the return air end of the furnace, tn this position,
the control and power plugs on the motor wilt
face downward. See figure 8.
GSR21V ICM2+ INSTALLATION
TYPICAL GSR21V & GSR21CV CIRCUIT
BOARD INSTALLATION AND WIRING
\
KIT CIRCUIT
BOARD
ALIGN
MOTOR/BRACKET
ASSEMBLY WITH
HOLES IN BLOWER
HOUSING
/
/
/
FIGURE 9
16- For GSR21V3 applications only- Use two SDST
screws provided to install choke on side of blower
housing. See figure 5 for installation dimensions.
EMBOSSED ARROW
ON MOTOR
MUST POINT UP
Electrical Connections (Figures 13 and 14)
17- Select the blue and purple wires provided in the kit.
18- install socket terminal of purple wire, provided in
kit, into either socket #3 or #6 of the original
motor control harness (P49),
0
19- install pin terminal end of purple wire into socket
#11 of the blower deck harness jack (J98).
.J
DOWNFLOW
HORIZONTAL
FIGURE 8
9-Install
blower housing
assembly
in cabinet.
Secure with screws previously removed.
10- Install the ground wire to blower
housing,
11- Place one sticker on the blower housing close to
the motor and the other sticker close to the unit
nameplate.
Circuit Board and Choke Installation
A field-installed,
power factor correcting choke is
provided for use only on GSR21V3 units. GSR21V5
units are factory equipped with the choke.
12- Use mounting bracket as a template to mark two
7/32" mounting holes on the blower deck flange.
Drill holes, See figure 9.
13-Place mounting bracket on the back side of the
blower deck flange and align drilled holes with
those in the mounting bracket,
20- Connect original motor control harness (P49) to
6-pin plug on circuit board (J95).
21-Trace the brown wire from the back side of the
fuse located on the terminal strip to the wire
bundle in the control box. See detail in figure 13,
Unscrew wire nut from bundle and add the kit
provided blue wire to it, Secure all wires together
with wirenut, Route the opposite end of blue wire
to control box side of blower deck harness and
insert it into position #11 of the plug (P98).
22- Re-connect blower deck harness P98/J98.
23- Connect motor control harness, provided with kit,
between
circuit
board
(J97-harness
to
P95-board)
and
motor
(P97-harness
to
J49-motor).
See figure 6 for correct positioning
of control harness to the circuit board.
24- Connect motor power harness, provided with kit,
between original power harness (J96-kit harness
to P48-originat
harness) and the motor (P96-kit
harness to J48-motor).
14-Install two screws, provided, through the flange
and into the bracket to secure, Mount bracket on
side of the flange.
25- For G21V3 applications only- Connect two loose
wires from kit power harness (J96/P48) to PFC
choke terminals,
Make sure insulation
tubing
covers connections. Tape over tubing and wire
with eiectrictians tape to ensure protection. See
figure 7 for field wiring.
15-Secure circuit board to mounting
provided stand-ells.
26- Refer
to
application
bracket
with
Page 4
Jumper
Adjustment
section
specific jumper selections,
for
8-Install
blower
housing
assembly
in cabinet,
Secure with screws previously removed.
9- Install the ground wire to hex screw on blower
housing,
10- Place one sticker on the blower housing close to
the motor and the other sticker close to the unit
nameplate.
WARNING
Motor Replacement
Circuit Board Installation
1- Remove blower access panel from unit,
2- Unplug existing ICM1 motor power harness (P48)
and control harness (P49),
3- Removegreen
ground wire from blower housing.
4- Remove two blower securing screws and remove
blower assembly.
5- Loosen the motor shaft set screw and bracket
securing screws. Remove existing tCM1 motor
from blower assembly. See figure 1, Remove
belly band screw to remove motor,
11-Determine
a location on the blower housing to
install the circuit board and mounting
bracket,
Location must allow for wiring to the control box,
must not cover warning or information
stickers,
and must be accessible to service. See figure 11.
TYPICAL CB21/B21V CIRCUIT BOARD
INSTALLATION AND WIRING
CB21V
TERMINAL STRIP
/
6-Place
replacement
motor
(ICM2+) in motor
bracket assembly according
to the dimension
shown
in figure
2. Position
motor/bracket
assembly so that brackets align with holes in
blower housing.
