Proxim Wireless S58-B60 Tsunami Multipoint Base Station Unit User Manual Backing down from TNG CCI 2
Proxim Wireless Corporation Tsunami Multipoint Base Station Unit Backing down from TNG CCI 2
Contents
Installation manual part 1
Tsunami Multipoint Version 1.3 Installation Manual CPN 63179 Issue Date: 01/24/03 Copyright and Service Marks Copyright © 2002 by Proxim Corporation. All rights reserved. No part of this manual may be reproduced without prior written permission from Proxim Corporation. The information contained in this manual is subject to change without notice. Proxim Corporation shall not be liable for errors contained herein or for incidental or consequential damages in connection with the furnishing, performance, or use of this manual or equipment supplied with this manual. Proxim Corporation makes no warranty of any kind with regard to this manual or any equipment supplied with this manual, including, but not limited to, the implied warranties of merchantability and fitness for a particular purpose. Tsunami™ is a registered product of Proxim Corporation. Windows is a registered product of Microsoft Inc. Other names are trademarks of their owners. Y2K (Year 2000 Issue): All software supplied by and for Proxim Corporation products adhere to the four(4) digit year nomenclature as required for Year 2000 compliance. Regulatory Notice This equipment has been tested and found to comply with the limits for a class B digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: Reorient or relocate the receiving antenna. Increase the separation between the equipment and receiver. Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. Consult the dealer or an experienced radio/TV technician for help. Shielded cables and I/O cords must be used for this equipment to comply with the relevant FCC regulations. Changes or modifications not expressly approved in writing by Proxim Corporation may void the user's authority to operate this equipment. This device complies with RSS-210 of Industry Canada. Operation is subject to the following two conditions: (1) this device may not cause interference, and (2) this device must accept any interference, including interference that may cause undesired operation of the device. WARNING! This device must be professionally installed! Tsunami Multipoint Version 1.3 Installation Guide Contents ABOUT THIS BOOK ...............................................................................................................5 Required Software and Firmware........................................................................................ 5 Safety Instructions........................................................................................................... 6 CHAPTER 1. SITE PLANNING ...............................................................................................7 General Considerations ..................................................................................................... 7 Specific Considerations ..................................................................................................... 8 Interference and How to Avoid It...................................................................................... 10 Antennas ...................................................................................................................... 11 Path Planning ................................................................................................................ 14 PMP Radio Information ................................................................................................... 14 CHAPTER 2. DEPLOYING THE BASE STATION UNIT (BSU) ..................................................16 Unpacking the System .................................................................................................... 16 Mounting the Base Station Unit ........................................................................................ 17 Installing the GPS Antenna .............................................................................................. 24 Installing BSU Configuration Software ............................................................................... 25 CHAPTER 3. DEPLOYING THE SUBSCRIBER UNIT...............................................................31 Mounting the Subscriber Unit (SU) ................................................................................... 31 Installing the Subscriber Utility Software ........................................................................... 34 Aiming the SU ............................................................................................................... 35 Displaying Link Status Information ................................................................................... 36 Confirming Network Activity ............................................................................................ 38 CHAPTER 4. SYSTEM DIAGNOSTICS AND OPERATING TIPS ...............................................40 Radio Diagnostics........................................................................................................... 40 Network Configuration Tips ............................................................................................. 44 Protecting the System .................................................................................................... 45 APPENDIX A. INITIAL SETTINGS .......................................................................................49 Specify the Desired Modulation (Data Rate) ....................................................................... 49 Specify the BSU’s Gateway Address .................................................................................. 49 Select the Routing Mode ................................................................................................. 49 Change the Frequency Plan and Operating Frequency.......................................................... 50 APPENDIX B. INSTALLING THE CONFIGURATION SOFTWARE AND UPGRADING FIRMWARE ....................................................................................................................51 Base Station Configuration Software Version 1.5 ................................................................ 51 Subscriber Utility Software .............................................................................................. 54 Firmware Downloads ...................................................................................................... 54 APPENDIX C. TECHNICAL SPECIFICATIONS.......................................................................57 Burst-Rate Limit ............................................................................................................ 57 Downlink/Uplink Throughput............................................................................................ 57 Frequency Plans ............................................................................................................ 57 Tx Power ...................................................................................................................... 58 Antenna ....................................................................................................................... 58 Receiver Sensitivity ........................................................................................................ 58 Maximum Distance Between Base Station and Subscriber Unit.............................................. 58 System......................................................................................................................... 59 Standards Compliance and Interfaces ............................................................................... 59 Configuration and Management........................................................................................ 59 Power/Environment Safety .............................................................................................. 60 Physical Dimension ........................................................................................................ 