Pella 803V0102 Users Manual

803V0102 803V_F2

803V0102 to the manual 77d9c8e9-d79e-40c4-9c37-ac4991d8ba0c

2015-02-06

: Pella Pella-803V0102-Users-Manual-517850 pella-803v0102-users-manual-517850 pella pdf

Open the PDF directly: View PDF PDF.
Page Count: 12

Part Number: 803V0102© 2012 Pella Corporation
INSTALLATION INSTRUCTIONS
IMPERVIA® SLIDING PATIO DOOR WITH FINS
Installation Instructions for Typical Wood Frame Construction.
These instructions were developed and tested for use with typical wood frame wall construction in
a wall system designed to manage water. These instructions are not to be used with any other
construction method. Installation instructions for use with other construction methods or multiple
units may be obtained from Pella Corporation or a local Pella retailer. Building designs, construction
methods, building materials, and site conditions unique to your project may require an installation
method different from these instructions and additional care. Determining the appropriate
installation method is the responsibility of you, your architect, or construction professional.
Sill Flashing Tape #2
Sill Flashing Tape #1
Water Resistive Barrier
Sheathing
Framing
Nailing Fin
Sill Support
Top
Flashing
Tape
Fin
Corner
Door Top
Door Bottom
Side
Flashing
Tape
Interlocker
Side
Flashing
Tape
Corner
Flashing
Tape
Corner
Flashing
Tape
REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT
Always read the Pella Impervia Limited Warranty before purchasing or installing
Pella Impervia products. By installing this product, you are acknowledging that this Limited
Warranty is part of the terms of the sale. Failure to comply with all Pella Impervia installation and
maintenance instructions may void your Pella Impervia product warranty. See Limited Warranty
for complete details on http://warranty.pellaimpervia.com.
YOU WILL NEED TO SUPPLY:
Ř Cedar or Impervious shims/spacers (12 to 20)
Ř 2" galvanized roofing nails (1/4 lb.)
Ř Closed cell foam backer rod/sealant backer
(24 to 32 ft.)
Ř Pella® SmartFlash™ foil backed butyl window
and door flashing tape or equivalent
Ř Pella Window and Door Installation Sealant or
equivalent high quality, multi-purpose sealant
(2 to 3 tubes per door)
Ř Low expansion, low pressure polyurethane
insulating window and door foam sealant
- DO NOT use high pressure or latex foams
Ř Pella aluminum sill support or 2 x 4 wood blocking
Ř Interior trim and/or jamb extensions (15 to 40 ft.)
FOR MULLION APPLICATIONS:
Ř I bar joining connector
Ř Pella silicone foam tape
Ř Mullion end plug (2)
Ř Field applied fins (4 pcs. per unit)
Ř Head drip fin (Vertical Mullion applications only)
TOOLS REQUIRED:
Ř Tape measure
Ř Level
Ř Square
Ř Hammer
Ř Stapler
Ř Hacksaw
Ř Sealant gun
Ř Scissors or Utility knife
Ř Screwdrivers
Ř (#2 Phillips with 8" shaft and small
flat blade)
Ř Rubber mallet
Ř Drill
Installation will require two or more
persons for safety reasons.
4&"-"/5
4&"-"/5
A. Confirm the opening is plumb and level.
Ensure the bottom of the rough opening does
not slope towards the interior.
Note: It is critical the bottom is level.
*OUFSJPS
"
*OUFSJPS
#
4th cut:
Make a 6" cut up from
each top corner at a 45o
angle to allow the water
resistive barrier to be lapped
over the fin at the head of
the door.
1st cut
2nd cut
3rd cut
Water Resistive Barrier
1C
B. Confirm the door will fit the opening. Measure all
four sides of the opening to make sure it is 1/2" larger
than the door in width and height. Measure the width
at the top, bottom and center. Measure the height at
the far left side, the far right side and in the center.
Note: Solid wood blocking of 1-1/2" or more is
required around the perimeter of the opening.
Fix any problems with the rough opening before
proceeding.
C. Cut the water resistive barrier.
1
ROUGH OPENING PREPARATION
1A
1B
1C
Exterior
1D
'




