USER’S MANUAL Solar Pump Inverter 2.2kw LS
User Manual: Pdf Solar pump inverter 2.2kw LS manual
Open the PDF directly: View PDF
.
Page Count: 22
| Download | |
| Open PDF In Browser | View PDF |
User Manual 2.2KW LS (Low PV Input Range) Solar Inverter for Water Pump Version: 1.1 Table Of Contents ABOUT THIS MANUAL ...................................................................................................................................... 1 Purpose ............................................................................................................................................................ 1 Scope ............................................................................................................................................................... 1 SAFETY INSTRUCTIONS................................................................................................................................... 1 Inspection ......................................................................................................................................................... 1 Installation ........................................................................................................................................................ 1 Operation ......................................................................................................................................................... 2 Maintenance .................................................................................................................................................... 2 INTRODUCTION ................................................................................................................................................. 3 Features ........................................................................................................................................................... 3 Basic System Architecture ............................................................................................................................... 3 Product Overview ............................................................................................................................................. 4 INSTALLATION ................................................................................................................................................... 5 Unpacking and Inspection................................................................................................................................ 5 Preparation ...................................................................................................................................................... 5 Mounting the Unit ............................................................................................................................................. 5 PV Connection ................................................................................................................................................. 6 AC Input Connection ........................................................................................................................................ 7 AC Output (Motor) Connection ........................................................................................................................ 8 Final Assembly ................................................................................................................................................. 9 Remote Communication Connection ............................................................................................................. 10 Control Signal Connection (Optional) ............................................................................................................ 10 COMMISSIONING ............................................................................................................................................. 11 OPERATION ...................................................................................................................................................... 12 Power ON/OFF .............................................................................................................................................. 12 Operation and Display Panel ......................................................................................................................... 12 Parameter Setting .......................................................................................................................................... 13 Fault and Warning Code ................................................................................................................................. 18 Fault Reference Code .................................................................................................................................... 18 Warning Reference Codes ............................................................................................................................. 19 SPECIFICATIONS ............................................................................................................................................. 