Exhibit S Installation and Operation Manual

November 1999
No. M68334 Rev. A
Issued by P-COM, Inc.
1801 Penn Street, Melbourne, Florida 32901 Printed in U.S.A
Every effort has been made to ensure that the information contained herein is complete and accurate. However the
information contained in this manual is subject to change without notice and P-COM reserves the right to change
specifications of hardware and software without prior notice and assumes no responsibility for any damages result-
ing from any errors or omissions in this manual. P-COM’s obligations regarding the use or application of its products
shall be limited to those commitments to the purchaser set forth in its Standard Terms and Conditions of Sale for a
delivered product.
© Copyright 1999, P-COM, Inc. All rights reserved. This document contains information Confidential and Proprietary
to P-COM, Inc. No part of this publication may be reproduced or transmitted by any means and disclosure or distribu-
tion of its contents outside the company in any form without written consent from P-COM is strictly prohibited.
Tel-Link
Point-To-Multipoint
Remote Terminal Installation &
Maintenance Manual
.
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual i
Tel-Link Point-To-Multipoint
Remote Terminal Installation & Maintenance Manual
Revision Page
Approval Signature
Rev By Desription of Changes Date
ARAD Initial Release 11/08/99
Title Signature Date
Executive Vice President for
Engineering
Program Management
Quality Assurance
Customer Service
Engineering
Technical Writer
November 1999
ii M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
This Page Intentionally Left Blank
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual iii
Tel-Link Point-To-Multipoint
Remote Terminal Installation & Maintenance Manual
Contents
1.0 General Information.......................................................................................................... 1-1
1.1 Manual Organization.............................................................................................. 1-1
1.2 FCC Requirements Summary................................................................................ 1-2
1.3 Requesting Changes.............................................................................................. 1-2
1.4 Special Notations................................................................................................... 1-3
1.5 General Safety Reminders..................................................................................... 1-3
1.6 P-COM PMP Terminology...................................................................................... 1-4
2.0 Remote Terminal Overview.............................................................................................. 2-1
2.1 Introduction ..................................................................................................... 2-1
2.2 Remote ATM Indoor Unit (IDU).............................................................................. 2-1
2.3 Asynchronous Transfer Mode (ATM) Service Modules (ASM).............................. 2-2
2.4 Remote Outdoor Unit (ODU).................................................................................. 2-3
2.5 Antenna ..................................................................................................... 2-4
2.6 IF Cable Run ..................................................................................................... 2-5
3.0 Tools and Test Equipment............................................................................................... 3-1
4.0 Site Preparation................................................................................................................. 4-1
4.1 ODU/Antenna Installation Preparation................................................................... 4-1
4.2 IDU Installation Preparation................................................................................... 4-2
4.3 Power Preparation................................................................................................. 4-2
4.4 IFL Installation Preparation.................................................................................... 4-2
5.0 Equipment Receiving, Unpacking and Inspection......................................................... 5-1
5.1 Introduction ..................................................................................................... 5-1
5.2 Receiving and Unpacking the Equipment.............................................................. 5-1
5.3 Inspecting the Equipment....................................................................................... 5-1
6.0 Remote ODU Installation.................................................................................................. 6-1
6.1 Introduction ..................................................................................................... 6-1
6.2 Tools Required ..................................................................................................... 6-1
6.3 Materials Required................................................................................................. 6-1
6.4 Step by Step Remote ODU/Antenna Installation Procedure.................................. 6-1
November 1999
iv M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
7.0 Remote ATM IDU & ASM Rack Installation..................................................................... 7-1
7.1 Introduction ..................................................................................................... 7-1
7.2 Remote ATM IDU Rack Installation....................................................................... 7-1
7.2.1 Tools Required............................................................................................. 7-1
7.2.2 Materials Required....................................................................................... 7-1
7.2.3 Remote ATM IDU Rack Installation Procedure............................................ 7-1
7.3 ASM Rack Installation............................................................................................ 7-3
7.3.1 Tools Required............................................................................................. 7-3
7.3.2 Materials Required....................................................................................... 7-3
7.3.3 ASM Rack Installation Procedure................................................................ 7-3
8.0 Remote Terminal Wire and Cabling Installation............................................................. 8-1
8.1 Introduction ..................................................................................................... 8-1
8.2 Ground, Power and Signal Wiring.......................................................................... 8-1
8.2.1 Tools Required............................................................................................. 8-1
8.2.2 Material Required......................................................................................... 8-1
8.2.3 Grounding.................................................................................................... 8-1
8.2.4 AC Power Supply......................................................................................... 8-3
8.2.5 DC Power Supply......................................................................................... 8-3
8.2.6 ASM to IDU Wiring....................................................................................... 8-4
8.2.7 IF Cabling..................................................................................................... 8-5
8.3 IDU to LSM Cabling............................................................................................... 8-5
8.3.1 Tools Required............................................................................................. 8-5
8.3.2 Material Required......................................................................................... 8-5
8.3.3 NMS Cabling................................................................................................ 8-5
9.0 Remote Terminal Initial Power Application.................................................................... 9-1
9.1 AC Power Application............................................................................................ 9-1
9.2 DC Power Application............................................................................................ 9-1
10.0 Initial Terminal Configuration and Testing..................................................................... 10-1
10.1 Terminal Configuration........................................................................................... 10-1
10.2 Antenna Alignment................................................................................................. 10-2
10.3 Terminal Commissioning........................................................................................ 10-3
10.3.1 LED Functionality....................................................................................... 10-3
10.3.2 Power-up Restoration................................................................................ 10-4
10.3.3 Network Monitoring.................................................................................... 10-4
10.3.4 Over The Air System Integration................................................................ 10-4
10.3.4.1 T1-CES ASM................................................................................ 10-4
10.3.4.2 T1-Frame Relay ASM................................................................... 10-5
10.3.4.3 10 BaseT ASM.............................................................................. 10-5
11.0 Technical Support............................................................................................................. 11-1
11.1 Warranty ..................................................................................................... 11-1
11.2 Return Process ..................................................................................................... 11-1
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual v
APPENDIX A: PMP Installation Procedure Checklist................................................................ A-1
APPENDIX B: Site Survey Checklist........................................................................................... B-1
Glossary.......................................................................................................................................... Gloss-1
November 1999
vi M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
This Page Intentionally Left Blank
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual vii
List of Figures
Figure 2-1 - 1U Remote ATM IDU Chassis (Front View)................................................................ 2-1
Figure 2-2 - 1U Remote ATM IDU Chassis (Rear View)................................................................. 2-2
Figure 2-3 - Front Panel Overlays for ATM Service Modules.......................................................... 2-3
Figure 2-4 - Remote Terminal Outdoor Unit with 30 cm Parabolic Antenna................................... 2-4
Figure 6-1 - Antenna Mounting Bracket.......................................................................................... 6-1
Figure 6-2 - Collar Assembly........................................................................................................... 6-2
Figure 6-3 - Attaching Antenna to Antenna Mounting Bracket........................................................ 6-3
Figure 6-4 - Elevation Adjustment Rod........................................................................................... 6-3
Figure 6-5 - Azimuth Adjustment Rod............................................................................................. 6-4
Figure 6-6 - Final Assembly............................................................................................................ 6-5
Figure 6-7 - Attaching ODU to Antenna Assembly.......................................................................... 6-5
Figure 7-1 - Rack Elevation of a Remote ATM IDU and ASMs....................................................... 7-2
Figure 8-1 - One Rack Unit Remote IDU AC Input (Rear View)...................................................... 8-2
Figure 8-2 - ASM AC Input (Rear View).......................................................................................... 8-2
Figure 8-3 - Remote IDU DC Input (Rear View).............................................................................. 8-3
Figure 8-4 - ATM Service Module DC Input (Rear View)................................................................ 8-4
Figure 8-5 - ASM to Remote ATM IDU Wiring................................................................................ 8-4
Figure 10-1 - LSM Interface Port..................................................................................................... 10-2
November 1999
viii M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
This Page Intentionally Left Blank
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual ix
List of Tables
Table 2-1 - LMR-400 Performance Characteristics....................................................................... 2-5
Table 2-2 - IFL Signals.................................................................................................................. 2-6
Table 3-1 - Recommended Tools and Equipment (Site Survey)................................................... 3-1
Table 3-2 - Recommended Tools and Equipment (Installation/Commissioning).......................... 3-2
Table 5-1 - PMP Remote Terminal Equipment Parts List............................................................. 5-2
Table 10-1 - Board LED Indications.............................................................................................. 10-1
November 1999
x M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
This Page Intentionally Left Blank
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 1-1
1.0 General Information
Before installing and operating a Tel-Link Point to Multipoint (PMP) System, P-COM recommends
installation personnel read this section in its entirety. Once accomplished, the user can proceed directly to
the section or subsection of interest.
This manual provides the installation procedures and guidelines for installing hardware associated with a
PMP System. This manual is intended for personnel who are responsible for installing and testing the PMP
system. The user should keep this manual next to the system at all times.
P-COM highly recommends the user utilize the P-COM PMP Installation Procedure Checklist located in
Appendix A to ensure the correct procedures are followed. For further assistance, contact the P-COM
Technical Assistance Center (TAC) at 1-877-674-3600.
1.1 Manual Organization
This manual is part of a set of PMP manuals that focus on specific aspects of the PMP system. The set of
manuals consist of the following:
M68330 - Tel-Link PMP System Description Manual
M68331 - Tel-Link PMP Local Site Manager Users Manual
M68332 - Tel-Link PMP Network Management System Users Manual
M68333 - Tel-Link PMP Sector Terminal Installation & Maintenance Manual
M68334 - Tel-Link PMP Remote Terminal Installation & Maintenance Manual
The Manual is divided into 11 sections providing specific information needed to install and test the PMP
System. The sections are:
Section 1: General Information - Contains discussions on
the use of this manual, summary of the manual,
special notations, and general safety reminders.
Section 2: Remote Terminal Overview - Provides a descrip-
tion of the PMP equipment.
