User manual
Installation and Setting Guide for Bridge IEEE802.11ac 20/40/80 MHz â This manual is subject to change without prior notice â #1206, SKnTechnopark, 124, Sagimakgol-ro, Jungwon-gu, Seongnam-si, Gyeonggi-do, Republic of Korea Tel. +82-31-742-0085 / Fax. +82-31-776-0088 FCC Compliance Statement This device complies with part 15 of the FCC rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. FCC ID: 2AL83PTP-5440 FCC Interference Statement This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to correct the interference by one of the following measures: ⢠Reorient or relocate the receiving antenna. ⢠Increase the separation between the equipment and receiver. ⢠Connect the equipment into an outlet on a circuit different from which the receiver is connected. ⢠Consult the dealer or an experienced radio/TV technician for help. FCC Caution Any changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate this equipment. This transmitter must not be co-located or operating in conjunction with any other antenna or transmitter. FCC Radiation Exposure Statement This equipment complies with FCC radiation exposure limits set forth for an uncontrolled environment. This equipment should be installed and operated with minimum distance 70 cm between the radiator and your body. This transmitter must not be co-located or operating in conjunction with any other antenna or transmitter. Contents 1. . Prod uc t............................................................................................................................................................................................ 1 1.1 Key Information ................................................................................................................................. 1 1.1.1 General Information ................................................................................................................................................... 1 1.1.2 Information on Power ........................................................................................................................................................ 1 1.2 Ethernet connectors ............................................................................................................................. 1 1.3 Top side of board ................................................................................................................................... 1 1.4 Product Size/Photo .......................................................................................................................................... 2 2. Discussion/Due Diligence/Design ..................................................................................................................................... 3 2.1 Discussion ............................................................................................................................................... 3 2.2 2 Due Diligence ............................................................................................................................. 3 2.3 3 Design ........................................................................................................................................... 5 3. Installation .................................................................................................................................................................................... 6 3.1 Bracket ...................................................................................................................................................................................... 6 3.2 Check points after installation ................................................................................................................................... 7 4. Bridge Setting .............................................................................................................................................................................. 8 4.1 Initial Setting ....................................................................................................................................................................... 8 4.2 Bridge Setting (Master) ............................................................................................................................................................. 9 4.3 Bridge Setting (Slave) ........................................................................................................................................................... 12 4.4 Security ................................................................................................................................................................................... 15 4.4.1 SSID Hide ............................................................................................................................................................................... 15 4.4.1 Mac filter....................................................................................................................................................................... 15 4.5 Firmware backup and Upload ................................................................................................................................................. 16 4.5.1 Firmware Backup ..............................................................................................................................................................16 4.5.2 Backup file Upload ............................................................................................................................................................. 16 4.5.3 New Firmware Upload ................................................................................................................................................... 16 4.6 Factory reset.............................................................................................................................................................. 17 4.7 Method to check Bridge Link ......................................................................................................................................... 18 4.8 Method to check Bridge Performance ................................................................................................................... 19 5. Bridge Link Budget .................................................................................................................................................................. 19 5.1 RSSI per distance .............................................................................................................................................................. 19 5.2 RSSI (Signal Level) Formula .................................................................................................................................................. 19 6. Bridge Performance Test ........................................................................................................................................................................ 20 6.1 Test configuration .............................................................................................................................................................. 20 6.2 Test results ............................................................................................................................................................................ 20 1. Product 1.1. KEY FEATURES 1.1.1 GENERAL INFORMATION Antenna MIMO SOMPA patch Duplex TDD (Time Division Duplex) Radio supported 5.8 GHz band 802.11ac 20/40/80 MHz Processor QCA8065 Physical ports 1X10/100/1000 Base T Ethernet Port Operating temperature -30°C to 50°C LED Indicators Power, LAN, Signal LED1,2 1.1.2 INFORMATION ON POWER Power over Ethernet 802.3 af/at Typical operating power 15W 1.2. ETHERTNET Connectors The board contains 1X10/100/1000 Base-T Ethernet Channels. The Ethernet Channels are available through standard 8-pin RJ45 connectors. Ethernet Connectors signaling is shown below. PIN Signal BI_DA+ BI_DA- BI_DB+ BI_DC+ BI_DC- BI_DB- BI_DD+ BI_DD+ 1.3. Product Size/ Photo [Product] 450Ă450Ă119mm (WĂHĂD) 450mm 450mm 450mm 450mm 45 [Frame] â Reset S/W (security bolt) ⥠Power LED : green ⢠LAN Ethernet LED : yellow ⣠WAN port (RJ-45, connect the POE) ⤠Signal LED : Red 2. Discussion / Due Diligence / Design 2.1 Discussion Discussion should be made before due diligence to prevent any unexpected field situation which may come during installation. [Discussion Items] â Purpose of Installation ⥠Adequate Address of Point / Detailed information on the installation location, i.e., Height of Tower and Power. *SAWWAVE equipment has power supply from Power POE which has used AC Power. ⢠Discussion on needed building materials which will be needed for installation. (Assistant Pole. Ground line, UPT cable and so on) ⣠Distance between Points / Availability of LOS ⤠Availability of the 2nd Point in case the Bridge at 1st point canât provide satisfied performance due to unexpected interference. ⼠Discussion on several field status. 2.2 Due Diligence Based on the discussion, visit the installation location to check neighboring environment and radio environment. These are needed to prevent any delay during installation. [Check items during due diligence] â Height of Tower / Location of Installation / Power / LOS (Line of sight) / Taking picture of neighboring environment [Method to check radio environment (Interference)] â Using a wireless LAN Card in a Notebook which has an Insider S/W, scan 5GHz band. ⥠Using 1 PTP equipment of SAWWAVE_PTP and an Interference Analyzer, scan 5 GHz Band. (Operating in Access Point Mode) ⢠Attach a 5GHz antenna at Spectrum analyzer. âť Using a Spectrum analyzer is the most accurate method to check radio environment. Especially, radar signal has provided very strong signal enough to ignore neighboring signals. But as the radar signal does not have a SSID, it can be checked only by Spectrum analyzer.
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.5 Linearized : No Page Count : 32 Language : ko-KR Tagged PDF : Yes Author : Registered User Creator : Microsoft® Word 2013 Create Date : 2017:05:27 10:22:36+09:00 Modify Date : 2017:05:27 10:22:36+09:00 Producer : Microsoft® Word 2013EXIF Metadata provided by EXIF.tools