20 ABOUT THIS MANUAL Purpose This manual describes the assembly, installation, operation and troubleshooting of this unit. Please read this manual carefully before installations and operations. Keep this manual for future reference. Scope This manual provides safety and installation guidelines as well as information on tools and wiring. SAFETY INSTRUCTIONS WARNING: This chapter contains important safety and operating instructions. Read and keep this manual for future reference. Inspection If missing components or damaged inverter is found after receiving, please do NOT install or operate it. Otherwise, it may cause human injury or equipment damage. Installation 1. Before installation, please make sure if the voltage range of PV panel and AC input voltage range meet the requirement. 2. Check if all wires are firmly connected without short circuit. Otherwise, it will cause equipment damage. 3. Do NOT install this inverter under direct sunlight because high temperature may cause equipment damage. 4. Please install the inverter away from inflammable and explosive objectives. Please ensure no liquid can enter the inverter. 5. Please install the inverter on metal non-combustible surface. 1. CAUTION!! Only qualified personnel can install and operate this inverter. 2. To reduce risk of electric shock, disconnect power source before making wire connection. Otherwise, it may cause electrical shock. 3. To reduce risk of electric shock, NEVER touch any terminals on electric circuits. 1 Operation 1. Only after wire connection is complete and put cover back to the inverter, it’s ok to do commissioning. Otherwise, it will cause electric shock 2. If sunlight is sufficient but little water is pumped, maybe the wires on motor connection are reversely connected. Please reverse any two wires of them. 3. When testing water pump, be sure to install water pump at appropriate water level. Never allow water pump in dry running. Otherwise, the inverter will activate protection. Maintenance 1. Only qualified personnel can maintain, repair, inspect the inverter and replace any components. 2. It may still contain energy after disconnecting power source for 10 minutes. Only service the unit after the bus voltage is within safe range. 2 INTRODUCTION Interest in renewable energy has increased over the past few years due to solar power becoming more cost effective and eco-friendly. This is a solar inverter which allows power to be switched from the DC power obtained from solar panels to the AC power needed to control the pump. With the renewable solar inverter, pumps can adapt to solar power sources rather than traditional electrical supplies or generators. This solar inverter is built-in with MPPT solar charger to maximize solar power. Besides, it is easy to install with low maintenance cost. It becomes an eco-friendly solution for the rural areas where grid power is expensive and unreliable. Besides, this inverter also accepts single-phase AC input. It allows the inverter to automatically switch between PV power and AC utility to guarantee water pump operation during night time. Features Built-in MPPT solar charger Supports single-phase asynchronous motor or three-phase asynchronous motor Built-in full protection and self-diagnosis Soft start function prevents water hammer effect and extends system lifecycle Comprehensive LCD and LEDs display real-time system status Remote monitoring through RS-485 Supports single-phase AC input. When PV energy is not sufficient, the inverter will automatically switch to AC input. Optional remote panel is available. Basic System Architecture This solar inverter is specially designed to power water pump. The following illustration shows basic application for this inverter. It also includes PV modules and remote float switches to have a complete running system. 3 Product Overview 1. PV input 2. Single-phase AC input 3. AC output 4. RS-485 communication port 5. RS-232 communication port 6. Signal control slot 7. Display screen (Refer to Operation and Display Panel for the details) 8. LED indicators (Refer to Operation and Display Panel for the details) 9. Operation buttons (Refer to Operation and Display Panel for the details) 4 INSTALLATION Unpacking and Inspection Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You should have received the following items inside of package: The unit x 1 User manual x 1 RJ45 cable x 1 RS-232 cable x 1 Preparation Before connecting all wirings, please take off bottom cover by removing two screws as shown below. Mounting the Unit Consider the following points before selecting where to install: Do not mount the inverter on flammable construction materials. Mount on a solid metal surface. Avoid direct sunlight. Be sure the environment is shady and cool. Be sure to install the inverter into a box with waterproof and dustproof. Install this inverter at eye level in order to allow the LCD display to be read at all times. The recommended installation position is to be adhered to the wall vertically. Be sure to keep other objects and surfaces as shown in the diagram to guarantee sufficient heat dissipation and to have enough space for removing wires. SUITABLE FOR MOUNTING ON CONCRETE OR OTHER NON-COMBUSTIBLE SURFACE ONLY. 5 1. Drill four holes in the marked locations with four 2. Install the unit by screwing four screws. It’s recommended to use M5 screws. screws. PV Connection CAUTION: Before connecting to PV modules, please install separately a DC circuit breaker between inverter and PV modules. The recommended spec of DC breaker is C16A/2P/750VDC/20KA for 2.2KW LS. NOTE: It’s required to install PV combiner box when using several PV modules in parallel and series. CAUTION: Important Before making PV connection, be sure to do the following actions to prevent human injury or machine damage. 