Section 3: Tools and Test Equipment Required - Provides
lists of tools and equipment necessary to perform
the installation.
Section 4: Site Preparation - Contains information on how to
prepare the installation site.
Section 5: Equipment Unpacking and Inspection - Provides
instructions on how to unpack and inspect the
PMP Equipment
Section 6: Remote Terminal Outdoor Unit Installation - Pro-
vides instructions on how to install the Outdoor
Unit.
November 1999
1-2 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
Section 7: Remote Terminal Indoor Unit Equipment Physical
Installation - Provides instructions on how to
install the Indoor Unit.
Section 8: Remote Terminal Wiring and Cabling Installation -
Provides instructions on how to wire and cable
the Remote Terminal.
Section 9: Remote Terminal Initial Power Application - Pro-
vides instructions on how to initially apply power
to the Remote Terminal.
Section 10: Initial Terminal Configuration and Testing - Pro-
vides instructions on how to configure and test the
Remote Terminal.
Section 11: Technical Support - Provides instructions on how
to contact the Technical Assistance Center.
1.2 FCC Requirements Summary
The Remote Terminal complies with Federal Communications Commission (FCC) Parts 2 and 101 Regula-
tions.
FCC ID for Remote Terminal: L5X-PMP-04-000
Operators must be familiar with the requirements of the FCC Parts 2 and 101 Regulations prior to operating
any link using the equipment. For installations outside the United States, contact local authorities for appli-
cable regulations.
1.3 Requesting Changes
P-COM welcomes any suggestions for improving this manual. A Reader Comments Form is provided at the
end of this manual for recording comments and suggestions for improvement.
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 1-3
1.4 Special Notations
This manual uses four levels of special notation to alert you to important information concerning your
safety, proper equipment handling, or useful tips for easier operation. These notations are shown below in
descending order of importance
DANGER! Indicates that personal injury can result if you do not comply with the given instruction. A
DANGER! statement will describe the potential hazard, its possible consequences, and the
steps you must take to avoid personal injury.
WARNING! Indicates that serious damage to the equipment can result if you do not comply with the
given instruction. A WARNING! statement will describe the potential hazard, its possible
consequences, and the steps you must take to avoid serious equipment damage.
CAUTION! Indicates that equipment damage and/or process failure can result if there is a failure to
comply with the given instruction. A CAUTION! statement will describe the potential
hazard, its possible consequences, and the steps that must be taken to avoid equipment
damage and/or process failure.
NOTE: Provides supplementary information to emphasize a point or procedure, or gives a tip for
easier operation.
1.5 General Safety Reminders
To prevent possible personal injury or equipment damage, always observe the following rules:
Installation and operations personnel should be familiar with the safety requirements before
attempting installation or operation of the equipment covered by this manual. Failure to follow
the requirements could result in death or injury to personnel and/or damage to the equipment.
Always examine the general area for any potential hazards (such as wet floors or overhead
wires) before beginning installation.
Observe all DANGER! notations. Dangerously high voltages are present within this equipment
when in operation. Lethal line voltages may be present unless the power has been discon-
nected.
Always remove any jewelry or other personal items that may conduct electricity before begin-
ning installation.
Keep away from live circuits. Whenever feasible in verifying circuits, check by continuity and
resistance methods with all power off, rather than directly checking voltages.
Observe grounding precautions. Verify the unit under test or being installed and all measure-
ment equipment are properly grounded.
November 1999
1-4 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
Do not test alone. Testing or adjusting the equipment should only be carried out in the pres-
ence of a person qualified to render aid.
Use proper lifting techniques when lifting the equipment to prevent injury.
It is the responsibility of the installer and the user to ensure that the public is not exposed to
excessive RF levels. Such information must be posted near the antenna in the form of caution
or warning notes and signs.
1.6 P-COM PMP Terminology
For the ease of the reader, a Glossary is provided at the end of the manual defining terminology used in
P-COM Tel-Link PMP Manuals.
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 2-1
2.0 Remote Terminal Overview
2.1 Introduction
The Remote Terminal provides the interface between network services and the customer premise. The
Remote Terminal is available with various interfaces for customer premise interconnect and communicates
with a Sector Terminal. The Remote Terminal consists of the following components:
Remote ATM Indoor Unit (IDU) containing a Modem and a Remote ATM Controller (RAC) with
four UTP-5 ports
One or more Asynchronous Transfer Mode (ATM) Service Modules
Outdoor Unit (ODU)
Antenna and Mounting hardware
An IFL consisting of a single coaxial cable connecting the IDU to the ODU
2.2 Remote ATM Indoor Unit (IDU)
The IDU is located inside the customer's facility at a remote site and is connected to an ODU via a coaxial
cable. The IDU is capable of implementing two types of software selectable uplinks: FDMA or TDMA. The
IDU is comprised of the following components:
1 rack unit (1U) Remote ATM IDU chassis
AC or DC Power Supply
A Modem that provides the physical layer wireless communication link between the Remote
Terminal and Sector Terminal
Remote ATM Controller (RAC)
Optional ATM Bandwith Manager Daughter Card
The 1U Remote ATM IDU Chassis measures 5 cm (H) x 45 cm (W) x 43 cm (D) (1.75” x 17.5” x17.5”). This
chassis can be desktop or rack mounted (refer to Figure 2-1 and Figure 2-2).
Figure 2-1 - 1U Remote ATM IDU Chassis (Front View)
LSM Interface Port Active LED Indicator Fault LED Indicator
November 1999
2-2 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
Figure 2-2 - 1U Remote ATM IDU Chassis (Rear View)
Power supply options are AC (90V to 260V) or DC (±19V to ±56V). An optional external battery Uninterrupt-
ible Power Supply (UPS) can provide up to 4 or 8 hours of operation in the presence of a primary power fail-
ure.
2.3 Asynchronous Transfer Mode (ATM) Service Modules (ASM)
The Remote Terminal provides the interface to network services at the customer premise. The Remote
IDU has four (4) UTP-5 ATM Interface Ports and can be connected to ASMs that can provide the following
interfaces for customer interconnect:
T1 Circuit Emulation Services (CES)
E1 Circuit Emulation Services (CES)
T1 Frame Relay
E1 Frame Relay
Ethernet 10BaseT
These ASMs provides the ATM conversion necessary to provide connectivity for a broad range of user
equipment and operates with no service affecting interdependicies. Figure 2-3 illustrates the ASMs avail-
able.
AC Input Interface Port
IFL Interface Port
LSM Interface Port
Active LED Indicator
Fault LED Indicator
Chassis Ground Stud
Summary Status Interface Port
NMS Dial Modem
Interface Port
ATM Service Module
Interface Ports
Optional
RX IF Sample Port
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 2-3
Figure 2-3 - Front Panel Overlays for ATM Service Modules
2.4 Remote Outdoor Unit (ODU)
Figure 2-4 illustrates a typical RF/Antenna configuration for the ODU. The packaging includes the following
components:
ODU Enclosure
RF Electronics
ODU Controller Card responsible for controlling and monitoring ODU functions and for interfac-
ing with the IDU
The ODU is frequency agile so that the same ODU can typically be used throughout the entire allocated fre-
quency band. Subsequently, this reduces sparing levels.
The ODU meets all National Electrical Code requirements pertaining to lightning and power transients and
meets or exceeds FCC and ETSI regulations pertaining to conducted and radiated Electromagnetic Emis-
sions.
The ODU is sealed against the environment and is capable of functioning in ambient temperatures ranging
from -40°C to +60°C, with up to 100% relative humidity. The ODU can survive steady state winds of 40 m/
s with gusts to 55 m/s (89 mph/123 mph).
November 1999
2-4 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
Figure 2-4 - Remote Terminal Outdoor Unit with 30 cm Parabolic Antenna
2.5 Antenna
The Antenna is typically a 30-cm parabolic and can be directly mounted to an 8.85 cm - 11.385 cm (3.5” -
4.5”) pipe. The mount will typically support a minimum of ±25 degrees of elevation and 360 degrees of azi-
muth adjustment. The packaging includes the following components:
Reflector
Feed
Radome
Mount
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 2-5
2.6 IF Cable Run
A single coaxial cable is used to connect the ODU to the Remote ATM IDU. The cable carries transmit IF
signal, receive IF signal, telemetry, 10 MHz reference signal and DC power between the IDU and ODU.
The IDU and ODU contain "N" type female connectors for interconnection of the coaxial cable.
Double screened LMR-400 coaxial cable is recommended to provide good EMC performance and possess
the following characteristics as shown in Table 2-1:
Table 2-1 - LMR-400 Performance Characteristics
Property LMR-400
Shielding > 90 dB
Impedance 50 Ohms
Velocity 85%
Capacitance 2.39 pF/ft
Center Conductor 0.109” (0.28 cm)
Attenuation (25°)30 MHz 0.70 dB/100 ft
220 MHz 1.80 dB/100 ft
450 MHz 2.7 dB/100 ft
900 MHz 3.90 dB/100 ft
Phase Stability +/- 10 ppm/deg C
DC Resistance 1.39 Ohms/1000 ft
Bend Radius 1” (2.54 cm)
Temperature Range -40°F to 185°F (-40°C to 85°C)
Maximum Length 1000 Feet (300 meters)
IF Connector Type N Male
November 1999
2-6 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
Table 2-2 shows the signals carried between the Remote IDU and Remote ODU on the coaxial IFL cable:
Table 2-2 - IFL Signals
IFL Signal Frequency Variation
IDU Transmit 205 MHz ±5 MHz
IDU Receive 490 MHz ±5 MHz
Telemetry 800 KHz 30 KHz
Reference Signal 10 MHz
(Phase Locked to
Hub Reference)
10 ppm (Unlocked)
IFL Power Voltage Variation
ODU Power +39 VDC +40 to +57 VDC
(±10%)
IFL Connector Termination 1 Termination 2
Type N Male IDU ODU
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 3-1
3.0 Tools and Test Equipment
Table 3-1 and Table 3-2 are the recommended list of tools and test equipment necessary for the following
activities:
Site Survey
Installation
Commissioning
NOTE: This is a typical Installers tool kit. On some installations additional tools may be necessary.
