CSP POAM Completion Guide

CSP_POAM__Completion_Guide

CSP_POAM__Completion_Guide

User Manual: Pdf

Open the PDF directly: View PDF PDF.
Page Count: 10

!
!
!
FedRAMP PLAN OF
ACTION & MILESTONES
(POA&M) TEMPLATE
COMPLETION GUIDE
Version 2.0
November 24, 2017
!
!|!i!
DOCUMENT REVISION HISTORY
DATE
VERSION
DESCRIPTION
AUTHOR
02/18/2015!
!
Publish!Date!
FedRAMP!PMO!
09/01/2015!
1!
Clarifications!and!format!updates!
FedRAMP!PMO!
10/21/2016!
1.1!
Instructions!for!the!new!Integrated!Inventory!Template!
Section!2.3;!Operational!Requirements!–!False!Positive!
Updates!to!Table!2!–!POA&M!Items!Column!Information!
Description!and!Section!2.3!
FedRAMP!PMO!
06/06/2017!
1.2!
Updated!logo!
FedRAMP!PMO!
11/24/2017!
2.0!
Updated!to!the!new!template!
FedRAMP!PMO!
!
HOW TO CONTACT US
Questions!about!FedRAMP!or!this!document!should!be!directed!to!info@fedramp.gov.""
For!more!information!about!FedRAMP,!visit!the!website!at!http://www.fedramp.gov.!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!|!ii!
TABLE OF CONTENTS
DOCUMENT!REVISION!HISTORY!...............................................................................................!i!
1.!INTRODUCTION!................................................................................................................!1!
1.1.!PURPOSE!...................................................................................................................................!1!
1.2.!SCOPE!........................................................................................................................................!2!
2.!POA&M!TEMPLATE!...........................................................................................................!2!
2.1.!WORKSHEET!1:!!OPEN!POA&M!ITEMS!......................................................................................!2!
2.2.!WORKSHEET!2:!CLOSED!POA&M!ITEMS!...................................................................................!5!
2.3.!INTEGRATED!INVENTORY!WORKBOOK!.....................................................................................!5!
3.!GENERAL!REQUIREMENTS!................................................................................................!6!
Appendix!A:!FedRAMP!ACRONYMS!....................................................................................!7!
!
LIST OF TABLESX
Table!1!–!POA&M!Items!Header!Information!Description!...................................................................................!2!
Table!2!–!POA&M!Items!Column!Information!Description!..................................................................................!3!
!
!|!1!
1. INTRODUCTION
The!Federal!Risk!and!Authorization!Management!Program!(FedRAMP)!Program!Management!
Office!(PMO)!prepared!this!document!to!provide!guidance!for!completing!the!Plan!of!Action!
and!Milestones!(POA&M)!Template.!The!POA&M!is!a!key!document!in!the!security!
authorization!package.!It!describes!the!specific!tasks!the!Cloud!Service!Provider!(CSP)!has!
planned!to!correct!any!weaknesses!or!deficiencies!in!the!security!controls!noted!during!the!
assessment!and!to!address!the!residual!vulnerabilities!in!their!cloud!system.!
CSPs!applying!for!a!FedRAMP!Joint!Authorization!Board!(JAB)!Provisional!Authorization!to!
Operate!(P-ATO)!should!use!this!guide!while!completing!the!POA&M"Template,"which!is!
available!at:!http://www.fedramp.gov/resources/templates-3/.!CSPs!develop!the!POA&M!
document!in!the!POA&M"Template!according!to!the!rules!and!requirements!described!in!this!
guide!to!ensure!consistency!across!providers.!The!POA&M!Template!provides!the!required!
format!for!preparing!the!Plan!of!Action!and!Milestones.!The!CSP!may!add!to!the!format!as!
necessary!to!comply!with!its!internal!policies!and!FedRAMP!requirements;!however!CSPs!are!
restricted!from!altering!columns!or!headers.!!
1.1. PURPOSE
The!purpose!of!the!POA&M!is!to!facilitate!a!disciplined!and!structured!approach!to!mitigating!
risks!in!accordance!with!the!CSP’s!priorities.!The!POA&Ms!include!the!findings!and!
recommendations!of!the!security!assessment!report!and!the!continual!security!assessments.!
FedRAMP!uses!the!POA&M!to!monitor!progress!in!correcting!weaknesses!or!deficiencies!noted!
during!the!security!control!assessment!and!throughout!the!continuous!monitoring!process.!
The!POA&Ms!are!based!on!the:!!
§ Security!categorization!of!the!cloud!information!system!