1. It’s required to turn off circuit breaker. 2. Make sure connect positive pole (+) of PV input connector in inverter to positive pole (+) of PV modules and negative pole (-) of PV input connector in inverter to negative pole (-) of PV modules. PV Module Selection: When selecting proper PV modules, please be sure to consider below parameters: 1. Open circuit Voltage (Voc) of PV modules not exceeds max. DC voltage (450VDC). 2. Accumulated voltage of connected PV panels should be close to 330V for inverter with 220V output voltage. To calculate PV module numbers in series (N) and in parallel (M), please follow below formula: For three-phase output: Imp>Po/(Kvo x 0.9 x M) For single-phase output, please use 2 times of PV power rating. Imp>2 x Po/(Kvo x 0.9 x M) Po represents the rated output power. Kvo is equal to 330V/345V/360V for 220V/230V/240V output voltage respectively. Maximum PV module numbers in series (N) > 330 / Vmp We strongly recommend the total PV Vmp is around 330Vdc to get the optimum MPPT output. 6 Below are popular solar panel specifications in the market: A. 75-A: 75W, Vmp=17.46V, Imp=4.3A, Voc=21.96V B. 75-B: 75W, Vmp=13.3V, Imp=5.64A, Voc=16.94V C. 140-A: 140W, Vmp=17.9V, Imp=7.82A, Voc=22.0V D. 250-A: 250W, Vmp=30.64, Imp=8.16A, Voc=37.38V Output type PV Panel 75-A PV Panel 75-B PV Panel 140-A PV Panel 250-A Three-phase output 19 pieces in Series x 2 Strings (2850W PV Panels) 25 pieces in Series x 2 Strings (3750W PV Panels) 19 pieces in Series (2660W PV Panels) 11 pieces in Series (2750W PV Panels) Single-phase output 19 pieces in Series x 4 Strings (5700W PV Panels) 25 pieces in Series x 3 Strings (5625W PV Panels) 19 pieces in Series x 2 Strings (5320W PV Panels) 11 pieces in Series x 2 Strings (5500W PV Panels) Please follow below steps to implement PV module connection: 1. Remove insulation sleeve 10 mm for positive and negative conductors. 2. Check correct polarity of connection cable from PV modules and PV input connectors. Then, connect positive pole (+) of connection cable to positive pole (+) of PV input connector. Connect negative pole (-) of connection cable to negative pole (-) of PV input connector. 3. Make sure the wires are securely connected. AC Input Connection CAUTION: Before connecting to AC power source, please install a separate AC circuit breaker between inverter and AC utility. It’s recommended to use 25A/2P/230V/4500A circuit breaker. CAUTION: Important Before making AC input connection, be sure to do the following actions to prevent human injury or machine damage. 1. It’s required to turn off circuit breaker. 2. Make sure to connect single-phase AC input to the L & N input connectors in inverter. Recommended terminal types: 7 Suggested cable requirement: Model Typical Wire size Amperage Terminal Dimensions d (mm) 2.2KW LS Torque Value 22A 11 AWG 4.5 D (mm) 9.5 1.3 ~ 1.4 Nm Please follow below steps to implement AC input connection: 1. Before making AC input connection, be sure to disconnect all circuit breakers or disconnectors first. 2. Remove insulation sleeve 10mm for two conductors. And shorten phase L and neutral conductor N 3 mm. 3. Insert AC input wires according to polarities indicated on terminal block and tighten the terminal screws. L→LINE (brown or black) N→Neutral (blue) 4. Make sure the wires are securely connected. AC Output (Motor) Connection WARNING! All wiring must be performed by a qualified personnel. WARNING! It's very important for system safety and efficient operation to use appropriate cable for AC output connection. To reduce risk of injury, please use the proper recommended terminal and cable size as below. Recommended terminal types: Suggested cable requirement: Model Typical Wire size Amperage Terminal Dimensions d (mm) 2.2KW LS 15A Torque Value 13 AWG 4.5 D (mm) 9.5 1.3 ~ 1.4 Nm Please follow below steps to implement AC output connection: 1. Remove insulation sleeve 10mm for two conductors if applying single-phase output or three conductors if applying three-phase output. And shorten these conductor 3 mm. 2. Please follow below steps to complete output wire connection. 8 Single-phase motor connection If applying for single-phase output application, please connect AC output U and W terminals to single-phase motor as shown below: Three-phase motor connection NOTE: If sunlight or AC input is normal, but little water is pumped, maybe the output wires on motor connection are reversely connected. Please reverse any two wires of them. International standards for motor lead wire US Black (BLK) Red (RED) Yellow (YEL) Ground (GND) International Gray (GRY) Black (BLK) Brown (BRN) Ground (GND) 3. Make sure the wires are securely connected. 