Samsung Electronics Co SLS-BD104Q1 WiMAX / TD-LTE Remote Radio Head User Manual Installation Manual
Samsung Electronics Co Ltd WiMAX / TD-LTE Remote Radio Head Installation Manual
Contents
- 1. Installation Manual
- 2. User Manual
Installation Manual
2600-00ETB9GAA Ver. 2.0 310 Mobile WiMAX/TD-LTE RRH-2WB Installation Manual COPYRIGHT This manual is proprietary to SAMSUNG Electronics Co., Ltd. and is protected by copyright. No information contained herein may be copied, translated, transcribed or duplicated for any commercial purposes or disclosed to the third party in any form without the prior written consent of SAMSUNG Electronics Co., Ltd. TRADEMARKS Product names mentioned i this manual may be trademarks and/or registered trademarks of their respective companies. This manual should be read and used as a guideline for properly installing and operating the product. This manual may be changed for the system improvement, standardization and other technical reasons without prior notice. Updated manuals are available at: https://systems.samsungwireless.com/ For questions on the manuals or their content, contact NetSysTechWriter@sta.samsung.com ©2012 SAMSUNG Electronics Co., Ltd. All rights reserved. 310 RRH-2WB (TD-LTE Fx) Installation Manual INTRODUCTION Purpose This manual describes how to install the RRH-2WB of TD-LTE Flexible system (SLSBD104) which is a multi-mode BS of Mobile WiMAX/TD-LTE, and how to connect cables. Document Content and Organization This document consists of 3 Chapters, 6 Annex and Abbreviation, which are summarized as follows: CHAPTER 1. Before Installation This chapter introduces the safety rules that must be understood for installing the RRH-2WB and describes the block diagram of the RRH-2WB. CHAPTER 2. Installing System This chapter describes the procedures to install the RRH-2WB. CHAPTER 3. Connecting Cables This chapter describes the procedures to connect the cables to the RRH-2WB installed. ANNEX A. Sector Antenna Installation This annex describes cautions and installation procedure of the sector antenna. ANNEX B. Installing Feeder Cable This annex describes cautions and allowed radius of curvature when installing feeder line. ANNEX C. Connector Assembly This annex describes the procedure of assembling connector. ANNEX D. Cleaning Optic Connector This annex describes the procedure of cleaning the optic connector and cleaning tool. © SAMSUNG Electronics Co., Ltd. 310 RRH-2WB (TD-LTE Fx) Installation Manual ANNEX E. Pressure Terminal Assembly This annex describes the procedure of assembling the pressure terminal. ANNEX F. Standard Torque This annex describes the standard torque when assembling the fixing materials. ABBREVIATION Describes the acronyms used in this manual. Conventions The following types of paragraphs contain special information that must be carefully read and thoroughly understood. Such information may or may not be enclosed in a rectangular box, separating it from the main text, but is always preceded by an icon and/or a bold title. WARNING Provides information or instructions that the reader should follow in order to avoid personal injury or fatality. CAUTION Provides information or instructions that the reader should follow in order to avoid a service failure or damage to the system. CHECKPOINT Provides the operator with checkpoints for stable system operation. NOTE Indicates additional information as a reference. © SAMSUNG Electronics Co., Ltd. II 310 RRH-2WB (TD-LTE Fx) Installation Manual Revision History VERSION DATE OF ISSUE 2.0 06. 2012. REMARKS - ‘Humidity condition’ was changed. (1.2) - ‘Table 3.5’~‘Table 3.7’ were changed. - ‘Cable Connection of RET’ (3.5.2) was added. - DU configuration was changed. (Figure 3.2, Table 3.7) 1.0 © SAMSUNG Electronics Co., Ltd. 04. 2012. First Version III 310 RRH-2WB (TD-LTE Fx) Installation Manual SAFETY CONCERNS The purpose of the Safety Concerns section is to ensure the safety of users and prevent property damage. Please read this document carefully for proper use. Symbols Caution Indication of a general caution Restriction Indication for prohibiting an action for a product Instruction Indication for commanding a specifically required action © SAMSUNG Electronics Co., Ltd. IV 310 RRH-2WB (TD-LTE Fx) Installation Manual Warning WARNING Power and Grounding Watches, Rings, and Other Metallic Accessories Do not wear accessories such as watches and rings in order to prevent electrical shock. Power Switch Off Make sure the power switch of power supplier is off when installing the system. Installing the system with power switch on may cause system damage or fatal human injury when cables are not correctly connected. Warning for Connecting the Ground Cable In cabling, the connection of cables without the connection to the ground cable may cause the damage of the equipment or the injury of the worker. Connect the ground cable first. Installation Warning for Laser Beam Running through Optical Cables In the system, the laser beam emitting light runs through the optical cable. The exposure of the laser beam on worker’s eye may cause serious injury so that it should be handled with care. Protection gloves and goggles Make sure that worker wears protection gloves and goggles to prevent damages from debris while drilling holes in a wall or ceiling. © SAMSUNG Electronics Co., Ltd. 310 RRH-2WB (TD-LTE Fx) Installation Manual Caution CAUTION Power and Feeder line Cautions while Cleaning Power Supply While cleaning the power supply device, take caution that the device does not come in contact with alien bodies that may cause power failure. Handling the Power Cable - Handling the power cable incorrectly may damage the rack or cause an electric shock through the cable. Ensure the power switch on the rectifier or the system is turned off before handling the power cable. - The fixing materials for power cable must be tightly secured to prevent electrical accidents. Power cable In case of using AWG8 (6 mm × 2C) power cable, it is applicable up to 70 m (299.66 ft). When the distance is 70 m (299.66 ft), followings should be considered. - Do not rapid ON/OFF (within one second): The voltage loss value caused by the cable resistance loss is 3 V, and the RRH-2WB could be damaged by the counter electromotive force caused by the cable inductance. - The battery’s life could be shorten: The RRH-2WB could be off in spite the battery remains. (When the battery capacity is designed within one hour) - Do not use the power cables linked: Using the power cables linked each other, the loss will be increased. Precautions for Measuring Insulation Resistance Since a high voltage is used for measuring insulation resistance, insulation resistance should not be measured when the system is in operation. Make sure to only measure the insulation resistance of the appointed part. Other components such as the system’s internal components and the unit (system frame), components of the communication cables, units, etc. should not be measured. Cable Work Sequence When performing cable work for the system, proceed with the ground work before any other work to prevent errors occurring due to static electricity and other reasons. © SAMSUNG Electronics Co., Ltd. VI 310 RRH-2WB (TD-LTE Fx) Installation Manual Connection of Feeder Cable Connector Connecting the feeder cable connector is critical process, so the qualified workers who finished the related education should perform. Radius of Curvature of Feeder Line When installing a feeder line, the radius of curvature of the sections where cables bent should be larger than the allowed radius of curvature. If the radius of curvature for the feeder line installation is less than the allowed radius of curvature, it may affect the performance of the system. Installation Cautions while Cleaning the Rack Make sure that worker does not damage installed cables while cleaning the rack. System Installation and Access Only authorized workers are allowed to install or access the system. Do not Work by Yourself Worker must not work alone in any key process. Management of Unused Ports Cover the unused ports (conduit, cable gland, etc.) with waterproof cap (sealing cap) to prevent infiltration of foreign material such as dust, moisture, or bug. Caution When Connecting the Optical Cable When connecting the optical cable, be careful to keep the cutting section of the connector core away from dust and foreign substances. If the cable is soiled with foreign substances, do not blow on the cable to remove them. Make sure to remove the dust or foreign substances in accordance with the cleaning instructions provided by the connector manufacturer. © SAMSUNG Electronics Co., Ltd. VII 310 RRH-2WB (TD-LTE Fx) Installation Manual Finishing Heat Shrink Tube of a Sector Antenna 1) Insert an antenna protection plate to antenna port. 2) Place the heat shrink tube on the connection point and shrink the heat shrink tube using a heat gun. Avoid aiming the heating gun toward the antenna’s body. Installing the Antenna When you install the antenna, the distant and angle between the antenna and lightning rod must be within the protective angle (left/right side 45° each from the central axis) to prevent the antenna from lightning damage. California USA Only This Perchlorate warning applies only to primary CR (Manganese Dioxide) Lithium coin cells in the product sold or distributed ONLY in California USA ‘Perchlorate Material-special handling may apply, See www.dtsc.ca.gov/hazardouswaste/perchlorate.’ © SAMSUNG Electronics Co., Ltd. VIII 310 RRH-2WB (TD-LTE Fx) Installation Manual TABLE OF CONTENTS INTRODUCTION Purpose ...................................................................................................................................................... I Document Content and Organization ....................................................................................................... I Conventions .............................................................................................................................................. II Revision History ....................................................................................................................................... III SAFETY CONCERNS IV Symbols .................................................................................................................................................... IV Warning ..................................................................................................................................................... V Caution ..................................................................................................................................................... VI California USA Only ............................................................................................................................... VIII CHAPTER 1. Before Installation 1-1 1.1 System Configuration and Structure.................................................................................... 1-1 1.2 Specifications ......................................................................................................................... 1-4 1.3 Cautions for Installation ........................................................................................................ 1-6 1.4 Pre-survey .............................................................................................................................. 1-8 1.5 Installation Tools .................................................................................................................... 1-9 CHAPTER 2. Installing System 2-1 2.1 Installing the RRH-2WB ......................................................................................................... 2-1 2.2 Foundation Work.................................................................................................................... 2-2 2.3 2.4 2.2.1 System Arrangement ............................................................................................................... 2-2 2.2.2 Marking and Drilling ................................................................................................................. 2-3 Unpacking and Transporting................................................................................................. 2-4 2.3.1 Importing Items ........................................................................................................................ 2-4 2.3.2 Unpacking Items ...................................................................................................................... 2-4 Fixing the System .................................................................................................................. 2-5 2.4.1 Fixing the Wall Type RRH-2WB.............................................................................................. 2-5 2.4.2 Fixing the Pole Type RRH-2WB ............................................................................................. 2-8 2.4.3 Fixing the Tower type RRH-2WB .......................................................................................... 2-22 © SAMSUNG Electronics Co., Ltd. IX 310 RRH-2WB (TD-LTE Fx) Installation Manual 2.5 System Leveling ................................................................................................................... 2-31 2.6 Insulation Test ...................................................................................................................... 2-33 CHAPTER 3. Connecting Cables 3-1 3.1 Work Flow for Cabling ........................................................................................................... 3-1 3.2 Cabling .................................................................................................................................... 3-5 3.3 Grounding............................................................................................................................... 3-7 3.3.1 3.4 Power Construction ............................................................................................................. 3-10 3.4.1 3.5 3.6 Grounding the System............................................................................................................. 3-8 Installing the Power Cable..................................................................................................... 3-10 External Interface Construction .......................................................................................... 