§ Specific!weaknesses!or!deficiencies!in!deployed!security!controls!
§ Importance!of!the!identified!security!control!weaknesses!or!deficiencies!
§ Scope!of!the!weakness!in!systems!within!the!environment!
§ Proposed!risk!mitigation!approach!to!address!the!identified!weaknesses!or!deficiencies!
in!the!security!controls!(for!example,!prioritization!of!risk!mitigation!actions,!allocation!
of!risk!mitigation!resources)!
The!POA&M!identifies:!(i)!the!tasks!the!CSP!plans!to!accomplish!with!a!recommendation!for!
completion!either!before!or!after!information!system!implementation;!(ii)!any!milestones!the!
CSP!has!set!in!place!for!meeting!the!tasks;!and!(iii)!the!scheduled!completion!dates!the!CSP!has!
set!for!the!milestones.!
!
!|!2!
1.2. SCOPE
The!scope!of!the!POA&M!includes!security!control!implementations!(including!all!management,!
operational,!and!technical!implementations)!that!have!unacceptable!weaknesses!or!deficiencies.!
The!POA&M!also!includes!an!up-to-date!list!of!assets!within!the!environment,!based!on!the!list!
provided!in!the!security!assessment!plan.!CSPs!are!required!to!submit!updated!POA&Ms!to!the!
Authorizing!Official!(AO)!in!accordance!with!the!FedRAMP"Continuous"Monitoring"Strategy"&"
Guide.!
!
2. POA&M TEMPLATE
CSPs!gather!and!report!basic!system!and!weakness!information!in!the!POA&M"Template.!The!
POA&M"Template!is!an!Excel!Workbook!containing!three!worksheets:!The!current!system!
POA&M!worksheet,!the!closed!(mitigated)!POA&M!worksheet,!and!an!up-to-date!System!
Inventory!worksheet.!CSPs!should!complete!the!System!Inventory!worksheet!first!because!the!
Asset!Identifier!in!the!POA&M!worksheet!refers!to!the!inventory!items.!
2.1. WORKSHEET 1: OPEN POA&M ITEMS
The!Open!POA&M!Items!worksheet!has!two!sections.!The!top!section!of!the!worksheet!
documents!basic!system!information!and!tracks!the!headers!described!in!the!table!below:!
Table 1 POA&M Items Header Information Description
HEADERS
DETAILS
CSP!
The!Vendor!Name!as!supplied!in!the!documents!provided!to!the!AO.!
System!Name!
The!Information!System!Name!as!supplied!in!the!documents!provided!to!the!AO.!
Impact!Level!
Systems!are!categorized!as!Low,!Moderate,!or!High!based!on!a!completed!FIPS!
199/800-60!evaluation.!FedRAMP!currently!supports!Moderate!and!Low!risk!impact!
level!systems.!
POA&M!Date!
The!date!the!POA&M!was!created,!which!is!the!date!the!CSP!committed!to!in!their!
continuous!monitoring!plan.!
!
The!bottom!section!of!the!Open!POA&M!Items!worksheet!is!the!corrective!action!plan!used!to!
track!IT!security!weaknesses.!This!section!of!the!POA&M!worksheet!has!some!similarities!to!the!
National!Institute!of!Standards!and!Technology’s!(NIST)!format!requirements,!but!requires!
additional!data!and!formatting!as!required!by!FedRAMP.!
!
!|!3!
Table 2 POA&M Items Column Information Description
HEADERS
DETAILS
Column!A!–!POA&M!ID!
Assign!a!unique!identifier!to!each!POA&M!item.!This!can!be!in!any!format!or!naming!
convention!that!produces!uniqueness,!but!FedRAMP!recommends!the!convention!V-
<incremented!number>.!(for!example,!V-123)!
Column!B!–!Controls!
Specify!the!FedRAMP!security!control!affected!by!the!weakness!identified!during!the!
security!assessment!process.!
Column!C!–!Weakness!
Name!
Specify!a!name!for!the!identified!weakness!that!provides!a!general!idea!of!the!
weakness.!Use!the!Weakness!Name!provided!by!the!security!assessor,!or!taken!from!
the!vulnerability!scanner!that!discovered!the!weakness.!
Column!D!–!Weakness!
Description!
Describe!the!weakness!identified!during!the!assessment!process.!Use!the!Weakness!
Description!provided!by!the!security!assessor!or!the!vulnerability!scanner!that!
discovered!the!weakness.!Provide!sufficient!data!to!facilitate!oversight!and!tracking.!