60 Installation Details ......................................................................................................... 61 Contents CPN 63179 Issue Date: 01/24/03 Tsunami Multipoint Version 1.3 Installation Guide Optional Accessories....................................................................................................... 61 APPENDIX D. CONSTRUCTING POWER AND ETHERNET CABLES.........................................62 Subscriber Unit Power and Ethernet Cable ......................................................................... 62 Assembling the RJ45 (Woodhead) Weatherproof Connector .................................................. 64 BSU Power and Ethernet Cable ........................................................................................ 65 Installing the AMP CPC Connector with Shield and Strain Relief............................................. 69 APPENDIX E. LIGHTNING PROTECTION RECOMMENDATIONS ...........................................70 Introduction .................................................................................................................. 70 Recommendation ........................................................................................................... 71 Physical Considerations................................................................................................... 72 Where Should the Protection Units be Located? .................................................................. 73 Lightning Protection Specifications.................................................................................... 73 APPENDIX F. TECHNICAL SUPPORT AND TRAINING ...........................................................76 Figures Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure Figure 1. BSU Wind Loading Analysis .......................................................................................................... 9 2. SU Wind Loading Analysis............................................................................................................ 9 3. BSU Azimuth Antenna Pattern .................................................................................................... 12 4. BSU Elevation Antenna Pattern................................................................................................... 12 5. SU Antenna Pattern .................................................................................................................. 13 6. Base Station Unit Components ................................................................................................... 16 7. BSU Mounting Hardware............................................................................................................ 18 8. U-Shaped Mounting Brackets Attached ........................................................................................ 18 9. Downtilt and Clamp Brackets with Screws Attached ...................................................................... 19 10. Bracket Assembly Detail of Screw, Washers, and Nut .................................................................. 19 11. Bracket Assembly Attached to Mounting Bracket......................................................................... 20 12. Screws/Clamp Bracket Assemblies Attached............................................................................... 20 13. Strap Clamps Attached and Mounted BSU .................................................................................. 21 15. BSU’s Power and Ethernet Connector ........................................................................................ 21 16. GPS Antenna Mounted on BSU.................................................................................................. 24 17. Subscriber Unit Installation Kit ................................................................................................. 31 18. Mounting Clamp Housing and U-Bolts Attached........................................................................... 32 19. Mounting Bracket Attached to SU.............................................................................................. 32 20. Mounted SU ........................................................................................................................... 33 21. SU’s Power and Ethernet Connector and Grounding Screw ........................................................... 33 22. Settings Page in Subscriber Utility............................................................................................. 35 23. Aiming Tool in Subscriber Utility ............................................................................................... 36 24. Subscriber Utility Status Window .............................................................................................. 37 25. BSU Log in the Base Station Configuration Software.................................................................... 40 26. Log 1 .................................................................................................................................... 42 27. SU Log 2 ............................................................................................................................... 43 28. BER Log in Base Station Configuration Software ......................................................................... 44 29. Password Definition/Usage Diagram .......................................................................................... 47 30. Fresnel Zones......................................................................................................................... 58 31. 8-Pin DIN and RJ45 Contact Arrangements ................................................................................ 62 32. Soldered Wires on 8-Pin DIN Connector ..................................................................................... 63 33. Metal Shell Placed Over 8-Pin DIN Connector ............................................................................. 63 34. Jacket Placed Over 8-Pin DIN Connector .................................................................................... 64 35. Cat 5 Cable with Insulation Removed ........................................................................................ 64 36. Wires Crimped into RJ45 Connector .......................................................................................... 64 37. Woodhead Cover Placed Over RJ45 Connector ............................................................................ 65 38. End Nut Seated on RJ45 Connector ........................................................................................... 65 39. 18-Pin Positronic Connector ..................................................................................................... 65 40. BSU Power and Ethernet Cable Connectors ................................................................................ 66 41. Crimping Styles and Insertion .................................................................................................. 67 42. Indoor Portion of Power and Ethernet Cable ............................................................................... 67 43. Wire Preparation..................................................................................................................... 68 44. BSU Cable Construction Tools................................................................................................... 68 45. 8-Pin AMP Connector ............................................................................................................... 69 Contents CPN 63179 Issue Date: 01/24/03
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.4 Linearized : No Modify Date : 2003:11:19 10:27:09-05:00 Create Date : 2003:11:19 10:26:40-05:00 Title : Backing down from TNG CCI 2 Author : Ingrid Sadler Creator : Acrobat PDFMaker 5.0 for Word Producer : Acrobat Distiller 5.0.5 (Windows) Page Count : 4 Mod Date : 2003:11:19 10:27:09-05:00 Creation Date : 2003:11:19 10:26:40-05:00 Metadata Date : 2003:11:19 10:27:09-05:00 Tagged PDF : YesEXIF Metadata provided by EXIF.tools