3-14 3.5.1 Cable Connection between the DU and the RRH-2WB...................................................... 3-14 3.5.2 Cable Connection of RET ..................................................................................................... 3-20 3.5.3 Connection of Feeder Cable ................................................................................................. 3-22 Installation Test .................................................................................................................... 3-30 ANNEX A. Sector Antenna Installation A-1 A.1 Cautions when Installing a Sector Antenna .........................................................................A-1 A.2 Sector Antenna Layout ..........................................................................................................A-1 A.3 Sector Antenna Installation ...................................................................................................A-2 ANNEX B. Installing Feeder Cable B-1 B.1 Cautions When Installing Feeder Cable ...............................................................................B-1 B.2 Antenna Feeder Cable Ground .............................................................................................B-4 B.3 Tower Ground Construction .................................................................................................B-8 ANNEX C. Connector Assembly C-1 C.1 N type-male (1/2 in. feeder line) ............................................................................................C-1 C.2 Din type-male (1/2 in. Feeder Line) .......................................................................................C-6 C.3 Finishing the Connector Connection Part by Tape .............................................................C-8 C.4 How to Shrink the Heat Shrink Tube ....................................................................................C-9 C.5 C.4.1 When Assembling a Connector to the Feeder Line .............................................................. C-9 C.4.2 When Connecting a Connector to another Connector ........................................................C-11 Power Connector Assembly................................................................................................C-15 © SAMSUNG Electronics Co., Ltd. 310 RRH-2WB (TD-LTE Fx) Installation Manual ANNEX D. Cleaning Optic Connector D-1 D.1 Cleaning Optic Connector .....................................................................................................D-1 D.2 IBC TM Brand Cleaner ..............................................................................................................D-2 TM Brand Type Cleaner (P/N 9393).................................................................................. D-2 TM Brand Type Cleaner (P/N 12910) ............................................................................... D-5 D.2.1 IBC D.2.2 IBC ANNEX E. Pressure Terminal Assembly E-1 ANNEX F. Standard Torque F-1 ABBREVIATION L ~ V............................................................................................................................................................ I LIST OF FIGURES Figure 1.1 RRH-2WB Configuration....................................................................................... 1-1 Figure 1.2 RRH-2WB Configuration When the Solar Shield is Assembled ............................. 1-2 Figure 1.3 RRH-2WB External Interface ................................................................................ 1-3 Figure 2.1 Procedure to Install the RRH-2WB ........................................................................ 2-1 Figure 2.2 RRH-2WB Installation Space ................................................................................. 2-2 Figure 2.3 RRH-2WB Marking ................................................................................................ 2-3 Figure 2.4 Fixing the RRH-2WB_Wall Type (1) ...................................................................... 2-5 Figure 2.5 Fixing the RRH-2WB_Wall Type (2) ...................................................................... 2-6 Figure 2.6 Fixing the RRH-2WB_Wall Type (3) ...................................................................... 2-7 Figure 2.7 Example of Installing on Wall Mount Pole .............................................................. 2-8 Figure 2.8 Example of Installing on Mono Pole ...................................................................... 2-9 Figure 2.9 Example of Installing on Pole .............................................................................. 2-10 Figure 2.10 Example of Installing on Pole (Detail A, Detail B) .............................................. 2-11 Figure 2.11 Fixing 1 Sector Pole Type RRH-2WB (1) ........................................................... 2-12 Figure 2.12 Fixing 1 Sector Pole Type RRH-2WB (2) ........................................................... 2-13 Figure 2.13 Fixing 1 Sector Pole Type RRH-2WB (3) ........................................................... 2-14 Figure 2.14 Fixing 3 Sector Pole Type RRH-2WB (1) ........................................................... 2-15 Figure 2.15 Fixing 3 Sector Pole Type RRH-2WB (2) ........................................................... 2-16 Figure 2.16 Fixing 3 Sector Pole Type RRH-2WB (3) ........................................................... 2-17 Figure 2.17 Fixing 3 Sector Pole Type RRH-2WB (4) ........................................................... 2-18 © SAMSUNG Electronics Co., Ltd. XI 310 RRH-2WB (TD-LTE Fx) Installation Manual Figure 2.18 Fixing 3 Sector Pole Type RRH-2WB (5) ........................................................... 2-19 Figure 2.19 Fixing 3 Sector Pole Type RRH-2WB (6) ........................................................... 2-20 Figure 2.20 Bolt Specifications for 3 Sector Pole Type RRH-2WB-Examples....................... 2-21 Figure 2.21 Example of Installing on the Tower .................................................................... 2-22 Figure 2.22 Fixing Tower Type RRH-2WB (1)....................................................................... 2-23 Figure 2.23 Fixing Tower Type RRH-2WB (2)....................................................................... 2-24 Figure 2.24 Fixing Tower Type RRH-2WB (3)....................................................................... 2-25 Figure 2.25 Fixing Tower Type RRH-2WB (4)....................................................................... 2-26 Figure 2.26 Fixing Tower Type RRH-2WB (5)....................................................................... 2-27 Figure 2.27 Fixing Tower Type RRH-2WB (6)....................................................................... 2-28 Figure 2.28 Fixing Tower Type RRH-2WB (7)....................................................................... 2-29 Figure 2.29 Fixing Tower Type RRH-2WB (8)....................................................................... 2-30 Figure 2.30 Leveling Test before Fixing Anchor Bolts ........................................................... 2-31 Figure 2.31 Leveling Test before Fixing System ................................................................... 2-32 Figure 2.32 Schematic Diagram for Insulation Test .............................................................. 2-33 Figure 3.1 Work Flow for Cabling ........................................................................................... 3-1 Figure 3.2 Cabling Diagram .................................................................................................... 3-5 Figure 3.3 Connection of the RRH-2WB Ground Cable ......................................................... 3-8 Figure 3.4 Power Equipment Diagram .................................................................................. 3-10 Figure 3.5 Installing the RRH-2WB Power Cable (1) ............................................................ 3-11 Figure 3.6 Installing the RRH-2WB Power Cable (2) ............................................................ 3-12 Figure 3.7 Power Cable Connector ...................................................................................... 3-13 Figure 3.8 Cable connection between the DU and the RRH-2WB (Optical connection) ....... 3-15 Figure 3.9 Optic Cable Connector between DU and RRH-2WB_RRH-2WB side ................. 3-16 Figure 3.10 Cable Connection of RET .................................................................................. 3-20 Figure 3.11 RET Cable Connector ........................................................................................ 3-21 Figure 3.12 Feeder Line Connection Diagram ...................................................................... 3-22 Figure 3.13 Connection of Feeder Cable (Detail A) .............................................................. 3-23 Figure 3.14 Connection of Feeder Cable (Detail B) .............................................................. 3-24 Figure 3.15 Heat Shrink Tube Specification .......................................................................... 3-26 Figure A.1 Sector Antenna ...................................................................................................... A-2 Figure B.1 Feeder Cable Grounding (1) ................................................................................. B-4 Figure B.2 Feeder Cable Grounding (2) ................................................................................. B-5 Figure B.3 Feeder Cable Grounding (3) ................................................................................. B-6 Figure B.4 Feeder Cable Grounding (4) ................................................................................. B-7 Figure B.5 Connecting the Tower Ground Cable .................................................................... B-9 © SAMSUNG Electronics Co., Ltd. XII 310 RRH-2WB (TD-LTE Fx) Installation Manual Figure C.1 Assembling the N type-male (1/2 in. Feeder Line) Connector (1) .........................C-2 Figure C.2 Assembling the N type-male (1/2 in. Feeder Line) Connector (2) .........................C-3 Figure C.3 Assembling the N type-male (1/2 in. Feeder Line) Connector (3) .........................C-4 Figure C.4 Assembling the N type-male (1/2 in. Feeder Line) Connector (4) .........................C-5 Figure C.5 Assembling the Din type-male (1/2 in. Feeder Line) Connector (1) ......................C-6 Figure C.6 Assembling the Din type-male (1/2 in. Feeder Line) Connector (2) ......................C-7 Figure C.7 Finishing the Connector Connection Part by Tape ................................................C-8 Figure C.8 Shrinking the Heat Shrink Tube_Feeder Line (1) ..................................................C-9 Figure C.9 Shrinking the Heat Shrink Tube_Feeder Line (2) ................................................C-10 Figure C.10 Shrinking the Heat Shrink Tube_Connection between Connectors (1) ............. C-11 Figure C.11 Shrinking the Heat Shrink Tube_Connection between Connectors (2) .............C-12 Figure C.12 Shrinking the Heat Shrink Tube_Connection between Connectors (3) .............C-13 Figure C.13 Power Connector Assembly (1).........................................................................C-15 Figure C.14 Power Connector Assembly (2).........................................................................C-16 TM Figure D.1 Optic Connector Cleaner (IBC Figure D.2 Optic Module Cleaning (LC Type Jack) .................................................................D-3 Figure D.3 Optic Cable Connector Cleaning (LC Type Plug) ..................................................D-4 Figure D.4 Optic Connector Cleaner (IBC Figure D.5 Optic Port Cleaning (ODC, PT/LC Jack) ...............................................................D-6 Figure D.6 Optic Cable Connector Cleaning (ODC Type Plug) ..............................................D-7 Figure D.7 Optic Cable Connector Cleaning (PT/LC Type Plug) ............................................D-8 Figure D.8 Measuring the Optical Output and Connecting the Optic Connector.....................D-9 Figure E.1 Pressure Terminal Assembly (1)............................................................................ E-1 Figure E.2 Pressure Terminal Assembly (2)............................................................................ E-2 TM Brand Type Cleaner: P/N 9393) ........................D-2 Brand Type Cleaner: P/N 12910) ......................D-5 LIST OF TABLES Table 1.1 Basic Installation Tools ............................................................................................ 1-9 Table 2.1 Recommended Distances for System ..................................................................... 2-2 Table 2.2 Anchor Bolt Drill Bits and Hole Depth...................................................................... 2-3 Table 3.1 Recommended Minimum Allowed Cable Bend Radius ........................................... 3-3 Table 3.2 RRH-2WB Connecting Cable .................................................................................. 3-6 Table 3.3 Amphenol CJE-AL06M25U15-2S Power Connector Pin Map ............................... 3-13 Table 3.4 Cable Spec for Mobile WiMAX Only Operation Mode ........................................... 3-17 © SAMSUNG Electronics Co., Ltd. XIII 310 RRH-2WB (TD-LTE Fx) Installation Manual Table 3.5 Optic Connector Pin Map between RRH-2WB and DU for Mobile WiMAX Only Operation Mode ........................................................ 3-17 Table 3.6 Cable Spec for WIMAX + TD-LTE Dual Mode ....................................................... 3-18 Table 3.7 Optic Connector Pin Map between RRH-2WB and DU for WIMAX + TD-LTE Dual Mode .................................................................... 3-18 Table 3.8 RET Cable-side Connector Pin Map ..................................................................... 3-21 Table 3.9 RF Cable Identification Tag ................................................................................... 3-29 Table 3.10 Construction Situation Checklist ......................................................................... 