This!description!should!demonstrate!awareness!of!the!weakness!and!facilitate!the!
creation!of!specific!milestones!to!address!the!weakness.!In!cases!where!it!is!necessary!
to!provide!sensitive!information!to!describe!the!weakness,!italicize!the!sensitive!
information!to!identify!it!and!include!a!note!in!the!description!stating!that!it!is!sensitive.!!
Column!E!–!Weakness!
Detector!Source!
Specify!the!name!of!the!Third!Party!Assessment!Organization!(3PAO),!vulnerability!
scanner,!or!other!entity!that!first!identified!the!weakness.!In!cases!where!there!are!
multiple!3PAOs,!include!each!one!on!a!new!line.!
Column!F!–!Weakness!
Source!Identifier!
Often!the!scanner/assessor!will!provide!an!identifier!(ID/Reference!#)!that!specifies!the!
weakness!in!question.!This!allows!further!research!of!the!weakness.!Provide!the!
identifier,!or!state!that!no!identifier!exists.!
Column!G!–!Asset!
Identifier!
List!the!asset/platform!on!which!the!weakness!was!found.!This!should!correspond!to!
the!Asset!Identifier!for!the!item!provided!in!Worksheet!3,!Inventory!List,!as!well!as!any!
applicable!network!ports!and!protocols.!Include!a!complete!Asset!Identifier!for!each!
affected!asset.!Do!not!use!an!abbreviation!or!“shorthand”.!The!CSP!may!obfuscate!the!
asset!information!when!it!is!required!by!the!internal!policies!of!the!CSP.!The!Asset!
Identifier!must!be!unique!and!consistent!across!all!POA&M!documents,!3PAOs,!and!any!
vulnerability!scanning!tools.!See!Section!2.3!for!formatting!requirements.!
Column!H!–!Point!of!
Contact!
Identify!the!person/role!that!the!AO!holds!responsible!for!resolving!the!weakness.!The!
CSP!must!identify!and!document!a!Point!of!Contact!(POC)!for!each!reported!weakness.!
Column!I!–!Resources!
Required!
Identify!any!cost!associated!with!resolving!the!weakness!and!provide!an!estimated!staff!
time!in!hours.!
Column!J!–!Overall!
Remediation!Plan!
Provide!a!high-level!summary!of!the!actions!required!to!remediate!the!plan.!In!cases!
where!it!is!necessary!to!provide!sensitive!information!to!describe!the!remediation!plan,!
italicize!the!sensitive!information!to!identify!it!and!include!a!note!in!the!description!
stating!that!it!is!sensitive.!
Column!K!–!Original!
Detection!Date!
Provide!the!month,!day,!and!year!when!the!weakness!was!first!detected.!This!should!be!
consistent!with!the!Security!Assessment!Report!(SAR)!and/or!any!continuous!
monitoring!activities.!The!CSP!may!not!change!the!Original!Detection!Date.!
Column!L!!–!Scheduled!
Completion!Date!
The!CSP!must!assign!a!completion!date!to!every!weakness!that!includes!the!month,!day,!
and!year.!The!Scheduled!Completion!Date!column!must!not!change!once!it!is!recorded.!!
!
!|!4!
HEADERS
DETAILS
Column!M!–!Planned!
Milestones!
Each!weakness!must!have!a!milestone!entered!with!it!that!identifies!specific!actions!to!
correct!the!weakness!with!an!associated!completion!date.!Planned!Milestone!entries!
shall!not!change!once!they!are!recorded.!
Column!N!–!Milestone!
Changes!
List!any!changes!to!existing!milestones!in!Column!M,!Planned!Milestones!in!this!column.!
Column!O!–!Status!
Date!
This!column!should!provide!the!latest!date!an!action!was!taken!to!remediate!the!
weakness!or!some!change!was!made!to!the!POA&M!item.!
Column!P!–!Vendor!
Dependency!
This!column!should!specify!whether!the!remediation!of!the!weakness!requires!the!
action!of!a!third!party!vendor.!Should!a!weakness!be!vendor!dependent,!a!monthly!
update!with!the!third!party!vendor!is!required.!In!these!cases,!the!weakness!cannot!be!
remediated,!and!the!POA&M!item!cannot!be!closed,!but!the!completion!date!may!be!
extended!if!a!monthly!update!is!made.!If!the!completion!date!is!extended,!provide!an!
update!in!Column!N,!Milestone!Changes.!Once!a!patch!is!available,!the!CSP!has!30!days!
to!remediate!high!vulnerabilities!and!90!days!to!remediate!moderate!vulnerabilities!
according!to!FedRAMP!standards.!This!timeframe!begins!on!the!date!that!the!patch!is!
released.!The!CSP!must!include!the!patch!release!date!in!column!Z!(comments).!In!this!
case,!the!CSP!may!overwrite!the!auto-calculated!scheduled!completion!date!found!in!
column!L.!