7- Before tightening mounting bracket screws, belly
band screw and motor shaft set screw, the
embossed arrow on the ICM2+ motor must be
pointing
UP. For upflow
applications,
motor
arrow must point to the blower housing opening.
For downflow applications, the arrow must point
to the return air end of the furnace. In this
position, the control and power plugs on the
motor
will
face downward.
For horizontal
applications, motor arrow must point to the back
of the unit with the power and control plugs
toward the access panel side. See figure 10.
CB21/B21V ICM2+ INSTALLATION
ALIGN MOTOR/BRACKET
ASSEMBLY WITH
)LES IN BLOWER HOUSING
Y
KIT CIRCUIT
BOARD
BLOWER
HOUSING
FIGURE 11
12- Use mounting bracket as a template to mark two
7/32" mounting
holes on the blower housing.
Drill holes and secure bracket to blower housing
with two screws provided. See figure 11,
13-Secure circuit board to mounting
bracket with
provided stand-offs.
Electrical Connections (Figure 15)
14- Connect motor power harness, provided with kit,
between original power harness (J96-kit harness
to P48-original
harness) and the motor (P96-kit
harness to J48-motor).
15- Connect motor controt harness, provided with kit,
between
circuit
board
(J97-harness
to
P95-board)
and
motor
(P97-harness
to
J49-motor),
....
/_
ARROW
ON MOTOR
MUST POINT UP
FOR
HORIZONTAL,
PLUG FACES
ACCESS PANEL
HORIZONTAL
FIGURE 10
UPFLOW
o
_.........
-DOWNFLOW
16-Connect original motor control harness (P49) to
6-pin ptug on circuit board (J95).
17- Install red wire, provided in kit, into either socket
#3 or #6 of the original motor control harness
(P49).
18- Install
opposite
end
of red wire
(spade
connection) to terminal "R" on the thermostat
terminal strip.
19- Refer
to Jumper
Adjustment
section
for
application specific jumper selections,
Page 5
TYPICAL
G21V ICM2+ WIRING
DIAGRAM
2#V
A
z_CONNECT WIRE TO THE
FUSEHOLDER SPADE ON
BACK SIDE OF LOW
VOLTAGE TERMINAL BOARD.
(OPPOSIDE SIDE OF FUSE
FROM TRANSFORMER BLUE
LEAD.)
USE COPPER CONDUCTORS
ONLY. REFER TO UNIT
RATING PLATE FOR
MINIMUM CIRCUIT
AMPACITY AND MAXIMUM
FUSE 51ZE
NEC/CEC
CONTROL
CLASS
2
FI
72
• P72
GVI
EOUIP
GROUND
ACC
A
KEY
&3
&24
53
_6
=I
3VI
J46
J48
J49
J72
J73
_43
LI5
"46
"4B
"49
"72
"73
51
510
_51
572
578
rl
rBI
FB2
I
ULSCH[HIION
COMPONENT
:ONTROL BURNER
:ONTROL VSP
_O_OR BLOWER
_OTOR COMB AIR BLOWER
:USE TRANSFORMER.TI
/ALVE GAS
JACK OUTPUT
JACK MOTOR.VAR.SPD
JACK MOTOR,VAR.SPD.
JACK PRIMARY CONTROL
JACK VSP CONTROL
RELAY ECONOMIZER
COIL CHOKE
_LUG OUTPUT
"LUG MOTOR,VAR.SPD.
"LUG MOTOR,VAR.SPD.
CONTROL
JLUG VSp CONTROL
HERMOSTAT ROOM
_W[_CH L[MIT,PR[
GAS
_WITCH DOOR INTERLOCK
_W[TCH DIFF. PRESSURE
_WITCH MODULATION CONTROL
rRANSFORMER CONTROL
ERMINAL STRIP LOW VOLTAGE
tERMINAL STRIP UNIT
z_
LI3 WIRED
IHP MOTOR
AS SHOWN.
