Samsung Electronics Co SFG-D1100 5G Outdoor CPE User Manual Installation Manual
Samsung Electronics Co Ltd 5G Outdoor CPE Installation Manual
Contents
- 1. Installation Manual
- 2. Safety & Warranty Guide
Installation Manual
Radio Access Network
5G CPE Outdoor
Installation Manual
Describes product installation and requirement procedure.
Document Version 1.0
December 2017
Document Number: TBA
© 2018 SAMSUNG Electronics Co., Ltd.
All Rights Reserved. The contents of this document/presentation contain proprietary information that
must be kept confidential. No part of this document shall be photocopied, reproduced, stored in a
retrieval system, or transmitted, in any form or by any means whether, electronic, mechanical, or
otherwise without the prior written permission of SAMSUNG Electronics Co., Ltd.
No warranty of accuracy is given concerning the contents of the information contained in this
publication. To the extent permitted by law no liability (including liability to any person by reason of
negligence) will be accepted by SAMSUNG Electronics Co., Ltd., its subsidiaries or employees for
any direct or indirect loss or damage caused by omissions from or inaccuracies in this document.
SAMSUNG Electronics Co., Ltd. reserves the right to change details in this publication without notice.
SNMTC-v3-0312
This manual should be read and used as a guideline for properly installing and/or operating the
product. Owing to product variations across the range, any illustrations and photographs used in
this manual may not be a wholly accurate depiction of the actual products you are using.
This manual may be changed for system improvement, standardization and other technical
reasons without prior notice.
Samsung Networks documentation is available at http://www.samsungdocs.com
Confidential
5G CPE Outdoor Installation Manual v1.0 iii
Copyright © 2018, All Rights Reserved.
Contents
Preface vi
Conventions in this Document ........................................................................................................ vi
New and Changed Information ...................................................................................................... vii
Revision History .............................................................................................................................. vii
Organization of This Document ..................................................................................................... vii
Related Documentation ................................................................................................................. vii
Personal and Product Safety .......................................................................................................... viii
Equipment Markings ....................................................................................................................... xii
Chapter 1 Before Installation 1
System View and External Interface ................................................................................................ 1
CPE Outdoor View ........................................................................................................................ 1
CPE Outdoor External Interface ................................................................................................... 3
Specifications ................................................................................................................................... 4
Cautions for Installation ................................................................................................................... 5
Before Installing ........................................................................................................................... 5
While Installing ............................................................................................................................ 5
After Installing ............................................................................................................................. 5
Installation Tools .............................................................................................................................. 7
Chapter 2 Installing System 9
Installation Procedure ...................................................................................................................... 9
System Arrangement ..................................................................................................................... 10
Transporting and Unpacking .......................................................................................................... 11
Bringing in Items ........................................................................................................................ 11
Unpacking Items ........................................................................................................................ 11
Fixing System .................................................................................................................................. 12
Fixing Unit Bracket Assembly ..................................................................................................... 12
Fixing System on a Pole Type ..................................................................................................... 13
Fixing System on a Wall Type .................................................................................................... 17
Chapter 3 Inspect the Installation 23
Appendix A Acronyms 27
Appendix B Standard Torque 28
Confidential
5G CPE Outdoor Installation Manual v1.0 iv
Copyright © 2018, All Rights Reserved.
List of Figures
Figure 1. CPE Outdoor View ............................................................................................................................ 1
Figure 2. CPE Outdoor View(include Cable Cover) .......................................................................................... 2
Figure 3. CPE Outdoor External Interface ....................................................................................................... 3
Figure 4. Procedure to Install the CPE Outdoor .............................................................................................. 9
Figure 5. CPE Outdoor Arrangement Pole type Installation.......................................................................... 10
Figure 6. CPE Outdoor Arrangement Wall type Installation ......................................................................... 10
Figure 7. Fixing Unit Bracket Assembly(1) ..................................................................................................... 12
Figure 8. Fixing Unit Bracket Assembly(2) ..................................................................................................... 13
Figure 9. Fixing Mounting bracket on the Pole (1) ........................................................................................ 14
Figure 10. Fixing Mounting bracket on the Pole (2) ........................................................................................ 15
Figure 11. Fixing Mounting bracket on the Pole (3) ........................................................................................ 16
Figure 12. Fixing CPE Outdoor on the Pole Mounting Bracket ....................................................................... 17
Figure 13. CPE Outdoor Marking Dimensions for Wall Type .......................................................................... 18
Figure 14. Marking Wall Type ......................................................................................................................... 19
Figure 15. Fixing Mounting Bracket on a Wall (1) ........................................................................................... 21
Figure 16. Fixing Mounting Bracket on the Wall(2) ........................................................................................ 21
Figure 17. Fixing CPE Outdoor on the Wall Mounting Bracket ...................................................................... 22
Figure 18. Installation Inspection Procedure .................................................................................................. 23
Confidential
5G CPE Outdoor Installation Manual v1.0 v
Copyright © 2018, All Rights Reserved.
