Laird Technologies 60SIPT 802.11 ac/a/b/g/n + Bluetooth 4.2 module / 802.11 ac/a/b/g/n M.2 2230 + Bluetooth 4.2 module User Manual CS DS 60 2230C PRELIMINARY
Laird Technologies 802.11 ac/a/b/g/n + Bluetooth 4.2 module / 802.11 ac/a/b/g/n M.2 2230 + Bluetooth 4.2 module CS DS 60 2230C PRELIMINARY
Contents
- 1. Users Manual_60-2230C_SQG-60SIPT
- 2. Users Manual_60-SIPT_SQG-60SIPT
Users Manual_60-2230C_SQG-60SIPT




![60-2230C Datasheet Embedded Wireless Solutions Support Center: http://ews-support.lairdtech.com www.lairdtech.com/wireless 5 © Copyright 2017 Laird. All Rights Reserved Americas: +1-800-492-2320 Europe: +44-1628-858-940 Hong Kong: +852 2923 0610 1. SCOPE This document describes key hardware aspects of the Laird 60-2230C M.2 module providing either SDIO or USB2.0 bus interface for WLAN connection and UART/SDIO/USB2.0 for Bluetooth® (including Low Energy or LE) connection. This document is intended to assist device manufacturers and related parties with the integration of this module into their host devices. Data in this document is drawn from the Marvell 88W8997 datasheet issued in April 25, 2016. Note that the information in this document is subject to change. Please contact Laird to obtain the most recent version of this document. 2. INTRODUCTION 2.1 General Description The 60-2230C module is a dual band 2x2 802.11ac WLAN plus Bluetooth 4.2 dual mode adapter; it complies with M.2 key-E standard. The module provides both simultaneous and independent operation of the following: IEEE 802.11ac (Wave 2), 2x2 receive Multi-User MIMO spatial stream multiplexing with data rates up to MCS9 (866.7 Mbps) Bluetooth (Class 1 and Class 2) Bluetooth 4.2 (with Low Energy or LE) Bluetooth Smart Ready operation Three-way coexistence for WLAN and Bluetooth Note: The Bluetooth® word mark and logos are registered trademarks owned by Bluetooth SIG, Inc. and any use of such marks by Laird is under license. Other trademarks and trade names are those of their respective owners. Internal coexistence arbitration and a Mobile Wireless System (MWS) serial transport interface provide the functionality for connecting an external Long Term Evolution (LTE). The module integrates all WLAN and Bluetooth functionality into a single package which supports low-cost and simple implementation along with flexibility for platform-specific customization. In addition, it has low power consumption radio architecture and proprietary power save technologies to extended battery life. On the DFS engine, the module supports 802.11h Dynamic Frequency Selection to detect the presence of radar signals; support is extended to 80 MHz mode under the 802.11ac channelization modes. In addition, the E-DFS (Enhanced DFS) scheme is designed to increase pulse detection rates for shorter (0.5 us, 0.8 us, 1 us), in-band DFS pulses. The scheme is designed to minimize the false-alarm rate for out-of-band DFS pulse. There are two interfaces for WLAN function: SDIO 3.0 – Supports both 1-bit SDIO and 4-bit SDIO transfer modes at full clock range up to 208 MHz USB 2.0 In addition, there are three interfaces for Bluetooth function: SDIO USB 2.0 High-Speed UART Comment [JW1]: Do we really want this sentence in there? Comment [JW2]: We should add the “2230” reference. So, the radio “complies with the M.2 2230 E-Key Standard” Comment [JW3]: We should probably add that the 60 series is “Bluetooth 5 Ready”.](https://usermanual.wiki/Laird-Technologies/60SIPT.Users-Manual-60-2230C-SQG-60SIPT/User-Guide-3490641-Page-5.png)