[V5 UNIT5)
B3
_2)
_OENOTES
_FY
_53
1£5
J96
J97
_95
"96
P97
--LINE
OPTIONAL
COMPONENTS
MOTOR KIT COMPONENTS
DESCRIPTION
COMPONFNTS
]ONTROL JP61 SPEED £ELECTOF
JACK JPBI SPEED SELECTOR
JACK OPBI POWER INTERFACE
JACK JPBI/B5
INTERFACE
JLUG JPBI SPEED SELECTOR
PLUG JPBI PO#ER INTERFACE
"LUG JPBI/B5 INTERFACE
VOLTABE FIELD WIRING
CLASS [[ VOLTAGE FIELD INSTALLED
EXISTING WIRE
(PIGGY BACK TO ORANGE KIT WIRE) _
_._
i!
ORANGE KIT WIRE
(WITH PIGGY BACK CONNECTION)_
H
BLUE WIRE TO
TRANSFORMER
BACK OF TERMINAL
STRIP
TERMINALS
FIGURE 12
Page 6
ON BACK OF FUSE
TYPICAL
GSR21V
ICM2+
WIRING
DIAGRAM
A
USE COPFER CONDUCTORS
&'e..Y.
REFER TO UNIT
RATINS R.AII_FOR
Q INII/AJM
CIRCUIT
AMPACITY AND MAXIli_Id
FUSE SIZE
NEC/CEC CLASS 2
El0
SZl
CONNECT WIRE TO WIR_
NUT CONTAININO WIDE
FUSE HOLDER.
CONTAINS
K43-1
[]
521 JON
ECON
P
15 AUTO RESET ON
UNITS ONLY,
Ut_ITE.)
FI
S,OA
TypEI
MEX
2
J72
NOTE-JP98 IS LDEATEI
ON BL(7_ZR DECK
A24
_.COOL
S7B
2
_}__ON___
THIS WIRE NOT tPSED
ON JOHNSONBURNER
CONTR(JL
Y2
YI
PLACE OUTDOORUNIT
AND/ON TEMPERATLJI_
CONTROLDI ABRAM
DEDE,
_,P7Z
WIRE IS FIELD INSTALLED IN
,_ SOCKET ,II OF BLOWER DECK
PLON & JACK(_.JON).WIDE
15 PROVIDED IN THE MOTOR
REPLACEMENT KIT.
V
ONOONDEQUIP
/.'_,K43
i
Z_ FIELD INSTALLED WIRE
IN OPEN SOCKETOF PAD
PLUG {EITDER '3 ON '6}
PROVIDED WITH BLOWER
MOTORREPLACEMENTKIT.
24V
LCmae}N c
/ 397
0000
JACK-MOTOR• VAR.SPD.
JACK-BLOY4ERDECK
A¥-
B3
MOTORNIT COMPONENTS
--
LINE VOLTADE FIELD IIRIN6
-- CLASS II VOLTAGE FIELD WIRINS
BLUE WIRE TO TRANSFORMER
_
BACK OF FUSE
ON TERMINAL
WIRE
NUT
_
P98
LOCATED AT
BLOWER DECK
BUNDLE
STR,P
_
BLUE KIT WIRE
(CONNECT TO WIRE NUT BUNDLE
AND TO POSITION #11 IN P98)
FIGURE 13
Page 7
TYPICAL
GSR21CV
ICM2+ WIRING
DIAGRAM
P?(/
170
(}FI
FIGURE 14
Page 8
PTO
2
3
B
TYPICAL
CB21/B21-41
& CB21/B21-51/65
FIELD WIRING FOR ECB21
UNITS WITHOUT CIRCUIT BREAKERS
FIELD
UNITS
CIRCUIT
4
CBB
A
C[RCUITLI
LI _
ICM2+ WIRING
DIAGRAM
WIRING FOR ECB21
WITH CIRCUIT BREAKERS
CIRCUIT
A
_
CIRCUIT
A co_A
,,_I__/T_ z_
2
A c°'A
LI _/T
_-
L2 _2
L2 _
AL3...,_
AL__A
L2
_L3
_
A
A
CONNECT POWER WIRES FROM
HEATER LABELED LI,L2
ON
"P" VOLTAGE UNITS AND
LI,LB,L3
ON "Y" VOLTAGE
UNITS TO TOG TERMINAL
STRIP
IN INDOOR UNIT.
Z_
EQUIPMENT IN GROUND
LOCATED
INDOOR :A
THE NUMBER OF CIRCUITS
VARY
UNIT
_ACCOROINB
TO HEATER MOOEL.