4. Make sure the control setting is matching the real wiring application. Final Assembly After connecting all wirings, please put bottom cover back by screwing two screws as shown below. 9 Remote Communication Connection WARNING: Please do NOT mis-connect the wires between RJ45 and RS485/RS-232 converter. First, please use one RS485 to RS 232 converter as media converter between inverter and computer. Please follow below chart for wiring connection between RS485 on the inverter and media converter. It’s necessary to connect to the utility as power source for the media converter. Then, use supplied RS-232 cable to connect to converter and computer. After wiring is complete, the media converter will light on and any data transmission occurs, the indicators for RXD and TXD will flash. Control Signal Connection (Optional) There are 7 ports in control signal connection. 2-port on the right side is to power supply for remote panel. 5-port on the left side is to detect water level to prevent water pump from dry running and water tank from overflow/underflow. Power Supply for Remote Panel If using remote panel, please connect these two ports to supply power for remote panel. Please follow user manual of remote panel for the detailed wire connection. Remote float switch Detection Control Signal Port: Internal circuit: 10 Signal Port Status Signal Water level status Normal Level Low Level High Level Remote Float Switch (1) S1 S2 Remote Float Switch (2) S3 Open Close Open Open Open Close Close Open n/a Remote float switch (1): It’s to prevent water tank overflow or underflow by sensing a remote float switch in water tank. When water level is normal, it will keep DI1 & COM2 and DI2 & COM2 in open status. When water level is high in water tank, it will receive high-level signal (open status on DI1 & COM2 and closed status on DI2 & COM2) from float switch and stop the inverter. When water tank is in low level, it will receive low-level signal (closed status on DI1 & COM2 and open status on DI2) from float switch and start up the inverter. This action is only available when the auto turn-on function is enabled. If the water level is normal, DI1 and COM2 are normally in open status. Remote float switch (2): It’s to prevent the water pump dry running by connecting to remote float switch. The length of connecting wire should not longer than 50m. If the water level is normal in the well, COM1 and DI3 (S3) is kept in normal close status. If the water level is low in the well, COM1 and DI3 (S3) will be open status. If open status is detected for COM1 and DI3 (S3), the inverter will automatically shut down in two seconds and show alarm. If closed status is detected for COM1 and DI3 (S3) again, the inverter will automatically turn on in two seconds and clear the alarm. And this automatic turn-on action only be effective when program P4.01 is set up as “1”. If this port is not connected to water level probe, be sure to connect COM1 and DI3 together. It’s default setting from factory. COMMISSIONING Step 1: Check the following requirements before commissioning: Ensure all wires are firmly and correctly connected Use a megger to check insulation of motor and wires Check if the open circuit DC voltage of PV module meets requirement Step 2: Switch on DC breaker or AC breaker and provide power to the inverter. Then, LCD screen will show 0.00. Please set up the parameters of the inverter such as rated power, rated frequency, rated current and rated voltage. For the detailed setting, please check “Parameter setting” section in Operation chapter. Step 3: Press “RUN” button to activate the inverter. If the output frequency or water yield is low, it may be wrong for output wire connection. Please exchange any two wires connected to the motor. Please be sure the output frequency and water yield are normal. It means the wire connection is correct and complete. 11 OPERATION Power ON/OFF Once the unit has been properly installed, simply press “RUN” button (located on the button area) to turn on the unit. Operation and Display Panel The operation and display panel, shown in below chart, is on the top case of the inverter. It includes four indicators, six function buttons and a display screen, indicating the operating status and input/output power information. LED indicators Display screen Function buttons LED Indicator LED Indicator Messages Hz Green Solid On Output frequency value is displayed on the LCD screen. A Green Solid On Output current value is displayed on the LCD screen. V Green Solid On Output voltage value is displayed on the LCD screen. A and V Green Solid on Output power value is displayed on the LCD screen. Green Solid on The inverter is running. Green OFF STOP/RUN The inverter stops. NOTE: After the inverter is powered on, LED display will show following information in turns: current output frequency, current output voltage, current output current, current PV voltage and current output power. After the inverter is powered off, LED display will still show output frequency until it’s 0. 