![60-2230C Datasheet Embedded Wireless Solutions Support Center: http://ews-support.lairdtech.com www.lairdtech.com/wireless 6 © Copyright 2017 Laird. All Rights Reserved Americas: +1-800-492-2320 Europe: +44-1628-858-940 Hong Kong: +852 2923 0610 The 60-2230C module also provides a PCM interface for master or slave mode; with the option of an 8-bit or 16-bit width size. Pins CON[0], CON[1], and CON[2] are configuration pins (operation mode). Currently, the default mode for the SDIO/UART (WLAN/Bluetooth) interface is 000. 3. FEATURES SUMMARY The Laird 60-2230C device features are described in Table 1. Table 1: 60-2230C of features Feature Description Radio Front End Integrates the complete transmit/receive RF paths including band pass filter, diplexer, switches, reference crystal oscillator, and power manage unit (PMU) Supports 20/40/80 MHz channel bandwidth WLAN/Bluetooth share one antenna Coexistence Coexistence arbitration for WLAN, Bluetooth, and LTE operation Power Management Dynamic Voltage Scaling (DVS) and Adaptive Voltage Scaling (AVS) feature supports the latest Marvell SoC and processor power control scheme. Pre-Calibration RF system-tested and calibrated in production. Sleep Clock An external sleep clock of 32.768 KHz is required during power save mode. Host Interface SDIO 3.0 (4-bit and 1-bit), SDR 12/25/50 mode (up to 100MHz), USB 2.0 or PCIe for WLAN SDIO 3.0, USB 2.0, HS-UART for Bluetooth HCI (compatible with any upper layer Bluetooth stack) PCM digital audio interface for Bluetooth audio application. Strap Value CONFIG_HOST[2-0] WLAN Bluetooth/BLE ROM Notes 000 SDIO UART - 001 SDIO SDIO - 010 PCIe USB 2.0 Initial USB 2.0 PHY and COM PHY PCIe portion 011 PCIe UART Initial COM PHY PCIe portion only 100 USB 2.0 UART Initial USB 2.0 PHY and COM PHY PCIe USB 3.0 101 USB 2.0 USB 2.0 Initial USB 2.0 PHY only Reference Frequency Incorporates a 40 MHz reference frequency source in package An external sleep clock is recommended for minimal current consumption. If no sleep clock input is provided, an internal sleep clock (derived from the reference clock) is used. An approximate 50 uA current increase on the 3.3V rail. Advanced WLAN A-MPDU RX (de-aggregation) and TX (aggregation) supports 802.11ac single-MPDU A-MPDU Multi-BSS/Station Transmit rate adaption, transmit power control Modulation and coding scheme (MCS): – 802.11ac—MCS0-9 Nsts=1 and 2 – 802.11n—MCS0-15 Dynamic frequency selection (DFS) – Radar detection 20/40/80 MHz channel bandwidths support On-chip gain selectable LNA with optimized noise figure and power consumption Internal PA with optimized gain distribution for linearity and noise performance Support Wild variety of WLAN encryption: TKIP/WEP/AES Comment [JW4]: We need to remove references to PCIE as the M.2 module does not support PCIE](https://usermanual.wiki/Laird-Technologies/60SIPT.Users-Manual-60-2230C-SQG-60SIPT/User-Guide-3490641-Page-6.png)
![60-2230C Datasheet Embedded Wireless Solutions Support Center: http://ews-support.lairdtech.com www.lairdtech.com/wireless 7 © Copyright 2017 Laird. All Rights Reserved Americas: +1-800-492-2320 Europe: +44-1628-858-940 Hong Kong: +852 2923 0610 Feature Description Advanced Bluetooth Bluetooth 4.2 (BDR/EDR/LE), Bluetooth Class 1 Supports the following data rates: 1 Mbps (GFSK), 2 Mbps ( /4-DQPSK), 3 Mbps (8-DPSK) Digital audio interface with PCM/TDM interface for voice application Adaptive Frequency Hopping (AFH) using Package Error Rate (PER) Standard SDIO or UART HCI transport layer WLAN/Bluetooth coexistence protocol support Shared LNA with WLAN/Bluetooth Encryption (AES) support 4. SPECIFICATIONS Table 2: Specifications Feature Description Physical Interface 84-pin LGA package (including 16 thermal ground