Spotwave Wireless SPOTCELL0011 Spotcell 612 User Manual 612 QIG 040625

Spotwave Wireless Ltd. Spotcell 612 612 QIG 040625

Contents

Quick install guide

TM SpotCell 612 Adaptive RepeaterQuick Installation Guidewww.spotwave.comSpotwave Wireless Inc. 1 Hines Road, Ottawa ON   K2K 3C7   Canada           780-00011-01-02    Spotwave and SpotCell are trademarks of Spotwave Wireless Inc. Patents pending.Parts List• Mounting kit• RG-11 Cables• High Power Coverage Unit (HPCU)• Adaptive Repeater Unit (ARU)DU (outward-facing unit)HPCU(coverage unit)• Donor Unit (DU)• BatteryBatteryARUARUmountingbracketCustomer Provided MaterialTypical SpotCell 612 DeploymentDUARU120 feet20 to 30 feetIMPORTANTDU & HPCUmountingbracketsbag ofhardwareRG-11CableTMIf required, more detailed information on installing the SpotCell  612 system can be found in the User Manual. The User Manual is available for downloading at:www.spotwave.com/2003/support/The AC power connection for the SpotCell 612 system must  be  completed  by  a  licensed  electrician  in  fullaccordance with electrical code requirements. All workon electrical utility poles must be done only by thosetrained for such work. Parts or material that is not includedbut which is required to install theSpotCell 612 system are:l  110-V AC electrical hook-up for     ARU,l  Ground bonding material for     grounding the ARU, DU and     HPCU (cable, ground rods, etc.),l  DU and HPCU support poles,l  ARU support pedestal (if needed),l  Material such as steel bands for     attaching to non-wooden supports     ,or where fastening with screws is     not permitted.Good physical separation between the DU and HPCU,combined with back-to-back positioning of the DU andHPCU units will optimize the coverage area.© 2002 Spotwave Wireless Inc. All rights reserved. Printed in Canada.HPCUCoverage Area10 feet30 feetARU mounts on stub poleor HPCU support pole.40-ft HPCU Cable - IncludedDU Cable - Order from Spotwave
3. Remove ARU front panel TMSpotCell  612 Quick Install Guide5. Install back-up battery 6. Replace panel & connect ground cable  2. Attach ARU1. Install ARU bracket 4. Connect AC power12. Set the system to Active mode8. Install ARU - DU Coaxial Cable 7. Connect ARU - HPCU Coaxial Cable9. Set to Install mode & power up 10. Determine DU alignment 11. Mount DU and HPCU13. DU and HPCU grounding & checklistcircuitbreakergroundstudbatterybattery clippanelscrewsPSU FUSE2A250VACBREAKERACTIVE               SCROLLexternalgroundstudFor your safety beware of overhead power lines and underground power and gas lines, and motorvehicle traffic. Failure to maintain a safe distance from power lines or contact with gas lines could result in death or serious injury. Ensure that all appropriate safety measures are practiced at all times. WARNINGLoosen the battery clip screw and remove the clip.Connect red wire to (+)positive battery terminaland black wire to (-) neg-ative terminal. Place battery on tray and the provided thermal insulator behind battery. Replace battery clip.Replace front panel and re-fasten panel screws.Connect ground bonding cable to external ground stud on the bottom of the ARU.Follow local and nationalelectrical code requirements for bonding ground cable toa suitable ground.Energize AC power cable butleave the circuit breaker OFF. Using 40-ft RG-11 coaxial cable with green boots, connect HPCU to ARU green RF port. Install coaxial cable as specified. Using an Allen wrench open the ARU door, andremove the two front screws and front cover panel.Connect DU to ARU with RG-11 cable (160-ft typical) ordered from Spotwave. Use back ARU RF port. Install as specified.  Set ARU to INSTALL modeby setting ARU mode switchto right position (opposite ACTIVE).Set ARU circuit breaker toclosed (ON) position.The HPCU LED showsGREEN when it has properDC power.Fasten DU mount to support pipe then attach DU. Align DU to the GREEN direction determined by Step 10 (or as specified in the installation service order).   Set ARU to ACTIVE with mode switch. Press SCROLL button until LCD shows ‘Signal Strength/Coverage’ bar graph display.Optimize alignment for maximum coverage potential (5 bars on lower display).1. Bond DU and HPCU units to ground. Follow      electrical code requirements.2. Ensure that there are drip loops on RG-11 at DU     and HPCU, unless cable routing is from below.3. Complete the installation report.4. Ensure ARU door is properly closed and locked.Second Rotation - Repeat 360-dg rotation. Take noteof where LED shows GREEN - this is the directionDU must face for maximum downlink signal strength.First Rotation - At location where downlink signal into DU is best, hold the DU vertical facing away from you. Slowly rotate it in a complete circle. Ignore the LED. Mount the ARU bracket on a support at least 25-ft from the planned HPCU location. Attach the bracketwith either the provided screws or alternatively withsteel bands.Place the ARU on the mounting bracket. An eye bolton  the  ARU  is  provided  to  attach  a  lift  rope  ifrequired.  Fasten  the  ARU  to  the  bracket  with  the provided hardware.Ensure AC power line is de-energized (OFF), andARU circuit breaker is in the open (OFF) position. Locate and aim HPCU for coverage. Mount HPCU (same hardware as DU). HPCU and DU must not face each other.  live(black)neutral(white)cableconnectorARUBack of HPCUgreenwashergreenbootsARUcableconnectorBack of DUBack to backis best.LEDLEDLoosen dome nut of 3/4” conduit fitting on cabinet bottom. Route AC power conduit or cable through fit-ting. Tighten dome nut until mild resistance is felt, plus1/4-turn more (½-turn for armored cable). Terminatelive (black) wire on left sideof connector block, neutral (white) wire on right side, and ground (green) wire on ground stud.

Navigation menu