List of Tables
Table 1. Specifications ................................................................................................................................... 4
Table 2. Basic Installation Tools ..................................................................................................................... 7
Table 3. Parts and Tools for Fixing Unit Bracket on CPE Outdoor ............................................................... 12
Table 4. Parts and Tools for Fixing Mounting bracket on the Pole .............................................................. 13
Table 5. Parts and Tools for Fixing CPE Outdoor on the Pole ...................................................................... 16
Table 6. Tools for Marking ........................................................................................................................... 17
Table 7. Tools for Drilling ............................................................................................................................. 19
Table 8. Anchor Bolt Drill Bits and Hole Depth ............................................................................................ 19
Table 9. Drilling Example ............................................................................................................................. 20
Table 10. Parts and Tools for Fixing Mounting Bracket on the Wall .............................................................. 20
Table 11. Parts and Tools for Fixing CPE Outdoor on the Wall ...................................................................... 22
Table 12. Construction Situation Checklist .................................................................................................... 24
Table 13. Standard Torque Value for Fastening Bolts ................................................................................... 28
Table 14. Brass Bolts Torque Value................................................................................................................ 28
Table 15. Connector Connection Torque Value ............................................................................................. 28
Confidential
5G CPE Outdoor Installation Manual v1.0 vi
Copyright © 2018, All Rights Reserved.
Preface
This manual describes how to install a 5G CPE Outdoor and how to connect its
cables. This manual includes the following 5G CPE Outdoor:
CPE Outdoor
Conventions in this Document
Samsung Networks product documentation uses the following conventions.
Symbols
Symbol
Description
Indicates a task.
Indicates a shortcut or an alternative method.
Provides additional information.
Provides information or instructions that you should follow to avoid service
failure or damage to equipment.
Provides information or instructions that you should follow to avoid personal
injury or fatality.
Provides antistatic precautions that you should observe.
Menu Commands
menu | command
This indicates that you must select a command on a menu, where menu is the
name of the menu, and command is the name of the command on that menu.
File Names and Paths
These are indicated by a bold typeface. For example:
Copy filename.txt into the /home/folder1/folder2/bin/ folder.
User Input and Console Screen Output Text
Input and output text is presented in the Courier font. For example,
context <designated epc-context-name>
CLI commands are presented in bold small caps. For example,
Type the RTRV-NE-STS command in the input field.
Confidential
Preface
5G CPE Outdoor Installation Manual v1.0 vii
Copyright © 2018, All Rights Reserved.
New and Changed Information
The following table describes information that has been added/changed since the
previous publication of this manual.
Change Type
Change Description
Revision History
The following table lists all versions of this document.
Document Version
Publication Date
Remarks
1.0
February 2018
First version
Organization of This Document
Section
Title
Description
Chapter 1
Before Installation
This chapter introduces CPE Outdoor and describes items
should be understood before installation.
Chapter 2
Installing System
This chapter describes the procedures to install the CPE
Outdoor.
Chapter 3
Connecting Cables
This chapter describes the procedures to connect the cables to
the CPE Outdoor installed.
Chapter 4
Inspect the
Installation
This chapter describes the procedures of inspecting installation
status after CPE Outdoor installation and cabling is completed.
Appendix A
Acronyms
This annex describes the acronyms used in this manual.
Appendix B
Clean the Optical
Connectors
This annex describes the procedure of cleaning the optical
connector and cleaning tool.
Appendix C
Standard Torque
This annex describes the standard torque when fastening the
bolt.
Related Documentation
5G RAN System Description
Confidential
Preface
5G CPE Outdoor Installation Manual v1.0 viii
Copyright © 2018, All Rights Reserved.
Personal and Product Safety
This product safety information includes European directives, which you must
follow. If these do not apply in your country, please follow similar directives that
do apply in your country.
Proposition 65 Warning (US Only)
State of California Proposition 65 Warning (US only)
WARNING: This product contains chemicals known to the State of California to
cause cancer and birth defects or other reproductive harm.
Electrical
The product is designed to operate from a -48 V DC supply and is therefore
classified as Safe Extra Low Voltage (SELV) equipment.
All structural parts are grounded and all input and outputs have built-in isolation
from the network. All input and output ports that connect to external power
sources are designed to meet relevant national safety requirements.
The product contains hazardous energy levels as defined by EN 60950. Care must
be taken when maintaining this equipment as injury to personnel or damage to the
equipment could result from mistakes. Maintenance should only be carried out by
trained and competent engineers who are familiar with the relevant procedures and
instructions.
Lasers
The product is fitted with optic modules rated as Class 1 radiation-emitting devices
under EN 60825-1. During installation, operation, and maintenance, never look
into the end of an optical fiber directly or by reflection either with the naked eye or
through an optical instrument. Do not operate equipment with exposed fiber
connectors-cover these with fiber cables or blanking caps. Do not remove
equipment covers during operation unless requested to do so in the documentation.
Carry out normal safety precautions when trimming fibers during installation.
Manual Handling
Care should be taken when handling equipment. Give due consideration to the
weight of the equipment, the physical capability of the individual(s) handling the
equipment, and movements such as twisting, bending and stooping, which could
lead to skeletal and muscular injuries.
Installation
Installation must be carried out by trained and competent engineers only. All
relevant safety measures should be taken to ensure equipment is not connected to
Confidential
Preface
5G CPE Outdoor Installation Manual v1.0 ix
Copyright © 2018, All Rights Reserved.
live power and transmission sources during installation. Equipment must be
correctly installed in order to meet the relevant safety standards and approval
conditions.
Each power feed to the unit requires a separate fused feed from the provided
power supply. The cable between the power distribution point and the installed
equipment must have a minimum cross-sectional area of 2.5 mm2.
Rack-mountable equipment must be placed in a standard 19-inch rack and secured
with the appropriate fixings as detailed in the installation manual.