REFER TO FAN COiL NAMEPLATE
FOR ACTUAL NUMBER EMPLOYEO
A
Z_
REFER
CHART
TO FACTORY BLOWER SPEED TAP SELACT[ON
ON UNIT FOR BLOWER
SPEED
iNFORMATION
Z_
USE
COPPER FOR
CONDUCTORS
ONLY.
TO UNIT
NAMEPLATE
MINIMUM
CIRCUIT REFER
AMPACITY
ANO MAXIMUM
OVERCURRENT
PROTECTION
51ZE
ECBBI
SERES
J2
>
'
2#V
R
POWER
1
05
BLOWER
G
Ao×MEAT
,
WI
I I
FI
W2
z_
_
_
AGX HEAT 2
A_
A
Y2
•
AF4_
C°°L/BEAT
2
m_Oj_
5
_
_
L_
EQUIP
GROUND
J4B
J4E
I
Z_
O
VALVE
YI
LqE]_
(I_
CIRCUIT
REV
COOL/HEATI
WHEN TWO SPEED THERMOSTAT IS USED,CONNECT
SECOND STAGE HEAT BULB TO TERMINAL
"W2" AND
REMOVE JUMPER BETWEEN TERMINALS
"R" & "W2"
/x
WHEN OUTDOOR THERMOSTAT IS USEO,CONNECT
LEADS
_TO
TERMINALS
"R" AND "WB" AND REMOVE JUMPER
CBB
LI
CONNECT
L2_
JUMPER
BETWEEN
WHEN CBBI 15 MATCHEO
UNIT, CONNECT
JUMPER
A
_
"YI
&
"YB"
WITH CONOENS[NB
BETWEEN
"R" & "0"
WHEN HUMIO[TY
CONTROL
{ABO] [5 NOT USEO
COMBINATIO
WiTH TWO 5PEEO COMPRESSOR,
CONNECT
JUMPER BETWEEN
"Y2" ANO "OS"
A
49
A
IN
WHEN HUMIOITY
CONTROL
[A20) [5 NOT UBEO iN
COMBINATION
WITH SINGLE SPEED COMPRESSOR,
CONNECT
JUMPER BETWEEN
"YI" AND "05"
--LINE
CLASS
VOLTAGE
F[ELO WIRING
[i VOLTAGE
FIELO WIRING
BAV
COMMON
1P97
CB21 SERIES
MOTOR KiT
COMPONENTS
(EY
_15
CB21
SERIES
13
:B5
:I
J_5
J46
J4B
JAB
(20_
J2
_46
_48
rl
rBl
DESCRIPTION
COMPONENT5
CONTROL JPBI SPEED SELECTOR
JACK JPBI 5PEEO SELECTOR
POWFR [NTFRFARF
JACK JPBI/B3
INTERFACE
PLUG JPBI 5PEEO SELECTOR
PLUG JPBI POWER
iNTERFACE
_LUG JPBI/B3
INTERFACE
(EY
k53
J95
Jg6
J97
_95
_96
J97
B3
DESCRIPTION
COMPONENT
CONTROL
BLOWER DRIVE
MOTOR BLOWER
CIRCUIT
BRKR BLO MTR
USE TRANSFORMER
JACK INPUT
JACK OUTPUT
JACK MOTOR,VAR
SPO
JACK MOTOR,VAR
SPD
I,_ RELAY BLOWER
JACK ELECT.
HEAT
PLUG iNPUT
"LUG OUTPUT
LENNOX_o.,.o._°o. W[RiNGOiAGRAMIg/g3
COILS
BLOWER COIL
UNITS
"LUG MOTOR_VAR
BPD
"LUG MOTOR,VAR
BPO
TRANSFORMER
CONTROL
TERM STRIP CLASS
]I VOLT
C821 41,51,65
IP
CBH21 41 IP
821 51,65
WITH MOTOR KIT
COIL SECTION 1846
£up_r_d_
Form N_
N_w F_rm
IP
N_
529,854W
@1993
Lannox
Industrlas
FIGURE 15
Page 9
Inu
Lilh¢
U.S.#
"ADJUST"
The ADJUSTpinsallowthe motorto run at normal
speed,approximately10%higher,or approximately
10%lowerthannormalspeed.Table9 givesthreerows
( +, NORMAL,and -) with their respectiveCFM
volumes.Noticethatthenormaladjustmentsettingfor
heatspeedposition#3 is 2000CFM,The+ adjustment
settingfor that positionis 2180CFMand for the adjustmentsettingis 1800CFM.Afterthe adjustment
setting has been determined,chosethe remainder
speedjumpersettingsfromthoseofferedin thetable.