Table 3-1 - Recommended Tools and Equipment (Site Survey)
DESCRIPTION QNTY BRAND PART NO.
Area Map 1NA NA
Binoculars 1NA NA
Camera (Digital Preferred) 1NA NA
Compass 1NA NA
Computer, Laptop (Pentium) (with Link
Budget Software) 1NA NA
Flag or Red Towel (to identify site from a
distance 2NA NA
Flashlight 1NA NA
Global Positioning System Receiver 1NA NA
Multimeter, Handheld 1Klein 44100
Radio, 2-Way or Cell Phone 2NA NA
Safety Belt 2NA NA
System Configuration Document 1NA NA
Site Survey Checklist 1NA NA
Wood Stick 1Desco 517F
November 1999
3-2 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
.
Table 3-2 - Recommended Tools and Equipment (Installation/Commissioning)
DESCRIPTION QNTY BRAND PART NO.
AC Circuit Tester 1Ideal 6-035
Antenna Alignment Tool 1P-COM 28055-1
Anti-Statitc Material Kit 1Charleswater 16430
Binoculars 1NA NA
Bit Error Rate Test Set, (with correct UIM
interface module) 1 FireBerd Portable 6000A
Cable Cutter 1Klein 63050
Compass 1NA NA
Computer, Laptop (Pentium) (with Link
Budget Software) 1NA NA
Crimp Tool, Die Set (RG-58, 59) 1IDEAL 30-581
Crimp Tool Die Set, (LMR-400, RG-8) 1RF Industries RFA-4005-02
Crimp Tool 1RF Industries RFA-4005-020
Crimp Tool, (RJ-45) 1IDEAL 30-559
Crimp Tool, (Solderless Connectors) 1NA NA
Diagonal Cutters, Flush Cut 1NA NA
Flashlight 1NA NA
Global Positioning System Receiver 1NA NA
Inclinometer 1NA NA
Knife, Utility 1NA NA
Multimeter, Handheld 1Klein 44100
Pliers, Needle Nose 4” Insulated 1NA NA
Pliers, Slip Joint 6” Insulated 1NA NA
Rachet, 3/8” Drive 1NA NA
Radio, 2-Way or Cell Phone 2NA NA
RF Connector (Type N Male) AR RF Industries RFN-1006-31
Rope, Nylon 100 Ft 2NA NA
Safety Belt 2NA NA
Safety Glasses 2NA NA
Screwdriver, #1 Phillips 1NA NA
Screwdriver, #2 Phillips 1NA NA
Screwdriver, #2 Phillips Stubby 1NA NA
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 3-3
Screwdriver, 1/4 x 1” Slotted 1NA NA
Screwdriver, 1/4 x 4” Slotted 1NA NA
Screwdriver, 1/8 x 2” Slotted 1NA NA
Screwdriver, 1/8 x 8” Slotted 1NA NA
Screwdriver, 3/16 x 3” Slotted 1NA NA
Socket Set (Deep well) 3/8-3/4 (3/8 drive) 1NA NA
Solder 1Weller SP23
Soldering Iron, 25 watt 1NA NA
Tape Measure (25 ft) 1NA NA
Tie Wraps, Black AR NA NA
Weather Proof Tape AR NA NA
Wire Brush 1NA NA
Wire Stripper, 10-18 AWG 1IDEAL 45-120
Wire Wrap Tool, 24 & 26 Gauge, Manual 1NA NA
Wire Wrap Tool, 24 & 26 Gauge, Power 1NA NA
Wood Stick 1Desco 517F
Wrench, 8” Adjustable 1NA NA
Wrench, Combination ASE 1/4 - 3/4 Set 1NA NA
Table 3-2 - Recommended Tools and Equipment (Installation/Commissioning)
DESCRIPTION QNTY BRAND PART NO.
November 1999
3-4 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
This Page Intentionally Left Blank
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 4-1
4.0 Site Preparation
Prior to beginning physical installation of the Tel-Link PMP equipment, the Site preparation work should be
complete. Site preparation includes but is not limited to the following:
Completed Site Survey Checklist (P-COM highly recommends the use and completion of the
Site Survey Checklist located in Appendix B)
System Configuration Document Specification
The criteria below should be evaluated prior to designating Remote to Sector terminal RF paths with the
use of Site Surveys and Link Budgets:
An unobstructed line-of-sight
Be within range (distance separation) with respect to the modulation type used
Be within the antenna beamwidth
NOTE: P-COM highly recommends a blower or fan be used with an enclosed rack containing three
or more IDUs.
The IDU is designed to be installed in a 19-inch equipment rack or enclosed cabinet in a location that is:
Dry, clean and well ventilated
Easily accessible
Within 655 feet (with CAT-5 cable) of subsequent T1 equipment
Within 1000 feet of the ODU when using LMR-400 or equivalent Coaxial cable
Compliant with all environmental specifications
4.1 ODU/Antenna Installation Preparation
Verify the location selected has the following characteristics:
Space on pole is adequate for mounting the antenna and ODU.
Verify the pole for the ODU/Antenna assembly is installed in the location identified on the Site
Survey Checklist.
Verify the pole has been securely installed and is grounded per local code.
November 1999
4-2 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
4.2 IDU Installation Preparation
Verify the location selected has the following characteristics:
Identify IDU mounting location as specified in a completed Site Survey Checklist.
Verify the required rack (if used) is installed, secured to the floor, and ready to accept the IDU.
Sufficient space is provided for the installation of the ASM.
4.3 Power Preparation
Verify the location selected has the following characteristics:
Verify the correct power source has been provided within close proximity to the IDU location.
Verify the power source is controlled through an appropriately sized circuit breaker or fuse.
4.4 IFL Installation Preparation
NOTE: Maximum cable length of 1000 ft (300 meters) between the Hub IF Combiner and ODU.
P-COM recommends the IFL should be Times-Microwave LMR-400 coaxial cable.
Verify the IFL between the ODU and IDU location is present.
Verify a sufficient length of IFL is present at both ends to provide a service loop prior to being
terminated to the equipment.
Terminate each end of the IFL with a Type-N male connector per manufacturers instructions.
Apply liquid electrical sealant to ensure a waterproof seal between the cable and connector.
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 5-1
5.0 Equipment Receiving, Unpacking and Inspection
5.1 Introduction
This procedure provides information for unpacking and inspecting the PMP equipment prior to physical
installation.
5.2 Receiving and Unpacking the Equipment
At a minimum, check for the following:
STEP 1. Check the outside of the shipping crates for visible signs of damage. Crushed corners
or tears in cardboard may indicate rough handling which may result in hidden damage
to equipment.
STEP 2. Inventory shipping crates and other packages received in the shipment. Verify that all
items listed on the Electronic Goods Descriptive Inventory or applicable shipping docu-
ment were received. Identify all missing items on the inventory sheet.
STEP 3. Record any noted damage to the outside of the packaging material on the carrier's Bill
of Lading and have the transportation company initial the sheet. All notations should
indicate location and condition.
Example: 1" x 2" scratch on left front (LF) metal panel; not LF panel
scratched. Another example would be 4" x 6" dent in center panel
(not dent in panel).
WARNING! The warranty will be violated if you do not take anti-static precautions when unpacking or
assembling the PMP boards in the PMP shelf. Circuit modules can be damaged by
electrostatic discharge. Ensure that an approved anti-static wrist strap is connected
between the wrist of the person and an electrical ground before handling any of the circuit
modules.
STEP 4. Carefully open the equipment packaging.
5.3 Inspecting the Equipment
STEP 1. For each of the PMP subsystems received, verify the equipment received matches the
shipping list by Part Number and Serial Number. Report any discrepancies immedi-
ately using the field return procedure outlined in Section 11 of this manual. The Tel-
Link PMP system may be ordered in different configurations. Table 5-1 shows the Part
Number for all system parts. In addition, the quantities of boards for redundant and
non-redundant configurations are identified. The Equipment Parts List may contain
more than the users specific requirements.
CAUTION! Tampering with seals will void the warranty.
November 1999
5-2 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
STEP 2. After unpacking the equipment, visually inspect the equipment for damage and ensure
that:
All components mounted on the individual boards are secure.
The circuit boards are not cracked.
There are no loose leads.
The shelf unit has not been dented or damaged in any way.
STEP 3. Dispose of as much packing material as possible. P-COM suggests that the user
retain at least one of each box with all packing materials. In the unlikely event that it is
necessary to return a unit, the user will possess the required packing material for safe
shipment of the unit.
STEP 4. Make claims for any damages incurred during shipment to the transportation company
involved in accordance with company procedures.
Table 5-1 - PMP Remote Terminal Equipment Parts List
REMOTE INDOOR UNIT (IDU)
Description Part Number Quantity
1 RU Remote IDU 28000-1,-2,-3 or -4 1
ATM Service Modules
Description Part Number Quantity
ATM Service Modules Interface Dependent 1
REMOTE OUTDOOR UNIT (ODU)
Description Part Number Quantity
Remote ODU Frequency Dependent 1
30 cm Parabolic Antenna Frequency Dependent 1
60 cm Parabolic Antenna Freqeuncy Dependent 1
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 6-1
6.0 Remote ODU Installation
6.1 Introduction
This procedure provides instruction for installing a P-COM Tel-Link Point to Multipoint Remote ODU/
Antenna assembly.
6.2 Tools Required
Multiple vendors of antenna and mounting assemblies may be used to operate with the ODU. A listing of
tools necessary to install an antenna/mounting assembly, can be found in Vendor's Antenna Installation
Manual.
6.3 Materials Required
Antenna/mounting assembly. This assembly typically includes all hardware needed to install
the antenna to the mount, and the mount to a pole.
Outdoor Unit (ODU)
6.4 Step by Step Remote ODU/Antenna Installation Procedure
WARNING! Failure to follow installation procedures may result in damage to the ODU/Antenna and
render the radio unusable. Read through the entire procedure before attempting
installation. If there are any questions, please contact P-COM Technical Assistance Center
(TAC) at 1 (877) 674-3600.