Maintenance
Maintenance must only be carried out by a suitably trained and competent
technician. All safety instructions must be carefully observed at all times.
Equipment covers should not be removed while live power and transmission is
connected unless in a controlled environment by trained technicians.
Fire
The product is powered from a -48 V DC supply. To protect against fire, the
equipment is fused.
Environment
The product must be operated in an environment with the specified relative
humidity and ambient temperature ranges.
Keep all liquids away from the equipment as accidental spillage can cause severe
damage.
Cooling
The product cools down by its own set of cooling fans housed in a fan module.
Each fan module detects a fan that is not operating normally. LEDs on the front
panel of the fan module provide an alarm indication in the event of fan failure.
In the event of fan failure, take urgent remedial action to restore full cooling
capacity.
Take appropriate measures to ensure that fan modules do not start spinning during
repair and maintenance procedures.
Anti-Static Precautions
The circuit boards and other modules in the product are sensitive to and easily
damaged by static electricity. If any card or sub-assembly is removed from the unit,
the following anti-static precautions must be observed at all times:
Service personnel must wear anti-static wrist straps.
Circuit boards and sub-assemblies must be placed on ground conductive mats
Confidential
Preface
5G CPE Outdoor Installation Manual v1.0 x
Copyright © 2018, All Rights Reserved.
or in conductive bags.
All tools must be discharged to ground before use.
The anti-static wrist strap and cord must be checked at regular intervals for
their suitability for use.
Grounding
To comply with EN 60950, the equipment must be connected to a safety
grounding point via a permanent link. Grounding points are located on the product
for this purpose. Always connect the ground cable before fitting other cables. The
product must remain grounded continuously unless all connections to the power
supply and data network are all removed.
If equipment is grounded through a cabinet or rack, make sure it is done so
properly according to the installation instructions.
Power Supply Connection
The equipment is designed to be powered from a -48 V DC supply. Power
connections and installation of associated wiring must be carried out by a suitably
qualified technician.
Only devices that comply with all relevant national safety requirements should be
connected to the unit’s power supply inlets. Other usage will invalidate any
approval given to this equipment.
Connection of this equipment to devices that are not marked with all relevant
national safety requirements may produce hazardous conditions on the network.
When the power supply is obtained by a rectifier/safety isolation transformer, the
supply must meet the requirements of EN 60950 providing double/reinforced
insulation between hazardous voltages and SELV/TNV circuits. Any battery must
be separated from hazardous voltages by reinforced insulation.
Indirect Connection
Before indirectly connecting any equipment to another device through a shared
power supply, ALWAYS seek advice from a competent engineer.
Devices that are not marked according to the relevant national safety standards
may produce hazardous conditions on the network.
Product Disposal
To reduce the environmental impact of products, Samsung has joined WEEE
compliance activities.
The WEEE symbol on the product indicates that the product is covered by the
European Directive 2002/96/CE for the disposal of Waste Electrical and Electronic
Equipment (WEEE). This means that the product should be disposed of separately
from the municipal waste stream via designated collection facilities appointed by
Confidential
Preface
5G CPE Outdoor Installation Manual v1.0 xi
Copyright © 2018, All Rights Reserved.
the government or the local authorities. This will help prevent potential negative
consequences for the environment and human health. Please check the terms and
conditions of the purchase contract for information about correct disposal.
Battery Disposal
The product contains a battery on the processor card. The battery should not be
disposed of with other household waste. Where marked, the chemical symbols Hg,
Cd or Pb indicate that the battery contains mercury, cadmium or lead above the
reference levels in EC Directive 2006/66. The battery incorporated in this product
is not user replaceable. For information on its replacement, please contact your
service provider. Do not attempt to remove the battery or dispose it in a fire. Do
not disassemble, crush, or puncture the battery.
End of life recycling materials information is available from Samsung.
California USA Only
This Perchlorate warning applies only to primary CR (Manganese Dioxide)
Lithium coin cells in the product sold or distributed ONLY in California USA
‘Perchlorate Material-special handling may apply, See
www.dtsc.ca.gov/hazardouswaste/perchlorate.’
Confidential
Preface
5G CPE Outdoor Installation Manual v1.0 xii
Copyright © 2018, All Rights Reserved.
Equipment Markings
This marking on the product, accessories or literature indicates that the
product and its electronic accessories (e.g. charger, headset, USB cable)
should not be disposed of with other household waste at the end of their
working life. To prevent possible harm to the environment or human health
from uncontrolled waste disposal, please separate these items from other
types of waste and recycle them responsibly to promote the sustainable
reuse of material resources.
Household users should contact either the retailer where they purchased
this product, or their local government office, for details of where and how
they can take these items for environmentally safe recycling.
Business users should contact their supplier and check the terms and
conditions of the purchase contract. This product and its electronic
accessories should not be mixed with other commercial wastes for disposal.
Correct disposal of batteries in this product
(Applicable in countries with separate collection systems.)
The marking on the battery, manual or packaging indicates that the battery
in this product should not be disposed of with other household waste. Where
marked, the chemical symbols Hg, Cd or Pb indicate that the battery
contains mercury, cadmium or lead above the reference levels in EC
Directive 2006/66.
The battery incorporated in this product is not user replaceable. For
information on its replacement, please contact your service provider. Do not
attempt to remove the battery or dispose it in a fire. Do not disassemble,
crush, or puncture the battery. If you intend to discard the product, the waste
collection site will take the appropriate measures for the recycling and
treatment of the product, including the battery.