&

( )
D. Fold the water resistive barrier. Fold side flaps into the
opening and staple to the inside wall. Fold the top flap up
and temporarily fasten with flashing tape.
E. Apply sill flashing tape #1. Cut a piece of flashing tape 12"
longer than the opening width. Apply at the bottom of the
opening as shown so it overhangs 1" to the exterior.
Note: The tape is cut 12" longer than the width of the
opening so it will extend up each side approximately 6".
F. Tab the sill flashing tape and fold. Cut 1" wide tabs at each
corner (1/2" from each side of corner). Fold tape to the exterior
and press firmly to adhere it to the water resistive barrier.
G. Apply sill flashing tape #2. Cut a piece of flashing tape
12" longer than the opening width. Apply at the bottom,
overlapping tape #1 by at least 1". DO NOT allow the tape to
extend past the interior face of the frame.
Note: The flashing tape does not need to
extend all the way to the interior of the
framing.
H. Attach the aluminum sill support or
wood blocking to the exterior of the sill
structure to support the edge of the door
sill. The sill support should be cut the entire
length of the sill member and placed flush
with the subfloor.
A. Remove the plastic wrap and cardboard packaging from the door.
Note: If screens or hardware are removed from the door at this time, label them
and store them in a protected area.
B. OX/XO doors only: Remove the shipping spacers. Carefully slide the movable
panel halfway open and remove the spacers from both the top and bottom of the
movable panel.
TWO OR MORE PEOPLE WILL BE REQUIRED
TO HANDLE THE PANEL AND FRAME SAFELY.
C. OX/XO doors only: If the vent panel is installed in the frame, you will need to
remove the vent panel by lifting it out of the lower track and tilting the bottom of
the panel away from the door frame. Then lower the panel out of the top track.
Carefully set the panel aside.
Note: If transoms or fixed units are mulled to doors and/or fins are to be
installed to no fin units, go to the Mulling Instructions and/or Applying
Installation Fins Instructions on the back before proceeding to the next step.
1D
1E
1E
1H
1G
1
ROUGH OPENING PREPARATION (CONTINUED)
2
PREPARE THE DOOR FOR INSTALLATION
A. Place three 3/8" beads of sealant. The first bead should
be approximately 3/4" from the exterior of the rough
opening, the second 2-1/2" in from the first bead of sealant.
OX/XO doors only: Place a third bead of sealant in the
groove of the sill support or 1/4" from the exterior edge of
the wood blocking.
"
TWO OR MORE PEOPLE WILL BE REQUIRED FOR THE
FOLLOWING STEPS.
&YUFSJPS
#
B. Insert the door from the exterior of the building.
DO NOT slide the bottom of the door into the
opening. Sliding will damage the sealant lines. Place
the bottom of the door at the bottom of the
opening, then tilt the top into position.
Center the door between the sides of
the opening to allow equal clearance for
shimming, and insert one roofing nail
in the first hole from the corner on each
end of the top nailing fin (see inset).
These are used to hold the door in place
while shimming it plumb and square.
#
C. Plumb and square door. Insert shims, as necessary,
between the door and the sides of the rough
opening starting up 6" from the bottom of the door.
Keep shims back 1/2" from interior face of window.
Note: DO NOT shim above the door. DO NOT
OVER SHIM.
Interior
3C
'JYFE1BOFM
1SFESJMMFEQBOFMSFUBJOFSIPMFT
5ISFTIPME
&
D. Fasten the door to the opening
by driving 2" galvanized roofing
nails into each pre-punched hole
in the nailing fin.
E. Install roller retainers. Position and secure the two roller retainers provided by drilling
pilot holes through the pre-drilled holes into the sill support. Apply sealant to the holes
and insert screws as specified below:
Aluminum sill support: 9/64" pilot holes, # 8 x 3/4" thread-cutting screws (provided).
Wood blocking: 1/8" pilot holes, #8 x 2-1/2" flat-head wood screws (provided).
3
SETTING AND FASTENING THE DOOR
3A
3B
3B
3C
%
3D
3E
A. Apply side flashing tape. Cut two pieces of flashing tape
4" longer than the frame height of the door. Apply one
piece to each side over the nailing fin and onto the water
resistive barrier. The tape should extend 2" above the
top of the door and 2" below the bottom of the door. Press
the tape down firmly.
B. Apply top flashing tape. Cut
a piece of flashing tape long
enough to go across the top of
the door and extend at least 1"
past the side flashing tape on
both sides. Apply the tape over
the top nailing fin as shown.
Note: The tape should cover
the entire nailing fin, but not
extend onto the door frame. The
top flashing tape must overlap the side
flashing tape to prevent water from getting
behind it.
C. Fold down top flap of water resistive barrier.
D. Apply flashing tape to diagonal cuts. Cut pieces of
flashing tape at least 1" longer than the diagonal cuts
in the water resistive barrier. Apply the tape covering
the entire diagonal cut in the water resistive barrier at
both upper corners of the door.
Note: Be sure to overlap the top corners.
&YUFSJPS

