TRANE Package Units(both Units Combined) Manual L0904649

User Manual: TRANE TRANE Package Units(both units combined) Manual TRANE Package Units(both units combined) Owner's Manual, TRANE Package Units(both units combined) installation guides

Open the PDF directly: View PDF PDF.
Page Count: 20

Scroll down to view the document on your mobile browser.
ITALLATfO TCP-II@M-1A18-AB33D8-2PT A CEALL phases of this installation must comply withNATIONAL, STATE AND LOCAL CODESLibrary Service LiteratureProduct Section UnitaryProduct Rooftop Air ConditioningModel TCPLiterature Type Installation, Operation, MaintenanceSequence 1ADate November 2001File No. SV-UN-RT-TCP-IOM-1A 11/01Supercedes TCPqOM-1Model: 12 SEER Single PackageTCPO24F1 TCPO48F1,3,4TCP030F1 TCP060F1,3,4 Cooling W/Electric HeatTCP036F1,3,4TCP042F1,3 BAYLIFT002AA 2 " 5 TonLIFTING LUG KITIMPORTANT-- This Document iscustomer property and is to remain with this unit. Please return to service informationpack upon completion ofwork.All phases of this installation must comply with the NATIONAL, STATE & LOCAL CODES. In the absence of local codes, the installa-tion must conform with National Electric Code ==ANSVNFPA 70 or "LATEST REViSiON."Since the manufacturer has a policy of continuousproduct improvement, it reserves the right to changespecifications and design without notice.© 2001 American Standard Inc. All rights reserved
GENERAL iNFORMATiONIMPORTANT: Read this entire manual before beginning instal=lation procedures.SAFETY NOTICE• THIS INFORMATION IS INTENDED FORUSE BY INDIVIDUALS POSSESSING ADEQUATE BACK-GROUNDS OF ELECTRICAL AND MECHANICAL EXPERI-ENCE. ANY ATTEMPT TO REPAIR A CENTRAL AIR CONDI-TIONING PRODUCT MAY RESULT IN PERSONAL INJURYAND/OR PROPERTY DAMAGE• THE MANUFACTURER ORSELLER CANNOT BE RESPONSIBLE FOR THE INTERPRE-TATION OF THIS INFORMATION, NOR CAN IT ASSUMELIABILITY IN CONNECTION WITH ITS USE.IMPORTANT: RECONNECT ALL GROUNDING DEVICES•ALL PARTS OF THIS PRODUCT CAPABLE OF CONDUCTINGELECTRICAL CURRENT ARE GROUNDED• IF GROUNDINGWIRES, SCREWS, STRAPS, CLIPS, NUTS OR WASHERSUSED TO COMPLETE A PATH TO GROUND ARE REMOVEDFOR SERVICE, THEY MUST BE RETURNED TOTHEIR ORIGI-NAL POSITION AND PROPERLY FASTENED•IMPORTANT: ALL POWER LEGS MAY NOT BE BROKEN BYCONTACTORS. SEE WIRING DIAGRAM ON UNIT CONTROLBOX COVER•BEFORE STARTING THE COMPRESSOR, THE CRANKCASEHEATER SHOULD BE ENERGIZED FOR EIGHT HOURS•Read this manual carefully before attempting to install, operate, orperform maintenance on this unit. Installation and maintenanceshould be performed by qualified service technicians only.NOTE: "Warnings" and "Cautions" appear at appropriateplaces in this manual Your personal safety and the properoperation of this air conditioning product require thatyou followthem carefully. The manufacturer assumes no liability forinstallations or servicing performed by unquafified personnel.INSPECTION1. Check for damage after the unit is unloaded• Report promptly,to the carrier, any damage found to the unit. Do not drop the unit.IMPORTANT: The use of "spreader bars" is required when ihoisting the unit (to prevent damage to sides and top). 12. Check the unit's nameplate to determine if the unit is correct forthe intended application• The power supply must be adequatefor both the unit and all accessories•3• Check to be sure the refrigerant charge has been retained duringshipment• Access to 1/4" flare pressure taps may be gained byremoving the furnace compartment access panel•TYPICAL ROOFTOP INSTALLATION WITH FULL PERIMETER CURBS(TCP024-036F Models on BAYCURB030,038).FIELD SUPPLIEDSUPPORTSAT EACH ENDOFCURBFIELD SUPPLIEDCANT STRIPFIELD SUPPLIEDRIGIDINSULATIONSUPPLY AIR _ RETURN AiRDUCT _ DUCTROOFMOUNTINGCURBPage 2

Navigation menu