Protective earth
CPE Outdoor should be grounded.
Confidential
5G CPE Outdoor Installation Manual v1.0 1
Copyright © 2018, All Rights Reserved.
Chapter 1 Before
Installation
This chapter introduces CPE Outdoor and describes the items that you should
know before installation.
System View and External Interface
This section provides the pictorial view of the CPE Outdoor and its interfaces.
CPE Outdoor View
Figure below depicts the physical structure of the CPE Outdoor.
Figure 1. CPE Outdoor View
[Bottom View]
[Top View]
[Left View]
10.19 (259)
2.08
(53)
Unit: in. (mm)
[Right View]
[Rear View]
[Front View]
6.77 (172)
2.52
(64)
Confidential
Chapter 1 Before Installation
5G CPE Outdoor Installation Manual v1.0 2
Copyright © 2018, All Rights Reserved.
Figure 2. CPE Outdoor View(include Cable Cover)
[Bottom View]
[Top View]
[Left View]
13.71 (348.4)
2.08
(53)
Unit: in. (mm)
[Right View]
[Rear View]
[Front View]
6.86 (174.4)
2.52
(64)
Confidential
Chapter 1 Before Installation
5G CPE Outdoor Installation Manual v1.0 3
Copyright © 2018, All Rights Reserved.
CPE Outdoor External Interface
Figure below depicts the external interface structure of the CPE Outdoor.
Figure 3. CPE Outdoor External Interface
Ground Terminal
LAN
[Bottom View]
Confidential
Chapter 1 Before Installation
5G CPE Outdoor Installation Manual v1.0 4
Copyright © 2018, All Rights Reserved.
Specifications
Table below lists the main specifications of the CPE Outdoor.
Table 1. Specifications
Item
Specifications
Technology
5G (follows Verizon 5GTF's latest version)
Operating Frequency
27.5 GHz - 28.35 GHz
Channel Bandwidth
100 MHz
Operating Bandwidth
100MHz x 8 Carrier
Antenna Configuration
Integrated Antenna
Data Channel: 2Tx/2Rx
RF chain per Data Channel: 32
RF Output Power
36dBm/Path (EIRP, Antenna Gain: 19dBi )
Power
Outdoor: PoE (Midspan)
Ethernet
Outdoor: RJ45 1 Port
PoE, 100Base-TX or 1000Base-T
USB
USB 2.0 1 Port
Bluetooth
BLE4.0
USIM
Nano-SIM 1 Port
Replaceable regular SIM
support Class C operating conditions: terminal or a smart card operating at 1,8 V
± 10 %
LED
Total: 4EA
Power: Green LED
Signal: 3 Color (Green/Amber/Red)
Connection: 3 Color (Green/Amber/Red)
Alarm: 3 Color (Green/Amber/Red)
Factory Reset
1EA (Push Button Switch)
Operational Temperature
Outdoor: -30 to 55 °C
Humidity
5% - 90%, non-condensing, not to exceed 30g/m^3 absolute humidity
IP rating
Outdoor: IP65
EMC
FCC Part 15 Subpart B
FCC
FCC Part 30 (5G RF)
Installation
Outdoor: Pole/Wall mounting bracket
Warranty
Warranty: 1 Year
Size(W x D x H)
6.77 in.(172 mm) x 2.08 in.(53 mm) x 10.19 in.(259 mm)
Volume
< 2.5 L (main frame, excluding bracket)
Weight
< 2.0 kg (main frame, excluding bracket)
Power Consumption
< 25 W
Confidential
Chapter 1 Before Installation
5G CPE Outdoor Installation Manual v1.0 5
Copyright © 2018, All Rights Reserved.
Cautions for Installation
Observe the safety instructions described in this section when installing the system.
Installation must be done in accordance with the applicable local electric codes.
Before Installing
Post warning signs in areas where high-voltage cables are installed.
Post ‘off limit’ signs in areas where accidents are most expected.
Use guardrails or fences to block open areas such as ditches, open roof areas,
and scaffolds.
Install the system in the restricted access area.
While Installing
The system power must be cut off before installing.
Ensure the power switch of power supply is off when installing the system.
Installing the system with power switch on may cause system damage or fatal
human injury when connecting or disconnecting cables.
Ensure that workers wear protection gloves and goggles to prevent injury from
debris while drilling holes in a wall or ceiling.
Do not wear accessories such as watches and rings to prevent electrical shock.
Cover unused ports with a cap. This prevents foreign substances from entering into
the unused ports.
To prevent foreign substances, outdoor air, and moisture from entering the cable
inlet (including cable gland and conduit), finish the inlet as follows:
Unused inlet: Use the hole finishing materials including cap and rubber packing.
Cable-installed inlet: After cable installation, block any space in the inlet with tape,
compressed sponge, rubber packing, and silicone.
After Installing
Remove any debris produced during the work and clean up the installation site.
In the system, the laser beam light runs through the optical cable. The workers
must handle the optical cables with care as the laser beam can seriously damage
the eyes.
Confidential
Chapter 1 Before Installation
5G CPE Outdoor Installation Manual v1.0 6
Copyright © 2018, All Rights Reserved.
Ensure that the workers do not damage installed cables while cleaning the system.
While cleaning the power supply device, take precaution that the device does not
come in contact with foreign objects that may cause power failure.