3-30 Table B.1 Curvature Radius of Feeder Cable for Outdoor ...................................................... B-1 Table B.2 Curvature Radius of Feeder Cable for Indoor (Based on LS Feeder Line) ............. B-2 Table B.3 Curvature Radius of LMR-400 (Based on Times Microwave System) .................... B-2 Table B.4 Connector Connection Torque Value ...................................................................... B-3 Table B.5 TGB Installation Example ....................................................................................... B-7 Table E.1 Compressor Specification by Cable Thickness ....................................................... E-2 Table F.1 Standard Torque Value for Tightening Bolts ............................................................. F-1 © SAMSUNG Electronics Co., Ltd. XIV 310 RRH-2WB (TD-LTE Fx) Installation Manual CHAPTER 1. Before Installation 1.1 System Configuration and Structure RRH-2WB Configuration The configuration of RRH-2WB is as follows: Unit: mm (in.) [Top View] 370 (14.57) [Right View] 143.5 (5.65) [Front View] 112 (4.41) [Left View] 520 (20.47) 504 (19.84) 354 (13.94) [Bottom View] Figure 1.1 RRH-2WB Configuration © SAMSUNG Electronics Co., Ltd. 1-1 310 RRH-2WB (TD-LTE Fx) Installation Manual When the solar shield is assembled, the RRH-2WB should be configured as follows: Unit: mm (in.) [Top View] 576 (22.68) 386.5 (15.22) [Front View] [Right View] 169 (6.65) [Left View] [Bottom View] Figure 1.2 RRH-2WB Configuration When the Solar Shield is Assembled © SAMSUNG Electronics Co., Ltd. 1-2 310 RRH-2WB (TD-LTE Fx) Installation Manual RRH-2WB External Interface The external interface of RRH-2WB is as follows: -48 V IN ATN_3 Optic Debug RET ATN_2 Frame Ground ATN_1 ATN_0 [Bottom View] Figure 1.3 RRH-2WB External Interface © SAMSUNG Electronics Co., Ltd. 1-3 310 RRH-2WB (TD-LTE Fx) Installation Manual 1.2 Specifications RF Specification The RF specification of the RRH-2WB is as follows: Category System Capacity Channel Bandwidth - Mobile WiMAX: 10 MHz - TD-LTE: 20 MHz RF Band 2,496~2,690 MHz Maximum Number of Carriers - 10 MHz Mobile WiMAX 1 carrier/path - 20 MHz TD-LTE 1 carrier/path Interface between DU and RRH-2WB CPRI, Optic (4 Core) In band Spectral Mask FCC 43 + 10 logP Tx/Rx Performance - Mobile WiMAX: RCT - TD-LTE: 3 GPP TS 36.104 Output Antenna Port-based - 5 W/Carrier/Path @ WiMAX 10 MHz - 10 W/Carrier/Path @ TD-LTE 20 MHz Input Power The table below lists the power standard for the RRH-2WB. Category Standard System Input Voltage -48 VDC (Voltage Variation Range: -40~-56 VDC) System Input Current (Max.) 6.25 A @ -48 V System Input Voltage If the operator wants AC power for the system input voltage, it can be supplied using an additional external rectifier. Unit Size and Weight The table below lists the size and weight of the RRH-2WB. Category Size Weight © SAMSUNG Electronics Co., Ltd. Standard mm 354 (W) × 112 (D) × 504 (H) in. 13.94 (W) × 4.41 (D) × 19.84 (H) kg 20.4 or less lb 45 or less 1-4 310 RRH-2WB (TD-LTE Fx) Installation Manual Environmental Condition The table below lists the environmental conditions and related standards such as operational temperature and humidity. Category Temperature Condition Humidity Condition Range a) a) Altitude -40~+50°C (-104~122°F) 5~100%, condensing, not to exceed 30g/m absolute humidity -60~1,800 m (197~6,000 ft) Vibration GR-487-CORE Sec.3.39 - Transportation shock - Transportation vibration - Installation shock - Environmentally induced vibration - Earthquake resistance Noise (sound pressure level) Under 65 dBA in height of 1.0 m (3 ft) and distance of 1.5 m (5 ft). Electromagnetic Wave (EMI) FCC Title 47 Part 15 Class B EN 301 489 Section 7.1 EMC emission GR-1089-CORE(Issue4) Sec. 3.2 Emission Criteria RF Regulation a) FCC Title 47 Part 27 The standards of temperature/humidity conditions are based on the value on the position where is 400 mm (1.3 ft) away from the front of the DU and in the height of 1.5 m (5 ft) on the bottom. RF Specification The table below lists the RF characteristics of the RRH-2WB. Category Total Tx Output Power Description 30 W - Mobile WiMAX: 5 + 5 W - TD-LTE: 10 + 10 W Tx Constellation error - Mobile WiMAX: RCT - TD-LTE: 3 GPP TS 36.104 RX Sensitivity - Mobile WiMAX: RCT - TD-LTE: 3 GPP TS 36.104 © SAMSUNG Electronics Co., Ltd. 1-5 310 RRH-2WB (TD-LTE Fx) Installation Manual 1.3 Cautions for Installation Observe the following safety instructions when installing the RRH-2WB: Before Installing Post warning signs in areas where high-voltage cables are installed. Post ‘off limit’ signs in areas where accidents are most expected. With guardrails or fences, block open areas such as connecting parts, roof, and scaffold. While Installing The power must be cut off before installing. Be careful that boards mounted on the system and the cables among the boards are damaged or scratched when the system is transported or installed. Power Switch Off Make sure the power switch of power supplier is off when installing the system. Installing the system with power switch on may cause system damage or fatal human injury when cables are not correctly connected. Protection gloves and goggles Make sure that worker wears protection gloves and goggles to prevent damages from debris while drilling holes in a wall or ceiling. Watches, Rings, and Other Metallic Accessories Do not wear accessories such as watches and rings in order to prevent electrical shock. Do not Work by Yourself Worker must not work alone in any key process. System Installation and Access Only authorized workers are allowed to install or access the system. © SAMSUNG Electronics Co., Ltd. 1-6 310 RRH-2WB (TD-LTE Fx) Installation Manual Fixing Materials for outdoor Stud bolts, Hex. nuts, spring washers, and plane washers that are used to fix the pole should be made of stainless materials (STS 304). If not, the joint parts may oxidize or gather rust. After Installing Cover the cable holes drilled on the floor with a solid cover. Remove any debris produced during the work and clean up the installation site. Warning for Laser Beam Running through Optical Cables In the system, the laser beam emitting light runs through the optical cable. The exposure of the laser beam on worker’s eye may cause serious injury so that it should be handled with care. Cautions while Cleaning the Rack Make sure that worker does not damage installed cables while cleaning the rack. Cautions while Cleaning Power Supply While cleaning the power supply device, take caution that the device does not come in contact with alien bodies that may cause power failure. Management of Unused Ports Cover the unused ports (conduit, cable gland, etc.) with waterproof cap (sealing cap) to prevent infiltration of foreign material such as dust, moisture, or bug. © SAMSUNG Electronics Co., Ltd. 1-7 310 RRH-2WB (TD-LTE Fx) Installation Manual 1.4 Pre-survey Before starting the construction, the constructor and the departments concerned with the construction inspect the following items with a pre-survey checklist for the smooth progress of the construction. If any insufficiencies or problems are found, make the plan upon deliberation with the departments. Installation/construction personnel and the service provider carry out the site survey for the system installation focusing on the following items: Examination about the conformance and the economical efficiency of the place that the system is transported or installed. Status of external interfaces Power capacity and wiring status Possibility of system extension Review if the place has the enough space to operate and maintain. © SAMSUNG Electronics Co., Ltd. 1-8 310 RRH-2WB (TD-LTE Fx) Installation Manual 1.5 Installation Tools The basic tools for installation are listed in the table below. The additional tools required for each site need to identified and prepared during a site survey before starting installation. Table 1.1 Basic Installation Tools No. Name Torque driver set Specification - No.0~+ No.3 (M2.6~M6 ‘+’ Driver) - 1.0~60 kgf.cm (0.07~4.34 lbf·ft) Torque wrench set - M6~M12 - 10~30 kgf.cm (0.72~2.17 lbf·ft), 100~500 kgf.cm (7.23~36.15 lbf·ft), Replaceable head Nut driver set 6~10 mm (0.24~0.39 in.) Hacksaw Frame/Blade Normal/HIS Level/Plumb bobs Normal/500 g (1.10 lb) Heating gun 50~300°C (122~572°F) Solder 30~130 W Power extension cable 30 m Tape measure 5 m/50 m (196.85 in./1.97 in.) 10 Cable cutter 325 mm (12.80 in.) 11 Silicon gun/Silicon Normal/Gray & Colorless 12 Spanner 19 mm, 24 mm, 36 mm (0.75 in. 0.94 in. 1.42 in.) Precautions when Using the Installation Tools The required installation tools may vary depending on the conditions at the site. In addition to the basic tools, a protractor, compass, GPS receiver, ladder, safety equipment, cleaning tools etc. should also be prepared in consideration of the site conditions. © SAMSUNG Electronics Co., Ltd. 1-9 310 RRH-2WB (TD-LTE Fx) Installation Manual CHAPTER 2. Installing System 2.1 Installing the RRH-2WB The procedure to install the RRH-2WB is listed in the flow chart below. Foundation Work Unpacking and Transporting CHAPTER 2. Installing System Fixing System System Leveling Insulation Test Grounding Power Construction CHAPTER 3. Connecting Cables External Interface Construction Installation Test Figure 2.1 Procedure to Install the RRH-2WB © SAMSUNG Electronics Co., Ltd. 2-1 310 RRH-2WB (TD-LTE Fx) Installation Manual 2.2 Foundation Work 2.2.1 System Arrangement A certain distance must be secured around the RRH-2WB in each direction for installation and maintenance. Table 2.1 Recommended Distances for System Category Recommended Distances Front/Rear 800 mm (31.50 in.) or more Side 200 mm (7.87 in.) or more Top/Bottom (In case of Pole Type) 1,000 mm (39.37 in.) or more Unit: mm (in.) 200 (7.87) Tower 390 (15.35) Pole[76.3~114.3 (3~4.5)] [Tower Type] 200 (7.87) 630.5 (24.82) 140 (5.51) Pole[76.3~114.3 (3~4.5)] 390 (15.35) 720.5 (28.37) [Pole Type-1 RRH] [Pole Type-3 RRH] Figure 2.2 RRH-2WB Installation Space System Installation Spaces The space specifications in the Figure above apply when the pole diameter is 101.6 mm (4 in.). The dimensions may vary depending on the diameter of the pole. © SAMSUNG Electronics Co., Ltd. 2-2 310 RRH-2WB (TD-LTE Fx) Installation Manual 2.2.2 Marking and Drilling System marking helps install the system in a precise location by marking the locations of the system, anchor bolts, and cable racks on the floors, walls, and ceilings. When marking is completed, drill holes for anchor bolts. 1) 2) On the location of the system installation, mark the positions of the equipment and anchor bolts as shown in the Figure below. Drill holes to insert the anchor bolts and cover the holes with acetate tape before installing the system. Table 2.2 Anchor Bolt Drill Bits and Hole Depth Mounting Method Anchor Bolt Drill Bits Hole Depth Wall mount M6 10 mm (0.39 in.) 33 mm (1.3 in.) Unit: mm (in.) 390 (15.35) 370 (14.57) 168 (6.61) 576 (22.68) 520 (20.47) 330 (12.99) Anchor Bolt Hole [Rear View] Figure 2.3 RRH-2WB Marking © SAMSUNG Electronics Co., Ltd. 2-3 310 RRH-2WB (TD-LTE Fx) Installation Manual 2.3 Unpacking and Transporting This paragraph describes the work to unpack cabinets and other components and transport them to the place to be installed. The cabinet is externally packed and cabinet and other components are individually packed. The external packing should be unpacked in the outside. If necessary, the packing can be unpacked after transported into the area near installation place. Transport the cabinet to the installation place. Beware of the damage of walls, pillars, and bottom of the passage when transporting the cabinet. Transport other components with packing and sort by types. 2.3.1 Importing Items Bring in items, taking care of the followings: Regarding equipment weight and size, check the path to bring the equipment. Lay Iron and veneer boards on stairs or doorsills to make the transportation easy. When bring in equipment, beware of damage or impairment of main entrance, walls, pillars, and floors of the station. Prepare protection materials and fix them with a highstrength adhesive. Carry boards in packing status, and unpack them when installing or mounting. Vibration Level for Transportation When carrying the system, fasten the system firmly not to exceed the proper vibration level from 1 to 500 Hz. When carrying system, use a lift to prevent accidents. However, if the system should be carried by people, enough people are required to carry the system. Before moving the system, check the storage place for the system and remove obstacles in advance. While moving system, boards and other devices should not be shocked physically and damaged caused by dust, moisture, and static electricity. When installing the items imported, system must be installed in a location whose access is not easy from outside. 2.3.2 Unpacking Items The procedure to unpack items is as follows: 1) The packing items should be packed until they reach the installation place. 2) The items are classified in accordance with each job specification and stored on a place that does not interfere with working. 3) Unpacked systems should be installed immediately. If not installed immediately, the systems should be stored in the installation place temporarily. 4) Unpack only external packing, leaving the internal packing in unpacked status. 5) Unpack the inner packaging after each system is placed on its installation location. 6) Do not recycle packaging waste. Dispose of it in consultation with the provider. © SAMSUNG Electronics Co., Ltd. 2-4 310 RRH-2WB (TD-LTE Fx) Installation Manual 2.4 Fixing the System 2.4.1 Fixing the Wall Type RRH-2WB The procedure for fixing the wall type RRH-2WB is as follows: 1) Fixing the RRH-2WB Unit Mounting Bracket 1) To mount the RRH-2WB on the wall, first fix an M6 anchor bolt assembly at the marked location on the wall. 2) Fit the rubber pads, the bakelites, and the RRH-2WB unit mounting bracket to the fixed M6 anchor bolt assembly, and firmly fix them using the M6 insulation bushings, plane washers, spring washers, and Hex. nuts in the order. ‘A’ M6 Anchor Bolt Ass’y Detail ‘A’ Rubber Pad Bakelite RRH-2WB Unit Mounting Bracket M6 Insulation Bushing M6 Plane Washer M6 Spring Washer M6 Hex. Nut Figure 2.4 Fixing the RRH-2WB_Wall Type (1) © SAMSUNG Electronics Co., Ltd. 2-5 310 RRH-2WB (TD-LTE Fx) Installation Manual 2) Fixing the RRH-2WB to the RRH-2WB Unit Mounting Bracket Temporarily fix the M8 hex. bolt, plane washer, and spring washer loosely to the left/right fixing hole on the top of the RRH-2WB. Hang the RRH-2WB to the hooking holes at the top of the RRH-2WB unit mounting bracket. Then align the RRH-2WB with the fixing holes of the RRH-2WB unit mounting bracket and fix them firmly. M8 Plane Washer M8 Spring Washer M8 × 15L Hex. Bolt Figure 2.5 Fixing the RRH-2WB_Wall Type (2) © SAMSUNG Electronics Co., Ltd. 2-6 310 RRH-2WB (TD-LTE Fx) Installation Manual 3) Assembling the Solar Shield to RRH-2WB Align the solar shield cover with the fixing holes of the RRH-2WB and then fix them firmly using M5 SEMS screws. M5 × 12L SEMS Figure 2.6 Fixing the RRH-2WB_Wall Type (3) © SAMSUNG Electronics Co., Ltd. 2-7 310 RRH-2WB (TD-LTE Fx) Installation Manual 2.4.2 Fixing the Pole Type RRH-2WB Installing on Wall Mount Pole The following is an example of installing RRH-2WB and a sector antenna to the wall mount pole: Sector Antenna (4T4R) Wall Mount Pole RRH-2WB Figure 2.7 Example of Installing on Wall Mount Pole © SAMSUNG Electronics Co., Ltd. 2-8 310 RRH-2WB (TD-LTE Fx) Installation Manual Installing on Mono Pole The following is an example of installing RRH-2WB and a sector antenna to the mono pole: RRH-2WB Sector Antenna (4T4R) Figure 2.8 Example of Installing on Mono Pole © SAMSUNG Electronics Co., Ltd. 2-9 310 RRH-2WB (TD-LTE Fx) Installation Manual Installing on Pole The following is an example of installing RRH-2WB and a sector antenna to the pole: ‘B’ ‘A’ Figure 2.9 Example of Installing on Pole © SAMSUNG Electronics Co., Ltd. 2-10 310 RRH-2WB (TD-LTE Fx) Installation Manual Detail ‘A’ RRH-2WB Pole for RRH-2WB Fixing Detail ‘B’ Sector Antenna (4T4R) Figure 2.10 Example of Installing on Pole (Detail A, Detail B) © SAMSUNG Electronics Co., Ltd. 2-11 310 RRH-2WB (TD-LTE Fx) Installation Manual 2.4.2.1 Fixing 1 Sector Pole Type RRH-2WB Fix 1 sector pole type RRH-2WB in the following steps. 