pad under the package) Wi-Fi Interface 1-bit or 4-bit Secure Digital I/O; PCIe v3.0 Gen1/Gen2 (2.5/5 Gbps); USB 2.0 Bluetooth/ BLE Interface Host Controller Interface (HCI) using High Speed UART, SDIO, USB 2.0 Strap Value CONFIG_HOST[2-0] WLAN Bluetooth/BLE ROM Notes 000 SDIO UART - 001 SDIO SDIO - 010 PCIe USB 2.0 Initial USB 2.0 PHY and COM PHY PCIe portion 011 PCIe UART Initial COM PHY PCIe portion only 100 USB 2.0 UART Initial USB 2.0 PHY and COM PHY PCIe USB 3.0 101 USB 2.0 USB 2.0 Initial USB 2.0 PHY only Main Chip Marvell 88W8997 (WLAN/BT); Marvell 88PG823 (PMU) Input Voltage Requirements DC 3.3 V ±10% I/O Signalling Voltage DC 3.3 V ± 10% or DC 1.8 V ± 10% Peak Current consumption, VCC=VIO = 3.3 volts (At maximum transmit power setting) Note: Reset refers to the radio are in reset, both Wi-fi and BT reset are asserted. MIMO 2x 2 operations. 802.11b (with BT in standby) @ 18 dBm 1 Mbps Transmit: XX mA Receive: XX mA 802.11g (with BT in standby) @ 18 dBm 6 Mbps Transmit: XX mA Receive: XX mA 802.11a (with BT in standby) @ 18 dBm 6 Mbps Transmit: XX mA Receive: XX mA 802.11n (2.4 GHz/40MHz) (with BT in standby) @ 16 dBm MCS0 Transmit: XX mA Receive: XX mA 802.11n (5.0 GH/40MHz) (with BT in standby) @ 16 dBm MCS0 Transmit: XX mA Receive: XX mA 802.11ac (5.0 GH/80MHz) (with BT in standby) @ 14 dBm MCS0 Transmit: XX mA Receive: XX mA Bluetooth (with Wi-Fi in standby) Transmit: XX mA Receive: XX mA Reset: XXX mA Comment [JW5]: Please Addd “Bluetooth 5 Ready” in there somewhere. It’s an important value-add for this radio Comment [JW6]: No PCIE Comment [JW7]: Andrew, do we have these numbers?](https://usermanual.wiki/Laird-Technologies/60SIPT.Users-Manual-60-2230C-SQG-60SIPT/User-Guide-3490641-Page-7.png)
![60-2230C Datasheet Embedded Wireless Solutions Support Center: http://ews-support.lairdtech.com www.lairdtech.com/wireless 8 © Copyright 2017 Laird. All Rights Reserved Americas: +1-800-492-2320 Europe: +44-1628-858-940 Hong Kong: +852 2923 0610 Feature Description Operating Temperature -30° to 85°C (-22° to 185°F) Operating Humidity 10 to 90% (non-condensing) Storage Temperature -40° to 85°C (-40° to 185°F) Storage Humidity 10 to 90% (non-condensing) Maximum Electrostatic Discharge Conductive 4KV; Air coupled 8KV follow EN61000-4-2 Size 13 mm (length) x 14 mm (width) x 1.87 mm (thickness) Weight TBD g Wi-Fi Media Direct Sequence-Spread Spectrum (DSSS) Complementary Code Keying (CCK) Orthogonal Frequency Divisional Multiplexing (OFDM) Bluetooth Media Frequency Hopping Spread Spectrum (FHSS) Wi-Fi Media Access Protocol Carrier sense multiple access with collision avoidance (CSMA/CA) A-MPDU Rx (De-aggregation) and Tx (aggregation) (802.11ac single-MPDU A-MPDU) Network Architecture Types Infrastructure and ad-hoc Wi-Fi Standards IEEE 802.11a, 802.11b, 802.11d, 802.11e, 802.11g, 802.11h, 802.11i, 802.11n, 802.11r, 802.11ac Bluetooth Standards Bluetooth version 2.1 with Enhanced Data Rate Bluetooth 4.2 (Bluetooth Low Energy or BLE) Wi-Fi Data Rates Supported Support 802.11 ac/a/b/g/n 2X2 MIMO 802.11b (DSSS, CCK) 1, 2, 5.5, 11 Mbps 802.11a/g (OFDM) 6, 9, 12, 18, 24, 36, 48, 54 Mbps 802.11n (OFDM, HT20/HT40, MCS 0-15) 802.11ac (OFDM, HT20, MCS0-8; OFDM HT40/HT80, MCS 0-9) Comment [JW8]: “Bluetooth 5 (Coming Soon)” Comment [JW9]: “MU-MIMO” or “802.11ac Wave 2”](https://usermanual.wiki/Laird-Technologies/60SIPT.Users-Manual-60-2230C-SQG-60SIPT/User-Guide-3490641-Page-8.png)