Confidential
Chapter 1 Before Installation
5G CPE Outdoor Installation Manual v1.0 7
Copyright © 2018, All Rights Reserved.
Installation Tools
Table below lists the basic tools needed for installation. The additional tools
required for each site need to be identified and arranged during a site survey before
starting the installation.
Table 2. Basic Installation Tools
Number
Name
Specification
Purpose of use
1
Torque Driver
Apply a torque range
: 6-22 lbf·in
For fastening M3 Screw
Apply a torque range
: 20-90 lbf·in
For fastening M6 SEMS (Hexagon+)
2
Screw Driver Bit
+, Number 2
For fastening M3 Screw
+, Number 3
For fastening M6 SEMS (Hexagon+)
3
Screw Driver
+, Number 2
For loosening M3 Screw
+, Number 3
For loosening M6 SEMS (Hexagon+)
T25H
For loosening M5 SEMS
4
T25H
For fastening Torx Screw (T25H)
5
Tape Measure
16 ft./150 ft.
Tape measure for length
measurement
6
Power Extension Cable
100 ft.
Basic tool
7
Level
Normal
For horizontality and verticality
8
Hammer Drill
Normal
Wall type drilling
9
Concrete Drill Bit
1/4 in. (6 mm)
For Plastic Anchor
10
Cable Cutter
0.24-1.26 in. (6-32 mm)
Cable cutting
11
Crimping Tool
14 AWG-4 AWG (1.5-16 mm2)
Pressure terminal for crimping
12
Wire Stripper
Apply cable thickness: 1.5-6.2
in. (4-16 mm)
Cable sheath for removal
Confidential
Chapter 1 Before Installation
5G CPE Outdoor Installation Manual v1.0 8
Copyright © 2018, All Rights Reserved.
Number
Name
Specification
Purpose of use
13
Nipper
Basic Tool
For cutting cable
14
LAN Tool
Basic Tool
RJ45 crimper
15
Industrial Scissor
Basic Tool
Cutting
16
Knife
Basic Tool
Cutting
17
Multi tester
Digital Pocket Tester
To measure voltage and current to
detect cable disconnection
18
Compass
Normal
Check azimuth during installation
19
Heating Gun
50-300°C
Shrinking Heat Shrink Tube
20
Hammer
Normal
Anchor fixing
The required installation tools may vary depending on the site conditions.
In addition to the basic tools, protractor, ladder, safety equipment, and cleaning
tools must also be arranged, considering the site conditions.
Confidential
5G CPE Outdoor Installation Manual v1.0 9
Copyright © 2018, All Rights Reserved.
Chapter 2 Installing System
This chapter describes installation procedure of the CPE Outdoor.
Installation Procedure
Figure below depicts the procedure to install the CPE Outdoor.
Figure 4. Procedure to Install the CPE Outdoor
Foundation Work
Unpacking and Transporting
Fixing System
Unpacking Items
Bringing in Items
Pole Type
Wall Type
Confidential
Chapter 2 Installing System
5G CPE Outdoor Installation Manual v1.0 10
Copyright © 2018, All Rights Reserved.
System Arrangement
A minimum distance must be secured around the CPE Outdoor, in each direction
for installation and maintenance.
Figure below depicts the minimum distance that must be secured for pole type
installation of the CPE Outdoor.
Figure 5. CPE Outdoor Arrangement Pole type Installation
Figure below depicts the minimum distance that must be secured for wall type
installation of the CPE Outdoor.
Figure 6. CPE Outdoor Arrangement Wall type Installation
Unit: in. (mm)
[Top View]
[Front View]
≥ 16 (400)
≥ 8 (200)
≥ 8 (200)
W: 6.86 (174.4)
H: 13.71 (348.4)
4.88 (124)
≥ 32 (800)
≥ 16 (400)
Unit: in. (mm)
[Top View]
[Front View]
≥ 16 (400)
≥ 8 (200)
≥ 8 (200)
W: 6.86 (174.4)
H: 13.71 (348.4)
4.88 (124)
≥ 32 (800)
≥ 16 (400)
Confidential
Chapter 2 Installing System
5G CPE Outdoor Installation Manual v1.0 11
Copyright © 2018, All Rights Reserved.
Transporting and Unpacking
This section details how to transport the items to the installation place and
describes the procedure to unpack cabinets and other components.
Bringing in Items
Take care of the following at each stage of transportation of the items:
Before moving a system, check storage place for the system and remove
obstacles in advance.
When carrying the system:
Fasten the system firmly to the transport vehicle or carrier to prevent damage
to the system from a vibration or shock.
Use an elevator to prevent accidents. However, if the system must be carried
by people, ensure there are enough people to carry the system.
The system must not be shocked physically.
Care must be taken to protect the system from dust, moisture, and static
electricity.
Unpacking Items
To unpack the items, ensure the following:
The items must be packed until they reach the installation place.
The items are classified in accordance with each job specification and stored at
a place that does not interfere with working.
Unpacked systems must be installed immediately. If immediate installation of
the systems is not planned, the systems must be stored in the installation place
temporarily.
Unpack only external packing, leaving the internal packing in unpacked status.
Unpack the inner packaging after each system is placed on its installation
location.
Dispose by-products (packaging waste) in accordance with waste management
rules. Do not recycle the by-products.
Confidential
Chapter 2 Installing System
5G CPE Outdoor Installation Manual v1.0 12
Copyright © 2018, All Rights Reserved.