STEP 1. Install the mounting bracket on the pole so that the flat face of the Antenna Mounting
Bracket is in line with the direction of the sector signal using the four pole interface
bolts (refer to Figure 6-1).
Figure 6-1 - Antenna Mounting Bracket
Reversible
Pole
Clamps
Antenna
Mounting
Bracket
Elevation
Adjust
Hole
Intended
Antenna
Direction
November 1999
6-2 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
STEP 2. Feed the pole interface bolts through the pole clamps on the back side of the pole and
secure with the pole clamp nuts. These pole clamps may be reversed to accomodate
smaller diameter poles.
STEP 3. Attach the Collar Assembly beneath the Antenna Mounting Bracket as in Step 2.
Ensure the Azimuth Adjust Hole is positioned on the tops ide f the collar assemby and
between the Antenna Mounting Bracket and pole clam assembly. This will be used
later for final azimuth adjustment (refer to Figure 6-2)
Figure 6-2 - Collar Assembly
NOTE: The plastic protective cover remains in place until the ODU is attached to the back side of
the Antenna.
STEP 4. Attach the Antenna to the Antenna Mounting Bracket using the four “Bracket Locknut
Cutouts” allowing the positioning of the Antenna over the bracket locking nuts, then
rotate the Antenna up or down for course eleation adjust (refer to Figure 6-3).
Antenna
Mounting
Bracket
Collar
Assembly
Azmuth
Adjust
Hole
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 6-3
Figure 6-3 - Attaching Antenna to Antenna Mounting Bracket
STEP 5. Attach and secure the Elevation Adjustmen Rod and Adjuster Clamp to the back side
of the Antenna Base and Elevation Adjust Hole. The clevis pin a the base of the adjust-
ing bolt seats into the elevation adjust hole at the base fo the mounting bracket (refer to
Figure 6-4). No cotter pin is required for the clevis.
Figure 6-4 - Elevation Adjustment Rod
Antenna
Mounting
Bracket
Antenna
Base
Bracket
Locknut
Cutouts
Elevation
Adjust
Hole
Adjuster
Bolt
Adjuster
Clamp
Clevis
Pin
November 1999
6-4 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
STEP 6. Rotate the Elevation Adjustment Rod and position the Antenna so its elevation is
coarsely aligned with the Sector Antenna. Secure the Antenna with the bracket locking
nuts.
STEP 7. Attach and secure the Azimuth Adjustment Rod and Adjuster Clamp to the base of the
mounting bracket and the Azimuth Adjust Hole on the Collar Assembly. The clevis pin
on the adjusting bolt seats into the azimuth adjust hole on the top side of the Collar
Assembly (refer to Figure 6-5). No cotter pin is required for the clevis.
Figure 6-5 - Azimuth Adjustment Rod
STEP 8. The final assembly will look similar to the picture beow. Both azimuth and elevation
may be adjusted from the back side of the antenna with this configuration (refer to Fig-
ure 6-6).
Adjuster
Bolt
Adjuster
Clamp
Azimuth
Collar
Assembly
Clevis
Pin
Hole
Adjust
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 6-5
Figure 6-6 - Final Assembly
STEP 9. Attach the ODU to the back side of the Antenna Assembly by mating the antenna
waveguide to the ODU orifice, ensuring the IFL Port is in the lower right hand position.
This will place the ODU in a vertical transmit polarity. Snap into place using the retain-
ing clips (refer to Figure 6-7). Final polarization will occur during commissioning.
Figure 6-7 - Attaching ODU to Antenna Assembly
Azimuth
Elevation
Adjustments
ODU
Retaining
Clips
Waveguide
Protection
Cap
IFL
Port
Connection
Waveguide
Orifice
Antenna
Assembly
Retaining
Clips
November 1999
6-6 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
This Page Intentionally Left Blank
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 7-1
7.0 Remote ATM IDU & ASM Rack Installation
7.1 Introduction
This procedure provides instructions for installing the IDU chassis and the ASMs in a standard 19 inch com-
mon equipment rack or cabinet. A typical installation for installing both the IDU and ASM in a rack is shown
in Figure 7-1.
7.2 Remote ATM IDU Rack Installation
7.2.1 Tools Required
Refer to Table 3-2 in Section 3.0 for applicable tools.
7.2.2 Materials Required
Four (4) cage nuts per IDU. (May not be required, consult rack manufacturer's documentation.)
Four (4) cage nuts per ATM Service Module. (May not be required, consult rack manufacturer's
documentation.)
Four (4) equipment mounting screws with washers per ATM Service Module. (Consult rack
manufacturer's documentation for required size.)
7.2.3 Remote ATM IDU Rack Installation Procedure
NOTE: P-COM highly recommends that a blower or fan be used with an enclosed rack containing
three or more IDU’s
STEP 1. Install Cage nuts on the rack if necessary
STEP 2. Install the IDU using screws in the four mounting holes.
November 1999
7-2 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
Figure 7-1 - Rack Elevation of a Remote ATM IDU and ASMs
1U Remote ATM IDU
ASM #1
ASM #2
ASM #3
ASM #4
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 7-3
7.3 ASM Rack Installation
7.3.1 Tools Required
Refer to Table 3-2 in Section 3.0 for applicable tools.
7.3.2 Materials Required
Four (4) cage nuts. (May not be required, consult rack manufacturer's documentation.)
Four (4) equipment mounting screws with washers. (Consult rack manufacturer's documenta-
tion for required size.)
7.3.3 ASM Rack Installation Procedure
STEP 1. Install Cage nuts on the rack if necessary
STEP 2. Install the IDU using screws in the four mounting holes.
November 1999
7-4 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
This Page Intentionally Left Blank
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 8-1
8.0 Remote Terminal Wire and Cabling Installation
8.1 Introduction
This procedure provides instructions for wiring and cabling for the Remote Terminal. The following shelf wir-
ing is required for full system operations:
Power Supply Cabling
Grounding
IFL Cabling interconnect
Interface Cabling to ASMs
8.2 Ground, Power and Signal Wiring
8.2.1 Tools Required
Refer to Table 3-2 in Section 3.0 for applicable tools.
8.2.2 Material Required
IFL cable (LMR-400 recommended)
90° Type-N Adapter
RF connectors (Type-N)
Weatherproofing sealant
Outside Grounding Wire IAW local code
12 AWG Green Stranded Wire
12 AWG Compression Ring Lugs
Power Cord (as applicable)
Interface Cabling to ASMs
8.2.3 Grounding
NOTE: Ensure the indoor equipment rack is grounded per applicable local code.
STEP 1. Ground the IDU chassis using the chassis ground stud on the rear of the chassis (refer
to Figure 8-1). Ground the IDU chassis by installing compression type lug and connect-
ing the lug to the rack frame vertical channel, or local grounding bar, by using 12 AWG
(or larger) copper wire. Remove any paint or oxidation from the surface of the equip-
ment.
November 1999
8-2 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
Figure 8-1 - One Rack Unit Remote IDU AC Input (Rear View)
STEP 2. Ground the ASM chassis using the ground stud on the rear of the chassis (refer to Fig-
ure 8-2). Ground the ASM chassis by installing compression type lug and connecting
the lug to the rack frame vertical channel, or local grounding bar, by using 12 AWG (or
larger) copper wire. Remove any paint or oxidation from the surface of the equipment.
Figure 8-2 - ASM AC Input (Rear View)
STEP 3. Attach and secure grounding cable, in accordance with local code, from building
ground to the antenna assembly pole structure for proper ODU grounding.
AC Input Interface Port
IFL Interface Port
LSM Interface Port
Active LED Indicator
Fault LED Indicator
Chassis Ground Stud
Summary Status Interface Port
NMS Dial Modem
Interface Port
ATM Service Module
Interface Ports
Optional
RX IF Sample Port
Chassis Ground Stud Ethernet Interface Port
AC Input Interface Port
User Interface Port ATM STP-1
Interface Port
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 8-3
8.2.4 AC Power Supply
DANGER! Before connecting the AC cord to the IDU, ensure that the power switch is turned off
For AC operations, a standard computer AC power cable rated for 10 Amp capacity is supplied with each
Remote ATM IDU chassis and ASMs. The AC receptacle is found on the rear of the Remote ATM IDU
chassis and ASMs (refer to Figure 8-1 and Figure 8-2). One power cable is supplied with the Remote ATM
IDU and each ASM.
8.2.5 DC Power Supply
DANGER! Before connecting the DC cable to the IDU, ensure that the protection fuse is removed to
prevent the application of power at this time.
For DC operations, 16 AWG, 2-conductor cable is supplied. The cables for carrying DC power to the
Remote ATM IDU and ASM should be routed to a DC distribution panel preferably installed in the same
rack. The DC distribution panel should provide individual fuse protection to each chassis (refer to Figure 8-
3 and Figure 8-4). The DC receptacle is found on the rear of the IDU and ASM. The DC power to the
Remote ATM IDU and ASMs should be protected with a 5.0 Amp fuse.
Figure 8-3 - Remote IDU DC Input (Rear View)
DC Input Interface Port
IFL Interface Port
LSM Interface Port
Active LED Indicator
Fault LED Indicator
Chassis Ground Stud
Summary Status Interface Port
NMS Dial Modem
Interface Port
ATM Service Module
Interface Ports
Optional
RX IF Sample Port
November 1999
8-4 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
Figure 8-4 - ATM Service Module DC Input (Rear View)
8.2.6 ASM to IDU Wiring
The ATM Service Module is connected to the IDU via a UTP-5 cable with RJ-45 connectors. The length of
the cable should be sufficient to allow a small service loop near each end but should not exceed 20 feet (6
meters) in length. Connect one end of the cable to the ATM STP-1 Interface Port of the ASM. Connect the
other end of the cable to the appropriate ATM Service Module Interface Port of the IDU (refer to Figure 8-5).