![60-2230C Datasheet Embedded Wireless Solutions Support Center: http://ews-support.lairdtech.com www.lairdtech.com/wireless 11 © Copyright 2017 Laird. All Rights Reserved Americas: +1-800-492-2320 Europe: +44-1628-858-940 Hong Kong: +852 2923 0610 Feature Description Typical Receiver Sensitivity (PER <= 10%) Note: All values nominal, +/-3 dBm. Sensitivity on CH13 (WLAN)/CH78 (BT) will decade up to 4-6dB. 802.11a: 6 Mbps -89 dBm 54 Mbps -74 dBm 802.11b: 1 Mbps -95 dBm 11 Mbps -90 dBm (PER<8%) 802.11g: 6 Mbps -91 dBm 54 Mbps -75 dBm 802.11n (2.4 GHz) 6.5 Mbps (MCS0;HT20) -91 dBm 65 Mbps (MCS7;HT20) 13.5Mbps(MCS0;HT40) 135Mbps (MCS7;HT40) -73 dBm -85 dBm -70 dBm 802.11n (5 GHz) 6.5 Mbps (MCS0;HT20) -89 dBm 65 Mbps (MCS7;HT20) 13.5Mbps(MCS0;HT40) 135Mbps (MCS7;HT40) -70 dBm -86 dBm -69 dBm 802.11ac (5 GHz) 6.5 Mbps (MCS0;HT20) -89 dBm 78 Mbps (MCS8;HT20) 13.5 Mbps (MCS0;HT40) 180 Mbps (MCS9;HT40) 29.3 Mbps (MCS0;HT80) 390/780 Mbps (MCS9;HT80) -67 dBm -86 dBm -63 dBm -81 dBm -60 dBm Bluetooth: 1 Mbps (1DH5) 2Mbps (2DH5) -95 dBm -94 dBm 3 Mbps (3DH5) -88 dBm BLE -95 dBm Operating Systems Supported Windows Mobile 5.0, 6.0, 6.1, 6.5 Windows Embedded Compact (CE) 5.0, 6.0, 7.0, 2013 Linux 2.6.x, 3.x.x, 4.0.x kernel Android 4.1.2 (Jellybean) and forward Comment [JW10]: No Windows support on the 60 Series Comment [JW11]: Linux Kernel 3.x and newer Android 5.x and newer](https://usermanual.wiki/Laird-Technologies/60SIPT.Users-Manual-60-2230C-SQG-60SIPT/User-Guide-3490641-Page-11.png)
![60-2230C Datasheet Embedded Wireless Solutions Support Center: http://ews-support.lairdtech.com www.lairdtech.com/wireless 12 © Copyright 2017 Laird. All Rights Reserved Americas: +1-800-492-2320 Europe: +44-1628-858-940 Hong Kong: +852 2923 0610 Feature Description Security Standards Wireless Equivalent Privacy (WEP) Wi-Fi Protected Access (WPA) IEEE 802.11i (WPA2) Encryption Wireless Equivalent Privacy (WEP, RC4 Algorithm) Temporal Key Integrity Protocol (TKIP, RC4 Algorithm) Advanced Encryption Standard (AES, Rijndael Algorithm) Encryption Key Provisioning Static (40-bit and 128-bit lengths) Pre-Shared (PSK) Dynamic 802.1X Extensible Authentication Protocol Types EAP-FAST EAP-TLS EAP-TTLS PEAP-GTC PEAP-MSCHAPv2 PEAP-TLS LEAP Compliance Note: All regulatory certifications are currently pending. ETSI Regulatory Domain EN 300 328 EN 301 489-1 EN 301 489-17 EN 301 893 EN 60950-1 EU 2002/95/EC (RoHS) FCC Regulatory Domain FCC 15.247 DTS – 802.11b/g (Wi-Fi) – 2.4 GHz FCC 15.407 UNII – 802.11a (Wi-Fi) – 5 GHz FCC 15.247 DSS – BT 2.1 Industry Canada RSS-247 – 802.11a/b/g/n (Wi-Fi) – 2.4 GHz, 5.8 GHz, 5.2 GHz, and 5.4 GHz RSS-247 – BT 2.1 Certifications Wi-Fi Alliance 802.11a, 802.11b, 802.11g , 802.11n, 802.11ac WPA Enterprise WPA2 Enterprise Cisco Compatible Extensions (Version 4) Bluetooth® SIG Qualification Warranty Three Year Warranty All specifications are subject to change without notice Comment [JW12]: We should list that EAP types are “supplicant software dependent”. Since we are supporting various software builds with the 60 Series, some of the features will rely on the software Comment [JW13]: We will have more Wi-Fi Alliance certs. I’m not exactly sure which ones yet, but we will have more. Comment [JW14]: We won’t have CCX certification on the 60 Series. At least, that’s not the plan at this moment](https://usermanual.wiki/Laird-Technologies/60SIPT.Users-Manual-60-2230C-SQG-60SIPT/User-Guide-3490641-Page-12.png)