The TEST pin is available to bypass the JPB1
control and run the motor at approximately
70% to
test that the motor is operational.
This is beneficial
primarily
in troubleshooting.
for motor to run.
G must be energized
"H EAT"
The HEAT jumper is used to set the blower speed to
obtain the required CFM for heating. G21V and
GSR21V unit require a jumper between HB and W2 to
allow HEAT to control heating speed.
For G2 lVand GSR2 lVunits - If a lower heating speed
(than one that is listed in HEAT SPEED section) is
IMP( IRTANT
To change jumper positions, gently pull the jumper off
the pins and place it on the desired set of pins. The
following
section
outlines
the different
jumper
selections available and conditions associated with
each one, Refer to figure
16 for identification.
Adjust circuit board jumpers for High, Low, Heat and
Adjust according
to tables 2, 3, and 4 for G21V,
GSR21V and GSR21CV units, table 5 for CB21V-41
and CBH21V-41 units, and table 6 for CB21V-51,
CBH21V-51, CB21V-65, CBH21V-65 and B21V-51/65
units. The entire group of CFM options are shown in
table 9 for G21V, table 10 for GSR21V, table 11 for
GSR21CV
units,
table
12 for CB21V-41
and
CBH21V-41
units, and table 13 for CB21V-51,
CBH21V-51, CB21V-65, CBH21V-65 and B21V-51i65
units. Note that speeds selected must all come from
the same row because the Adjust
determines the speeds available,
required, the LOW jumper may be used to set the
heating speed. This is done by first placing the LOW
jumper
in the desired CFM position
and then
removing a jumper between HB and W2 on the unit
S _,
ADJUST
HEAT
2
1
TE_ST
"HIGH"
HIGH
LOW
The HIGH jumper is used to determine
the CFM
during cooling speed. These jumper selections are
activated when G and DS terminals are energized for
G21V, GSR21V or GSR21CV and when G, DS and O are
energized for the CB21.
/
J95
The LOW jumper is used to determine
CFM during
low speed cooling. These jumper selections
are
activated when G is energized. The LOW jumper
may also be used for low speed heating for G21V
and GSR21V units only. See the "HEAT" section for
details.
Page lO
position
"A53" JPB1 KIT BLOWER BOARD
terminal strip. Doing so will activate the low speed
jumper setting when W1 is energized. The heat speed
is not operable on GSR21CV units.
"LOW"
jumper
FIGURE 16
P95
TABLE 2
G21V3 and GSR21V3 SERIES UNITS
ICM1 SPEED TAP TO ICM2+ JUMPER SELECTIONS
(ForStaticPressure0.0" to 0.8" w.g.)
ORIGINAL
MOTOR
SPEED TAP
POSITION
ORIGINAL
MOTOR
APPROXk
MATE CFM
CIRCUIT BOARD
JUMPER
POSITION
2
490
LOW 1"
TABLE 4
GSR21CV5 SERIES UNITS
ICM1 SPEED TAP TO ICM2+ JUMPER SELECTIONS
(For Static Pressure O.O" to 1.2" w.g.)
ADJUSTMENT
JUMPER
POSITION
ORIGINAL
MOTOR
SPEED TAP
POSITION
ORIGINAL
MOTOR
APPROXIMATE CFM
CIRCUIT BOARD
JUMPER
POSITION
2
905-1020
LOW 2
NORM
3
945-!030
LOW 2
NORM
4
1170-1330
LOW 3
NORM
NORM
NORM
ADJUSTMENT
JUMPER
POSITION
3
635
LOW 2*
NORM
4
760
LOW 3*
NORM
5
1345-1500
LOW 4 / HIGH 1
5
880
LOW 4*
NORM
6
!510-1700
HIGH 2
"-"
6
1030
HEAT 1 / HIGH 1
NORM
7
1700-1850
HIGH 2
NORM
7
1140
HEAT 2 / HIGH 2
NORM
8
1885-2000
HIGH 2
"+"
9
2010-2100
HIGH 3
NORM
10
2000-2200
HIGH 4
NORM
11
2000-2200
HIGH 4
NORM
8
1220
HEAT 3 / HIGH 3
NORM
9
1345
HEAT 3 / HIGH 3
"+"
10
1420
HEAT 4 / HIGH 4
"+"
11
1420
HEAT 4/HIGH
"+"
4
*HEAT is not used on GSR2 I CV units.