1) Fixing the RRH-2WB Unit Mounting Bracket and Pole Mount Bracket To install the RRH-2WB into a pole, fix the RRH-2WB unit mounting bracket and the pole mounting bracket firmly using M8 carriage bolts, plane washers, spring washers, and hex. nuts. Pole Mounting Bracket RRH-2WB Unit Mounting Bracket M8 Hex.Nut M8 Spring Washer M8 Plane Washer M8 × 180L Carriage Bolt Figure 2.11 Fixing 1 Sector Pole Type RRH-2WB (1) © SAMSUNG Electronics Co., Ltd. 2-12 310 RRH-2WB (TD-LTE Fx) Installation Manual 2) Fixing the RRH-2WB to the RRH-2WB Unit Mounting Bracket Temporarily fix the M8 hex. bolt, plane washer, and spring washer loosely to the left/right fixing hole on the top of the RRH-2WB. Hang the RRH-2WB to the hooking holes at the top of the RRH-2WB unit mounting bracket. Then align the RRH-2WB with the fixing holes of the RRH-2WB unit mounting bracket and fix them firmly. M8 Plane Washer M8 Spring Washer M8 × 15L Hex. Bolt Figure 2.12 Fixing 1 Sector Pole Type RRH-2WB (2) © SAMSUNG Electronics Co., Ltd. 2-13 310 RRH-2WB (TD-LTE Fx) Installation Manual 3) Assembling the Solar Shield to RRH-2WB Align the solar shield cover with the fixing holes of the RRH-2WB and then fix them firmly using M5 SEMS screws. M5 × 12L SEMS Figure 2.13 Fixing 1 Sector Pole Type RRH-2WB (3) © SAMSUNG Electronics Co., Ltd. 2-14 310 RRH-2WB (TD-LTE Fx) Installation Manual 2.4.2.2 Fixing 3 Sector Pole Type RRH-2WB Fix 3 sector pole type RRH-2WB in the following steps. 1) Assembling 3 sector Pole Mount Bracket Attach a pole mount bracket-jig to the 3 sector pole mount brackets. Fix the brackets to each other using M4 flat head screws at 8 fixing spots. M4 × 8L Flat Head Screw Pole Mount Bracket-jig Pole Mount Bracket Figure 2.14 Fixing 3 Sector Pole Type RRH-2WB (1) © SAMSUNG Electronics Co., Ltd. 2-15 310 RRH-2WB (TD-LTE Fx) Installation Manual 2) Fixing 3 sector Pole Mount Bracket Assemblies 1 and 2 Assemble 3 sector pole mount bracket assemblies 1 and 2. Firmly fix the two assemblies to each other using M8 × 80L Hex. bolts, spring washers, and plane washers at 4 fixing spots. M8 Plane Washer M8 Spring Washer M8 × 80L Hex. Bolt 3 Sector Pole Mounting Bracket Ass’y-1 3 Sector Pole Mounting Bracket Ass’y-2 Figure 2.15 Fixing 3 Sector Pole Type RRH-2WB (2) © SAMSUNG Electronics Co., Ltd. 2-16 310 RRH-2WB (TD-LTE Fx) Installation Manual 3) Fixing the 3 sector Pole Mount Bracket Assembly to the Pole Fix 3 Sector pole mount bracket assembly 3 to the 3 sector pole mount bracket assemblies 1 and 2. Firmly fix the assemblies to each other using M8 × 80L Hex. bolts, spring washers, and plane washers. ‘A’ Detail ‘A’ 3 Sector Pole Mounting Bracket Ass’y-3 M8 Plane Washer M8 Spring Washer M8 × 80L Hex. Bolt 3 Sector Pole Mounting Bracket Ass’y-2 3 Sector Pole Mounting Bracket Ass’y-1 Figure 2.16 Fixing 3 Sector Pole Type RRH-2WB (3) © SAMSUNG Electronics Co., Ltd. 2-17 310 RRH-2WB (TD-LTE Fx) Installation Manual 4) Fixing the RRH-2WB Unit Mounting Bracket to the 3 sector Pole Mount Bracket Assembly Fix the RRH-2WB unit mounting brackets to the 3 sector pole mount bracket assembly attached to the pole. At this time, the RRH-2WB unit mounting brackets should be firmly fixed using M8 Hex. bolts, spring washers, and plane washers. Use four sets at the bottom and the top as shown in the Figure. M8 Plane Washer M8 Spring Washer M8 × 25L Hex. Bolt 3 Sector Pole Mounting Bracket Ass’y RRH-2WB Unit Mounting Bracket Figure 2.17 Fixing 3 Sector Pole Type RRH-2WB (4) © SAMSUNG Electronics Co., Ltd. 2-18 310 RRH-2WB (TD-LTE Fx) Installation Manual 5) Fixing the RRH-2WB to the RRH-2WB Unit Mounting Bracket Temporarily fix the M8 hex. bolt, plane washer, and spring washer loosely to the left/right fixing hole on the top of the RRH-2WB. Hang the RRH-2WB to the hooking holes at the top of the RRH-2WB unit mounting bracket. Then align the RRH-2WB with the fixing holes of the RRH-2WB unit mounting bracket and fix them firmly. M8 Plane Washer M8 Spring Washer M8 × 15L Hex. Bolt Figure 2.18 Fixing 3 Sector Pole Type RRH-2WB (5) © SAMSUNG Electronics Co., Ltd. 2-19 310 RRH-2WB (TD-LTE Fx) Installation Manual 6) Assembling the Solar Shield Cover to RRH-2WB Align the solar shield cover with the fixing holes of the RRH-2WB and then fix them firmly using M5 SEMS screws. M5 × 12L SEMS Figure 2.19 Fixing 3 Sector Pole Type RRH-2WB (6) © SAMSUNG Electronics Co., Ltd. 2-20 310 RRH-2WB (TD-LTE Fx) Installation Manual Bolt Specifications for 3 Sector Pole Type RRH-2WB-Examples M8 × 50L Hex. Bolt 65 A Pole: Ф 76.3 mm (3 in.) 3 Sector Pole Mounting Ass’y M8 × 70L Hex. Bolt 80 A Pole: Ф 89.1 mm (3.5 in.) 3 Sector Pole Mounting Ass’y M8 × 80L Hex. Bolt 90 A Pole: Ф 101.6 mm (4 in.) 3 Sector Pole Mounting Ass’y M8 × 80L Hex. Bolt 100 A Pole: Ф 114.3 mm (4.5 in.) 3 Sector Pole Mounting Ass’y Figure 2.20 Bolt Specifications for 3 Sector Pole Type RRH-2WB-Examples © SAMSUNG Electronics Co., Ltd. 2-21 310 RRH-2WB (TD-LTE Fx) Installation Manual 2.4.3 Fixing the Tower type RRH-2WB Installing on the Tower The following is an example of installing RRH-2WB, and a sector antenna to the tower: Sector Antenna (4T4R) Tower RRH-2WB #1 RRH-2WB #3 RRH-2WB #2 Figure 2.21 Example of Installing on the Tower © SAMSUNG Electronics Co., Ltd. 2-22 310 RRH-2WB (TD-LTE Fx) Installation Manual Fixing the Tower type RRH-2WB Fix tower type RRH-2WB in the following steps. 1) Fixing the RRH-2WB Fixing Support to Tower a) Tighten the M8 stud bolts to the RRH-2WB fixing support (front side) fixing holes with plane washers, spring washers, and hex. nuts. M8 Hex. Nut M8 Spring Washer M8 Plane Washer M8 Stud Bolt RRH-2WB Fixing Support (Front Side) M8 Plane Washer M8 Spring Washer M8 Hex. Nut Figure 2.22 Fixing Tower Type RRH-2WB (1) © SAMSUNG Electronics Co., Ltd. 2-23 310 RRH-2WB (TD-LTE Fx) Installation Manual b) Align the RRH-2WB fixing support (front side) outside of the tower and the RRH-2WB fixing support (rear side) inside of the tower with each M8 stud bolt and fixing hole, and tighten them with M8 plane washers, spring washers, and hex. nuts. M8 Hex. Nut M8 Spring Washer M8 Plane Washer RRH-2WB Fixing Support (Rear Side) M8 Plane Washer M8 Spring Washer M8 Hex. Nut M8 Stud bolt Tower Angle RRH-2WB Fixing Support (Front Side) Figure 2.23 Fixing Tower Type RRH-2WB (2) © SAMSUNG Electronics Co., Ltd. 2-24 310 RRH-2WB (TD-LTE Fx) Installation Manual 2) Fixing the RRH-2WB Unit Mounting Bracket to the RRH-2WB Fixing Support Tighten the RRH-2WB unit mounting bracket to the RRH-2WB fixing supports with the M8 carriage bolts, plane washers, spring washers, and hex. nuts. M8 Hex. Nut M8 Spring Washer M8 Plane Washer RRH-2WB Fixing Support (Rear Side) Tower Angle RRH-2WB Fixing Support (Front Side) RRH-2WB Unit Mounting Bracket M8 Carriage Bolt Figure 2.24 Fixing Tower Type RRH-2WB (3) © SAMSUNG Electronics Co., Ltd. 2-25 310 RRH-2WB (TD-LTE Fx) Installation Manual 3) Fixing the RRH-2WB to the RRH-2WB Unit Mounting Bracket Temporarily fix the M8 hex. bolt, plane washer, and spring washer loosely to the left/right fixing hole on the top of the RRH-2WB. Hang the RRH-2WB to the hooking holes at the top of the RRH-2WB unit mounting bracket. Then align the RRH-2WB with the fixing holes of the RRH-2WB unit mounting bracket and fix them firmly. M8 Plane Washer M8 Spring Washer M8 × 15L Hex. Bolt Figure 2.25 Fixing Tower Type RRH-2WB (4) © SAMSUNG Electronics Co., Ltd. 2-26 310 RRH-2WB (TD-LTE Fx) Installation Manual 4) Assembling the Solar Shield to RRH-2WB a) Align the solar shield cover with the fixing holes of the RRH-2WB and then fix them firmly using M5 SEMS screws. M5 × 12L SEMS Figure 2.26 Fixing Tower Type RRH-2WB (5) © SAMSUNG Electronics Co., Ltd. 2-27 310 RRH-2WB (TD-LTE Fx) Installation Manual b) Attach RRH-2WB #1 and #2 to one side of the tower and RRH-2WB #3 to the other side RRH-2WB #1 RRH-2WB #3 RRH-2WB #2 Figure 2.27 Fixing Tower Type RRH-2WB (6) © SAMSUNG Electronics Co., Ltd. 2-28 310 RRH-2WB (TD-LTE Fx) Installation Manual 5) Fixing the Sector Antenna a) Place the pipe fixing plate and antenna fixing pipe in their positions and fix them to the platform pipe using M10 U-bolts. Antenna Fixing Pipe Platform Pipe Pipe Fixing Plate Antenna Fixing Pipe M10 Hex. Nut M10 Spring Washer M10 Plane Washer M10 U-Bolt Antenna Fixing Pipe M10 Hex. Nut M10 Spring Washer M10 Plane Washer Pipe Fixing Plate Platform Pipe M10 U-Bolt Figure 2.28 Fixing Tower Type RRH-2WB (7) © SAMSUNG Electronics Co., Ltd. 2-29 310 RRH-2WB (TD-LTE Fx) Installation Manual b) Install a sector antenna (4T4R) to each antenna fixing pipe. Sector Antenna (4T4R) Antenna Fixing Pipe Figure 2.29 Fixing Tower Type RRH-2WB (8) © SAMSUNG Electronics Co., Ltd. 2-30 310 RRH-2WB (TD-LTE Fx) Installation Manual 2.5 System Leveling Leveling refers to compensating for the level difference on the floor that is generated during floor work to install devices horizontally or vertically. Leveling can be carried out using a vinyl hose, a balance weight, or a level. However, levels are used for this system. Leveling Using a Level 1) 2) 3) Attach a level to the top, left, and right of the system. Adjust the system height so that the bubble in the level moves to the center of the window. (In the case of a digital level, the LCD should indicate an even plane.) Leveling is complete when the bubble stays at the window center in every level. Leveling Test for Wall Type System (Before Fixing the Anchor Bolt) 1) Before fixing the anchor bolts, draw a vertical and a horizontal between the markings of the anchor bolts, as shown in the Figure below. Make the lines vertical/horizontal using a spirit level. 2) When the lines are not placed in vertical/horizontal, complying with the distance to fix the equipment, modify the markings of the anchor bolts until the lines are placed in vertical/horizontal. Measuring for horizontal section Horizontal line 90° Vertical line Measuring for vertical section 90° Figure 2.30 Leveling Test before Fixing Anchor Bolts © SAMSUNG Electronics Co., Ltd. 2-31 310 RRH-2WB (TD-LTE Fx) Installation Manual 3) After fixing the equipment, place a spirit level on the side and top of the equipment, test the vertical/ horizontal leveling. 4) If the leveling result shows that the equipment is not placed in vertical/horizontal, check and adjust the drilling location, connection materials’ dimensions, and structures’ dimensions and then make the equipment place in vertical/horizontal. Measuring Horizontal Position Measuring Vertical Position Figure 2.31 Leveling Test before Fixing System © SAMSUNG Electronics Co., Ltd. 2-32 310 RRH-2WB (TD-LTE Fx) Installation Manual 2.6 Insulation Test When conducting an insulation test, it is advised to set the insulation tester to DC 500 V and the insulation value is recommend as 100 MΩ or higher. 1) 2) 3) Connect a lead of an insulation tester to the Hex.bolt for fixing the RRH-2WB. Connect another lead to the anchor bolt. Measure the insulation resistance by using the insulation tester. The insulation resistance should be over 100 MΩ. If the measured resistance is less than 100 MΩ, the value indicates the insulation failure. Thus, check the following and perform the insulation test again. Check if the connection between the Hex.bolt for fixing the RRH-2WB and the anchor bolt is proper. (Note that the anchor bolts must be shielded with an insulated bushing.) Check if the insulated bushing is damaged. Replace the insulator (insulated bushing, bakelite, rubber pad, etc.) or parts for fixing. Anchor Bolt Measuring Instrument of Insulation Resistance Hex.bolt for Fixing the RRH-2WB Figure 2.32 Schematic Diagram for Insulation Test Precautions for Measuring Insulation Resistance Since a high voltage is used for measuring insulation resistance, insulation resistance should not be measured when the system is in operation. Make sure to only measure the insulation resistance of the appointed part. Other components such as the system’s internal components and the unit (system frame), components of the communication cables, units, etc. should not be measured. © SAMSUNG Electronics Co., Ltd. 2-33 310 RRH-2WB (TD-LTE Fx) Installation Manual CHAPTER 3. Connecting Cables 3.1 Work Flow for Cabling The cabling sequence is as follows. Cable Path Inspection Cable Cutting Cable Installation Cable Binding Connector Attachment When assembling the connector at the site Connector Assembly Identification Tag Attachment Figure 3.1 Work Flow for Cabling Cabling Workflow The sequence of cable cutting and installation of the cable workflow can be changed depending on the field situation such as ‘cutting after installing’ or ‘installing after cutting’. Considerations when Cutting the Cable after Installation When cutting the cable after installation, make sure that the connector is disconnected. Installation of the cable with the connector connected to the system may cause contact failure or damage to the connector assembled to the system and the cable due to cable tension or the operator’s mistakes. © SAMSUNG Electronics Co., Ltd. 3-1 310 RRH-2WB (TD-LTE Fx) Installation Manual Cable Path Inspection When installing a cable that connects between the rectifier, Main Ground Bar (MGB), and backhaul device, etc. within the system, the