Fixing System
This section details the procedure to fix the CPE Outdoor.
Fixing Unit Bracket Assembly
To fix a unit bracket assembly on the CPE Outdoor
1 Ensure that the items mentioned in below table are available.
Table 3. Parts and Tools for Fixing Unit Bracket on CPE Outdoor
Category
Description
Parts
Unit Bracket Assembly
1 Set
Fasteners
M5 × L14 SEMS (T25H)
4 EA
Recommended Torque Value
M5 SEMS
25 lbfin (29 kgf·cm)
Working Tools
Torque Driver (20-90 lbfin)
Screw Driver Bit (T25H)
Screw Driver (T25H)
2 Loosen the fixed screw of unit bracket to 0.2 inch on the left/right side as
shown in figure below.
Figure 7. Fixing Unit Bracket Assembly(1)
Screw(T25H)
0.2 in.
0.2 in.
Confidential
Chapter 2 Installing System
5G CPE Outdoor Installation Manual v1.0 13
Copyright © 2018, All Rights Reserved.
3 Fix the unit bracket to the fixing hole of the CPE Outdoor rear using fasteners
as shown in figure below.
Figure 8. Fixing Unit Bracket Assembly(2)
Fixing System on a Pole Type
The CPE Outdoor can be fixed on pole using mounting bracket or chain bracket
assembly. This section details both procedures.
To fix a mounting bracket on the pole
1 Ensure that the items mentioned in below table are available.
Table 4. Parts and Tools for Fixing Mounting bracket on the Pole
Category
Description
Parts
Mounting bracket
1 EA
Fastener
Steel Band
2 EA
Recommended Torque Value
Steel Band Fixing Screw
48.5 lbfin (56.1 kgfcm)
Working Tools
Torque Driver (20-90 lbfin)
Screw Driver Bit ('+', Number 3)
M5 SEMS
(T25H)
Unit Bracket Assembly
M6 SEMS
(T25H)
Confidential
Chapter 2 Installing System
5G CPE Outdoor Installation Manual v1.0 14
Copyright © 2018, All Rights Reserved.
The standard of the pole on which the mounting bracket can be attached using
steel bands is 35 A to 100 A.
2 Pass the steel band through the fixing hole of the mounting bracket, as shown
in figure below.
Figure 9. Fixing Mounting bracket on the Pole (1)
Mounting Bracket
Steel Band
Pole Size (Diameter)
Length of Steel Band
50 A (2.4 in./60.5 mm)
502 mm
65 A (3 in./76.3 mm)
80 A (3.5 in./89.2 mm)
90 A (4 in./101.6 mm)
100 A (4.5 in./114.3 mm)
125 A (5.5 in./139.8 mm)
Confidential
Chapter 2 Installing System
5G CPE Outdoor Installation Manual v1.0 15
Copyright © 2018, All Rights Reserved.
3 Place a mounting bracket to the pole and fix the steel band, as shown in figure
below.
Figure 10. Fixing Mounting bracket on the Pole (2)
Steel Band
Fixing Screw
Confidential
Chapter 2 Installing System
5G CPE Outdoor Installation Manual v1.0 16
Copyright © 2018, All Rights Reserved.
4 Check the level of mounting bracket on the pole and adjust the level, as
detailed in figure below.
Figure 11. Fixing Mounting bracket on the Pole (3)
When fixing the mounting bracket on the pole, be sure to check the level of
bracket. After finishing the installation, adjust the level minutely.
When poor leveling happens, adjust the position of fasteners used to fix the
mounting bracket.
To fix the CPE Outdoor on the pole mounting bracket
1 Ensure that the items mentioned in below table are available.
Table 5. Parts and Tools for Fixing CPE Outdoor on the Pole
Category
Description
Parts
Fasteners
M5 × L14 SEMS (T25H)
(Fastened to the unit bracket)
2 EA
Recommended Torque Value
M5 SEMS
25 lbfin (29 kgf·cm)
Working Tools
Screw Driver Bit (T25H)
Torque Driver (20-90 lbf·in)
2 Hang the fasteners over the top groove of the pole mounting bracket, and then
fix it using fasteners. This is depicted in figure below.
If it is level, the bubble of the
spirit level is positioned at the
center of both lines.
Confidential
Chapter 2 Installing System
5G CPE Outdoor Installation Manual v1.0 17
Copyright © 2018, All Rights Reserved.
Figure 12. Fixing CPE Outdoor on the Pole Mounting Bracket
Fixing System on a Wall Type
An CPE Outdoor can be fixed on wall using a mounting bracket. This section
details the procedures for fixing the mounting bracket on the wall and fixing the
CPE Outdoor on the bracket.
To mark on the wall
1 Ensure that the items mentioned in below table are available.
Table 6. Tools for Marking
Category
Description
Working Tools
Tape Measure
Permanent Maker
Level
M5 SEMS(T25H)
Mounting Bracket_Hook Groove
M5 SEMS(T25H)
[Left View]
[Right View]
Confidential
Chapter 2 Installing System
5G CPE Outdoor Installation Manual v1.0 18
Copyright © 2018, All Rights Reserved.
Perform leveling test before drilling by referring to System Leveling, to ensure the
positions marked are horizontal or vertical. If the result shows the marked
positions are not horizontal or vertical, modify the marking positions.
When the position to place the system is determined, place the system on that
position and then mark the positions where anchor bolts are to be fixed. This
reduces marking error range.