![60-2230C Datasheet Embedded Wireless Solutions Support Center: http://ews-support.lairdtech.com www.lairdtech.com/wireless 16 © Copyright 2017 Laird. All Rights Reserved Americas: +1-800-492-2320 Europe: +44-1628-858-940 Hong Kong: +852 2923 0610 6. BLUETOOTH FUNCTIONAL DESCRIPTION The 60-2230C Bluetooth (BT) block is based on the 60-SIPT SiP that already has fully-integrated Bluetooth baseband and radio. Several features and functions are listed in Table 4. Table 4: Bluetooth functions Feature Description Bluetooth Interface Voice interface: Hardware support for continual PCM data transmission/reception without processor overhead. Standard PCM clock rates from 64 kHz to 2.048 MHz with multi-slot handshake and synchronization. A-law, U-law, and linear voice PCM encoding/decoding. SDIO interface High-Speed UART interface USB 2.0 Bluetooth Core functionality Bluetooth 4.2 Bluetooth Class 2/Bluetooth class 1 WLAN and Bluetooth share same LNA and antenna Digital audio interfaces with PCM/TDM interface for voice application Baseband and radio BDR and EDR package type: 1Mbps, 2Mbps, 3Mbps Fully functional Bluetooth baseband: AFH, forward error correction, header error control, access code correction, CRC, encryption bit stream generation, and whitening Adaptive Frequency Hopping (AFH) using Packet Error Rate (PER) Interlaced scan for faster connection setup Simultaneous active ACL connection setup Automatic ACL package type selection Full master and slave piconet support Scatter net support SCO/eSCO links with hardware accelerated audio signal processing and hardware supported PPEC algorithm for speech quality improvement All standard SCO/eSCO voice coding All standard pairing, authentication, link key, and encryption operations Encryption (AES) support Bluetooth Low Energy (BLE) Core functionality Advertiser, Scanner, Initiator, Master, and Slave roles support (connects up to 16 links) WLAN/Bluetooth Coexistence (BCA) protocol support Shared RF with BDR/EDR Encryption (AES) support Intelligent Adaptive Frequency Hopping (AFH) LE privacy 1.2 LE Secure Connection LE Data Length Extension LE Advertising Length Extension 2 Mbps LE Direction Finding – Connectionless Angle of Departure (AoD) Direction Finding – Connectionless Angle of Arrival (AoA) Comment [JW15]: We will need to add the BT5 features to this list when we get the BT5 certification](https://usermanual.wiki/Laird-Technologies/60SIPT.Users-Manual-60-2230C-SQG-60SIPT/User-Guide-3490641-Page-16.png)




![60-2230C Datasheet Embedded Wireless Solutions Support Center: http://ews-support.lairdtech.com www.lairdtech.com/wireless 21 © Copyright 2017 Laird. All Rights Reserved Americas: +1-800-492-2320 Europe: +44-1628-858-940 Hong Kong: +852 2923 0610 Symbol Parameter Conditions Min Typ Max Unit 11ac HT80 EVM compliant MCS6-8(Ntst=1,2) 12 11ac HT80 EVM compliant MCS9(Ntst=1,2) 10 ATx Transmit power accuracy at 25 - - + 2.0 dB Freq. Mode/Rate [Mbps] Output Power Per Chain [dBm] Typical Current Consumption Single Chain (mA)8 Max. Current Consumption Single Chain (mA)8 5180 MHz 5190 MHz 6 Mbps 18 dBm 400 710 54 Mbps 16 dBm 330 610 HT20 MCS0 18 dBm 400 720 HT20 MCS7 16 dBm 360 620 HT40 MCS7 14 dBm 320 550 5500 MHz 5510 MHz 6 Mbps 18 dBm 380 680 54 Mbps 16 dBm 330 600 HT20 MCS0 18 dBm 370 690 HT20 MCS7 16 dBm 320 600 HT40 MCS7 14 dBm 300 530 5825 MHz 5795 MHz 6 Mbps 18 dBm 380 690 54 Mbps 16 dBm 310 600 HT20 MCS0 18 dBm 360 710 HT20 MCS7 16 dBm 340 550 HT40 MCS7 14 dBm 300 530 7Performance data are measured under single chain operation. Note: Final TX power values on each channel are limited by the regulatory certification test limit.](https://usermanual.wiki/Laird-Technologies/60SIPT.Users-Manual-60-2230C-SQG-60SIPT/User-Guide-3490641-Page-21.png)