12 Function Buttons Function Button ESC/PROG ENTER RUN STOP/RST Description To enter or exit setting mode. To confirm the selection/value in setting mode. To turn on the unit, press this button for at least 1 second. To turn off the unit, press this button for at least 1 second. To reset fault message, press this button for at least 1 second. To increase the setting value. To decrease the setting value. and ENTER Press these two buttons at the same time to move cursor location. Parameter Setting The entire display setting program structure is demonstrated as below chart. 13 Parameter setting procedure for water pump Operation steps Screen Display 1. Press “ESC/PROG” button for 500ms. Then, it will display “P0” in display screen. 2. Press “ENTER” button for 500ms, display screen will show as in the right chart. 3. Press “ENTER” button again to start to set up rated power of the water pump. Press “ENTER” and “DOWN” buttons to switch cursor location. Press “UP” or “DOWN” button to change value for rated power. Until it shows correct rated power, please press “ENTER” button to confirm the setting. 4. Press “UP” button for 500ms to switch to P0.01 program. 5. Press “ENTER” button to be able to set up rated frequency. Press “ENTER” and “DOWN” buttons to switch cursor location. Them, press “UP” or “DOWN” button to change value for nominal frequency. Until it shows correct nominal frequency, please press “ENTER” button to confirm the setting. 6. Press “UP” button for 500ms to switch to P0.02 program. 14 7. Press “ENTER” button to be able to set up nominal voltage of the water pump. Press “ENTER” and “DOWN” buttons at the same time to switch cursor. Then, press “UP” or “DOWN” button to change value for nominal voltage. Until it shows correct nominal voltage, please press “ENTER” button to confirm the setting. 8. Press “UP” button for 500ms to switch to P0.03 program. 9. Press “ENTER” button to be able to set up nominal current of the water pump. Press “ENTER” and “DOWN” buttons to switch cursor location. Then, press “UP” or “DOWN” button to change value for nominal current. Until it shows correct nominal current, please press “ENTER” button to confirm the setting. 10. Then, all parameters of water pump are set up completely. Press “ESC/PROG” button to return to P0 level. Please press “ESC/PROG” button again for 1 second to return to main interface. 11. Set up output setting to match the real wiring. P5.00 for setting single-phase output or three-phase output. 12. Turn on the inverter by pressing “RUN” button. Then, RUN/STOP LED will light up and display screen will show inverter information in turns. CAUTION: Before turning on the inverter, be sure to the wiring connection is matching the P5.00 setting. Otherwise, it will cause damage on the motor. NOTE: If it’s requested to have the inverter is automatically turned on every morning, please set up program P4.01 as “1” in standby mode. 15 Parameter Setting Table 〇: This parameter can be modified no matter the inverter is in operation or off status. ◎: This parameter can be modified only when inverter is turned off and it shows 0.00 Hz in display screen. Program # P0.00 P0.01 Description Nominal power Nominal frequency Setting Range Unit P0 Parameter settings for the motor Default Value Note 10-2200 W 2200 ◎ 50/60 Hz 50 ◎ P0.02 Nominal voltage 187-264 V 220 ◎ P0.03 Nominal current 0.1-60 A 14 ◎ Hz 50 ◎ Hz 10 ◎ P0.04 P0.05 Upper limit for frequency Low Setting value in P0.05 – setting value in P0.01 limit for frequency 6 – setting value in P0.04 P1 Over-current device on the motor and torque increasing P1.00 P1.01 P1.02 P1.03 A multiple of Maximum 10-200 current limit Kp for for 110 nominal current 〇 max. current control Ki % max. current control 60S overload protection 50-6000 None 1000 〇 5-1000 None 100 〇 110-250 % 150 ◎ 110-250 % 250 ◎ 0-10 % 0 Overload P1.04 protection on motor Voltage P1.05 for torque increasing Percentage of nominal voltage P2 DC battery voltage setting P2.00 Over DC voltage protection Under P2.01 P2.01 - 450 DC voltage protection P2.02 PV reference voltage Setting value in 90 – Setting value in P2.00 V 450 ◎ V 90 ◎ V 330 〇 Setting value in P2.01 – setting value in P2.00 16 Program # Description Setting Range Unit Default Value Note P3 Protection setting for the inverter of the water pump P3.00 P3.01 P3.02 P3.03 P3.04 P3.05 P3.06 Sleep mode while PV energy is weak Sleep mode for dry running Allow dry pumping duration Over temperature fault on inverter Over 10-3600 S 120 〇 10-7200 S 1200 〇 1-3600 S 5 〇 °C 85 ◎ °C 75 〇 1-3600 S 20 ◎ 1-3600 S 20 ◎ setting value in P3.04 ~ 100 temperature 10 ~ setting value in warning on inverter Acceleration P3.03 time for time for motor Deceleration motor P4 Inverter operation mode setting 0:Disable. P4.00 P4.01 MPPT function enable/disable Auto turn-on Control PV voltage in setting value of None 1 ◎ None 0 ◎ None 0000 ◎ None 1 〇 None 0 ◎ P2.02 1:Enable 0:Disable 1:Enable P5 Output setting Three-phase or P5.00 single-phase output setting P5.01 P5.02 Remote monitored device ID setting Restore to default setting 0000: Single-phase output 1111: Three-phase output 1 ~ 247 0:No 1:Yes 17 Fault and Warning Code All fault and warning codes can be reset by pressing “RST” button except for A07 and A11. When faults or warning occur, press “RST” button and the inverter will enter standby mode. Please press “RUN” button to turn on the