Nokia Solutions and Networks T5BR1 CDMA Cellular Base Station User Manual IHET5BR1 Part 1 of 3
Nokia Solutions and Networks CDMA Cellular Base Station IHET5BR1 Part 1 of 3
Contents
- 1. IHET5BR1 User Manual Part 1 of 3
- 2. IHET5BR1 User Manual Part 2 of 3
- 3. IHET5BR1 User Manual Part 3 of 3
IHET5BR1 User Manual Part 1 of 3
1X SCt4812ET Lite BTS Optimization/ATP Software Release 2.16.0.x and CDMA LMF Build 2.16.x.x 800 MHz and 1.9 GHz CDMA English 08/01/2001 68P09253A60–1 PRELIMINARY Notice While reasonable efforts have been made to assure the accuracy of this document, Motorola, Inc. assumes no liability resulting from any inaccuracies or omissions in this document, or from use of the information obtained herein. The information in this document has been carefully checked and is believed to be entirely reliable. However, no responsibility is assumed for inaccuracies or omissions. Motorola, Inc. reserves the right to make changes to any products described herein and reserves the right to revise this document and to make changes from time to time in content hereof with no obligation to notify any person of revisions or changes. Motorola, Inc. does not assume any liability arising out of the application or use of any product, software, or circuit described herein; neither does it convey license under its patent rights or the rights of others. It is possible that this publication may contain references to, or information about Motorola products (machines and programs), programming, or services that are not announced in your country. Such references or information must not be construed to mean that Motorola intends to announce such Motorola products, programming, or services in your country. Copyrights This instruction manual, and the Motorola products described in this instruction manual may be, include or describe copyrighted Motorola material, such as computer programs stored in semiconductor memories or other media. Laws in the United States and other countries preserve for Motorola certain exclusive rights for copyrighted material, including the exclusive right to copy, reproduce in any form, distribute and make derivative works of the copyrighted material. Accordingly, any copyrighted Motorola material contained herein or in the Motorola products described in this instruction manual may not be copied, reproduced, distributed, merged or modified in any manner without the express written permission of Motorola. Furthermore, the purchase of Motorola products shall not be deemed to grant either directly or by implication, estoppel, or otherwise, any license under the copyrights, patents or patent applications of Motorola, as arises by operation of law in the sale of a product. Usage and Disclosure Restrictions License Agreement The software described in this document is the property of Motorola, Inc. It is furnished by express license agreement only and may be used only in accordance with the terms of such an agreement. Copyrighted Materials Software and documentation are copyrighted materials. Making unauthorized copies is prohibited by law. No part of the software or documentation may be reproduced, transmitted, transcribed, stored in a retrieval system, or translated into any language or computer language, in any form or by any means, without prior written permission of Motorola, Inc. High Risk Activities Components, units, or third–party products used in the product described herein are NOT fault–tolerant and are NOT designed, manufactured, or intended for use as on–line control equipment in the following hazardous environments requiring fail–safe controls: the operation of Nuclear Facilities, Aircraft Navigation or Aircraft Communication Systems, Air Traffic Control, Life Support, or Weapons Systems (“High Risk Activities”). Motorola and its supplier(s) specifically disclaim any expressed or implied warranty of fitness for such High Risk Activities. Trademarks and Motorola are registered trademarks of Motorola, Inc. Product and service names profiled herein are trademarks of Motorola, Inc. Other manufacturers’ products or services profiled herein may be referred to by trademarks of their respective companies. Copyright Copyright 2001 Motorola, Inc. All Rights Reserved Printed on Recyclable Paper REV012501 SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICE FOA Table of Contents 1X SCt4812ET Lite BTS Optimization/ATP Software Release 2.16.0.x and CDMA LMF Build 2.16.x.x List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv List of Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii Foreword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xii FCC Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xv General Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xviii Revision History . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xx Patent Notification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxi Chapter 1: Introduction Optimization Manual Scope and Layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 Purpose of the Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3 When to Optimize . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4 Required Test Equipment and Software . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5 Required Documents and Related Publications . . . . . . . . . . . . . . . . . . . . . . . . . 1-12 Terms and Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-13 BTS Equipment Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-15 Cabinet Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-17 Internal Assembly Location and Identification . . . . . . . . . . . . . . . . . . . . . . . . . 1-18 BTS Sector Configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-26 Chapter 2: Preliminary Operations Preliminary Operations: Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1 Ethernet LAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3 Initial Power Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4 Chapter 3: Optimization/Calibration 08/01/2001 Optimization/Calibration – Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1 Preparing the LMF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4 Span Lines – Interface and Isolation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-14 LMF to BTS Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-20 Using CDMA LMF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-21 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY Table of Contents – continued Pinging the Processors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-28 Download the BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-31 CSM System Time – GPS & LFR/HSO Verification . . . . . . . . . . . . . . . . . . . . . 3-37 Test Equipment Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-47 Test Set Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-55 Bay Level Offset Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-64 RFDS Setup and Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-76 Alarms Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-85 Chapter 4: Automated Acceptance Test Procedure (ATP) Automated Acceptance Test Procedure – Introduction . . . . . . . . . . . . . . . . . . . . 4-1 Acceptance Tests – Test Set Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3 Abbreviated (All–inclusive) Acceptance Tests . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4 Individual Acceptance Tests–Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7 TX Spectral Purity Transmit Mask Acceptance Test . . . . . . . . . . . . . . . . . . . . . 4-9 TX Waveform Quality (Rho) Acceptance Test . . . . . . . . . . . . . . . . . . . . . . . . . . 4-12 TX Pilot Time Offset Acceptance Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13 TX Code Domain Power/Noise Floor Acceptance Test . . . . . . . . . . . . . . . . . . . 4-15 RX FER Acceptance Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-18 Generating an ATP Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-20 Chapter 5: Leaving the Site Updating Calibration Data Files . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1 Prepare to Leave the Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3 Chapter 6: Basic Troubleshooting ii Basic Troubleshooting Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1 Troubleshooting: Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2 Troubleshooting: Download . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7 Troubleshooting: Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10 Basic Troubleshooting – RF Path Fault Isolation . . . . . . . . . . . . . . . . . . . . . . . . 6-12 Troubleshooting: Transmit ATP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-15 Troubleshooting: Receive ATP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-17 Troubleshooting: CSM Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18 SCCP Backplane Troubleshooting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-20 RFDS – Fault Isolation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-26 Module Front Panel LED Indicators and Connectors . . . . . . . . . . . . . . . . . . . . . 6-28 Basic Troubleshooting – Span Control Link . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-35 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Table of Contents – continued Appendix A: Data Sheets Optimization (Pre–ATP) Data Sheets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1 Site Serial Number Check List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-13 Appendix B: FRU Optimization/ATP Test Matrix FRU Optimization/ATP Test Matrix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-1 Appendix C: BBX Gain Set Point vs. BTS Output Considerations BBX2 Gain Set Point vs. BTS Output Considerations . . . . . . . . . . . . . . . . . . . C-1 Appendix D: CDMA Operating Frequency Information CDMA Operating Frequency Programming Information – North American PCS Bands . D-1 Appendix E: PN Offset/I & Q Offset Register Programming Information PN Offset Programming Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . E-1 Appendix F: Test Equipment Preparation Test Equipment Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-1 Manual Cable Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-14 Appendix G: Download ROM Code Downloading ROM Code with the LMF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-1 Appendix H: In–Service Calibration Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-1 Power Delta Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-3 In–Service Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-18 Index 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY iii List of Figures 1X SCt4812ET Lite BTS Optimization/ATP Software Release 2.16.0.x and CDMA LMF Build 2.16.x.x iv Figure 1-1: SC4812ET Lite Logical BTS Span Cabling . . . . . . . . . . . . . . . . . . 1-16 Figure 1-2: SC4812ET Lite BTS Frame . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-17 Figure 1-3: Internal Assemblies and FRUs (Cabinet doors not shown for clarity) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-18 Figure 1-4: 50–Pair Punchblock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-20 Figure 1-5: SCCP Shelf, IS–95A/B and 1X Devices . . . . . . . . . . . . . . . . . . . . . 1-22 Figure 1-6: RF Interface Panel, DRDCs Installed . . . . . . . . . . . . . . . . . . . . . . . 1-23 Figure 1-7: RF Interface Panel, TRDCs Installed . . . . . . . . . . . . . . . . . . . . . . . 1-24 Figure 1-8: RFDS, DRDC, and TRDC Details . . . . . . . . . . . . . . . . . . . . . . . . . 1-25 Figure 1-9: SC4812ET Lite LPA Configuration with Bandpass Filters (Starter Frame Mapping Only) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-27 Figure 2-1: Backplane DIP Switch Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2 Figure 2-2: External Ethernet LAN Connectors . . . . . . . . . . . . . . . . . . . . . . . . . 2-3 Figure 2-3: Frame Power Subassemblies, North American and International Cabinets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-5 Figure 2-4: ACLC Circuit Breaker Panel – North American . . . . . . . . . . . . . . . 2-6 Figure 2-5: ACLC Circuit Breaker Panel – International . . . . . . . . . . . . . . . . . . 2-6 Figure 2-6: DC PDA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7 Figure 2-7: ACLC Voltage Measurement Probe Points – North American . . . . 2-11 Figure 2-8: ACLC Voltage Measurement Probe Points – International . . . . . . . 2-12 Figure 2-9: Meter Alarm Panel (MAP) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-13 Figure 2-10: Heat Exchanger Blower Assembly and Circuit Breakers . . . . . . . 2-18 Figure 3-1: CDMA LMF Folder Structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-9 Figure 3-2: BTS Folder Name Syntax Example . . . . . . . . . . . . . . . . . . . . . . . . . 3-10 Figure 3-3: CAL File Name Syntax Example . . . . . . . . . . . . . . . . . . . . . . . . . . 3-10 Figure 3-4: CDF Name Syntax Example . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-10 Figure 3-5: Code Load File Name Syntax Example . . . . . . . . . . . . . . . . . . . . . . 3-12 Figure 3-6: DDS File Name Syntax Example . . . . . . . . . . . . . . . . . . . . . . . . . . 3-13 Figure 3-7: Disconnecting Span Lines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-14 Figure 3-8: Rear and Front View of CSU Shelf . . . . . . . . . . . . . . . . . . . . . . . . . 3-16 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY List of Figures – continued 08/01/2001 Figure 3-9: 50–Pair Punchblock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-17 Figure 3-10: LMF Connection Detail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-20 Figure 3-11: CDMA LMF Computer Common MMI Connections . . . . . . . . . . 3-27 Figure 3-12: BTS Ethernet LAN Interconnect Diagram . . . . . . . . . . . . . . . . . . 3-28 Figure 3-13: CSM MMI Terminal Connection . . . . . . . . . . . . . . . . . . . . . . . . . . 3-40 Figure 3-14: Cable Calibration Test Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-50 Figure 3-15: TX Calibration Test Setup (CyberTest and HP 8935) . . . . . . . . . . 3-51 Figure 3-16: TX Calibration Test Setup HP 8921A and Advantest . . . . . . . . . . 3-52 Figure 3-17: Optimization/ATP Test Setup Calibration (CyberTest, HP 8935 and Advantest) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-53 Figure 3-18: Optimization/ATP Test Setup HP 8921A . . . . . . . . . . . . . . . . . . . 3-54 Figure 3-19: Calibrating Test Equipment Setup for TX Cable Calibration (Using Signal Generator and Spectrum Analyzer) . . . . . . . . . . . . . . . . . . . . . . . 3-60 Figure 3-20: Calibrating Test Equipment Setup for RX ATP Test (Using Signal Generator and Spectrum Analyzer) . . . . . . . . . . . . . . . . . . . . . . . 3-61 Figure 3-21: Battery Over–Temperature Sensor . . . . . . . . . . . . . . . . . . . . . . . . . 3-92 Figure 3-22: MAP Connector J8 (Rear of MAP) . . . . . . . . . . . . . . . . . . . . . . . . 3-93 Figure 4-1: TX Mask Verification Spectrum Analyzer Display . . . . . . . . . . . . . 4-11 Figure 4-2: Code Domain Analyzer CD Power/Noise Floor Display Examples 4-17 Figure 6-1: TX Output Fault Isolation Flowchart . . . . . . . . . . . . . . . . . . . . . . . 6-14 Figure 6-2: CSM Front Panel Indicators & Monitor Ports . . . . . . . . . . . . . . . . . 6-29 Figure 6-3: GLI2 Front Panel Operating Indicators . . . . . . . . . . . . . . . . . . . . . . 6-32 Figure 6-4: MCC24 Front Panel LEDs and LED Indicators . . . . . . . . . . . . . . . 6-34 Figure 6-5: MGLI/GLI Board MMI Connection Detail . . . . . . . . . . . . . . . . . . . 6-36 Figure D-1: North America PCS Frequency Spectrum (CDMA Allocation) . . . D-1 Figure D-2: North American Cellular Telephone System Frequency Spectrum (CDMA Allocation). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . D-4 Figure F-1: HP8921A/600 Cables Connection for 10 MHz Signal and GPIB without Rubidium Reference . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-2 Figure F-2: HP8921A Cables Connection for 10 MHz Signal and GPIB with Rubidium Reference . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-4 Figure F-3: Cable Connections for Test Set without 10 MHz Rubidium Reference . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-7 Figure F-4: Cable Connections for Test Set with 10 MHz Rubidium Reference . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-8 Figure F-5: Power Meter Detail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-10 Figure F-6: Gigatronics 8542C Power Meter Detail . . . . . . . . . . . . . . . . . . . . . F-13 Figure F-7: Cable Calibration Using HP8921 with PCS Interface . . . . . . . . . . . F-17 Figure F-8: Cable Calibration Using Advantest R3465 . . . . . . . . . . . . . . . . . . . F-20 Figure H-1: Delta Calibration Setup – Agilent E4432B to HP437 . . . . . . . . . . H-5 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY List of Figures – continued vi Figure H-2: Delta Calibration Setup – Agilent E4432B to Agilent E4406A . . . H-5 Figure H-3: Delta Calibration Setup – Advantest R3562 to HP437 . . . . . . . . . H-8 Figure H-4: Delta Calibration Setup – Advantest R3562 to R3267 . . . . . . . . . . H-8 Figure H-5: Delta Calibration Setup – E6380A to HP437 . . . . . . . . . . . . . . . . . H-10 Figure H-6: Delta Calibration Setup – E6380A to E6380A . . . . . . . . . . . . . . . . H-11 Figure H-7: Delta Calibration Setup – HP8921A to HP437 . . . . . . . . . . . . . . . H-13 Figure H-8: Delta Calibration Setup – HP8921A to HP8921A . . . . . . . . . . . . . H-14 Figure H-9: Delta Calibration Setup – R3561L to HP437 . . . . . . . . . . . . . . . . . H-17 Figure H-10: Delta Calibration Setup – R3561L to R3465 . . . . . . . . . . . . . . . . H-17 Figure H-11: Optimization/ATP Test Setup Using Directional Coupler – Agilent Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-20 Figure H-12: Optimization/ATP Test Setup Using Directional Coupler – Advantest R3267/R3562 Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-21 Figure H-13: Optimization/ATP Test Setup Using RFDS – Agilent Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-22 Figure H-14: Optimization/ATP Test Setup Using RFDS – Advantest R3267/R3562 Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-23 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY List of Tables 1X SCt4812ET Lite BTS Optimization/ATP Software Release 2.16.0.x and CDMA LMF Build 2.16.x.x 08/01/2001 Table 1-1: Non–Standard Terms and Abbreviations . . . . . . . . . . . . . . . . . . . . . . 1-13 Table 1-2: SCCP Cage Module Device ID Numbers (Top Shelf) . . . . . . . . . . . 1-16 Table 1-3: SCCP Cage Module Device ID Numbers (Bottom Shelf) . . . . . . . . 1-16 Table 1-4: BTS Sector Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-26 Table 1-5: Sector Configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-27 Table 2-1: Initial Installation of Boards/Modules . . . . . . . . . . . . . . . . . . . . . . . . 2-1 Table 2-2: Initial Inspection and Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4 Table 2-3: DC Power System Pre–Power Application Test . . . . . . . . . . . . . . . . 2-7 Table 2-4: AC Voltage Measurements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9 Table 2-5: Applying Internal AC Power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12 Table 2-6: DC Power Application and Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-14 Table 2-7: Battery Charge Test (Connected Batteries) . . . . . . . . . . . . . . . . . . . . 2-15 Table 2-8: Battery Discharge Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-16 Table 2-9: Power Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-17 Table 3-1: CD ROM Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4 Table 3-2: Copying CBSC CDF Files to the LMF Computer . . . . . . . . . . . . . . 3-5 Table 3-3: Create HyperTerminal Connection . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7 Table 3-4: T1/E1 Span Isolation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-15 Table 3-5: Punchdown Location for 50–Pair Punch Block . . . . . . . . . . . . . . . . 3-18 Table 3-6: Connect the LMF to the BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-20 Table 3-7: BTS GUI Login Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-23 Table 3-8: BTS CLI Login Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-24 Table 3-9: BTS GUI Logout Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-25 Table 3-10: BTS CLI Logout Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-26 Table 3-11: Establishing MMI Communication . . . . . . . . . . . . . . . . . . . . . . . . . 3-26 Table 3-12: Pinging the Processors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-29 Table 3-13: Verify GLI ROM Code Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-32 Table 3-14: Download and Enable MGLI and GLI Devices . . . . . . . . . . . . . . . 3-33 Table 3-15: Download RAM Code and Data to Non–GLI Devices . . . . . . . . . . 3-34 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY vii List of Tables viii – continued Table 3-16: Select CSM Clock Source . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-34 Table 3-17: Enable CSMs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-35 Table 3-18: Enable MCCs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-36 Table 3-19: Test Equipment Setup (GPS & LFR/HSO Verification) . . . . . . . . . 3-39 Table 3-20: GPS Initialization/Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-41 Table 3-21: LORAN–C Initialization/Verification . . . . . . . . . . . . . . . . . . . . . . . 3-45 Table 3-22: Test Equipment Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-48 Table 3-23: Selecting Test Equipment Manually in a Serial Connection Tab . . 3-56 Table 3-24: Selecting Test Equipment Using Auto-Detect . . . . . . . . . . . . . . . . . 3-57 Table 3-25: Test Equipment Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-58 Table 3-26: Cable Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-59 Table 3-27: Calibrating TX Cables Using Signal Generator and Spectrum Analyzer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-60 Table 3-28: Calibrating RX Cables Using a Signal Generator and Spectrum Analyzer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-61 Table 3-29: Setting Cable Loss Values . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-62 Table 3-30: Setting TX Coupler Loss Values . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-63 Table 3-31: BLO BTS.cal file Array Branch Assignments . . . . . . . . . . . . . . . . 3-66 Table 3-32: SC4812ET Lite BTS.cal File Array (Per Sector) . . . . . . . . . . . . . . 3-67 Table 3-33: Set Up Test Equipment (RF Path Calibration) . . . . . . . . . . . . . . . . 3-68 Table 3-34: All Cal/Audit Path Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-71 Table 3-35: TX Calibration Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-71 Table 3-36: Download BLO . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-73 Table 3-37: TX Path Audit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-74 Table 3-38: Create CAL File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-75 Table 3-39: RFDS Parameter Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-77 Table 3-40: Definition of Parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-78 Table 3-41: Valid NAM Field Ranges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-79 Table 3-42: Set Antenna Map Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-80 Table 3-43: Set RFDS Configuration Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-81 Table 3-44: RFDS TSIC Calibration Channel Frequencies . . . . . . . . . . . . . . . . 3-82 Table 3-45: RFDS Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-83 Table 3-46: Program NAM Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-84 Table 3-47: Alarm Testing Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-86 Table 3-48: Heat Exchanger Alarm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-86 Table 3-49: ACLC and Power Entry Door Alarm . . . . . . . . . . . . . . . . . . . . . . . 3-86 Table 3-50: AC Fail Alarm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-87 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY List of Tables – continued 08/01/2001 Table 3-51: Minor Alarm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-87 Table 3-52: Single Rectifier Fail or Minor Alarm, Single–Carrier System . . . . 3-88 Table 3-53: Multiple Rectifier Failure or Major Alarm, Single–Carrier System 3-88 Table 3-54: Single Rectifier Fail or Minor Alarm, Two–Carrier System . . . . . . 3-89 Table 3-55: Multiple Rectifier Failure or Major Alarm, Two–Carrier System . 3-90 Table 3-56: Battery Over–Temperature Alarm . . . . . . . . . . . . . . . . . . . . . . . . . . 3-90 Table 3-57: Rectifier Over–Temperature Alarm . . . . . . . . . . . . . . . . . . . . . . . . . 3-93 Table 4-1: Set Up Test Equipment – TX Output Verify/Control Tests . . . . . . . . 4-3 Table 4-2: All TX/RX ATP Test Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-5 Table 4-3: All TX ATP Test Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-5 Table 4-4: All RX ATP Test Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6 Table 4-5: Test Spectral Purity Transmit Mask . . . . . . . . . . . . . . . . . . . . . . . . . 4-10 Table 4-6: Test Waveform Quality (Rho) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-12 Table 4-7: Test Pilot Time Offset . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13 Table 4-8: Test Code Domain Power/Noise Floor . . . . . . . . . . . . . . . . . . . . . . . 4-16 Table 4-9: Test FER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-19 Table 4-10: Generating an ATP Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-20 Table 5-1: Copying CAL Files to a Diskette . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1 Table 5-2: Copying CAL Files from Diskette to the CBSC . . . . . . . . . . . . . . . . 5-1 Table 5-3: Remove External Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3 Table 5-4: Reset BTS Devices and Remote Site Initialization . . . . . . . . . . . . . . 5-3 Table 5-5: Bring Modules into Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4 Table 5-6: Remove LMF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4 Table 5-7: Connect T1 or E1 Spans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5 Table 5-8: Check Before Leaving the Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5 Table 6-1: Login Failure Troubleshooting Procedures . . . . . . . . . . . . . . . . . . . . 6-2 Table 6-2: Force Ethernet LAN A to Active State as Primary LAN . . . . . . . . . 6-2 Table 6-3: GLI IP Address Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4 Table 6-4: Troubleshooting a Power Meter Communication Failure . . . . . . . . . 6-5 Table 6-5: Troubleshooting a Communications Analyzer Communication Failure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6 Table 6-6: Troubleshooting Code Download Failure . . . . . . . . . . . . . . . . . . . . . 6-7 Table 6-7: Troubleshooting Data Download Failure . . . . . . . . . . . . . . . . . . . . . 6-7 Table 6-8: Troubleshooting Device Enable (INS) Failure . . . . . . . . . . . . . . . . . 6-8 Table 6-9: LPA Errors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9 Table 6-10: Troubleshooting BLO Calibration Failure . . . . . . . . . . . . . . . . . . . 6-10 Table 6-11: Troubleshooting Calibration Audit Failure . . . . . . . . . . . . . . . . . . . 6-11 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY ix List of Tables – continued Table 6-12: Troubleshooting TX Mask Measurement Failure . . . . . . . . . . . . . . 6-15 Table 6-13: Troubleshooting Rho and Pilot Time Offset Measurement Failure 6-15 Table 6-14: Troubleshooting Code Domain Power and Noise Floor Measurement Failure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-16 Table 6-15: Troubleshooting Carrier Measurement Failure . . . . . . . . . . . . . . . . 6-16 Table 6-16: Troubleshooting Multi-FER Failure . . . . . . . . . . . . . . . . . . . . . . . . 6-17 Table 6-17: No GLI2 Control via LMF (all GLI2s) . . . . . . . . . . . . . . . . . . . . . . 6-21 Table 6-18: No GLI2 Control through Span Line Connection (Both GLI2s) . . 6-22 Table 6-19: MGLI2 Control Good – No Control over Co–located GLI2 . . . . . 6-22 Table 6-20: MGLI2 Control Good – No Control over AMR . . . . . . . . . . . . . . . 6-22 Table 6-21: MGLI2 Control Good – No Control over Co–located BBX2s . . . . 6-23 Table 6-22: BBX2 Control Good – No (or Missing) Span Line Traffic . . . . . . . 6-23 Table 6-23: No MCC24/MCC8E Channel Elements . . . . . . . . . . . . . . . . . . . . . 6-23 Table 6-24: No DC Input Voltage to Power Supply Module . . . . . . . . . . . . . . . 6-24 Table 6-25: No DC Input Voltage to any SCCP Shelf Module . . . . . . . . . . . . . 6-25 Table 6-26: TX and RX Signal Routing Problems . . . . . . . . . . . . . . . . . . . . . . . 6-25 Table 6-27: RFDS Fault Isolation – All tests fail . . . . . . . . . . . . . . . . . . . . . . . . 6-26 Table 6-28: RFDS Fault Isolation – All tests fail on single antenna path . . . . . 6-26 Table 6-29: Troubleshoot Control Link Failure . . . . . . . . . . . . . . . . . . . . . . . . . 6-35 Table 6-30: Set BTS Span Parameter Configuration . . . . . . . . . . . . . . . . . . . . . 6-37 Table A-1: Verification of Test Equipment Used . . . . . . . . . . . . . . . . . . . . . . . . A-1 Table A-2: Site Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-2 Table A-3: Preliminary Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-2 Table A-4: GPS Receiver Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-5 Table A-5: LFR Receiver Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-6 Table A-6: LPA IM Reduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-7 Table A-7: TX BLO Calibration (3–Sector: 1–Carrier and 2–Carrier Non–adjacent Channels) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-8 Table A-8: TX Bay Level Offset Calibration (3–Sector: 2–Carrier Adjacent Channels) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-9 Table A-9: TX Antenna VSWR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-10 Table A-10: RX Antenna VSWR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-11 Table A-11: CDI Alarm Input Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-11 Table B-1: When RF Optimization Is required on the BTS . . . . . . . . . . . . . . . . B-1 Table B-2: When to Optimize Inter–frame Cabling . . . . . . . . . . . . . . . . . . . . . . B-1 Table B-3: SC 4812ET Lite BTS Optimization and ATP Test Matrix . . . . . . . . B-3 Table C-1: BBX2 Gain Set Point vs. Actual BTS Output (in dBm) . . . . . . . . . C-1 Table D-1: 1900 MHz TX and RX Frequency vs. Channel . . . . . . . . . . . . . . . . D-2 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY List of Tables – continued 08/01/2001 Table D-2: 800 MHz TX and RX Frequency vs. Channel . . . . . . . . . . . . . . . . . D-4 Table E-1: PnMaskI and PnMaskQ Values for PilotPn . . . . . . . . . . . . . . . . . . . E-3 Table F-1: HP8921A/600 Communications Test Set Rear Panel Connections Without Rubidium Reference . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-1 Table F-2: HP8921A/600 Communications Test Set Rear Panel Connections With Rubidium Reference . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-3 Table F-3: System Connectivity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-5 Table F-4: Setting HP8921A GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . F-6 Table F-5: Pretest Setup for HP8921A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-6 Table F-6: Pretest Setup for HP8935 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-6 Table F-7: Advantest R3465 GPIB Address and Clock Setup . . . . . . . . . . . . . . F-9 Table F-8: Pretest Setup for Advantest R346 . . . . . . . . . . . . . . . . . . . . . . . . . . . F-9 Table F-9: Power Meter Calibration Procedure . . . . . . . . . . . . . . . . . . . . . . . . . F-10 Table F-10: Calibrate Gigatronics 8542 Power Meter . . . . . . . . . . . . . . . . . . . . F-12 Table F-11: Calibrating Test Cable Setup (using the HP PCS Interface) . . . . . . F-14 Table F-12: Procedure for Calibrating Test Cable Setup Using Advantest R3465 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-18 Table G-1: Download ROM and RAM Code to Devices . . . . . . . . . . . . . . . . . . G-2 Table H-1: Agilent E4406A Power Delta Calibration Procedure . . . . . . . . . . . . H-3 Table H-2: Advantest R3267 Power Delta Calibration Procedure . . . . . . . . . . . H-6 Table H-3: Agilent E6380A Power Delta Calibration Procedure . . . . . . . . . . . . H-9 Table H-4: HP8921A Power Delta Calibration Procedure . . . . . . . . . . . . . . . . . H-12 Table H-5: Advantest Power Delta Calibration Procedure . . . . . . . . . . . . . . . . . H-15 Table H-6: In–Service Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-24 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY xi Foreword Scope of manual This manual is intended for use by cellular telephone system craftspersons in the day-to-day operation of Motorola cellular system equipment and ancillary devices. It is assumed that the user of this information has a general understanding of telephony, as used in the operation of the Public Switched Telephone Network (PSTN), and is familiar with these concepts as they are applied in the cellular mobile/portable radiotelephone environment. The user, however, is not expected to have any detailed technical knowledge of the internal operation of the equipment. This document covers only the steps required to verify the functionality of the RF Base Transceiver Subsystem (BTS) equipment prior to system level testing, and is intended to supplement site specific application instructions. It also should be used in conjunction with existing product manuals. Additional steps may be required. This manual is not intended to replace the system and equipment training offered by Motorola, although it can be used to supplement or enhance the knowledge gained through such training. Text conventions The following special paragraphs are used in this manual to point out information that must be read. This information may be set-off from the surrounding text, but is always preceded by a bold title in capital letters. The four categories of these special paragraphs are: NOTE Presents additional, helpful, non-critical information that you can use. IMPORTANT Presents information to help you avoid an undesirable situation or provides additional information to help you understand a topic or concept. CAUTION Presents information to identify a situation in which equipment damage could occur, thus avoiding damage to equipment. WARNING Presents information to warn you of a potentially hazardous situation in which there is a possibility of personal injury. xii 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Foreword – continued The following special paragraphs are used in tables in the manual to point out information that must be read. NOTE Presents additional, helpful non-critical information that you can use. * IMPORTANT Presents information to help you avoid an undesirable situation or provide additional information to help you understand a topic or concept. ! CAUTION Presents information to identify a situation where equipment damage could occur and help you avoid damaging your equipment. n WARNING Presents information to warn you of a potentially hazardous situation where there is a possibility of personal injury (serious or otherwise). Changes to manual Changes that occur after the printing date are incorporated into your manual by Cellular Manual Revisions (CMRs). The information in this manual is updated, as required, by a CMR when new options and procedures become available for general use or when engineering changes occur. The cover sheet(s) that accompany each CMR should be retained for future reference. Refer to the Revision History page for a list of all applicable CMRs contained in this manual. Receiving updates Technical Education & Documentation (TED) maintains a customer database that reflects the type and number of manuals ordered or shipped since the original delivery of your Motorola equipment. Also identified in this database is a “key” individual (such as Documentation Coordinator or Facility Librarian) designated to receive manual updates from TED as they are released. To ensure that your facility receives updates to your manuals, it is important that the information in our database is correct and up-to-date. Therefore, if you have corrections or wish to make changes to the information in our database (i.e., to assign a new “key” individual), please contact Technical Education & Documentation at: MOTOROLA, INC. Technical Education & Documentation 1 Nelson C. White Parkway Mundelein, Illinois 60060 U.S.A. Phone: Within U.S.A. and Canada . . . . . 800-872-8225 Outside of U.S.A. and Canada . . +1-847-435–5700 FAX: . . . . . . . . . . . . . . . . . . . . . . +1-847-435–5541 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY xiii Foreword – continued Reporting manual errors In the event that you locate an error or identify a deficiency in your manual, please take time to write to us at the address above. Be sure to include your name and address, the complete manual title and part number (located on the manual spine, cover, or title page), the page number (found at the bottom of each page) where the error is located, and any comments you may have regarding what you have found. We appreciate any comments from the users of our manuals. xiv 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY FCC Requirements Content This section presents Federal Communications Commission (FCC) Rules Parts 15 and 68 requirements and compliance information for the SCt4812T/ET/ET Lite series RF Base Transceiver Stations (BTS). FCC Part 15 Requirements Part 15.19a(3) – INFORMATION TO USER NOTE This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. Part 15.21 – INFORMATION TO USER CAUTION Changes or modifications not expressly approved by Motorola could void your authority to operate the equipment. 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY xv FCC Requirements – continued 15.105(b) – INFORMATION TO USER NOTE This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment OFF and ON, the user is encouraged to try to correct the interference by one or more of the following measures: – Reorient or relocate the receiving antenna. – Increase the separation between the equipment and receiver. – Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. – Consult the dealer or an experienced radio/TV technician for help. FCC Part 68 Requirements This equipment complies with Part 68 of the Federal Communications Commission (FCC) Rules. A label inside the cabinet frame easily visible with the door open in the upper portion of the cabinet contains, among other information, the FCC Registration Number and Ringer Equivalence Number (REN) for this equipment. If requested, this information must be provided to the telephone company. The REN is useful to determine the quantity of the devices which may connect to the telephone line. Excessive RENs on the telephone line may result in the devices not ringing in response to incoming calls. In most, but not all areas, the sum of the RENs should not exceed five (5.0). To be certain of the number of devices that may be connected to the line as determined by the total RENs, contact the telephone company to determine the maximum REN for the calling area. If the dial–in site access modem causes harm to the telephone network, the telephone company will notify you in advance that temporary discontinuance of service may be required. If advance notice is not practical, the telephone company will notify you of the discontinuance as soon as possible. Also, you will be advised of your right to file a complaint with the FCC if you believe it is necessary. The telephone company may make changes in its facilities, equipment, operations, or procedures that could affect the operation of your dial–in xvi 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY FCC Requirements – continued site access modem. If this happens, the telephone company will provide advance notice so that you can modify your equipment as required to maintain uninterrupted service. If you experience trouble with the dial–in site access modem, please contact: Global Customer Network Resolution Center (CNRC) 1501 W. Shure Drive, 3436N Arlington Heights, Illinois 60004 Phone Number: (847) 632–5390 for repair and/or warranty information. If the trouble is causing harm to the telephone network, the telephone company may request you to disconnect the equipment from the network until the problem is solved. You should not attempt to repair this equipment yourself. This equipment contains no customer or user–serviceable parts. Changes or modifications not expressly approved by Motorola could void your authority to operate this equipment. 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY xvii General Safety Remember! . . . Safety depends on you!! The following general safety precautions must be observed during all phases of operation, service, and repair of the equipment described in this manual. Failure to comply with these precautions or with specific warnings elsewhere in this manual violates safety standards of design, manufacture, and intended use of the equipment. Motorola, Inc. assumes no liability for the customer’s failure to comply with these requirements. The safety precautions listed below represent warnings of certain dangers of which we are aware. You, as the user of this product, should follow these warnings and all other safety precautions necessary for the safe operation of the equipment in your operating environment. Ground the instrument To minimize shock hazard, the equipment chassis and enclosure must be connected to an electrical ground. If the equipment is supplied with a three-conductor ac power cable, the power cable must be either plugged into an approved three-contact electrical outlet or used with a three-contact to two-contact adapter. The three-contact to two-contact adapter must have the grounding wire (green) firmly connected to an electrical ground (safety ground) at the power outlet. The power jack and mating plug of the power cable must meet International Electrotechnical Commission (IEC) safety standards. Do not operate in an explosive atmosphere Do not operate the equipment in the presence of flammable gases or fumes. Operation of any electrical equipment in such an environment constitutes a definite safety hazard. Keep away from live circuits Operating personnel must: S not remove equipment covers. Only Factory Authorized Service Personnel or other qualified maintenance personnel may remove equipment covers for internal subassembly, or component replacement, or any internal adjustment. S not replace components with power cable connected. Under certain conditions, dangerous voltages may exist even with the power cable removed. S always disconnect power and discharge circuits before touching them. Do not service or adjust alone Do not attempt internal service or adjustment, unless another person, capable of rendering first aid and resuscitation, is present. xviii 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY General Safety – continued Use caution when exposing or handling the CRT Breakage of the Cathode–Ray Tube (CRT) causes a high-velocity scattering of glass fragments (implosion). To prevent CRT implosion, avoid rough handling or jarring of the equipment. The CRT should be handled only by qualified maintenance personnel, using approved safety mask and gloves. Do not substitute parts or modify equipment Because of the danger of introducing additional hazards, do not install substitute parts or perform any unauthorized modification of equipment. Contact Motorola Warranty and Repair for service and repair to ensure that safety features are maintained. Dangerous procedure warnings Warnings, such as the example below, precede potentially dangerous procedures throughout this manual. Instructions contained in the warnings must be followed. You should also employ all other safety precautions that you deem necessary for the operation of the equipment in your operating environment. WARNING Dangerous voltages, capable of causing death, are present in this equipment. Use extreme caution when handling, testing, and adjusting . 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY xix Revision History Manual Number 68P09253A60 Manual Title 1X SCt4812ET Lite BTS Optimization/ATP Software Release 2.16.0.x and CDMA LMF Build 2.16.x.x Version Information The following table lists the manual version, date of version, and remarks on the version. xx Version Level Date of Issue 08/2/2001 Remarks Preliminary version of manual for R2.16.0 1X BTS 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Patent Notification Patent numbers This product is manufactured and/or operated under one or more of the following patents and other patents pending: 4128740 4193036 4237534 4268722 4282493 4301531 4302845 4312074 4350958 4354248 4367443 4369516 4369520 4369522 4375622 4485486 4491972 4517561 4519096 4549311 4550426 4564821 4573017 4581602 4590473 4591851 4616314 4636791 4644351 4646038 4649543 4654655 4654867 08/01/2001 4661790 4667172 4672657 4694484 4696027 4704734 4709344 4710724 4726050 4729531 4737978 4742514 4751725 4754450 4764737 4764849 4775998 4775999 4797947 4799253 4802236 4803726 4811377 4811380 4811404 4817157 4827507 4829543 4833701 4837800 4843633 4847869 4852090 4860281 4866710 4870686 4872204 4873683 4876740 4881082 4885553 4887050 4887265 4893327 4896361 4910470 4914696 4918732 4941203 4945570 4956854 4970475 4972355 4972432 4979207 4984219 4984290 4992753 4998289 5020076 5021801 5022054 5023900 5028885 5030793 5031193 5036515 5036531 5038399 5040127 5041699 5047762 5048116 5055800 5055802 5058136 5060227 5060265 5065408 5067139 5068625 5070310 5073909 5073971 5075651 5077532 5077741 5077757 5081641 5083304 5090051 5093632 5095500 5105435 5111454 5111478 5113400 5117441 5119040 5119508 5121414 5123014 5127040 5127100 5128959 5130663 5133010 5140286 5142551 5142696 5144644 5146609 5146610 5152007 5155448 5157693 5159283 5159593 5159608 5170392 5170485 5170492 5182749 5184349 5185739 5187809 5187811 5193102 5195108 5200655 5203010 5204874 5204876 5204977 5207491 5210771 5212815 5212826 5214675 5214774 5216692 5218630 5220936 5222078 5222123 5222141 5222251 5224121 5224122 5226058 5228029 5230007 5233633 5235612 5235614 5239294 5239675 5241545 5241548 5241650 5241688 5243653 5245611 5245629 5245634 1X SCt4812ET Lite BTS Optimization/ATP 5247544 5251233 5255292 5257398 5259021 5261119 5263047 5263052 5263055 5265122 5268933 5271042 5274844 5274845 5276685 5276707 5276906 5276907 5276911 5276913 5276915 5278871 5280630 5285447 5287544 5287556 5289505 5291475 5295136 5297161 5299228 5301056 5301188 5301353 5301365 5303240 5303289 5303407 5305468 5307022 5307512 5309443 5309503 5311143 5311176 5311571 5313489 5319712 5321705 5321737 5323391 5325394 5327575 5329547 5329635 5339337 D337328 D342249 D342250 D347004 D349689 RE31814 PRELIMINARY xxi Patent Notification – continued Notes xxii 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY 1 Chapter 1: Introduction Table of Contents 08/01/2001 Optimization Manual Scope and Layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Manual Scope and Layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Assumptions and Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Document Composition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1-1 1-1 1-2 Purpose of the Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Why Optimize? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . What Is Optimization? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . What Happens During Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3 1-3 1-3 1-3 When to Optimize . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . New Installations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Site Expansion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Periodic Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Repaired Sites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4 1-4 1-4 1-4 1-4 Required Test Equipment and Software . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Policy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Test Equipment Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Test Cable Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Equipment Warm–up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Required Test Equipment and Software . . . . . . . . . . . . . . . . . . . . . . . . Optional Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5 1-5 1-5 1-5 1-5 1-6 1-10 Required Documents and Related Publications . . . . . . . . . . . . . . . . . . . . . . . . . Required Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Related Publications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-12 1-12 1-12 Terms and Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Standard and Non–standard Terms and Abbreviations . . . . . . . . . . . . . 1-13 1-13 BTS Equipment Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Equipment Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Logical BTS Numbering . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-15 1-15 1-15 Cabinet Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Major Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-17 1-17 Internal Assembly Location and Identification . . . . . . . . . . . . . . . . . . . . . . . . . Internal Assemblies and FRUs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SCCP Cage Configuration and the 1X Devices . . . . . . . . . . . . . . . . . . 1-18 1-18 1-26 BTS Sector Configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Sector Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-27 1-27 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 1 Table of Contents – continued Notes 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Optimization Manual Scope and Layout Manual Scope and Layout This document provides information pertaining to the optimization and audit tests of the Motorola SC4812ET Lite RF Base Transceiver Station (BTS) equipment frame and its associated internal and external interfaces. The following subjects are addressed: preliminary background information; optimization, and alarm/redundancy tests; Acceptance Test Procedures (ATP) to verify site operation and regulation compliance; site turnover; troubleshooting. Most applications use the same test procedure for all equipment variations. However, decision break points are provided throughout the procedure when equipment–specific tests are required. For example, when tests using external test equipment are performed instead of those using the RFDS, additional test procedures and illustrations are provided to cover both applications. This optimization procedure consists of a group of task-oriented tests. Each major test category (Audit, Initial power–up, Calibration tests, etc.) is described in chapters which are broken down into multi-page “maps.” Each “map” typically consists of pages containing all the information necessary to perform the test (including all required input levels, output levels, CDMA Local Maintenance Facility (CDMA LMF) commands, and test points required). Also described are some of the main concepts you must understand in the test process. Whenever possible, graphics, flowcharts, or other examples complement the information/steps. Assumptions and Prerequisites This document assumes that the BTS frames and cabling have been installed per the Frame Mounting Guide Analog/CDMA/TDMA; 68P09226A18, which covers the physical “bolt down” of all SC series equipment frames, and the SC4812ET Lite Installation; 68P09253A36, which covers BTS–specific cabling configurations. 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 1-1 1 Optimization Manual Scope and Layout – continued Document Composition This document covers the following major areas: S Introduction, consisting of preliminary background information (such as component and subassembly locations and frame layouts) to be considered by the Cellular Field Engineer (CFE) before performing optimization or tests. S Preliminary Operations, consisting of jumper configuration of BTS sub–assemblies, pre–power–up tests, initial application of power to the BTS equipment frames, and initial power–up tests. S Optimization/Calibration, consisting of procedures for downloading all BTS processor boards, test equipment set–up, RF path verification, BLO calibration and calibration audit, and Radio Frequency Diagnostic System (RFDS) calibration. S Acceptance Test Procedures (ATP), consisting of automated ATP tests, executed by the CDMA LMF, and used to verify all major TX and RX performance characteristics on all BTS equipment. This chapter also covers generating an ATP report. S Prepare to Leave the Site, discussing site turnover after ATP is completed. S Basic Troubleshooting, consisting of procedures to perform when an ATP fails, as well as when incorrect results are obtained during logon, test equipment operation, calibration, and GPS operation. S Appendices that contain pertinent PN offset, frequency programming, and output power data tables, along with additional data sheets that are filled out manually by the CFE at the site. 1-2 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Purpose of the Optimization Why Optimize? Proper optimization and calibration ensures that: S Accurate downlink RF power levels are transmitted from the site. S Accurate uplink signal strength determinations are made by the site. What Is Optimization? Optimization compensates for the site-specific cabling and normal equipment variations. Site optimization guarantees that the combined losses of the new cables and the gain/loss characteristics and built-in tolerances of each BTS frame do not accumulate and cause improper site operation. What Happens During Optimization Optimization identifies the accumulated loss (or gain) for each receive and transmit path at the BTS site, and stores these values in a database. S A receive path (RX) starts at the Duplexer Directional Coupler (DRDC) or Transmit & Receive Dual Directional Coupler (TRDC) antenna feedline port and travels through the DRDC/TRDC, the Multi–coupler Preselector Card (MPC) and additional splitter circuitry, ending at a Broad Band Transceiver (BBX) backplane slot in the Small CDMA Channel Processor (SCCP) shelf. S A transmit path (TX) starts at the SCCP shelf BBX backplane slot, is routed to the Linear Power Amplifier (LPA) Trunking Module, through the LPAs, back through the LPA Trunking Module, through the bandpass filter or 2–cavity combiner, and ends at the DRDC/TRDC antenna feedline port. Six of the seven BBX2 boards in each SCCP shelf are optimized to specific RX and TX antenna ports. The seventh BBX2 board acts in a redundant capacity for BBX2 boards 1 through 6, and is optimized to all antenna ports. A single value is generated for each complete path, thereby eliminating the accumulation of error that would occur from individually measuring and summing the gain and loss of each element in the path. BTS equipment factors in these values internally, leaving only site–specific antenna feed line loss and antenna gain characteristics to be factored in by the CFE when determining site Effective Radiated Power (ERP) output power requirements. 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 1-3 1 When to Optimize New Installations After the initial site installation, the BTS must be prepared for operation. This preparation includes verifying hardware installation, initial power–up, downloading of operating code, verifying GPS operation and verifying transmit and receive paths. Next, the optimization is performed. Optimization includes performance verification and calibration of all transmit and receive RF paths, and download of accumulated calibration data. A calibration audit of all RF transmit paths may be performed any time after optimization to verify BTS calibration. After optimization, a series of manual pre–Acceptance Test Procedure (ATP) verification tests are performed to verify alarm/redundancy performance. After manual pre–ATP verification tests, a series of ATPs are performed to verify BTS performance. An ATP is also required before the site can be placed in service. Site Expansion Optimization is also required after expansion of a site with additional, interconnected BTS frames. Periodic Optimization Periodic optimization of a site may also be required, depending on the requirements of the overall system. Repaired Sites IMPORTANT 1-4 Refer to Appendix B for a detailed FRU Optimization/ATP Test Matrix outlining the minimum tests that must be performed any time a BTS subassembly or RF cable associated with it is replaced. 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Required Test Equipment and Software Policy To ensure consistent, reliable, and repeatable optimization test results, test equipment and software meeting the following technical criteria should be used to optimize the BTS equipment. Test equipment can, of course, be substituted with other test equipment models if the equipment meets the same technical specifications. It is the responsibility of the customer to account for any measurement variances and/or additional losses/inaccuracies that can be introduced as a result of these substitutions. Before beginning optimization or troubleshooting, make sure that the test equipment needed is on hand and operating properly. Test Equipment Calibration Optimum system performance and capacity depend on regular equipment service, calibration, and characterization prior to BTS optimization. Follow the original equipment manufacture (OEM) recommended maintenance and calibration schedules closely. Test Cable Calibration Equipment test cables are very important in optimization. It is recommended that the cable calibration be run at every BTS with the test cables attached. This method compensates for test cable insertion loss within the test equipment itself. No other allowance for test cable insertion loss needs to be made during the performance of tests. Another method is to account for the loss by entering it into the CDMA LMF during the optimization procedure. This method requires accurate test cable characterization in a shop. The cable should be tagged with the characterization information prior to field optimization. Equipment Warm–up After arriving at a site, the test equipment should be plugged in and turned on to allow warm up and stabilization to occur for as long as possible. The following pieces of test equipment must be warmed up for a minimum of 60 minutes prior to using for BTS optimization or RFDS calibration procedures: S Communications test set. S Rubidium time base. S Power meter. 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 1-5 1 Required Test Equipment and Software – continued Required Test Equipment and Software The following test equipment and software is required for the optimization procedure. Common assorted tools such as screwdrivers and frame keys are also needed. Read the owner’s manual for all of the test equipment to understand its individual operation before using the tool in the optimization. NOTE Always refer to specific OEM test equipment documentation for detailed operating instructions. CDMA LMF Hardware Requirements A CDMA LMF computer platform that meets the following requirements (or better) is recommended: Notebook computer 64 MB RAM minimum (128 MB recommended) 266 MHz (32 bit CPU) Pentium processor 4 Gbyte internal hard disk drive SVGA 12.1–inch active matrix color display with 1024 x 768 (recommended) or 800 x 600 pixel resolution and capability to display more than 265 colors 20X CD–ROM drive 3 1/2 inch floppy drive 56kbps V.90 modem Serial port (COM 1) Parallel port (LPT 1) PCMCIA Ethernet interface card (for example, 3COM Etherlink III) with a 10BaseT–to–coax adapter S MSr Windows 98R Second Edition (SE) operating system NOTE If 800 x 600 pixel resolution is used, the CDMA LMF window must be maximized after it is displayed. CDMA LMF Software The CDMA LMF is a graphical user interface (GUI) based Local Maintenance Facility (LMF). This software product is specifically designed to provide cellular communications field personnel with the capability to support the following CDMA Base Transceiver Stations (BTS) operations: 1-6 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Required Test Equipment and Software – continued Installation Maintenance Calibration Optimization Ethernet LAN Transceiver (part of CGDSLMFCOMPAQNOV96) S PCMCIA Ethernet Adpater + Ethernet UTP Adapter 3COM Model – Etherlink III 3C589B used with S Transition Engineering Model E–CX–TBT–03 10BaseT/10Base2 Converter (or equivalent) NOTE Xircom Model PE3–10B2 or its equivalent can also be used to interface the CDMA LMF Ethernet connection to the RFM frame. Ethernet LAN External In/Out Port Adapter Trompeter Electronics, Inc., AD–BJ20–E1–PL75 or equivalent BNC (F) to TRB (M) adapter is required if it is necessary to connect the CDMA LMF computer to the LAN external interface triaxial connectors located in the power entry compartment. RS–232 to GPIB interface S National Instruments GPIB–232–CT with Motorola CGDSEDN04X RS232 serial cable or equivalent; used to interface the CDMA LMF to the test equipment. S A standard RS–232 cable can be used with the following modifications: –Pin 8 (CTS) does not have to be jumpered/shorted to the others as it is a driver output. The DTR is already a driver output signal. The other pins are to receivers. Short pins 7, 1, 4, 6 on each cable end: 9–pin D (female) 9–pin D (female) GND 5 5 GND RX 3 2 TX TX 2 3 RX RTS 7 7 RTS RSD/DCD 1 08/01/2001 1 RSD/DCD DTR 4 4 DTR DSR 6 6 DSR 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 1-7 1 Required Test Equipment and Software – continued Model SLN2006A MMI interface kit S Motorola Model TRN9666A null modem board. Connectors on opposite sides of the board must be used as this performs a null modem transformation between cables. This board can be used for 25–pin to 8–pin, 25–pin to 25–pin, and 10–pin to 10–pin conversions. S Motorola 30–09786R01 MMI cable or equivalent; used to interface the CDMA LMF serial port connection to the GLI, CSM, ETIB board, and module debug serial ports. Communications system analyzer CDMA/analog The following communications system analyzers are supported by the LMF: S Motorola CyberTest S Advantest R3465 Analyzer with R3561L Signal Generator S Hewlett Packard Model HP 8921A/600 Analyzer including 83203B CDMA Interface, manual control system card, and 83236A/B PCS Interface for 1900 MHz BTSs. S Hewlett Packard Model HP 8935 Analyzer or a combination of test equipment supported by the CDMA LMF and used during optimization and testing of the RF communications portion of BTS equipment. The analyzer provides the following functions: Frequency counter. Noise measurement meter. Deviation meter. RF power meter (average and code domain). RF signal generator (capable of DSAT/CDMA modulation). Audio signal generator. AC voltmeter (with 600–ohm balanced audio input and high impedance input mode). C–Message filter. Spectrum analyzer. CDMA code domain analyzer. GPIB cables Hewlett Packard 10833A or equivalent; one or two meters long, used to interconnect test equipment and CDMA LMF terminal. Power meter S Hewlett Packard Model HP437B with HP8481A power sensor capable of measuring from –30 dBm to 20 dBm, or 1-8 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Required Test Equipment and Software – continued S Gigatronics 8542B power meter. Timing reference cables S Two Huber & Suhner 16MCX/11BNC/K02252D or equivalent; right angle MCX–male to standard BNC–male RG316 cables; 10 ft. long are required to interconnect the communications system analyzer to SGLN4132A and SGLN1145A CSM board timing references, or S Two BNC–male to BNC–male RG316 cables; 3 meters (10 feet) long, used to interconnect the communications system analyzer to SGLN4132B and SGLN1145B (and later) CSM front panel timing references in the RF Modem Frame. Digital multimeter Fluke Model 8062A with Y8134 test lead kit or equivalent; used for precision DC and AC measurements to four decimal places. Directional coupler Narda Model 3020A 20 dB coupler terminated with two Narda Model 375BN–M loads, or equivalent. RF attenuators S 20 dB Fixed attenuator, 20 Watt (Narda 768–20), used in conjunction with calibration of test cables or during general troubleshooting procedures. S 10 dB Fixed attenuator, 20 Watt (Narda 768–10), for cable calibration with a Cybertest CDMA analyzer. Clamp–on DC current probe Amprobe CT600, or equivalent, 600 amp capability with jaw size which accommodates 2/0 cable. Used with the DMM for back–up battery charging testing. Miscellaneous RF adapters, loads, etc. As required to interface test cables and BTS equipment and for various test setups. Should include at least (2) 50 Ohm loads (type N) for calibration and (1) RF short. RF load 100W non–radiating RF load used (as required) to provide dummy RF loading during BTS transmit tests. High–impedance conductive wrist strap Motorola Model 42–80385A59; used to prevent damage from ESD when handling or working with modules. 