Figure 8-5 - ASM to Remote ATM IDU Wiring
Chassis Ground Stud Ethernet Interface Port
User Interface Port ATM STP-1
Interface Port DC Input Interface Port
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 8-5
8.2.7 IF Cabling
WARNING! Do not plug the IDU into the AC outlet or DC power source until the cable to the ODU is
connected. If power is on, a DC voltage (44VDC) will be present on the N connector of the
IDU and could be shorted when installing the coaxial cable to the ODU.
Sufficient length of cable should be used to allow routing along the side of the rack, and a service loop.
Connect the Type-N male connector on the IF coaxial cable to the IF Interface Port of the IDU (refer to Fig-
ure 8-1 and Figure 8-3).
STEP 1. Terminate IFL Cable ends with Type-N Male RF connectors
STEP 2. Ensure a 90° Type-N Adapter is securely attached to the ODU Type-N female port
STEP 3. Connect the IFL cable to the 90° Type-N Adapter of the ODU and apply Weatherproof-
ing sealant
8.3 IDU to LSM Cabling
8.3.1 Tools Required
Refer to Table 3-2 in Section 3.0 for applicable tools.
8.3.2 Material Required
Serial, straight-through, computer cable with DB-9 male/female connectors, 15-25 ft in length
8.3.3 NMS Cabling
STEP 1. Connect LSM to the Local Site Manager Interface Port located in the front of all IDU
chassis (refer to Figure 8-1 and Figure 8-3).
STEP 2. Refer to the LSM Manual for operations.
STEP 3. Connect ATM Interface Port cables to customer supplied equipment, e.g., router, ter-
minal server, etc. (refer to Figure 8-2 and Figure 8-4).
November 1999
8-6 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
This Page Intentionally Left Blank
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 9-1
9.0 Remote Terminal Initial Power Application
9.1 AC Power Application
STEP 1. Ensure the AC power switch of the Remote ATM IDU and ASMs are in the OFF posi-
tion.
STEP 2. Plug the AC cord for the Remote ATM IDU and ASMs into the AC source.
STEP 3. Place the AC power switch on the Remote ATM IDU and ASMs in the ON position.
STEP 4. Verify power is applied to the chassis by viewing the LEDs on the front panel.
STEP 5. If the LEDs on the boards do not illuminate, remove the AC connector from the appro-
priate equipment and verify wiring and AC voltage.
9.2 DC Power Application
STEP 1. Ensure the DC connectors to the Remote ATM IDU and ASMs are not connected.
STEP 2. Verify the appropriately sized fuses are installed IAW procedures in section 8.3.
STEP 3. Plug in the DC connector into the DC Power Port of the Remote ATM IDU and ASMs.
STEP 4. Verify power is applied to the chassis by viewing the LEDs on the front panel.
STEP 5. If the LEDs on the boards do not illuminate, remove the DC connector from the appro-
priate equipment and verify wiring and voltage polarity.
November 1999
9-2 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
This Page Intentionally Left Blank
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 10-1
10.0 Initial Terminal Configuration and Testing
Proper functioning of this command and response exchange verifies that the IDU’s Local Site Manager
(LSM) agent and other critical software components are present and operational. Refer to the Tel-Link PMP
Local Site Manager Users Manual M68331 for detailed information on LSM operations. From the PC, the
installer can use the Get and Set commands to communicate with the LSM agent in the IDU to program and
interrogate the IDU configuration. Completion of the configuration will ensure items are properly loaded.
10.1 Terminal Configuration
STEP 1. After applying power to the Remote IDU and ASMs, allow the unit to warm up for five
minutes.
STEP 2. Verify that the Remote IDU and ASMs have completed their self-test processes and
the LEDs on the front of each card are in an operational state. (Refer to Table 10-1).
Table 10-1 - Board LED Indications
BOARD LED COLOR INDICATION DESCRIPTION
Remote IDU Green
(Active) Blinking OK
Off or Solid On Fault
Red
(Fault) Solid on or
Blinking Fault
Off OK
ATM Service
Module Green
(Port) Solid On Active and Configured
Off Not Configured
Red
(Port) Solid On Inactive and Configured
Off Not Configured
Red
(Fault) Solid On Fault
Off OK
Green
(Power) Solid On OK
Off Off
November 1999
10-2 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
STEP 3. Connect the LSM to the IDU LSM Interface Port. Connection is via a straight through
cable with Male/Female DB-9 connections. The LSM should be running the P-COM
WaveView software (refer to Figure 10-1).
Figure 10-1 - LSM Interface Port
STEP 4. Verify appropriate software is loaded in the Remote ATM IDU and in accordance with
the System Configuration Document.
STEP 5. Verify the transmitter is disabled.
Remote ATM IDU Set the rac_Commissioning_Complete register to No.
STEP 6. Load (Get and Set) appropriate registers in the IDU. Refer to the System Configuration
Document for appropriate frequencies, data rates, modulation schemes, etc. The icon
to the left of each of the configuration item's name should have a green plus symbol to
indicate successful loading of each configuration parameter.
10.2 Antenna Alignment
STEP 1. Enable the transmitter
Set the rac_Commissioning_Complete register to No.
STEP 2. Connect the LSM to the Remote IDU controller card and set
odu_Antenna_Align_Enable to Enable.
STEP 3. Connect the Antenna Alignment Unit (AAU) to the Remote Terminal ODU auxiliary port
and prepare to align.
STEP 4. Loosen the appropriate bolts to allow the fine adjustment tuning of the antenna.
STEP 5. Azimuth and elevation adjustments should be made and confirmed with both visual
and electronic alignment with AAU of the Sector antenna. With correct course align-
ment, the demodulator will lock up to the sector transmit signal.
STEP 6. The person aligning the antenna at the remote site should now contact the person
located at the Remote IDU and confirm the remote site Demodulator has locked up to
the Sector Terminal. If it has not, course antenna alignment is incorrect and repeat
steps 4 and 5.
LSM Interface Port
Active LED Indicator
Fault LED Indicator
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 10-3
STEP 7. The person located at the Remote IDU should connect the LSM to the IDU and display
the Demod table of the Remote Site Controller window. Locate and observe the
dem_Meas_Signal_Quality register value.
STEP 8. Secure the Remote antenna assembly to prevent movement of azimuth and elevation
settings when the maximum reading has bee obtained.
STEP 9. WIth the LSM still connected to the Remote IDU, set the odu_TxLevCtrlEn register to
Power_Ramp. This will enable automatic gain control of the Remote ODU.
STEP 10. Set rac_Commissioning_Complete register to Yes.
10.3 Terminal Commissioning
10.3.1 LED Functionality
The following steps will verify the functionality of the LEDs on the Remote IDU:
STEP 1. Verify the LEDs are in the following state:
STEP 2. Remove the IF Cable to the Remote IDU and verify the following LED state occurred:
SECTOR BOARDS GREEN LEDs RED LEDs
Sector ATM Controller Blinking Off
Modulator Blinking Off
ODU Mux Blinking Off
Demodulator Blinking Off
REMOTE BOARD GREEN LEDs RED LEDs
Remote IDU Blinking Off
BOARD GREEN LEDs RED LEDs
Remote IDU Blinking Blinking
November 1999
10-4 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
STEP 3. Reconnect the IF Cable to the Remote IDU and verify the following LED state
occurred:
10.3.2 Power-up Restoration
The following steps will ensure the PMP equipment will restore back to an operational state with the inter-
ruption of power:
STEP 1. Connect an ATM Test Set to the ASM. Place an ATM Port of the Remote IDU into a
loopback mode and the ATM Test Set will generate ATM packets.
STEP 2. Allow the system to stabilize into an operational state and turn the power off to the
Remote IDU. The ATM Test Set should be displaying bit/packet errors.
STEP 3. Reapply power to the Remote IDU. After approximately one minute, the bit/packet
errors displayed on the ATM Test Set should halt.
10.3.3 Network Monitoring
The following steps will demonstrate messaging between a Sector and Remote Terminal:
STEP 1. Allow the system to stabilize into an operational state.
STEP 2. From the Sector Terminal using the LSM with the proper Site ID selected, initiate a Get
All command on the Remote Controller Section. The Remote Controller Chassis Win-
dow should refresh with configuration parameters.
STEP 3. initiate a Get All command on the ODU Section. The ODU Chassis Window should
refresh with configuration parameters.
10.3.4 Over The Air System Integration
The following procedures will demonstrate the over-the-air system integration of the PMP equipment will
not significantly degrade bit error rate performance.
10.3.4.1T1-CES ASM
STEP 1. Provision a CBR connection with the appropriate VPI/VCI for 1.544 mbps CAS
between the T1-CES ASM and the ATM switch.
STEP 2. Generate traffic of the CBR (1.544 Mbps) from the Remote Terminal to a test set con-
nected to the ATM Switch.
STEP 3. Verify the equipment can handle the traffic with no lost cells and conduct a Bit Error
Rate Test for 15 minutes. The BER test set should display a performance of zero bit
errors (BER performance <1E-9).
BOARD GREEN LEDs RED LEDs
Remote IDU Blinking Off
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 10-5
10.3.4.2T1-Frame Relay ASM
STEP 1. Provision a CBR connection with the appropriate VPI/VCI for 1.544 mbps CAS
between the T1-Frame Relay ASM and the ATM switch.
STEP 2. Connect the Frame Relay test set #1 to Port 1 of the Frame Relay ASM.
STEP 3. Connect the Frame Relay test set #2 to a T1/FR port on the ATM switch.
STEP 4. Configure the Remote Terminal ATM port under test for internal loopback.
STEP 5. Configure each Frame Relay test set to generate “keep alive” messages at a rate of 2
per minute.
STEP 6. Reset the test set and allow the test to run for 30 minutes.
STEP 7. Record the following performance parameters.
FCS Errors
LMI Time-outs
LIM Errors
LMI Messages
PVC Status
10.3.4.310 BaseT ASM
STEP 1. Provision the 10 BaseT ASM with the appropriate VPI/VCI and IP address.
STEP 2. Configure the PC with LAN Analyzer software loaded with the appropriate IP address.
STEP 3. Generate Ethernet Packets (pings) from the PC to Destination IP. All pings should have
a response with a mean response time of <10 ms.