2 Check the distance between the location for fixing the CPE Outdoor and the
anchor bolt hole, as shown in figure below.
Figure 13. CPE Outdoor Marking Dimensions for Wall Type
3 Place the mounting bracket on the fixing location, check the level status using
a level, and adjust the level of the bracket assembly.
4 If the level status is normal, mark the anchor bolt holes on the wall. This is
detailed in figure below.
Unit: in. (mm)
: Anchor Bolt Hole
[Rear View]
2.49 (64)
3.69 (93.8)
Confidential
Chapter 2 Installing System
5G CPE Outdoor Installation Manual v1.0 19
Copyright © 2018, All Rights Reserved.
Figure 14. Marking Wall Type
To drill the anchor holes
1 Ensure that the items mentioned in below table are available.
Table 7. Tools for Drilling
Category
Description
Woking Tools
Hammer Drill
Drill Bit (1/4 inch)
Vacuum Cleaner
Table 8. Anchor Bolt Drill Bits and Hole Depth
Category
Anchor Bolt
Drill Bits
Hole Depth
CPE Outdoor
Φ 6
1/4 in. (6 mm)
1.4 in. (35 mm)
2 Drill anchor holes at the marked points. Remove dust from the holes using a
vacuum cleaner.
[O]
* Remove the debris from the drilled hole.
[Anchor Hole Cross Section]
35 mm
(1.4 in)
[X]
1/4 in.
(6 mm)
2.49 (64)
Unit: in. (mm)/ Marking Point
If it is level, the bubble of the
spirit level is positioned at the
center of both lines.
3.69 (93.8)
Confidential
Chapter 2 Installing System
5G CPE Outdoor Installation Manual v1.0 20
Copyright © 2018, All Rights Reserved.
Table 9. Drilling Example
To fix the mounting bracket on the wall
1 Ensure that the items mentioned in below table are available.
Table 10. Parts and Tools for Fixing Mounting Bracket on the Wall
Category
Description
Parts
Mounting Bracket
1 EA
Fastener
M4 × L25 PH+ Taptite Screw
4 EA
Φ 6 × L30 Plastic Anchor
4 EA
Recommended Torque Value
M4 PH+ Tapping Screw
13 lbf·in (15 kgfcm)
Working Tools
Torque Driver (6~22 lbf·in)
Screw Driver Bit ('+', No. 2)
Hammer Drill
Vacuum Cleaner
1/4 in.
(6 mm)
Confidential
Chapter 2 Installing System
5G CPE Outdoor Installation Manual v1.0 21
Copyright © 2018, All Rights Reserved.
2 Fix the Φ 6 plastic anchors to the holes drilled on the wall.
Figure 15. Fixing Mounting Bracket on a Wall (1)
3 Place the Mounting bracket along with the fixed plastic anchors.
Figure 16. Fixing Mounting Bracket on the Wall(2)
M4 PH+ Taptite Screw
Mounting Bracket
Wall
Plastic Anchor
Confidential
Chapter 2 Installing System
5G CPE Outdoor Installation Manual v1.0 22
Copyright © 2018, All Rights Reserved.
To fix the CPE Outdoor on the wall
1 Ensure that the items mentioned in below table are available.
Table 11. Parts and Tools for Fixing CPE Outdoor on the Wall
Category
Description
Parts
Fasteners
M5 × L14 SEMS (T25H)
(Fastened to the unit bracket)
2 EA
Recommended Torque Value
M5 SEMS
25 lbfin (29 kgf·cm)
Working Tools
Screw Driver Bit (T25H)
Torque Driver (20-90 lbf·in)
2 Hang the fasteners over the top groove of the wall mounting bracket, and then
fix it using fasteners. This is depicted in figure below.
Figure 17. Fixing CPE Outdoor on the Wall Mounting Bracket
M5 SEMS(T25H)
Mounting Bracket_Hook Groove
M5 SEMS(T25H)
[Left View]
[Right View]
Confidential
5G CPE Outdoor Installation Manual v1.0 23
Copyright © 2018, All Rights Reserved.
Chapter 3 Inspect the
Installation
This chapter describes the procedures to check installation status.
Figure below depicts the overall procedure for inspecting the installation status.
Figure 18. Installation Inspection Procedure
Inspection Plan
Create an inspection sheet per system and select an inspector to set an inspection
schedule per site.
NO
YES
Sharing Inspection Results
Taking Corrective Actions
On-site Inspection
Inspection Checklist
Inspection Checklist/Corrective Actions
Sharing the Results of
Corrective Actions and
Preparing Preventive Plan
Inspection Plan
Checking the Results of
Corrective Actions
Confidential
Chapter 3 Inspect the Installation
5G CPE Outdoor Installation Manual v1.0 24
Copyright © 2018, All Rights Reserved.
On-site Inspection and Inspection Checklist
The on-site inspection is to perform inspection visually or using instruments for
each specification, standard, and installation status, based on the inspection
checklist at the site where the system is installed.
The inspector must record the results onto the inspection checklist during or after
field inspection.
Sharing Inspection Results and Taking Corrective Actions
The inspector must share the inspection results (inspection checklist and corrective
actions) with an installation operator. The installation operator must take the
corrective actions, if necessary, after reviewing the requirements.
Checking the Results of Corrective Actions
The inspector must check if the corrective actions are properly taken. If they are
not sufficient, the inspector must ask the installation operator to take the corrective
actions again.