#
&YUFSJPS
%
$
&YUFSJPS
"
F. Doors with vertical mullions only: Fasten the door sill
to the rough opening sill using one of the following screw
types and locations.
a. Doors using aluminum sill support: Drill a 5/32"
diameter hole 1" from each of the mulled door jambs
through the door sill and the aluminum sill support.
Place a bead of sealant in each hole and install a #10 x
3/4" self tapping flat head screw in each hole.
b. Doors on concrete: Drill a 5/32" diameter hole 1" from
each of the mulled door jambs through the door sill
and into the concrete floor. Place a bead of sealant in
each hole and install a 3/16" x 1-3/4" corrosion resistant masonry screw in each hole.
Note: The hole may be placed on either side of the track. Place the hole in the
best location to prevent the concrete from breaking at the screw location.
c. Doors with wood floors or wood sill supports: Drill a 5/32" diameter hole 1" from
each of the mulled door jambs through the door sill. Place a bead of sealant in each
hole and install a #10 x 1-1/2" corrosion resistant flat head wood screw in each hole.
3F
a
3F
b,c
3
SETTING AND FASTENING THE DOOR (CONTINUED)
4INTEGRATING THE DOOR TO THE
WATER RESISTIVE BARRIER
4A
4B
4C
4D
Caution: Ensure use of low expansion polyurethane window and door installation
foams and strictly follow the foam manufacturer’s recommendations for application.
Use of high expansive foams or improper application of the foam may cause the door
to bow and hinder operation.
A. Apply insulating foam sealant. From the interior, insert
the nozzle of the applicator approximately 1" deep into
the space between the door and the rough opening and
apply a 1" deep bead of foam. This will allow room for
expansion of the foam and will minimize squeeze out.
Apply sealant across interior surface of shims to create
a continuous seal. For windows with jamb extensions
installed, ensure the foam is placed between the
window frame and the rough opening, not between the
jamb extension and the rough opening. Follow foam
manufacturer's instructions.
Note: It may be necessary to squeeze the end of the
tube with pliers to be able to insert into the space
between the window frame and the rough opening.
DO NOT completely fill the space from the back of the
fin to the interior face of the opening.
*OUFSJPS
"
B. Check the door operation by opening and closing the door.
Note: If the door does not operate correctly, check to make sure it is still plumb, level,
square and that the sides are not bowed. If adjustments are required, remove the
foam with a serrated knife. Adjust the shims, and reapply the insulating foam sealant.
Note: If the optional Patio Door High Performance Panel Retainer was ordered with
the sliding door, install the high performance roller retainer before installing the
vent panel. Follow the instructions included with the parts.
"
TWO OR MORE PEOPLE WILL BE REQUIRED TO HANDLE THE PANEL SAFELY.
A. Insert door panel. From the exterior of the building, tilt the
top of the panel toward the door frame and insert the top
of the door panel into the top track. Move the bottom of the
panel toward the door frame until it is vertical. Gently set the
panel down into the bottom track.
Note: Be careful not to pinch your fingers between the
two panels.
B. Install the handles. Follow the instructions included in the
hardware box.
C. Install the bumpers and retainer. Follow the instructions attached to the parts bag.
D. Check door operation. Open and close the door a few times to check for
proper operation.
Note: If there are any problems with the operation of the door, recheck shim locations
and adjust for plumb and square.
E. Install screen. Use the screen instructions included with the screen door.
5A
5REINSTALL THE VENT PANEL - OX/XO DOORS ONLY
6INTERIOR SEAL
6A
"
#
Note: Application of closed cell foam backer rod
and sealant does not apply to stucco.
A. Insert closed cell foam backer rod into the space
around the door as deep as it will go. This should
provide at least a 1/2” clearance between the
backer rod and the exterior face of the door.
Note: Backer rod adds shape and depth for
the sealant line.
B. Apply a bead of high quality exterior grade
sealant to the entire perimeter of the door. On
doors where the bottom fin has been removed,
insert sealant into the spaces between the bottom
of the door and the sill support and connect it to the
perimeter sealant.
Note: Refer to the sealant manufacturer’s label
to Confirm compatibility with vinyl and the
adjoining building components and priming
requirements.
C. Shape, tool and clean excess sealant. When
finished, the sealant should be the shape of an
hourglass.
Note: This method creates a more flexible sealant
line capable of expanding and contracting.
When applying siding, brick veneer or other exterior finish material, leave adequate
space between the door frame and the material for sealant. Refer to the illustration
corresponding to your finish material.
Note: The sealant details shown are standard recommendations from the sealant
industry. Contact your sealant supplier for recommendations and instructions for these
and any other applications.
#3*$,7&/&&3
#BDLFSSPEBOE
TFBMBOUUZQJDBM
*OTVMBUJOH
GPBN