November 1999
10-6 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
This Page Intentionally Left Blank
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 11-1
11.0 Technical Support
11.1 Warranty
P-COM warrants PMP products to be free from defects in materials and workmanship for a period of twelve
(12) months from the date of shipment from the factory. Extended warranty options are available.
11.2 Return Process
The boards of the PMP product requiring service may be sent to P-COM Florida at any time whether the
unit is under warranty or not. There is a charge for repairs after the twelve-month warranty period.
A product requiring service should be returned with a Return Material Authorization (RMA), a detailed
description of the problem and proof of purchase date if the twelve-month warranty has not expired. The
product should be returned in its original shipping carton to ensure that in-transit damage does not occur.
The following process is used whenever returning equipment to P-COM:
STEP 1. Contact P-COM TAC at the telephone number below to obtain an RMA number and
return shipping address:
P-COM Technical Assistance Center
Phone Number:1-877-674-3600
FAX Number:1-407-674-3700
Hours of Operation
8:00 AM to 5:00 PM Eastern Time (standard or daylight savings)
NOTE: All equipment received without an RMA will be returned to the sender.
STEP 2. Pack the equipment in the original shipping containers, if possible. If original shipping
containers have been discarded, pack the failed unit so as to protect it from shipping
damage.
STEP 3. Obtain insurance from the shipper that will cover the entire value of the equipment
being returned.
STEP 4. Send the equipment (pre-paid shipping) to the address received from the Technical
Assistance Center.
STEP 5. P-COM will notify the sender, upon receipt of the equipment, of an estimated time to
repair and for return shipping instructions. An estimate of the repair cost will be given
for all non-warranty repairs
All repairs covered under warranty will be completed at no cost and the return shipping (surface) will be
paid for by P-COM. Repairs not covered by the warranty will be performed at current P-COM labor rates
and material costs and billed to the customer. In addition, shipping will be billed for non-warranty repairs.
November 1999
11-2 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
This Page Intentionally Left Blank
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual A-1
APPENDIX A: PMP Installation Procedure Checklist
November 1999
A-2 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
PMP INSTALLATION PROCEDURE CHECKLIST
Technician(s)
Name: Date:
INTRODUCTION
This Installation Procedure Checklist is provided to ensure correct installation procedures of P-COM PMP
equipment. The Checklist is to be completed for each site installed and the installer is to check-off each
step as completed. The installer will sign and date the Checklist and forward it to the P-COM Technical
Assistance Center (TAC) when the installation is completed.
Site Name:
Site Designation:
Sector Terminal Remote Terminal
FORMS:
Verify possession of completed Site Survey Form for the designated site.
Verify possession of System Configuration Document for the designated site.
Verify possession of Commissioning Test Form for the designated site.
INVENTORY:The shipping list contains all equipment ordered by the customer for the total
number of Sector and Remote Terminals.
Verify possession of completed Site Survey Form for the designated site.
Verify possession of System Configuration Document for the designated site.
NOTE: Any visible damage should be reported immediately to the customer and to P-COM TAC
at: 1-(877) 674-3600
INTERFACILITY LINK (IFL) INSTALLATION SEQUENCE
IFL INSTALLATION
PREPARATION: The IFL should be Times-Microwave LMR-400 coaxial cable, or equiv-
alent, unless otherwise stated in the P-COM Site Survey Form
Verify presence of an appropriate IFL between ODU and IDU locations.
Verify sufficient length (4 ft) of IFL exists at both ends to provide a service loop
prior to being terminated to the equipment.
Terminate each end of the IFL with Type-N male connectors.
Page 1 of 5
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual A-3
OUTDOOR UNIT (ODU) INSTALLATION SEQUENCE
ODU/ANTENNA
INSTALLATION
PREPARATION:
Verify the pole used to mount the ODU/Antenna assembly is installed at the
location identified in the SIte Survey Form.
Verify the pole is securely mounted and connected to earth ground in accor-
dance with local code.
ODU/ANTENNA
INSTALLATION:
Install the ODU/Antenna assembly in accordance with the P-COM Installation
and Maintenance Manual.
Sector ODU/Antenna: Course align the antenna in the direction for operation
as specified in the P-COM System Configuration Document.
Remote ODU/Antenna: Align the antenna in the general direction of the desig-
nated Sector Terminal. Fine-tuning will be performed during the “Initial Power-
up and Test Sequence.”
ODU
INTERCONNECT:
Sector Terminal: Connect the IFL cable between the appropriate ODU and
Basic IDU Chassis.
Remote Terminal: Connect the IFL cable between the ODU RF POrt (Type-N
Connector and Remote IDU.
INDOOR UNIT (IDU) INSTALLATION SEQUENCE
IDU INSTALLATION
PREPARATION: Each Site should be identified, In the P-COM Site Survey Form, if the
IDU is to be rack mounted or placed on a tabletop.
Verify presence of IDU chassis and all cards intended to populate the IDU.
Verify presence of customer’s interface demarcation
Verify required rack/table is installed, secured to the floor, and ready to accept
the IDU.
Verify correct power source has bee provided within close proximity to the
location where the IDU is to be installed and is controlled through an appropri-
ate sized circuit breaker or fuse
Verify power to the IDU is in the Off position (AC) or disconnected (DC).
Page 2 of 5
PMP INSTALLATION PROCEDURE CHECKLIST
Technician(s)
Name: Date:
November 1999
A-4 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
IDU
INSTALLATION:
Properly install the IDU in accordance with P-COM Installation & Maintenance
Manual.
IDU
INTERCONNECT:
Sector Terminal: Connect the IFL cable to the RF Port of the IDU.
Remote Terminal: Connect the IFL cable to the RF Port of the IDU.
Sector and Remote Terminals: Connect the power leads/cords to the IDU Input
Power Port. Terminate the power leads/cord to the appropriate AC or DC
power source. Two power leads/cable may be terminated for a Sector IDU with
optional redundant power supplies.
Sector and Remote IDUs: Connect a ground wire from the chassis to a local
earth ground.
CUSTOMER
PREMISE EQUIP-
MENT (CPE)
PREPARATION:
Verify CPE has been installed within close proximity to the IDU equipment.
Verify sufficient length of CPE cable is present to provide a service loop prior to
being terminated to the equipment.
Sector and Remote Terminals: After completion of the Commissioning Test
Plan connect the CPE cable to the appropriate port on the USer Interface Mod-
ule (UIM) or Network Interface Card (NIC).
ODU POWER
SUPPlY The ODU Power Supply should be installed at least 1 RU above each
Sector bank of IDUs to prevent air flow restriction.
Properly install the ODU Power Supply in accordance with P-COM Installation
& Maintenance Manual.
Page 3 of 5
PMP INSTALLATION PROCEDURE CHECKLIST
Technician(s)
Name: Date:
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual A-5
ODU POWER
SUPPLY:
Connect the ODU Power Supply to the Basic Chassis IDU in accordance with
the P-COM Sector Terminal Installation & Maintenance Manual.
Connect a ground wire from the ODU Power Supply to a local earth ground.
Connect the power cord/leads to the Input Power Port. Terminate the power
cord/leads to the appropriate AC or DC Power Source.
INITIAL POWER-ON AND TEST SEQUENCE
Turn the circuit breaker assigned to the IDU to the ON position when prepared
to apply power to the IDU.
SECTOR
TERMINAL:
Apply power to the Sector IDU and IF Combiner. Allow the terminal to warm up
for 5 minutes.
Verify each card has completed its self-test process and the LEDs are in an
operational condition. Interpretation of LED conditions may be found in Table
11-1, Board LED Indications of the P-COM Installation Manual.
Connect the LSM to the Controller card via DB-9 cable.
Verify appropriate software in the IDU
Load (Set/Get) appropriate registers in the IDU
Verify configuration loaded successfully.
Verify transmitter is disabled. The sc_Commissioning_Complete register
should indicate “No”.
Perform Terminal (Local Testing) in accordance with P-COM PMP Installation
Manual.
Enable the transmitter. Set the sc_Commissioning_Complete register to
“Yes”.
Verify proper transmit level.
Page 4 of 5
PMP INSTALLATION PROCEDURE CHECKLIST
Technician(s)
Name: Date:
November 1999
A-6 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
REMOTE
TERMINAL:
Apply power to the Remote IDU. Allow the terminal to warm up for 5 minutes.
Verify each card has completed its self-test process and the LEDs are in an
operational condition. for the 7 RU Interpretation of LED conditions may be
found in Table 11-1, Board LED Indications of the P-COM Installation Manual.
Connect the LSM to the Controller card via DB-9 cable.
Verify appropriate software in the IDU
Load (Set/Get) appropriate registers in the IDU
Verify configuration loaded successfully.
Verify transmitter is disabled. The rc_Commissioning_Complete register
should indicate “No”.
Perform Terminal (Local Testing) in accordance with P-COM PMP Installation
Manual.
Align the Remote Terminal antenna. Connect a AAU to the test port of the
ODU. Adjust the antenna in elevation, then in azimuth to obtain a peak voltage
measurement. Align antenna for a peak reading on the AAU. Tighten down all
mounting bolts.
Verify proper receive level is registered at the IDU.
Enable the transmitter. Set the rc_Commissioning_Complete register to
“Yes”.
Perform BER tests on the Remote Terminal for all T1 ports for a minimum of 30
minutes.
INSTALLATION COMPLETED
This concludes the P-COM PMP equipment installation sequence. Sing and date in the spaces
provided below and proceed to the P-COM PMP Commissioning Test Plan.
Completion Number:
Date:
Signature:
Page 5 of 5
PMP INSTALLATION PROCEDURE CHECKLIST
Technician(s)
Name: Date:
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual B-1
APPENDIX B: Site Survey Checklist
November 1999
B-2 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
SITE SURVEY CHECKLIST
Engineer: Date:
Customer Address:
Contact Names:
Telephone Numbers:
SITE CHARACTERISTICS
Prior to site installation planning visit, complete line-of-sight, transmission engineering and preliminary frequency coordination work to
establish viability of path selected.