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 1-9 1 Required Test Equipment and Software – continued Driver bit for tamper–resistant fasteners Torx tamper–resistant insert bit set, Grainger 5F530 or equivalent, to remove tamper–resistant fasteners securing the frame rear access cover. Optional Equipment This section provides a list of additional equipment that might be required during maintenance and troubleshooting operations. NOTE Not all optional equipment specified in this section will be supported by the CDMA LMF in automated tests. Duplexer Filtronics Low IM Duplexer (Cm035–f2) or equivalent; used during Spectral Purity Receive band noise tests. Frequency counter Stanford Research Systems SR620 or equivalent; used if direct measurement of the 3 MHz or 19.6608 MHz references is required. Spectrum analyzer Spectrum Analyzer (HP8594E with CDMA personality card) or equivalent; required for manual tests other than standard Receive band spectral purity and TX LPA IM reduction verification tests performed by the CDMA LMF. LAN tester Model NETcat 800 LAN troubleshooter (or equivalent); used to supplement LAN tests using the ohm meter. Span line (T1/E1) verification equipment As required for the local application. RF test cable (if not provided with test equipment) Motorola Model TKN8231A; used to connect test equipment to the BTS transmitter output during optimization or during general troubleshooting procedures. Oscilloscope Tektronics Model 2445 or equivalent; used for waveform viewing, timing, and measurements, or during general troubleshooting procedures. 2–way splitter Mini–Circuits Model ZFSC–2–2500 or equivalent; used to provide the diversity receive input to the BTS. 1-10 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Required Test Equipment and Software – continued CDMA subscriber mobile or portable radiotelephone Safco Model 2136–150 with power supply and antenna; used to provide test transmission and reception during BTS maintenance and troubleshooting. Do not substitute other models that do not feature special test modes. Two radios will be required for system and drive–around testing after optimization and BTS ATP are completed. RF circulator Circulator (FERROCOM 5809866C01) or equivalent; can substitute for a duplexer during Receive sensitivity FER testing in conjunction with Safco CDMA mobile. High stability 10 MHz rubidium standard Stanford Research Systems SR625 or equivalent. Required for CSM and LFR/HSO frequency verification. 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 1-11 1 Required Documents and Related Publications Required Documents The following documents are required to perform optimization of the cell site equipment: S Site Document (generated by Motorola Systems Engineering), which includes: – General site information – Floor plan – RF power levels – Frequency plan (includes Site PN and operating frequencies) – Channel allocation (paging, traffic, etc.) – Board placement – Site wiring list – Site–specific CDF file S Demarcation Document (Scope of Work Agreement) S Equipment manuals for non-Motorola test equipment Related Publications Additional, detailed information about the installation, operation, and maintenance of the SC4812ET Lite BTS and its components is included in the following publications: CDMA RFDS User’s Guide; 68P64114A51 LMF Help function LMF CLI Reference; 68P09253A56 CDMA RFDS Hardware Installation; 68P64113A93 SC4812ET Lite Installation; 68P09253A36 SC4812ET Lite Field Replaceable Units; 68P09253A49 SC4812T/ET/ET Lite Troubleshooting; 68P09252A93 Frame Mounting Guide Analog/CDMA/TDMA; 68P09226A18 Cellular Glossary of Terms and Acronyms; 68P09213A95 M–PATHt T1 Channel Service Unit User’s Guide, ADC Kentrox part number 65–77538101 S M–PATHt E1 Channel Service Unit Installation Guide, ADC Kentrox part number 1174662 S 2–Slot Universal Shelf Installation Guide, ADC Kentrox part number 65–78070001 1-12 1X SCt4812ET Lite BTS Optimization/ATP 68P09253A60 08/01/2001 PRELIMINARY Terms and Abbreviations Standard and Non–standard Terms and Abbreviations Standard terms and abbreviations used in this manual are defined in Cellular Glossary of Terms and Acronyms; 68P09213A95. Any non–standard terms or abbreviations included in this manual are listed in Table 1-1. Table 1-1: Non–Standard Terms and Abbreviations Term or Abbreviation ACLC Definition AC Load Center. An SC4812ET Lite RF Base Transceiver Station (BTS) subassembly which provides the frame interface for external AC power connection and internal AC circuit control and protection. CCD Clock Combining and Distribution. SC4812–series BTS CDMA Channel Processor (CCP) shelf module which accepts timing signals from the active source and distributes them to other CCP shelf modules. CIO Combiner Input/Output. DMAC Digital Metering, Alarm, Control. Part of the Meter Alarm Panel (MAP) which provides control of and status information for the AC power rectifiers as well as back–up battery monitoring and test capability. Term is used interchangeably with MAP (see below). DRDC Duplexer, Receive Filter, Dual Directional Coupler. Provides duplexing of BTS transmit and receive signals to a single antenna and antenna signal sampling in either the forward (transmit) or reflected (receive) direction for use by an RF Diagnostic Subsystem (RFDS). EMPC Expansion Multi–coupler Preselector Card. BTS expansion frame MPC module which is used to receive, amplify, and distribute RX signals from the starter frame MPC. ETIB External Trunked Interface Board. Module providing status indicators and MMI interface connections for LPAs in SC4812ET and SC4812ET Lite BTS frames. HSO High Stability Oscillator. Module providing backup timing source for a BTS when the timing signal from the GPS or RGPS module is unavailable. HSOX HSO Expansion. Module used in a BTS expansion frame to interface with the starter frame HSO or LFR and distribute the timing signals to the expansion frame CSM modules. LPAC Linear Power Amplifier Controller MAP Meter Alarm Panel. SC4812ET Lite Field Replaceable Unit (FRU) which contains the functions of both the Temperature Compensation Panel (TCP) and the DMAC. Term is used interchangeably with DMAC. MPC Multi–coupler Preselector Card. BTS CCP shelf module used to amplify and distribute RX signals to BBX modules. PDA Power Distribution Assembly. Assembly in an SC4812ET Lite BTS providing internal DC power distribution and circuit protection. . . . continued on next page 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 1-13 1 Terms and Abbreviations – continued Table 1-1: Non–Standard Terms and Abbreviations Term or Abbreviation 1-14 Definition RGD Remote Global Positioning System (GPS) Distribution SCCP Small CDMA Channel Processor. The type of CCP shelf used in the SC4812ET Lite BTS. test equipment set The CDMA LMF computer, communications test set, directional couplers, attenuators, termination loads, associated test cables, and adapters needed for the complete calibration and acceptance testing of a BTS. The test equipment set is calibrated and maintained as a unit. When one component of a set is replaced, the complete set must be recallibrated to ensure measurement errors are not introduced during BTS optimization and ATP. TCP Temperature Compensation Panel. A function of the SC4812ET Lite MAP which provides the capability to adjust DC voltage output of the rectifiers to compensate for variations resulting from temperature changes. TRDC Transmit & Receive Dual Directional Coupler (Non–duplexed, Receive Filter). TRDCs contains separate transmit and receive paths and bandpass filters which are not connected electrically. Transmit and receive antenna signals are not duplexed and must be handled by separate antennas. Each RF path contains a dual directional coupler on the antenna port which allows sampling of antenna signals in the forward (transmit) and reflected (receive) directions for use by an RFDS. 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY BTS Equipment Identification Equipment Overview The SC4812ET Lite BTS frame consists of a single, outdoor, weatherized cabinet containing RF and power components. The BTS is functionally similar to the two–cabinet SC4812ET, but provides more flexibility in site selection because of its smaller footprint and lighter weight. The BTS is powered by 240 Vac, rectified internally to +27 Vdc, and can support up to two carriers in a 3–sector configuration. An SC4812ET Lite starter frame with the maximum of one SC4812ET Lite expansion frame can support a maximum of four carriers in a 3–sector configuration. Six–sector operation is not supported with any SC4812ET Lite configuration. The BTS frame houses the fan modules, RF compartment heat exchanger, Small CDMA Channel Processor shelf (SCCP), RF Linear Power Amplifier (LPA) modules, LPA trunking modules, bandpass filters or 2:1 combiners, and Duplexer Directional Couplers (DRDC) or Triplexer Directional Couplers (TRDC). Power components include an AC Load Center (ACLC), rectifiers, a +27 Vdc Power Distribution Assembly (PDA), backup batteries, battery heaters, and one duplex GFCI 115 Vac utility outlet. Logical BTS Numbering An SC4812ET Lite logical BTS can consist of up to two SC4812ET Lite frames. In a logical BTS, all frames located at a site are identified as parts of a single, numbered BTS (for example, BTS–812). Each frame is assigned a unique frame number. The first, or starter, frame of a logical BTS has a –1 suffix (for example, BTS–812–1) and the second, or expansion, frame of the logical BTS is numbered with the suffix, –101 (e. g. BTS–812–101). Figure 1-1 shows the frame configuration for a logical BTS consisting of two SC4812ET Lite frames. The figure also shows the BTS–to–CBSC Transcoder and inter–frame span configurations which can be employed with an SC4812ET Lite logical BTS. 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 1-15 1 BTS Equipment Identification – continued Figure 1-1: SC4812ET Lite Logical BTS Span Cabling TO XC (Optional) TO XC BTSSPAN 101 BTSSPAN 1 BTSSPAN 102 (Optional) Frame 1 Frame 101 (Starter Frame) (Expansion Frame) SCCP Shelf Card/Module Device ID Numbers All Ethernet LAN–addressable modules in the logical BTS frames at a single site are also identified with unique Device ID numbers dependent upon the Frame ID number in which they are located. Refer to Table 1-2, Table 1-3, and Figure 1-5 for specific SCCP Shelf Device ID numbers. Table 1-2: SCCP Cage Module Device ID Numbers (Top Shelf) Frame Module ID Number (Left to Right) Power Power AMR GLI2 (PS–1) (PS–2) –1 –1 MCC2 BBX2 BBX2–R MPC/ EMPC –1 – – R1 – 101 – – 101 101 101 102 101 102 103 R101 – Table 1-3: SCCP Cage Module Device ID Numbers (Bottom Shelf) Frame Module ID Number (Left to Right) HSO/ CSM CSM CCD CCD LFR –1 –2 AMR GLI2– –2 – – – – 101 – 101 102 – – – 102 102 1-16 MCC2 BBX2 103 104 104 105 106 SW MPC/ EMPC –2 – – – – 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Cabinet Identification Major Components Figure 1-2 illustrates the features of the BTS frame, the single major component of the Motorola SC4812ET Lite. Figure 1-2: SC4812ET Lite BTS Frame Power Entry and Network Interface Compartment Main Door with Heat Exchanger Battery Compartment Door (Can only be opened after Main Door is open) SCCP Shelf Backplane Rear Access Panel RF Interface Panel SC4812ETL0001–1 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 1-17 1 Internal Assembly Location and Identification Internal Assemblies and FRUs Figure 1-3 shows the location of the internal assemblies and Field Replaceable Units (FRU). A brief description of each item is found in the following paragraphs. Figure 1-3: Internal Assemblies and FRUs (Cabinet doors not shown for clarity) Span I/O CSUs External Span I/O LPA Trunking Blower LPAC Module Assembly LPAs Rectifiers MAP CSU Shelf SCCP Fans ETIB SCCP Shelf RFDS ESD Grounding Jack DC PDA Filter/Combiner Shelf (Bandpass filters shown) DRDC/TRDC Shelf ACLC GFCI Utility Outlet Back–up Batteries (Heaters underneath batteries) SC4812ETL0002–4 1-18 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Internal Assembly Location and Identification – continued AC Load Center (ACLC) The ACLC is the frame entry point for AC power. It incorporates AC power control, distribution, and surge protection (Figure 1-3). Back–up Batteries The batteries (Figure 1-3) provide +24 Vdc back–up for the frame should AC power be interrupted. The frame can accommodate a total of 12 12V batteries grouped in six strings. Each string consists of two batteries connected in series for 24 Vdc output. The six strings are connected in parallel to meet the current–draw requirements of the frame. The maximum time duration of the back–up capability depends on system configuration. Battery Heaters The battery heater pads warm the batteries to provide improved cold–weather performance. A separate heater pad is required for each battery string and is located between each battery string and its respective support shelf. Channel Service Units (CSU) (Optional) The SC4812ET Lite can be equipped with up to two M–PATH 537 CSU or two M–PATH 437 CSU modules which install in the CSU shelf (Figure 1-3). These modules allow monitoring of span performance and provide capability for remote network management. CSU Shelf The CSU shelf is an ADC Kentrox 2–slot Universal Shelf which can accommodate two M–PATH 537 or two M–PATH 437 CSU modules. When the optional CSU modules are not installed, cover plates are installed over the CSU card slots (Figure 1-3). DC Power Distribution Assembly (PDA) Both rectifier output voltage and back–up battery voltage are routed to the PDA (Figure 1-3) where they are combined into system DC bus voltage. The PDA provides distribution of DC power and system DC bus protection from the loads with MAIN BREAKER and the smaller post–distribution circuit breakers. MAIN BREAKER permits removal of all frame loading from the bus. The 13 post–distribution circuit breakers permit removal of individual loads. Duplexer, Receive filter, Dual Directional Coupler (DRDC) DRDCs permit duplexing of sector transmit and receive signals on a single antenna. The DRDCs also incorporate a receive bandpass filter and dual directional couplers which permit signal monitoring by the RF Diagnostic Subsystem. ET Interface Board (ETIB) and LPA Control (LPAC) Board The ETIB is an interconnect module with status LEDs, MMI recepticles, and secondary surge protection for the LPA modules. The LPAC board provides the interface for the LPA connections (Figure 1-3). 