SANYOPHS Cell StationMarch 19, 2004- User’s Manual -
1Table of ContentsInstallation conditions ................................................................................................................. 2,3Fixing antenna for PBS-CS100 ...................................................................................................... 4Condition of the antenna cable (PBS-CS100) .............................................................................. 5Terminal block appearance ............................................................................................................ 6Notes at the time of lid opening and closing ................................................................................. 7Connection of the power cable ............................................................................................... 8,9,10Connection of the line cable ............................................................................................... 11,12,13Concerning the installation of cable ............................................................................................ 14Warning ......................................................................................................................................... 15Appendix (1), (2)  ...................................................................................................................... 16,17
2Installation conditions]Place\CS shall be installed in the place where the public can not easily access.\Installation place shall have the structure which can support the weight of CSand its fixing facilities.\Installation place shall be flat with no inclination.\If CS is installed in the place where it  may drop down, it shall be providedwith protective measure against the drop.\There shall be no object around 2m of CS.\For the maintenance use, there shall be the space in about 500mm around thestand.\CS  shall  be installed in the direction that the logo plate appears upwards. CScan be placed in vertical direction with arranging the fixing metal.
3Installation conditions]Antenna\With fixing antennas, there shall be enough viewing angle from CS. (Targetangle: vertical: 30 degree or more, horizontal: 330 degree or more)]ISDN Line\Interconnection box for ISDN line shall be available near the CS.\ISDN line length from the exchange to CS and its quality shall comply withthe technical standard (ANSI T1.601-1992).]Power supply\AC120V shall be available with easy wiring connection work.
4Fixing antenna for PBS-CS100To ISDN LineAC120VMDFBreakerPBS-CS100
5Condition of the antenna cable(PBS-CS100)]Numbering arrangement\Numbering  arrangement  of  1 - 4 shall be madeclockwise or counterclockwise.]Tightening torque of the antenna cable:7 - 12 Kgf-cm.]Wind the self-bonding tape between theantenna connector and the end of cable.12341234Case of ClockwiseCase of Counterclockwise
6Terminal block appearance(PBS-CS100)]Terminal block of the power supply and line’s connections are shown below1: Status indications LED2: Reset Switch3: Maintenance terminal connector4,5: Line Status LED6: Power supply Terminal7: Earth clamp for Power cable8: Cable gland for power cable9: Cable gland for Line cable10: Power supply switch11: Fuse12: Earth clamp for Line cable13,14: Line terminal connector1234567891011121314
7Notes at the time oflid opening and closing]Opening\After loosening all lid’s fixation screws completely, pulllower part and central screw of the lid, and slide. (Photo1)\Confirm that all screws are free completely and two pins ofthe lid is at the right edge of two metal fittings ,thereforerotate the lid while pulling in the direction”an arrow” likebelow . (Photo2)]Closing\Tightening torque of Cap screw: 10 - 15 Kgf-cm\Tighten with M4 hexagon Socket Cap screws. (Cap screw).\Tighten 6 screws equally and well balanced, after confirmingthat the waterproof packing is nonexistent between the lidand the CS.[Caution1] If the clamp face or waterproof packing is scarredby screw’s cusp, the waterproof performance may not beobtained.(Photo1)(Photo2)
8Connection of the power cable (1)1) Reeve the cable from the cable gland nutinto the lid.2) Pull the cable out to enough length thatthe tip of the cable can be processed.3) Peel the covering of the cable. (Photo 3)4) Peeling off core line.5) Loosen the copper shield and wind itonto the core wire’s tip 4 turns or more.(Photo3)CoppershieldCoveringendCovering70 - 90mminterposition material: Cut it at the covering’ root.(figure)8 - 9mm60 - 80mm15mmCopper shield*The cable color is generally used in Japan, and itused in U.S.A. shall comply with the localspecifications.