Site Name:
Site Designation:
Sector Terminal Remote Terminal
Coordinates: GPS
EPE Degrees Minutes Seconds
Latitude:
Longitude:
Ground Elevation AMSL (Above Mean Sea level)
Distance Between Hub and Remote Terminals (kilometers)
Azimuth (True) From Sector:
Hub/Sector: Remote:
Transmit Frequency (High/Low Band; Polarization)
Transit: Receive:
Available Conduit:
Page 1 of 6
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual B-3
Customer Date:
Site Name:
OUTDOOR EQUIPMENT
Roof Access
(Describe):
Site Access
Roof Access Door Ladder Req
Permit Req Access Keys Req
Roof Penetration Wall Penetration
Special Tools Req On-SIte Escort Req
If Yes, What Special Tools: If Yes, Who is Needed as the Escort:
Sketch/photos of Equipment and Site (on pages 5 and 6) - Include Site Layout (Topographical Map and Building Blueprints if available),
Location of Antenna/ODU, and briefly explain how the Antenna/ODU will be installed below:
Tripod:
Wall Mount
Parapet:
Tower:
Other:
Pole Diameter:
Show details in sketch of proposed mounting and hardware (pole) location. Show relationship to coaxial cable access and building
ground. Show lightning rod ground connect point if applicable.
Terrain
Considerations:
Obstructions:
Other Considerations:
Page 2 of 6
SITE SURVEY CHECKLIST
Yes No Yes No
November 1999
B-4 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
Customer Date:
Site Name:
INTERFACILITY POWER AVAILABILITY
Available Power (Voltage and Current
NOTE: Do not mount radio equipment in the proximity of machinery that can either generate
larege electromagnetic fields or large voltage spikes as they cycle On/Off (i.e. air
conditioners, elevator motores, etc.)
AC Power On Roof: AC Power At Rack:
Identify Location and
Distance to Available
AC Power:
Distance Between
ODU and IDU:
NOTE: Maximum distance of LMR-400 Cable is 1000 Feet.
Has Cable Been Ordered?
IFL Cable Supplied By: P-COM Customer
Distance Between IDU and Customer Premise:
Sketch/Photos Of Equipment - Cable Run from ODU to IDU
Show Access Points (i.e. Floors) (Sketch) (Space available on Pages 5 and 6)
IFL Exists in-place:
Is Plenum Rated Cable Required:
Length: Type:
Is Pull Rope Installed in Conduit
Is New Pull Rope Required:
Page 3 of 6
SITE SURVEY CHECKLIST
Yes No Yes No
Yes No
Yes No
Yes No
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual B-5
Customer Date:
Site Name:
INDOOR EQUIPMENT
What Type of Terminating Equipment Will Be Used (Customer Premise Equipment)
Check Site For:
Phone Jack: AC/DC Power:
Fuse Panel: Battery Back-up
Number of IDUs Required:
IDU Mounting Rack Mounted Tabletop Mounted
Rack/Table Supplied By P-COM Customer
Rack or Table Ordered:
Limitations on Rack
or Table Floor Space:
Temperature/Humidity Controlled Room
Air Flow Restrictions:
Fans Needed:
Other Rack Installa-
tion Considerations:
TOOLS REQUIRED
Binoculars Camera
Cellular Phone (2 each) Compass
Flashlight/Strobe GPS Receiver:
Tape Measure
Other Equipment:
Page 4 of 6
SITE SURVEY CHECKLIST
Yes No Yes No
Yes No
Yes No
Yes No Yes No
November 1999
B-6 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
Customer Date:
Site Name:
SKETCH OF EQUIPMENT AND SITE
Page 5 of 6
SITE SURVEY CHECKLIST
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual B-7
Customer Date:
Site Name:
SKETCH OF EQUIPMENT AND SITE
Page 6 of 6
SITE SURVEY CHECKLIST
November 1999
B-8 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual Gloss-1
Glossary
NAME DESCRIPTION
AAL ATM Adaption Layer - A collection of standardized protocols providing
services to higher layers by adapting user traffic to a cell format.
AAU Antenna Alignment Unit
Active Window The window whose Title Bar is highlighted. Active windows lie in front
of all windows that intersect them in three dimensional space
AGC Automatic Gain Control
AIS Alarm Indicator Status - One of the Operations and Maintenance func-
tion types used for fault management.
AMI Alternate Mark Inversion - A type of bipolar line signaling used by DS-1
and DS-3 interfaces.
ANSI American National Standards Institute. A US technology standards
organization.
AMSL Above Mean Sea Level
ASIC Application Specific Integrated Circuit
ASM ATM Service Module
ATM Asynchronous Transfer Mode - A broadband switching and multiplex-
ing, connection-oriented, high-performance and cost effective inte-
grated technology.
B8ZS Bipolar with Eight Zero Substitution - A line code substituting 8 zeros
with Bipolar Violations for bit synchronization purposes.
Base Station The center of a cell where Sector Terminal(s) are installed.
BER Bit Error Rate - A measure of the rate of bit errors in a digital system.
BNC Bayonet Nut Connector
BOD Bandwidth-On-Demand - A technique allocating more bandwidth to
users requiring it and reduces bandwidth to users that do not.
BPV Bipolar Violation - DS-1 and DS-3 line fault alarms.
BRI Basic Rate Interface - A ISDN service specification that provides two
64-Kbps B-channels and one 16-Kbps D-channel.
Calibration File A file used by the LSM to calibrate a particular model of ODU
CAS Channel Associated Signaling
CBR Constant Bit Rate - One of five service classes for the ATM layer. This
service type allows a user to define a specific cell delay, cell delay vari-
ation, and reserve a specific constant fixed bandwidth on the network.
November 1999
Gloss-2 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
CCITT Consultative Committee on International Telegraphy and Telephony.
CCS Common Associated Signaling
CHAMP Connector
Chassis Number An integer value that uniquely identifies a chassis
Chassis Parameter A value that may be read and/or written from/to a board that exists
within a chassis. Examples of chassis parameters include
odu_Temperature for the ODU, or sc_Tx_Frequency in the Sector
Controller
Chassis Window The window that displays information about the individual boards mak-
ing up a chassis. The operator interacts with this window to control and
monitor chassis parameters.
CLAV Cell Available
Client Area The area of a window excluding the title bar and bounded by the win-
dow frame. The client area is used to display the document visually to
the operator.
Closing a Window Expanding a window down to its maximum size. Maximizing a window
under Windows 95 is performed by clicking on the maximize button on
the Title Bar
Configuration Files Files that contain the labels, desired values, sampling intervals, and
sampling active states for chassis parameters. These files are dis-
played graphically within Chassis Windows.
Configuration Section A section of a Configuration File containing parameters for a given
board that do not exist within any configuration tables.
Configuration Table A table of parameters lying within a configuration section,
Continuous Get The process of automatically performing Gets on chassis parameters
at selected intervals
CPE Customer Premise Equipment - Customer provided equipment that
connects to the interface port(s) of the IDU.
CRC Cyclic Redundancy Check - A process used to check the integrity of a
block of data.
Current Value The current setting of a chassis parameter. Used in conjunction with a
Get operation
DBPSK Differential Bi-Phase Shift Keyed
Debug Port The serial port used by the LSM to monitor and debug a PMP System.
Definition Files Files that contain the VID number, PID number, sample rate and sam-
pling active settings, as well as enumerated values for chassis param-
eters. These files are displayed graphically with Chassis Windows
NAME DESCRIPTION
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual Gloss-3
Desired Value The value that the operator wishes to change a chassis parameter to.
Used in conjunction with a Set operation
Desired Value The value one wishes to change a chassis parameter to. Used in con-
junction with a Set operation.
Desktop The backdrop against which applications run in the Windows 95 envi-
ronment. It is in reality the parent window of all windows present with
Windows 95.
Detailed Help Detailed information about an object, available by clicking on the
arrow/question mark button in the Toolbar and then clicking on the
object.
DFM Drive Fault Monitor
Dialog Box A window consisting of controls with which an operator interacts. Dia-
log boxes come in two flavors: modal dialog boxes, which require that
the operator terminate the dialog box before other window objects
present in the application may be accessed, and modeless dialog
boxes, which allow the operator to interact with other window objects at
any time while the dialog box exists.
DLL Dynamic Link Library - Libraries of code shared by applications
DLL Libraries Libraries of code shared by applications
Down Link The RF communications path from a Base Station to the Remote Ter-
minal
DQPSK Differential Quandrature-Phase Shift Keyed
DSP Digital Signal Processor
DSX DS-n customer premise equipment
EIA Electronics Industry Association
EIRP Effective Isotropic Radiated Power
EMC Electromagnetically Coupled
EPLD Electronically Programmable Logic Device
Error Code An integer value indicating success/failure at performing a Set/Get
operation.
Error Message A message received from the PMP System via the LSM Port that gives
information on an error that was detected within the PMP System.
Error messages may be displayed via the Error Message Window.
ESF Extended Super Frame Format - Combination of 24 T1 frames.
ETSI European Telecommunications Standards Institute - European equiva-
lent of ANSI.
NAME DESCRIPTION
November 1999
Gloss-4 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
Explorer Short for Windows 95 Explorer, the application that comes bundled
with Windows 95 allowing the manipulation of drives, directories and
files.
EXZ Excessive Zero Events - Used by DS-3 interface.
FCC Federal Communications Commission - A US regulatory commission.
FDDI Fiber Distributed Data Interface - ANSI standard for implementing high-
speed (100-Mbps) LAN over fiber.
FDMA Frequency Decision Multiple Access - A technique that allows multiple
users access to bandwidth by subdividing into multiple channels.
FEC Forward Error Correction - An error correction technique allowing the
receiver to correct some errors in the received signal.
FERF Fare End Receive Failure
FPGA Field Programmable Gate Array
FSK Field Shift Keyed
FWA Fixed Wireless Access
Get Operation The process of obtaining the current value of a chassis parameter
GUI Graphical User Interface
HDB3 High Density Bipolar Order 3
HDLC High-level Data Link Control - A synchronous bit-oriented protocol for
serial data.