cable path length and the cable installation method, etc. must be inspected. Follow these guidelines when inspecting the cabling path. A minimum cable length must be selected provided that it does not affect the cable installation and maintenance. The cable must be placed in a location where it will not be damaged by external factors. (power line, flooding, footpaths, etc.) In areas where the cable may be damaged by external factors, ensure that measures are taken to prevent damage to the cable. (cable tray, ducts, flexible pipe, etc.) Cable Cutting Measure the exact distance, carefully checking the route, and cut the cable using a cutting tool. Follow these guidelines when cutting the cable. Cut the cable to the length determined in the Cable Path Inspection step. Use a dedicated cable cutting tool. Cut the cable at right angles. Be careful to keep the cable away from any moisture, iron, lead, dust or other foreign material when cutting. Remove any foreign material attached to the cable using solvent and a brush. Cable Installation Cable installation involves running the cable along the cabling path to the target connector of the system or an auxiliary device after cable path inspection and cable cutting have been completed. Follow these guidelines when installing a cable. Be careful not to damage the cable. If the cable is damaged, cut out the damaged section before installing. When installing the cable over other cables, make sure the cable is installed on the other cables. Pay more attention to the vertical and horizontal cross sections where the cables are usually reversed. Always use the maximum curvature radius possible, and make sure that the minimum curvature radius specification is complied with. If the cable needs to be protected, use a PVC channel, spiral sleeve, flexible pipe, and cable rack, etc. © SAMSUNG Electronics Co., Ltd. 3-2 310 RRH-2WB (TD-LTE Fx) Installation Manual Table 3.1 Recommended Minimum Allowed Cable Bend Radius No Type Recommended Minimum Allowed Remark Cable Bend Radius GV/CV/FR-8 8 times of the cable external diameter 0.6/1 KV Cable Optic Cable 20 times of the cable external diameter UTP/FTP/S-FTP Cable 4 times of the cable external diameter PVC/LSZH, 4 Pair 1/2 in. Feeder Line (Indoor) 32 mm (1.26 in.) RFS, LS 1/2 in. Feeder Line (Outdoor) 125 mm (4.92 in.) RFS, LS 7/8 in. Feeder Line (Outdoor) 250 mm (9.84 in.) RFS, LS 1-1/4 in. Feeder Line (Outdoor) 380 mm (14.96 in.) RFS, LS 1-5/8 in. Feeder Line (Outdoor) 500 mm (19.69 in.) RFS, LS LMR-400 10 RG-316D 25.4 mm (1 in.) Installation 101.6 mm (4 in.) Repeated 15 mm (0.59 in.) ※ If the allowed cable bend radius is specified by the manufacturer, comply with the bend radius specified. Cable Binding Cable binding involves fixing and arranging an installed cable using binding strings, cable ties, binding lines, and ram clamps, etc. Follow these guidelines when binding a cable. Be careful not to damage the cable during binding. Use appropriate cable binding tools according to the target location (indoor or outdoor, etc.) and the use of the cable (power supply cable, optical cable, feeder line, etc.). Do not let the cutting section of a cable tie and binding line, etc. be exposed to the outside. This may cause damage to cables or personal injury. Make sure that the cutting sections of cables are not exposed to the outside. If there is a danger that contact failure may occur in a connector connection due to tension, install the cable as short as possible. Connector Attachment Connector attachment involves assembling a connector to an installed cable or to a device on the site. Follow these guidelines when attaching a connector. Make sure you are fully aware of the connector assembly method before assembling a connector. Assemble the connector in accordance with its pin map. Each connector has a hook to prevent its core positions from being changed. Check the corresponding grooves before connecting a connector to another connector. Trim the remaining string of any knot in a binding string so that the knot does not loosen. © SAMSUNG Electronics Co., Ltd. 3-3 310 RRH-2WB (TD-LTE Fx) Installation Manual Use a heat shrink tube at a connector connection for cables that are installed outdoor, such as feeder lines, to prevent water leakage and corrosion from occurring at the part exposed to the outside. Connect each cable of the connector assembly in a straight line. Be careful when connecting a cable so that contact failure does not occur at a connector connection due to tension. Identification Tag Attachment Identification tag attachment involves attaching a marker cable tie, nameplate, and label, etc. to the both ends of a cable (connections to a connector) to identify its use and cabling path. Marker Cable Tie On the marker cable tie, a label can be attached. The appearance and specification may differ depending on the type and manufacturer. Follow these guidelines when attaching an identification tag. When installing a cable outdoor, use relief engraving and coated labels, etc. to prevent the markings from being erased. Since the form and attachment method for identification tags are different for each provider, consult with the provider before attaching them. Connecting Ground Cable In cabling, the connection of cables without the connection to the ground cable may cause the damage of the equipment or the bodily injury of the worker. Connect the ground cable first. Cable Work Sequence When performing cable work for the system, proceed with the ground work before any other work to prevent errors occurring due to static electricity and other reasons. Cable Installation Checklist When installing, take care not to overlap or tangle the cables; also, consider future expansion. Install the DC power cable and data transmission cable away from the AC power cable to prevent electromagnetic induction. Cable Works The cable works require the knowledge for the cabling works such as cable installation/tying. © SAMSUNG Electronics Co., Ltd. 3-4 310 RRH-2WB (TD-LTE Fx) Installation Manual 3.2 Cabling The cabling diagram of the RRH-2WB is as follows: [MGB] Optic Cable (for DU) [DU] RRH-2WB Frame Ground Cable 2) Power Cable 3) 1) [RF Antenna] 4) RF Antenna Cable Ground Kit [TGB] TGB Ground Cable [Rectifier] ※ TGB and Ground Kit are used when using the 7/8 in. feeder line or more. Figure 3.2 Cabling Diagram © SAMSUNG Electronics Co., Ltd. 3-5 310 RRH-2WB (TD-LTE Fx) Installation Manual Table 3.2 RRH-2WB Connecting Cable From RRH-2WB To MGB Cable 1) RRH-2WB Frame Ground Cable : AWG 10, GV 4 mm × 1C Rectifier 2) Power Cable : AWG8, CV 6 mm × 2C DU 3) Optic Cable : ODC-4 to LC/PC, Single Mode RF Antenna 4) RF Antenna Cable : 1/2 in. Feeder Line, 7/8 in. Feeder Line Underground ground MGB AWG4/0, GV 95 mm × 1C (However, this can be different, defending on the standard of service provider) TGB AWG4/0, GV 95 mm × 1C (However, this can be different, defending on the standard of service provider) © SAMSUNG Electronics Co., Ltd. 3-6 310 RRH-2WB (TD-LTE Fx) Installation Manual 3.3 Grounding Grounding is required for protecting complex electronic or electric systems such as power system, communication system, and control system from lightning, over-current, over-voltage, and electric noise. Thus, the systems can operate properly and protect human life from electrical shock. Ground equipment minimizes the electrical potential of the electronic device to that of the ground, which is zero electrical potential, so that it can prevent the device from occurring electrification. The purposes of the ground construction are as follows: To prevent human life and the system from over-current, over-voltage, and lightning To provide a discharge path for surge voltage generated by lightning and power switch To protect the system from static electricity To eliminate or minimize the high-frequency potential in the system housing To provide a conductor for the balance and stability of high-frequency current To stabilize the potential of the circuit against the ground Connecting Ground Cable In cabling, the connection of cables without the connection to the ground cable may cause the damage of the equipment or the bodily injury of the worker. Connect the ground cable first. © SAMSUNG Electronics Co., Ltd. 3-7 310 RRH-2WB (TD-LTE Fx) Installation Manual 3.3.1 Grounding the System RRH-2WB Grounding The way to connect the ground cable of RRH-2WB is as follows: Install a ground cable (AWG10, GV 4 mm2 × 1C) from the MGB to the ground terminal at the bottom of the RRH-2WB. 2) Fix a 4 mm2 pressure terminal and a heat shrink tube at the cable end. Pressure terminal: 2 Hole, 90°, hole diameter: 6.3 mm (0.25 in.), hole distance 16 mm (0.63 in.) Heat shrink tube: Green 3) Align the pressure terminal fixed to the cable with the fixing holes on the RRH-2WB’s grounding terminal, and fix it with M6 SEMS. Apply a torque of 20~30 kgf.cm (1.45~ 2.17 lbf·ft). 1) RRH-2WB ‘A’ Detail ‘A’ 4 mm2 Pressure Terminal Heat Shrink Tube (Green) M6 × 12L SEMS Ground Cable (AWG10, GV 4 mm2 × 1C) From MGB (Main Ground Bar) Figure 3.3 Connection of the RRH-2WB Ground Cable © SAMSUNG Electronics Co., Ltd. 3-8 310 RRH-2WB (TD-LTE Fx) Installation Manual Pressure Terminal for RRH-2WB Frame Grounding As for the pressure terminal or the cable, the UL certified products or equivalent should be used. Ex) Manufacturer-Panduit 4 mm Pressure Terminal: LCD10-14AF-L When connecting the pressure terminal to a cable, remove the cable sheath where the pressure terminal is connected, and then push the cable all the way to the end of the cable lead-in part. Check the position of the coaxial cable through the inspection window of the pressure terminal before compressing it with a compressor. © SAMSUNG Electronics Co., Ltd. 3-9 310 RRH-2WB (TD-LTE Fx) Installation Manual 3.4 Power Construction The power construction is to supply the power inside the exchange. The power supply device is configured as follows: Commercial Power AC Distributor AC Rectifier DC System Battery Figure 3.4 Power Equipment Diagram Handling the Power Cable - Handling the power cable incorrectly may damage the rack or cause an electric shock through the cable. Ensure the power switch on the rectifier or the system is turned off before handling the power cable. - The fixing materials for power cable must be tightly secured to prevent electrical accidents. 3.4.1 Installing the Power Cable 1) 2) 3) 4) 5) Install a power cable (AWG8, CV 6 mm2 × 2C) covered with flexible pipes from the rectifier to the power port at the bottom of the RRH-2WB. Fit a water-proof power connector to the installed power cable (AWG8, CV 6 mm2 × 2C). Refer to the assembly manual enclosed in the connector box for how to assemble the connector. Fit a cut heat shrink tube to the power cable before connecting the cable to the system power port. Connect the cable fitted with the power connector to the power port at the bottom of the system. When the cable connection is completed, contract the heat shrink tube (jelly type) using a heating gun so that the flexible pipes and the connector unit are well fixed. (Finish using silicon if necessary.) © SAMSUNG Electronics Co., Ltd. 3-10 310 RRH-2WB (TD-LTE Fx) Installation Manual Power Connector (Amphenol, CJE-AL06M25U15-2S) Power Cable (AWG8, CV 6 mm2 × 2C, -48 V DC) Heat Shrink Tube (Jelly Type, Black) Heat Shrink Tube (Jelly Type, Black) Figure 3.5 Installing the RRH-2WB Power Cable (1) © SAMSUNG Electronics Co., Ltd. 3-11 310 RRH-2WB (TD-LTE Fx) Installation Manual Heat Shrink Tube (Jelly Type, Black) Heat Shrink Tube (Jelly Type, Black) Figure 3.6 Installing the RRH-2WB Power Cable (2) © SAMSUNG Electronics Co., Ltd. 3-12 310 RRH-2WB (TD-LTE Fx) Installation Manual Circuit Breaker Installation Circuit breaker of slow blow type should be installed to the power line which is connected from the rectifier (or power distributor) to the system in order to supply the power stably. The capacity of -48 VDC circuit breaker is 20 A. Power cable In case of using AWG8 (6 mm × 2C) power cable, it is applicable up to 70 m (299.66 ft). When the distance is 70 m (299.66 ft), followings should be considered. - Do not rapid ON/OFF (within one second): The voltage loss value caused by the cable resistance loss is 3 V, and the RRH-2WB could be damaged by the counter electromotive force caused by the cable inductance. - The battery’s life could be shorten: The RRH-2WB could be off in spite the battery remains. (When the battery capacity is designed within one hour) - Do not use the power cables linked: Using the power cables linked each other, the loss will be increased. [RRH-2WB Power Cable Side] Figure 3.7 Power Cable Connector Table 3.3 Amphenol CJE-AL06M25U15-2S Power Connector Pin Map Pin No. Description Power Cable Color (CV 6 mm × 2C) Heat Shrink Tube Color -48 V Black Blue Return White Red Power Cable Color In the table above, the cable color is based on the inner wire of the CV 6 mm × 2 core cable. The color of the inner wires may vary depending on the type and manufacturer of the cable used. © SAMSUNG Electronics Co., Ltd. 3-13 310 RRH-2WB (TD-LTE Fx) Installation Manual 3.5 External Interface Construction 3.5.1 Cable Connection between the DU and the RRH-2WB The RRH-2WB is a unified RF module interfacing remotely with the DU through an optical cable. It is located at the front end of the antenna. Cable connection between the DU and the RRH-2WB is as shown below. 