NJO
7*/:-45&&-
4*%*/(
*OTVMBUJOH
'PBN
#BDLFSSPE
BOE
TFBMBOU
UZQJDBM


NJO
800%
4*%*/(
4FBMBOU
UZQJDBM
*OTVMBUJOH
'PBN

456$$08*5)
*/46-"5*0/#0"3%
*OTVMBUJOH
'PBN
$"-*'03/*"8"--
8*5)456$$0
*OTVMBUJOH
'PBN
7
SEALING THE DOOR TO THE EXTERIOR WALL CLADDING
7A
7B
MULLING INSTRUCTION
HORIZONTAL MULLIONS:
Note: If transoms are to be attached (mulled) to the top of the unit, perform this
process before attaching fins.
A. Apply two strips of foam tape across the
bottom of the transom frame.
Note: The tape must extend the full
width of the transom frame.
B. Place a foam plug at each end of the top
between the exterior rib and the joining
mullion groove.
C. Position and align the transom with the
sliding door.
D. Start the I bar joining connector from
one end and drive it to the full width of the
units.
Note: A rubber mallet may be used to
drive the I bar joining connector into
position. If necessary, the I bar joining
connector can be cut in half and driven
from each end.
E. Apply sealant to the ends of the mullion joint. The bead of sealant should extend
from the center of the mullion joint to the exterior of the unit, covering the foam plug.
A. Align foot bolt to the strike, then tighten the
exposed screw.
B. Slide the foot bolt actuator to the opposite
position and tighten the screw.
C. Check the door and foot blot for proper
operation. If the foot bolt assembly location
needs to be adjusted, loosen both attachment
screws and adjust foot bolt location, re-tighten
the screws.
8A 8B
8C
8
FOOT BOLT ADJUSTMENT
8A 8B
8C
5SBOTPN6OJU
4MJEJOH%PPS # %
0QUJPOBM+BNC&YUFOTJPO
$
"
A
C
B D
VERTICAL MULLIONS:
A. Lay the units on a smooth clean surface,
exterior side up to perform these steps. &
9
5
&
*
0
3
3
*
#
*
/
5
&
*
0
3
3
*
#
#
% &
&
9
5
&
*
0
3
3
*
#
*
/
5
&
*
0
3
3
*
#
'
B. Apply two strips of foam tape down
the fixed door frame sides. Place one
strip on the interior rib and one strip on
the exterior rib.
C. Position and align the sliding door
with the fixed door.
D. Place a foam plug at the top and
bottom between the exterior rib and the
joining mullion groove.
E. Start the I bar joining connector
from one end and drive it to the full
height of the doors.
Note: A rubber mallet may be used
to drive the I bar joining connector
into position.
F. Apply a bead of sealant, covering the mullion joint from
the center of the I bar joining connector to the exterior.
G. Apply a reinforcement plate at the
head using the square notches to align
the plate to the head frame screws in the
1-1/2" wide flat groove to the interior side
of the frame.
H. Secure the plate with #8 x 1" pan head
sheet metal screws, using three screws
per door head.
I. Align the reinforcement plate at the
sill using the center 3/8" diameter
holes to align the plate to the sill frame
screws in the 1-1/2" wide flat groove.
J. Secure the plate with #8 x 1" pan
head sheet metal screws, using
three screws per door sill.
(
)
*
+
B
D E
F
HG
JI
APPLYING INSTALLATION FINS
A. Cut the fins to length. Using the following
formula, cut the fins to length, making sure
the end cut is square on both ends.
Heads and Sills: Length = Frame width + 2-1/2"
Jambs: Length = Frame height + 2-1/2"
Jambs, if there is no fin at the sill: Length = Frame height + 1-1/4"
Combinations: Length = Combination height + 2-1/2"
B. Notch the ends of the fins. Measure and
mark 1-7/16" from each end of the fins. Using
a hacksaw, cut the fin receptor leg at the mark.
Finish removing the bottom receptor legs by
scoring the fin with a utility knife and snapping it
off the fin.
Note: When using fins on all four sides, all ends
must be notched. If no fin is used at the sill, DO NOT
notch the bottom of the jamb fins.