Column!Q!–!Last!
Vendor!Check-in!Date!
If!the!remediation!of!the!weakness!is!dependent!on!a!third!party!vendor’s!action,!as!
specified!in!Column!P,!Vendor!Dependency;!a!monthly!update!with!the!third!party!
vendor!is!required.!Provide!the!date!that!the!latest!update!was!made.!
Column!R!–!Vendor!
Dependent!Product!
Name!
If!the!remediation!of!the!weakness!is!vendor!dependent,!provide!the!name!of!the!
product!for!which!the!third!party!vendor!has!responsibility.!
Column!S!–!Original!
Risk!Rating!
Provide!the!original!risk!rating!of!the!weakness!at!the!time!it!was!identified!as!part!of!an!
assessment!and/or!continuous!monitoring!activities.!
Column!T!–!Adjusted!
Risk!Rating!
Provide!the!adjusted!risk!rating!when!a!Deviation!Request!Form!is!submitted.!If!no!risk!
adjustment!is!made,!state!N/A.!In!the!case!that!the!scanner!changes!its!risk!rating!from!
a!lower!to!higher!risk!rating,!the!CSP!may!update!this!column!and!set!column!U!to!“Yes.”!
No!deviation!request!form!is!necessary!in!this!case.!!
Column!U!–!Risk!
Adjustment!
State!the!status!of!the!risk!adjustment!request.!CSP!determination!of!a!risk!adjustment!
will!cause!this!column!to!be!set!to!“pending”.!The!adjustment!is!finalized!(setting!the!
Risk!Adjustment!to!“yes”)!if!it!is!approved!by!the!AO.!Approved!risk!adjustments!may!
alter!the!scheduled!completion!date.!
Column!V!–!False!
Positive!
State!the!status!of!the!weakness!deviation!request!for!false!positive.!A!False!Positive!
(FP)!occurs!when!a!vulnerability!is!identified!that!does!not!actually!exist!on!the!system.!
For!example,!a!vulnerability!scanner!may!incorrectly!identify!a!weakness!that!is!not!
installed,!or!not!completely!identify!a!recent!system!update.!Either!the!scanner!is!
incorrect,!or!it!has!not!found!a!completed!system!update.!A!false!positive!means!the!
weakness!is!determined!to!be!non-existent!and!is!a!false!positive!provided!by!the!
vulnerability!scanner.!A!CSP!determination!of!a!false!positive!will!cause!this!column!to!
be!set!to!“pending”,!the!deviation!is!finalized!(setting!the!status!to!“yes”)!if!it!is!
approved!by!the!AO.!Approved!false!positives!can!also!be!closed,!see!Section!2.2!for!
guidance!on!closing!a!POA&M!item.!
!
!|!5!
HEADERS
DETAILS
Column!W!
Operational!
Requirement!
State!the!status!of!the!weakness!deviation!request!for!operational!requirement.!An!
Operational!Requirement!(OR)!means!that!there!is!a!weakness!in!the!system!that!will!
remain!an!open!vulnerability!that!cannot!be!corrected!without!impacting!the!full!
operation!of!the!system.!An!OR!is!also!an!open!vulnerability!that!could!be!exploited!
(regardless!of!the!limited!opportunity!for!exploitation),!such!as!a!component!that!is!
installed!but!not!enabled.!A!CSP!determination!of!an!operational!requirement!will!cause!
this!column!to!be!set!to!“pending”,!the!deviation!is!finalized!(setting!the!status!to!yes”)!
if!it!is!approved!by!the!AO.!Approved!operational!requirements!remain!on!Worksheet!1,!
POA&M!Template,!and!are!to!be!periodically!reassessed!by!the!CSP.!
Column!X!–!Deviation!
Rationale!
Provide!a!rationale!for!the!various!weakness!deviations!requested,!including!mitigating!
factors!and!compensating!controls!that!address!the!specific!risk!to!the!system.!For!False!
Positives,!include!information!about!evidence/artifacts!that!support!the!result.!
Column!Y!–!Supporting!
Documents!
List!any!additional!documents!that!are!associated!with!the!POA&M!item.!
Column!Z!–!Comments!
Provide!any!additional!comments!that!have!not!been!provided!in!any!of!the!other!
columns.!
!
2.2. WORKSHEET 2: CLOSED POA&M ITEMS
The!Closed!POA&M!Items!worksheet!contains!similar!basic!system!information!as!the!top!of!