1) 2) 3) 4) Install an optic cable from the DU to the optic port at the bottom of the RRH-2WB. Fit a cut heat shrink tube to the optic cable before connecting the cable to the system optic port. Connect the optic cable connector (ODC type) to the optic port at the bottom of the system. When the cable connection is completed, contract the heat shrink tube (jelly type) using a heating gun so that the flexible pipes and the connector unit are well fixed. (Finish using silicon if necessary.) © SAMSUNG Electronics Co., Ltd. 3-14 310 RRH-2WB (TD-LTE Fx) Installation Manual Optic Connector (ODC-Outdoor connector) Optic Cable (Single Mode) Heat Shrink Tube (Jelly Type, Black) Heat Shrink Tube (Jelly Type, Black) Optic Cable (Single Mode) Heat Shrink Tube (Jelly Type, Black) Figure 3.8 Cable connection between the DU and the RRH-2WB (Optical connection) © SAMSUNG Electronics Co., Ltd. 3-15 310 RRH-2WB (TD-LTE Fx) Installation Manual [Huber + Suhner] Full Part No.: 09Z04FG0-J3/85-5-10[XX]NN ※ XX is cable length. (10: 10 meter) [Cable: 04-E9/FSN (ZN)Z-G55] LC 1 Pin 1: Blue Pin 4: Red Pin 3: Black LC 2 LC 3 LC 4 Pin 2: Green [RRH-2WB-side Connector: ODC-4 (ODCP-Z/M-A300-04)] [DU-side Connector: FLC-Z/K-A006] Pin 4 (LC 1): Red Pin 2 (LC 3): Green Pin 3 (LC 2): Black Pin 1 (LC 4): Blue Figure 3.9 Optic Cable Connector between DU and RRH-2WB_RRH-2WB side © SAMSUNG Electronics Co., Ltd. 3-16 310 RRH-2WB (TD-LTE Fx) Installation Manual Mobile WiMAX Only Operation Mode (4T4R) Optic cable between RRH-2WB and DU for Mobile WIMAX only operation mode is as follows: Table 3.4 Cable Spec for Mobile WiMAX Only Operation Mode Cable type DU Side (LC) ODC-4 to LC Cable For 1 Carrier st Red Green Primary Secondary Table 3.5 Optic Connector Pin Map between RRH-2WB and DU for Mobile WiMAX Only Operation Mode LC Connector Boot Color DU Port MRA-F #0 MRA-F #1 MRA-F #2 (Cable Marker) L0 Red (LC1) L1 Black (LC2) L0 Red (LC1) L1 Black (LC2) L0 Red (LC1) L1 Black (LC2) RRH-2WB RRH-2WB #0 RRH-2WB #1 RRH-2WB #2 LC 2 (Black) RRH-2WB #2 LC 1 (Red) RRH-2WB #1 LC 1 (Red) LC 2 (Black) LC 2 (Black) RRH-2WB #0 © SAMSUNG Electronics Co., Ltd. LC 1 (Red) 3-17 310 RRH-2WB (TD-LTE Fx) Installation Manual WiMAX + TD-LTE Dual Mode (2T2R) Optic cable between RRH-2WB and DU for WIMAX + TD-LTE dual mode is as follows: Table 3.6 Cable Spec for WIMAX + TD-LTE Dual Mode Cable type DU Side(LC) ODC-4 to LC Cable WiMAX @ ANT0/ANT1 Red (LC1) LTE @ ANT2/ANT3 Green (LC3) Blue (LC4) Table 3.7 Optic Connector Pin Map between RRH-2WB and DU for WIMAX + TD-LTE Dual Mode LC Connector Boot Color DU Port (Cable Marker) MRA-L A0 Green (LC3) A1 Blue (LC4) MRA-F #0 L0 Red (LC1) MRA-L B0 Green (LC3) B1 Blue (LC4) MRA-F #1 L0 Red (LC1) MRA-L C0 Green (LC3) C1 Blue (LC4) L0 Red (LC1) MRA-F #2 RRH-2WB #1 LC 4(Blue) RRH-2WB #0 RRH-2WB #1 RRH-2WB #2 LC 4(Blue) RRH-2WB #1 LC 3(Green) RRH-2WB #0 RRH-2WB LC 3(Green) RRH-2WB #2 LC 4(Blue) RRH-2WB #2 RRH-2WB #0 LC 3(Green) RRH-2WB #2 LC 1(Red) RRH-2WB #1 LC 1(Red) RRH-2WB #0 LC 1(Red) © SAMSUNG Electronics Co., Ltd. 3-18 310 RRH-2WB (TD-LTE Fx) Installation Manual Warning for Laser Beam Running through Optical Cables In the system, the laser beam emitting light runs through the optical cable. The exposure of the laser beam on worker’s eye may cause serious injury so that it should be handled with care. Connecting the Optic Cable Before connecting the optical cable, check if the cutting section of the connector core is soiled. Be careful to keep the cutting section away from dust or foreign material. If the cable is soiled with foreign material, do not blow to remove them. Make sure to clean the connector in accordance with the cleaning directions for the optic cable. Refer the ‘ANNEX D’. © SAMSUNG Electronics Co., Ltd. 3-19 310 RRH-2WB (TD-LTE Fx) Installation Manual 3.5.2 Cable Connection of RET Below is the method for connecting the Remote Electrical Tilting (RET) cable to control the antenna tilting angle remotely. RET - When applying 27 VDC voltage, a current of 1 A or less must be supplied to the RET from the RRH-2WB. - For the external material of the RET, metal without vent hole or the UL certificated material must be use. RET Connector (Samwoo, SU-20SP-8P) Heat Shrink Tube (Jelly Type, Black) RET Cable Figure 3.10 Cable Connection of RET © SAMSUNG Electronics Co., Ltd. 3-20 310 RRH-2WB (TD-LTE Fx) Installation Manual Figure 3.11 RET Cable Connector Table 3.8 RET Cable-side Connector Pin Map Samwoo, SU-20SP-8P Pin RET Connector © SAMSUNG Electronics Co., Ltd. Function RS485B DGND RS485A +28 V +28 V RTN 1, 2, 8 NC 3-21 310 RRH-2WB (TD-LTE Fx) Installation Manual 3.5.3 Connection of Feeder Cable Connect a feeder cable between the RRH-2WB and the sector antenna as follows. Sector Antenna ‘B’ 1/2 in. Feeder line RRH-2WB ‘A’ Figure 3.12 Feeder Line Connection Diagram © SAMSUNG Electronics Co., Ltd. 3-22 310 RRH-2WB (TD-LTE Fx) Installation Manual Detail ‘A’ 1) From the 1/2 in. jumper ass’y between RRH-2WB and the RF antenna 1/2 in. jumper ass’y, install one end of the cable, which the miniature Din-type male connector is connected to, to the RF port at the bottom of RRH-2WB. 2) Attach the heat shrink tube (jelly type) for finishing to the Jumper cable, and connect the miniature Dintype male connector to the RF port. 3) After connecting the connector, finish the connection with a heat shrink tube (jelly type). Miniature Din Type- Male Connector (For 1/2 in. Feeder Line) RF Cable (1/2 in. Feeder Line) Heat Shrink Tube (Jelly Type, Black) Heat Shrink Tube (Jelly Type, Black) Heat Shrink Tube (Jelly Type, Black) Figure 3.13 Connection of Feeder Cable (Detail A) © SAMSUNG Electronics Co., Ltd. 3-23 310 RRH-2WB (TD-LTE Fx) Installation Manual Detail ‘B’ 4) Attach the heat shrink tube (jelly type, black) for finishing to the other end of the 1/2 in. jumper ass’y connected to the RRH-2WB’s RF port, and connect the N-type male connector to the sector antenna’s port. 5) After connecting the connector, finish the connection with a heat shrink tube (jelly type, black). Sector Antenna (4T4R) Antenna Connector (N Type-Female) N Type-Male Connector For 1/2 in. Feeder Line Heat Shrink Tube (Jelly Type, Black) 1/2 in. Feeder Line Heat Shrink Tube (Jelly Type, Black) 1/2 in. Feeder Line Heat Shrink Tube (Jelly Type, Black) Figure 3.14 Connection of Feeder Cable (Detail B) © SAMSUNG Electronics Co., Ltd. 3-24 310 RRH-2WB (TD-LTE Fx) Installation Manual Checking the Antenna/Arrestor/Line Amplifier Connector Specs The connector specifications may differ depending on the supplier and the manufacturer of antenna/arrestor/line amplifier. Check the specifications of the antenna/arrestor/line amplifier before preparing materials. Even, the same kind of connectors may have different specifications depending on the cable, so check whether the connector can be applied to the cable to be used. Ex) Din Type-Male: 1/2 in. for feeder line, 7/8 in. for feeder line © SAMSUNG Electronics Co., Ltd. 3-25 310 RRH-2WB (TD-LTE Fx) Installation Manual 1/2 in. Feeder Line ※ Heat Shrink Tube (Jelly Type) 28/6 × 150 mm Before Shrinking Length /Max. Shrink Sector Antenna (4T4R) N Type-Male Connector For 1/2 in. Feeder Line - Heat Shrink Tube (Jelly Type, Black) : 28/6 × 150 mm (1.10/0.24 × 5.91 in.) RRH-2WB Miniature Din Type-Male Connector (For 1/2 in. Feeder Line) - Heat Shrink Tube (Jelly Type, Black) : 28/6 × 150 mm (1.10/0.24 × 5.91 in.) Figure 3.15 Heat Shrink Tube Specification © SAMSUNG Electronics Co., Ltd. 3-26 310 RRH-2WB (TD-LTE Fx) Installation Manual Finishing Heat Shrink Tube of a Sector Antenna 1) Insert an antenna protection plate to antenna port. 2) Place the heat shrink tube on the connection point and shrink the heat shrink tube using a heat gun. Antenna Protection Plate Antenna Jumper Cable (1/2 in. Feeder Line) Antenna Protection Plate Heat Shrink Tube (Jelly Type) Heat Shrink Tube (Jelly Type) Avoid aiming the heating gun toward the antenna’s body as shown in the figure below. © SAMSUNG Electronics Co., Ltd. 3-27 310 RRH-2WB (TD-LTE Fx) Installation Manual Installing the Antenna When you install the antenna, the distant and angle between the antenna and lightning rod must be within the protective angle (left/right side 45° each from the central axis) to prevent the antenna from lightning damage. Lightning Rod 45° 45° RF Antenna © SAMSUNG Electronics Co., Ltd. 3-28 310 RRH-2WB (TD-LTE Fx) Installation Manual Checking Feeder Connection After connecting the feeder cables, perform the continuity test and feeder cable return loss to check if the feeder cable is changed and measure VSWR of antenna and feeder cable. Connection Part of System External Interface Connector Antenna Measure all cables of section ~ . The measured VSWR should be the specification value or less. If the VSWR exceeds the specification value, disassemble the connector and measure each section separately. Checking VSWR for Minimum Cable Bend Radius and Length of RF Cable If the VSWR value for minimum cable bend radius and length of RF cable is not applied, system may not work properly because RF signals cannot transmit or receive smoothly. So, the VSWR value for minimum cable bend radius and length of RF cable must be checked and applied. RF Cable Identification Tag Installation Attach the identification tape in the below table to the RF cable. Table 3.9 RF Cable Identification Tag Category Description Installation position Attach the identification tag to the both ends of the antenna. Materials Use the material of aluminum coated by vinyl for the identification tag. Fixing method - Antenna side: Attach the tag to the feeder line using binding strings through the two holes on the tag. - Equipment Side: Cover up the feeder line with the tag and fix it using binding strings through the two holes on the tag. Identification method The markings must be prevented from being erased by using relief engraving or coated labels. © SAMSUNG Electronics Co., Ltd. 3-29 310 RRH-2WB (TD-LTE Fx) Installation Manual 3.6 Installation Test If the installation of the system is complete, progress the installation test to check the status of the system. If there is any problem, restore the system and write out the failure table. Table 3.10 Construction Situation Checklist Result Category Check Items Criteria Remarks Pass System Installation Power Acceptance System fixing status (vertical and horizontal) Horizontal and vertical locations System arrangement status Horizontal and vertical locations Locking status and standard compatibility of bolts/nuts/ washers Visual inspection and magnet test External wiring and other wirings Visual inspection for twist, array and arrangement Cable installation between systems Checking twist, distortion and installation status External connector connection Visual inspection to check poor contact (tightening status) Other appurtenant work (Cable duct installation and others) Visual inspection Equipment power line standards Visual inspection Power terminal panel ↔ System Visual inspection Cabling Status Visual inspection for twisted or entangled status Damage of cable sheath Visual inspection Connection status of system Visually inspect to ensure power connector that the power connector Fail is properly connected, and that there are no gaps or movement. System input voltage (BATT voltage) Measurement by digital meter (voltmeter) Cabling status Visual inspection (Flexible, Vinyl hose) © SAMSUNG Electronics Co., Ltd. 3-30 310 RRH-2WB (TD-LTE Fx) Installation Manual Table 3.10 Construction Situation Checklist (Continued) Result Category Check Items Criteria Remarks Pass Ground Construction Feeder Line Status Various TAG Status Finish Status Ground line standard Visual inspection Ground bar ↔ System Visual inspection Ground line cabling status Cabling status check Termination treatment of the ground line (pressure terminal) Visual inspection Feeder line cabling and locking status Beauty, robustness and Bending ANT installation and attachment status Visual inspection (ANT bar’s vibration status) Connection and finish status Beauty and robustness Feeder tag Visual inspection (Information mentioned: length, loss value, location) Power cable tag Visual inspection (Power Identification) Ground table tag Visual inspection Attachment status of the label for the real-name construction system - Indoor: wall side of the gate side - Outdoor: inside of the cover of the distribution box Visual inspection (size and material) Cable duct bolt’s attachment status Visual inspection Feeder inlet finish treatment status Visual inspection (check if the rear part is attached) Status of inside/outside of the system and vicinity of the base station Visual inspection Fail General Opinion © SAMSUNG Electronics Co., Ltd. 3-31 310 RRH-2WB (TD-LTE Fx) Installation Manual ANNEX A. Sector Antenna Installation A.1 Cautions when Installing a Sector Antenna Precautions of antenna installation are as follows. Sector antennas should be installed vertically. (± 1°) Antenna is the precise material, so be careful not to make damage or form change. When moving antenna, use the tool suitable to rating. In addition, use the rated carrying device which is at least 200 % or more than antenna considering the stability. Be careful not to give too much strength to the antenna. If it rains, suspend connecting the feeder cable and antenna. Fix it after adjusting the direction of antenna exactly. Distance between steel tower and antenna and the distance between send-receive antennas are based on the antenna layout. Attach the antenna on the position specified in the drawing. Install the antenna not to make a feature change of the antenna considering the direction of the radiation Connect the antenna not making the alien substance flowed so that Passive InterModulation Distortion (PMID) is not affected. Measure VSWR of all antennas and the value should be within the regulated value. A.2 Sector Antenna Layout The method of sector antenna layout is as follows. 1) 2) 3) 4) Use the transit to adjust the antenna installation direction exactly. Fix the direction of the sector antenna, same as the angle settled when designing the cell after installing the steel tower. Arrange the antennas of each sector to the sector directional angle at right angles by adjusting the distance between antenna and steel tower. In the event of the station whose the direction between sectors is not 120°, install it to make the steel tower and antenna direction different being careful of the tilt and azimuth. For circular platform, separate the antenna interval at maximum. © SAMSUNG Electronics Co., Ltd. A-1 310 RRH-2WB (TD-LTE Fx) Installation Manual A.3 Sector Antenna Installation The method of sector antenna installation is as follows. 1) Put up an antenna pole and insert the sector antenna into the antenna pole using a fixing clamp. 2) Set the antenna’s up/down tilt to 0° and fix the fixing clamps at the top and bottom. 3) After tightening the fixing clamp, adjust the antenna up/down (tilt) depending on the signal strength. The bolt of the guide clamp must be loosened, so the antenna angle can be adjusted. 