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 1-19 1 Internal Assembly Location and Identification – continued Filter/Combiner Shelf (Bandpass Filters or 2:1 Combiners) The filter/combiner shelf (Figure 1-3) holds the transmit bandpass filters or 2:1 combiners, depending on system configuration. Heat Exchanger The heat exchanger provides cooling to the frame RF compartment. The fan speed of the heat exchanger adjusts automatically with temperature. The heat exchanger is located in the frame main door (Figure 1-2). Punchblock The punchblock (Figure 1-4) is the interface between the frame and the T1/E1 span lines. It is located on the right–hand side of the power entry compartment at the rear of the frame. The punchblock provides the initial interconnection between the spans and the Customer–defined I/O, alarms, multi–frame timing source (RGPS and RHSO), and pilot beacon control (optional). Figure 1-4: 50–Pair Punchblock 50–Pin Punchblock (Cabling not shown for clarity) Rear of Frame (Power Entry Compartment Door Open) Section of Network Interface Panel (Rotated 30_ Right) 1-20 1X SCt4812ET Lite BTS Optimization/ATP SC4812ETL0024–1 08/01/2001 PRELIMINARY Internal Assembly Location and Identification – continued Rectifiers The rectifiers (Figure 1-3) convert AC power supplied to the frame to +27.4 Vdc which powers the frame and maintains the charge of the back–up batteries. Rectifier positions are numbered 1 through 4 from left to right when facing the frame. Single–carrier frames are equipped with three rectifiers installed in positions 1, 2, and 3. Two–carrier frames are equipped with four rectifiers. The number of rectifiers supplied with each configuration provides N+1 redundancy. RF Diagnostic Subsystem (RFDS) The RFDS (Figure 1-5) provides the capability for remotely monitoring the status of the SC4812ET Lite transmit and receive paths. For IS–95A/B operation, the RFDS is a COBRA model. To support 1X operation, the RFDS must the 1X–capable COBRA–II. Small CDMA Channel Processor (SCCP) Shelf The SCCP shelf has provisions for the following types and quantities of modules (Figure 1-3 and Figure 1-5): 08/01/2001 Alarm Monitoring and Reporting (AMR) cards (2) Combiner Input/Output (CIO) card (1) Multi–coupler Preselector Cards (MPC3) (2) Broadband Transceiver (BBX2 or BBX–1X) cards, primary (6) BBX2 or BBX–1X card, redundant (1) CDMA Clock Distribution (CCD) cards (2) Clock Synchronization Manager (CSM) on two cards (one with GPS receiver, if ordered) Fan modules (2) Filler panel (as required) Group Line Interface (GLI2) cards (2) High Stability Oscillator (HSO)/Low Frequency Receiver (LFR) card (Optional) (1) Multi–Channel CDMA (MCC8E, MCC24, or MCC–1X) cards (4) Power supply cards (2) Switch card (1) 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 1-21 Internal Assembly Location and Identification – continued MPC BBX2 BBX2 BBX2 BBX2 MCC8 E or MCC24 GLI2 MCC8 E or MCC24 AMR Power Supply Power Supply 19mm Filler Panel Figure 1-5: SCCP Shelf, IS–95A/B and 1X Devices FILLER HSO/LFR CSM 1 POWER 1 CSM 101 POWER 2 CSM 2 CIO MPC SWITCH MCC 101 101 101 102 AMR GLI2 MCC CCD 102 102 103 104 POWER 2 CSM 102 BBX2 BBX2 HSO/LFR POWER 1 MCC8 E or MCC24 BBX2 FILLER MCC8 E or MCC24 AMR GLI2 AMR GLI2 CCD CCD CSM CSM CCD NOTES: 1. MCCs may be MCC8Es, MCC24s, or MCC–1Xx 2. BBXx may be BBX2s or BBX–1Xs HSO BBX2 FRAME 1 SWITCH MPC 101 102 103 R101 BBX2 104 105 106 SWITCH MPC FRAME 101 (Expansion Frame) R1 SC4812ETL0003–4 Span I/O Boards The two span I/O boards, Span I/O A and Span I/O B (Figure 1-3), provide the span line interface from the punchblock or the CSU modules, if equipped, to the SCCP backplane. Transmit & receive, non–duplexed, Receive filter, Dual Directional Coupler (TRDC) TRDCs provide separate, bandpass–filtered sector transmit and receive paths. When TRDCs are used separate transmit and receive antennas are required for each sector. As with DRDCs, TRDCs dual directional couplers for each antenna path which permit signal monitoring by the RFDS. 1-22 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Internal Assembly Location and Identification – continued Figure 1-6: RF Interface Panel, DRDCs Installed TX IN NOTE: Plugs are installed when TX IN combiners are not fitted. GROUND 1A 2A 2B TX OUT REMOTE ASU ANTENNAS 3A 1B 3B NOTES: 1. CARRIER 1 TX/RX USES ANTENNA PORTS 1A, 2A, 3A; RX DIVERSITY FROM PORTS 1B, 2B, 3B. RX EXPANSION 1A 2A 3A 1B DUPLEXED TX & RX PORTS 2B 3B 2. CARRIER 2 TX/RX USES ANTENNA PORTS 1B, 2B, 3B; RX DIVERSITY FROM PORTS 1A, 2A, 3A. SC4812ETL0018–2 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 1-23 1 Internal Assembly Location and Identification – continued Figure 1-7: RF Interface Panel, TRDCs Installed NOTE: Plugs are installed when TX IN combiners are not fitted. TX PORTS GROUND RX PORTS 1A 2A 3A 1B 2B 3B NOTES: 1. CARRIER 1 TX USES TX PORTS 1A, 2A, 3A; CARRIER 1 RX USES RX PORTS 1A, 2A, 3A; CARRIER 1 RX DIVERSITY USES RX PORTS 1B, 2B, 3B TX OUT REMOTE ASU RX EXPANSION 1A 2A 3A 1B 2B 3B 2. CARRIER 2 TX USES TX PORTS 1B, 2B, 3B; CARRIER 2 RX USES RX PORTS 1B, 2B, 3B; CARRIER 2 RX DIVERSITY USES RX PORTS 1A, 2A, 3A SC4812ETL0019–2 1-24 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Internal Assembly Location and Identification – continued Figure 1-8: RFDS, DRDC, and TRDC Details RFDS DUPLEXED TX & RX ANTENNA BTS CPLD TX RX DRDC ANT CPLD 3B 2B 1B 3A 2A DRDC/TRDC ANTENNA CONNECTOR ASSIGNMENTS TX ANTENNA 1A TX BTS CPLD TX ANT CPLD TX RX ANTENNA RX RX ANT CPLD TRDC RX BTS CPLD SC4812ETL0005–3 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 1-25 1 Internal Assembly Location and Identification – continued SCCP Cage Configuration and the 1X Devices SC4812ET Lite frames have one SCCP cage which will support up to 4 MCC cards and 6 BBX cards. MCC Cards A BTS may be configured with a mix of MCC–8E, MCC–24, and MCC–1X cards. Any MCC card slot will support any of the three MCC types. For 1X capability under R16.0, at least one MCC card must be an MCC–1X which can be installed in any MCC card slot. BBX Cards Up to 6 BBX cards of mixed BBX2s and BBX–1Xs can also be supported. BBX card slots 1 through 6 are carrier– and sector–dependent. As a result, the BBX slots dedicated to the sectors for one carrier should be populated with the same type of cards. Refer to Table 1-5 for BBX card slot carrier and sector correlations. The BBX–R1 card slot is dedicated to the redundant BBX. This slot will support either a BBX2 or a BBX–1X. If a cage has BBX–1X carriers, the redundant BBX (BBXR) must be a BBX–1X card to provide 1X redundancy support. 1-26 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY BTS Sector Configurations Sector Configuration There are a number of ways to configure the BTS frame. Table 1-4 outlines the basic requirements. For more detailed information also see Table 1-5 and Figure 1-9. Bandpass filters are used for single–carrier configurations and two–carrier systems when carriers are either adjacent or not adjacent Table 1-4: BTS Sector Configuration Number of Carriers Number of Sectors Channel Spacing Filter/Combiner Requirements N/A Bandpass Filter Adjacent or Non–adjacent Bandpass Filter The matrix in Table 1-5 shows the correlation between the various sector configurations and BBX cards. 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 1-27 1 BTS Sector Configurations – continued Table 1-5: Sector Configurations Configuration Description 3–Sector / 1 Carrier The configuration below maps RX and TX with bandpass filters for a 3–sector/1–carrier frame. ANT 1A ANT 2A ANT 3A ANT 1B ANT 2B ANT 3B TX1 / RX1A TX2 / RX2A TX3 / RX3A RX1B RX2B RX3B Carrier # BBX2–1 BBX2–2 BBX2–3 BBX2–1 BBX2–2 BBX2–3 (diversity (diversity (diversity RX) RX) RX) 3–Sector / 2–ADJACENT or 2–NON–ADJACENT Carriers The configuration below maps RX and TX with bandpass filters for 3–sectors/2–carriers for both adjacent and non–adjacent channels. ANT 1A ANT 2A ANT 3A ANT 1B ANT 2B ANT 3B TX1 / RX1A TX2 / RX2A TX3 / RX3A TX4 / RX1B TX5 / RX2B TX6 / RX3B Carrier # BBX2–1 BBX2–2 BBX2–3 BBX2–1 BBX2–2 BBX2–3 (diversity (diversity (diversity RX) RX) RX) BBX2–4 BBX2–5 BBX2–6 BBX2–4 BBX2–5 BBX2–6 (RX) (RX) (RX) (TX & (TX & (TX & diversity diversity diversity RX) RX) RX) Figure 1-9: SC4812ET Lite LPA Configuration with Bandpass Filters (Starter Frame Mapping Only) Table 1-5 Configuration Numbers 1 and 2 Bandpass Filters 3–Sector CARRIER 1 SECTOR 1, 2, 3 CARRIER 2 SECTOR 1, 2, 3 SC4812ETL0011–3 1-28 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Chapter 2: Preliminary Operations Table of Contents 08/01/2001 Preliminary Operations: Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cellsite Types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CDF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Site Equipage Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Initial Installation of Boards/Modules . . . . . . . . . . . . . . . . . . . . . . . . . . Setting Frame SCCP Configuration Switch . . . . . . . . . . . . . . . . . . . . . 2-1 2-1 2-1 2-1 2-1 2-1 2-2 Ethernet LAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Ethernet LAN Termination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3 2-3 Initial Power Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Required Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cabling Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Initial Inspection and Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DC Power System Pre-Power Application Test . . . . . . . . . . . . . . . . . . External AC Power Connection Verification . . . . . . . . . . . . . . . . . . . . . Applying AC Power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DC Power Application and Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . Battery Charge Test (Connected Batteries) . . . . . . . . . . . . . . . . . . . . . . Battery Discharge Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Power Removal Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4 2-4 2-4 2-4 2-4 2-7 2-9 2-12 2-14 2-15 2-16 2-17 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY Table of Contents – continued Notes 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Preliminary Operations: Overview Introduction This section first verifies proper frame equipage. This includes verifying module placement, jumper, and dual in–line package (DIP) switch settings against the site-specific documentation supplied for each BTS application. Next, pre-power up and initial power-up procedures are presented. Cellsite Types Sites are configured as 3–sector with one or two carriers. Each type has unique characteristics and must be optimized accordingly. CDF The Cell-site Data File (CDF) contains site type and equipage data information and passes it directly to the CDMA Local Maintenance Facility (LMF) during optimization. The number of BTS frames, BBX2 and MCC24 boards, and linear power amplifier assignments are some of the equipage data included in the CDF. Site Equipage Verification Review the site documentation. Match the site engineering equipage data to the actual boards and modules shipped to the site. Physically inspect and verify the equipment provided for the frame. CAUTION Always wear a conductive, high impedance wrist strap while handling any circuit card/module to prevent damage by ESD. After removal, the card/module should be placed on a conductive surface or back into the anti–static bag it was shipped in. Initial Installation of Boards/Modules Table 2-1: Initial Installation of Boards/Modules Step Action Refer to the site documentation and, if it was not previously done, slide all boards and modules into the appropriate shelves as required. DO NOT SEAT the boards and modules at this time. As the actual site hardware is installed, record the serial number of each module on a “Serial Number Checklist” in the site logbook. 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 2-1 Preliminary Operations: Overview – continued Setting Frame SCCP Configuration Switch The backplane configuration switch is located behind the frame rear access panel. It must be set for the frame type as shown in Figure 2-1. The switch setting must be verified and set before power is applied to the BTS equipment. Figure 2-1: Backplane DIP Switch Settings 2-2 MODEM_FRAME_ID_0 EXPANSION FRAME SETTING (FRAME 101) MODEM_FRAME_ID_1 ON OFF RIGHT / LEFT STARTER FRAME SETTING (FRAME 1) BOTTOM / TOP ON OFF REAR ACCESS PANEL T–27 BUTTON HEAD OR T–30 PAN HEAD TAMPER–RESISTANT FASTENER (14) 1X SCt4812ET Lite BTS Optimization/ATP SC4812ETL0022–1 08/01/2001 PRELIMINARY Ethernet LAN Ethernet LAN Termination For proper operation, each end of the primary and redundant BTS Ethernet Local Area Networks (LAN) must be terminated with a 50–ohm load. For a BTS consisting of a single frame, this is done by placing 50–ohm triaxial terminations on the LAN A and B external IN and OUT connectors located in the power entry compartment (Figure 2-2). When the LAN links multiple frames in a logical BTS, the 50–ohm triaxial terminations must be installed on all uncabled LAN A and B external connectors on each frame. Check the LAN A and B external IN and OUT connectors in the power entry compartment of each frame, and be sure terminations are installed on all the uncabled external LAN connectors. Figure 2-2: External Ethernet LAN Connectors LAN A OUT LAN A IN Rear of Frame (Power Entry Compartment Door Open) LAN B IN LAN B OUT Section of Network Interface Panel (Rotated 30_ Right) 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP SC4812ETL0024–2 PRELIMINARY 2-3 Initial Power Up Introduction The following information is used to check for any electrical short circuits and to verify the operation and tolerances of the cell site and BTS power supply units before applying power for the first time. It contains instructional information on the proper initial power up procedures for the SC4812ET Lite for both the North American version and the International version. If directions are different for either version, they are called out within the procedure. Please pay attention to all cautions and warning statements in order to prevent accidental injury to personnel. Required Tools The following tools are used in the procedures. S Clamp–on DC current probe (600 amp capability with jaw size to accommodate 2/0 cable). S Digital Multimeter (DMM) with standard 2mm (.080”) tip probes S Hot Air Gun – (optional for part of the Alarm Verification) Cabling Inspection Using the site-specific documentation generated by Motorola Systems Engineering, verify that the following cable systems are properly connected: S Receive RF cabling – up to six RX cables S Transmit RF cabling – up to six TX cables IMPORTANT For DC power applications (+27 V): S The positive power cable is red. S The negative power cable is black. (The black power cable is at ground potential.) Initial Inspection and Setup CAUTION Ensure all battery shelf circuit breakers (Figure 2-3) for unused battery positions are off (pulled out) before and during the entire power up process. Leave these breakers in the off position when leaving the site. Table 2-2: Initial Inspection and Setup Step Action Be sure that the facility circuit breaker controlling external AC power supplied to the frame is set to OFF. Be sure that all AC Load Center (ACLC), all DC Power Distribution Assembly (PDA), and all battery shelf circuit breakers are turned OFF. . . . continued on next page 2-4 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Initial Power Up – continued Table 2-2: Initial Inspection and Setup Step Action Confirm that the Meter Alarm Panel (MAP) POWER switch and all LEDs (Figure 2-9) are OFF. If any LEDs are lighted, re–check and turn OFF all battery shelf circuit breakers. If a heat source was placed in the RF compartment to prevent condensation prior to BTS power–up, turn off the heat source and remove it and any associated cabling from the BTS before proceeding. Confirm that the external 220 Vac supply is correctly connected to the ACLC input by performing the procedure in Table 2-4. Figure 2-3: Frame Power Subassemblies, North American and International Cabinets AC Rectifiers External Blower Assembly LPAs Battery Shelf Circuit Breakers (Between Bus Bar and Cabinet Wall) Meter Alarm Panel (MAP) With TCU SCCP Fans ETIB SCCP Shelf RFDS DC PDA ACLC Circuit Breaker Access Door Utility Outlet NOTE: GFCI capability is built into the Utility Outlet of the North American Cabinet. GFCI capability is built into the circuit breakers of the International Cabinet 08/01/2001 Backup Batteries (Heaters underneath batteries) SC4812ETL0002–3 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 2-5 Initial Power Up – continued Figure 2-4: ACLC Circuit Breaker Panel – North American LEDs CAUTION LIVE TERMINALS ATTENTION RECT. 1/3 RECT. 2/4 MAIN HEATER GFI SC4812ETL0008–1 Figure 2-5: ACLC Circuit Breaker Panel – International JOCYLN LEDs ELECTRONIC SYSTEMS CAUTION ATTENTION LIVE TERMINALS RECT 1/3 2-6 RECT 2/4 MAIN HEATER GFI 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Initial Power Up – continued