TABLE
CB21V/CBH21V-41
*HEAT will be the heating speed if a jumper is present between
terminals HB and W2 on the unit terminal strip. For LOW to be the
heating speed, remove the jumper between terminals HB and W2
on unit terminal strip, if present.
TABLE 3
G21V5 and GSR21V5 SERIES
ICM1 SPEED TAP TO ICM2+ JUMPER
ICM1
2
ORIGINAL
MOTOR
APPROXlMATE CFM
770
CIRCUIT BOARD
JUMPER
POSITION
LOW 1"
TAP
TO
ICM2+
(For Static Pressure 0.0" to 0.6" w.g.)
UNITS
SELECTIONS
ORIGINAL
MOTOR
SPEED TAP
POSITION
ORIGINAL
MOTOR
APPROXk
MATE CFM
CIRCUIT BOARD
JUMPER
POSITION
1
676
LOW 1
NORM
2
750
LOW 1
NORM
3
850
LOW 2
NORM
4
926
LOW 3
NORM
5
1025
LOW 4 / HIGH 1
NORM
6
1125
HEAT I / HIGH 2
NORM
7
!225
HEAT 2 / HIGH 3
NORM
8
1325
HEAT 3 / HIGH 3
NORM
NORM
(For Static Pressure0.0" to 0.8" w.g.)
ORIGINAL
MOTOR
SPEED TAP
POSITION
SPEED
5
SERIES
UNITS
JUMPER
SELECTIONS
ADJUSTMENT
JUMPER
POSITION
NORM
ADJUSTMENT
JUMPER
POSITION
3
1015
LOW 2*
NORM
4
1305
LOW 3*
NORM
9
1400
HEAT 4 / HIGH 4
5
1510
LOW 4*
NORM
10
!550
HEAT 4/HIGH
4
"+"
"-"
11
1550
HEAT 4/HIGH
4
"+"
6
1685
HEAT 2 / HIGH 2
7
1820
HEAT 2 / HIGH 2
NORM
8
2010
HEAT 2 / HIGH 2
"+"
9
2050
HEAT 3 / HIGH 3
NORM
10
2100
HEAT 3 / HIGH 3
NORM
11
2100
HEAT 3 / HIGH 3
NORM
TABLE
6
CB21V / CBH21V / B21V-51/65
ICM1
SPEED
TAP
TO
ICM2+
SERIES
JUMPER
UNITS
SELECTIONS
(For Static Pressure O.0" to 0.6" w.g.)
*HEAT will be the heating speed if a jumper is present between
terminals HB and W2 on the unit terminal strip. For LOW to be the
heating speed, remove the jumper between terminals HB and W2
on unit terminal strip, if present.
Page 11
ORIGINAL
MOTOR
SPEED TAP
POSITION
ORIGINAL
MOTOR
APPROXk
MATE CFM
CIRCUIT BOARD
JUMPER
POSITION
ADJUSTMENT
JUMPER
POSITION
1
750
LOW 1
NORM
2
850
LOW 1
NORM
3
950
LOW 2
NORM
4
1150
LOW 3
NORM
5
1300
LOW 4
NORM
6
!500
HEAT 1 / HIGH 1
NORM
7
1650
HEAT 2 / HIGH 2
NORM
8
1800
HEAT 3 / HIGH 3
NORM
9
!950
HEAT 4/HIGH
4
NORM
10
2100
HEAT 4/HIGH
4
"+"
11
2100
HEAT 4/HIGH
4
"+"
TABLE 7
G21V3-60/80
ICM2+
(For Static
ADJUST
JUMPER
SETTING
BLOWER
Pressure
LOW SPEED
JPB1 JUMPER POSITION
MOTOR
PERFORMANCE
0.0" to 0,8" w.g.)