Worksheet!1,!Open!POA&M!Items.!The!remainder!of!the!document!should!contain!the!POA&M!
items!that!are!completed.!The!details!will!reflect!almost!all!of!the!information!provided!in!the!
Open!POA&M!Items!worksheet;!however!Column!O,!Status!Date,!needs!to!be!updated!to!the!
date!of!completion.!
To!“close”!a!POA&M!item,!update!the!date!in!Column!O,!Status!Date!and!move!the!POA&M!
item!to!Worksheet!2,!Closed!POA&M!items.!
A!POA&M!item!can!be!moved!to!the!Closed!POA&M!Items!when!either!of!the!following!occurs:!!
§ All!corrective!actions!have!been!applied!and!evidence!of!mitigation!has!been!provided.!
Evidence!of!mitigation!can!be!verification!by!a!3PAO,!a!targeted!vulnerability!scan!that!
covers!the!weakness!domain,!the!following!continuous!monitoring!scans,!etc.!!
§ A!false!positive!request!was!submitted!and!approved!by!the!AO.!
2.3. INTEGRATED INVENTORY WORKBOOK
As!indicated!above,!CSPs!may!append!their!current!Integrated"Inventory"Workbook"Template!(a!
separate!FedRAMP!Template)!as!an!additional!worksheet!(worksheet!3)!within!the!POA&M"
Template!or!may!retain!the!Integrated"Inventory"Workbook"Template!as!a!separate!document,!
as!desired.!While!the!Integrated"Inventory"Workbook"Template!is!initially!submitted!and!
!
!|!6!
referenced!in!the!SSP/SAP/SAR!and!other!applicable!documents!as!part!of!the!initial!
assessment,!it!must!be!updated!and!submitted!regularly!with!the!POA&M,!as!part!of!
continuous!monitoring!in!accordance!with!the!FedRAMP"Continuous"Monitoring"Strategy"&"
Guide.!!Please!see!the!Integrated"Inventory"Workbook"Template!for!instructions!on!completing!
and!updating!the!inventory!of!system!assets.!
The!FedRAMP"Integrated"Inventory"Workbook"Template!can!be!found!on!the!following!
FedRAMP!website!page:!Templates.!
!
3. GENERAL REQUIREMENTS
POA&Ms!must!include!all!known!security!weaknesses!within!the!cloud!information!system.!!
POA&Ms!must!comply!with!the!following:!
§ Use!the!POA&M"Template!to!track!and!manage!POA&Ms.!
§ If!a!finding!is!reported!in!the!SAR!and/or!in!the!continuous!monitoring!activities,!the!
finding!must!be!included!as!an!item!on!the!POA&M.!
§ All!findings!must!map!back!to!a!finding!in!the!SAR!and/or!any!continuous!monitoring!
activities!
§ False!positives!identified!in!the!SAR!(Appendices!C,!D,!and!E),!along!with!supporting!
evidence!(for!example,!clean!scan!report)!do!not!have!to!be!included!in!the!POA&M.!
§ Each!line!item!on!the!POA&M!must!have!a!unique!identifier.!This!unique!identifier!
should!pair!with!a!respective!SAR!finding!and/or!any!continuous!monitoring!activities.!
§ All!high!and!critical!risk!findings!must!be!remediated!prior!to!receiving!a!Provisional!
Authorization.!
§ High!and!critical!risk!findings!identified!following!Provisional!Authorization!through!
continuous!monitoring!activities!must!be!mitigated!within!30!days!after!identification.!
§ Moderate!findings!shall!have!a!mitigation!date!within!90!days!of!Provisional!
Authorization!date!or!within!90!days!of!identification!as!part!of!continuous!monitoring!
activities.!
§ The!POA&M!must!be!submitted!in!an!appropriate!format!for!the!FedRAMP!automated!
processes.!See!the!example!row!in!the!POA&M"Template.!
!
Note:&"The"POA&M"Spreadsheet"has"problems"with"data"validation"in"the"Mac"version"of"
Microsoft"Office."Disabling"macros"should"prove"to"be"a"sufficient"work-around."
!
!
!|!7!
APPENDIX A: FedRAMP ACRONYMS
!
The! master! list! of! FedRAMP! acronym! and! glossary! definitions! for! all! FedRAMP! templates! is!
available!on!the!FedRAMP!website!Documents!page!under!Program!Overview!Documents.!
(https://www.fedramp.gov/resources/documents-2016/)!
Please!send!suggestions!about!corrections,!additions,!or!deletions!to!info@fedramp.gov.!
!
!
!
!