Figure 2-6: DC PDA 1A 1C 3A 3C SHUT OFF BOTH BREAKERS ONLY DURING HEAT EXCHANGER MAINTENANCE OR REPAIR 30 30 30 30 15 1B 1D 3B 3D PILOT BEACON 25 25 MAIN BREAKER LPA BLOWERS HEAT EXCHANGER CAUTION LPA 300 10 15 PS1 PS2 50 50 PUSH BUTTON TO RESET LPA BLOWERS ETIB OPTIONS SC4812ETL0009–3 DC Power System Pre-Power Application Test Before applying any power to the BTS frame, follow the procedure in Table 2-3 to verify there are no shorts in the DC power distribution system. NOTE The procedure in Table 2-3 is required only on initial BTS power–up or following maintenance when any major power components (e.g., ACLC, DC PDA, Meter Alarm Panel) were replaced or internal DC power cables were disconnected. Table 2-3: DC Power System Pre–Power Application Test Step Action Physically verify all ACLC front–panel circuit breakers (Figure 2-4) are OFF (down), all DC PDA circuit breakers (Figure 2-6) are set to OFF (pulled out), and all battery shelf circuit breakers (Figure 2-3) are OFF (pulled out). Visually ensure that all AC rectifier modules (Figure 2-3) are not powered (DC, PWR, and bar graph LEDs are not lighted), that the MAP power switch (Figure 2-9) is OFF, and that no LEDs on the MAP are lighted. Inside the battery compartment, measure the voltage between the + (red) and – (black) battery bus bars. There should be no 27 Vdc present. . . . continued on next page 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 2-7 Initial Power Up – continued Table 2-3: DC Power System Pre–Power Application Test Step Action * IMPORTANT Do not unseat the AC rectifier modules in the following step. Perform the following: S In the frame RF compartment, unseat all circuit boards/ modules (except CCD and CIO cards) in the SCCP shelf, but leave them in their respective slots. S In the frame LPA compartment, disconnect the Linear Power Amplifier (LPA) cables from the compartment bulkhead feed through connector. Set the DMM to measure resistance, and inside the battery compartment, measure the resistance between the + (red) and – (black) battery bus bars. The resistance should measure > 1 ΜΩ. Leave the DMM set to measure resistance, and insert the probes into the MAP VOLT and AMP TEST POINTS (Figure 2-9). Place the (+) DMM probe into the (–) AMP TEST POINT. Place the (–) DMM probe into the (–) VOLT TEST POINT. Resistance should measure greater than 750 Ω. On the DC PDA, set the MAIN BREAKER to the ON position by pushing it in. Resistance between the MAP (–) VOLT TEST POINT and the (–) AMP TEST POINT should measure between 300 Ω. minimum 900 Ω. maximum. Before proceeding, be sure the SCCP shelf power/converter modules PS1 and PS2 are correct by verifying that the locking/retracting tabs appear as follows: (in +27 volt systems) – ! CAUTION Using the incorrect type of power/converter modules will damage the module, the SCCP shelf, and other modules installed in the SCCP shelf. * IMPORTANT In the following steps, if the DMM reads between 300 Ω minimum and 900 Ω maximum after inserting any board/module, a low impedance problem probably exists in that board/module. Replace the suspect board/module and repeat the test. If test still fails, isolate the problem before proceeding. Insert and lock the PS1 DC–DC converter module into its slot, and and turn ON the PS1 DC circuit breaker on the DC PDA. 10 Resistance between the MAP (–) VOLT TEST POINT and the (–) AMP TEST POINT should typically increase as capacitors charge, finally measuring between 300 Ω minimum and 900 Ω. maximum. 11 Repeat steps 9 and 10 for the PS2 converter module/circuit breaker and all other remaining modules in the SCCP shelf. 12 On the DC PDA, set the LPA 1A–1B circuit breaker to the ON position by pushing it in, and repeat step 10. 13 Repeat step 12 for each of the three remaining LPA circuit breakers. . . . continued on next page 2-8 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Initial Power Up – continued Table 2-3: DC Power System Pre–Power Application Test Step 14 Action Carefully reconnect each LPA cable one at a time. Repeat step 10 after reconnecting each cable. S A typical response is that the ohmmeter will steadily climb in resistance as module input capacitors charge, finally indicating between 300 Ω minimum and 900 Ω. maximum. 15 Set the Pilot Beacon, both Heat Exchanger, ETIB, and Options circuit breakers to ON one at a time. Repeat step 10 after pushing in each circuit breaker. 16 Set all DC PDA circuit breakers to OFF (pulled out). CAUTION Failure to properly connect the external AC power cable will damage the surge protection module inside the ACLC. External AC Power Connection Verification Following verification of frame DC power system integrity, external AC power connections must be verified. To accomplish this, the series of AC voltage measurements specified in Table 2-4 is required. Table 2-4: AC Voltage Measurements Step Action NOTE This procedure is required only after external AC power wiring has been initially connected or removed and reconnected to the frame. n WARNING Ensure the frame is unpowered by setting the facility circuit breaker controlling external AC power supplied to the frame to OFF. Physically verify all DC PDA circuit breakers are set to OFF (pulled out), and all battery shelf circuit breakers are OFF (pulled out). Open the ACLC circuit breaker access door, and set all ACLC circuit breakers to OFF (down). Remove the four screws securing the ACLC front panel assembly, and remove the ACLC front panel assembly to gain access to the AC circuit breaker input terminals (Figure 2-8). Apply external AC power to the frame by setting the facility circuit breaker to ON. . . . continued on next page 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 2-9 Initial Power Up – continued Table 2-4: AC Voltage Measurements Step Action ! CAUTION North AMERICAN Cabinet only: If the AC voltages measured in the following steps exceed 120 V when measuring from terminals L1 or L2 to neutral or ground, STOP and DO NOT proceed until the cause of the higher voltages are determined. The frame will be damaged if the Main breaker is turned on with excessive voltage on the inputs. Measure the AC voltage from terminal L1 to neutral. North American Cabinet: S Voltage should be in the nominal range of 115 to 120 Vac. International Cabinet: S Voltage should be in the nominal range of 210 to 240 Vac. Measure the AC voltage from terminal L1 to ground. North American Cabinet: S Voltage should be in the nominal range of 115 to 120 Vac. International Cabinet: S Voltage should be in the nominal range of 210 to 240 Vac. Steps 7a through 7c apply to the North American cabinet only. If working on a International cabinet continue to step 8. 7a Measure the AC voltage from terminal L2 to neutral on the North American cabinet. S Voltage should be in the nominal range of 115 to 120 Vac. 7b Measure the AC voltage from terminal L2 to ground on the North American cabinet. S Voltage should be in the nominal range of 115 to 120 Vac. 7c ! CAUTION If the AC voltages measured (on the North American cabinet) in the following step exceeds 240 V when measuring between terminals L1 and L2, STOP and DO NOT proceed until the cause of the higher voltages are determined. The frame will be damaged if the Main breaker is turned on with excessive voltage on the inputs. Measure from terminal L1 to terminal L2. S Voltage should be in the nominal range from 208 to 240 Vac. Remove external AC power from the frame by setting the facility circuit breaker to OFF. Install the ACLC front panel assembly and secure with the four screws removed in step 1. 10 Apply external AC power to the frame by setting the facility circuit breaker to ON. 2-10 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Initial Power Up – continued Figure 2-7: ACLC Voltage Measurement Probe Points – North American L1 L2 = Ground = Neutral = Line 1 = Line 2 (ACLC front panel assembly removed.) 08/01/2001 L1 L2 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 2-11 Initial Power Up – continued Figure 2-8: ACLC Voltage Measurement Probe Points – International G = Ground N = Neutral L1 = Line 1 (ACLC front panel assembly removed.) L1 Applying AC Power Once the external AC power connections are verified, AC power may be applied internally to the frame. Table 2-5 provides the procedure for applying internal AC power. Table 2-5: Applying Internal AC Power Step Action Be sure the requirements of Table 2-4 for AC input power connection verification have been met. Be sure all DC PDA circuit breakers are set to OFF (pulled out), all ACLC front–panel circuit breakers are OFF (down), and all battery shelf circuit breakers are OFF (pulled out). . . . continued on next page 2-12 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Initial Power Up – continued Table 2-5: Applying Internal AC Power Step Action Be sure the MAP power switch, TCP switch, and BATT TEST switch are all set to OFF. If it has not already been done, set the facility circuit breaker supplying AC power to the frame to ON. Set the ACLC MAIN circuit breaker ON. S For the North American cabinet: Observe that all eight (8) green LEDs on the front of the ACLC are illuminated (Figure 2-4). S For the International cabinet: Observe that all four (4) green LEDs on the front of the ACLC are illuminated (Figure 2-4). On the ACLC, set RECT. 1/3 and RECT. 2/4 branch circuit breakers ON. All the installed rectifier modules (Figure 2-3) will start up, and the green DC and PWR LEDs should light on each. Set the MAP power switch to ON. The MAP VOLT display should read 27.4 + 0.2 VDC with the TCP switch OFF. ! CAUTION Once power is applied to the MAP, be careful not to short either of the VOLT TEST POINTS to ground. Failure to comply will result in severe damage to the MAP. On the MAP, set the TCP switch (Figure 2-9) to ON. Verify no alarm LEDs are lighted on the MAP. NOTE Depending on battery compartment temperature, the rectifier voltage displayed on the MAP VOLT indicator may change by as much as +1.5 V when the TCP is set to on. Check the rectifier current bar graph displays (green LED display on the rectifier module). None should be lighted at this time. 10 If batteries are fitted, set the ACLC HEATER circuit breaker to ON. NOTE The GFCI AC circuit breaker should remain OFF unless the GFCI outlet is in use. 25_C SET COMM SENSOR 2 SENSOR 1 TO DISABLE SENSOR FAIL Figure 2-9: Meter Alarm Panel (MAP) TCP SWITCH BATT TEST SWITCH MASTER VOLTAGE ADJ. VOLT TEST POINTS POWER INDICATOR POWER SWITCH SC4812ETL0015–2 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 2-13 Initial Power Up – continued DC Power Application and Testing Table 2-6 lists the step–by–step instructions for applying DC power and ensuring the DC power system components are correctly functioning. Table 2-6: DC Power Application and Tests Step Action Be sure all DC PDA and battery shelf circuit breakers are OFF (pulled out). Be sure the procedures in Table 2-3 (if applicable) and Table 2-5 have been performed. ! CAUTION When measuring voltage at the VOLT TEST POINTS, be careful not to short either of the test points to ground. Failure to comply will result in severe damage to the MAP. Measure voltage at the MAP VOLT TEST POINTS while pressing the 25° C SET button (Figure 2-9). The voltage should read 27.4 + 0.2 Vdc. Adjust with the MASTER VOLTAGE ADJ. on the MAP, if necessary, to obtain an indicated 27.4+0.2 Vdc. Release the 25° C SET button. Depending on the ambient temperature, the voltage reading may now change by up to + 1.5 V compared to the reading just measured. If it is cooler than 25_C, the voltage will be higher, and if it is warmer than 25_C, the voltage will be lower. Inside the battery compartment, measure the voltage between the cable connection point at the bottom of the + (red) battery bus bar and chassis ground, observing that the polarity is correct. The voltage should be the same as the measurement in step 4. Measure the voltage between the + (red) and – (black) battery bus bars in the battery compartment. Place the probe at the bottom of the bus bars where the cables are connected. The DC voltage should measure the same as in step 4. Close (push in) DC PDA MAIN BREAKER. On the DC PDA(Figure 2-6), set the PS1 and PS2 circuit breakers to the ON position by pushing them in one at a time while observing the rectifier output current indicated on the MAP AMP display. – The display should indicate between 20 and 60 amps. On the DC PDA), set the remaining circuit breakers to the ON position by pushing them in one at a time in the following sequence: LPA circuit breakers (four breakers, labeled 1A–1B through 3C–3D). HEAT EXCHANGER circuit breakers (two breakers) ETIB circuit breaker PILOT BEACON circuit breaker OPTION circuit breaker . . . continued on next page 2-14 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Initial Power Up – continued Table 2-6: DC Power Application and Tests Step 10 Action Confirm that the MAP AMP display continues to indicate between 20 and 60 amps during the initial power application. NOTE No battery charging or heavy RF loading is present at this point. 11 If the frame is not equipped with the pilot beacon option, set the PILOT BEACON circuit breaker to OFF. Battery Charge Test (Connected Batteries) Table 2-7 lists the step–by–step instructions for testing the battery charging performance. Table 2-7: Battery Charge Test (Connected Batteries) Step Action Close the battery shelf circuit breakers (Figure 2-3) for connected batteries only. This process should be completed quickly to avoid individual battery strings drawing excess charge current NOTE If the batteries are sufficiently discharged, the battery circuit breakers may not engage individually due to the surge current. If this condition occurs, disconnect the batteries from the 27Vdc bus by setting the MAP power switch to OFF, and then engage all the connected battery circuit breakers. The MAP power switch should then be turned ON. Using the clamp–on DC current probe and DMM, measure the current in each of the battery string connections to the battery bus bars. The charge current may initially be high but should quickly reduce in a few minutes if the batteries have a typical new–battery charge level. NOTE The MAP AMP display will indicate the total current output of the rectifiers during this procedure. As an alternative, the bar graph meters on the AC rectifier modules can be used as a rough estimate of the total battery charge current. Each rectifier module bar graph has eight (8) LED elements to represent the output current. Each illuminated LED element indicates that approximately 12.5% (1/8 or 8.75 Amps) of an individual rectifier’s maximum current output (70 Amps) is flowing. RECTIFIER BAR GRAPH EXAMPLE: Question: A system fitted with three (3) rectifier modules each have three bar graph LED elements illuminated. What is the total output current into the batteries? Answer: Each bar graph is indicating approximately 12.5% of 70 amps, therefore, 3 x 8.75 equals 26.25 amps per rectifier. As there are three rectifiers, the total charge current is equal to (3 x 26.25 A) 78.75 amps. This charge current calculation is only valid when the RF and LPA compartment electronics are not powered on, and the RF compartment heat exchanger is turned off. This can only be accomplished if the DC PDA MAIN BREAKER is set to OFF. . . . continued on next page 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 2-15 Initial Power Up – continued Table 2-7: Battery Charge Test (Connected Batteries) Step Action The current in each string should be approximately equal (within + 5 amps). Allow a few minutes to ensure that the battery charge current stabilizes before taking any further action. Recheck the battery current in each string. If the batteries had a reasonable charge, the current in each string should reduce to less than 5 amps. Recheck the DC output voltage. It should remain the same as measured in step 4 of the frame DC Power Application and Test (Table 2-6). NOTE If discharged batteries are installed, the MAP AMP display may indicate approximately 288 amps for a two–carrier frame (four rectifiers) or 216 amps for a single–carrier frame (three rectifiers). Alternately, all bar graph elements may be lighted on the rectifiers during the charge test. Either indication shows that the rectifiers are at full capacity and are rapidly charging the batteries. It is recommended in this case that the batteries are allowed to charge and stabilize as in the above step before commissioning the site. This could take several hours. Battery Discharge Test Perform the test procedure in Table 2-8 only when the battery current is less than 5 Amps per string. Refer to Table 2-7 on the procedures for checking current levels. Table 2-8: Battery Discharge Test Step Action Turn the BATT TEST switch on the MAP ON (Figure 2-9). The rectifier output voltage and current should decrease by approximately 10% as the batteries assume the load. Alarms for the MAP may occur. Measure the individual battery string current using the clamp–on DC current probe and DMM. The battery discharge current in each string should be approximately the same (within + 5 amps). Turn BATT TEST switch OFF. CAUTION Failure to turn off the MAP BATT TEST switch before leaving the site will result in low battery capacity and reduce battery life. 2-16 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Initial Power Up – continued Power Removal Procedure If it becomes necessary to remove power from the frame, follow the procedure in Table 2-9. Table 2-9: Power Removal Step Action Set all DC PDA circuit breakers to OFF (pulled out) in the following sequence: – LPAs – Pilot beacon – Heat exchanger – ETIB – Options – PS1 and PS2 – MAIN BREAKER #1 (Internal) n WARNING The surge capacitors in the DC PDA will store a large electrical charge for long periods of time. Failure to discharge these capacitors as specified in this step could result in serious personal injury or damage to equipment. On the DC PDA, set the PS1 and PS2 circuit breakers to ON (pushed in), and wait at least 30 seconds. Set the DC PDA PS1 and PS2 circuit breakers to OFF. Set the MAP power switch to OFF. Set all ACLC circuit breakers to OFF (down) in the following sequence: – GFI – HEATER – RECT. 1/3 – RECT. 2/4 – MAIN Set the facility circuit breaker controlling external power to the frame to OFF. 