HIGH (COOL) SPEED
JPB1 JUMPER POSITION
HEAT SPEED
JPB1 JUMPER POSITION
1
2
3
4
1
2
3
4
1
2
3
4
+
540
700
830
1000
1150
1260
1400
1410
1150
1250
1350
1400
NORM
490
630
740
880
1040
1140
1240
1265
1030
1140
1220
1300
440
560
670
800
940
1030
1140
1160
920
1020
1100
1190
NOTE: ADJUST position
on JPB1 ("NORM",
GSR21V3-80
"+", or "-") determines
ICM2+
(For Static
ADJUST
JUMPER
SETTING
the row of CFM available
TABLE 8
BLOWER MOTOR
Pressure
LOW SPEED
JPB1 JUMPER POSITION
to use.
PERFORMANCE
0.0" to 0.8" w.g.)
HIGH (COOL) SPEED
JPB1 JUMPER POSITION
HEAT SPEED
JPB1 JUMPER POSITION
1
2
3
4
1
2
3
4
1
2
3
4
+
520
670
800
960
1110
1220
1340
! 420
1110
1210
13!0
1420
NORM
480
600
740
880
1070
1160
1270
!300
1000
1100
1200
1280
420
550
650
770
950
1040
1150
! 170
900
1000
1100
1! 50
NOTE: ADJUST position
on JPB1 ("NORM _, "+", or "-") determines
G21V5-80/100
ADJUST
Pressure
LOW SPEED
JPB1 JUMPER POSITION
JUMPER
SETTING
TABLE 9
BLOWER MOTOR
ICM2+
(For Static
the row of CFM available
to use.
PERFORMANCE
0.0" to 0,8" w.g.)
HIGH (COOL) SPEED
JPB1 JUMPER POSITION
HEAT SPEED
JPB1 JUMPER POSITION
1
2
3
4
1
2
3
4
1
2
3
4
+
800
1050
14!0
1620
1710
2030
2270*
2270*
1900
2140
2270*
2270*
NORM
720
950
1280
1500
1570
1850
2100
2220
1700
1940
2080
2200
850
1120
1310
1420
1650
1860
!990
1520
1730
1860
1940
620
NOTE: ADJUST position
on JPB1 ("NORM",
"+", or "-") determines
the row of CFM available
to use.
*2300 CFM @ 0.2" w.g.; 2250 CFM @ 0.5" w.g.; 2200 CFM @ 0.8" w.g.
TABLE
GSR21V5-80/100
ICM2+
(For Static
ADJUST
JUMPER
SETTING
10
BLOWER
Pressure
LOW SPEED
JPB1 JUMPER POSITION
MOTOR
PERFORMANCE
0.0" to 0,8" w.g.)
HIGH (COOL) SPEED
JPB1 JUMPER POSITION
HEAT SPEED
JPB1 JUMPER POSITION
1
2
3
4
1
2
3
4
1
2
3
4
+
860
1100
1460
1740
1800
2090
2100-
2100-
1930
2100-
2100-
2100-
NORM
770
1020
1390
1580
1720
1990
2100"
2100"
1800
2000
2100"
2100"
680
900
1180
1400
1450
1690
1940
2040
1580
1780
1920
2010
NOTE: ADJUST position
on JPB 1 ("NORM ", "+", or "-") determines
the row of CFM available
*2200 CFM @ 0.2" w.g.; 2100 CFM @ 0.5" w.g.; 2000 CFM @ 0.8" w.g.
Page12
to use.
TABLE 11
GSR21CV5-80/100 ICM2+ BLOWER MOTOR PERFORMANCE
(For Static Pressure O.O" to 1.2" w.g.)
ADJUST
JUMPER
SETTING
LOW SPEED
STATIC
NORM
HIGH (COOL)
JPR1 JUMPER POSITION
JPB1 JUMPER POSITION
JPB1 JUMPER POSITION
1
2
3
4
1
2
3
4
1.2
750
1080
1440
1670
1790
2000
2000
2000
1.0
790
1090
1450
1660
1800
2080
2070
2080
840
1130
1460
1640
1770
2100
2230
2210
1.2
680
940
1340
1510
1490
1870
2020
2000
1.0
700
960
1350
1510
1500
1880
2110
2070
0.5
750
1030
1360
1520
1500
1840
2130
2220
1.2
590
790
1160
1330
1410
1670
1920
1980
1.0
610
830
1180
1350
1420
1660
1940
2010
0.5
670
900
1200
1360
1440
1640
1920
2010
CB21V-41
(Operating
ADJUST
JUMPER
on JPB 1( "NORM",
TABLE 12
CBH21V-41
BLOWER
AND
at 0.00 through
0,60 in. w.g.
