Spotwave Wireless SPOTCELL0011 Spotcell 612 User Manual 612 QIG 040625

Spotwave Wireless Ltd. Spotcell 612 612 QIG 040625

Contents

Quick install guide

Download: Spotwave Wireless SPOTCELL0011 Spotcell  612 User Manual 612 QIG 040625
Mirror Download [FCC.gov]Spotwave Wireless SPOTCELL0011 Spotcell  612 User Manual 612 QIG 040625
Document ID464414
Application ID2TXcgT+7py0yagRbFNVbqw==
Document DescriptionQuick install guide
Short Term ConfidentialNo
Permanent ConfidentialNo
SupercedeNo
Document TypeUser Manual
Display FormatAdobe Acrobat PDF - pdf
Filesize40.09kB (501151 bits)
Date Submitted2004-08-31 00:00:00
Date Available2004-08-31 00:00:00
Creation Date2004-06-30 16:14:14
Producing SoftwareCorel PDF Engine Version 1.0.0.458
Document Lastmod2004-06-30 16:14:14
Document Title612 QIG 040625
Document CreatorCorelDRAW Version 12.0
Document Author: Al Stretten

TM
SpotCell 612 Adaptive Repeater
Quick Installation Guide
If required, more detailed information on installing the SpotCellTM 612 system can
be found in the User Manual. The User Manual is available for downloading at:
www.spotwave.com/2003/support/
IMPORTANT
The AC power connection for the SpotCell 612 system
must be completed by a licensed electrician in full
accordance with electrical code requirements. All work
on electrical utility poles must be done only by those
trained for such work.
Parts List
Customer Provided Material
• Donor Unit (DU)
• Battery
DU
(outward-facing unit)
• High Power Coverage Unit (HPCU)
• Adaptive Repeater Unit (ARU)
• RG-11 Cables
• Mounting kit
HPCU
(coverage unit)
Battery
ARU
mounting
bracket
Parts or material that is not included
but which is required to install the
SpotCell 612 system are:
ARU
DU & HPCU
mounting
brackets
RG-11
Cable
bag of
hardware
40-ft HPCU Cable - Included
DU Cable - Order from Spotwave
110-V AC electrical hook-up for
ARU,
Ground bonding material for
grounding the ARU, DU and
HPCU (cable, ground rods, etc.),
DU and HPCU support poles,
ARU support pedestal (if needed),
Material such as steel bands for
attaching to non-wooden supports
,or where fastening with screws is
not permitted.
Typical SpotCell 612 Deployment
DU
Good physical separation between the DU and HPCU,
combined with back-to-back positioning of the DU and
HPCU units will optimize the coverage area.
HPCU
Coverage Area
ARU
www.spotwave.com
ARU mounts on stub pole
or HPCU support pole.
Spotwave Wireless Inc. 1 Hines Road, Ottawa ON K2K 3C7 Canada
© 2002 Spotwave Wireless Inc. All rights reserved. Printed in Canada.
Spotwave and SpotCell are trademarks of Spotwave Wireless Inc. Patents pending.
30 feet
20 to 30 feet
780-00011-01-02
120 feet
10 feet
WARNING
1. Install ARU bracket
Mount the ARU bracket on a support at least 25-ft
from the planned HPCU location. Attach the bracket
with either the provided screws or alternatively with
steel bands.
For your safety beware of overhead power lines and underground power and gas lines, and motor
vehicle traffic. Failure to maintain a safe distance from power lines or contact with gas lines could
result in death or serious injury. Ensure that all appropriate safety measures are practiced at all times.
2. Attach ARU
Place the ARU on the mounting bracket. An eye bolt
on the ARU is provided to attach a lift rope if
required. Fasten the ARU to the bracket with the
provided hardware.
SpotCellTM 612 Quick Install Guide
3. Remove ARU front panel
Using an Allen wrench open the ARU door, and
remove the two front screws and front cover panel.
panel
screws
4. Connect AC power
Ensure AC power line is de-energized (OFF), and
ARU circuit breaker is in the open (OFF) position.
Loosen dome nut of 3/4” conduit fitting on cabinet
bottom. Route AC power conduit or cable through fitting. Tighten dome nut until mild resistance is felt, plus
1/4-turn more (½-turn for armored cable). Terminate
live (black) wire on left side
of connector block,
neutral (white) wire on
right side, and ground
(green) wire on
ground stud.
circuit
breaker
ground
stud
live
(black)
neutral
(white)
5. Install back-up battery
6. Replace panel & connect ground cable
7. Connect ARU - HPCU Coaxial Cable
8. Install ARU - DU Coaxial Cable
Loosen the battery clip screw and remove the clip.
Replace front panel and re-fasten panel screws.
Connect red wire to (+)
positive battery terminal
and black wire to (-) negative terminal.
Connect ground bonding cable to
external ground stud on the
bottom of the ARU.
Using 40-ft RG-11 coaxial cable with green boots,
connect HPCU to ARU green RF port. Install coaxial
cable as specified.
Connect DU to ARU with RG-11 cable (160-ft typical)
ordered from Spotwave. Use back ARU RF port. Install
as specified.
Place battery on tray and the
provided thermal insulator
behind battery.
Replace battery
clip.
ARU
Back of HPCU
Follow local and national
electrical code requirements
for bonding ground cable to
a suitable ground.
battery
Energize AC power cable but
leave the circuit breaker OFF.
battery clip
green
washer
Back of DU
green
boots
external
ground
stud
LED
LED
cable
connector
cable
connector
9. Set to Install mode & power up
10. Determine DU alignment
11. Mount DU and HPCU
Set ARU to INSTALL mode
by setting ARU mode switch
to right position (opposite
ACTIVE).
First Rotation - At location where downlink signal into
DU is best, hold the DU vertical facing away from you.
Slowly rotate it in a complete circle. Ignore the LED.
Fasten DU mount to support pipe then attach DU.
Align DU to the GREEN direction determined by Step
10 (or as specified in the installation service order).
Set ARU circuit breaker to
closed (ON) position.
The HPCU LED shows
GREEN when it has proper
DC power.
ACTIVE
ARU
Locate and aim HPCU for coverage. Mount HPCU
(same hardware as DU). HPCU and DU must not
face each other.
SCROLL
PSU FUSE
2A
250V
Back to back
is best.
AC
BREAKER
Second Rotation - Repeat 360-dg rotation. Take note
of where LED shows GREEN - this is the direction
DU must face for maximum downlink signal strength.
12. Set the system to Active mode
Set ARU to ACTIVE with mode switch.
Press SCROLL button until LCD shows
‘Signal Strength/Coverage’ bar graph display.
Optimize alignment for maximum coverage
potential (5 bars on lower display).
13. DU and HPCU grounding & checklist
1. Bond DU and HPCU units to ground. Follow
electrical code requirements.
2. Ensure that there are drip loops on RG-11 at DU
and HPCU, unless cable routing is from below.
3. Complete the installation report.
4. Ensure ARU door is properly closed and locked.

Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.3
Linearized                      : No
Page Count                      : 2
Create Date                     : D:20040630161414
Modify Date                     : D:20040630161414
Producer                        : Corel PDF Engine Version 1.0.0.458
Author                          : Al Stretten
Creator                         : CorelDRAW Version 12.0
Title                           : 612 QIG 040625
EXIF Metadata provided by EXIF.tools
FCC ID Filing: P3YSPOTCELL0011

Navigation menu