![60-2230C Datasheet Embedded Wireless Solutions Support Center: http://ews-support.lairdtech.com www.lairdtech.com/wireless 26 © Copyright 2017 Laird. All Rights Reserved Americas: +1-800-492-2320 Europe: +44-1628-858-940 Hong Kong: +852 2923 0610 10.3 DDR50 Mode (50MHz) (1.8V) Figure 4: SDIO CMD timing Diagram--- DDR50 modes (50 MHz) (1.8V) Figure 5: SDIO DAT[3:0] timing Diagram--- DDR50 modes (50 MHz) (1.8V) Note: In DDR50 mode, DAT[3:0] lines are samples on both edges pF the clock (not applicable for CMD line) Table 18: SDIO timing requirements--- DDR50 modes (50MHz) Symbol Parameter Condition Min. Typ. Max. Unit Clock TCLK Clock time 50MHz (max) between rising edge DDR50 20 -- -- ns TCR, TCF Rise time, fall time TCR, TCF <4.00ns (max) at 50MHz. CCARD=10pF DDR50 -- -- 0.2*TCLK ns Clock Duty -- DDR50 45 -- 55 % CMD Input (referenced to clock rising edge) TIS Input setup time DDR50 6 -- -- ns](https://usermanual.wiki/Laird-Technologies/60SIPT.Users-Manual-60-2230C-SQG-60SIPT/User-Guide-3490641-Page-26.png)
![60-2230C Datasheet Embedded Wireless Solutions Support Center: http://ews-support.lairdtech.com www.lairdtech.com/wireless 27 © Copyright 2017 Laird. All Rights Reserved Americas: +1-800-492-2320 Europe: +44-1628-858-940 Hong Kong: +852 2923 0610 Symbol Parameter Condition Min. Typ. Max. Unit CCARD TIH Input hold time CCARD DDR50 0.8 -- -- ns CMD Output (referenced to clock rising and failing edge) TODLY Output delay time during data transfer mode CL30pF (1card) DDR50 -- -- 13.7 ns TOHLD Output hold time CL≥15pF (1 card) DDR50 1.5 -- -- ns DAT[3:0] Input (referenced to clock rising and failing edges) TIS2X Input setup time CCARD DDR50 3 -- -- ns TIH2X Input hold time CCARD DDR50 0.8 -- -- ns DAT[3:0] Output (referenced to clock rising and failing edges) TODLY2X (max) Output delay time during data transfer mode CL25pF (1card) DDR50 -- -- 7.0 ns TODLY2X (min) Output hold time CL≥15pF (1 card)) DDR50 1.5 -- -- ns 11. USB SPECIFICATIONS 11.1 USB LS Driver and Receiver Parameters Table 19: Notes: Over full range of values specified in the Recommended Operating Conditions unless otherwise specified. The load is 100Ω differential for these parameters, unless other specified. Table 15: USB LS Driver and Receiver Specifications Symbol Parameter Min. Typ. Max. Unit BR Baud rate - 1.5 - Mbps BRPPM Baud rate tolerance -15000 - 15000 ppm Driver Specifications VOH Output signal ended high Defined with 1.425KΩ pull-up resistor to 3.6V 2.8 - 3.6 V VOL Output signal ended low Defined with 1.425KΩ pull-up resistor to ground 0.0 - 0.3 V VCRS Output signal crossover voltage 1.3 2.0 V](https://usermanual.wiki/Laird-Technologies/60SIPT.Users-Manual-60-2230C-SQG-60SIPT/User-Guide-3490641-Page-27.png)




![60-2230C Datasheet Embedded Wireless Solutions Support Center: http://ews-support.lairdtech.com www.lairdtech.com/wireless 32 © Copyright 2017 Laird. All Rights Reserved Americas: +1-800-492-2320 Europe: +44-1628-858-940 Hong Kong: +852 2923 0610 Table 19: PCM Timing Specification – Slave Mode Symbol Parameter Min. Typ. Max. Unit FBCLK - - 2/2.048 - MHz Duty CycleBCLK - 0.4 0.5 0.6 - TBCLK rise/fall - - 3 - ns TDO - - - 30 ns TDISU - 15 - - ns TDIHO - 10 - - ns TBFSU - 15 - - ns TBFHO - 10 - - ns 13. PIN DEFINITIONS Table 20: Pin definitions Pin # Name Type Voltage Ref. Description If Not Used 1 GND - - Ground GND 2 3.3V Power - 3.3V module power supply - 3 USB_D+ I/O 3.3V USB Differential Data-Positive N/C 4 3.3V Power - 3.3V module power supply - 5 USB_D- I/O 3.3V USB Differential Data-Negative N/C 6 LED1# O,PU 3.3V LED indicator for WLAN with 10mA drive capability N/C 7 GND - - Ground GND 8 PCM_CLK I/O 1.8V PCM Clock Signal (Optimal) Optimal clock used for some codecs. Output if Master mode; Input if Slave mode. N/C 9 SDIO CLK I,PU 1.8V SDIO 4-bit Mode Clock Input N/C 10 PCM_SYNC I/O 1.8V PCM Sync Pulse Signal Output if