4) After setting the antenna angle, tighten the bolt of the guide clamp, which was loosened previously. Regarding the nut, the double nut mounting should be used to prevent the nut from coming loose. Guide Clamp Bolt_3 Guide Clamp Bolt_1 Upper Fixing Clamp Upper Guide Clamp Guide Clamp Bolt_2 Pole Main Radiation Direction Lower Guide Clamp Lower Fixing Clamp Antenna Input Port Guide Clamp Bolt_4 Figure A.1 Sector Antenna © SAMSUNG Electronics Co., Ltd. A-2 310 RRH-2WB (TD-LTE Fx) Installation Manual Installing the Antenna When you install the antenna, the antenna must be installed within the protective angle (left/right side 45° each from the central axis) of lightning rod to prevent the antenna from lightning damage. Lightning Rod 45° 45° GPS Antenna RF Antenna © SAMSUNG Electronics Co., Ltd. A-3 310 RRH-2WB (TD-LTE Fx) Installation Manual ANNEX B. Installing Feeder Cable B.1 Cautions When Installing Feeder Cable When installing the feeder, the following cautions shall be considered: Put a plate to work not to make damage for the surface of the feeder cable. If there is external damage of the feeder cable, cut the damaged part and work wiring. After connecting the antenna to the feeder cable, finish the connection part of the contracted pipe using the contracted tube. Attach the cognitive tapes to the both ends of the feeder cable, which makes it easy to recognize. When connecting cabinet, antenna and lightening arrestor, etc. to the feeder cable, connect strongly to prevent from generating reflected wave. The curvature radius should be maximized, keep the minimum curvature radius. Table B.1 Curvature Radius of Feeder Cable for Outdoor Specification LS Feeder Line Allowed Radius of Curvature Remark Outdoor HFC-12D 1/2 in. 125 mm (4.92 in.) HFC-22D 7/8 in. 250 mm (9.84 in.) HFC-33D 1-1/4 in. 380 mm (14.96 in.) HFC-42D 1-5/8 in. 510 mm (20.08 in.) RFS Feeder LCF12-50 1/2 in. 125 mm (4.92 in.) Line LCF78-50 7/8 in. 250 mm (9.84 in.) LCFS114-50 1-1/4 in. 380 mm (14.96 in.) LCF158-50 1-5/8 in. 500 mm (19.69 in.) © SAMSUNG Electronics Co., Ltd. B-1 310 RRH-2WB (TD-LTE Fx) Installation Manual Table B.2 Curvature Radius of Feeder Cable for Indoor (Based on LS Feeder Line) Specification Allowed Radius of Curvature Remark Indoor LS Feeder HFSC 6D 1/4 in. 25 mm (0.98 in.) Line HFSC 10D 3/8 in. 25 mm (0.98 in.) HFSC 12D 1/2 in. 32 mm (1.26 in.) HFSC 22D 7/8 in. 125 mm (4.92 in.) RFS Feeder SCF14-50 1/4 in. 25 mm (0.98 in.) Line SCF38-50 3/8 in. 25 mm (0.98 in.) SCF12-50 1/2 in. 32 mm (1.26 in.) UCF78-50 7/8 in. 125 mm (4.92 in.) Table B.3 Curvature Radius of LMR-400 (Based on Times Microwave System) Specification Allowed Radius of Curvature Remark LMR-400 25.4 mm (1 in.) Installation 101.6 mm (4 in.) Repeated Radius of Curvature of Feeder Line When installing a feeder line, the radius of curvature of the sections where cables bent should be larger than the allowed radius of curvature. If the radius of curvature for the feeder line installation is less than the allowed radius of curvature, it may affect the performance of the system. © SAMSUNG Electronics Co., Ltd. B-2 310 RRH-2WB (TD-LTE Fx) Installation Manual Ensure that the feeder cable does not interfere with steel towers, ladders and in the areas chiefly used by people. Connect the connector to the antenna in a straight line and after connecting, do not apply excessive force. Use the vinyl tape for electricity and heat shrink tube for the external exposed part of the connector not to avoid leak water. Wind the self-bonding rubber tape overlapping (keep a distance as the half size of rubber tape) to the connector connection part and wind the vinyl tape for electricity to the 2 times or more and then cover with the jelly type heat shrink tube. Connection of Feeder Cable Connector Connecting the feeder cable connector is critical process, so the qualified workers who finished the related education should perform. Table B.4 Connector Connection Torque Value Connector Torque Value SMA connector 2.5 kgf·cm (0.18 lbf·ft) TNC connector 9 kgf·cm (0.65 lbf·ft) N-type connector Din-type connector © SAMSUNG Electronics Co., Ltd. 20 kgf·cm (1.45 lbf·ft) 200 kgf·cm (14.46 lbf·ft) B-3 310 RRH-2WB (TD-LTE Fx) Installation Manual B.2 Antenna Feeder Cable Ground Ground the antenna feeder line using the grounding kit located under the Tower Ground Bar (TGB) installed in the lower section of the tower or in the antenna feeder line duct. The procedure for connecting the ground kit to the feeder line is as follows: Insulation Tape Rubber Tape M6 × 25L Hex. Bolt Ground Kit M6 Spring Washer M6 Plane Washer M6 Plane Washer M6 Spring Washer M6 Hex. Nut 1) Remove about 55 mm (2.17 in.) of the sheath of cable when the 7/8 in. feeder cable is used. 2) Open it by returning hook of the clamp fixing for Ground kit in the left direction. 55 mm Figure B.1 Feeder Cable Grounding (1) © SAMSUNG Electronics Co., Ltd. B-4 310 RRH-2WB (TD-LTE Fx) Installation Manual 3) Insert the ground kit clamp into the place from which the feeder line sheath is removed. 4) Pull the clamp lock to the upward so that the lock can be hung on the global protrusion area on the side. 5) Overlap the exposed part of the ground kit clamp using rubber tape (Keep a distance as the half size of rubber tape) and press it with your hands lightly to make rubber tape adhere well. 6) Wrap the part where the rubber tape is attached using insulation tape two times or more. When cutting off the tape, cut it off neatly using a cutting device such as scissors or a knife. Feeder Line Ground Kit Clamp Protrusion area Clamp lock Rubber Tape Scissors (knife) Insulation Tape Figure B.2 Feeder Cable Grounding (2) © SAMSUNG Electronics Co., Ltd. B-5 310 RRH-2WB (TD-LTE Fx) Installation Manual 7) Align the 42 mm (1.65 in.) heat shrink tube [jelly type, 200 mm (7.87 in.)] inserted when installing the feeder line into the fixing part of the ground kit. 8) Shrink the heat shrink tube[jelly type, 200 mm (7.87 in.)] by heating gun. Heat Shrink Tube 42 mm (1.65 in.) 200 mm (7.87 in.) Heat Shrink Tube 42 mm (1.65 in.) Heating Gun Figure B.3 Feeder Cable Grounding (3) © SAMSUNG Electronics Co., Ltd. B-6 310 RRH-2WB (TD-LTE Fx) Installation Manual 9) After the ground kit has been installed to the feeder line, attach the pressure terminal (1 hole) of the ground cable connected to the ground kit to the TGB. 10) When attaching the pressure terminal, use M6 × 25L hex. Bolts. 7/8 in. Feeder Line M6 × 25L Hex. Bolt (STS304) Ground kit Pressure Terminal (1 Hole) TGB (Tower Ground Bar) TGB Ground Cable (AWG 1, GV 35 mm2 × 1C) Figure B.4 Feeder Cable Grounding (4) Checking the Ground Kit and TGB Specifications The specifications, clamp, and pressure terminal type of the ground kit and TGB differ depending on manufacturers. Make sure to check the specifications of the ground kit and TGB, and identify the installation method before installing it. Table B.5 TGB Installation Example Category TGB Usage Description Earth terminal board for feeder cable for grounding in using the feeder cable of more than 7/8 in. TGB Location Lower section of cable rack in feeder cable duck - Less than 20 m (65.62 ft): 1 (Ex. steel tower lower section) - Exceed 20 m (65.62 ft): 2 or more (Ex. steel tower lower and upper section) Material Pure copper Installation Method Using the insulator to separate from the steel tower electrically Connection Method Extract the AWG1, GV 35 mm ground cable to the direction of the floor and weld it to the tower’s ground cable. © SAMSUNG Electronics Co., Ltd. B-7 310 RRH-2WB (TD-LTE Fx) Installation Manual B.3 Tower Ground Construction 1) Install a Tower Ground Bar (TGB) that will be used to ground a feeder cable onto the tower. If the height of the tower is exceeds 20 m (65.62 ft), two or more TGBs should be installed (onto the lower and upper sections of the tower). If the tower is 20 m (65.62 ft) or less, one TGB should be installed. Since the TGB installation location and the number of TGBs to be installed can differ depending on the system environment and provider’s standards, consult your service provider. 2) Each TGB should be grounded and separated from other grounds. If there is an existing ground bar or ground cable for TGB, install the TGB by branching from it using a ground cable (AWG 1, GV 35 mm2 × 1C) ground cable. (However, the specification of TGB ground cable can be different, defending on the standard of service provider.) 3) Tighten the ground kit (feeder cable grounding assembly) to the TGB ground terminal and the tower hole using the pressure terminal hole attached at the end of the ground kit’s ground cable. © SAMSUNG Electronics Co., Ltd. B-8 310 RRH-2WB (TD-LTE Fx) Installation Manual Lightning Rod Lightning Rod Ground Cable (AWG4/0, GV 95 mm2 × 1C) Ground Kit TGB (Tower Ground Bar) (Tower Height>20 m) TGB Ground Cable (AWG1, GV 35 mm2 × 1C) 7/8 in. Feeder Line or more Ground Kit TGB (Tower Ground Bar) TGB Ground Cable (AWG1, GV 35 mm2 × 1C) TGB Ground Cable (AWG4/0, GV 95 mm2 × 1C) Figure B.5 Connecting the Tower Ground Cable © SAMSUNG Electronics Co., Ltd. B-9 310 RRH-2WB (TD-LTE Fx) Installation Manual ANNEX C. Connector Assembly C.1 N type-male (1/2 in. feeder line) Below is the method for assembling the N type-male connector to the 1/2 in. feeder line. © SAMSUNG Electronics Co., Ltd. C-1 310 RRH-2WB (TD-LTE Fx) Installation Manual 1) The components of the N type-male are an N type-male body, an insert ring, a clamping nut, O-ring, and a heat shrink tube, and it is assembled using the wire stripper, trimming tool, spanner, etc. Heat Shrink Tube [28 mm (1.1 in.)] N type-Male Body O-Ring Clamping Nut Insert Ring 1/2 in. Feeder Line Trimming Tool 2) Using a stripping tool or a knife, strip the 1/2 in. feeder line by 25 mm (0.98 in.) from the end, as shown in the figure below. 1/2 in. Feeder Line Conductor 1/2 in. Feeder Line Jacket 25 mm Figure C.1 Assembling the N type-male (1/2 in. Feeder Line) Connector (1) © SAMSUNG Electronics Co., Ltd. C-2 310 RRH-2WB (TD-LTE Fx) Installation Manual 3) Remove the 11 mm (0.43 in.) of the external conductor end and 10 mm (0.39 in.)of the jacket using a trimming tool. Trimming Tool Collet 4) Insert the internal conductor into the deburring hole at the bottom of the trimming tool to trim it. 24 mm (0.94 in.) 11 mm (0.43 in.) Figure C.2 Assembling the N type-male (1/2 in. Feeder Line) Connector (2) © SAMSUNG Electronics Co., Ltd. C-3 310 RRH-2WB (TD-LTE Fx) Installation Manual 5) Insert the o-ring, clamping nut, insert ring and N type-male body to the stripped 1/2 in. feeder line in this order. O-ring is inserted into the second groove from inside of outer insulator. 6) Tighten the clamping nut and N type-male body inserted into the 1/2 in. feeder line firmly using a spanner. The recommended torque for tightening the clamping nut and N type-male body is 30~50 N.m (306~510 lbf·ft). (Note that it should only be tightened by rotating the external body with the clamping nut in a fixed and stable position.) O-Ring Clamping Nut Insert Ring N type-Male Body Keep the fixed state Figure C.3 Assembling the N type-male (1/2 in. Feeder Line) Connector (3) © SAMSUNG Electronics Co., Ltd. C-4 310 RRH-2WB (TD-LTE Fx) Installation Manual 7) Insert the heat shrink tube into the 1/2 in. feeder line fitted with the N type-male connector as shown in the figure below. - Heat shrink tube: Ф 28 mm, 100 mm (Ф 1.1 in., 3.94 in.) 8) Shrink the heat shrink tube inserted into the 1/2 in. feeder line using a heating gun. Clamping Nut Heat Shrink Tube 28 mm (1.1 in.) Heating Gun Figure C.4 Assembling the N type-male (1/2 in. Feeder Line) Connector (4) Checking to carry out when assembling the N type-male connector The shape, tool and assembly method may differ depending on the connector type and manufacturer. Make sure to check the user manual provided by the manufacturer before assembling. © SAMSUNG Electronics Co., Ltd. C-5 310 RRH-2WB (TD-LTE Fx) Installation Manual C.2 Din type-male (1/2 in. Feeder Line) Below is the method for assembling the Din type-male connector to the 1/2 in. feeder line. 1) The components of the Din type-male are an Din type-male body, pin, an insert ring, a clamping nut, o-ring, and a heat shrink tube, and it is assembled using the wire stripper, trimming tool, wrench, etc. Pin Din type-male Body Clamping Nut Insert Ring Feeder Line O-Ring Heat Shrink Tube 2) Straighten the cable, then, using a suitable tool, strip it to the connector’s wire strip length. When cutting the sheath, hold the cable firmly with one hand and cut the cable pulling the cutting tool inwards with the other hand. Gently rotate the tool several times (do not pull it too hard), so that the internal copper line is not damaged. Cutting Tool 3) Using a cutter, cut the sheath from the stripped edge to the end of the cable and completely strip the sheath. Cutter Feeder Line 4) Insert the o-ring, clamping nut, insert ring, pin and Din type-male body into the stripped feeder line in this order. Figure C.5 Assembling the Din type-male (1/2 in. Feeder Line) Connector (1) © SAMSUNG Electronics Co., Ltd. C-6 310 RRH-2WB (TD-LTE Fx) Installation Manual 5) Tighten firmly the clamping nut and Din type-male body inserted to the 1/2 in. feeder line using a wrench. The recommended torque for tightening the clamping nut and Din type-male body is 30~50 N.m (306~510 lbf·ft) (Note that it should only be tightened by rotating the external body with the clamping nut in a fixed and stable position.) Spanner (keep the fixed state) Clamping Nut Din type-Male Body 6) Insert the heat shrink tube [28 mm/10 cm (1.10 in./3.94 in.)] to the 1/2 in. feeder line fitted with the Din type-male connector; and shrink the heat shrink tube inserted into the feeder line using a heating gun. Heating Gun Heat Shrink Tube Figure C.6 Assembling the Din type-male (1/2 in. Feeder Line) Connector (2) Checking to carry out when assembling the Din type-male connector The shape, tool and assembly method may differ depending on the connector type and manufacturer. Make sure to check the user manual provided by the manufacturer before assembling. © SAMSUNG Electronics Co., Ltd. C-7 310 RRH-2WB (TD-LTE Fx) Installation Manual C.3 Finishing the Connector Connection Part by Tape Finishing the connector connection part by tape (insulation tape, rubber tape, etc.) in the outdoor environment is as follows: 1) Overlap the exposed part of the connector connection part using rubber tape (Keep a distance as the half size of rubber tape) and press it with your hands lightly to make rubber tape adhere well. 2) Wrap the part where the rubber tape is attached using insulation tape two times or more. When cutting off the tape, cut it off neatly using a cutting device such as scissors or a knife. 