LOW SPEED
JPB1 JUMPER POSITION
2
1
0.5
NOTE: HEA Tspeed tap is not used on GSR21CV units. ADJ USTposition
CFM available to use.
SETTING
HEAT SPEED
SPEED
"+"
or "-')
3
determines
4
the row of
PERFORMANCE
External
Static
Pressure)
HIGH (COOL) SPEED
JPB1 JUMPER POSITION
HEAT SPEED
JPB1 JUMPER POSITION
1
2
3
4
1
2
3
4
1
2
3
4
+
850
950
1060
1!50
1150
1250
1490
!600
1230
1346
1480
1600
NORM
750
850
950
1025
1025
1125
1325
!425
1125
1225
1325
1425
650
730
830
900
900
1000
1190
!260
980
1080
1190
1260
NOTE: ADJUST position
on BDC-2 ("NORM';
"+", or "-") determines
TABLE
CB21V-51,
CBH21V-51,
(Operating
ADJUST
JUMPER
SETTING
the row of CFM available
to use.
13
CB21V-65,
CBH21V-65
AND B21V-51/65
BLOWER PERFORMANCE
at 0,0O through
0.60 in. w.g. External
Static Pressure)
LOW SPEED
JPB1 JUMPER POSITION
HIGH (COOL) SPEED
JPB1 JUMPER POSITION
HEAT SPEED
JPB1 JUMPER POSITION
1
2
3
4
1
2
3
4
1
2
3
4
+
935
1060
1265
1425
1650
1780
1955
2160
1650
1800
2000
2200
NORM
850
950
1150
1300
1500
1650
1800
!950
1500
1650
1800
1956
850
1026
1!10
1350
1485
1560
!760
1340
1480
1630
1760
the row of CFM available
to use.
750
NOTE: ADJUST position
on BDC-2 ("NORM _, "+", or "-") determines
Page13
Tocheck-outtheICM2+refertofigure17andfollowthe
check-outprocedureasoutlined.If theblowerfailsany
of thesetests,do not attemptto repairthe motor.
ICM2+
Therearenofieldserviceable
partsin thiscomponent.
Replace
themotorandrepeatthecheck-outprocedure,
CHECK-OUT
A kit is available from the Lennox parts center to use in testing the variable speed motor. The kit 70J 11 includes a
test plug harness to facilitate vsm check-out. Follow testing procedures outlined in the instructions provided
with the kit. The testing procedures are different than those listed below. If not using the kit to test the motor,
follow the procedure below.
NOTE-Any A. C. voltage source less than 30 volts or any D.C. voltage source less than 20 volts may be used to
check out the motor. An ordinary 9 volt battery is recommended,
Unit transformer
T1 secondary may be
used in lieu of a battery. A 9 volt battery will last for about one day of normal operation. If transformer T1 is
used, double check all wiring
connections
before placing
CHECK-OUT
1
2
3
4
5
6
7
8
9
10
unit back in operation.
PROCEDURE
11
1
1234-
Disconnect power to unit.
Disconnect 11 pin plug located on JPB1.
Connect
voltage
shown above.
ICM2+
LOW source
SPEED as
CHECK-OUT
Turn on power to unit. Blower should
operate at low speed.
2
3
4
5
6
7
8
9
10
_1
ICM2+ HIGH SPEED CHECK-OUT
5- Disconnect
power to unit.
6- Connect voltage source as shown above.
7- Turn on power to unit. Blower should
operate at high speed.
1
2
3
4
5
6
7
8
9
10
11
wn above.
r should
o e,a
eed
FIGURE 17
Page 14
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.2 Linearized : No Page Count : 14 Page Layout : SinglePage Page Mode : UseNone Producer : Goby Monitor Application version 4, 0, 0, 13 Create Date : Sun Jul 20 21:11:22 2008 Author : Title : Subject :EXIF Metadata provided by EXIF.tools