'SBNFSFDFQUPSMFH
#
C. Install the two side fins into the top of the frame
jamb grooves located on the side frame members
of the door. Slide the fins into place.
Note: Spray a solution of water and soap on the
frame jamb grooves to reduce sliding friction.
D. Install and slide the top fin into the frame
head groove located in the top frame member.
Note: The top fin must overlap the exterior
of the side fins.
'SBNFKBNCHSPPWF
$
$
'SBNFIFBEHSPPWF
%
$VUUPMFOHUIVTJOH
HJWFOGPSNVMB
"
E. Apply a bead of sealant where the fins overlap. Pump extra
sealant into the cavity created by the two overlapping fins.
4*%&7*&8
3FHVMBS'JO
*OTUBMMBUJPO
mO
'SBNF
HSPPWF
%*OTUBMMBUJPO
mO
4*%&7*&8
0GGTFU'JO
'SBNF
HSPPWF
%
1VNQFYUSB
TFBMBOUIFSF
&
F. When applying fins to mulled products, place a line of
sealant from the exterior face of the fin to the exterior of the
door frame at the mullion joint.
B
D
E
A
C
C
D D
APPLYING HEAD DRIP FIN - REQUIRED FOR VERTICAL
MULLION APPLICATIONS
A. Apply a bead of sealant along the whole
width of the mulled composite behind the
exterior rib.
B. On vertical mulls, cut the head drip to the
width of the units. Attach the head drip to
the top of units aligning the ends and seal to
the frame on both ends.
Note: The head drip may either be riveted to
the fin or installed when the unit is installed.
If the head drip is being installed with the
unit, perform Step A at this time.
#
"
&
9
5
&
3
*
0
3
*
/
5
&
3
*
0
3
FINISH
The interior and exterior frame and sash are protected by a powder coat baked-on finish that
requires no painting. Clean this surface with mild soap and water. Stubborn stains and deposits
may be removed with mineral spirits. DO NOT use abrasives. DO NOT scrape or use tools that
might damage surface.
Use of inappropriate solvents, brickwash or cleaning chemicals will cause adverse reactions with
window and door materials and voids the Limited Warranty.
CARE AND MAINTENANCE
Care and maintenance information is available by contacting your local Pella sales
representative. This information is also available on www.pellaimpervia.com.
IMPORTANT NOTICE
Because all construction must anticipate some water infiltration, it is important that the wall system
be designed and constructed to properly manage moisture. Pella Corporation is not responsible
for claims or damages caused by anticipated and unanticipated water infiltration; deficiencies in
building design, construction and maintenance; failure to install Pella® products in accordance with
Pella installation instructions; or the use of Pella products in wall systems which do not allow for
proper management of moisture within the wall systems. The determination of the suitability of all
building components, including the use of Pella products, as well as the design and installation of
flashing and sealing systems are the responsibility of the Buyer or User, the architect, contractor,
installer, or other construction professional and are not the responsibility of Pella.
Pella products should not be used in barrier wall systems which do not allow for proper
management of moisture within the wall systems, such as barrier Exterior Insulation and Finish
Systems, (EIFS) (also known as synthetic stucco) or other non-water managed systems. Except
in the states of California, New Mexico, Arizona, Nevada, Utah, and Colorado, Pella makes no
warranty of any kind and assumes no responsibility for Pella windows and doors installed
in barrier wall systems. In the states listed above, the installation of Pella products in barrier
wall or similar systems must be in accordance with Pella installation instructions.
Product modifications that are not approved by Pella Corporation will void the Limited Warranty.
Part Number: 803V0102
B
A
This page left blank intentionally.
Page 1 of 12 - Pella Pella-803V0102-Users-Manual-  Pella-803v0102-users-manual
Page 2 of 12 - Pella Pella-803V0102-Users-Manual-  Pella-803v0102-users-manual
Page 3 of 12 - Pella Pella-803V0102-Users-Manual-  Pella-803v0102-users-manual
Page 4 of 12 - Pella Pella-803V0102-Users-Manual-  Pella-803v0102-users-manual
Page 5 of 12 - Pella Pella-803V0102-Users-Manual-  Pella-803v0102-users-manual
Page 6 of 12 - Pella Pella-803V0102-Users-Manual-  Pella-803v0102-users-manual
Page 7 of 12 - Pella Pella-803V0102-Users-Manual-  Pella-803v0102-users-manual
Page 8 of 12 - Pella Pella-803V0102-Users-Manual-  Pella-803v0102-users-manual
Page 9 of 12 - Pella Pella-803V0102-Users-Manual-  Pella-803v0102-users-manual
Page 10 of 12 - Pella Pella-803V0102-Users-Manual-  Pella-803v0102-users-manual
Page 11 of 12 - Pella Pella-803V0102-Users-Manual-  Pella-803v0102-users-manual
Page 12 of 12 - Pella Pella-803V0102-Users-Manual-  Pella-803v0102-users-manual

Navigation menu