Sharing the Results of Corrective Actions and Preparing Preventive Plan
After the corrective actions are all completed, the inspector must share the results
with the installation operator and relevant departments. The inspector must prepare
a preventive plan to prevent the same or similar problems from re-occurring.
Construction Situation Checklist
Table below provides the checklist to check the installation of the CPE Outdoor
and other devices.
Table 12. Construction Situation Checklist
Category
Check Items
Criteria
Result
Pass
Fail
Installing
Equipment
Appearance of equipment
and mechanical parts
Equipment damage such as dent,
scratch, and crack
Placement of equipment
and mechanical parts
Maintenance and horizontal/vertical
placement
Leveling condition of
equipment and
mechanical parts
Horizontal/vertical status
Validity of status and
specifications of fastening
bolt, nut, and washer
Checking fasteners omission
Compliance with assembly order of
fasteners
Compliance with fastening torque value
Insulation status
Checking electrical contact between
insulators (insulation resistance tester)
Grounding
Installation of ground bar
Checking the separation of
communication/power/lightning
Confidential
Chapter 3 Inspect the Installation
5G CPE Outdoor Installation Manual v1.0 25
Copyright © 2018, All Rights Reserved.
Category
Check Items
Criteria
Result
Pass
Fail
grounding
Cable specification
Checking the specification
Cabling
Cable damage
Proper installation route
Compliance with the radius of curvature
Cable binding status
Binding status
Binding interval
Checking binding materials
Cable connection
Assembly condition of a pressure
terminal
Fastening condition of a pressure
terminal
Checking compliance with fastening
torque value
Installation status of cable
tag
Position
Marking content
Checking tag installation method
Power
Installation status of power
supply
Power supply capacity
Output voltage (tester)
Installation of circuit
breaker
Checking circuit breaker capacity
Cable specification
Checking the specification
Checking the limit distance
Cabling
Cable damage
Proper installation route
Compliance with the radius of curvature
Cable binding status
Binding status
Binding interval
Checking binding materials
Cable connection
Checking cable connection (Pin Map)
Input voltage
Assembly condition of a pressure
terminal and connector
Fastening condition of a pressure
terminal and connector
Checking compliance with fastening
torque value
Installation status of cable
tag
Position
Marking content
Checking tag installation method
Other data
cables
Cable specification
Checking the specification
Cabling
Cable damage
Proper installation route
Confidential
Chapter 3 Inspect the Installation
5G CPE Outdoor Installation Manual v1.0 26
Copyright © 2018, All Rights Reserved.
Category
Check Items
Criteria
Result
Pass
Fail
Compliance with the radius of curvature
Cable binding status
Binding status
Binding interval
Checking binding materials
Cable connection
Checking cable connection (Pin Map)
Assembly condition of a connector
Fastening condition of a connector
Checking compliance with fastening
torque value
Installation status of cable
tag
Position
Marking content
Checking tag installation method
Checking tag installation method
Others
Reserved ports
Checking port cap fastening status
Cable inlet
status/Connection of
equipment I/O port
Checking fastening status
(Conduit/Cable Gland)
Cable tray and duct
Checking installation status
Status of inside/outside of
the equipment and system
surrounding area
Checking the stocking condition (waste
parts, waste materials, and packing
materials)
Opinion
■
Confidential
5G CPE Outdoor Installation Manual v1.0 27
Copyright © 2018, All Rights Reserved.
Appendix A Acronyms
AC Alternating Current
CPE Outdoor Access Unit
BH Back Haul
DC Direct Current
DL DownLink
GNSS Global Navigation Satellite System
GPS Global Positioning System
MGB Main Ground Bar
PDLC Polymer Dispersed Liquid Crystal
RTN Return
SELV Safe Extra Low Voltage
SEMS pre-asSEMbled washers and screws
S-FTP Screened-Foiled Twisted Pair
TDD Time Division Duplex
UL UpLink
UTP Unshielded Twisted Pair
Confidential
5G CPE Outdoor Installation Manual v1.0 28
Copyright © 2018, All Rights Reserved.
Appendix B Standard Torque
When operator fastens the bolt, use the standard torque values provided in tables
below to prevent the equipment and bolt from damage and secure by fastening.
When the torque value for each connection part is defined already, use the defined
value.
Table 13. Standard Torque Value for Fastening Bolts
Bolt Spec.
Torque Value (N·m)
Torque Value (lbf·in)
Torque Value (kgf·cm)
M3
0.63
5.6
6.4
M4
1.5
13
15
M5
2.8
25
29
M6
4.9
43
50
M8
12
110
127
M10
25
217
250
M12
42
372
428
Table 14. Brass Bolts Torque Value
Bolt Spec.
Torque Value (N·m)
Torque Value (lbf·in)
Torque Value (kgf·cm)
M6
2.9
26
30
M8
6.3
56
64
Table 15. Connector Connection Torque Value
Connector
Torque Value (N·m)
Torque Value (lbf·in)
Torque Value (kgf·cm)
SMA connector
0.59
5.2
6
TNC connector
0.88
7.8
9
N-type connector
2
17
20
DIN-type connector
25
217
250
4.3-10-type connector
5
44
51
Torque value can be different, defending on the material, characteristic, and
specification of the equipment and fastener. Ensure that you check the proper
torque value for each specification of the equipment and the fastener.
5G CPE Outdoor
Installation Manual
Document Version 1.0
© 2018 Samsung Electronics Co., Ltd.
All rights reserved.