inverter for operation again. After A02 or A03 warning occurs, the inverter will auto restart operation after a period of sleep mode. If pressing “RST” button during sleep mode, please be sure to press “RUN” button again for operation. Fault Reference Code Fault code E01 E02 E03 Fault type Time out for BUS soft start Soft start relay fault Over voltage in output E04 Over current in output E05 E06 Output voltage RMS High High PV voltage E07 Current unbalance E09 Over Temperature E10 Over current. E11 Instantaneous Bus voltage over E12 E13 E14 E15 Current detect fault Output voltage detect fault NTC0 no connect NTC1 no connect E16 E17 E18 Output setting is wrong. AC input relay fault. Bus voltage over 450 VDC Possible Cause The resistor of soft start is broken. The soft start relay is broken. 1. Inverter control is abnormal. 2. Detection is interfered. 1. Output short circuited. 2. The motor is suddenly locked. 3. The motor is abnormal. Inverter control is abnormal. 1. PV input voltage is too high. 2. There is something wrong with voltage detection circuit. 1. Output phase loss 2. Output wire is short to the earth. 3. The motor is abnormal. 1. IGBT temperature is too high 2. The wire of IGBT temperature detection is not connected. 1. Output short circuited. 2. The motor is suddenly locked. 3. Inverter connects to single phase motor but LCD output setting is three-phase output. 1. Pump intrusion. 2. PV voltage is too high. Current detection circuit is abnormal. Voltage detection circuit is abnormal. Heatsink detected wire is not connected. Environment temperature detected wire is not connected. P5.00 parameter setting is wrong. AC input relay is broken. 1. PV voltage is too high. 2. AC input voltage is too high. 18 Warning Reference Codes Warning code A01 Warning type PV input voltage is too low. A02 A03 A04 Weak sunlight Dry running Motor over-temperature protection. A05 Output overload protection A06 A07 A08 A09 EEPROM error IGBT over temperature warning Over temperature warning Over temperature A10 Wrong parameter setting in the motor. Water tank is full. Water tank is dry. Well is dry. Password verification is not complete. AC input voltage loss Startup on single-phase output fails. A11 A12 A13 A14 A15 A16 A17 Inverter overload protection. 19 Possible Cause 1. PV input voltage is too low. 2. Sunlight is too weak. Sunlight is too weak Water level in the well is low. 1. The motor is suddenly locked. 2. The pump head is too high. 3. Wrong current setting on the motor. 1. The motor is suddenly locked. 2. Wrong current setting on the motor. 3. Inverter connects to three-phase motor but LCD output setting is single phase output. There is something wrong with EEPROM circuit. Over temperature on IGBT. Over temperature warning 1. Environment temperature is beyond the upper limit. 2. The wire of environment temperature detection is not connected. Wrong parameter setting in the motor. Water tank is full. No water or water in low level in the water tower. No water or water in low level in the well. No password is set up. AC input voltage is abnormal. PV power is lower than specification. 1. If this warning occurs, if AC power input is available, the inverter will switch to AC power input for 30 minutes. After 30 minutes, the inverter will switch back to PV input. If there is no AC power input available, the inverter will be in standby mode for 30 minutes and then re-start up. If the sun is strong and this warning code keeps alarm, please increase your PV module no. 2. Increase PV power. Output power is beyond the nominal output power of the inverter. SPECIFICATIONS MODEL 2.2KW LS Rated Output Power 2200 W Power grid or AC generator input 220/230/240V(1PH) Nominal voltage (-15%~+10%) Frequency range 47-63Hz PV INPUT (DC) Nominal DC Voltage / Maximum 320 VDC / 450 VDC DC Voltage Start-up Voltage 120VDC MPPT Voltage Range 120 VDC ~ 420VDC Number of MPP Trackers 1 AC OUTPUT Nominal Voltage 220/230/240V VAC Efficiency Nominal Output Current Motor Type > 97% 14 A 10 A Single-phase motor Three-phase asynchronous motor Frequency Precision ± 0.2% PROTECTION Phase lost, dry pumping, motor locked, weak sunlight, over-voltage, Full Protection under-voltage, over-current, surge, over-temperature and short circuit protection PHYSICAL Dimension, D X W X H (mm) 110 x 230 x 342 Net Weight (kgs) 5 Type of Mechanical Protection IP20 INTERACE Communication Port RS-232/RS-485 ENVIRONMENT Humidity Operating Temperature < 95% RH (No condensing) -20°C~45°C at 100% full load, 20 46°C~60°C power derating
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.6 Linearized : Yes Encryption : Standard V4.4 (128-bit) User Access : Print, Extract, Print high-res Author : e2017256 Create Date : 2017:11:01 17:59:59+08:00 Modify Date : 2017:11:02 10:02:33+08:00 Language : zh-TW Tagged PDF : Yes XMP Toolkit : Adobe XMP Core 5.2-c001 63.139439, 2010/09/27-13:37:26 Format : application/pdf Creator : e2017256 Title : USER’S MANUAL Creator Tool : Microsoft® Word 2013 Metadata Date : 2017:11:02 10:02:33+08:00 Producer : Microsoft® Word 2013 Document ID : uuid:d6caed3c-f940-4e0d-a03e-514735f50c57 Instance ID : uuid:86af36f7-ebc9-4707-a2bb-f2be0a1974ad Page Count : 22EXIF Metadata provided by EXIF.tools