Master mode; Input if Slave mode. N/C 11 SDIO CMD I/O 1.8V SDIO 4-bit Mode Command/Response N/C 12 PCM_IN I 1.8V PCM Data N/C 13 SDIO DATA0 I/O,PU 1.8V SDIO 4-bit Mode DATA line Bit[0] N/C 14 PCM_OUT O 1.8V PCM Data N/C 15 SDIO DATA1 I/O,PU 1.8V SDIO 4-bit Mode DATA line Bit[1] N/C 16 LED2# O,PU 3.3V LED indicator for BT with 10mA drive capability. N/C 17 SDIO DATA2 I/O,PU 1.8V SDIO 4-bit Mode DATA line Bit[2] N/C 18 GND - - Ground GND 19 SDIO DATA3 I/O,PU 1.8V SDIO 4-bit Mode DATA line Bit[3] N/C 20 UART WAKE# N/C N/C N/C N/C 21 SDIO WAKE# N/C N/C N/C N/C 22 UART TXD O 1.8V UART Serial Data Output N/C](https://usermanual.wiki/Laird-Technologies/60SIPT.Users-Manual-60-2230C-SQG-60SIPT/User-Guide-3490641-Page-32.png)











![60-2230C Datasheet Embedded Wireless Solutions Support Center: http://ews-support.lairdtech.com www.lairdtech.com/wireless 44 © Copyright 2017 Laird. All Rights Reserved Americas: +1-800-492-2320 Europe: +44-1628-858-940 Hong Kong: +852 2923 0610 Maximum Output Power for Each Frequency TBD 20.5 dBm, 5.15-5.25 GHz 20.5 dBm, 5.25-5.35 GHz 20.5 dBm, 5.47-5.725 GHz Software Version for Testing SW version: P95 The minimum distance between the user and/or any bystander and the radiating structure of the transmitter is 20 cm. 5150 ~ 5350 MHz is limited to indoor used in the following countries: BE DK IE FR CY LU NL PT SK UK NO BG DE EL HR LV HU AT RO FI LI TR CZ EE ES IT LT MT PL SI SE IS CH 20. ORDERING INFORMATION Part Number Description 60-2230C 2X2 802.11 a/b/g/n with BT4.2 dual mode module. 20.1 General Comments This is a preliminary datasheet. Please check with Laird for the latest information before commencing a design. If in doubt, ask. Česky [Czech] [Jméno výrobce] tímto prohlašuje, že tento [typ zařízení] je ve shodě se základními požadavky a dalšími příslušnými ustanoveními směrnice 1999/5/ES. Dansk [Danish] Undertegnede [fabrikantens navn] erklærer herved, at følgende udstyr [udstyrets typebetegnelse] overholder de væsentlige krav og øvrige relevante krav i direktiv 1999/5/EF. Deutsch [German] Hiermit erklärt [Name des Herstellers], dass sich das Gerät [Gerätetyp] in Übereinstimmung mit den grundlegenden Anforderungen und den übrigen einschlägigen Bestimmungen der Richtlinie 1999/5/EG befindet. Eesti [Estonian] Käesolevaga kinnitab [tootja nimi = name of manufacturer] seadme [seadme tüüp = type of equipment] vastavust direktiivi 1999/5/EÜ põhinõuetele ja nimetatud direktiivist tulenevatele teistele asjakohastele sätetele. English Hereby, [name of manufacturer], declares that this [type of equipment] is in compliance with the essential requirements and other relevant provisions of Directive 1999/5/EC. Español [Spanish] Por medio de la presente [nombre del fabricante] declara que el [clase de equipo] cumple con los requisitos esenciales y cualesquiera otras disposiciones aplicables o exigibles de la Directiva 1999/5/CE. Ελληνική [Greek] ΜΕ ΤΗΝ ΠΑΡΟΥΣΑ [name of manufacturer] ∆ΗΛΩΝΕΙ ΟΤΙ [type of equipment] ΣΥΜΜΟΡΦΩΝΕΤΑΙ ΠΡΟΣ ΤΙΣ ΟΥΣΙΩ∆ΕΙΣ ΑΠΑΙΤΗΣΕΙΣ ΚΑΙ ΤΙΣ ΛΟΙΠΕΣ ΣΧΕΤΙΚΕΣ ∆ΙΑΤΑΞΕΙΣ ΤΗΣ Ο∆ΗΓΙΑΣ 1999/5/ΕΚ. Français [French] Par la présente [nom du fabricant] déclare que l'appareil [type d'appareil] est conforme aux exigences essentielles et aux autres dispositions pertinentes de la directive 1999/5/CE.](https://usermanual.wiki/Laird-Technologies/60SIPT.Users-Manual-60-2230C-SQG-60SIPT/User-Guide-3490641-Page-44.png)