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 2-17 Initial Power Up – continued Figure 2-10: Heat Exchanger Blower Assembly and Circuit Breakers Heat Exchanger Assembly Top (Internal) Blower Blower Power Cord Mounting Bracket Bottom (Ambient) Blower Fan Module Mounting Bracket Fan Module Core T–30 Screw T–30 Screw Blower Power Cord DC PDA 1A 1C 3A LPA BLOWERS HEAT EXCHANGER CAUTION LPA 3C SHUT OFF BOTH BREAKERS ONLY DURING HEAT EXCHANGER MAINTENANCE OR REPAIR 30 30 30 30 15 1B 1D 3B 3D PILOT BEACON 25 25 MAIN BREAKER 300 10 15 PS1 PS2 50 50 ETIB OPTIONS PUSH BUTTON TO RESET LPA BLOWERS OUT=OFF IN=ON Heat Exchanger Blower Assembly Circuit Breaker Side View SC4812ETL0016–3 2-18 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Chapter 3: Optimization/Calibration Table of Contents 08/01/2001 Optimization/Calibration – Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Optimization Process Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cell Site Types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cell Site Data File (CDF) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CDF Site Equipage Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BTS System Release Software Download . . . . . . . . . . . . . . . . . . . . . . . 3-1 3-1 3-1 3-2 3-2 3-3 3-3 Preparing the LMF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LMF Installation and Update Procedures . . . . . . . . . . . . . . . . . . . . . . . Copy CBSC CDF Files to the LMF Computer . . . . . . . . . . . . . . . . . . . Creating a Named HyperTerminal Connection for MMI Communication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Folder Structure Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . wlmf Folder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . cdma Folder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . bts–nnn Folders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . bts–nnn.cal File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . bts–nnn.cdf File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . cbsc File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . loads Folder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . version Folder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . code Folder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . data Folder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4 3-4 3-4 3-5 3-7 3-9 3-9 3-9 3-9 3-10 3-10 3-11 3-11 3-11 3-11 3-12 Span Lines – Interface and Isolation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . T1/E1 Span Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Isolate BTS from T1/E1 Spans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . T1/E1 Span Isolation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Configure Optional Channel Service Units . . . . . . . . . . . . . . . . . . . . . . Alarm and Span Line Cable Pin/Signal Information . . . . . . . . . . . . . . . 3-14 3-14 3-14 3-15 3-15 3-17 LMF to BTS Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LMF to BTS Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-20 3-20 Using CDMA LMF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Basic CDMA LMF Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CDMA LMF and Logical BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Logging Into a BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-21 3-21 3-21 3-22 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY Table of Contents – continued Logging Out . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Establishing an MMI Communication Session . . . . . . . . . . . . . . . . . . . Online Help . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-24 3-26 3-27 Pinging the Processors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pinging the BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-28 3-28 Download the BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Verify GLI ROM Code Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Download RAM Code and Data to MGLI and GLI . . . . . . . . . . . . . . . Download RAM Code and Data to Non–GLI Devices . . . . . . . . . . . . . Select CSM Clock Source . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Enable CSMs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Enable MCCs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-31 3-31 3-32 3-33 3-33 3-34 3-35 3-36 CSM System Time – GPS & LFR/HSO Verification . . . . . . . . . . . . . . . . . . . . . Clock Synchronization Manager (CSM) System Time . . . . . . . . . . . . . Low Frequency Receiver/ High Stability Oscillator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CSM Frequency Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Test Equipment Setup (GPS & LFR/HSO Verification) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . GPS Initialization/Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LORAN–C Initialization/Verification . . . . . . . . . . . . . . . . . . . . . . . . . . 3-37 3-37 3-37 3-39 3-39 3-40 3-45 Test Equipment Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Connecting Test Equipment to the BTS . . . . . . . . . . . . . . . . . . . . . . . . Equipment Warm-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-47 3-47 3-49 Test Set Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Selecting Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Manually Selecting Test Equipment in a Serial Connection Tab . . . . . Automatically Selecting Test Equipment in a Serial Connection Tab . . Calibrating Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Calibrating Cables – Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Calibrating Cables with a CDMA Analyzer . . . . . . . . . . . . . . . . . . . . . Calibrating TX Cables Using a Signal Generator and Spectrum Analyzer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Calibrating RX Cables Using a Signal Generator and Spectrum Analyzer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Setting Cable Loss Values . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Setting TX Coupler Loss Value . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-55 3-55 3-55 3-56 3-56 3-57 3-58 3-58 3-59 Bay Level Offset Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RF Path Bay Level Offset Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . When to Calibrate BLOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TX Path Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RX Path Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-64 3-64 3-64 3-64 3-65 3-65 1X SCt4812ET Lite BTS Optimization/ATP 3-60 3-61 3-62 3-63 08/01/2001 PRELIMINARY Table of Contents 08/01/2001 – continued BLO Calibration Data File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Test Equipment Setup: RF Path Calibration . . . . . . . . . . . . . . . . . . . . . Transmit (TX) Path Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TX Calibration Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Download BLO Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Calibration Audit Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Transmit (TX) Path Audit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TX Audit Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Create CAL File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-66 3-68 3-69 3-71 3-72 3-73 3-73 3-74 3-75 RFDS Setup and Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RFDS Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RFDS Parameter Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RFDS TSU NAM Programming . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Explanation of Parameters used when Programming the TSU NAM . . Valid NAM Ranges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Set Antenna Map Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Set RFDS Configuration Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RFDS Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Program TSU NAM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-76 3-76 3-76 3-78 3-78 3-79 3-80 3-81 3-82 3-84 Alarms Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Alarm Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Alarm Reporting Display . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Alarm Testing Set–up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Heat Exchanger Alarm Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Door Alarm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . AC Fail Alarm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Minor Alarm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rectifier Alarms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Single Rectifier Failure (Three Rectifier System) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Multiple Rectifier Failure (Three Rectifier System) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Single Rectifier Failure (Four Rectifier System) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Multiple Rectifier Failure (Four Rectifier System) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Battery Over Temperature Alarm (Optional) . . . . . . . . . . . . . . . . . . . . . Rectifier Over Temperature Alarm . . . . . . . . . . . . . . . . . . . . . . . . . . . . Before Leaving the site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-85 3-85 3-85 3-86 3-86 3-86 3-87 3-87 3-87 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 3-87 3-88 3-89 3-90 3-90 3-93 3-93 Table of Contents – continued Notes 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY Optimization/Calibration – Introduction Introduction This chapter provides procedures for downloading system operating software, set up of the supported test equipment, CSM reference verification/optimization, and transmit/receive path verification. IMPORTANT Before using the LMF, use an editor to view the ”CAVEATS” section in the ”readme.txt” file in the c:\wlmf folder for any applicable information. Optimization Process Overview After a BTS is physically installed and the preliminary operations, such as power up, have been completed, the CDMA LMF is used to calibrate and optimize the BTS. The basic optimization process consists of the following: S Download MGLI2 (GLI2––1) with application code and data and then enable MGLI2. S Use the CDMA LMF status function and verify that all of the installed devices of the following types respond with status information: CSM2, BBX2, GLI2, and MCC (and TSU if RFDS is installed). If a device is installed and powered up but is not responding and is colored gray in the BTS display, the device is not listed in the CDF file. The CDF file will have to be corrected before the device can be accessed by CDMA LMF. S Download device application code and data to all devices of the following types: – CSM2 – BBX2 – Remaining GLI2 (GLI2– –2) – MCC S Download the RFDS TSIC (if installed). S Verify the operation of the GPS and HSO signals. S Enable the following devices (in the order listed): – Secondary CSM (slot 2) – Primary CSM (slot 1) – All MCCs S Using the CDMA LMF test equipment selection function, select the test equipment to be used for the calibration. S Calibrate the TX and RX test cables if they have not previously been calibrated using the CDMA LMF that is going to be used for the optimization/calibration. Cable calibration values can be entered manually, if required. S Connect the required test equipment for a full optimization. 08/01/2001 1X SCt4812ET Lite BTS Optimization/ATP PRELIMINARY 3-1 Optimization/Calibration – Introduction – continued S Select all of the BBXs and all of the MCCs and use the full optimization function. The full optimization function performs TX calibration, BLO download, TX audit, all TX tests, and all RX tests for all selected devices. S If the TX calibration fails, repeat the full optimization for any failed paths. S If the TX calibration fails again, correct the problem that caused the failure and repeat the full optimization for the failed path. S If the TX calibration and audit portion of the full optimization passes for a path but some of the TX or RX tests fail, correct the problem that caused the failure and run the individual tests as required until all TX and RX tests have passed for all paths. Cell Site Types Sites are configured as Omni/Omni or Sector/Sector (TX/RX). Each type has unique characteristics and must be optimized accordingly. Cell Site Data File (CDF) IMPORTANT Before using the CDMA LMF for optimization/ATP, the correct bts–#.cdf and cbsc–#.cdf files for the BTS must be obtained from the CBSC and put in a bts–# folder in the LMF. Failure to use the correct CDF files can cause unreliable or improper site operation. Failure to use the correct CDF files to log into a live (traffic carrying) site can shut down the site. The CDF includes the following information: S Download instructions and protocol S Site specific equipage information S SCCP shelf allocation plan – BBX2 equipage (based on cell–site type) including redundancy – CSM equipage including redundancy – Multi Channel Card 24 or 8E (MCC24 or MCC8E) channel element allocation plan. This plan indicates how the SCCP shelf is configured, and how the paging, synchronization, traffic, and access channel elements (and associated gain values) are assigned among the (up to 4) MCC24s or MCC8Es in the shelf. S CSM equipage including redundancy S Effective Rated Power (ERP) table for all TX channels to antennas respectively. Motorola System Engineering specifies the ERP of a transmit antenna based on site geography, antenna placement, and government regulations. Working from this ERP requirement, the antenna gain, (dependent on the units of measurement specified) and 3-2 1X SCt4812ET Lite BTS Optimization/ATP 08/01/2001 PRELIMINARY
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.3 Linearized : No Modify Date : 2001:09:20 17:15:23-04:00 Create Date : 2001:09:20 17:14:47-04:00 Producer : Acrobat Distiller 4.0 for Windows Page Count : 80EXIF Metadata provided by EXIF.tools