3) Bind the end part of the insulation tape using cable tie to prevent slips. Rubber Tape Insulation Tape Cable Tie Figure C.7 Finishing the Connector Connection Part by Tape © SAMSUNG Electronics Co., Ltd. C-8 310 RRH-2WB (TD-LTE Fx) Installation Manual C.4 How to Shrink the Heat Shrink Tube C.4.1 When Assembling a Connector to the Feeder Line Below is the procedure for shrinking the heat shrink tube. 1/2 in. Feeder Line 1) Prepare a 1/2 in. feeder line, heat shrink tube, and heating gun to finish the cable using a heat shrink tube. 1/2 in. Connector Heat Shrink Tube (Jelly Type) 28/6 × 150 mm (5.9 in.) Heating Gun 2) Insert the heat shrink tube into the 1/2 in. feeder line, and then place the heat shrink tube at the end of the cutting area of the connector where the tool will be used. Cutting Area 3) Set the heating gun to 250 to 300°C. (482~572°F) Figure C.8 Shrinking the Heat Shrink Tube_Feeder Line (1) © SAMSUNG Electronics Co., Ltd. C-9 310 RRH-2WB (TD-LTE Fx) Installation Manual Heat Shrink Tube 4) Holding one end of the heat shrink tube with your hand, apply heat starting from the connector using the heating gun. 5) Rotate the heating gun so that heat is evenly distributed to prevent that bubbles are generated or heat is concentrated to a specific part. Heating Gun 6) Shrink the heat shrink tube until jelly appears at the end part of it (refer the Figure below) and finish it. Jelly Figure C.9 Shrinking the Heat Shrink Tube_Feeder Line (2) © SAMSUNG Electronics Co., Ltd. C-10 310 RRH-2WB (TD-LTE Fx) Installation Manual C.4.2 When Connecting a Connector to another Connector Below is the procedure for shrinking the heat shrink tube. 1) Prepare a 1/2 in. feeder line, 7/8 in. feeder line, heat shrink tube, and heating gun to finish the cable using a heat shrink tube. Heat Shrink Tube (Jelly Type) 38/12 × 300 mm (11.81 in.) 7/8 in. Feeder Line Connector 1/2 in. Feeder Line 2) Inset the heat shrink tube to one end of the feeder line and connect the connector. Heating Gun 3) Insert the heat shrink tube, placing connector part (where 1/2 in. and 7/8 in. feeder line will be connected) in the center, and mark the center part. Figure C.10 Shrinking the Heat Shrink Tube_Connection between Connectors (1) © SAMSUNG Electronics Co., Ltd. C-11 310 RRH-2WB (TD-LTE Fx) Installation Manual 4) Set the heating gun to 250 to 300°C. (482~572°F) 5) Holding one end of the heat shrink tube with your hand, apply heat starting from the marked part at the center using the heating gun. 6) Rotate the heating gun so that heat is evenly distributed to prevent that bubbles are generated or heat is concentrated to a specific part. Heat Shrink Tube Heating Gun Figure C.11 Shrinking the Heat Shrink Tube_Connection between Connectors (2) © SAMSUNG Electronics Co., Ltd. C-12 310 RRH-2WB (TD-LTE Fx) Installation Manual 7) Shrink the heat shrink tube until jelly appears at the end part of it (refer the figure below) and finish it. Jelly Figure C.12 Shrinking the Heat Shrink Tube_Connection between Connectors (3) © SAMSUNG Electronics Co., Ltd. C-13 310 RRH-2WB (TD-LTE Fx) Installation Manual Check for Working with the Heat Shrink Tube - If you work without holding one end of the heat shrink tube, the location of the heat shrink tube may be changed. Therefore, make sure to hold one end of it when applying heat. - The connector part where 1/2 in. and 7/8 in. feeder line are connected must be the center of the heat shrink tube. After inserting the heat shrink tube, mark the center part. - If jelly does not appear on the end of the heat shrink tube, it may mean that it is not shrunk properly. Apply heat until jelly appears using a heating gun. Jelly © SAMSUNG Electronics Co., Ltd. C-14 310 RRH-2WB (TD-LTE Fx) Installation Manual C.5 Power Connector Assembly The procedure for assembling the power connector (Amphenol, CJE-AL06M25U15-2S) is as follows. 1) Cut the power cable to the length of installing section. 2) Strip the external sheath of the cable for the connector about 35 mm (1.38 in.) from the end and sheath of internal core conductor about 10 mm (0.39 in.). 10 mm (0.39 in.) 35 mm (1.38 in.) 3) Solder the connector pin after inserting it into the stripped core conductor. After soldering, check if the connector pin is firmly fixed. 4) Insert the connector parts into the cable with the connector pin as below. Figure C.13 Power Connector Assembly (1) © SAMSUNG Electronics Co., Ltd. C-15 310 RRH-2WB (TD-LTE Fx) Installation Manual 5) Insert the connector pin assembled with the power cable into the end of connector. The pin map of connector end and cable is as below. - C: -48 VDC/Black - D: Return/White Push the pin into the end and check if it does not pull off. 6) After connecting the connector end and the pin assembled with the cable, assemble the connector parts to the connector end one by one. 7) Place the heat shrink tube [38 mm (1.50 in.)] to the lead-in part of connector cable, and shrink it using the heating gun. Do not shrink the tube for too long time since the jelly might come out too much. Figure C.14 Power Connector Assembly (2) © SAMSUNG Electronics Co., Ltd. C-16 310 RRH-2WB (TD-LTE Fx) Installation Manual ANNEX D. Cleaning Optic Connector D.1 Cleaning Optic Connector When connecting optical cable to the system, performance of system can be decreased or fails can occur if core section of optical connector is dirty due to dust or foreign material. Therefore, worker should clean the optic connector before connecting optic cable to the system to prevent this phenomenon. This manual describes the method that cleans optic connector when using the IBCTM Brand cleaner. Caution When Connecting the Optical Cable When connecting the optical cable, be careful to keep the cutting section of the connector core away from dust or foreign material. If the cable is soiled with foreign material, do not blow to remove them. Make sure to clean the connector in accordance with the cleaning directions below. When using Optic Connector Cleaner When using optic connector cleaner, use the products shown in the example below or their equivalents. Ex) Manufacturer-USCONEC (http://www.usconec.com) TM - IBC Brand Cleaner (P/N: 9393): For LC-LC and MU Connector Cleaning TM - IBC Brand Cleaner (P/N: 9392): For SC Connector Cleaning TM - IBC Brand Cleaner (P/N: 12910): For ODC Connector Cleaning Manufacturer-TheFibers (www.thefibers.com) - HuxCleaner 1.25 mm (0.05 in.)Type: For LC and MU Connector Cleaning - HuxCleaner 2.5 mm (0.10 in.) Type: For SC, FC and ST Connector Cleaning © SAMSUNG Electronics Co., Ltd. D-1 310 RRH-2WB (TD-LTE Fx) Installation Manual D.2 IBCTM Brand Cleaner Method that uses IBCTM Brand Cleaner is as follows: D.2.1 IBCTM Brand Type Cleaner (P/N 9393) Method that uses IBCTM Brand Cleaner for LC-LC and MU connector is as follows: Outer Shell Nozzle Guide Cap Lock Button (for Extend Nozzle) [Optic Connector Cleaner Configuration] Lock Button (for Extend Nozzle) [Nozzle Extension] Guide Cap Guide Cap Cover [In Case of LC type Connector (Plug)] Guide Cap [In Case of LC type Connector (Jack)] TM Figure D.1 Optic Connector Cleaner (IBC © SAMSUNG Electronics Co., Ltd. Brand Type Cleaner: P/N 9393) D-2 310 RRH-2WB (TD-LTE Fx) Installation Manual Optic Module Cleaning (LC Type Jack) 1) To clean the optic module, remove the guide cap from the cleaner (P/N: 9393). Guide Cap Outer Shell Nozzle [IBC Brand Cleaner: P/N 9393] 2) Insert a cleaner guide cap to every core of the optic module. Clean it by pushing the outer shell toward the nozzle until you hear the sound of the detergent being sprayed. (Repeat once or twice.) Nozzle Outer Shell Optic Module Figure D.2 Optic Module Cleaning (LC Type Jack) © SAMSUNG Electronics Co., Ltd. D-3 310 RRH-2WB (TD-LTE Fx) Installation Manual Optic Cable Connector Cleaning (LC Type Plug) 1) To clean the optic cable connector, open the guide cap cover from the cleaner (P/N: 9393). Outer Shell Nozzle Guide Cap Guide Cap Cover [IBC Brand Cleaner: P/N 9393] 2) Insert a cleaner guide cap to every core of the optic cable connector. Clean it by pushing the outer shell toward the nozzle until you hear the sound of the detergent being sprayed. (Repeat once or twice.) Guide Cap Nozzle Outer Shell LC Type Connector Figure D.3 Optic Cable Connector Cleaning (LC Type Plug) © SAMSUNG Electronics Co., Ltd. D-4 310 RRH-2WB (TD-LTE Fx) Installation Manual D.2.2 IBCTM Brand Type Cleaner (P/N 12910) Method that uses IBCTM Brand Cleaner for ODC connector is as follows: Outer Shell Nozzle Guide Cap Lock Button (for Extend Nozzle) [Optic Connector Cleaner Configuration] Lock Button (for Extend Nozzle) [Nozzle Extension] Guide Cap Guide Cap Cover [In Case of LC type Connector (Plug)] Guide Cap [In Case of LC type Connector (Jack)] TM Figure D.4 Optic Connector Cleaner (IBC © SAMSUNG Electronics Co., Ltd. Brand Type Cleaner: P/N 12910) D-5 310 RRH-2WB (TD-LTE Fx) Installation Manual Optic Port Cleaning (ODC, PT/LC Jack) 1) To clean the optic port of system, remove the guide cap from the cleaner. Guide Cap Cover Guide Cap Outer Shell Nozzle 2) Insert a cleaner guide cap to every core hole of the system’s optic port. Clean it by pushing the outer shell toward the nozzle until you hear the sound of the detergent being sprayed. (Repeat once or twice.) Core [Optic Port of System: ODC-4] Core [Optic Port of System: PT/LC] Figure D.5 Optic Port Cleaning (ODC, PT/LC Jack) © SAMSUNG Electronics Co., Ltd. D-6 310 RRH-2WB (TD-LTE Fx) Installation Manual Optic Cable Connector Cleaning (ODC Type Plug) 1) To clean the ODC connector of cable, remove the guide cap from the cleaner (P/N: 12910). Guide Cap Nozzle Outer Shell [IBC Brand Cleaner: P/N 12910] 2) Insert a cleaner guide cap to every core hole of the ODC connector. Clean it by pushing the outer shell toward the nozzle until you hear the sound of the detergent being sprayed. (Repeat once or twice.) ODC Connector Nozzle Outer Shell Figure D.6 Optic Cable Connector Cleaning (ODC Type Plug) © SAMSUNG Electronics Co., Ltd. D-7 310 RRH-2WB (TD-LTE Fx) Installation Manual Optic Cable Connector Cleaning (PT/LC Type Plug) 1) To clean the PT/LC connector of cable, remove the guide cap from the cleaner (P/N: 12910). Guide Cap Nozzle Outer Shell [IBC Brand Cleaner: P/N 12910] 2) Insert a cleaner guide cap to every core hole of the the PT/LC connector. Clean it by pushing the outer shell toward the nozzle until you hear the sound of the detergent being sprayed. (Repeat once or twice.) PT/LC Connector Nozzle Outer Shell Figure D.7 Optic Cable Connector Cleaning (PT/LC Type Plug) © SAMSUNG Electronics Co., Ltd. D-8 310 RRH-2WB (TD-LTE Fx) Installation Manual Measuring the Optical Output and Connecting the Optic Connector 1) Check the optical output again using an optic power meter. 2) If the optical output measurement result meets the reference value, clean the connector again and connect it. If the measurement result does not meet the reference value, discard the cable, replace it with a new cable, and then clean the new one and connect it to the system. [LC/PC Plug] [PT/LC Plug] [Optic Powermeter] [ODC Plug] [Harting Plug] Figure D.8 Measuring the Optical Output and Connecting the Optic Connector © SAMSUNG Electronics Co., Ltd. D-9 310 RRH-2WB (TD-LTE Fx) Installation Manual ANNEX E. Pressure Terminal Assembly Method that assembles the pressure terminal by using the crimp-type compressor is as follows: [Ring Type Dies] [Hydraulic Pressure Terminal Compressor] [Hex. Type Dies] 1) Select the appropriate compressor and dies for the cable specification and pressure type. 2) Attach the cable and dies satisfying the pressure terminal specification to the lower section of the compressor terminal. 3) Attach the cable and dies satisfying the pressure terminal specification to the upper section of the compressor terminal. Figure E.1 Pressure Terminal Assembly (1) © SAMSUNG Electronics Co., Ltd. E-1 310 RRH-2WB (TD-LTE Fx) Installation Manual 4) Insert the pressure terminal into the compressor lock and press gently. 6) 5) Unsheathe the cable and insert the high pressure heat shrink tube that fits the cable into the pressure terminal attached to the compressor. By moving the compressor lever up and down, firmly connect the cable to the pressure terminal. Once the pressure terminal assembly is complete, turn the compressor lever handle to the right to unlock it, and remove the pressure terminal attached to the cable. Figure E.2 Pressure Terminal Assembly (2) Table E.1 Compressor Specification by Cable Thickness Compressor Specification Cable Spec. Small-size Hand Large-size Hand Hydraulic Compressor Compressor Compressor (AK-38, 100) (IZUMI Hex. Type Dies) 2.5 5.5 10 16 14 14 16 25 22 22 25 35 38 38 35 50 60 50 70 80 70 95 100 95~300 (mm ) © SAMSUNG Electronics Co., Ltd. E-2 310 RRH-2WB (TD-LTE Fx) Installation Manual ANNEX F. Standard Torque When you tighten the bolt, refer to the standard torque value below to prevent the equipment and bolt from damage and secure by tightening. When the torque value for each connection part is defined already, refer to the defined value. Table F.1 Standard Torque Value for Tightening Bolts Bolt Spec. Torque Value (kgf.cm) Torque Value (lbf.ft) M3 4.08~6.12 0.29~0.44 M4 9.52~14.28 0.69~1.03 M5 20.0~30.0 1.45~2.17 M6 33.28~49.92 2.41~3.61 M8 82.4~123.6 5.96~8.94 M10 166.4~249.6 12.03~18.05 M12 292.0~438.0 21.11~31.67 Checking Standard Torque Value Torque value can be different, defending on the material, characteristic and specification of the equipment and fixing material. Make sure to check the proper torque value for each specification of the equipment and fixing material. © SAMSUNG Electronics Co., Ltd. F-1 310 RRH-2WB (TD-LTE Fx) Installation Manual ABBREVIATION LTE Long Term Evolution MGB Main Ground Bar MIMO Multiple Input Multiple Output MIP Mobile IP NE Network Element PIMD Passive Inter-Modulation Distortion RSSI Received Signal Strength Indicator RRH Remote RF Head TGB Tower Ground Bar VSWR Voltage Standing Waveform Ratio © SAMSUNG Electronics Co., Ltd. Mobile WiMAX/TD-LTE RRH-2WB Installation Manual ©2012 Samsung Electronics Co., Ltd. All rights reserved. Information in this manual is proprietary to SAMSUNG Electronics Co., Ltd. No information contained here may be copied, translated, transcribed or duplicated by any form without the prior written consent of SAMSUNG. Information in this manual is subject to change without notice.
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.6 Linearized : Yes Encryption : Standard V4.4 (128-bit) User Access : Print, Print high-res Create Date : 2012:06:01 17:17:14Z Creator : Microsoft® Office Word 2007 Modify Date : 2012:11:15 16:31:11-05:00 Language : en-US Tagged PDF : Yes XMP Toolkit : Adobe XMP Core 4.2.1-c041 52.342996, 2008/05/07-20:48:00 Creator Tool : Microsoft® Office Word 2007 Metadata Date : 2012:11:15 16:31:11-05:00 Producer : Microsoft® Office Word 2007 Format : application/pdf Document ID : uuid:def897fb-8f86-4652-9243-36ca20e3fb21 Instance ID : uuid:a96962dd-0baa-4fdf-b199-5b3ddc98f4bd Page Count : 139EXIF Metadata provided by EXIF.tools