![60-2230C Datasheet Embedded Wireless Solutions Support Center: http://ews-support.lairdtech.com www.lairdtech.com/wireless 45 © Copyright 2017 Laird. All Rights Reserved Americas: +1-800-492-2320 Europe: +44-1628-858-940 Hong Kong: +852 2923 0610 Italiano [Italian] Con la presente [nome del costruttore] dichiara che questo [tipo di apparecchio] è conforme ai requisiti essenziali ed alle altre disposizioni pertinenti stabilite dalla direttiva 1999/5/CE. Latviski [Latvian] Aršo[name of manufacturer /izgatavotājanosaukums] deklarē, ka[type of equipment / iekārtas tips]atbilstDirektīvas 1999/5/EK būtiskajāmprasībām un citiemar to saistītajiemnoteikumiem. Lietuvių [Lithuanian] Šiuo [manufacturer name] deklaruoja, kad šis [equipment type] atitinka esminius reikalavimus ir kitas 1999/5/EB Direktyvos nuostatas. Nederlands [Dutch] Hierbij verklaart [naam van de fabrikant] dat het toestel [type van toestel] in overeenstemming is met de essentiële eisen en de andere relevante bepalingen van richtlijn 1999/5/EG. Malti [Maltese] Hawnhekk, [isem tal-manifattur], jiddikjara li dan [il-mudel tal-prodott] jikkonforma mal-ħtiġijiet essenzjali u ma provvedimenti oħrajn relevanti li hemm fid-Dirrettiva 1999/5/EC. Magyar [Hungarian] Alulírott, [gyártó neve] nyilatkozom, hogy a [... típus]megfelel a vonatkozó alapvetõ követelményeknek és az 1999/5/EC irányelv egyéb elõírásainak. Polski [Polish] Niniejszym [nazwa producenta] oświadcza, że [nazwa wyrobu] jest zgodny z zasadniczymi wymogami oraz pozostałymi stosownymi postanowieniami Dyrektywy 1999/5/EC. Português [Portuguese] [Nome do fabricante] declara que este [tipo de equipamento] está conforme com os requisitos essenciais e outras disposições da Directiva 1999/5/CE. Slovensko [Slovenian] [Ime proizvajalca] izjavlja, da je ta [tip opreme] v skladu z bistvenimi zahtevami in ostalimi relevantnimi določili direktive 1999/5/ES. Slovensky [Slovak] [Menovýrobcu]týmtovyhlasuje, že[typzariadenia]spĺňazákladnépožiadavky a všetkypríslušnéustanoveniaSmernice 1999/5/ES. Suomi [Finnish] [Valmistaja = manufacturer] vakuuttaa täten että [type of equipment = laitteen tyyppimerkintä] tyyppinen laite on direktiivin 1999/5/EY oleellisten vaatimusten ja sitä koskevien direktiivin muiden ehtojen mukainen. Svenska [Swedish] Härmed intygar [företag] att denna [utrustningstyp] står I överensstämmelse med de väsentliga egenskapskrav och övriga relevanta bestämmelser som framgår av direktiv 1999/5/EG. 20.2 Labeling Requirements The final end product must be labeled in a visible area with the following notice: © Copyright 2017 Laird. All Rights Reserved. Any information furnished by Laird and its agents is believed to be accurate and reliable. All specifications are subject to change without notice. Responsibility for the use and application of Laird materials or products rests with the end user since Laird and its agents cannot be aware of all potential uses. Laird makes no warranties as to non-infringement nor as to the fitness, merchantability, or sustainability of any Laird materials or products for any specific or general uses. Laird, Laird Technologies, Inc., or any of its affiliates or agents shall not be liable for incidental or consequential damages of any kind. All Laird products are sold pursuant to the Laird Terms and Conditions of Sale in effect from time to time, a copy of which will be furnished upon request. When used as a tradename herein, Laird means Laird PLC or one or more subsidiaries of Laird PLC. Laird™, Laird Technologies™, corresponding logos, and other marks are trademarks or registered trademarks of Laird. Other marks may be the property of third parties. Nothing herein provides a license under any Laird or any third party intellectual property right.](https://usermanual.wiki/Laird-Technologies/60SIPT.Users-Manual-60-2230C-SQG-60SIPT/User-Guide-3490641-Page-45.png)