9Connection of the power cable (2)6) Turn the Power supply switch off.(Photo4)\Push the power supply switch at "○"side to turnit off.\[Caution] When pushing the power switch at "-"side, CS is turned on.(photo4)Push
10Connection of the power cable (3)7) Feazings processing of the core line.\Pressing the black portion of the connectorwith a minus screwdriver(φ6) or a plusscrewdriver(φ4) , insert a core wire.\L (Loading), N (Neutral), FG (Frame Ground).8)  Combine the copper shield to the position“FIX” of Photo 5. And tighten the cablegland firmly.\[Caution]If the fixation of the terminalblock’s lid is imperfect, it is feared that thisCS gives hindrance to other electric devices.N:WhiteFG:RedL:BlackForming(photo5)9) Form core wires that are inserted into the power supply terminal.10) The tightening of the dome nut must be done by hand without fail andtighten it strongly.11) Wind the self-bonding tape between  the surface of dome nut and the end ofcable.FixPress with a screwdriver
11Connection of the line cable (1)1) Reeve the cable from the dome nut intothe lid.2) Pull the line cable out to enough lengththat the tip of the cable can beprocessed.3) Peeling off the line cable covering.     (Photo 6)\Peel off the covering of the line cable. Thelength of the line cable is 100 - 120 mm.(Photo 6)4) Loosen the shield and wind it on theheart line of covering 4 turns or more.(Photo 7)(photo6)(photo7)Shield tapeDrain wireCovering130 - 140mmWind the aluminum shield, andfurthermore wind drain wire here too.Process the end of the line wire, which arenot used, with the suiting tape.
12Connection of the line cable (2)5) Loosen these four pair lines, peel offcore lines.(Figure)6) Feazings processing of the core line.\Pressing the button of the connectorwith a minus screwdriver(φ3), insert acore wire. (Photo8)(Figure)(photo8)Pair linesscrewL1L2L3 L4Ground clamp for the Line8mmPress with a screwdriver
13Connection of the line cable (3)7) Form core wires that are inserted intothe line connector.\Form the line cable as not touching on theblock. (Photo 9)\Pay attention that the line cable does nottouch on the packing .8) Tighten the dome nut.9) Wind the self-bonding tape between thesurface of dome nut and the end ofcable.(photo9)
14Concerning the installation of cables]Ground earth terminal of the power cable securely      In case that ground does not executed, there is the possibility that destroys the CS.Because the surge protection by the ground wire can not perform.]The earthing less than 10ohm (Class A) is desirable.     There is the possibility that the obstacle occurs to sounds and pictures of other radiodevices, when the earthing resistance becomes high.]Separation distance between cables      Distance (generally 20 cm or more) shall be kept between the line cable and the powercable for secure installation.]The shield processing of the cable  (maintenance box & breaker box)     Earthing must be executed as for the breaker box.]Installation of lightening facilitySpecifications of the CS do not specify the requirement  for the installation of lightningconductor. Don't connect the lightning cable to FG of the power supply.
15WARNING!FCC RF EXPOSURE COMPLIENCE]To satisfy the FCC RF exposure requirement, a minimumseparation distance of 0.65m must be maintained betweenthe nearby person and radiating elements.]Unauthorized alteration, modifications or attachments couldimpair its quality, damage the cell station, or result inviolation of FCC regulations.
16Appendix1:Installation materials (for example)]Materials        Quantity                PBS-CS100Antenna 4Coaxial cable 4Power supply cable 1Line cable 2pairStand 1setAntenna pole 1Antenna Arm 4Arm fixing block 1Self-bonding tape        as adequateTie band        as adequate
17Appendix2:Cable specificationsKinds Usage  Specifications  Remarks Coaxial cable  Antenna - PHS cell station 8D-SFA (connector with one-side N style (P))     MAX: 6m Accessory of the antenna Power cable  PHS cell station - power supply breaker box   With the 2.0mm2 , 3 cores with the copper shield tape    Outsize diameter : 8.5 – 13.5 Ø Frameresisting: PE cable       The color is designated. (black, white, green and red) Power cable   the equivalent   to the existing   cell station Line cable  Cell station -Maintenance box Single line: Ø 1.0mm-4 pairs A category 4 or more with aluminum or copper shield tape   (Shield material 0.05t over) Outsize diameter : 5 – 10 Ø Flame resisting: PE cable Line cable   The equivalent   to the existing   cell station

Navigation menu