Hex Records Records collectively making up a hex .rec file, the file format used for
software updates. Motorola defines the standard for the records used
by the LSM for software updates.
IDU Indoor Unit - PMP chassis, including cards populating the chassis,
located inside a building.
IF Intermediate Frequency
IFL Interfacility Link - A communications link between the IDU and ODU
Incoming Packets Packets of data received by the Local Site Manager via a serial port
ISDN Integrated Services Digital Network - Digital service for voice, data,
and video.
ISP Internet Service Provider
Keyboard Accelerator A keystroke sequence that emulates the selection of a menu item
Keystroke Sequence A group of keys on the keyboard simultaneously depressed
NAME DESCRIPTION
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual Gloss-5
Label A name uniquely identifying a chassis parameter
LAN Local Area Network
LCD Liquid Crystal Display
LED Light Emitting Diode
LIU Line Interface unit
LMCS Local Multi-Point Communications Services
LMDS Local Multi-Point Distribution System
LNA Low Noise Amplifier
Logs Status information reports accumulated over time. Examples include
incoming packets logs, or error message logs.
LOS Loss of Signal
LSM Local Site Manager -Laptop or desktop PC based software tool used to
monitor, control and configure the PMP System.
LSM Installer The software application that installs the LSM and all subordinate files
LSM Port The serial port used by the LSM to communicate with a PMP System
LSM Uninstaller The software application that uninstalls the LSM and all subordinate
files
Main Window The window that contains the menu bar and toolbar, serving as the
parent of all windows and dialog boxes. Closing the Main Window ter-
minates the LSM
Maximizing a Window Expanding a window to its maximum size. Maximizing a window under
Windows 95 is performed by clicking on the maximize button in the title
bar.
MC Modem Controller
MCF Motorola Cold-Fire Processor
Menu Bar A list of individual menus. Present at the top of the Main Window
Menu Item An individual item that resides within a menu which may be selected by
the operator
MIB Management Information Base - Database containing information
regarding network management and performance.
Minimizing a Window Shrinking a window down to a single title bar. Minimizing a window
under Windows 95 is performed by clicking on the minimize button on
the Title Bar
Mouse Cursor The cursor that displays the current position of the mouse
NAME DESCRIPTION
November 1999
Gloss-6 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
NCO Numerical Control Oscillator
NMA Network Management Agent
NMS Network Management System
NOC Network Operations Center
ODU Outdoor Unit - PMP communications equipment located outside a
building connected to an antenna.
OMT Othogonal Mode Transducer
Operator The person who is interacting with the Local Site Manager
OTA Over the Air
Outgoing Packets Packets of data transmitted via the LSM Port to the PMP System.
PA Power Amplifier
PCB Printed Circuit Board
PD Pattern Detect
PID Process ID - A number uniquely identifying a process with a board.
PMP Point-to-Multipoint
PMP System The combination of hardware and embedded software that make up
the P-COM Point-to-Multipoint System
Popup Menu A menu that comes into existence when a Windows Object is selected
by the operator while the right mouse button is pressed. Popup Menus
serve as a convenient means of querying/changing the settings for a
given Window Object
POST Power Up Self Test
PSN Public Switched Network
PTN Public Telephone Network
QAM Quadrature Amplitude Modulation - A high bandwidth efficiency modu-
lation technique
QPSK Quadrature Phase Shift Keyed - Digital modulation technique.
Quick Help A brief summary of a chassis parameter, available by double clicking
on the chassis parameter in the label column of a Chassis Window.
RAC Remote ATM Controller - ATM controller card used in the Remote Ter-
minal IDU to manage and control the traffic a the Remote site.
RAM Random Access Memory
RCS Redundancy Control Switch
NAME DESCRIPTION
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual Gloss-7
Remote IDU Remote Terminal Indoor Unit chassis located at the remote location
Remote ODU Remote Terminal Outdoor Unit located at the remote location, con-
nected to a directional antenna pointed towards the Sector Terminal.
Remote Terminal Consists of a Remote IDU, Remote ODU and Interfacility Link
Restoring a Window Resizing a window to its previous size. Restoring a window under Win-
dows 95 is performed by clicking on the restore button in the title bar.
RF Radio Frequency
RMA Return Material Authorization
ROM Read Only Memory
RSSI Receive Signal Strength Indicator
RU Rack Unit
Rx Receive Signal
SAC Sector ATM Controller - ATM controller card used at the Base Station/
Sector Terminal IDU to manage and control the traffic at the sector.
Sample Interval The rate at a Continuous Get is performed on a chassis parameter
Sampling Active Whether or not Continuous Gets will be performed on a chassis param-
eter
SAW Surface Acoustic Wave
SCC Serial Communication Controller
Scroll Bars Bars present at the bottom and/or right edge of a Window enabling the
operator to scroll the data upwards or downwards, thus observing
information that lies beyond that capable of being displayed in the win-
dow
SDH Synchronous Digital Hierarchy - A hierarchy for very high-speed digital
transmissions over optical fiber links
Sector A geographic area radiating out from a Base Station. Typically referred
to as the area covered by a Sector Antenna
Sector IDU Sector Terminal Indoor Unit chassis located at the Base Station
Sector ODU Sector Terminal Outdoor Unit chassis located at the Base Station loca-
tion, connected to an antenna providing coverage over a sector.
Sector Terminal Consists of one or more Sector IDUs connected to a common, or
redundant, set of Hub IF Combiners and Sector ODU/Antenna assem-
blies
NAME DESCRIPTION
November 1999
Gloss-8 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
Selection Highlighting an item for an action via the process of single clicking on
the item. Holding down the Shift Key while selecting items allows con-
tiguous selections. Holding down the Ctrl Key while selecting items
allows noncontagious selections.
Set Operation The process of changing the current value of a chassis parameter
Settings Options for customizing the Local Site Manager to an operator's prefer-
ences. Available from the Setup Dialog Box
SF Super Frame Format
Shortcut A Windows 95 Object that points to an application or data file. Double
clicking on a shortcut to an application executes the application. Dou-
ble clicking on a data file executes the application tied to the data file
Site Diagnostic Report A report produced listing detailed information about the current status
of all chassis making up the system
Slot Number A value that uniquely identifies a board within a chassis
SNMP Simple Network Management Protocol - Protocol for exchanging net-
work management information.
SNR Signal-to-Noise Ration - A measurement of the strength of the RF sig-
nal when compared to the background noise level.
Software Updating The process of updating code for a board that resides within a chassis
Splitter Bar A vertical bar separating panes of a window. The splitter bar may be
dragged to resize the panes of a window.
Start Menu A menu containing applications (or shortcuts to applications) that are to
be executed whenever Windows 95 boots
Status Bar An area which enables the displaying of detailed information about the
current menu item that is selected, or about the current status of an
operation. Present at the bottom of the Main Window
STM Synchronous Transfer Mode
STP Shielded Twisted Pair
STS Synchronous Transport Signal
System Menu The menu accessible by clicking on the icon that resides at the far left
corner of the title bar of a window. The System Menu contains a list of
operations commonly performed on windows.
TAC Technical Assistance Center
Task Bar The bar that runs along the bottom of the Windows 95 User Interface
TDM Time Division Multiplex
NAME DESCRIPTION
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual Gloss-9
TDMA Time Division Multiple Access - A technique allowing multiple users
access to a single channel through time sharing.
Title Bar The bar that runs along the top of Windows. The title bar contains the
name of the document (or some means of identifying its purpose), as
well as the close box, minimize box, and maximize box.
Toolbar A list of buttons serving as an equivalent to the selection of menu items
that reside within the Menu Bar. Present immediately below the Menu
Bar of the Main Window
Tooltip A small popup window appearing whenever the mouse cursor hovers
over an object for a given amount of time. Tooltips are most often used
to supply concise help for Toolbar buttons.
Tx Transmit Signal
UNI User Network Interface - Interface between the Remote Terminal and
the ATM network. The ATM forum has defined two contexts in which
the UNI appears: Public UNI, connecting ATM equipment within a pri-
vate network, either hosting or switching with public network provider
networks. Private UNI, used exclusively to connect hosts to switches
where both are managed by the same administrative entity.
Uplink The RF Communications path from the Remote Terminals to the Base
Station
VID Variable ID - A number uniquely identifying a parameter.
VOM Volt-Ohm-Meter
Whitespace Tabs or spaces. This term originates from the Unix world
Windows Object An object presented to the operator through the Windows 95 user
Interface. Window objects encompass such thins as icons, menus, and
windows
WLL Wireless Local Loop
VBR-nt Variable Bit Rate-non real time - One of five service classes for the
ATM layer.
NAME DESCRIPTION
November 1999
Gloss-10 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
This Page Intentionally Left Blank
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
Reader Comment Form
We welcome your comments and suggestions for improving our manuals. Please record your suggestions
below and FAX the completed form with your comments to (407) 674-3797.
NOTE: This form is for documentation comments only. Problems with hardware or software
should be reported separately to the Technical Assistance Center at 1-(877)-674-3600.
1. Did you find any omissions or inaccuracies in the manual? If so, please specify the page and the prob-
lem. (It may help to include a marked up copy of the page along with this form.)
____________________________________________________________________________________
____________________________________________________________________________________
2. Did you find this manual understandable, usable, and well organized? Please make suggestions for
improvement.
____________________________________________________________________________________
____________________________________________________________________________________
3. Is there sufficient documentation on the associated hardware or software required for your use of the
Point to Multipoint System, as described in this manual? If not, specify the type of information you feel
is missing.
____________________________________________________________________________________
____________________________________________________________________________________
4. Please indicate the type of user/reader that you most nearly represent:
_____System programmer/System Manager _____Maintenance Technician
_____Process Engineer _____Other_______________________
5. Please indicate the way(s) in which you use this manual:
_____Instructional Tool _____Other_______________________
_____Reference Tool
Name _________________________________ Title __________________________________
Company______________________________ Division_______________________________
Address_______________________________ City __________________________________